Loading...
HomeMy WebLinkAboutCapital Improvement Program Budget FY 2016-2021    Otay Water District Capital Improvement Program Budget Fiscal Year 2016-2021 BOARD OF DIRECTORS Jose Lopez, Division 4 President Mitchell Thompson, Division 2 Vice President Mark Robak, Division 5 Treasurer Tim Smith, Division 1 Gary Croucher, Division 3 MANAGEMENT TEAM Mark Watton General Manager German Alvarez Assistant General Manager Joseph R. Beachem Chief Financial Officer Geoff Stevens Chief Information Officer Adolfo Segura Assistant Chief, Administrative Services and IT Pedro Porras Chief, Water Operations Jose Martinez Assistant Chief, Water Operations Rod Posada Chief, Engineering Table of Contents Page LETTER OF TRANSMITTAL ii GENERAL INFORMATION CIP Budget Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 At-A-Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Awards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Strategic Performance Management Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Current Economic Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 The Future . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Demographics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Organization Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 CIP Budget Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 CIP Budget Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Resolution No. 4290 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 CAPITAL BUDGET SUMMARY Capital Improvement Program Narrative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Major CIP Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 CIP Projects in Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 CIP Reserve Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 CIP Funding Source and Category . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 CIP Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 CIP Justification and Impact on Operating Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 CIP Project Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Capital Purchases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 CIP PROJECTS CIP Project Sheet Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 CIP Project Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Capital Facility Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 Replacement/Renewal Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123 Capital Purchase Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215 Developer Reimbursement Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223 APPENDIX Annual CIP Development Policy No. 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 225 Water Meter Capacity Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226 Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 227 List of Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 230 Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 231 i September 24, 2015 Honorable Board of Directors Otay Water District I am pleased to present the Otay Water District’s Adopted Operating and Capital Budget for Fiscal Year 2016. The budget supports the District’s updated FY 2015-2018 Strategic Plan as well as the financing of all of the District’s services, programs, and capital needs during the 2016 fiscal year. With a balanced budget and the Strategic Plan in place, the District is well- positioned for continued success in the ensuing years. The coming years will continue to pose considerable challenges for those in California’s water community. The state is facing its fourth straight year of a record drought and despite extensive local efforts to develop more reliable water, Governor Jerry Brown and the State Water Resources Control Board (SWRCB) have ordered mandatory cuts in potable water use across California and set a statewide conservation goal of 25 percent. To reduce potable water use by 25 percent statewide, the regulations adopted by the SWRCB place each urban water supplier into one of eight tiers which are assigned a conservation standard ranging from 4 percent to 36 percent. Under the SWRCB order, customers of the Otay Water District must reduce water use by 20 percent over the next nine months. This order came despite Otay customers having reduced water use 27 percent since 2007. Each month, the SWRCB will compare every urban water suppliers’ water use with their use for the same month in 2013 to determine if they are on track for meeting their conservation standard. Agencies that consistently fail to meet the conservation standard could be fined as much as $10,000 per day. The order was also imposed without regard to San Diego County having 97 percent of the water supply it needs to meet customer demand this year, despite four years of record drought. San Diego County, including Otay Water District customers by virtue of being a member of the San Diego County Water Authority (CWA), have expended more than $3.1 billion over the last decade to create a more reliable water supply network that has shielded ii customers from the most severe of the drought’s impacts. Water supplies in the San Diego region will improve even more as the western hemisphere’s largest desalination plant comes online in a matter of months. As the conservation mandates went into effect, sales decreased 27 percent in May and 26 percent in June, 2015. The District expects sales to recover somewhat in FY 2016 with the warmer summer months. As one would assume, such dramatic reductions in sales will impact revenues. Staff anticipated moderate reductions in sales and will continue to closely monitor these trends as they relate to overall District finances. The District’s success as an organization through the economic recession, banking crisis, slowdown in the housing industry, and now the severe drought is significantly enhanced by the policies and practices put in place by the Board of Directors to ensure the strength and stability of the District. The management team is fully confident that with these policies and practices, supported by the FY 2015-2018 Strategic Plan, along with a dedicated and talented staff, that we will achieve continued success as an organization and thus, assure the well-being of the people we serve. FY 2015-2018 Strategic Plan The FY 2015-2018 Strategic Plan consisted of a two-phased approach. Phase 1 has been completed with the primary focus on developing key enterprise-wide projects – SCADA, Work Order/Asset Management, and Emergency Preparedness/NIMS. We are now entering Phase 2 of the FY 2015-2018 Strategic Plan where the focus is to build upon the system foundation, business process improvement, and facilities. Where rapid growth had been a significant focus in the early years of the District and in its earlier strategic plans, today we are primarily focused on managing long-term maintenance and replacement of infrastructure. The change is based on the recognition that as an organization matures, fewer resources are needed to support growth; but greater effort is required to maintain and upgrade infrastructure and assets. This is important because in this phase of its lifecycle, an organization derives income more from customer rates and less from developer fees. Therefore, the increased maintenance and replacement costs place increased pressure on customer rates. To balance the customer’s interest in minimizing rate increases while also maintaining an organization’s infrastructure, investments, and a strong financial position; the management team must place greater emphasis on internal efficiency and the iii development of technology assisted best practices. In effect, the organization must use investments in technology to do more with the same or fewer resources. From a water supply perspective, this means determining the optimum mix of water supply, treatment, and delivery solutions for customers. From a daily operating perspective, efficiency improvements have become the primary source of competitive advantage and cost optimization for utilities. A goal included in the District’s past strategic plans is to capitalize on technology investments and utilizing those technologies to continually improve efficiency and productivity. The success of this approach is evidenced by the gains in productivity and by the reduction in staffing the District has experienced. The following charts show that since 2007, the District has reduced staffing by 36.75 full-time equivalent positions, or 21% percent, while the number of customer accounts increased by 2,034. Employee Count and Number of Accounts With increased efficiency and higher employee productivity, the District has been able to continue absorbing some of the pass-through costs from its water suppliers, the City of San Diego, San Diego County Water Authority (CWA), and Metropolitan Water District (MWD). This helps to address customer concerns about rising water rates. Based on an annual survey of water and sewer rates conducted by District staff, Otay continues to be one of the lower cost providers in San Diego County. The District has the 10th lowest water rate out of the 23 member agencies in San Diego County and the 7th 17 4 . 7 5 17 2 . 7 5 16 8 . 7 5 16 6 15 9 15 6 14 8 14 3 14 0 13 8 52,615 54,649 51,500 52,000 52,500 53,000 53,500 54,000 54,500 55,000 0 20 40 60 80 100 120 140 160 180 200 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Em p l o y e e  Co u n t FISCAL YEAR iv lowest sewer rate out of the 28 sewer service providers in San Diego County. The results of the water and sewer surveys are shown on pages 30 and 31, respectively. The chart below shows that since 2007, the wholesale water supply costs have increased 96.2 percent while the District’s retail water rates have increased a lesser 88.2 percent. Wholesale Water Supply Costs vs. District Retail Rate Increases The District currently delivers water service to nearly 49,274 potable and 706 recycled water customer accounts. All of the potable water sold to customers is purchased from CWA. Forty-seven percent of this water is in turn purchased from the region’s primary water importer, MWD. This number has decreased significantly compared to previous years and beginning in FY 2016, 7% will come from seawater desalination. The District has been proactive in reducing its dependence on MWD water treatment facilities. For example, in 2009 the District entered into an agreement with CWA that allowed our neighboring Helix Water District to treat imported water on behalf of the District at their Levy Water Treatment Plant. This has brought regional water treatment closer to our customers, which reduces dependence on water treatment facilities located outside of San Diego County. The District also collects and recycles wastewater from approximately 4,669 homes and businesses. Wastewater is collected and delivered to the Ralph W. Chapman Water Recycling Facility (RWCWRF), which is capable of reclaiming wastewater at a rate of 1.3 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 96.2% 88.2% v million gallons per day. In addition to the Chapman facility, the District continues purchasing up to 6 million gallons per day of recycled water from the City of San Diego’s South Bay Water Reclamation Plant. The use of recycled water for landscape irrigation and industrial processes reduces dependence on imported potable supplies, provides a local supply that is drought proof, and diversifies District resources. Fiscal Year 2016 Operating Budget Summary Otay Water District’s operating expenditures consist of three major sectors: potable water, recycled water, and sewer, budgeted at $89,236,000 for Fiscal Year 2016. Revenues from potable and recycled water are projected to be $78,897,700, approximately $1,888,000 less than the Fiscal Year 2015 budget. Water sales volumes are expected to decrease by 8% compared to FY 2015 budgeted sales due to drought mandates. Sewer revenues are projected to be $3,206,300, approximately $198,600 more than fiscal year 2015. This increase in sewer revenue is due to the final phase-in of the residential sewer rate increases from 2013. The remaining budgeted revenues of $7.1 million come from various special fees, assessments, and miscellaneous income. Significant aspects of the Operating Budget are:  A balanced budget supporting the goals of the Strategic Plan.  The use of an economist to project growth for the region.  An updated six-year Rate Model to ensure sound financial planning and reserve levels.  Ongoing water supply rate increases of 5.8 percent from MWD and CWA due to the high cost of supply programs, higher energy costs, and increasing operating costs.  Implemented rate increases in potable, recycled water, and sewer. This included pass-through rate increases from the City of San Diego, CWA, and the County of San Diego.  In efforts to minimize rate increases, the District has again reduced staffing levels from 140 full-time equivalent positions last year to 138 this year.  Of San Diego County’s 23 water agencies, the Otay Water District’s water rates are below the countywide average. vi Fiscal Year 2016 Capital Improvement Program The Fiscal Year 2015-16 Capital Improvement Program (CIP) Budget consists of 80 projects and a budget of $11.1 million. The budget emphasizes long-term planning for ongoing programs to meet population growth while functioning within fiscal constraints. This year’s CIP budget increased by $500,000 compared to last year’s projection primarily due to an increase in capital purchases for vehicles and the APCD Engine Replacements and Retrofits. Awards and Acknowledgments  The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to Otay Water District, for its annual budget for the fiscal year beginning July 1, 2014. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device.  The Government Finance Officers Association of the United States and Canada (GFOA) also presented a Special Capital Recognition for the Fiscal Year 2014-2015 Budget.  The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Operating Budgeting for Fiscal Year 2014-2015.  The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Capital Budgeting for Fiscal Year 2014-2015.  The Government Finance Officers Association Officers (GFOA) presented Otay Water District the Certificate of Excellence in Financial Reporting for its Comprehensive Annual Financial Report for the Fiscal Year ended June 30, 2014. vii Conclusion The challenges presented this year were met by the Otay Water District’s Board of Directors’ resolve to keep the stability and financial strength of the District as one of its highest priorities. This budget reflects the vision of the Board of Directors of the Otay Water District, its management, and its employees. We will continue to strive to make improvements in our budget processes, including an extensive review and analysis of projections for revenues, expenditures, capital projects, and reserves. I would like to thank the staff involved in this process for the efforts put forth in the preparation of this budget to ensure a successful outcome. To the Board of Directors, we acknowledge and appreciate their continued support and direction in achieving excellence in the financial management and operations of the District. Mark Watton, General Manager viii CIP Budget Guide The District views the Capital Improvement Program (CIP) Budget as an essential tool for proper financial management of the CIP projects. The District manages growth and maintenance of assets through this program. This CIP budget is developed with input from the various project managers throughout the organization and is adopted prior to the start of each fiscal year for the current fiscal year and five subsequent years. It is designed and presented for the general needs of the District, its staff, and citizens. It is a comprehensive and balanced financial plan. This plan features the CIP budget based on demands for services and the impact on the District’s financial status and future plans. The budget book is divided into the following sections. General Information The introductory section contains an overview and general information about the District including the organization chart and awards received. Also included are the budget calendar, a description of the budget process, and the resolution adopting the budget. Capital Budget Summary The Capital Budget Summary consists of an overview of the District’s CIP, including how the Water Resources Master Plan (WRMP) is used to modify the CIP each year based on the latest set of assumptions and criteria. Also included are highlights of the major CIP projects that are completed, in construction, or in design. Additionally, this section contains a review of the CIP reserve funds and funding sources, a six-year listing of CIP project expenditures, project justification and impact on the Operating Budget, project schedules, and the capital purchases budget. CIP Projects This section contains the project sheet description and project sheets for each CIP project. These sheets are developed by the project manager and contain critical information for the management of these projects. The projects are divided into four categories: Capital Facility Projects, Replacement/Renewal Projects, Capital Purchase Projects, and Developer Reimbursement Projects. Appendix The last section consists of the Water Meter Capacity Fee Schedule, a Glossary of budget and financial terms, a List of Acronyms used in this budget book, and an Index. 1 At-A-Glance Mission Statement To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner. History The Otay Water District was formed in 1956 to serve as a public water and sewer agency, authorized as a California special district under the provisions of the Municipal Water District Act of 1911. The District’s ordinances, policies, taxes, and rates for service are set by five Directors elected by voters in their respective geographic area. The District joined the San Diego County Water Authority (CWA) in September 1956 to acquire the right to purchase and distribute imported water throughout its service area. The District is also responsible for the collection, treatment, and disposal of wastewater from a portion of the northern region of the District. In 1980, the District started operation of the Ralph W. Chapman Water Recycling Facility (RWCWRF) and in May, 2007 a new source of recycled water from the City of San Diego was obtained, allowing the Otay Water District to supply 11.4% of total water demand with recycled water. Service Area The District's boundaries encompass an area of approximately 125 square miles in San Diego County, lying immediately east of the City of San Diego metropolitan area and running from the City of El Cajon south to the international border, abutting the cities of El Cajon and La Mesa and encompassing most of the City of Chula Vista and a small portion of the City of San Diego. Organizational Structure The General Manager reports directly to the Board of Directors. The Assistant General Manager along with District management oversees day-to-day operations. The Assistant General Manager oversees the five departments of Administrative Services; Finance; Information Technology and Strategic Planning; Water Operations; and Engineering. These and other lines of reporting are shown on the organization chart on page 16. 2 General Information For Fiscal Year 2016, the District will have a staff of 138 full-time equivalent employees under the leadership of the General Manager. The District provides water service to approximately 52% of its expected ultimate deliveries with a population of more than 217,000 people. This percentage increases as the District's service area continues to grow to ultimate build-out. The District is projected to deliver approximately 27,000 acre-feet of potable water to 49,500 potable customer accounts. By 2035, deliveries are expected to reach 48,400 acre-feet of potable water to serve 285,000 people or 69,000 accounts. The growth rate, as projected by the San Diego Association of Governments (SANDAG), for the City of Chula Vista, is approximately .96% per year over the next decade. Using historical data and considering current economic conditions, staff has moderated this projection to a growth rate of 0.33% for Fiscal Year 2016. Since 1956, the District has provided high quality water to a semi-arid region of the southeastern San Diego County. In 1971 the District constructed a small collection and treatment plant for sewer in the northern section of the District, and in 1980 the District opened the Ralph W. Chapman Water Recycling Facility (RWCWRF). For over 50 years, the available supply of water has helped transform the District service area from a mostly scrub and cactus covered backcountry into a balance of diverse environments. Recycled water from the RWCWRF is used to irrigate golf courses, schools, public parks, roadway landscapes, and various other approved uses in eastern Chula Vista. The RWCWRF is capable of recycling wastewater at a rate of 1.3 million gallons per day (1,200 acre-feet per year). The District is also in partnership with the City of San Diego to beneficially reuse an additional 2,906 acre-feet per year of recycled water for fiscal year 2016, and ultimately up to 6,720 acre-feet per year. The District continues to be the largest retail provider of recycled water in the County of San Diego. The District also owns and operates a wastewater collection system providing public sewer service to approximately 4,670 customer accounts within the Jamacha drainage basin. The sewer service area covers approximately 8,797 acres, which is about 11% of the District’s total service area. Residential customers comprise 97% of the sewer customer base. 1. Carlsbad Municipal Water District 2. City of Del Mar 3. City of Escondido 4. Fallbrook Public Utility District 5. Helix Water District 6. City of National City 7. City of Oceanside 8. Olivenhain Municipal Water District 9. Otay Water District 10. Padre Dam Municipal Water District 11. Camp Pendleton Marine Corps Base 12. City of Poway 13. Rainbow Municipal Water District 14. Ramona Municipal Water District 15. Rincon del Diablo Municipal Water District 16. City of San Diego 17. San Dieguito Water District 18. Santa Fe Irrigation District 19. South Bay Irrigation District 20. Vallecitos Water District 21. Valley Center Municipal Water District 22. Vista Irrigation District 23. Yuima Municipal Water District 24. Lakeside Water District San Diego County Water Agencies 3 Distinguished Budget Presentation Award The Government Finance Officers Association (GFOA) presented a Distinguished Budget Presentation Award to the District for its annual budget for the fiscal year 2014-2015. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device. This award is valid for a period of one year only. We believe our current budget continues to conform to program requirements, and we are submitting it to GFOA to determine its eligibility for another award. This year the District also received a Special Capital Recognition from GFOA for its Fiscal Year 2014-2015 Budget. 4 Financial Awards The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Operating Budgeting for Fiscal Year 2014-2015. The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Capital Budgeting for Fiscal Year 2014-2015. 5 Financial Awards The Government Finance Officers Association Officers (GFOA) presented Otay Water District the Certificate of Excellence in Financial Reporting for its Comprehensive Annual Financial Report for the Fiscal Year ended June 30, 2014. 6 Award The Construction Management Association of America (CMAA) presented the Otay Water District with the 2015 Distinguished Owner Honoree Award. 7 Strategic Performance Management Plan Introduction The Strategic Plan is the core document which guides the District’s efforts to meet and positively adapt to change. The overall plan is extensively reviewed and revised every three to four years. This current edition (covering fiscal years 2015-2018) is the fifth in a series of updated plans. In order to develop the FY 2015-2018 Strategic Plan, the Senior Management Team carefully reviewed the previous strategic plans and, in an interactive environment, examined future opportunities and risks. After careful analysis, an overall direction is set for the plan. In 2015 a solid systems foundation was put in place completing a replacement work order and SCADA system, and improving the core GIS system for managing the District’s infrastructure. The FY 2016 to 2018 objectives, which follow, build upon this foundation and focus on business process improvement and facilities. The General Manager presented the plan to the Board on May 19, 2015 as part of the overall District Budget. With this plan, the Board is able to make more informed oversight decisions about the utility’s direction, and assess performance. 8 Strategic Performance Management Plan Mission To provide high quality and reliable water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient manner. Vision A District that is innovative in providing water services at affordable rates, with a reputation for outstanding customer service. Key Challenge Our key challenge, as District staff, is to quantify and demonstrate our commitment and the ability to optimize our resources, business processes, and technology to achieve the strategic plan goals. We, as a team, commit to regularly assess and document how our decisions and work practices accomplish our goals and objectives. Balanced Scorecard Goals 9 Strategic Performance Management Plan FY 2016 – 2018 Objectives  Optimize SCADA Program.  Optimize Asset Management Program.  Address Dependency on Imported Water through Proper Planning.  Improve District Emergency Response Program.  Enhance Communication with Customers.  Enhance Cost Benefit Analysis.  Utilize Power and Fuel Effectively.  Optimize Inventory Management.  Evaluate City of San Diego Pure Water Program Planning/Implementation.  Evaluate and Enhance the District's Water Conservation Programs and Services.  Manage an Effective Leak Detection and Repair Program.  Enhance District's Facilities Physical Security.  Improve and Streamline Meter Related Work Processes.  Evaluate Sewer System Business.  Evaluate Efficiencies for Delivering Capital Assets.  Guarantee Adequate Maintenance of all District’s Pressure Vessels.  In Conjunction with the City of San Diego, Manage the Infrastructure for a more Efficient Transmission of Recycled Water.  Evaluate the Viability of Implementing an Indirect Potable Reuse Program.  Strengthen Internal Audit Program.  Evaluate Opportunities to Combine or Transfer Similar Work Functions.  Optimize GPS/GIS Technology. 10 Strategic Performance Management Plan  Evaluate Eden's Self-service Option with HR Module.  Streamline Procurement and Contractor On-boarding Process via Web-based eProcurement Technology.  Evaluate Current and New CIS Systems.  Streamline Enterprise Confined Space Program.  Streamline Operations Work Processes.  Streamline Data Input in Reporting for Field Services.  Streamline Work Processes in Four Strategic Areas Including Departmental Synergies, Technology, Procurements, and Alignment of Business Practices.  Evaluate Two-Way Emergency Radio Replacement.  Revise Business Practices by Modifying the Master Recycled Water Permit.  Implement a Habitat Conservation Plan that will Streamline O&M within District Easements.  Negotiate a New Successor MOU for Represented Employees for FY 2017 and Related Compensation and Benefits for Unrepresented Employees.  Succession Planning. 11 Current Economic Conditions The District services the needs of a growing population by purchasing water from the San Diego County Water Authority (CWA). The CWA purchases its water from the Metropolitan Water District of Southern California (MWD) and the Imperial Irrigation District (IID). The District takes delivery of the water through several connections of large diameter pipelines owned and operated by CWA. The District currently receives treated water from CWA and from Helix Water District (HWD) by contract with CWA. In addition to the treated water deliveries from CWA, the District has several emergency agreements with the City of San Diego, Helix Water District, and Sweetwater Authority that allows agencies to have flexibility to deal with emergency shutdowns. Through innovative agreements like these, benefits can be achieved by both parties by using excess capacity of another agency and diversifying local supply, thereby increasing reliability. For several decades, the District has collected and recycled wastewater generated within the Jamacha drainage basin and pumped the recycled water south to the Salt Creek basin where it is used for irrigation and other non-potable uses. However, the demand for recycled water out-paced the supply, requiring the District to supplement the limited supply of recycled water with potable water. Through the agreement with the City of San Diego, the District has discontinued supplementing its recycled demand with potable water. Once again, this decreases the demand on potable water and increases reliability of the District’s supply. The District’s sewer service area is growing at a slow but steady rate of approximately 0.2% each year. Most of this growth is from small development projects or homeowners converting their septic system to sewer because of environmental issues. The District’s water service area was one of the fastest growing regions in the nation. During the past decade, the population of the service area has nearly doubled. It is estimated that the District is currently serving approximately 217,000 residents. The local and national recovery from the global recession of 2009 has been slow; however, due to San Diego County’s diverse economy, it is forecasted to do better than most of the nation. Over the past 12 years, the District has added more than 7,291 new customer connections, with 2,189 occurring in Fiscal Year 2004. In Fiscal Year 2015, the District sold 139 meters which is an average of 12 meters per month. 12 The Future The District continues to use the challenges presented by growth to create new opportunities and new organizational efficiencies. By utilizing and continuing to refine its Strategic Business Plan, it has captured the Board of Director’s vision and united its staff in a common mission. The organization has achieved a number of significant accomplishments based on its successful adherence to its Strategic Business Plan. The District is not only poised to continue successfully providing an affordable, safe, and reliable water supply for the people of its service area, but is set to reap the rewards of greater efficiencies and economies of scale. Future Development As in the previous fiscal year, the District employed an economist to provide an Economic Outlook of the national economy, San Diego County’s economy, the future of south San Diego County, and an overview of the Otay Water District. Projections of future development indicate that the ratio of multi-family units will increase because the remaining land is zoned for multi-family development. Projected Units for Sale and Rental Otay Water District Service Area FY 2016 through FY 2021 Project FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 Total Total Single-Family Units 149 288 375 618 780 805 3,015 Total Condominium 297 202 482 715 780 688 3,164 Total Rental 150 475 885 692 757 714 3,673 Total Units 596 965 1,742 2,025 2,317 2,207 9,852 % Multi-Family 75% 70% 78% 69% 66% 64% 69% Source: The London Group Realty Advisors, March 2015 Using the economist report, the District’s engineering staff projects that over the next six years the District will sell another 3,207 meters which translates to 4,676 equivalent dwelling units (EDUs). Projected Meter Sales in EDUs 0 200 400 600 800 1000 1200 1400 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 13 The Future San Diego County Water Supply San Diego County imports about 90 percent of its water from the Colorado River and Northern California. Since these sources face legal and environmental constraints, the region has been exploring other ways to ensure an adequate water supply, including increased water recycling, more aggressive conservation programs, increased water storage, groundwater desalination, and seawater desalination. Carlsbad Desalination Project The District’s water wholesaler, the San Diego County Water Authority, voted on November 29, 2012, to approve a water purchase agreement with Poseidon Resources Corporation (Poseidon). Under the water purchase agreement, the County Water Authority will purchase 48,000 to 56,000 acre-feet of water annually from the desalination plant located in Carlsbad, California. The plant is expected to produce up to 54 million gallons of water a day beginning in the fall of 2015 and will generate enough water to serve about 112,000 families and meet 7 to 10 percent of the region’s demand. The total price for the desalinated water, including related upgrades to the County Water Authority’s pipelines and treatment plant, is projected to start between $2,014 and $2,257 per acre-foot (in 2012 dollars). An acre-foot is approximately 325,900 gallons, or enough to supply two typical single-family households of four for a year. Rosarito Desalination and the Otay Mesa Conveyance and Disinfection System Projects The Rosarito Desalination Project is comprised of a 100 million gallons per day seawater reverse osmosis desalination plant, together with a pump station and pipeline, to convey water to Tijuana and to the District. This would be the first cross- border water supply project of its kind and requires public messaging to inform key stakeholders and the public of the significance of the Project. If successful, this Project may start delivering water to District customers by early 2020. The Project includes the construction of facilities on the U.S. side to include a large diameter pipeline 3.5 miles long, a pump station, a disinfection facility and the use of the Roll Reservoir in Otay Mesa. Rosarito Desalination Project rendering 14 Demographics The District boundaries shown in the map encompass an area of approximately 125.5 square miles in San Diego County, located immediately east of the City of San Diego metropolitan area and running from the City of El Cajon south to the international border. SANDAG creates and maintains a tremendous quantity of demographic, economic, land use, transportation, and criminal justice information about the San Diego region. The demographic data include population characteristics such as age, education, and employment. The following demographic data was provided by The London Group Realty Advisors, which summarizes the sub regional areas of Sweetwater, South Bay and Jamul. Demographics of the Otay Water District The population of the Otay Water District has grown from 114,937 in 1980 to 243,916 in 2010. This represents a 149.1% increase over the past 30 years. The average persons per household was 3.32 in 2010. SANDAG reports the City of Chula Vista’s ethnic/racial makeup with 58% Hispanic, 20% white, 14% Asian and the remaining population are of other ethnic/racial descent. In a recent economic forecast conducted by The London Group Realty Advisors, the District’s median age is 35.7 and 34.0% of adults have a four-year degree or higher. The average household income is $94,136 and the median household income is $80,805. The London Group Realty Advisors have projected that the housing units in the District’s service area will consist of low density townhomes and multi-plexes. The average residential sales price in South San Diego County was $629,632 in 2014. Otay Water District Demographics Population 243,916 Persons/Household 3.32 Ethnic/Racial makeup Hispanic 58.0% White 20.0% Asian 14.0% Other 8.0% Median Age 35.7 Percentage with 4 year degree or higher 34.0% Average Household Income $ 94,136 Median Household Income $ 80,805 Source: SANDAG, The London Group Realty Advisors, Claritas Demographics 15     Organization Chart District Position Count - (138 Positions) GENERAL MANAGER (5) Assistant General Manager Administrative Services (13) Finance (32) Water Operations (56) Engineering Services (19) Human Resources Purchasing and Facilities Safety and Security Administration Controller and Budgetary Services Treasury and Accounting Services Customer Service IT Applications IT Operations GIS Water System Operations Utility Maintenance/ Construction Engineering Services and Environmental Services Public Services and Field Services Citizens and Customers Information Technology and Strategic Planning (13) BOARD OF DIRECTORS Meter Maintenance 16 CIP Budget Calendar Each year, the Engineering Department prepares budget instructions for distribution to the departments. These instructions give direction and deadlines for each phase of the CIP budgeting process. The CIP Budget Process is explained on pages 18 and 19. January-February March April May-June July–January 1/9/15 Budget workbooks and instructions for the Operating and Capital Budget are distributed to departments 1/9/15-2/25/15 Departments begin CIP Budget Process which includes:  Review existing FY 2015 CIP Projects.  Remove any CIPs that are complete or will not be budgeted in the CIP budget the next six-years.  Estimate the total project-to-date expenditures through 6/30/15 for each CIP.  Adjust the annual amount for the remaining CIPs and include justifications for each year’s changes.  Develop CIP project cost and schedules  Submit new CIP projects to Engineering for consideration. 3/3/15 Engineering Department reviews all CIP budget requests with Assistant General Manager and adjusts, if necessary 3/06/15-3/18/15 Engineering reviews and prepares CIP budget and submits to finance for review and to incorporate into rate model to determine proposed rates 3/30/15 CIP budget presented to the General Manager for review and comments 4/28/15 General Manager performs preliminary review of budget. 5/7/15 Review assumptions and rates with Chiefs, Assistant General Manager, and General Manager 05/19/15 Budget Workshop for FY 2015-2016 Operating and Capital Budgets 06/03/15 Board Meeting – approval of the FY 2016-2021 Capital Improvement Program Budget and the FY 2015- 2016 Operating and Capital Budget 09/02/15 Board approval of water and sewer rate increase notices 10/7/15-10/26/15 Rate increase Message inserted with water and sewer billing 01/01/16 Water and Sewer Rate Increase 17 CIP Budget Process The District has integrated the Capital Improvement Program (CIP) Budget and the Operating Budget. Appropriate budget amounts are determined by using historical data of operations, growth, developers' input, SANDAG projections, and the economic outlook. Additionally, these budgets are developed based on the District's Water Resources Master Plan and the Strategic Business Plan, both long-range planning tools. To assure reliable, high-quality service to the growing customer base, the District has committed to a number of long-range strategies that drive the budgeting process. The strategies and assumptions used to develop the District's integrated budget are:  An average projected long-term growth rate of 1.4%  Pass-through rate increases for costs imposed on the District by the wholesale water providers.  Accurate projection of capital budget needs including replacement needs.  Reserve funding in accordance with the Reserve Policy to meet future growth demands.  Funding of the Strategic Plan initiatives categorized into the Balanced Scorecard perspectives.  Avoidance of rate spikes by leveling rate increases over a six-year period. In January, the Engineering Department (Engineering) issues budget instructions for the CIP budget process. The project manager use the CIP Budget module system to review and estimate project expenditures to the end of the fiscal year. Projects may have been added, deleted or modified due to increased costs, changes in the scope of work, unanticipated events or emergencies. The CIP Budget Process ensures that all projects are reviewed and updated to reflect any changes and are included in the District’s Rate Model and Financial Forecast. Engineering reviews each project budget for accuracy, ensures that projects are categorized into the appropriate project types and funding sources, and then prioritizes projects based on need and timing. Projects are also reviewed to see if any grant funding is available and if so, estimated amounts are included as a funding source to these projects. In March, Engineering compiles the Preliminary CIP Budget and submits the consolidated CIP list to the Assistant General Manager and the General Manager for review and comments. Engineering also updates the five-year projection of CIP expenditures and provides it to the Finance Department (Finance) to incorporate into the District’s Rate Model to determine proposed rates. 18 CIP Budget Process Finance inputs the operating revenues and expenditures, CIP expenditures, reserve funding, and reserve levels into the District’s Rate Model. Inflators for cost and volume changes are input into the Rate Model and cost and rates are calculated for the current fiscal year plus five subsequent years. Using this comprehensive modeling tool, the District is able to smooth future rate increases, determine when debt should be issued, and maintain all of the reserve levels in accordance with its Reserve Policy. In the spring, the District presents the Strategic Plan to the Board of Directors for adoption. This is followed by a special board meeting in May where the District presents the Preliminary Operating and Capital Budget to the Board of Directors for adoption. The adoption of the Strategic Plan and Operating and Capital Budgets on an annual basis gives the District its direction for the following fiscal year. The District is accounted for and budgeted as an enterprise fund and conforms to the guidelines of generally accepted accounting principles (GAAP). The General Manager has the authority to transfer appropriations within the budget allocations or may request that the Board of Directors increase the current budgeted funds. The Operating and Capital Budgets are intended as a financial guide and may be modified by the Board of Directors during the 2016 fiscal year.   Water   and   Sewer  Rates    Strategic  Plan  MWD/CWA &   Sewer Rates  Year End  Balances  Operating  Budget Input  CIP Budget  Input    Assumptions  Interest Rates  Inflation  Growth   Sales   Targets  Debt Coverage Reserve Levels   Rate  Model  Operating  Budget    CIP  Budget  19 20 21 Capital Improvement Program The District provides water service to a population of approximately 217,000 which is expected to ultimately increase to 308,000 by the year 2050. This growth as well as the maintenance of existing assets requires long-term capital planning. The process is dynamic, due to the evolving needs of the community, the water supply issues, and changing regulations. As such, capital planning is part of the District’s overall strategic planning. The capital planning process involves identifying current needs, future needs, and prioritizing them based on certain operating assumptions. The primary objective of this planning effort is to support an orderly and efficient program of expansion, new water supply, replacement, and betterment, while maintaining a stable long-range financial plan. To accommodate growth requires that the District invest $283 million in capital assets through ultimate build-out. The Fiscal Year 2016 Capital Budget is $11.1 million and the six-year Capital Improvement Program (CIP) totals $193.9 million. A separate CIP Budget document contains the descriptions, justifications, expenditures, and funding for all the identified projects to ultimate build- out. Assumptions and Criteria The CIP is developed based on the District's Water Resources Master Plan, incorporating historical data, growth, developers' input, SANDAG projections, and long-term economic outlook. The Water Resources Master Plan was built using several major assumptions and design criteria as follows: 1. Utilizing historical water demands for each land use type in the District to calculate future demands. 2. Using maximum day peaking factors that vary with demand level. 3. Utilizing land use as planned by the City of Chula Vista. 4. Providing ten days of emergency water supply through a maximum of five days in covered reservoirs and a minimum of five days from interconnections with adjacent agencies. 5. Inclusion of emergency operational storage to meet the five-day covered storage requirement into the ten-day outage supply requirement. CIP Justification and Impact on Operating Budget The justification for each project is determined by whether it is required due to growth (Expansion), new water sources (New Supply), improvements or upgrades (Betterment), or to replace an existing asset (Replacement). As these projects are completed and placed into service, there may be an impact on the Operating Budget by increasing costs in the areas of maintenance, energy, or chemicals as shown on the justification and impact pages in this section. 22 Capital Improvement Program Capital Purchases and Facilities All capital expenditures are in the CIP. This includes capital facilities and capital purchases. Capital purchases are non-recurring operating expenditures for assets that cost more than $10,000 each and have an estimated useful life of two years or more. The Capital Purchase Projects include Vehicles, Office Equipment, Furniture, and Field Equipment purchases. The details of these purchases can be found on page 40. Capital Facility Projects are items that exceed $10,000 or $20,000 for infrastructure related items (as defined under Capital Equipment on page 228 of the Glossary) and have a useful life of at least two years. The CIP projects are identified and are prioritized based on the following criteria: 1. Safety, restoration of service, immediate obligation, Board directed, or critical system need. 2. System upgrades or requirements to maintain system reliability in the next few fiscal years. 3. Need to meet the future growth of the system. 4. Project requirement may be reduced in capacity or may have low probability of need in the future. The following are the four categories of CIP projects: New Water Supply Facilities required to support new sources of water are funded from new supply fees or user rates. Expansion Facilities required to support new or future users are funded from capacity fees or user rates. Betterment Facilities required because of inadequate capacity or new requirements that benefit existing users are funded from availability, betterment fees, or rates. Replacement Facilities required to renew or replace existing facilities that have deteriorated or have exceeded their useful life are funded from user rates. 23 Major CIP Projects Capital Improvement Projects The Fiscal Year 2016 CIP Budget contains 89 projects. The cost of the work planned for 80 of these projects fall within Fiscal Year 2016 and total $11.1 million. Of the 80 projects planned for Fiscal Year 2016, one is designated as a reimbursable project with an estimated cost totaling $1,000. These projects are built by developers and reimbursed by the District. The following shows how the $11.1 million of projects are broken down into four categories: 1. Capital facilities $ 3.1 million 2. Replacement or renewal projects $ 6.9 million 3. Capital purchase projects $ 1.1 million 4. Developer reimbursement projects $ 1.0 thousand The Six-Year CIP and Fiscal Year 2015 Capital Budget are consistent with the District's Water Resources Master Plan, current capacity fees, and the District's strategic financial objectives. 24 CIP Projects in Construction Calavo Basin Sewer Rehabilitation – Phase I (S2033)  Project part of the District’s comprehensive sewer management program.  Project will replace deteriorated or sagging sections of sewer pipe.  Overall Project Budget: $6.00M  Start: January 2015  Estimated Completion: July 2015 Payment Restoration Trench Restoration 25 CIP Projects in Construction 850-3 Reservoir Interior Coating & Upgrades (P2542)  Remove and Replace Deteriorating Reservoir Coatings.  Structural Modifications to Increase Service Life.  $0.53M Budget  Start: May 2015  Estimated Completion: October 2015 Sandblasting Interior Roof Interior Roof Prior to Sandblasting 26 CIP Projects in Construction 944-1, 944-2, & 458-2 Reservoir Interior/Exterior Coating & Upgrades (P2531, P2532, P2535)  Remove and Replace Deteriorating Reservoir Coatings.  Structural Modifications to Increase Service Life.  $1.83M Budget  Start: November 2014  Estimated Completion: October 2015 Scaffolding Removal on the 944-2 Reservoir 27 CIP Projects in Construction 450-1 Disinfection Facility Rehabilitation (R2112)  Remove and Replace Sodium Hypochlorite Tanks and Chemical Feed Pumps.  Construct New Roll-Up Door.  $0.27M Budget  Start: January 2015  Estimated Completion: July 2015 Disinfection Facility – New Roll-Up Door Disinfection Facility – New Chemical Pump Concrete Pad 28 CIP Projects in Construction  Relocate Existing Water Facilities to support SR-11 Construction.  $2.25M Budget  Start: February 2014  Estimated Completion: August 2015 SR-11 Utility Relocations Sequence (P2453) Heat Shrink a Cathodic Protection Sleeve on an Installation for the SR-11 29 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total Beginning Balance 54,032$ 57,795$ 45,100$ 35,643$ 34,298$ 37,881$ 264,749$ Capacity Fees 2,220 4,251 6,323 9,557 11,952 12,864 47,167 Grants 3,714 - - - - - 3,714 Interest 416 507 486 453 503 594 2,958 Temporary Meters 397 399 403 407 413 419 2,439 Availability (Betterment Portion)473 491 510 529 550 571 3,124 New Supply Fee 245 475 715 1,050 1,322 1,418 5,224 COPS 2010B Reimbursement 770 770 770 770 770 770 4,621 Transfer from General Fund 15,549 9,364 10,211 11,491 11,015 10,693 68,323 Interfund Transfers 30 40 47 50 54 58 279 Total Sources 23,814 16,297 19,465 24,307 26,579 27,387 137,849 CIP Projects 11,136 20,085 20,014 16,651 13,997 14,407 96,290 Debt Service 7,780 7,764 7,757 7,840 7,824 7,814 46,779 Developer Services 1,135 1,142 1,151 1,162 1,174 1,187 6,950 Total Uses 20,051 28,991 28,922 25,653 22,995 23,408 150,019 Net Sources (Uses)3,763$ (12,694)$ (9,457)$ (1,345)$ 3,584$ 3,979$ (12,171)$ Ending Balance 57,795$ 45,100$ 35,643$ 34,298$ 37,881$ 41,860$ 252,578$ CIP Reserve Funds, in Thousands ($) The CIP Reserve Funds presentation, shown on the following pages, is designed to provide an understanding of how the funding of CIPs is expected to financially influence the District over the next six years.  The financial impacts are based on CIPs and their funding sources, including fund transfers in accordance with the District’s Reserve Policy, and planned debt issuances. This data is captured in the District’s Rate Model on an annual basis in order to make these projections. The District does not anticipate issuing new water or sewer debt. CIP Reserve Funds $0 $10 $20 $30 $40 $50 $60 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Reserve Fund Balances, in thousands ($) New Supply Expansion Replacement Betterment 30 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total Expansion 479$ 556$ 889$ 1,171$ 367$ 213$ 3,676$ Betterment 2,558 5,271 4,785 4,335 4,852 5,402 27,202 Replacement 7,959 14,118 13,060 8,745 5,578 5,192 54,652 New Supply 140 140 1,280 2,400 3,200 3,600 10,760 Total 11,136$ 20,085$ 20,014$ 16,651$ 13,997$ 14,407$ 96,290$ FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total Capital Facility Projects 3,111$ 9,283$ 12,546$ 10,991$ 10,863$ 10,055$ 56,849$ Replacement/Renewal Projects 6,883 9,948 5,933 3,437 1,832 1,150 29,183 Capital Purchase Projects 1,141 705 535 513 402 532 3,828 Developer Reimbursement Projects 1 29 100 100 20 - 250 Subtotal 11,136 19,965 19,114 15,041 13,117 11,737 90,110 FY 2017 Through FY 2021 Projects - 120 900 1,610 880 2,670 6,180 Total 11,136$ 20,085$ 20,014$ 16,651$ 13,997$ 14,407$ 96,290$ CIP Category CIP Funding Source and Category CIP Funding Source $0 $5 $10 $15 $20 $25 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Six-Year CIP by Funding Source, in thousands ($) Betterment Replacement Expansion New Supply $0 $5 $10 $15 $20 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Six-Year CIP by Category, in thousands ($) Capital Facility Projects Replacement/Renewal Projects Capital Purchase Projects Developer Reimbursement Projects 31 CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total P2040 Res - 1655-1 Reservoir 0.5 MG $ 25 $ 250 $ 900 $ 925 $ 100 $ - $ 2,200 P2083 PS - 870-2 Pump Station Replacement 350 5,000 5,000 3,350 - - 13700 P2267 36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations 50 200 55 - - - 305 P2325 PL-10" to 12" Oversize, 1296 Zone, PB Road-Rolling Hills Hydro PS/PB Bndy 1 20 - - - - 21 P2451 Otay Mesa Desalination Conveyance and Disinfection System 350 350 3,200 6,000 8,000 9,000 26900 P2466 Regional Training Facility 8 6 - - - - 14 P2469 Information Technology Network and Hardware 175 50 - - - - 225 P2470 Financial System Enhancements 100 - - - - - 100 P2486 Asset Management Plan Condition Assessment and Data Acquisition 75 75 28 - - - 178 P2511 Otay Interconnect Pipeline 50 200 200 102 1 1 554 P2537 Operations Yard Property Acquisition Improvements 450 150 15 - - - 615 P2540 Work Order Management System Replacement 60 100 - - - - 160 P2541 624 Pressure Zone PRSs 525 5 - - - - 530 P2547 District Administration Vehicle Charging Stations 1 43 5 - - - 49 P2549 Fuel System Upgrade 30 - - - - - 30 P2551 Blossom Lane Helix WD and Otay WD Interconnection 150 13 - - - - 163 P2552 South Barcelona Helix WD and Otay WD Interconnection 150 20 - - - - 170 P2554 640/340 PRS at Energy Way and Nirvana Avenue 1 1 50 250 75 23 400 P2555 Administration and Operations Parking Lot Improvements 10 50 100 100 100 140 500 P2561 Res - 711-3 Reservoir Cover/Liner Replacement 5 95 1,700 - - - 1800 P2562 Res - 571-1 Reservoir Cover/Liner Replacement 1 9 10 90 2,490 - 2600 P2563 Res - 870-1 Reservoir Cover/Liner Replacement 1 5 5 9 90 890 1000 P2568 Technology Business Processes Improvement 40 75 - - - - 115 P2569 Metro Ethernet Implementation/ District Facilities - Pilot 100 - - - - - 100 P2570 SCADA Equipment & Infrastructure Enhancement - 100 100 100 - - 300 P2571 Datacenter Network Enhancement & Replacement of Infrastructure Componets - - - 100 100 - 200 P2572 Enterprise Resource Planning (ERP) Replacement - - - - - 250 250 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway 5 20 20 - - - 45 R2107 RWCWRF Screening Compactor and Chlorine Injectors Enclosure 7 - - - - - 7 CIP Projects ($1,000s) The 2016 Fiscal Year CIP Budget contains 89 projects. The costs for the work planned for Fiscal Year 2016 is $11.1 million. Of the 80 projects planned for Fiscal Year 2016, one is designated as a reimbursable project with an estimated cost of $1,000. This project is built by a developer and reimbursed by the District. CAPITAL FACILITY PROJECTS 32 CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total R2108 Res - 927-1 Reservoir Cover Replacement $ 10 $ - $ - $ - $ - $ - $ 10 R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications 25 5 92 - - - 122 R2114 Large Recycle Pump Replacement at the RWCWRF 927-1 Pump Station 40 - - - - - 40 R2117 RWCWRF Disinfection System Improvements 110 1,100 1,100 100 - - 2410 R2118 Steele Canyon Sewer PS Chopper Pump 40 - - - - - 40 R2119 Treatment Plant Automation & Security Upgrades 50 50 50 50 - - 200 R2121 Res - 944-1 Reservoir Cover/Liner Replacement 25 1,375 - - - - 1400 R2122 Emergency Recycled Water Fire Hydrant Installations 75 - - - - - 75 S2043 RWCWRF Sludge Handling System 1 1 1 1 1 1 6 38 Total Capital Facility Projects $ 3,096 $ 9,368 $ 12,631 $ 11,177 $ 10,957 $ 10,305 $ 57,534 CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total P2382 Safety and Security Improvements $ 300 $ 250 $ - $ - $ - $ - $ 550 P2453 SR-11 Utility Relocations 5 5 250 250 257 - 767 P2485 SCADA Communication System and Software Replacement 75 35 150 150 150 160 720 P2493 624-2 Reservoir Interior/Exterior Coating 55 50 - - - - 105 P2494 Multiple Species Conservation Plan 87 - - - - - 87 P2495 San Miguel Habitat Management/Mitigation Area 120 120 160 160 180 190 930 P2496 Otay Lakes Road Utility Relocations 20 5 - - - - $25 P2504 Regulatory Site Access Road and Pipeline Relocation 50 365 135 20 - - $570 P2507 East Palomar Street Utility Relocation 25 120 110 - - - $255 P2508 Pipeline Cathodic Protection Replacement Program 150 300 50 47 - - $547 P2515 870-1 Reservoir Paving 15 - - - - - $15 P2518 803-3 Reservoir Interior/Exterior Coating 20 45 - - - - $65 P2519 832-2 Reservoir Interior/Exterior Coating 20 45 25 - - - $90 P2520 Motorola Mobile Radio Upgrade 30 14 - - - - $44 P2529 711-2 Reservoir Interior & Exterior Coating 600 130 25 35 - - $790 P2530 711-1 Reservoir Interior & Exterior Coating 800 200 15 25 - - $1,040 P2531 944-1 Reservoir Interior & Exterior Coating 130 50 35 - - - $215 P2532 944-2 Reservoir Interior & Exterior Coating 50 50 50 - - - $150 P2533 1200-1 Reservoir Interior & Exterior Coating 5 490 35 35 - - $565 P2534 978-1 Reservoir Interior & Exterior Coating - 10 275 5 35 - $325 P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades 115 5 35 - - - $155 P2538 Administration and Operations Building Fire Sprinkler Replacement Program 5 20 18 - - - $43 P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations 100 100 100 40 - - $340 CIP Projects ($1,000s) REPLACEMENT/RENEWAL PROJECTS CAPITAL FACILITY PROJECTS, CONTINUED 33 CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total P2542 850-3 Reservoir Interior Coating $ 230 $ 15 $ 35 $ - $ - $ - $ 280 P2543 850-1 Reservoir Interior/Exterior Coating - 10 515 10 40 - $575 P2544 850-2 Reservoir Interior/Exterior Reservoir Coating 5 5 880 10 40 - $940 P2545 980-1 Reservoir Interior/Exterior Coating 950 445 50 50 - - $1,495 P2546 980-2 Reservoir Interior/Exterior Coating - - 10 1,390 10 40 $1,450 P2550 Fuel Island Upgrade 75 - - - - - $75 P2553 Heritage Road Bridge Replacement and Utility Relocation 10 100 290 645 155 - $1,200 P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project 1 29 65 5 - - $100 P2558 Additional Pump Station Fuel Storage 25 - - - - - $25 P2559 Pressure Vessel Repair and Replacement Program 50 250 - - - - $300 P2564 Administration Carpet Replacement Program 65 75 75 - - - $215 P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades - - - 5 675 45 $725 P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades - - - - 10 1,780 $1,790 P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades - - - - 10 555 $565 R2109 Sweetwater River Wooden Trestle Improvement for the Recycled Water Forcemain 400 10 - - - - $410 R2111 RWCWRF - RAS Pump Replacement 250 - - - - - $250 R2112 450-1 Disinfection Facility Rehabilitation 40 25 - - - - $65 R2116 RecPL - 14-Inch, 927 Zone, Forcemain Assessment and Repair 225 1,000 150 50 - - $1,425 R2120 RWCWRF Filtered Water Storage Tank Improvements 10 245 245 - - - $500 S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement 50 150 150 200 250 300 $1,100 S2024 Campo Road Sewer Main Replacement 500 3,400 1,000 - - - $4,900 S2027 Rancho San Diego Pump Station Rehabilitation 320 1,000 1,000 915 - - $3,235 S2033 Sewer System Rehabilitation 900 800 800 800 800 500 $4,600 46 Total Replacements and Renewal Projects $ 6,883 $ 9,968 $ 6,733 $ 4,847 $ 2,612 $ 3,570 $ 34,613 CAPITAL PURCHASE PROJECTS CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total P2282 Vehicle Capital Purchases $ 556 $ 298 $ 295 $ 327 $ 308 $ 317 $ 2,101 P2285 Office Equipment and Furniture Capital Purchases 15 15 15 14 6 - 65 P2286 Field Equipment Capital Purchases 50 100 83 68 16 105 $422 P2366 APCD Engine Replacements and Retrofits 535 307 157 118 78 110 $1,305 4 Total Capital Purchase $1,156 $720 $550 $527 $408 $532 $3,893 REPLACEMENT/RENEWAL PROJECTS, CONTINUED CIP Projects ($1,000s) 34 DEVELOPER REIMBURSEMENT PROJECTS . CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total P2556 HWY 94 Upsized Utility Relocations at Melody Lane $ 1 $ 29 $ 100 $ 100 $ 20 $ - $ 250 1 Total Reimbursement Projects $1 $29 $100 $100 $20 $0 $250 SUMMARY CIP No Description FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total 80 Total - FY 2016 Projects $11,136 $19,965 $19,114 $15,041 $13,117 $11,737 $90,110 9 Total - FY 2017 through FY 2021 Projects $0 $120 $900 $1,610 $880 $2,670 $6,180 89 Grand Totals $11,136 $20,085 $20,014 $16,651 $13,997 $14,407 $96,290 CIP Projects ($1,000s) 35 CIP #Description Cost Cat. (2) Funding Source (3) FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 TOTAL P2040 Res - 1655-1 Reservoir 0.5 MG M E/B $0 $0 $0 $50 $51 $52 $153 P2451 Otay Mesa Desalination Conveyance and Disinfection System M/E/C N/B - - - 40,000 75,000 115,000 P2466 Regional Training Facility M E/B 1,000 1,000 1,000 1,000 - - 4,000 P2537 .M/E B - 700 725 750 776 800 3,751 P2547 District Administration Vehicle Charging Stations M/E E/B - 700 700 700 700 700 3,500 S2043 RWCWRF Sludge Handling System M/E/C B - - - - 30,000 30,000 1,000 2,400 2,425 2,500 41,527 106,552 156,404 $2,000 $4,800 $4,850 $5,000 $83,054 $213,104 $312,808 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 TOTAL $1,000 $1,200 $1,200 $1,250 $10,252 $20,252 $35,154 - 1,200 1,225 1,250 26,275 66,300 96,250 - - - - 5,000 20,000 25,000 $ 1,000 $ 2,400 $ 2,425 $ 2,500 $ 41,527 $ 106,552 $ 156,404 (1) (2) (3) Projected Incremental Operating Expenditures (1) E - Expansion B - Betterment R - Replacement N - New Supply The following schedule shows anticipated operating costs associated with each project in the CIP. Below is a summary of each category of new costs that will be impacted. No additional revenues are associated with the individual projects, as revenues are linked more directly to growth in water sales and capacity fee revenues. Cost Category Maintenance (M) Energy (E) Chemical (C) Funding Source - Some projects have multiple funding sources as indicated by a slash (/): CIP Justification and Impact on Operating Budget O&M cost for a reservoir: Total annual operating cost divided by the number of million gallons (MG) of storage capacity in the system. This rate per MG is then multiplied by the MG capacity of the new reservoir. Reservoirs require chemical treatment; therefore, the chemical cost per MG is estimated and applied to the future operating cost. Both O&M and chemical costs are increased annually for inflation. Each of the capital purchases and other types of assets has its own unique O&M cost. Cost Category - Indicates maintenance cost (M), energy cost (E), or chemical cost (C), based on the project type and Engineer's estimates. O&M cost for a pump station: Total annual operating cost divided by the number of million of gallons a day (MGD) capacity in the system = O&M cost per MGD. This rate is then multiplied by the MGD capacity of the new pump station. Similarly, power cost per MGD for transmission is calculated and applied to the MGD of the new pump station. Chemical expenses are incurred for pumping at the well sites. All estimated costs are increased annually for inflation. Projected Incremental Operating Expenditures (operating cost) or O&M includes labor, benefits, materials, and overhead. O&M cost for pipes: Total annual operating cost divided by the number of feet of pipe in the system = O&M cost to maintain a foot of pipe. This rate is then multiplied by the number of feet in new pipeline, and is increased annually for inflation. Total Operating Budget Cost Impact 36 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 P2040 Res - 1655-1 Reservoir 0.5 MG 7/1/2015 6/30/2020 P2083 PS - 870-2 Pump Station Replacement 7/1/2013 3/1/2019 P2267 36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations 4/1/2015 6/30/2018 P2325 PL-10" to 12" Oversize, 1296 Zone, PB Road- Rolling Hills Hydro PS/PB Bndy 7/1/2015 6/30/2017 P2451 Otay Mesa Desalination Conveyance and Disinfection System 7/1/2006 6/30/2022 P2466 Regional Training Facility 7/1/2007 6/30/2017 P2469 Information Technology Network and Hardware 7/1/2008 6/30/2017 P2470 Financial System Enhancements 7/1/2008 6/1/2016 P2486 Asset Management Plan Condition Assessment and Data Acquisition 7/1/2009 6/30/2018 P2511 Otay Interconnect Pipeline 7/1/2010 6/30/2025 P2537 Operations Yard Property Acquisition 6/1/2008 6/30/2016 P2540 Work Order Management System Replacement 7/1/2013 6/30/2017 P2541 624 Pressure Zone PRSs 7/1/2013 6/30/2016 P2547 District Administration Vehicle Charging Stations 7/1/2014 6/30/2018 P2549 Fuel System Upgrade 6/1/2015 12/31/2015 P2551 Blossom Lane Helix WD and Otay WD Interconnection 7/1/2014 8/31/2016 P2552 South Barcelona Helix WD and Otay WD Interconnection 7/1/2014 8/31/2016 P2554 640/340 PRS at Energy Way and Nirvana 7/1/2015 6/30/2020 P2555 Administration and Operations Parking Lot Improvements 7/1/2015 6/30/2017 P2561 Res - 711-3 Reservoir Cover/Liner Replacement 7/1/2015 6/30/2018 P2562 Res - 571-1 Reservoir Cover/Liner Replacement 7/1/2015 6/30/2020 P2563 Res - 870-1 Reservoir Cover/Liner Replacement 7/1/2015 6/30/2021 P2568 Technology Business Processes Improvement 7/1/2015 6/30/2017 P2569 Metro Ethernet Implementation/ District Facilities - Pilot 7/1/2015 6/30/2016 P2570 SCADA Equipment & Infrastructure 7/1/2016 6/30/2019 P2571 Datacenter Network Enhancement & Replacement of Infrastructure Componets 7/1/2018 6/30/2020 P2572 Enterprise Resource Planning (ERP) 7/1/2020 6/30/2022 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway 7/1/2001 12/31/2020 R2107 RWCWRF Screening Compactor and Chlorine Injectors Enclosure 7/1/2012 12/31/2015 R2108 Res - 927-1 Reservoir Cover Replacement 7/1/2013 6/30/2016 R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications 7/1/2013 6/30/2018 R2114 Large Recycle Pump Replacement at the RWCWRF 927-1 Pump Station 7/1/2014 6/30/2016 R2117 RWCWRF Disinfection System Improvements 7/1/2015 6/30/2019 R2118 Steele Canyon Sewer PS Chopper Pump 7/1/2015 2/29/2016 R2119 Treatment Plant Automation & Security 7/1/2015 6/30/2019 Planning Design Construction Ongoing CIP Project Schedule FY 2018 FY 2019 FY 2020 FY 2021 CAPITAL FACILITY PROJECTS Finish FY 2016 FY 2017StartCIP Project TitleCIP No 37 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 R2121 Res - 944-1 Reservoir Cover/Liner Replacement 7/1/2015 6/30/2018 R2122 Emergency Recycled Water Fire Hydrant Installations 7/1/2015 6/30/2016 S2043 RWCWRF Sludge Handling System 7/1/2013 6/30/2024 P2382 Safety and Security Improvements 7/1/2002 6/30/2017 P2453 SR-11 Utility Relocations 7/1/2006 6/30/2020 P2485 SCADA Communication System and Software Replacement 7/1/2009 6/30/2021 P2493 624-2 Reservoir Interior/Exterior Coating 7/1/2009 6/30/2017 P2494 Multiple Species Conservation Plan 7/1/2009 6/30/2016 P2495 San Miguel Habitat Management/Mitigation 7/1/2009 6/30/2021 P2496 Otay Lakes Road Utility Relocations 7/1/2009 6/30/2017 P2504 Regulatory Site Access Road and Pipeline Relocation 7/1/2010 6/30/2019 P2507 East Palomar Street Utility Relocation 7/1/2010 6/30/2018 P2508 Pipeline Cathodic Protection Replacement 7/1/2010 6/30/2019 P2515 870-1 Reservoir Paving 7/1/2011 6/30/2016 P2518 803-3 Reservoir Interior/Exterior Coating 7/1/2011 7/31/2016 P2519 832-2 Reservoir Interior/Exterior Coating 7/1/2011 7/31/2016 P2520 Motorola Mobile Radio Upgrade 8/1/2011 6/30/2017 P2529 711-2 Reservoir Interior & Exterior Coating 6/1/2015 8/31/2016 P2530 711-1 Reservoir Interior & Exterior Coating 6/1/2015 8/1/2016 P2531 944-1 Reservoir Interior & Exterior Coating 5/1/2014 11/30/2015 P2532 944-2 Reservoir Interior & Exterior Coating 5/1/2014 11/30/2015 P2533 1200-1 Reservoir Interior & Exterior Coating 6/1/2016 6/30/2019 P2534 978-1 Reservoir Interior & Exterior Coating 6/2/2016 6/30/2019 P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades 6/1/2013 11/30/2015 P2538 Administration and Operations Building Fire Sprinkler Replacement Program 7/1/2013 6/30/2018 P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations 7/1/2013 6/30/2019 P2542 850-3 Reservoir Interior Coating 6/30/2013 11/30/2015 P2543 850-1 Reservoir Interior/Exterior Coating 6/1/2018 6/1/2022 P2544 850-2 Reservoir Interior/Exterior Reservoir 6/1/2018 6/1/2020 P2545 980-1 Reservoir Interior Exterior Coating 1/1/2015 12/31/2016 P2546 980-2 Reservoir Interior/Exterior Coating 7/1/2017 7/31/2020 P2550 Fuel Island Upgrade 6/1/2015 12/31/2015 P2553 Heritage Road Bridge Replacement and Utility Relocation 7/1/2014 6/30/2020 P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project 7/1/2015 6/30/2019 P2558 Additional pump station fuel storage 7/1/2015 6/30/2016 P2559 Pressure Vessel Repair and Replacement 7/1/2015 6/30/2017 P2564 Administration Carpet Replacement Program 7/1/2015 6/30/2018 P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades 1/1/2019 6/30/2020 P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades 1/4/2021 6/30/2022 P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades 1/4/2021 6/30/2022 Planning Design Construction Ongoing CIP Project Schedule CAPITAL FACILITY PROJECTS, continued REPLACEMENT/RENEWAL PROJECTS CIP No CIP Project Title Start Finish FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 38 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 R2109 Sweetwater River Wooden Trestle Improvement for the Recycled Water 6/30/2014 6/30/2016 R2111 RWCWRF - RAS Pump Replacement 7/1/2013 6/30/2016 R2112 450-1 Disinfection Facility Rehabilitation 7/1/2014 6/30/2017 R2116 RecPL - 14-Inch, 927 Zone, Forcemain Assessment and Repair 7/1/2014 6/30/2019 R2120 RWCWRF Filtered Water Storage Tank Improvements 7/1/2015 6/30/2018 S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement 7/1/2003 6/30/2025 S2024 Campo Road Sewer Main Replacement 7/1/2010 6/30/2017 S2027 Rancho San Diego Pump Station Rehabilitation 7/1/2011 6/30/2019 S2033 Sewer System Rehabilitation 7/1/2011 6/30/2021 CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases 12/1/2000 6/30/2021 P2285 Office Equipment and Furniture Capital 7/1/2000 6/30/2019 P2286 Field Equipment Capital Purchases 7/1/1996 6/30/2021 P2366 APCD Engine Replacements and Retrofits 12/1/2000 6/1/2020 DEVELOPER REIMBURSEMENT PROJECTS . P2556 HWY 94 Upsized Utility Relocations at Melody Lane 7/1/2015 6/30/2020 Planning Design Construction Ongoing FY 2017 FY 2018 FY 2020 FY 2021 REPLACEMENT/RENEWAL PROJECTS, continued FY 2016 FY 2019CIP No CIP Project Title Start Finish CIP Project Schedule 39 Item#Amount Office Equipment/Furniture 11 15,000$ Office Equipment/Furniture 15,000$ 15,000 35,000 50,000 11,000 405,000 140,000 556,000 APCD Engine Replacements and Retrofits 14,500 520,000 APCD Engine Replacements and Retrofits 535,000 Grand Total 1,156,000$ P2285 Office 15,000$ P2286 Field 50,000 P2282 Vehicle 556,000 P2366 APCD Engine Replacements and Retrofits 535,000 Grand Total 1,156,000$ Two portable engine driven pumps 19 Valve machine Total of Total of 3 Portable Meter Test Program/hardware 18 Replace truck bed for Unit No. 184 21 One-ton service truck with engine driven Hydraulic air compressor and 20-foot crane. Vehicles Operations Summary by Project Total of Vehicles 9 17 Operations 22 Portable Emissions Analyzer Total of Field Equipment Potable Vactor truck with 15-yard debris body Administrative Services Workstation ergonomics Operations FY 2016 Capital Purchases Capital purchases are non-recurring operating expense items for District-wide use that cost more than $10,000 each and have an estimated useful life of two years or more. The Capital Purchase Projects include Field Equipment, Office Equipment and Furniture, and Vehicle purchases. Description Field Equipment Finance 40 CIP Project Sheet Description The following pages describe each information item on the individual CIP project sheets included in this section. CIP Number: The CIP project number for all projects is assigned by the Engineering Project Manager, and is a unique identifying code on all District records for the specified project. Project Title: Project titles follow a set format as described herein. The type of project should be identified first. For example, if a project were a 711 Pressure Zone 24-inch pipeline, the title would read “PL - 24-Inch, 711 Zone, Location - From A to B.” Pump stations and reservoirs are identified similarly with abbreviations for type and size. Director Division: All projects are located within a Board of Director’s division boundary unless they apply to the entire District or are outside of the District boundaries. The Director division where the majority of the physical project is located is listed. If it is a District-wide project it is listed as “District-wide.” If it is outside the District boundary it is listed as “None.” Project Manager: The person responsible for managing the project from inception through completion. I.D. Location: Most projects are located within one or more improvement districts. The I.D. location listed is where the majority of the physical project is located. However, projects located in portions of the District which have not yet been annexed into an improvement district are listed as “None.” Original Approved Date: The date the project was originally approved with budget expenditures for the corresponding fiscal year by the Board of Directors. Priority: The priority of the project is listed in this field as one of the following: 1. HIGH: Safety, restoration of service to customers, obligation that requires immediate action, directed by the Board of Directors, and/or critical system need. 2. MEDIUM: Upgrade of system or expansion requirement to maintain system reliability not critical. Identified through planning effort as required within next few fiscal years. 3. LOW: Identified through planning effort as required in future years to support development; not anticipated in the immediate future. 4. VERY LOW: Requirement may have low probability of need in the future. Related CIP Projects: A maximum of three CIP project numbers that affect the scheduling and/or is related to the subject project and/or could provide important information. 41 CIP Project Sheet Description Budget Amount: The estimated budget includes all costs needed to complete a project including land, right-of-way, consultants, contractors, District staff time, etc. All prior years’ costs are part of the total cost and dollars are rounded up to the nearest $1,000. Description of Project: A brief description of a project which typically includes size, length, capacity, etc. Justification of Project: A brief explanation of why a project is required which addresses flexibility, reliability, water quality, safety, contractual obligation, immediate growth, etc., as appropriate. Comments: Pertinent information that should be known about a project that is not shown elsewhere on the project sheet, including details of funding sources, including grant funding or contributions from other agencies. Funding Detail: The funding sources are listed along with the percentage of distribution to expansion, betterment, and/or replacement. Expenditure Schedule: The breakdown of a project’s expenditures by fiscal year – prior years’ cost along with a six-year budget schedule. Included in each year are all costs to complete the work scheduled in that year rounded up to the nearest $1,000. Project Schedule: The schedule of the primary project phase and estimated cost by the phases of planning, design, and construction shown with the estimated start date (month/year), finish date (month/year). The schedule time frames and estimated cost for each major phase of the project, correspond with the expenditure schedule information. Project Incremental Operation Expenditures: To determine the cost to maintain these new assets, the District looks at the cost of maintaining similar assets through the Infrastructure Management System and financial system. Costs are tracked by three main infrastructure asset groups of pipes, pump stations, and reservoirs, as well as capital purchases and other types. Pipes typically have only operation and maintenance (O&M) costs associated with them, pump stations have O&M as well as power cost, and reservoirs have O&M and chemical cost. Each of the capital purchases and other types has its own unique O&M cost. See page 27 for a further explanation of these expenditures. Project Location: A vicinity map is drawn in AutoCAD format using the GIS database as the foundation showing the approximate location and limits of a project within the District. Some projects do not have a specific location. In this case, a map of the entire District will then be shown as the project location. 42 CIP Project Sheet Description Thomas Bros. Map: The Thomas Brothers’ map page is inserted in this field to show where the project is primarily located. Some projects do not have a specific location in which case the words “District-wide” will be shown. OWD Map Book: The page in the District’s facility map book where a project is primarily located. Some projects do not have a specific location in which case the words “District-wide” will be shown. Submitted By: The project manager who originally submitted or the project manager who revised the project sheet along with the date of submittal or last revision date of the CIP project sheet. 43 CIP No Description Page P2040 Res - 1655-1 Reservoir 0.5 MG 47 P2083 PS - 870-2 Pump Station Replacement 49 P2267 36-Inch Main Pumpouts & Air/Vacuum Ventilation Installations 51 P2325 PL-10" to 12" Oversize, 1296 Zone, PB Road-Rolling Hills Hydro PS/PB Bndy 53 P2451 Otay Mesa Desalination Conveyance & Disinfection System 55 P2466 Regional Training Facility 57 P2469 Information Technology Network & Hardware 59 P2470 Financial System Enhancements 61 P2486 Asset Management Plan Condition Assessment & Data Acquisition 63 P2511 Otay Interconnect Pipeline 65 P2537 Operations Yard Property Acquisition Improvements 67 P2540 Work Order Management System Replacement 69 P2541 624 Pressure Zone PRSs 71 P2547 District Administration Vehicle Charging Stations 73 P2549 Fuel System Upgrade 75 P2551 Blossom Lane Helix WD & Otay WD Interconnection 77 P2552 South Barcelona Helix WD & Otay WD Interconnection 79 P2554 640/340 PRS at Energy Way & Nirvana Avenue 81 P2555 Administration and Operations Parking Lot Improvements 83 P2561 Res - 711-3 Reservoir Cover/Liner Replacement 85 P2562 Res - 571-1 Reservoir Cover/Liner Replacement 87 P2563 Res - 870-1 Reservoir Cover/Liner Replacement 89 P2568 Technology Business Processes Improvement 91 P2569 Metro Ethernet Implementation/ District Facilities - Pilot 93 P2570 SCADA Equipment & Infrastructure Enhancement 95 P2571 Datacenter Network Enhancement & Replacement of Infrastructure Componets 97 P2572 Enterprise Resource Planning (ERP) Replacement 99 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway 101 R2107 RWCWRF Screening Compactor & Chlorine Injectors Enclosure 103 R2108 Res - 927-1 Reservoir Cover Replacement 105 R2110 RecPS - 944-1 Optimization & Pressure Zone Modifications 107 R2114 Large Recycle Pump Replacement at the RWCWRF 927-1 Pump Station 109 R2117 RWCWRF Disinfection System Improvements 111 R2118 Steele Canyon Sewer PS Chopper Pump 113 R2119 Treatment Plant Automation & Security Upgrades 115 R2121 Res - 944-1 Reservoir Cover/Liner Replacement 117 CAPITAL FACILITY PROJECTS CIP Project Index 44 CIP No Description R2122 Emergency Recycled Water Fire Hydrant Installations 119 S2043 RWCWRF Sludge Handling System 121 38 Total Capital Facility Projects P2382 Safety and Security Improvements 123 P2453 SR-11 Utility Relocations 125 P2485 SCADA Communication System and Software Replacement 167 P2493 624-2 Reservoir Interior/Exterior Coating 129 P2494 Multiple Species Conservation Plan 131 P2495 San Miguel Habitat Management/Mitigation Area 133 P2496 Otay Lakes Road Utility Relocations 135 P2504 Regulatory Site Access Road & Pipeline Relocation 137 P2507 East Palomar Street Utility Relocation 139 P2508 Pipeline Cathodic Protection Replacement Program 141 P2515 870-1 Reservoir Paving 143 P2518 803-3 Reservoir Interior/Exterior Coating 145 P2519 832-2 Reservoir Interior/Exterior Coating 147 P2520 Motorola Mobile Radio Upgrade 149 P2529 711-2 Reservoir Interior & Exterior Coating 151 P2530 711-1 Reservoir Interior & Exterior Coating 153 P2531 944-1 Reservoir Interior & Exterior Coating 155 P2532 944-2 Reservoir Interior & Exterior Coating 157 P2533 1200-1 Reservoir Interior & Exterior Coating 159 P2534 978-1 Reservoir Interior & Exterior Coating 161 P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades 163 P2538 Administration & Operations Building Fire Sprinkler Replacement Program 165 P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations 167 P2542 850-3 Reservoir Interior Coating 169 P2543 850-1 Reservoir Interior/Exterior Coating 171 P2544 850-2 Reservoir Interior/Exterior Reservoir Coating 173 P2545 980-1 Reservoir Interior/Exterior Coating 175 P2546 980-2 Reservoir Interior/Exterior Coating 177 P2550 Fuel Island Upgrade 179 P2553 Heritage Road Bridge Replacement & Utility Relocation 181 P2557 520 Res Recirculation Pipeline Chemical Supply & Analyzer Feed Replacement Project 183 CAPITAL FACILITY PROJECTS, continued REPLACEMENT/RENEWAL PROJECTS CIP Project Index 45 CIP No Description Page P2558 Additional Pump Station Fuel Storage 185 P2559 Pressure Vessel Repair and Replacement Program 187 P2564 Administration Carpet Replacement Program 189 P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades 191 P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades 193 P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades 195 R2109 Sweetwater River Wooden Trestle Improvement for the Recycled Water Forcemain 197 R2111 RWCWRF - RAS Pump Replacement 199 R2112 450-1 Disinfection Facility Rehabilitation 201 R2116 RecPL - 14-Inch, 927 Zone, Forcemain Assessment and Repair 203 R2120 RWCWRF Filtered Water Storage Tank Improvements 205 S2012 San Diego County Sanitation District Outfall & RSD Outfall Replacement 207 S2024 Campo Road Sewer Main Replacement 209 S2027 Rancho San Diego Pump Station Rehabilitation 211 S2033 Sewer System Rehabilitation 213 46 Total Replacements and Renewal Projects CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases 215 P2285 Office Equipment & Furniture Capital Purchases 217 P2286 Field Equipment Capital Purchases 219 P2366 APCD Engine Replacements and Retrofits 221 4 Total Capital Purchase DEVELOPER REIMBURSEMENT PROJECTS P2556 HWY 94 Upsized Utility Relocations at Melody Lane 223 1 Total Reimbursement Projects REPLACEMENT/RENEWAL PROJECTS, continued CIP Project Index 46 P2040Res - 1655-1 Reservoir 0.5 MG Kevin Cameron 8/19/1992 5 22 3 $2,200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Construction of a 0.5 million gallon reservoir and approximately 1,500 feet of 12-inch pipeline to connect to the existing system at Prisilla Drive. These improvements are located within the Rancho Jamul Estates area. JUSTIFICATION OF PROJECT: The project will increase both system reliability, and service capabilities, and provide adequate fire protection for the Rancho Jamul Estates area within the 1655 Pressure Zone. The existing system is currently served with a hydropneumatic pump station. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 50 %0 %0 %0 %50 % Betterment ID 22 0 %50 %0 %0 %50 % TOTAL:50 %50 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $25 $250 $900 $925 $100 $0 $2,200 PRIOR YEARS: TOTAL $0 47 P2040 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2017 6/30/2018 $82 $226 PROJECT PHASE: 7/1/2018 6/30/2020 $1,892 PROJECT LOCATION:OWD Map Book:310 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $50 $51 $52 $153 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 48 P2083PS - 870-2 Pump Station Replacement Jeff Marchioro 5/17/1995 P2451 2 22 1 $15,000,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Construction of a new pump station to replace the existing Low Head and High Head pump stations. JUSTIFICATION OF PROJECT: The two existing pump stations have reached the end of their useful lives. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $350 $5,000 $5,000 $3,350 $0 $0 $15,000 PRIOR YEARS: TOTAL $1,300 49 P2083 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 9/1/2013 9/1/2013 6/30/2016 $700 $970 PROJECT PHASE: 7/1/2016 3/1/2019 $13,330 PROJECT LOCATION:OWD Map Book:055 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 50 P226736-Inch Main Pumpouts and Air/Vacuum Ventilation Installations Jeff Marchioro 6/3/1996 3 22 2 $735,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Installation of ventilation equipment on the existing pumpout and air/vacuum vaults on 36-inch transmission main from the San Diego County Water Authority Otay FCF No. 11 to the Regulatory Site. This project also includes upsizing the existing 2-inch air/vacuum valves to 6-inch. JUSTIFICATION OF PROJECT: The vault openings do not stay in place when refilling because they lack ventilation. By installing vents in these vaults, the lids will stay in place, thus eliminating a safety hazard. Draining and filling the 36-inch main at higher flow rates is required to return the system to service in shorter periods of time. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $200 $55 $0 $0 $0 $735 PRIOR YEARS: TOTAL $430 51 P2267 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 4/1/2015 6/30/2016 $0 $75 PROJECT PHASE: 7/1/2016 6/30/2018 $660 PROJECT LOCATION:OWD Map Book:198 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 52 P2325PL-10" to 12" Oversize, 1296 Zone, PB Road-Rolling Hills Hydro PS/PB Bndy Stephen Beppler 4 22 2 $22,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Construction of approximately 6.900 feet of 12-inch pipeline within the 1296 Pressure Zone, from the Rolling Hills Hydropneumatic Pump Station to the future 1296 Reservoir. A portion of the project will be constructed by the developer and is subject to reimbursement at actual cost for the oversize portion per Board policy. JUSTIFICATION OF PROJECT: The conversion from a hydropneumatic tank system to a reservoir includes the construction of a waterline from the current system to the proposed tank location. Upsizing of the theoretically required 10-inch water main to a 12-inch line will provide the District adequate water movement capabilities for future needs. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $20 $0 $0 $0 $0 $22 PRIOR YEARS: TOTAL $1 53 P2325 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2015 6/30/2016 $1 $1 PROJECT PHASE: 7/1/2016 6/30/2017 $20 PROJECT LOCATION:OWD Map Book:160 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 54 P2451Otay Mesa Desalination Conveyance and Disinfection System Rod Posada 5/23/2006 P2083 2 22 1 $30,000,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The Otay Water District could potentially receive a potable water supply source from the planned Rosarito Desalination Facility via a conveyance system, pumping facilities, and disinfection system. JUSTIFICATION OF PROJECT: The concept could provide for an independent water source to the Otay Water District. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total New Water Supply Fee Projects 0 %0 %0 %40 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:0 %60 %0 %40 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $350 $350 $3,200 $6,000 $8,000 $9,000 $30,000 PRIOR YEARS: TOTAL $3,100 55 P2451 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2006 6/30/2016 7/1/2016 6/30/2018 $3,500 $3,500 PROJECT PHASE: 7/1/2018 6/30/2022 $23,000 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $10,000 $10,000 $20,000 $0 $0 $0 $0 $25,000 $55,000 $80,000 $0 $0 $0 $0 $5,000 $10,000 $15,000 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 56 P2466Regional Training Facility Lisa Coburn-Boyd 5/29/2007 P2504 5 22 1 $300,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The project is the construction of a Regional Training Facility at the Regulatory Site through a partnership with the San Miguel Consolidated Fire Protection District. JUSTIFICATION OF PROJECT: The Otay Water District needs a training center to train staff on trenching, shoring, fire safety, rescue, and confined space. The San Miguel Consolidated Fire Protection District has secured funding for this project and will be the lead agency in the development of the training facility. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 40 %0 %0 %0 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:40 %60 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $8 $6 $0 $0 $0 $0 $300 PRIOR YEARS: TOTAL $286 57 P2466 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2007 6/30/2017 $300 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book:343 2016 2017 2018 2019 2020 2021 Total $1,000 $1,000 $1,000 $1,000 $0 $0 $4,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 58 P2469Information Technology Network and Hardware Michael Kerr 6/23/2008 0 District Wide 1 $1,684,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will continue to upgrade the data center and networks and support operating system and security upgrades. Specific projects include further enhancements to our virtualized server environment, power monitoring equipment and purchase of necessary devices to support operations. Specific projects include: 1 Replacement of end-of-life servers with high capacity server enclosures ($100K).2 Power and data center management and software ($25K). 3 Break-fix replacement for key data center items ($25K).4 Enhancement to District's disaster recovery computing environment ($25K). JUSTIFICATION OF PROJECT: Enhance data center hardware and software to accommodate purchase of new and more efficient services to enhance capacity, reliability, security, and disaster recovery. In addition, these funds will replace legacy end-of-life equipment. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %40 %0 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:0 %60 %40 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $175 $50 $0 $0 $0 $0 $1,684 PRIOR YEARS: TOTAL $1,459 59 P2469 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2008 6/30/2017 $1,684 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015Jolene Fielding 60 P2470Financial System Enhancements Michael Kerr 6/23/2008 0 District Wide 1 $1,765,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Develop enhancements, streamlining, and integration functionality for Eden to include Tyler Cashiering ($40K) and Eden Self-Service Module ($15K). These projects will commence during FY16. The initial cost proposal for the self-service components came in lower than expected, therefore, the total CIP funding will be $55K to cover both projects. Tyler Cashiering – Integration and centralization of payments based on customer payment type, collection process, and single point of entry for data, billing, payment processing, and reporting features. Eden Payroll & Self-Service – Automation of employee self-service information, payroll processing, increase efficiency, on-line access for District users. JUSTIFICATION OF PROJECT: This CIP funds the creation and enhancement and modifications of our existing financial information systems. Each year items which require software and hardware changes and additions to these systems are prioritized, scoped, and funded with this CIP. Funds are used for software development costs, software acquisition costs, consulting services, and associated new hardware. 1) Development with ESRI of GIS for Infrastructure Management ($80K).2) Support for Eden modifications for Work Order, Purchasing, and Billing System Modifications ($50K). COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %60 %0 %60 % Betterment ID 22 0 %40 %0 %0 %40 % TOTAL:0 %40 %60 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $100 $0 $0 $0 $0 $0 $1,765 PRIOR YEARS: TOTAL $1,665 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM 61 P2470 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2008 6/1/2016 $1,765 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 62 P2486Asset Management Plan Condition Assessment and Data Acquisition Ming Zhao 5/21/2009 0 District Wide 1 $1,015,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the development of an integrated Asset Management system. Funds in 2016 will be used to assign the criticality to major facilities and testing of condition assessment methodologies. Implement the Asset Management software - inforMaster. Explored the analytical capabilities to better use asset management information. JUSTIFICATION OF PROJECT: Implementation of an Asset Management Plan is best practice and will provide for a formal means of maintaining, replacing, and funding the existing fixed assets. It is a strategic objective in the existing and new strategic plan. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 40 %0 %0 %0 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:40 %60 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $75 $75 $28 $0 $0 $0 $1,015 PRIOR YEARS: TOTAL $837 63 P2486 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2009 6/30/2018 $1,015 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 64 P2511Otay Interconnect Pipeline Jeff Marchioro 5/17/2010 P2528 3 22 1 $37,300,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will provide for a 30-inch transmission main interconnection and pump station between the North District and South District to transport 10,000 gallons per minute between the two systems in either direction. Also, the system will allow for the ability to transfer water from the Sweetwater Authority Perdue Water Treatment Plant into either the North or South Districts. This project was previously titled "North District - South District Interconnection System." JUSTIFICATION OF PROJECT: The Integrated Water Resources Plan identifies the objective, goals, purpose, and benefits of interconnecting the North and South Districts as well as for the need to diversify water resources for increased reliability. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 40 %0 %0 %0 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:40 %60 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $200 $200 $102 $1 $1 $2,601 PRIOR YEARS: TOTAL $2,047 65 P2511 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2010 6/1/2014 6/1/2013 6/30/2023 $1,250 $2,200 PROJECT PHASE: 7/1/2023 6/30/2025 $33,850 PROJECT LOCATION:OWD Map Book:184 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 66 P2537Operations Yard Property Acquisition Improvements Stephen Beppler 11/13/2008 P2479 4 22 1 $775,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The project will provide site improvements including fencing, grading, and paving for vehicle parking and equipment storage. After the one year warranty has expired, the District's Administration and Operations parking lots will be slurry sealed and restriped. JUSTIFICATION OF PROJECT: The site improvements are required to provide flexibility in operations and for future expansion purposes. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $450 $150 $15 $0 $0 $0 $775 PRIOR YEARS: TOTAL $160 67 P2537 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2008 6/30/2014 7/1/2014 11/30/2015 $25 $135 PROJECT PHASE: 12/1/2015 6/30/2016 $615 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $1 $0 $1 $0 $700 $725 $750 $775 $800 $3,750 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/11/2015Bob Kennedy 68 P2540Work Order Management System Replacement Michael Kerr 0 District Wide 1 $500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Replace existing work order system. JUSTIFICATION OF PROJECT: The work order system will organize and track all activities associated with District assets. As part of the implementation of enterprise asset management, the work order system will adopt a GIS centric architecture and integrate efficiently with other core systems. In addition, it needs to be able to assist in all phases of asset creation, maintenance, replacement, and decommission. The current system is at the end of its useful life and does not have the ability to be modified to meet these needs. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %60 %0 %60 % Betterment ID 22 0 %40 %0 %0 %40 % TOTAL:0 %40 %60 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $60 $100 $0 $0 $0 $0 $500 PRIOR YEARS: TOTAL $340 69 P2540 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2013 6/30/2017 $500 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:4/29/2015Rita Bell 70 P2541624 Pressure Zone PRSs Jeff Marchioro P2434 2 22 1 $750,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will provide two pressure reducing stations feeding the 458 and 485 Pressure Zones from the 624 Pressure Zone (Sequoia & Brandywine 624/458 PRS and Terra Nova Drive 624/485 PRS, respectively). JUSTIFICATION OF PROJECT: This project would upgrade the 485 and 485 Pressure Zones to improve fire flow and enhance system reliability. The 624/485 PRS project will also improve blending and distribution of treated water from the future Rancho Del Rey Groundwater Well (CIP P2434). COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $525 $5 $0 $0 $0 $0 $750 PRIOR YEARS: TOTAL $220 71 P2541 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 6/30/2014 7/1/2014 8/31/2015 $2 $220 PROJECT PHASE: 9/1/2015 6/30/2016 $528 PROJECT LOCATION:OWD Map Book:127 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:7/28/2015Bob Kennedy 72 P2547District Administration Vehicle Charging Stations Stephen Beppler 3 22 1 $60,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Construct four (4) electric vehicle charging stations at the lower Administration parking lot. JUSTIFICATION OF PROJECT: Alternative fueled vehicles are becoming more common, with electric only vehicles making up a significant portion of these. To support the needs of these vehicles and their limited driving range, the District proposes installing vehicle charging stations to allow employees to consider using for their commute. COMMENTS: $1,000 for Permit$14,600 for each Charging Station with dual power docks (2 total)$15,000 Installation$5,000 for Conduit FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 40 %0 %0 %0 %40 % Betterment ID 22 0 %60 %0 %0 %60 % TOTAL:40 %60 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $43 $5 $0 $0 $0 $60 PRIOR YEARS: TOTAL $11 73 P2547 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 6/30/2015 7/1/2015 6/30/2016 $10 $10 PROJECT PHASE: 7/1/2016 6/30/2018 $40 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $200 $200 $200 $200 $200 $1,000 $0 $500 $500 $500 $500 $500 $2,500 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 74 P2549Fuel System Upgrade Kent Payne P2550 3 22 1 $30,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is to upgrade the Districts fuel system, both in the vehicles as well as the fuel island. JUSTIFICATION OF PROJECT: This project will allow any employee to fill a District vehicle with no training. Authorizations and transactions will be done wireless so electrical lines run through the fuel hoses or ground loops will be used and it will also allow Management tighter control on the dispensing of fuel by placing limits on types of fueling and have better reporting features. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $30 $0 $0 $0 $0 $0 $30 PRIOR YEARS: TOTAL $0 75 P2549 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2015 7/31/2015 8/1/2015 9/30/2015 $1 $1 PROJECT PHASE: 10/1/2015 12/31/2015 $28 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 76 P2551Blossom Lane Helix WD and Otay WD Interconnection Stephen Beppler P2552 3 22 2 $200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: To upgrade the meter, vault, telemetry and other interconnection appurtenances to meet current standards. JUSTIFICATION OF PROJECT: To upgrade the existing interconnection to meet current standards. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 1 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $150 $13 $0 $0 $0 $0 $193 PRIOR YEARS: TOTAL $30 77 P2551 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 6/30/2015 7/1/2015 2/28/2016 $5 $25 PROJECT PHASE: 3/1/2016 8/31/2016 $170 PROJECT LOCATION:OWD Map Book:315 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/11/2015Bob Kennedy 78 P2552South Barcelona Helix WD and Otay WD Interconnection Stephen Beppler P2551 3 22 2 $200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: To upgrade the meter, telemetry, vault, and other interconnection appurtenances to current standards. JUSTIFICATION OF PROJECT: To upgrade the existing interconnection to meet current standards. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $150 $20 $0 $0 $0 $0 $200 PRIOR YEARS: TOTAL $30 79 P2552 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 6/30/2015 7/1/2015 2/28/2016 $5 $30 PROJECT PHASE: 3/1/2016 8/31/2016 $165 PROJECT LOCATION:OWD Map Book:317 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/11/2015Bob Kennedy 80 P2554640/340 PRS at Energy Way and Nirvana Avenue Jeff Marchioro P2405 2 22 2 $400,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will provide a pressure reducing station near Energy Way and Nirvana Avenue. The PRS will feed the 340 Pressure Zone from the 640 Pressure Zone. The existing Energy Way pipeline will be converted from the 340 pressure zone to the higher 640 pressure zone with the Village 3 North pipeline interconnection proposed for the intersection of Heritage Road and Energy Way. JUSTIFICATION OF PROJECT: This project would upgrade the 340 pressure to improve fire flow and enhance system reliability. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $1 $50 $250 $75 $23 $400 PRIOR YEARS: TOTAL $0 81 P2554 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2017 7/1/2017 6/30/2018 $20 $75 PROJECT PHASE: 7/1/2018 6/30/2020 $305 PROJECT LOCATION:OWD Map Book:050 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015OTAY\Jeff.Marchioro 82 P2555Administration and Operations Parking Lot Improvements Kevin Cameron 3 22 2 $500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: AC Pavement repairs, slurry seal, re-striping and update area lighting improvements to existing Administration and Operations parking lots. JUSTIFICATION OF PROJECT: Parking lot needs to be re-striped and AC pavement needs to be resealed. Area lighting will be updated to more energy efficient fixtures. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $10 $50 $100 $100 $100 $140 $500 PRIOR YEARS: TOTAL $0 83 P2555 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 12/31/2015 1/1/2016 12/31/2016 $10 $75 PROJECT PHASE: 1/1/2017 6/30/2017 $415 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:7/28/2015Bob Kennedy 84 P2561Res - 711-3 Reservoir Cover/Liner Replacement Jeff Marchioro 5 22/27 2 $1,800,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover and liner with new membrane system. JUSTIFICATION OF PROJECT: The existing membrane floating cover and liner have reached the end of their useful lives and require replacement to meet regulatory requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $95 $1,700 $0 $0 $0 $1,800 PRIOR YEARS: TOTAL $0 85 P2561 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2017 1/1/2017 9/30/2017 $10 $90 PROJECT PHASE: 10/1/2017 6/30/2018 $1,700 PROJECT LOCATION:OWD Map Book:159 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015OTAY\Jeff.Marchioro 86 P2562Res - 571-1 Reservoir Cover/Liner Replacement Jeff Marchioro 2 22 3 $2,600,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover and liner with new membrane system. JUSTIFICATION OF PROJECT: The existing membrane floating cover and liner have reached the end of their useful lives and require replacement to meet regulatory requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $9 $10 $90 $2,490 $0 $2,600 PRIOR YEARS: TOTAL $0 87 P2562 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2019 1/1/2019 9/30/2019 $10 $100 PROJECT PHASE: 10/1/2019 6/30/2020 $2,490 PROJECT LOCATION:OWD Map Book:55 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 88 P2563Res - 870-1 Reservoir Cover/Liner Replacement Jeff Marchioro 2 22 3 $1,000,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover and liner with a new membrane system. JUSTIFICATION OF PROJECT: The existing membrane floating cover and liner have reached the end of their useful lives and require replacement to meet regulatory requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $5 $5 $9 $90 $890 $1,000 PRIOR YEARS: TOTAL $0 89 P2563 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2020 1/1/2020 9/30/2020 $10 $100 PROJECT PHASE: 10/1/2020 6/30/2021 $890 PROJECT LOCATION:OWD Map Book:55 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 90 P2568Technology Business Processes Improvement Michael Kerr 0 District Wide 2 $115,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Business Process Improvement - Advance business processes and operational efficiencies through effective implementation of information technology with assistance from integrated work flow tools, document management solutions and standardization. JUSTIFICATION OF PROJECT: (YR1/YR2) - Redesign of Business Process Reengineering to streamline and/or sustain future demands and growth with existing staff and enterprise integration enhancement. (YR1) - InfoPath Forms - (designing, distributing, and submitting electronic forms) - Near end of life and will soon need to be replaced. Staff will conduct analysis on software replacement. $20,000 (YR1) - Upgrade of the District's back-end Intranet structure (SharePoint) - Near end of life for support and will need to be upgraded with new features to include BI (Business Intelligence) plug-in solution (Dashboard Designer) - $20,000 (YR2) - Enterprise Content Management and Document Management Solution. The District's current content management solution requires adaptation and new features in keeping abreast with current technologies to include content strategies and a standard taxonomy. The current solution also does not integrate well with SharePoint, the District's current Intranet back-end technology solution, and other possible integration solutions. - $75,000 COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $40 $75 $0 $0 $0 $0 $115 PRIOR YEARS: TOTAL $0 91 P2568 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2015 6/30/2017 $115 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015Jolene Fielding 92 P2569Metro Ethernet Implementation/ District Facilities - Pilot Michael Kerr 0 District Wide 2 $100,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Implementation of Metro Ethernet to Otay Water District Facilities. JUSTIFICATION OF PROJECT: The District currently uses Firetide, Inc., as its wireless technology solution to provide data communication to monitor its supervisory control and data acquisition (SCADA) system. The current environment is supported by a third party vendor, Day Wireless. Currently, the District relies on this technology as its main source of information, however, this solution has been inconsistent for the past 12 to 18 months, numerous manhours, extensive troubleshooting, and vendor involvement hve been the key to maintaining the system with a Band-Aid approach. Metro-E technology is cost-effective, consistent, scalable, and also has bandwidth management monitoring, thereby, minimizing staff’s efforts in extensive troubleshooting. The design of the Metro-E solution will provide elevated security and offer continuous availability for the District’s business continuity efforts. Data will be securely transported within a private network that will be accessible by District staff only. This new wired technology will also minimize manhours necessary to support this solution and give the District added value in reliability and sustainability. Other factors in requesting a change in technology in support of SCADA includes, decreased maintenance costs, Quality of Service (QOS), increased utilization, limitation of vulnerabilities, encryption of sensitive data and business continuity. This project will span the course of 1 year with focus on the District's high priority facilities and other facilities necessary for a successful project. This CIP (Pilot) will cover 6 to 7 sites over a span of 1 year to determine future costs necessary for the project. Cost - $100,000 COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $100 $0 $0 $0 $0 $0 $100 PRIOR YEARS: TOTAL $0 93 P2569 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 $0 $0 PROJECT PHASE: 7/1/2015 6/30/2016 $100 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 94 P2570SCADA Equipment & Infrastructure Enhancement Michael Kerr 7/1/2017 0 District Wide 2 $300,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: SCADA Equipment & Infrastructure Enhancement. JUSTIFICATION OF PROJECT: SCADA equipment and infrastructure requires replacement and enhancement to effectively manage the District's operational facilities. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $100 $100 $100 $0 $0 $300 PRIOR YEARS: TOTAL $0 95 P2570 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2016 6/30/2019 $300 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/8/2015Rita Bell 96 P2571Datacenter Network Enhancement & Replacement of Infrastructure Componets Michael Kerr 7/7/2018 0 District Wide 2 $200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Data Center Network Enhancement & Replacement of Infrastructure Components. JUSTIFICATION OF PROJECT: Data center network infrastructure is reaching the end of its service life. This project plans for enhancement and replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $100 $100 $0 $200 PRIOR YEARS: TOTAL $0 97 P2571 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2018 6/30/2020 $200 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 98 P2572Enterprise Resource Planning (ERP) Replacement Micheal Kerr 7/1/2020 0 District Wide 3 $500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Enterprise Resource Planning Replacement. JUSTIFICATION OF PROJECT: Based on preliminary road maps from the current vendor, staff anticipates that the current ERP system, Eden, will become inflexible and constricted with new systems on the horizon. Staff is presently identifying key core business processes in achieving improvements in productivity and quality. Staff also anticipates that the outcome of the workshops will recognize that Eden will lack the necessary functionality, business agility, flexibility, and technology necessary for the District's overall growth. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $250 $250 PRIOR YEARS: TOTAL $0 99 P2572 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2020 6/30/2022 $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 100 R2077RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway Stephen Beppler 5/23/2006 R2048, R2058, R2087 2 22 4 $4,500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Construction of approximately 9,300 feet of 24-inch pipeline within the 860 Pressure Zone in Alta Road from the Alta Gate location to Airway Road. Portions of this project are being built by Developers through reimbursement agreements. The balance of this project will be constructed as part of the Otay Mesa recycled water system. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Mesa and link the planned 860-1 Reservoir with the recycled water transmission system in Otay Mesa. Funding opportunity is the United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. COMMENTS: Temporary moratorium enacted for Otay Mesa recycled water in July 2014, will be revisited in about a year. In the meanwhile, putting a hold on all recycled water projects in Otay Mesa. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $20 $20 $0 $0 $0 $2,850 PRIOR YEARS: TOTAL $2,805 101 R2077 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2001 12/1/2009 1/1/2010 6/30/2019 $164 $451 PROJECT PHASE: 7/1/2019 12/31/2020 $3,885 PROJECT LOCATION:OWD Map Book:39 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 102 R2107RWCWRF Screening Compactor and Chlorine Injectors Enclosure Jake Vaclavek 5/15/2011 3 22 2 $215,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Install screening compactor at the RWCWRF headwork, repair concrete supports at headwork, and construct a 3-sided enclosure around the chlorine injectors at the reclamation plant chlorine contact basin. JUSTIFICATION OF PROJECT: The screening compactor will remove waste material at the headwork to the RWCWRF and compact the material for disposal to a landfill. This will result in reducing the amount of solids discharged back to Metro. The PVC chlorine injectors at the chlorine contact basin at the reclamation plant need to be protected from sunlight. COMMENTS: Added $78,000 to FY15 for purchase and installation of a redundant compactor for reliability. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $7 $0 $0 $0 $0 $0 $215 PRIOR YEARS: TOTAL $208 103 R2107 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2012 12/31/2015 $215 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 104 R2108Res - 927-1 Reservoir Cover Replacement Jeff Marchioro 5 22/27 1 $1,090,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover and liner with a new membrane system. JUSTIFICATION OF PROJECT: The existing membrane floating cover and liner have reached the end of their useful lives and require replacement to meet regulatory requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $10 $0 $0 $0 $0 $0 $1,090 PRIOR YEARS: TOTAL $1,080 105 R2108 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 8/1/2013 7/1/2013 11/6/2013 $5 $75 PROJECT PHASE: 11/6/2013 6/30/2016 $1,010 PROJECT LOCATION:OWD Map Book:172 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015OTAY\Jeff.Marchioro 106 R2110RecPS - 944-1 Optimization and Pressure Zone Modifications Jeff Marchioro R2091 1 22 1 $200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Improve the control strategy to increase pumping capacity and streamline operation of the pump station. As a result of this effort, replacement of 5 service saddles on Clubhouse Drive will need to be replaced with higher pressure class saddles. Add sump pump to an existing pressure reducing station vault located east of the intersection of Otay Lakes Road and Hunte Parkway. JUSTIFICATION OF PROJECT: Revising the control strategy will increase pumping capacity and improve the District's ability to operate the pump station during off-peak hours when electricity rates are low. Retrofitting the PRS vault with a sump pump will prolong the life expectancy of existing pressure reducing station components. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $25 $5 $92 $0 $0 $0 $200 PRIOR YEARS: TOTAL $78 107 R2110 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 10/1/2013 10/1/2013 9/30/2015 $60 $25 PROJECT PHASE: 9/30/2015 6/30/2018 $115 PROJECT LOCATION:OWD Map Book:115 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015OTAY\Jeff.Marchioro 108 R2114Large Recycle Pump Replacement at the RWCWRF 927-1 Pump Station Don Anderson 3 22 1 $120,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Replace large recycle pumps. JUSTIFICATION OF PROJECT: Pumps are old and corroded and have lost efficiency. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $40 $0 $0 $0 $0 $0 $120 PRIOR YEARS: TOTAL $80 109 R2114 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2014 6/30/2016 $120 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 110 R2117RWCWRF Disinfection System Improvements Stephen Beppler 3 22 2 $2,500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The RWCWRF does not have adequate chlorine contact basin volume to meet the San Diego RWQCB requirement for chlorine contact time (CT) for the recycled water produced from this facility, so it subsequently needs to use the 14-inch effluent force main to obtain the required CT. It is believed that the high chlorine dosage needed with this arrangement is adversely impacting the force main, its appurtenances, and the reservoir liners. If CT can be met within the plant, the chlorine residual leaving the plant can be lowered substantially. Alternatives being evaluated include additional contact basin volume, changing to ultraviolet (UV) disinfection and other options. JUSTIFICATION OF PROJECT: The District currently uses the existing 14-Inch CML force main to meet the required chlorine contact time resulting in a higher corrosion rate for facilities on this pipeline. Increasing the size of the chlorine contact basin or switching to another disinfection method at the RWCWRF will extend the useful life of the force main and reservoir liners. COMMENTS: Improvement options include changing to UV disinfection in addition to increasing contact time at the plant. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $110 $1,100 $1,100 $100 $0 $0 $2,500 PRIOR YEARS: TOTAL $90 111 R2117 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 12/31/2015 1/1/2016 12/31/2016 $100 $250 PROJECT PHASE: 1/1/2017 6/30/2019 $2,150 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 112 R2118Steele Canyon Sewer PS Chopper Pump Stephen Beppler 3 18 1 $40,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Installation of a recirculating chopper pump in the Steele Bridge SPS wet well to protect the sewage pumps from assorted debris. The existing pumps have been requiring a high frequency of repairs and replacement of parts due to rags, construction materials, and other non-typical wastewater solids entering the pump station. The new chopper pump is designed to handle these types of materials and will also eliminate the buildup of settled matter within the wet well. JUSTIFICATION OF PROJECT: The new chopper pump will result in few maintenance repairs and extend the life of the sewage pumps. Based upon the current frequency and cost of maintenance of the sewage pumps, the chopper pump addition should pay for itself within a few years. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 18 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $40 $0 $0 $0 $0 $0 $40 PRIOR YEARS: TOTAL $0 113 R2118 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 7/31/2015 8/3/2015 9/30/2015 $2 $5 PROJECT PHASE: 10/1/2015 2/29/2016 $33 PROJECT LOCATION:OWD Map Book:331 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 114 R2119Treatment Plant Automation & Security Upgrades Stephen Beppler 3 22 0 $200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Identify and implement automation improvements at the RWCWRF to decrease operations staffing requirements and enhance the plant security features. JUSTIFICATION OF PROJECT: To reduce long-term operating costs of the Ralph W. Chapman Water Reclamation Facility, the District will implement automation to streamline operator labor requirements. In addition to the ability to monitor the treatment processes, the automation will also include security monitoring to ensure the protection of District facilities as well as ensure that future requirements associated with the on-site storage of chlorine gas are met. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $50 $50 $50 $0 $0 $200 PRIOR YEARS: TOTAL $0 115 R2119 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2016 6/30/2017 $50 $50 PROJECT PHASE: 7/1/2017 6/30/2019 $100 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 116 R2121Res - 944-1 Reservoir Cover/Liner Replacement Jeff Marchioro 5 22 2 $1,400,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover and liner with new membrane system. JUSTIFICATION OF PROJECT: The existing membrane floating cover and liner have reached the end of their useful lives and require replacement to meet regulatory requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $25 $1,375 $0 $0 $0 $0 $1,400 PRIOR YEARS: TOTAL $0 117 R2121 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2016 6/30/2017 $10 $100 PROJECT PHASE: 7/1/2017 6/30/2018 $1,290 PROJECT LOCATION:OWD Map Book:172 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/11/2015Bob Kennedy 118 R2122Emergency Recycled Water Fire Hydrant Installations Kevin Cameron 7/1/2015 0 District Wide 1 $75,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will install 2-3 fire hydrants on the recycled water system for emergency fire suppression. The project includes meeting Title 22 requirements, establishing protocol, and site selection. JUSTIFICATION OF PROJECT: Due to the Governor's mandate to reduce water use, CAL Fire has requested to use recycled water for emergency fire suppression. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $75 $0 $0 $0 $0 $0 $75 PRIOR YEARS: TOTAL $0 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM 119 R2122 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 9/30/2015 10/1/2015 3/31/2016 $15 $15 PROJECT PHASE: 4/1/2016 6/30/2016 $45 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 120 S2043RWCWRF Sludge Handling System Stephen Beppler 5/14/2013 R2096 3 18 3 $1,500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will provide funding for a Sludge Handling System at the RWCWRF to reduce the amount of solids the District sends to Metro. JUSTIFICATION OF PROJECT: The District currently sends all sludge produced at RWCWRF to Metro for treatment. The District's Wastewater Management Plan provided a preliminary estimate of the cost of handling sludge at the RWCWRF that is close to the cost Metro charges the District for treatment of solids. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 18 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $1 $1 $1 $1 $1 $47 PRIOR YEARS: TOTAL $41 121 S2043 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 6/30/2022 7/1/2022 6/30/2023 $75 $200 PROJECT PHASE: 7/1/2023 6/30/2024 $1,225 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $10,000 $10,000 $0 $0 $0 $0 $0 $10,000 $10,000 $0 $0 $0 $0 $0 $10,000 $10,000 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 122 P2382Safety and Security Improvements Oscar Ramirez 6/5/2002 0 District Wide 1 $2,667,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is to improve the security of the Otay Water District facilities by installing and upgrading to current standards the hardware and software required to provide access control, video surveillance, intrusion detection and response. Fiscal Year 2016 will include initiating delivery of the following items: 1.- Operations bldg - installation of: gate, RFID and FOB access to separate and secure Ops/Shop areas from warehouse $50K. Installation of protective gate at shops fuel truck area $20K. 2.-Installation and basic upgrade of District facilities physical security burglar alarm panels to Digital Monitoring Systems (DMP) to ready sites for "ENTRE" enterprise security and access control management software $120K. 3.-Installation of additional outer cameras, lighting, and perimeter beams at shop's yard area $15K. 4.-Video verification systems upgrades from analog cameras to digital + add 1 Network Video Recorder $45K. 5.-Intrusion and physical access entry alarm system installation and integration at District facilities $50K. JUSTIFICATION OF PROJECT: Although existing facilities are relatively safe and secure, the Federal government has recommended that security to water systems be improved. The project is required to fund needed changes and improvements to District facilities. General Fund at 40% expansion and 60% replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %60 %0 %60 % Expansion 40 %0 %0 %0 %40 % TOTAL:40 %0 %60 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $300 $250 $0 $0 $0 $0 $2,667 PRIOR YEARS: TOTAL $2,117 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM 123 P2382 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2002 6/30/2017 9/1/2003 6/30/2017 $62 $231 PROJECT PHASE: 1/1/2004 6/30/2017 $2,374 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/25/2015Rita Bell 124 P2453 SR-11 Utility Relocations Jeff Marchioro 5/23/2006 2 22 1 $2,250,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required due to construction of SR-11 on the Otay Mesa. Facility relocations vary in size from 8-inch to 24-inch. Both the potable and recycled water systems are impacted. JUSTIFICATION OF PROJECT: Caltrans will construct SR-11, which will result in utility conflicts with existing Otay Water District facilities at various locations. In most cases, the Otay Water District does have prior and superior rights. The facilities must be relocated prior to Caltrans construction of SR-11. The cost of the facilities relocations that have prior rights will be reimbursed by Caltrans. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $5 $250 $250 $257 $0 $2,250 PRIOR YEARS: TOTAL $1,483 125 P2453 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2006 6/1/2016 7/1/2009 6/30/2015 $20 $350 PROJECT PHASE: 1/8/2014 6/30/2020 $1,880 PROJECT LOCATION:OWD Map Book:5 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015OTAY\Jeff.Marchioro 126 P2485SCADA Communication System and Software Replacement Adolfo Segura 5/21/2009 0 District Wide 1 $2,014,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will replace the existing SCADA software and radio communication system and install fuel level transmitters on all diesel fuel tanks. A Battery Backup System will be installed at remote SCADA/Radio sites without emergency power generators. Money budgeted in FY 2016 and 2017 is for the replacement of PLC's in the field that will no longer be supported at that time. $40K in FY 16 for the SCADA Roadmap Documentation. JUSTIFICATION OF PROJECT: The vendor will no longer be upgrading or supporting the existing system beginning 2012. The radio equipment needs replacement to allow for increased bandwidth capability to increase security systems functionality. The fuel level transmitters on all diesel fuel tanks and remote SCADA monitoring will provide supervisors with real time fuel levels to monitor available runtime on stand-by engines during extended power outages. The battery backup system will provide continuous communications and SCADA monitoring and control for 3 days if the District lost power at sites without emergency power generators. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $75 $35 $150 $150 $150 $160 $2,014 PRIOR YEARS: TOTAL $1,294 127 P2485 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2009 6/30/2021 $2,014 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:7/9/2015Bob Kennedy 128 P2493624-2 Reservoir Interior/Exterior Coating Kevin Cameron 5/21/2009 4 22 1 $1,675,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 624-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the most recent reservoir assessment report dated August 8, 2008 the 624-2 Reservoir interior coating is in relatively poor condition and is in need of replacement. Based on the FY 2012 Corrosion Report for Reservoir Coatings, the exterior was scheduled to be replaced in FY 2013. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $55 $50 $0 $0 $0 $0 $1,675 PRIOR YEARS: TOTAL $1,570 129 P2493 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2009 8/1/2010 9/1/2010 12/31/2013 $5 $95 PROJECT PHASE: 1/8/2014 6/30/2017 $1,575 PROJECT LOCATION:OWD Map Book:130 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015Jolene Fielding 130 P2494Multiple Species Conservation Plan Lisa Coburn-Boyd 5/21/2009 P2495 0 District Wide 1 $950,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is to provide funding to develop a plan to streamline the environmental permitting processes for the capital improvement program projects to be constructed. JUSTIFICATION OF PROJECT: The project will save time and money when compared to environmental permitting each capital improvement program project individually. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $87 $0 $0 $0 $0 $0 $950 PRIOR YEARS: TOTAL $863 131 P2494 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2009 6/30/2016 $950 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:2/9/2015Lisa Coburn-Boyd 132 P2495San Miguel Habitat Management/Mitigation Area Lisa Coburn-Boyd 5/21/2009 P2494 5 22 1 $2,100,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is to provide funding for the establishment and management of mitigation areas on capital improvement program projects sites and at the San Miguel Habitat Management Area to offset environmental impacts due to construction activities. JUSTIFICATION OF PROJECT: The resource agencies (USFWS, CDFG, etc.) require areas of land to be set aside, established, managed, and maintained in order to mitigate for impacts due to construction activities. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 100 %0 %0 %0 %100 % TOTAL:100 %0 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $120 $120 $160 $160 $180 $190 $2,100 PRIOR YEARS: TOTAL $1,170 133 P2495 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2009 6/30/2021 $2,100 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book:159 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:4/29/2015Rita Bell 134 P2496Otay Lakes Road Utility Relocations Dan Martin 5/21/2009 4 22 1 $325,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required to accommodate the City of Chula Vista road improvement project located along Otay Lakes Road and Telegraph Canyon Road. JUSTIFICATION OF PROJECT: The Otay Water District will be required to relocate all conflicting systems at its own expense for the City of Chula Vista has prior and superior rights. COMMENTS: Work under construction. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $20 $5 $0 $0 $0 $0 $325 PRIOR YEARS: TOTAL $300 135 P2496 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2009 8/1/2009 9/1/2009 12/1/2009 $4 $11 PROJECT PHASE: 1/1/2010 6/30/2017 $310 PROJECT LOCATION:OWD Map Book:113 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 136 P2504Regulatory Site Access Road and Pipeline Relocation Kevin Cameron 5/17/2010 P2466 5 22 1 $900,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Improve the existing access road from the proposed sheriff substation site to the Regulatory Reservoir Site. JUSTIFICATION OF PROJECT: Improving the existing access road will provide for increased safety and all weather permanent access to the Regulatory Reservoir Site. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %50 %0 %50 % Betterment ID 22 0 %50 %0 %0 %50 % TOTAL:0 %50 %50 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $365 $135 $20 $0 $0 $900 PRIOR YEARS: TOTAL $330 137 P2504 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2010 9/1/2010 10/1/2010 12/31/2016 $85 $275 PROJECT PHASE: 1/1/2017 6/30/2019 $540 PROJECT LOCATION:OWD Map Book:331 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/11/2015Bob Kennedy 138 P2507East Palomar Street Utility Relocation Kevin Cameron 5/17/2010 2 22 2 $940,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the necessary utility relocations due to construction improvements to I-805 near East Palomar Street. Both the existing potable and recycled water systems will be impacted. JUSTIFICATION OF PROJECT: Caltrans will be making improvements to I-805 that will result in conflicts with existing pipelines. Project funds reimbursement to Caltrans. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $25 $120 $110 $0 $0 $0 $940 PRIOR YEARS: TOTAL $685 139 P2507 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2010 12/1/2010 1/1/2011 12/1/2012 $5 $245 PROJECT PHASE: 1/1/2013 6/30/2018 $690 PROJECT LOCATION:OWD Map Book:80 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 140 P2508Pipeline Cathodic Protection Replacement Program Jeff Marchioro 5/17/2010 0 District Wide 1 $725,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for the replacement and repairs of existing cathodic protection systems on various pipelines. JUSTIFICATION OF PROJECT: The ongoing cathodic protection program efforts have identified various pipelines for anode replacement, cathodic test station repair, installation of isolation kits, and repair of existing anode beds. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $150 $300 $50 $47 $0 $0 $725 PRIOR YEARS: TOTAL $178 141 P2508 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2010 6/30/2016 7/1/2014 6/30/2016 $50 $100 PROJECT PHASE: 10/1/2014 6/30/2019 $575 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 142 P2515870-1 Reservoir Paving Stephen Beppler 5/16/2011 2 22 2 $510,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for repaving the existing perimeter road around the 870-1 Reservoir and add roadway paving to the reservoir. JUSTIFICATION OF PROJECT: The existing perimeter reservoir roadway is at the end of its useful life and access to the reservoir is limited in the winter months and unsafe. COMMENTS: Project is complete. Warranty work and miscellaneouseous security improvements will be added. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $15 $0 $0 $0 $0 $0 $510 PRIOR YEARS: TOTAL $495 143 P2515 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2011 12/1/2011 1/1/2012 12/31/2014 $50 $75 PROJECT PHASE: 1/1/2015 6/30/2016 $385 PROJECT LOCATION:OWD Map Book:55 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 144 P2518803-3 Reservoir Interior/Exterior Coating Kevin Cameron 5/15/2012 5 22 2 $700,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 803-3 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2010 Cathodic Assessment Report, the 803-3 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: Project is complete. Project to be suspended until warranty inspection in 2016. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $20 $45 $0 $0 $0 $0 $700 PRIOR YEARS: TOTAL $635 145 P2518 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2011 9/1/2012 10/1/2012 12/1/2013 $10 $65 PROJECT PHASE: 1/1/2013 7/31/2016 $625 PROJECT LOCATION:OWD Map Book:370 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 146 P2519 832-2 Reservoir Interior/Exterior Coating Kevin Cameron 5/15/2012 5 22 2 $750,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 832-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2010 Cathodic Assessment Report, the 832-2 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: Project under construction. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $20 $45 $25 $0 $0 $0 $750 PRIOR YEARS: TOTAL $660 147 P2519 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2011 9/1/2012 10/1/2012 12/1/2013 $10 $50 PROJECT PHASE: 1/1/2013 7/31/2016 $690 PROJECT LOCATION:OWD Map Book:332 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 148 P2520Motorola Mobile Radio Upgrade Jose Martinez 5/16/2011 0 District Wide 1 $135,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is for Motorola radio upgrades which involves three components, radio repeater upgrade, portable and base unit upgrades, and vehicle mobile radio upgrades. JUSTIFICATION OF PROJECT: The existing Motorola radio equipment is an essential part of the District's Emergency Response Program. A recent assessment of the radio equipment has determined that the equipment has reached the end of its useful life and needs upgrades. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $30 $14 $0 $0 $0 $0 $135 PRIOR YEARS: TOTAL $91 149 P2520 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 8/1/2011 6/30/2017 $135 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:4/29/2015Rita Bell 150 P2529711-2 Reservoir Interior & Exterior Coating Kevin Cameron P2530 1 22 2 $790,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 711-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 711-2 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $600 $130 $25 $35 $0 $0 $790 PRIOR YEARS: TOTAL $0 151 P2529 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2015 8/31/2015 9/1/2015 12/31/2015 $10 $95 PROJECT PHASE: 1/1/2016 8/31/2016 $685 PROJECT LOCATION:OWD Map Book:131 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 152 P2530711-1 Reservoir Interior & Exterior Coating Kevin Cameron P2529 1 22 2 $1,040,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 711-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 711-1 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $800 $200 $15 $25 $0 $0 $1,040 PRIOR YEARS: TOTAL $0 153 P2530 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2015 8/31/2015 9/1/2015 12/31/2015 $10 $65 PROJECT PHASE: 1/1/2016 8/31/2016 $965 PROJECT LOCATION:OWD Map Book:131 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 154 P2531944-1 Reservoir Interior & Exterior Coating Kevin Cameron P2532 5 22 1 $315,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 944-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 944-1 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $130 $50 $35 $0 $0 $0 $315 PRIOR YEARS: TOTAL $100 155 P2531 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 5/1/2014 6/30/2014 7/1/2014 12/30/2014 $10 $40 PROJECT PHASE: 12/31/2014 11/30/2015 $265 PROJECT LOCATION:OWD Map Book:322 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 156 P2532944-2 Reservoir Interior & Exterior Coating Kevin Cameron P2531 5 22 2 $895,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 944-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 944-2 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $50 $50 $0 $0 $0 $895 PRIOR YEARS: TOTAL $745 157 P2532 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 5/1/2014 6/30/2014 7/1/2014 10/31/2014 $10 $75 PROJECT PHASE: 12/31/2014 11/30/2015 $810 PROJECT LOCATION:OWD Map Book:322 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 158 P25331200-1 Reservoir Interior & Exterior Coating Kevin Cameron 5 22 2 $565,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 1200-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 1200-1 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $490 $35 $35 $0 $0 $565 PRIOR YEARS: TOTAL $0 159 P2533 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2016 9/30/2016 10/1/2016 12/31/2016 $5 $60 PROJECT PHASE: 1/1/2017 6/30/2019 $500 PROJECT LOCATION:OWD Map Book:369 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 160 P2534978-1 Reservoir Interior & Exterior Coating Kevin Cameron 5 22 2 $325,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 978-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 978-1 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $10 $275 $5 $35 $0 $325 PRIOR YEARS: TOTAL $0 161 P2534 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/2/2016 9/30/2016 10/1/2016 12/31/2016 $10 $40 PROJECT PHASE: 1/1/2017 6/30/2019 $275 PROJECT LOCATION:OWD Map Book:378 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 162 P2535458-2 Reservoir Interior & Exterior Coating & Upgrades Kevin Cameron 5/15/2012 2 22 2 $660,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 458-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2011 Cathodic Assessment Report, the 458-2 Reservoir interior coating is in relatively poor condition and is in need of replacement. The exterior coating on the roof is failing and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $115 $5 $35 $0 $0 $0 $660 PRIOR YEARS: TOTAL $505 163 P2535 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2013 9/30/2013 10/1/2013 12/31/2014 $5 $65 PROJECT PHASE: 1/1/2015 11/30/2015 $590 PROJECT LOCATION:OWD Map Book:66 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 164 P2538Administration and Operations Building Fire Sprinkler Replacement Program Kevin Cameron 5 22 1 $110,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: A licensed fire sprinkler designer is required to prepare plans and specifications for the work and obtain all permits and approvals before the project can be competitively bid by contractors. JUSTIFICATION OF PROJECT: Inspections of the Administration building and the Operations building fire sprinkler systems are performed to NFPA-25, California Code of Regulations, Title 19 and Local Fire Department requirements annually. A recent inspection of the fire sprinkler system has identified corrosion throughout the systems as the cause for leaks the District experienced last year and is recommending the replacement of the existing fire sprinkler systems piping. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $20 $18 $0 $0 $0 $110 PRIOR YEARS: TOTAL $67 165 P2538 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 12/1/2012 7/1/2013 7/1/2013 3/1/2014 $0 $40 PROJECT PHASE: 3/1/2014 6/30/2018 $70 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 166 P2539South Bay Bus Rapid Transit (BRT) Utility Relocations Kevin Cameron 1 22/27 1 $940,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required due to construction of South Bay BRT. Facility relocations vary in size and they impact both the potable and recycled water systems. JUSTIFICATION OF PROJECT: Project improvements will affect the locations of some OWD facilities in streets in Chula Vista. Engineering/staff time will be needed to review the design drawings and identify any OWD facilities which will need relocation or vertical adjustment. A construction budget is also needed for the work in relocating and adjusting these facilities. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $100 $100 $100 $40 $0 $0 $940 PRIOR YEARS: TOTAL $600 167 P2539 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 6/30/2014 7/1/2014 4/30/2016 $15 $90 PROJECT PHASE: 5/1/2016 6/30/2019 $835 PROJECT LOCATION:OWD Map Book:80-82, 97-99, 113 & 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 168 P2542850-3 Reservoir Interior Coating Kevin Cameron 5 22 2 $530,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior coating of the 850-3 Reservoir. JUSTIFICATION OF PROJECT: The interior coating is in poor condition and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $230 $15 $35 $0 $0 $0 $530 PRIOR YEARS: TOTAL $250 169 P2542 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/30/2013 7/31/2014 8/1/2014 4/30/2015 $10 $60 PROJECT PHASE: 5/1/2015 11/30/2015 $460 PROJECT LOCATION:OWD Map Book:355 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 170 P2543850-1 Reservoir Interior/Exterior Coating Kevin Cameron 3 22 2 $575,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 850-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the current Cathodic Assessment Report, the interior and exterior coatings on the 850-1 Reservoir are nearing the end of their useful life and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $10 $515 $10 $40 $0 $575 PRIOR YEARS: TOTAL $0 171 P2543 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2018 6/29/2018 7/2/2018 11/7/2018 $10 $40 PROJECT PHASE: 11/8/2018 6/1/2022 $525 PROJECT LOCATION:OWD Map Book:304 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 172 P2544850-2 Reservoir Interior/Exterior Reservoir Coating Kevin Cameron 3 22 2 $940,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 850-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the current Cathodic Assessment Report, the interior and exterior coatings on the 850-2 Reservoir are nearing the end of their useful life and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $5 $5 $880 $10 $40 $0 $940 PRIOR YEARS: TOTAL $0 173 P2544 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2018 6/29/2018 7/2/2018 11/7/2018 $10 $65 PROJECT PHASE: 11/8/2018 6/1/2020 $865 PROJECT LOCATION:OWD Map Book:317 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 174 P2545980-1 Reservoir Interior/Exterior Coating Kevin Cameron P2546 5 22 2 $1,495,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 980-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2013 Cathodic Assessment Report, the 980-1 Reservoir interior and exterior coatings are nearing the end of their useful life and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $950 $445 $50 $50 $0 $0 $1,495 PRIOR YEARS: TOTAL $0 175 P2545 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 1/1/2015 6/30/2015 7/1/2015 2/29/2016 $10 $85 PROJECT PHASE: 3/1/2016 12/31/2016 $1,400 PROJECT LOCATION:OWD Map Book:172 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/12/2015Bob Kennedy 176 P2546980-2 Reservoir Interior/Exterior Coating Kevin Cameron P2545 5 22 2 $1,450,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 980-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the current Cathodic Assessment Report, the interior and exterior coatings on the 980-2 Reservoir are nearing the end of their useful life and are in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $10 $1,390 $10 $40 $1,450 PRIOR YEARS: TOTAL $0 177 P2546 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2017 6/30/2018 7/1/2018 10/31/2019 $10 $40 PROJECT PHASE: 11/1/2019 7/31/2020 $1,400 PROJECT LOCATION:OWD Map Book:172 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 178 P2550Fuel Island Upgrade Kent Payne P2549 3 22 1 $75,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project is to upgrade the District's fuel system, both in the vehicles as well as the fuel island dispensers, sumps, and island. JUSTIFICATION OF PROJECT: This work is needed to comply with County requirements for the operation of the fuel island.This project will allow any employee to fill a District vehicle with no training. Authorizations and transactions will be done wireless so electrical lines run through the fuel hoses or ground loops will be used and it will also allow Management tighter control on the dispensing of fuel by placing limits on types of fueling and have better reporting features. COMMENTS: Work to improve the secondary containment and dispensing equipment in accordance with District/County Settlement agreement. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $75 $0 $0 $0 $0 $0 $75 PRIOR YEARS: TOTAL $0 179 P2550 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/1/2015 7/31/2015 8/1/2015 9/30/2015 $5 $10 PROJECT PHASE: 10/1/2015 12/31/2015 $60 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 180 P2553Heritage Road Bridge Replacement and Utility Relocation Kevin Cameron 2 22 2 $1,200,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The existing 16-Inch potable water pipeline to Sleep-Train Amphitheatre and Aquatica Seaworld’s Waterpark was built under the Otay River. The City of Chula Vista is planning to replace the Heritage Road Bridge (Project No. STM-364). The District has requested the City reserve room in the bridge for a 16-inch steel pipeline for potable use and an 8-inch pipeline for future recycled water use. In addition to the bridge crossing, approximately 1,600 linear feet of 16-inch potable water pipeline is required. An existing 16-inch ACP pipeline in Otay River will be abandoned or converted to recycled water use. JUSTIFICATION OF PROJECT: A new bridge crossing of the Otay River at Heritage Road provides an opportunity for the District to relocate a pipeline out of the river into a more secure location and also provides an economical way to build a recycled water pipeline to these commercial customers. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Expansion 40 %0 %0 %0 %40 % Replacement 0 %0 %60 %0 %60 % TOTAL:40 %0 %60 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $10 $100 $290 $645 $155 $0 $1,200 PRIOR YEARS: TOTAL $0 181 P2553 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 6/30/2015 7/1/2015 6/30/2016 $50 $150 PROJECT PHASE: 7/1/2016 6/30/2020 $1,000 PROJECT LOCATION:OWD Map Book:50 & 51 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 182 P2557520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project Stephen Beppler 5 22 1 $100,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: The existing chemical feed lines are cast/black iron and need to be replaced with new dual wall CPVC chemical feed lines. Other miscellaneous improvements needed. Length approximately 150 feet. JUSTIFICATION OF PROJECT: The existing chemical feed lines for the 520 Reservoir are experiencing deterioration and not designed to current code for providing chemical containment. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $29 $65 $5 $0 $0 $100 PRIOR YEARS: TOTAL $0 183 P2557 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2016 6/30/2017 $5 $25 PROJECT PHASE: 7/1/2017 6/30/2019 $70 PROJECT LOCATION:OWD Map Book:343 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 184 P2558Additional Pump Station Fuel Storage Doug Rahders 255 22 1 $25,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Purchase and install two additional bulk diesel fuel storage tanks for the 1004-2 pump station and 1100-1 hydro station. JUSTIFICATION OF PROJECT: Based on an emergency diesel fuel storage study, during an extended emergency power outage current fuel storage at both the 1004-2 p/s and 1100-1 h/s offers less than a day's worth of fuel usage. District staff will add in one above ground diesel fuel storage tank at each site to provide double the run time of the emergency standby gensets during a power outage. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $25 $0 $0 $0 $0 $0 $25 PRIOR YEARS: TOTAL $0 185 P2558 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2015 6/30/2016 $25 PROJECT LOCATION:OWD Map Book:302 & 160 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 186 P2559Pressure Vessel Repair and Replacement Program Jeff Marchioro 0 District Wide 2 $300,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: An assessment of thirteen existing steel pressure vessels, including five hydropneumatic and eight surge tanks of various ages, is needed to determine the remaining useful life of each facility. Pressure vessel interiors and exteriors and appurtenances will be repaired, coated, and/or replaced entirely. JUSTIFICATION OF PROJECT: Pressure vessels are a key component of thirteen existing District pump stations. Routine inspection by qualified professionals, and follow up repair and/or replacement, is needed to preserve the life expectancy of each pressure vessel and associated pump station facilities. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $250 $0 $0 $0 $0 $300 PRIOR YEARS: TOTAL $0 187 P2559 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 12/31/2016 1/1/2016 12/31/2016 $10 $50 PROJECT PHASE: 3/1/2016 6/30/2017 $240 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/6/2015OTAY\Jeff.Marchioro 188 P2564Administration Carpet Replacement Program Kent Payne 3 22 2 $215,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Covers material and labor costs for a phased replacement of the existing carpet in the following areas and in order of need: Customer Service; Finance; GM Suite; Admin Services; Engineering; and Training Room. Materials specified include commercial grade carpet tile and broadloom. Installation has little to no impact on daily operations with cubicle lift-in-place technologies and night/weekend work. JUSTIFICATION OF PROJECT: The existing carpet was installed in 1997 during the Headquarters expansion and remodel. Normal carpet lifespan is 10-12 years; at 18 years, Admin carpet is 150-180% lifespan and shows its age including deep wear patterns with areas of backing separation, indelible stains and extreme fading as noted with recent cubicle removal and planned removal due to downsizing. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $65 $75 $75 $0 $0 $0 $215 PRIOR YEARS: TOTAL $0 189 P2564 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2015 6/30/2018 $215 PROJECT LOCATION:OWD Map Book:318 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 190 P2565803-2 Reservoir Interior/Exterior Coating & Upgrades Kevin Cameron 5 22 2 $725,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 803-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2013 Cathodic Assessment Report, the 803-2 Reservoir interior and exterior coatings are near the end of their useful life and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $5 $675 $45 $725 PRIOR YEARS: TOTAL $0 191 P2565 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 1/1/2019 6/30/2019 7/1/2019 10/1/2019 $5 $70 PROJECT PHASE: 10/2/2019 6/30/2020 $650 PROJECT LOCATION:OWD Map Book:357 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 192 P2566520-2 Reservoir Interior/Exterior Coating & Upgrades Kevin Cameron 5 22 3 $1,790,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 520-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2013 Cathodic Assessment Report, the 520-2 Reservoir interior and exterior coatings are at the end of their useful life and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $10 $1,780 $1,790 PRIOR YEARS: TOTAL $0 193 P2566 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 1/4/2021 6/30/2021 7/1/2021 9/30/2021 $10 $90 PROJECT PHASE: 10/1/2021 6/30/2022 $1,690 PROJECT LOCATION:OWD Map Book:343 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 194 P25671004-2 Reservoir Interior/Exterior Coating & Upgrades Kevin Cameron 3 22 3 $565,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 1004-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the 2013 Cathodic Assessment Report, the 1004-2 Reservoir interior and exterior coatings are at the end of their useful life and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $10 $555 $565 PRIOR YEARS: TOTAL $0 195 P2567 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 1/4/2021 6/30/2021 7/1/2021 9/30/2021 $10 $65 PROJECT PHASE: 10/1/2021 6/30/2022 $490 PROJECT LOCATION:OWD Map Book:316 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 196 R2109Sweetwater River Wooden Trestle Improvement for the Recycled Water Forcemain Stephen Beppler 5/14/2014 3 22/27 2 $600,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Modification of the wooden trestle to reduce the potential damage of a wildfire event to the structure. JUSTIFICATION OF PROJECT: The existing wooden trestle over the Sweetwater River supports a 14-inch steel force main for recycled water. The 200 foot long wooden trestle was built in 1980 and a recent assessment has recommended a brush management plan be prepared to extend into the adjacent San Diego National Wildlife Refuge. The report also recommends the installation of a heat shield, installation of a fire suppression system, or modification of the existing structure to reduce the threat of wildfire to the structure. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $400 $10 $0 $0 $0 $0 $516 PRIOR YEARS: TOTAL $106 197 R2109 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 6/30/2014 12/31/2014 1/1/2015 8/31/2015 $100 $100 PROJECT PHASE: 9/1/2015 6/30/2016 $400 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 198 R2111RWCWRF - RAS Pump Replacement Stephen Beppler 5/14/2013 R2096 3 22 1 $600,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Replace and upgrade the RAS pumps to 360 GPM to improve process control of the plant. JUSTIFICATION OF PROJECT: These improvements are needed due to increased pumping requirements of the new process. The existing pumps were installed in 1992 and are reaching the end of their useful life. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $250 $0 $0 $0 $0 $0 $600 PRIOR YEARS: TOTAL $350 199 R2111 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2013 6/30/2014 7/1/2014 6/30/2015 $10 $75 PROJECT PHASE: 7/1/2015 6/30/2016 $515 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 200 R2112450-1 Disinfection Facility Rehabilitation Kevin Cameron 2 22 1 $265,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Replace the two (2) existing sodium hypochlorite tanks, relocate and replace the valves and piping on the existing sodium hypochlorite feed system, remove existing acoustic louver and replace with roll-up door. JUSTIFICATION OF PROJECT: One of the existing sodium hypochlorite tanks has failed and is in need of replacement. The other is approaching the end of its useful life. The sodium hypochlorite feed system has faulty valves that are no longer available. The acoustic louver was installed for a diesel generator which is no longer needed. A roll-up door will ease future replacement of equipment. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $40 $25 $0 $0 $0 $0 $265 PRIOR YEARS: TOTAL $200 201 R2112 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 6/30/2014 7/1/2014 6/30/2015 $5 $50 PROJECT PHASE: 7/1/2016 6/30/2017 $200 PROJECT LOCATION:OWD Map Book:66 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 202 R2116RecPL - 14-Inch, 927 Zone, Forcemain Assessment and Repair Jeff Marchioro 3 22 1 $1,750,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: An assessment of the existing 16,000 L.F. 14-Inch CML forcemain built in 1978 is needed to determine the remaining useful life of the facility. The forcemain will be repaired and any corroded appurtenances will be replaced. JUSTIFICATION OF PROJECT: A leaking section of the pipeline was replaced and a condition assessment of this pipeline is recommended. COMMENTS: Assume 20% of the pipeline must be replaced or repaired. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $225 $1,000 $150 $50 $0 $0 $1,750 PRIOR YEARS: TOTAL $325 203 R2116 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2014 3/31/2017 1/1/2015 6/30/2017 $500 $200 PROJECT PHASE: 1/1/2015 6/30/2019 $1,050 PROJECT LOCATION:OWD Map Book:186, 200, 304, 318, 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/12/2015OTAY\Jeff.Marchioro 204 R2120RWCWRF Filtered Water Storage Tank Improvements Stephen Beppler R2096 3 22 2 $500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: Seal and recoat interior and exterior of steel tank walls and concrete floor. Construct improvements to facilitate operation and maintenance activities and compliance with all applicable codes and OSHA standards. Salvage or replace and improve existing floating cover. JUSTIFICATION OF PROJECT: HDR Engineering’s Inspection and Condition Assessment Report dated May 2015 recommended structural improvements, replacement of interior and exterior coatings, and replacement of the cathodic protection system. The coatings are in relatively poor condition and in need of replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 22 0 %100 %0 %0 %100 % TOTAL:0 %100 %0 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $10 $245 $245 $0 $0 $0 $500 PRIOR YEARS: TOTAL $0 205 R2120 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 2/1/2016 2/2/2016 1/5/2018 $10 $40 PROJECT PHASE: 1/8/2018 6/30/2018 $450 PROJECT LOCATION:OWD Map Book:319 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/21/2015Bob Kennedy 206 S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Stephen Beppler 6/4/2003 3 18 1 $3,550,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the Otay Water District proportionate share of the San Diego County Sanitation District total costs for replacement of various system components of the existing Spring Valley and Rancho San Diego Outfall Systems per terms of an existing agreement with the SVSD. The reimbursement also includes a proportionate share of operating and maintenance costs. JUSTIFICATION OF PROJECT: Various components of the San Diego County Sanitation District Spring Valley Outfall and the Rancho San Diego Outfall are in very bad condition and are in need of repair and/or replacement. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $150 $150 $200 $250 $300 $1,935 PRIOR YEARS: TOTAL $835 207 S2012 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2003 6/30/2025 $3,550 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/11/2015Jolene Fielding 208 S2024Campo Road Sewer Main Replacement Stephen Beppler 5/17/2010 3 18 2 $5,500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funds to upgrade the sewer main capacity of approximately 11,050 feet of existing 10-inch PVC sewer main, 450 feet of 10-inch reinforced polymer mortar pipe sewer main, and 50 feet of 15-inch sewer main. The project location begins at the south end of Avocado Blvd, through the Rancho San Diego Village Shopping Center, paralleling SR-94/Campo Road in the adjacent open space. JUSTIFICATION OF PROJECT: The existing sewer main is under sized and must be replaced to increase capacity. Portions of the sewer main are located in areas of sensitive habitat making it difficult to access for maintenance. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Betterment ID 18 0 %50 %0 %0 %50 % Replacement 0 %0 %50 %0 %50 % TOTAL:0 %50 %50 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $500 $3,400 $1,000 $0 $0 $0 $5,500 PRIOR YEARS: TOTAL $600 209 S2024 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2010 12/31/2014 1/1/2015 6/30/2016 $100 $900 PROJECT PHASE: 7/1/2016 6/30/2017 $4,500 PROJECT LOCATION:OWD Map Book:330 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:8/18/2015Bob Kennedy 210 S2027Rancho San Diego Pump Station Rehabilitation Stephen Beppler 5/16/2011 3 18 1 $3,500,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for the rehabilitation of the Rancho San Diego Pump Station located near Singer Lane. JUSTIFICATION OF PROJECT: The existing sewer pump station is over 20 years old and the pumps have reached the end of their useful lives. The pump station also needs improvements to bring the station up to current OSHA requirements. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $320 $1,000 $1,000 $915 $0 $0 $3,500 PRIOR YEARS: TOTAL $265 211 S2027 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2011 7/1/2013 7/1/2013 6/30/2015 $50 $500 PROJECT PHASE: 7/1/2015 6/30/2019 $2,950 PROJECT LOCATION:OWD Map Book:331 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:4/27/2015Rita Bell 212 S2033Sewer System Rehabilitation Stephen Beppler 5/16/2011 5 18 1 $6,000,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for sewer system rehabilitation efforts that have been identified. These efforts involve replacement of approximately 13,000 lineal feet of failing or damaged pipe segments, separated pipe joints, etc. JUSTIFICATION OF PROJECT: The closed circuit television sewer assessment program process has assisted in the identification of sewer mains containing sags, which has allowed debris to form, and/or are damaged and need to be repaired. COMMENTS: Project being designed and constructed in phases based upon area and type of repair. Calavo Basin Phase 1 under construction in Spring 2015. Rancho San Diego (RSD) Basin Phase 1 and Trenchless Repair under design Spring 2015, construction FY2016. Future phases of Calavo and RSD to follow in subsequent FYs. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $900 $800 $800 $800 $800 $500 $6,000 PRIOR YEARS: TOTAL $1,400 213 S2033 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2011 1/1/2016 3/1/2013 1/1/2017 $400 $1,000 PROJECT PHASE: 6/30/2014 6/30/2021 $4,600 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 214 P2282Vehicle Capital Purchases Doug Rahders 6/3/1996 0 District Wide 1 $5,191,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various vehicles for daily Otay Water District functions. JUSTIFICATION OF PROJECT: Replacements or newly acquired vehicles will be used for operational and administrative functions throughout the entire Otay Water District. COMMENTS: 2/21/14, $500K Vactor scheduled in FY 16 FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $556 $298 $295 $327 $308 $317 $5,191 PRIOR YEARS: TOTAL $3,090 215 P2282 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 12/1/2000 6/30/2021 $5,191 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:4/29/2015Rita Bell 216 P2285Office Equipment and Furniture Capital Purchases Kent Payne 6/3/1996 0 District Wide 1 $589,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various office equipment and furniture items used for daily Otay Water District functions. JUSTIFICATION OF PROJECT: Replacements or new acquisitions of office equipment and furniture will be used for operational and administrative functions throughout the entire Otay Water District. COMMENTS: 2016 - Projected expenditure for Customer Service workstation ergonomic upgrades. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $15 $15 $15 $14 $6 $0 $589 PRIOR YEARS: TOTAL $524 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM 217 P2285 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: $0 $0 PROJECT PHASE: 7/1/2000 6/30/2019 $589 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:9/30/2015Jolene Fielding 218 P2286 Field Equipment Capital Purchases Doug Rahders 6/3/1996 0 District Wide 1 $1,808,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various pieces of field equipment used for daily Otay Water District functions. JUSTIFICATION OF PROJECT: Replacements or new acquisitions of field equipment will be used for operational functions throughout the entire Otay Water District. COMMENTS: FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $50 $100 $83 $68 $16 $105 $1,808 PRIOR YEARS: TOTAL $1,386 219 P2286 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/1996 6/30/2021 $1,808 $0 PROJECT PHASE: $0 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 220 P2366 APCD Engine Replacements and Retrofits Doug Rahders 12/6/2000 0 District Wide 1 $3,835,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project will replace and/or retrofit 14 diesel fuel burning engines with the best technology exhaust gas control systems throughout the Otay Water District to comply with APCD engine emission regulations. The Otay Water District also needs to replace, re-power, and/or retrofit the heavy vehicle diesel fleet to comply with upcoming emissions regulations. JUSTIFICATION OF PROJECT: The Otay Water District is required to replace and/or retrofit its engines to meet current APCD requirements including the Air Toxics Control Measures, and to be consistent with the intended operation of the engines to meet system demands. The Otay Water District also needs to replace, re-power, and/or retrofit the heavy vehicle diesel fleet to meet future emissions requirements. COMMENTS: 9/25/13, transferred $45K from FY15 to FY14 to perform emissions retrofits on District vehicles. 2/21/2014, 2 portable gensets and 2 pump engine APCD permits are scheduled to expire on 12/31/2016. FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $535 $307 $157 $118 $78 $110 $3,835 PRIOR YEARS: TOTAL $2,530 221 P2366 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 12/1/2000 6/1/2001 7/1/2001 6/1/2010 $113 $312 PROJECT PHASE: 7/1/2010 6/1/2020 $3,410 PROJECT LOCATION:OWD Map Book: 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 222 P2556HWY 94 Upsized Utility Relocations at Melody Lane Stephen Beppler 5 22 2 $250,000 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: PROJECT TITLE:CIP Number: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: DESCRIPTION OF PROJECT: This project provides the funding for the upsized utility relocations required to accommodate the County of San Diego road improvement project along HWY 94 at Melody Lane. Facility relocations are for upsizing the existing 8-inch, 12-Inch, and 16-Inch potable water pipeline as needed to larger pipelines. This reimbursement is only for incremental pipeline cost due to upsize. JUSTIFICATION OF PROJECT: COMMENTS: Cost Estimate: $20K; 8-inch to 16-inch upsize ~ 70 feet $120K; 12-inch to 16-inch upsize ~ 1,155 feet $0; 16-inch relocation ~ 1,780 feet $75K; 12-inch to 16-inch upsize ~ 735 feet FUNDING SOURCE:Expansion Betterment Replacement New Water Supply Total Replacement 0 %0 %100 %0 %100 % TOTAL:0 %0 %100 %0 %100 % FUND DETAILS: EXPENDITURE SCHEDULE (X $1,000): FY FY FY FY FY FY FY 2016 2017 2018 2019 2020 2021 Total $1 $29 $100 $100 $20 $0 $250 PRIOR YEARS: TOTAL $0 223 P2556 PROJECT SCHEDULE: PLANNING: DESIGN: CIP Number: ESTIMATED START DATE ESTIMATED FINISHED DATE ESTIMATED COST (X $1,000): CONSTRUCTION: 7/1/2015 6/30/2016 7/1/2016 6/30/2017 $1 $5 PROJECT PHASE: 7/1/2017 6/30/2020 $244 PROJECT LOCATION:OWD Map Book:205 & 309 2016 2017 2018 2019 2020 2021 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): MAINT: ENERGY: CHEMICAL: Submitted By:Date:5/7/2015Jolene Fielding 224 Annual CIP Development Policy No. 6 PURPOSE To define the policy on the preparation and approval of the annual Capital Improvement Program. BACKGROUND District staff develops and maintains a Water Resources Master Plan (WRMP), an Integrated Water Resources Plan (IRP), and Strategic Plan that collectively are used to prepare the annual Capital Improvement Program (CIP) and to identify the CIP projects required for ultimate build out. The WRMP is revised every five years and adopted by the Board. Annually, staff prepares a six-year moving window CIP that provides information on budget assumptions, source of funds, allocation of funds, project costs, project location, description, justification, scheduling, etc. The six-year CIP is submitted and presented to the Board of Directors to obtain approval for staff to proceed with implementation to plan, design, and construct facilities and programs necessary to meet the needs of the District. POLICY The General Manager, or his designee, shall prepare a proposed six-year CIP for submission to the Board of Directors for their review prior to and approval by June 30 of each fiscal year. The CIP projects shall be reviewed and updated annually to consider appropriate revisions based on the most recent WRMP, IRP, Strategic Plan, and market condition information. The timing of projects shall be based on necessity and availability of financing. The intent is that new CIP projects will be installed as development requires the facilities. With regard to all CIP projects, it is acknowledged that compliance with the California Environmental Quality Act adds a measure of unpredictability with regard to the timing of CIP projects. The WRMP, IRP, and the CIP projects shall be divided into two phases: Phase I - one to six years; and Phase II - seven to ultimate buildout. CIP project sheets for projects in Phase I shall be prepared and identify estimated total cost, cash expenditure timing, location, description, justification, funding allocation, and schedule. For the Phase II CIP projects, the CIP shall identify the need for the projects, along with their estimated total cost and funding allocation. Upon approval by the Board of Directors of the annual six-year CIP, staff is authorized to proceed with planning, design, construction, etc. of those projects that have budgets within the current fiscal year. The General Manager is authorized to redistribute funds between approved CIP projects as long as the total fiscal year budget is not exceeded. In addition, the General Manager is authorized to exceed the budget for specific CIP projects under the following conditions: a. For CIP projects less than or equal to $50,000, the cumulative amount of the specific CIP project expenditures does not exceed that authorized under Code of Ordinances Section 2.01, Authority of the General Manager. b. For CIP projects more than $50,000, the amount being authorized does not exceed the lessor of 25% of the specific CIP project budget amount or that authorized under Code of Ordinances Section 2.01, Authority of the General Manager. c. The total fiscal year CIP budget is not exceeded. 225 Water Meter Capacity Fees CAPACITY NAME FEE (1) Capacity Fee Section 28.01 $8,163.60 Triad Capacity Fee $6,124.75 New Water Supply Fee $1,011.25 (1) This is based on a 3/4 inch water meter effective 7/1/2015. Note: For a full listing of fees per meter size visit the District's website at: www.otaywater.gov/engineering/public-services. Open the On-Line Forms and select Fees and Deposits. 226 Glossary The Capital Budget contains terminology that is unique to public finance and budgeting. The following budget glossary provides assistance in understanding these terms. Acre-Foot: The volume of water that will cover one acre to a depth of one foot. One acre-foot equals 435.6 units or 325,850 gallons. Annexation Fees: Whenever water service is requested for land outside the boundaries of the District the land must first be annexed into the District. The annexation fee for water service was set at $1,477 per EDU on July 1, 2009. Whenever sewer service is requested for land outside the boundaries of an improvement district (ID) the land must first be annexed into the ID. The fee for sewer annexation was set at $3,819 on December 16, 1998. These base rates are adjusted quarterly according to a cost of living index. The rates as of July 1, 2014 are $1,622 and $5,986 for water and sewer, respectively. Assets: Resources owned or held by the District that have monetary value. Availability Fees: The District levies charges each year in developed areas to be used for general purposes for construction of facilities. This fee is levied in undeveloped areas to provide a source of funding for planning, mapping, and preliminary design of facilities to meet future development. Current legislation provides that any availability charge in excess of $10.00 per acre shall be restricted only for the purpose of constructing facilities in the improvement district in which it was assessed. Betterment Fees: In addition to other applicable water rates and charges, certain water customers pay a fee based on water service zone or improvement district. These are restricted for the use in the area where they are collected and may be used for the construction and maintenance of facilities. Betterment Fees for Maintenance: The Operating Budget earns betterment fees for maintenance work performed on infrastructure within special betterment zones. Betterment fees are collected for the construction and maintenance of these specific assets. Capacity Fee: A connection fee is charged when a new water meter is placed into service. This fee is a contribution of capital to either reimburse existing customers for the available capacity in the existing system, or to help finance planned future growth-related capacity improvements. Capacity Fee Revenues: These fees are earned by the Operating Budget as the Engineering Department supports expansion functions. 227 Glossary Capital Budget: The portion of the annual budget that appropriates funds for the purchase of capital equipment items and capital improvements. These expenditures are separated from regular operating items, such as salaries, utilities, and office supplies. The Capital Budget includes funds for capital equipment purchases over $10,000, such as vehicles, furniture, machinery, computer systems, and special tools. The capital budget also includes funds for infrastructure related items over $20,000 (as explained below) which are distinguished from operating items according to their value and projected useful life. Capital Equipment: Fixed assets such as vehicles, equipment, furniture, technical instruments, etc. which have a life expectancy of more than two years and a value over $10,000. This category may include items over $20,000 that are infrastructure related items (this cost may not extend useful life of the water or sewer infrastructure, but without the purchase of the item, the whole asset is rendered useless, as described in the District’s Capitalization Policy). Capital Improvement Program: A long-range plan of the District for the construction, rehabilitation and modernization of the District-owned and operated infrastructure. CWA: The County Water Authority was organized in 1944 under the State County Water Authority Act for the primary purpose of importing Colorado River water to augment the local water supplies of the Authority's member agencies. The Authority purchases water from MWD which imports water from the Colorado River and the State Water Project. Debt Service: The District's obligation to pay the principal and interest of bonds and other debt instruments according to a predetermined payment schedule. Desalination: The removal of dissolved minerals (including salts) from seawater or brackish water. Engineered water desalination processes, which produce potable water from seawater or brackish water, have become important because many regions throughout the world suffer from water shortages. Expenditures/Expenses: These terms refer to the outflow of funds paid or to be paid for an asset, goods or services obtained regardless of when actually paid for. (Note: An encumbrance is not an expenditure). An encumbrance reserves funds to be expended in a future period. Fiscal Year: Twelve-month term designating the beginning and ending period for recording financial transactions. The District has specified July 1 to June 30 as its fiscal year. Grants: Contributions or gifts of cash or other assets from another governmental agency to be used or expended for a specified purpose, activity, or facility. Capital grants are restricted by the grantor for the acquisition and/or construction of fixed assets. Operating grants are restricted by 228 Glossary the grantor for operating purposes or may be used for either capital or operating purposes at the discretion of the grantee. Interest Income: Earnings from the investment portfolio. Per District Policy Number 25, interest income will be allocated to improvement districts each month based upon each fund’s prior month- ending balance. Reserve Fund: The District maintains Reserve Funds per the District’s policy for both designated and restricted balances. Designated Reserve Funds are “general use” funds designated by the Board. Restricted reserves are those that are legally set aside for a particular purpose and cannot be used for any other purpose. Water Capacity Fees: Charges paid by customers to connect to a District water system for potable or recycled water service. Fees are determined by multiplying the demand factor for the meter size by the total of the District-wide capacity fee and applicable zone charge. 229 AF Acre-Foot/Feet AMR Automated Meter Reader/Reading APCD Air Pollution Control District ASCE American Society of Civil Engineers AWWA American Water Works Association CEQA California Environmental Quality Act CIP Capital Improvement Program CMAA Construction Management Association of America CSI California Solar Initiative CWA County Water Authority (San Diego) FCF Flow Control Facility FY Fiscal Year GAAP Generally Accepted Accounting Principles GIS Geographic Information System GPS Global Positioning System HWD Helix Water District ID Improvement District IID Imperial Irrigation District IMS Infrastructure Management System IRP Integrated Water Resources Plan LOPS Lower Otay Pump Station MBR Membrane Bioreactor MG Million Gallons MGD Million Gallons per Day MWD Metropolitan Water District O&M or O/M Operations and Maintenance OIS Otay Information System PB Pacific Bay PL Pipeline PS Pump Station RWCWRF Ralph W. Chapman Water Recycling Facility SANDAG San Diego Association of Governments SCADA Supervisory Control and Data Acquisition SDCWA San Diego County Water Authority SVSD Spring Valley Sanitation District VCP Vitrified Clay Pipe WD Water District WRMP Water Resources Master Plan WTP Water Treatment Plant List of Acronyms 230 Index Annual CIP Development Policy No. 6 183 At-A-Glance 2 Awards 4-6 Capital Facility Projects 37-86 Capital Improvement Program Narrative 17-18 Capital Purchases Budget 30 Capital Purchase Projects 157-168 CIP Budget Calendar 12 CIP Budget Guide 1 CIP Budget Process 13-14 CIP Funding Source and Category 24 CIP Justification and Impact on Operating Budget 27 CIP Project Index 34-36 CIP Project Schedule 28-29 CIP Project Sheet Description 31-33 CIP Projects 25-26 CIP Projects in Construction 20-22 CIP Reserve Funds 23 Current Economic Conditions 7 Demographics 10 Developer Reimbursement Projects 169-182 General Information 3 Glossary 185-187 Index 189 Letter of Transmittal ii-viii List of Acronyms 188 Major CIP Projects 19 Organization Chart 11 Replacement/Renewal Projects 87-156 Resolution No. 4210 15-16 Table of Contents i The Future 8 Water Meter Capacity Fees 184 231