HomeMy WebLinkAboutCapital Improvement Program Budget FY 2010-2015 ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 2010-2015 TABLE OF CONTENTS Page Letter of Transmittal ii GENERAL INFORMATION Budget Guide 1 Otay Water District At-A-Glance 2 General Information 3 Financial Awards 4 Awards 5 Current Economic Conditions 8 The Future 9 Demographics 10 Organization Chart 11 Budget Calendar 12 Budget Process 13 Resolution No. 4136 15 CAPITAL BUDGET SUMMARY Capital Improvement Program Narrative 16 Major CIP Projects 18 Flagship CIP Projects in Construction 19 CIP Projects in Construction 22 CIP Reserve Funds 24 CIP Funding Source and Category 25 CIP Projects 26 CIP Justification and Impact on Operating Budget 28 CIP Project Schedule 30 Capital Purchases Budget 32 CIP PROJECTS CIP Project Sheet Description 33 CIP Project Index 35 Capital Facility Projects 37 Replacement/Renewal Projects 131 Capital Purchase Projects 191 Developer Reimbursement Projects 209 APPENDIX Water Meter Capacity Fees 211 Glossary 212 List of Acronyms 218 Index 222 September 1, 2009 Honorable Board of Directors Otay Water District I am pleased to present the Otay Water District’s (District) Adopted Operating and Capital Budget for Fiscal Year 2010. This year’s budget establishes the management plan to finance all of the District’s services and programs during the 2010 fiscal year. The mission of the District is to provide customers with the best quality water, wastewater, and recycled water service in a professional, effective, and efficient manner. As in past years, we again face key challenges. These challenges include an economy in recession and continuing instability in the financial markets; ongoing home foreclosures; drought in the Southwest; water shortages brought about by legal action to reduce water deliveries from the Sacramento – San Joaquin Bay Delta; and the higher cost of imported water. Given these uncertain times, the District must find the best solutions that balance the many expectations placed on it by its customers. Meeting our customer’s expectations requires dedication and a commitment to continuous improvement. The primary way to achieve our objectives is to improve all aspects of our core business processes. The main tool we will continue to use is our Strategic Plan. The District adopted its first Strategic Plan in 2003, and it’s updated every three years. It is reviewed quarterly by management and semi-annually by the Board. This year it was updated for the 2009 through 2011 timeframe. Efficiency improvements have become the new competitive advantage for utilities. As a result, the theme of the 2009 through 2011 Strategic Plan is to capitalize on the technology investments we have made and to utilize these technologies to continue to improve productivity and efficiency. The Strategic Plan also carries forth the District’s transformation from a growth-centric to a maintenance-based organization. Where capital and developer fees supported growth for many years, today we have become equally focused in managing long-term maintenance and replacement of our infrastructure. ii This necessary change is illustrated by the business maturity curve. During high growth periods, we focused on achieving the macro targets of building and installing new infrastructure. In the future, however, fewer resources are needed to support slowing growth, but the effort to maintain and improve infrastructure and assets increases. In future years, the District also derives income more from rates and less from fees. Consequently, increased costs place pressure on rates more directly. Therefore, to balance the customer’s interest in minimizing rate increases while also maintaining its infrastructure investments and our strong financial position, the District will emphasize internal efficiency and development of technology assisted best practices. In effect, we will use our investments in technology to do more with the same or even fewer resources. Today, the District provides water service to nearly 47,125 potable and 683 recycled water customers within approximately 125.5 square miles of southeastern San Diego County. All of the potable water sold to customers is purchased from the San Diego County Water Authority (CWA). Much of this water is purchased from the region’s water importer, the Metropolitan Water District of Southern California (MWD). The District entered into an agreement with CWA to have the Helix Water District, at their Levy Water Treatment Plant, treat imported untreated water on behalf of the Otay Water District. This action brought regional water treatment closer to customers and reduced dependence on water treatment facilities located outside of San Diego County. To deliver that locally treated water to customers, the District initiated construction of a 5.1 mile, 36-inch diameter pipeline. Drinking water delivered by the new pipeline will be stored in two newly constructed 10 million gallon reservoirs. In addition to bringing water treatment closer to customers, this new source of treated water, pipeline, and storage reservoir system diversifies the District’s water supply and improves reliability. The Otay Water District also owns and operates a wastewater collection and recycling system to provide public sewer service to approximately 4,640 homes and businesses. Wastewater collected is conveyed to the District’s Ralph W. Chapman Water Recycling Facility (RWCWRF), which is capable of reclaiming wastewater at a rate of 1.3 million gallons per day. The District also purchases up to six million gallons per day of recycled water from the City of San Diego’s South Bay Water Reclamation Plant. Recycled water from these two sources is used to irrigate golf courses, schools, public parks, roadway landscapes, and other approved uses in the City of Chula Vista, California. The use of recycled water reduces dependency on imported supplies and provides a local supply thereby diversifying District resources. iii BUDGET SUMMARY The Otay Water District’s operating expenditures consist of three major sectors: potable water, recycled water, and sewer, totaling $75,716,500 for Fiscal Year 2010. Revenues from potable and recycled water are projected to be $64,077,000, about $8.5 million (15.3%) more than Fiscal Year 2009. Water sales volumes are expected to decrease as a result of the slowing economy and expanded efforts to promote water conservation, however, rate increases are essential to offset the higher cost of water. Sewer revenues are projected to be $2,244,800, about $99,500 more than Fiscal Year 2009 because of necessary rate increases. The remaining revenue of $9.4 million comes from special fees and assessments and miscellaneous income. Significant aspects of the Operating Budget are: • A balanced budget meeting the goals of the Strategic Plan. • An updated six-year Rate Model to ensure sound financial planning and reserve levels. • Unprecedented water supply rate increases of 21.1% from MWD and 18.1% from CWA because of the high cost of supply programs, higher energy, and operating costs. • Implemented rate increases in potable, recycled water, and sewer. This included pass- through rate increases from CWA, and County of San Diego. • In response to the economic slowdown, the District has again reduced staffing levels from 169 full time equivalents to 166. It also cut operating expenditures by $793,100 due to program funding changes and other discretionary spending cuts. • Of San Diego County’s 23 water agencies, Otay’s water rate is the eighth-lowest and below the county-wide average. • Expanded residential, landscape, and commercial water conservation programs. The 2009-10 Capital Improvement Budget (CIP) consists of 87 projects and a budget of $37.2 million. The budget emphasizes long-term planning for on-going programs while functioning within fiscal constraints and population growth. This year’s CIP budget increased by $10.5 million compared to last year’s projection due to new water supply projects. The Future The coming years will continue to be challenging times for those in California’s water community. After years of record low precipitation that dramatically curtailed snow runoff from the Sierra Nevada Mountains, California’s governor declared an official statewide drought. Following the governor’s action, Southern California’s largest water wholesaler announced a water supply alert across its six-county service area. It also urged all local jurisdictions to implement water conservation ordinances and to “significantly increase efforts” to conserve water. In addition to the drought, federal court orders have curtailed water deliveries from Northern California due to environmental factors in the Sacramento-San Joaquin Bay Delta. Worsening environmental conditions in the Bay Delta now challenge Southern California’s ability to receive water from the State Water Project. A political stalemate in the state capital has also made iv finding compromise or addressing the environmental issues in the Bay Delta more difficult. These factors combined are driving higher costs for water across the state. Through foresight and its investments in drought-proof recycled water, conservation, and a water rate structure that rewards conservation, the Otay Water District has thus far avoided having to require mandatory water conservation. Rather, the District has achieved its water conservation goals using voluntary measures. As you would expect, the planned water sales reductions have impacted price and will continue to affect the District’s finances. Staff continues working diligently to address the financial impacts of conservation as it prepares for the possibility of a severe water shortage and prolonged sales reductions. With these factors in mind, our success as an organization is vastly enhanced by the practices and policies put in place by the Board of Directors to ensure the strength and stability of the District as we move forward into uncertain times. We are fully confident that with the policies and practices put in place by the Board, supported by dedicated and talented staff; we will achieve continued success as an organization and assure the well-being of the customers we serve. In adopting this budget, these factors were met by the Otay Water District’s Board of Directors resolve to keep the stability and strength of the District as one of its highest priorities. AWARDS AND ACKNOWLEDGMENTS • The Government Finance Officers Association (GFOA) awarded a Certificate of Achievement for Excellence in Financial Reporting to the Otay Water District for its Comprehensive Annual Financial Report (CAFR) for the fiscal year that ended June 30, 2008. In order to be awarded a Certificate of Achievement, a government agency must publish an easy to understand and efficiently organized Comprehensive Annual Financial Report. This report must satisfy both generally accepted accounting principles and applicable legal requirements. • The District also received a Distinguished Budget Presentation Award from the GFOA for the District’s Operating and Capital Budget for the Fiscal Year beginning July 1, 2008, as well as two awards from the California Society of Municipal Finance Officers (CSMFO) for Excellence in Operating Budgeting and Excellence in Capital Budgeting. These prestigious awards recognize conformance with the highest standards for preparation of state and local government financial reports. • The American Society of Civil Engineers (ASCE) presented Otay Water District and Infrastructure Engineering Corporation the 2008 Outstanding Civil Engineering Project for Water Supply/Waste Water Treatment & Reuse for 640 Reservoirs. Additionally, the Construction Management Association of America (CMAA) presented Otay Water District the 2009 Project Achievement Award for the 640-1 and 640-2 Reservoirs to recognize outstanding achievement in the practice of construction management. • The Otay Water District’s Information Technology and Strategic Planning Department was awarded the Center for Digital Government’s Best of California, Leadership and v Excellence Award for 2008 and the Municipal Information Systems Association of California’s (MISAC) "Excellence in IT Practices Award." • The California Highway Patrol presented the Otay Water District a Certificate of Achievement for its terminal which has achieved consecutive satisfactory compliance ratings. This is a meritorious achievement that “recognizes the commitment to highway safety demonstrated by the personnel responsible for operation of this terminal.” In conclusion, this Budget reflects the vision of the Board of Directors of the Otay Water District, its management, and its employees. We will continue to strive to make improvements in our budget processes, including an extensive review and analysis of projections for revenues, expenditures, capital projects, and reserves. I would like to thank all the staff involved in this process for the efforts put forth in the preparation of this budget to ensure a successful outcome. To the Board of Directors, we acknowledge and appreciate their continued support and direction in achieving excellence in financial management. __ Mark Watton, General Manager vi CIP Budget Guide  The District views the Capital Improvement Program (CIP) Budget as an essential tool for proper financial management of the CIP projects. The District manages growth and maintenance of assets through this program. This CIP budget is developed with input from the various project managers throughout the organization and is adopted prior to the start of each fiscal year for the current fiscal year and five subsequent years. It is designed and presented for the general needs of the District, its staff, and citizens. It is a comprehensive and balanced financial plan. This plan features the CIP budget based on demands for services and the impact on the District’s financial status and future plans. The budget book is divided into the following sections: General Information This introductory section contains an overview and general information about the District including the organization chart and awards received. Also included are the budget calendar, a description of the budget process, and the resolution adopting the budget. Capital Budget Summary The Capital Budget Summary consists of an overview of the District’s CIP including the Water Resources Master Plan (WRMP) which is based on major assumptions and criteria of the CIP. Also included are highlights of the major CIP projects completed, in construction, in design, or in progress. Additionally, this section contains the CIP reserve funds and funding sources, a six- year listing of CIP project expenditures, the project justification and impact on the Operating Budget, project schedules, and the capital purchases budget. CIP Projects This section contains the project sheet description and project sheets for each CIP project. These sheets are developed by the project manager and contain critical information for the management of these projects. The projects are divided into four categories: Capital Facility Projects, Replacement/Renewal Projects, Capital Purchase Projects, and Developer Reimbursement Projects. Appendix The last section consists of the Water Meter Capacity Fee Schedule, the Glossary of budget and financial terms, a List of Acronyms used in this budget book, and an Index. 1 HISTORY The Otay Water District was formed in January 1956 and joined the San Diego County Water Authority (CWA) in September 1956 to acquire the right to purchase and distribute imported water throughout its service area. The District is also responsible for the collection, treatment, and disposal of wastewater from a portion of the northern region of the District. In 1980, the District started operation of the Ralph W. Chapman Water Recycling Facility (RWCWRF), and in June, 2007, a new source of recycled water from the City of San Diego was completed, allowing Otay Water District to supply 15 to 20 percent of total water demand with recycled water. MISSION STATEMENT The mission of the District is to provide customers with the best quality water, wastewater, and recycled water service in a professional, effective, and efficient manner. SERVICE AREA The District's boundaries encompass an area of approximately 125 square miles in San Diego County, lying immediately east of the City of San Diego metropolitan area and running from the City of El Cajon south to the international border. GOVERNMENT The Otay Water District was formed in 1956 to serve as a public water and sewer agency, authorized as a California special district under the provisions of the Municipal Water District Act of 1911. The District’s ordinances, policies, taxes, and rates for service are set by five Directors, elected by voters in their respective geographic division, to serve staggered four-year terms on its governing board. The District is a “revenue neutral” public agency, meaning that each end-user pays only their fair share of the District’s costs of water acquisitions and the operation and maintenance of the public facilities. ORGANIZATIONAL STRUCTURE The General Manager manages the day-to-day District operations and reports directly to the Board of Directors. Two Assistant General Managers report to the General Manager. One Assistant General Manager oversees the departments of Administrative Services, Finance, Information Technology and Strategic Planning while the other oversees the departments of Water Operations and Engineering. These and other lines of reporting are shown on the organization chart on page 11. Otay Water District At‐A‐Glance  2 For Fiscal Year 2010, the District will have a staff of 166 full-time equivalent employees under the leadership of the General Manager. The District provides water service to approximately 39% of its land area with a population of more than 195,000 people. This percentage increases as the District's service area continues to grow to ultimate build-out. The District is projected to deliver approximately 33,300 acre-feet of potable water to 47,125 potable customer accounts and to ultimately deliver 60,700 acre-feet of potable water to serve 277,000 people or 66,000 accounts. The rate of growth, as projected by the San Diego Association of Governments (SANDAG) for the Chula Vista area of San Diego County, is approximately 1.7% per year over the next decade. Using historical data and considering current economic conditions, staff has moderated this projection to a growth rate of 0.2% for Fiscal Year 2010. Since 1956, the District has provided high quality water to a semi-arid region of the southeastern San Diego County. In 1971, the District constructed a small collection and treatment plant for sewer in the northern section of the District, and in 1980 the District opened the Ralph W. Chapman Water Recycling Facility (RWCWRF). For over 50 years, the available supply of water has helped transform the District service area from a mostly scrub and cactus-covered backcountry into a wonderful balance of diverse environments. Recycled water from the RWCWRF is used to irrigate golf courses, schools, public parks, roadway landscapes, and various other approved uses in eastern Chula Vista. The RWCWRF is capable of recycling wastewater at a rate of 1.3 million gallons per day. The District is also in a partnership with the City of San Diego to beneficially reuse an additional 3,356 acre-feet per year of recycled water for Fiscal Year 2010, and ultimately up to 6,720 acre-feet per year. This makes Otay Water District the largest retail provider of recycled water in the county. The District also owns and operates a wastewater collection system providing public sewer service to approximately 4,640 customer accounts within the Jamacha drainage basin. The sewer service area covers approximately 8,797 acres, which is about 11% of the District’s total service area. Residential customers comprise 98% of the sewer customer base. Photo Credit: “The Metropolitan Water District of Southern California”, see Sisyrinchium bellum and wildflower Tidy Tips on “This page intentionally left blank.” General Information  3 Financial Awards  The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to Otay Water District, California for its annual budget for the fiscal year beginning July 1, 2008. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device. This award is valid for a period of one year only. We believe our current budget continues to conform to program requirements, and we are submitting it to GFOA to determine its eligibility for another award. The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Operating Budgeting for Fiscal Year 2008-2009. 4 Awards  The California Society of Municipal Finance Officers (CSMFO) presented Otay Water District the Certificate of Award for Excellence in Capital Budgeting for Fiscal Year 2008- 2009. The American Society of Civil Engineers (ASCE) presented Otay Water District and Infrastructure Engineering Corporation the 2008 Outstanding Civil Engineering Project for Water Supply/Waste Water Treatment & Reuse for 640 Reservoirs. 5 Awards  The Construction Management Association of America (CMAA) presented Otay Water District the 2009 Project Achievement Award for the 640-1 and 640-2 Reservoirs to recognize outstanding achievement in the practice of construction management. The Construction Management Association of America (CMAA) presented Otay Water District the 2008 Client of the Year Award. The Otay Water District’s Information Technology and Strategic Planning Department was awarded the Center for Digital Government’s Best of California, Excellence in IT Operations Support and Service, Award for 2008. The Otay Water District’s Information Technology and Strategic Planning Department was awarded the Municipal Information Systems Association of California’s (MISAC) Excellence in IT Practices Award. 6 Awards  The California Highway Patrol presented the Otay Water District a Certificate of Achievement for its terminal which has achieved consecutive satisfactory compliance ratings. This is a meritorious achievement and recognizes the commitment to highway safety demonstrated by the personnel responsible for operation of this terminal. 7 Current Economic Conditions  Currently, the District services the needs of a growing population by purchasing water from the San Diego County Water Authority (CWA). CWA purchases its water from the Metropolitan Water District of Southern California (MWD) and the Imperial Irrigation District (IID). Otay takes delivery of the water through several connections of large diameter pipelines owned and operated by CWA. The District currently receives treated water from CWA, and the Helix Water District (HWD) by contract with CWA. In the Southern region, in addition to the treated water deliveries from CWA, the District has an emergency agreement with the City of San Diego in the case of a shutdown of the main treated water source. Through innovative agreements like this, benefits can be achieved by both parties by using excess capacity of another agency, and diversifying local supply, thereby increasing reliability. For several decades, the District has collected and recycled wastewater generated within the Jamacha drainage basin and pumped the recycled water south to the Salt Creek basin where it is used for irrigation and other non-potable uses. However, the demand for recycled water out- paced the supply, requiring the District to supplement the limited supply of recycled water with potable water. Through the new agreement with the City of San Diego, the District has discontinued supplementing its recycled demand with potable water. Once again, this decreases the demand on potable water and increases reliability of the District’s supply. The District’s sewer service area is growing at a slow but steady rate of approximately 0.6% each year. Most of this growth is from small development projects or homeowners converting their septic system to sewer because of environmental issues. The District’s service area was one of the fastest growing regions in the nation. During the past decade, the population of the service area has nearly doubled. It is estimated that the District is currently serving approximately 195,000 residents. In just the past seven years, the District has added more than 7,994 new customer connections, with most of this occurring in just four years. The phenomenal growth has slowed, as our local and national economy is experiencing a downturn. This slowdown is reflected internally as the District’s Development Services Department approved on average only 13 permits per month, and sold 158 water meters in Fiscal Year 2008-2009. 8 The Future  The District continues to use the challenges presented by growth to create new opportunities and new organizational efficiencies. By utilizing and continuing to refine its Strategic Business Plan, it has captured the Board of Director’s vision and united its staff in a common mission. The organization has achieved a number of significant accomplishments based on its successful adherence to its Strategic Business Plan. The District is not only poised to continue successfully providing an affordable, safe, and reliable water supply for the people of its service area, but is set to reap the rewards of greater efficiencies and economies of scale. 2, 3 2 6 1, 3 9 7 83 5 63 8 22 0 15 8 99 78 18 2 1, 3 2 4 1, 8 7 9 2, 1 5 6 - 500 1,000 1,500 2,000 2,500 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 METER SALES Projected Actual The Engineering Department projects that over the next six years the District will sell another 5,718 meters. SANDAG, the regional planning agency, shows a slowing of the historic annual growth rate of 6.3% since 1980, to a projected future annual growth rate of 1.7% through 2030, for the City of Chula Vista. For the unincorporated areas of the region the historic annual growth rate has been only 1.3% since 1980, but is expected to increase to 1.7% through 2030. 9 Demographics  The District boundaries shown in the chart below encompass an area of approximately 125 square miles in San Diego County, located immediately east of the City of San Diego metropolitan area and running from the City of El Cajon south to the international border. SANDAG creates and maintains a tremendous quantity of demographic, economic, land use, transportation and criminal justice information about the San Diego region. The demographic data include population characteristics like age, education, and employment. Because of the overlapping of the District’s service area with the cities of Chula Vista, La Mesa, El Cajon, and the unincorporated areas of Spring Valley and Jamul, the following demographic data is from the City of Chula Vista as it most closely represents the District. The population of Chula Vista has grown from 83,927 in 1980, to 135,136 in 1990, to 173,556 in 2000, and in 2008 the population reached 231,305. This represents an increase of 147,378 in the past 28 years or a 175.6% increase, which correlates to the Districts rapid growth for the same period. The racial make up of Chula Vista is 50% Hispanic, 28% White, 13% Asian, 4% Black, and the remaining 5% is all other groups. The median household income for Chula Vista was $71,298 in 2007, and 97% of Chula Vista’s housing units were occupied. 10 GENERAL MANAGER BOARD OF DIRECTORS Assistant General Manager Engineering Planning Water  Operations Water System  Operations Assistant General Manager Information  Technology and  Strategic Planning IT Applications Finance Controller  and  Budgetary Administrative  Services Human Resources Organization Chart Citizens and  Customers GENERAL MANAGER BOARD OF DIRECTORS Assistant General Manager Engineering Planning Design Water  Resources Public  Services Construction Survey Environmental Water  Operations Water System  Operations Utility  Maintenance/  Construction Collection/  Treatment/  Recycle  Operations Assistant General Manager Information  Technology and  Strategic Planning IT Applications IT Operations GIS Finance Controller  and  Budgetary  Services Treasury  and  Accounting  Services Customer  Service Payroll and  Accounts  Payable Administrative  Services Human Resources Purchasing and      Facilities Safety and Risk  Administration Water  Conservation Organization Chart Citizens and  Customers 11 CIP Budget Calendar Each year, the Engineering Department prepares budget instructions for distribution to the departments. These instructions give direction and deadlines for each phase of the CIP budgeting process. The CIP Budget Process is explained on pages 13 and 14. January 29, 2009 Budget workbooks and instructions for the Operating and Capital Budget are distributed to departments. January 30, 2009 to February 13, 2009 Departments begin CIP Budget Process which includes: • Review existing FY 2009 CIP projects. • Remove any CIPs that are complete or will not be budgeted in the CIP budget the next six years. • Estimate the total project-to-date expenditures through 6/30/09 for each CIP. • Adjust the annual amount for the remaining CIPs when appropriate and include justification for the changes to each year’s changes. • Develop CIP project cost and schedules, unless more specific information is available. • Submit new CIP projects for consideration. March 13, 2009 Engineering Department reviews all CIP budget requests with Assistant General Manager and adjusts, if necessary. March 20, 2009 Engineering reviews and prepares CIP budget and submits to Finance for review and to incorporate into rate model to determine proposed rates. April 6, 2009 CIP budget presented to the General Manager for review and comments. April 16, 2009 General Manager performs preliminary review of budget. May 13, 2009 Final review of proposed budget and rates is done by the General Manager. May 21, 2009 Board of Directors adopts Fiscal Year 2009 Operating and Capital Budget. 12 CIP Budget Process  The District has integrated the Capital Improvement Program (CIP) Budget and the Operating Budget. These budgets are developed based on the District's Water Resources Master Plan and Strategic Business Plan. Appropriate budget amounts are determined by using the historical data of operations, growth, developers' input, SANDAG projections, and economic outlook. The District is accounted for and budgeted as an enterprise fund and conforms to the guidelines of generally accepted accounting principles (GAAP). To assure reliable, high-quality service to the growing customer base, the District has committed to a number of long-range strategies that drive the budgeting process. The strategies and assumptions used to develop the District's integrated budget are: • an average projected long-term growth rate of 1.7% • pass-through rate increases for costs imposed on the District by the wholesale water providers • accurate projection of capital budget needs (including replacement needs) • reserve funding in accordance with the Reserve Policy to meet future growth demands • funding of the Strategic Plan initiatives categorized into the Balanced Scorecard perspectives • avoidance of rate spikes by leveling rate increases over a six-year period The Engineering Department (Engineering) issues budget instructions for the CIP budget process. Each project manager receives a report of year-to-date project expenses and then estimates cost to the end of the fiscal year, plus future costs, including inflation, to complete the project. Costs are adjusted for scope changes as well as construction cost increases. Engineering then compiles the CIP Budget and submits it to the Assistant General Managers and the General Manager for review prior to presentation to the Board of Directors. Once all of these budgets have been calculated, the Finance Department inputs all of the operating revenues and expenses, CIP expenses, reserve funding, and reserve levels into the District’s Rate Model. Inflators for cost and volume changes are input into the Rate Model and cost and rates are calculated for the current fiscal year plus five subsequent years. Using this comprehensive modeling tool, the District is able to smooth future rate increases, determine when debt should be issued, and maintain all of the reserve levels in accordance with its Reserve Policy. In the spring, the Strategic Plan is presented to the Board of Directors for adoption. This is followed by the Finance and the Engineering Departments presenting to the Board of Directors their recommendations at a special budget meeting in May of each year. The adoption of the Strategic Plan and budget on an annual basis gives the District its direction for the following fiscal year. 13 CIP Budget Process  During the year, each project manager receives monthly budget and cost reports on their assigned CIP projects. These reports are essential to monitor and control costs. As events occur or conditions change, modifications to or deviations from the original budget may be necessary. In the event the General Manager determines that an emergency exists which requires immediate action, he may transfer appropriation within the budget allocations, or request that the Board of Directors increase the current budgeted funds. All CIP budget adjustments and requests are submitted to the Engineering Department. The budgets are reviewed for accuracy, categorized into the appropriate project types and funding sources and then prioritized based on need and timing of projects. Projects are reviewed to see if any grant funding is available, and if so, estimated amounts are included as a funding source to these projects. Engineering submits the consolidated CIP list to the Assistant General Managers and General Manager for review and approval. After any necessary adjustments, the CIP budget is submitted to the Board of Directors for approval each fiscal year along with the Operating Budget. The Budget Report is intended as a financial guide and may be modified by the Board of Directors during Fiscal Year 2010. 14 15 Capital Improvement Program  The District provides water service to a population of approximately 195,000 which is expected to ultimately increase to 277,000. This growth as well as the maintenance of existing assets requires long term capital planning. The process is a dynamic one due to the evolving needs of the community, water supply issues, and changing regulations, and therefore is part of the District’s overall strategic planning. The capital planning process involves identifying current and future needs, and prioritizing them based on certain operating assumptions. The primary objective of this planning effort is to support an orderly, efficient program of expansion, replacement and betterment, while maintaining a stable long-range financial plan. To accommodate this growth requires that the District invest $500 million in capital assets through ultimate build-out. The Fiscal Year 2010 Capital Budget is $37.2 million and the five-year Capital Improvement Program (CIP) totals $222.4 million. A separate CIP Budget Notebook contains the descriptions, justifications, expenditures, and funding for all the identified projects to ultimate build-out. Assumptions and Criteria The Water Resources Master Plan (WRMP) is based on several major assumptions and design criteria as follows: 1. Utilizing historical water demands for each land use type in the District to calculate future demands; 2. Using maximum day peaking factors that vary with demand level; 3. Utilizing land use as planned by the City of Chula Vista; 4. Providing ten days of emergency water supply through a maximum of five days in covered reservoirs and a minimum of five days from interconnections with adjacent agencies; 5. Inclusion of emergency operational storage to meet the five-day covered storage requirement into the ten-day outage supply requirement. In summary, the CIP is developed based on the District's Water Resources Master Plan, incorporating historical data, growth, developers' input, SANDAG projections, and long-term economic outlook. Justification for Project and Impact on Operating Budget The justification for each project is determined by whether it is required due to growth (Expansion), improvements or upgrades (Betterment), or to replace an existing asset (Replacement). As these projects are completed and placed into service, there may be an impact on the Operating Budget by increasing cost in the areas of maintenance, energy or chemicals as shown on the justification and impact pages in this section. 16 Capital Purchases and Facilities This year, all capital expenditures are in the CIP. This includes capital facilities and capital purchases. Capital purchases are non-recurring operating expense items for District-wide use that cost more than $10,000 each and have an estimated useful life of two years or more. The Capital Purchase Projects include Vehicle, Office Equipment and Furniture, and Field Equipment purchases, the details of which can be found on page 32. Capital Facility Projects are items that exceed $10,000 or $20,000 for infrastructure related items (as defined under Capital Equipment on page 213 of the Glossary) and have a useful life of at least two years. The CIP projects identified are prioritized based on the following criteria: 1. Safety, restoration of service, immediate obligation, Board directed or critical system need. 2. System upgrades or requirements to maintain system reliability in the next few fiscal years. 3. Need to meet the future growth of the system. 4. Project requirement may be reduced in capacity or may have low probability of need in the future. The following three categories of CIP projects are: Expansion Facilities required to support new or future users which are funded from capacity fees or user rates. Betterment Facilities required because of inadequate capacity or new requirements that benefit existing users and funded from availability, betterment fees or rates. Replacement Facilities required to renew or replace existing facilities that have deteriorated or have exceeded their useful life and are funded from user rates. Capital Improvement Projects The 2010 Fiscal Year CIP Budget contains 87 projects. The cost of the work planned for Fiscal Year 2010 is $37.2 million. Of the 87 projects planned for Fiscal Year 2010, only one is designated as reimbursable projects with estimated costs of $1,000. These projects are built by developers and reimbursed by the District. Capital Improvement Program  17 The following shows how the $37.2 million of projects are broken down into four categories: 1.Capital facilities $ 28.7 million 2.Replacement or renewal projects $ 6.7 million 3.Capital purchase projects $ 1.8 million 4.Developer reimbursement projects $ 1.0 thousand The Five-Year CIP and Fiscal Year 2010 Capital Budgets are consistent with the District's Water Resources Master Plan, current capacity fees, and the District's strategic financial objectives. Major CIP Projects  18 Flagship CIP Project in Construction Key Component: A new 2.0 MG Steel Reservoir will provide additional storage in the 1296 Pressure Zone. Schedule: Notice to Proceed was issued on February 10, 2009. Project is on schedule and is expected to be completed prior to February 16, 2010. Cost: The project budget is $3.64 million, of which $1.7 million, or 47%, has been spent. Significant Issues: None. Highlights: The design of this reservoir is a Type III concrete reservoir. The lifecycle cost of building a concrete reservoir is much lower than a welded steel reservoir. A solar power generating system was added to this project which includes a 75 square-foot photovoltaic panel for generating power, which is tied to the SDG&E power grid. 1296-3 Reservoir 2.0 MG (P2143) This project was awarded in February 2009. This project will provide additional storage in the 1296 Pressure Zone. 19 Flagship CIP Project in Construction Key Component: A new 2.2 MG Steel Reservoir to meet the ultimate demand in the 850 pressure zone. Schedule: Construction is approximately 98% complete. The project is scheduled for completion in June 2009. Cost: The project budget is $3.25 million, of which $3.14 million, or 97%, has been spent. Significant Issues: The project completion date has been extended from June 2009 to August 2009, due to delays by SDG&E for service to the site along with long lead times for materials. Highlights: The design includes a solar panel capable of producing a minimum of 1 kW that will be tied back to the grid. 850-4 Reservoir (P2191) This project was awarded and started in February 2008. This project includes the construction of a 2.2 MG steel reservoir. 20 Flagship CIP Project in Construction  36-Inch Pipeline From FCF No. 14 to Regulatory Site Project Key Component: Approximately 5 miles of 36-inch pipeline for potable water from Otay’s FCF No. 14 to the Regulatory Site. Schedule: A construction contract was awarded on June 3, 2009. Cost: The project budget is $22.0 million, of which $3.77 million, or 17% has been spent. Significant Issues: None Highlights: The first and main component of the Jamacha Road Pipeline Project consists of the construction of a 36-inch tape wrapped cement mortar lined and coated steel pipeline which will transfer water from the Otay 14 Flow Control Facility. The second component consists of the replacement of concrete cylinder pipe with approx. 4,500 feet of 12-inch and 8-inch polyvinyl chloride pipe along Jamacha Road. 21 CIP Project in Construction  1485-1 Pump Station Replacement (P2172) This project was awarded and started in January 2009. This project consists of construction of a new pump station to replace the existing pump station and to expand capacity as projected within the Water Resources Master Plan. 22 CIP Project in Construction  450-1 Reservoir Disinfection Facility (R2092) This project was awarded in December 2008. The recycled water will be additionally disinfected prior to delivery to District customers. This project will supplement the disinfection provided for the South Bay Water Reclamation Plant. 23 (Thousand $000s)FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Total Capacity Fees 1,619$ 1,514$ 2,576$ 10,051$ 13,584$ 16,340$ 45,683$ Debt financing 41,000 - 54,380 - 14,610 - 109,990 Grants 5,221 3,970 1,130 1,050 1,000 1,000 13,371 Interest 1,104 1,354 1,755 2,133 2,112 2,502 10,961 Betterment Charges 948 948 976 1,006 1,036 1,067 5,981 Temporary Meters 1,171 1,171 1,173 1,178 1,185 1,187 7,064 Availability (Betterment Portion) 519 519 534 550 567 584 3,273 Transfer from General Fund 9,833 8,669 13,859 15,894 17,683 21,582 87,520 Interfund Transfers - - - - - 1,545 1,545 Total Sources 61,415 18,144 76,384 31,862 51,776 45,807 285,387 CIP Projects 37,272 29,946 42,366 43,841 35,041 33,949 222,415 Betterment Fees for Maintenance 571 583 595 606 618 631 3,604 Debt Service 5,261 6,238 8,513 9,876 11,134 11,474 52,496 Developer Services 1,397 1,404 1,418 1,432 1,447 1,461 8,559 Interfund Transfers - - - - - 1,545 1,545 Total Uses 44,501 38,171 52,892 55,756 48,240 49,060 288,619 Net Sources (Uses)16,913$ (20,027)$ 23,492$ (23,894)$ 3,537$ (3,253)$ (3,232)$ CIP Reserve Funds The CIP Reserve Funds presentation, shown on the following pages, is designed to provide an understanding of how the funding of CIPs is expected to financially influence the District over the next six years. The financial impacts are based on the CIP and its funding sources, including fund transfers in accordance with the District’s Reserve Policy, and planned debt issuances. This data is captured in the District’s Rate Model on an annual basis in order to make these projections. $15,046 $31,910 $17,245 $9,434 $26,029 $8,712 $20,966 $29,667 $17,034 $5,598 $33,832 $4,343 $3,002 $37,894 $6,413 $3,040 $39,400 $1,616 $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 Th o u s a n d s FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Fiscal Year RESERVE FUND BALANCES Betterment Replacement Expansion 24 (Thousands $000s)FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 TOTAL Expansion 13,915$ 14,415$ 19,966$ 23,210$ 22,494$ 28,620$ 122,620$ Betterment 14,614 9,152 18,307 17,406 9,695 4,302 73,476 Replacement 8,744 6,379 4,093 3,225 2,852 1,027 26,319 TOTAL 37,272$ 29,946$ 42,366$ 43,841$ 35,041$ 33,949$ 222,415$ (Thousands $000s)FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 TOTAL Capital Facility Projects 28,728$ 21,672$ 34,246$ 30,407$ 21,699$ 18,082$ 154,834$ Maintenance Projects 6,716 6,830 3,520 2,325 2,250 500 22,141 Capital Purchase Projects 1,827 995 1,090 1,310 962 867 7,051 Developer Reimbursement Projects 1 99 825 350 - - 1,275 Subtotal 37,272 29,596 39,681 34,392 24,911 19,449 185,301 FY 2011 Through FY 2015 Projects - 350 2,685 9,449 10,130 14,500 37,114 TOTAL 37,272$ 29,946$ 42,366$ 43,841$ 35,041$ 33,949$ 222,415$ CIP Funding Source and Category $0 $10,000 $20,000 $30,000 $40,000 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 SIX-YEAR CIP BY FUNDING SOURCE Expansion Replacement Betterment $0 $10,000 $20,000 $30,000 $40,000 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 SIX-YEAR CIP BY CATEGORY Capital Facility Projects Maintenance Projects Capital Purchase Projects Developer Reimbursement Projects 25 2010 2011 2012 2013 2014 2015 CIP No.Description FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total CAPITAL FACILITY PROJECTS P2009 PL - 36-Inch, SDCWA Otay FCF No. 14 to Regulatory Site 15,000$ 3,200$ -$ -$ -$ -$ 18,200$ P2010 PL - 24-Inch, Sweetwater Authority Perdue WTP to 36-Inch Main 135 400 1,600 1,600 - - 3,735 P2038 PL - 12-Inch, 978 Zone, Jamacha, Hidden Mesa, and Chase Upsize and Replacements 1,100 200 - - - - 1,300 P2040 Res - 1655-1 Reservoir 0.5 MG 1 1 1 78 700 795 1,576 P2143 Res - 1296-3 Reservoir 2 MG 2,000 40 - - - - 2,040 P2172 PS - 1485-1 Pump Station Replacement 1,550 25 - - - - 1,575 P2181 PL - 30-Inch, 1296 Zone, Proctor Valley Road - Proctor Valley PS/Millar Ranch 100 400 2,000 1,700 - - 4,200 P2185 Res - 640-1 Reservoir 20.0 MG 550 - - - - - 550 P2191 Res - 850-4 Reservoir 2.2 MG 435 - - - - - 435 P2203 PL - 36-Inch, 1296 Zone, Proctor Valley Road - Millar Ranch/Pioneer 120 140 800 440 - - 1,500 P2204 PL - 24-Inch, 1296 Zone, Pioneer Way - Proctor Valley/1296 Reservoirs 100 200 1,100 600 - - 2,000 P2318 PL - 20-Inch, 657 Zone, Summit Cross-Tie and 36-Inch Main Connections 1 99 230 200 - - 530 P2387 PL - 12-Inch, 832 Zone, Steele Canyon Road - Via Caliente/Campo 15 - - - - - 15 P2391 PS - Perdue WTP Pump Station (5 MGD)200 300 2,700 2,000 - - 5,200 P2430 PL - 30-Inch, 980 Zone, Proctor Valley Road - PB Bndy/Proctor Valley PS 150 450 2,400 2,200 - - 5,200 P2434 Rancho Del Rey Groundwater Well Development 1,450 1,648 - - - - 3,098 P2450 Otay River Groundwater Well Demineralization Project 20 100 500 1,000 5,000 4,400 11,020 P2451 Rosarito Desalination Facility Conveyance System 500 850 12,000 14,000 2,450 - 29,800 P2465 Regulatory Site Material Storage Bins 10 - - - - - 10 P2466 Regional Training Facility 90 60 - - - - 150 P2467 San Diego Formation Groundwater Feasibility Study 600 600 - - - - 1,200 P2471 850/657 PRS at La Presa Pump Station 80 225 - - - - 305 P2472 Water Supply Feasibility Studies 150 -----150 CIP Projects ($1,000s) The 2010 Fiscal Year CIP Budget contains 87 projects. The costs for the work planned for Fiscal Year 2010 is $37.3 million. Of the 87 projects planned for Fiscal Year 2010, one is designated as reimbursable project with an estimated cost of $1,000. This project is built by a developer and reimbursed by the District. P2472 Water Supply Feasibility Studies 150 - - - - - 150 P2473 PS - 711-1 Pump Station Improvement 325 50 - - - - 375 P2474 Fuel Storage Covers and Containment 100 - - - - - 100 P2475 Pump Station Fire Hydrant Installations 40 - - - - - 40 P2481 Middle Sweetwater River Basin Groundwater Well System 1,000 2,000 4,000 - - - 7,000 P2482 Otay Mesa Lot 7 Groundwater Well System 150 1,700 1,200 - - - 3,050 P2487 Sir Francis Helix and Otay Valley Cal American Agency Interconnections 200 - - - - - 200 P2488 Del Rio Road Helix and Otay Agency Interconnection 25 125 - - - - 150 P2489 Gillespie Drive Helix and Otay Agency Interconnection 25 125 - - - - 150 P2497 Solar Power Feasibility Study 50 - - - - - 50 P2498 Brine Disposal Pipeline Otay River Demineralization Plant to South Bay Outfall 5 10 40 100 4,000 1,445 5,600 R2048 RecPL - Otay Mesa Distribution Pipelines and Conversions 150 250 1,500 90 - - 1,990 R2053 RWCWRF - R.O. Building Remodel and Office Furniture 15 - - - - - 15 R2058 RecPL - 16-Inch, 860 Zone, Airway Road - Otay Mesa/Alta 350 775 775 700 - - 2,600 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway 295 3,150 400 55 - - 3,900 R2081 RecPL - 20-Inch, 944 Zone, Lane Avenue - Proctor Valley/Pond No. 1 70 - - - - - 70 R2087 RecPL - 20-Inch, 944 Zone, Wueste Road - Olympic/Otay WTP 350 3,500 450 - - - 4,300 R2088 RecPL - 20-Inch, 860 Zone, County Jail - Roll Reservoir/860-1 Reservoir 5 20 200 1,700 1,510 - 3,435 R2089 North District Recycled Water Regulatory Compliance 20 - - - - - 20 R2091 RecPS - 944-1 Pump Station Upgrade 500 - - - - - 500 R2092 Dis - 450-1 Reservoir Disinfection Facility 70 - - - - - 70 R2093 MBR City of Chula Vista 50 50 50 50 1,500 3,280 4,980 R2094 Potable Irrigation Meters to Recycled Water Conversions 500 500 1,000 - - - 2,000 R2097 RWCWRF - Salt Creek Live Stream Discharge 26 160 100 - - - 286 S2018 RWCWRF - Secondary Process Automation 50 - - - - - 50 47 Total Capital Facility Projects 28,728 21,353 33,046 26,513 15,160 9,920 134,720 26 CIP Projects ($1,000s) CIP No.Description FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total REPLACEMENT/RENEWAL PROJECTS P2356 PL - 12-Inch, 803 Zone, Jamul Drive Permastran Pipeline Replacement 15 - - - - - 15 P2366 APCD Engine Replacements and Retrofits 180 190 220 200 200 200 1,190 P2382 Safety and Security Improvements 70 50 50 50 50 50 320 P2416 SR-125 Utility Relocations 40 - - - - - 40 P2440 I-905 Utility Relocations 200 63 - - - - 263 P2453 SR-11 Utility Relocations 75 175 245 - - - 495 P2456 Air and Vacuum Valve Upgrades 500 450 450 - - - 1,400 P2458 AMR Manual Meter Replacement 1,400 1,500 1,650 1,700 1,650 - 7,900 P2477 Res - 624-1 Reservoir Cover Replacement 325 100 - - - - 425 P2483 PS - 870-1Pump Motor and Switch Gear Replacement 130 - - - - - 130 P2484 Large Water Meter Replacement Program 135 100 100 100 100 - 535 P2485 SCADA Communication System and Software Replacement 265 350 300 - - - 915 P2486 Asset Management Plan Condition Assessment and Data Acquisition 300 300 200 - - - 800 P2490 1296-1 Reservoir Interior/Exterior Coating and Upgrades 340 10 - - - - 350 P2491 850-3 Reservoir Exterior Coating 290 10 - - - - 300 P2492 1296-2 Reservoir Interior/Exterior Coating and Upgrades 30 560 10 - - - 600 P2493 624-2 Reservoir Interior Coating and Upgrades 30 910 10 - - - 950 P2494 Multiple Species Conservation Plan 141 75 10 - - - 226 P2495 San Miguel Habitat Management/Mitigation Area 225 150 150 175 150 150 1,000 P2496 Otay Lakes Road Utility Relocations 75 25 - - - - 100 R2086 RWCWRF Force Main AirVac Replacements and Road Improvements 40 - - - - - 40 R2095 RWCWRF - Filter Storage Reservoir Cover Replacement 75 - - - - - 75 R2096 RWCWRF - Blower System Rehabilitation/Replacement 800 200 - - - - 1,000 S2012 SVSD Outfall and RSD Replacement and OM Reimbursement 300 130 100 100 100 100 830 S2015 Calavo Lift Station Replacement 10 - - - - - 10 S2019 Avocado Boulevard 8-Inch Sewer Main Improvement 600 1,032 - - - - 1,632 S2020 Calavo Drive 8-Inch Sewer Main Replacement 40 300 10 - - - 350 S2021 Jamacha Road 8-Inch Sewer Main Replacement 30 110 10 - - - 150 S2022 Hidden Mesa Drive 8-Inch Sewer Main Rehabilitation 5 40 5 - - - 50 S2023 Calavo Drive Sewer Main Utility Relocation 50 -----50S2023Calavo Drive Sewer Main Utility Relocation 50 - - - - - 50 30 Total Replacement/Renewal Projects 6,716 6,830 3,520 2,325 2,250 500 22,141 CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases 484 410 420 640 392 382 2,728 P2285 Office Equipment and Furniture Capital Purchases 40 20 20 20 20 20 140 P2286 Field Equipment Capital Purchases 183 65 50 50 50 15 413 P2443 Information Technology Mobile Services 150 100 100 100 - - 450 P2461 Records Management System Upgrade 100 - - - - - 100 P2469 Information Technology Network and Hardware 300 200 300 300 300 250 1,650 P2470 Application Systems Development and Integration 430 200 200 200 200 200 1,430 P2478 Administration Building Engine/Generator Set 120 - - - - - 120 P2479 Operations Yard Property Acquisition 20 - - - - - 20 9 Total Capital Purchase Projects 1,827 995 1,090 1,310 962 867 7,051 CIP No.Description FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total DEVELOPER REIMBURSEMENT PROJECTS P2325 PL - 10" to 12" Oversize, 1296 Zone, PB Road - Rolling Hills Hydro PS/PB Bndy 1 49 - - - - 50 1 Total Developer Reimbursement Projects 1 49 - - - - 50 87 Total - FY 2010 Projects 37,272 29,227 37,656 30,148 18,372 11,287 163,962 19 FY 2011 Through FY 2015 Projects - 719 4,710 13,693 16,669 22,662 58,453 Grand Totals 37,272$ 29,946$ 42,366$ 43,841$ 35,041$ 33,949$ 222,415 27 CIP No.Description J/FS (1)Total FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 P2009 PL - 36-Inch, SDCWA Otay E/B 9,300$ - - 9,300 9,600 9,900 10,200 39,000$ P2010 PL - 24-Inch, Sweetwater Authority E/B 1,400 - - - - 1,400 1,400 2,800 P2037 Res - 980-3 Reservoir 15 MG E 28,200 - - - - - - - P2181 PL - 30-Inch, 1296 Zone E/B 1,800 - - - - 1,800 1,900 3,700 P2203 PL - 36-Inch, 1296 Zone E/B 1,000 - - - - 1,000 1,000 2,000 P2204 PL - 24-Inch, 1296 Zone E/B 700 - - - - 700 700 1,400 P2235 Res - 624-4 Emergency Reservoir E 75,100 - - - - - - - P2391 PS - Perdue WTP Pump Station E/B 51,800 - - - - 51,800 53,400 105,200 P2430 PL - 30-Inch, 980 Zone E/B 2,700 - - - - 2,700 2,800 5,500 P2434 Rancho Del Rey Groundwater Well E/B 5,700 - - 5,700 5,900 6,100 6,300 24,000 P2451 Rosarito Desalination Facility E/B 3,400 - - - - - 3,400 3,400 P2481 Middle Sweetwater River Basin E/B 9,700 - - - 9,700 10,000 10,300 30,000 P2482 Otay Mesa Lot 7 Groundwater Well E/B 3,200 - - - 3,200 3,300 3,400 9,900 P2498 Brine Disposal Pipeline Otay River E/B 2,700 - - - - - - - P2033 PL - 16-Inch, 1296 Zone E 2,200 - - - - 1,100 2,200 3,300 P2038 PL - 12-Inch, 978 Zone B/R 1,500 - - 1,500 1,500 1,500 1,500 6,000 P2040 Res - 1655-1 Reservoir B 900 - - - - - - - P2143 Res - 1296-3 Reservoir E 3,800 - 3,800 3,900 4,000 4,100 4,200 20,000 P2172 PS - 1485-1 Pump Station B/R 7,400 - 7,400 7,600 7,800 8,000 8,200 39,000 P2185 Res - 640-1 Reservoir E/B 37,600 - 18,800 37,600 38,700 39,900 41,100 176,100 P2190 PL - 10-Inch, 1485 Zone B 400 - - - - 400 400 800 P2191 Res - 850-4 Reservoir E/B 4,200 2,100 4,200 4,300 4,400 4,500 4,600 24,100 P2318 PL - 20-Inch, 657 Zone B 100 - - - - 100 100 200 P2357 PS - 657-1/850-1 Pump Station B (44,400) - - - (44,400) (45,700) (47,100) (137,200) P2370 Res - Dorchester Reservoir B (4,800) - - - (4,800) (4,900) (5,000) (14,700) P2387 PL - 12-Inch, 832 Zone B 600 500 600 600 600 600 600 3,500 P2450 Otay River Groundwater Well E/B 28,100 - - - - - - - R2034 RecRes - 860-1 Reservoir E 7,500 - - - - - 7,500 7,500 R2048 RecPL - Otay Mesa Distribution E 10,200 - - - - - 10,200 10,200 R2077 RecPL - 24-Inch, 860 Zone E 3,200 - - - - 3,200 3,300 6,500 R2081 RecPL - 16-Inch, 944 Zone E 2,700 2,300 2,400 2,500 2,600 2,700 2,800 15,300 R2087 RecPL - 16-Inch, 944 Zone E 5,100 - - - 5,100 5,300 5,500 15,900 R2088 RecPL - 24-Inch, 860 Zone E/B 2,400 - - - - - 1,800 1,800 R2091 RecPS - 944-1 Pump Station Upgrade E 107,900 - 107,900 111,100 114,400 117,800 121,300 572,500 R2092 Dis - 450-1 Res Disinfection Facility E 10,700 - 5,400 10,700 11,000 11,300 11,600 50,000 Total Capital Facility Projects 384,000$ 4,900$ 150,500$ 194,800$ 169,300$ 238,600$ 269,600$ 1,027,700$ P2458 AMR Retrofit R (226,400) (36,500) (34,500) (34,700) (39,300) (40,400) (41,000) (226,400) Total Replacement/Renewal Projects (226,400) (36,500) (34,500) (34,700) (39,300) (40,400) (41,000) (226,400) (1)Projected Incremental Operating Expenditures(operating cost) or O&M includes labor, benefits, materials and overhead. (2)J/FS - Justification and Funding Source - Some projects have multiple funding sources as indicated by a slash (/): E - Expansion B - Betterment R - Replacement CAPITAL FACILITY PROJECTS CIP Justification and Impact on Operating Budget Projected Incremental Operating Expenditures (1) REPLACEMENT/RENEWAL PROJECTS O&M cost for pipes: Total annual operating cost divided by the number of feet of pipe in the system = O&M cost to maintain a foot of pipe. This rate is then multiplied by the number of feet in new pipeline, and is increased annually for inflation. O&M cost for a pump station: Total annual operating cost divided by the number of million of gallons a day (MGD) capacity in the system = O&M cost per MGD. This rate is then multiplied by the MGD capacity of the new pump station. Similarly, power cost per MGD for transmission is calculated and applied to the MGD of the new pump station. Chemical expenses are incurred for pumping at the well sites. All estimated costs are increased annually for inflation. O&M cost for a reservoir: Total annual operating cost divided by the number of million gallons (MG) of storage capacity in the system. This rate per MG is then multiplied by the MG capacity of the new reservoir. Reservoirs require chemical treatment; therefore, the chemical cost per MG is estimated and applied to the future operating cost. Both O&M and chemical costs are increased annually for inflation. Each of the capital purchases and other types of assets has its own unique O&M cost. 28 CIP Justification and Impact on Operating Budget CIP No.Description J/FS (2)Total FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total P2443 IT Mobile Services E/R 18,000$ 18,000 18,500 19,100 19,700 20,300 20,900 116,500$ Total Capital Purchase Projects 18,000 18,000 18,500 19,100 19,700 20,300 20,900 116,500 P2104 PL - 12-Inch, 711 Zone E 2,000 - - - - 2,000 2,100 4,100 P2107 PL - 12-Inch, 711 Zone E 1,700 - - - - 1,700 1,800 3,500 P2325 PL - 10" to 12" Oversize E 2,300 - - 2,300 2,400 2,500 2,600 9,800 P2402 PL - 12-Inch, 624 Zone E 1,000 - - - - 1,000 1,000 2,000 P2403 PL - 12-Inch, 624 Zone E 3,100 - - - - - 3,100 3,100 R2028 RecPL - 8-Inch, 680 Zone E 2,400 - - - - - 2,400 2,400 R2042 RecPL - 8-Inch, 944 Zone E 900 - - - 500 500 500 1,500 R2047 RecPL - 12-Inch, 680 Zone E 1,400 - - - 1,400 1,400 1,400 4,200 R2058 RecPL - 16-Inch, 860 Zone E 3,600 - - - - 3,600 3,700 7,300 R2082 RecPL - 24-Inch, 680 Zone E 1,200 - - - 1,200 1,200 1,200 3,600 R2083 RecPL - 20-Inch, 680 Zone E 700 - - - 700 700 700 2,100 R2084 RecPL - 20-Inch, 680 Zone E 1,900 - - - - 1,900 2,000 3,900 R2085 RecPL - 20-Inch, 680 Zone E 1,300 - - - - 1,300 1,300 2,600 Total Developer Reimbursement Projects 23,500 - - 2,300 6,200 17,800 23,800 50,100 Total Operating Budget Cost Impact 199,100$ (13,600)$ 134,500$ 181,500$ 155,900$ 236,300$ 273,300$ 967,900$ FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 Total (14,600)$ 18,150$ 43,000$ 43,400$ 76,200$ 105,000$ 271,150$ - 98,200 105,500 78,400 124,800 128,500 535,400 1,000 18,150 33,000 34,100 35,300 39,800 161,350 (13,600)$ 134,500$ 181,500$ 155,900$ 236,300$ 273,300$ 967,900$ Note:See pages 184-185 for complete description of CIP projects. Cost Category CAPITAL PURCHASE PROJECTS DEVELOPER REIMBURSEMENT PROJECTS The preceding schedule shows anticipated operating costs associated with each project in the CIP, and below is a summary of each category of new costs that will be impacted. No additional revenues are associated with the individual projects, as revenues are linked more directly to growth in water sales and capacity fee revenues. Projected Incremental Operating Expenditures Operations and Maintenance Energy Chemical Total Operating Budget Cost Impact 29 ID CIP CIP Project Title Start Finish 1 Project Category: Capital Facility Projects Mon 11/4/91 Tue 6/30/15 2 P2009 PL - 36-Inch, SDCWA Otay FCF No. 14 to Regulatory Site Tue 7/1/97 Thu 6/30/11 3 P2010 PL - 24-Inch, Sweetwater Authority Perdue WTP to36-Inch Main Fri 1/1/10 Sun 6/30/13 4 P2038 PL - 12-Inch, 978 Zone, Jamacha, Hidden Mesa, andChase Upsize and Replacements Fri 7/1/05 Thu6/30/11 5 P2040 Res - 1655-1 Reservoir 0.5 MG Thu7/1/93 Tue 6/30/15 6 P2143 Res - 1296-3 Reservoir 2 MG Thu11/1/01 Wed6/30/10 7 P2172 PS - 1485-1 Pump Station Replacement Mon7/2/01 Wed6/30/10 8 P2181 PL - 30-Inch, 1296 Zone, Proctor Valley Road -Proctor Valley PS/Millar Ranch Fri 1/1/10 Sun 6/30/13 9 P2185 Res - 640-1 Reservoir 20.0 MG Mon11/4/91 Sun10/31/10 10 P2191 Res - 850-4 Reservoir 2.2 MG Tue7/1/03 Thu12/31/09 11 P2203 PL - 36-Inch, 1296 Zone, Proctor Valley Road -Millar Ranch/Pioneer Fri 1/1/10 Sun 6/30/13 12 P2204 PL - 24-Inch, 1296 Zone, Pioneer Way - ProctorValley/1296 Reservoirs Fri 1/1/10 Sun 6/30/13 13 P2318 PL - 20-Inch, 657 Zone, Summit Cross-Tie and36-Inch Main Connections Mon11/3/97 Sun 6/30/13 14 P2387 PL - 12-Inch, 832 Zone, Steele Canyon Road - ViaCaliente/Campo Fri 7/1/05 Mon8/31/09 15 P2391 PS - Perdue WTP Pump Station (5 MGD)Fri 1/1/10 Sun 6/30/13 16 P2430 PL - 30-Inch, 980 Zone, Proctor Valley Road - PB Bndy/Proctor Valley PS Fri 1/1/10 Sun 6/30/13 17 P2434 Rancho Del Rey Groundwater Well Development Fri 7/1/94 Thu 6/30/11 18 P2450 Otay River Groundwater Well Demineralization Project Mon 7/2/07 Tue 6/30/15 19 P2451 Rosarito Desalination Facility Conveyance System Mon 7/3/06 Mon 6/30/14 20 P2465 Regulatory Site Material Storage Bins Mon 7/2/07 Wed 6/30/1021P2466Regional Training Facility Tue 8/1/06 Thu 6/30/1122P2467San Diego Formation Groundwater Feasibility Study Mon 7/2/07 Thu 6/30/1123P2471850/657 PRS at La Presa Pump Station Tue 7/1/08 Thu 6/30/1124P2472Water Supply Feasibility Studies Tue 7/1/08 Wed 6/30/1025P2473PS - 711-1 Pump Station Improvement Thu 1/1/09 Thu 6/30/11 26 P2474 Fuel Storage Covers and Containment Tue 7/1/08 Wed 6/30/10 27 P2475 Pump Station Fire Hydrant Installations Wed 4/1/09 Wed 6/30/10 28 P2481 Middle Sweetwater River Basin Groundwater WellSystem Tue7/1/08 Sat 6/30/12 29 P2482 Otay Mesa Lot 7 Groundwater Well System Tue7/1/08 Sat 6/30/12 30 P2487 Sir Francis Helix and Otay Valley Cal AmericanAgency Interconnections Tue7/1/08 Mon11/30/09 31 P2488 Del Rio Road Helix and Otay AgencyInterconnection Wed7/1/09 Thu6/30/11 32 P2489 Gillespie Drive Helix and Otay AgencyInterconnection Wed7/1/09 Thu6/30/11 33 P2497 Solar Power Feasibility Study Mon7/3/06 Wed6/30/10 34 P2498 Brine Disposal Pipeline Otay RiverDemineralization Plant to South Bay Outfall Mon3/1/10 Tue 6/30/15 35 R2048 RecPL - Otay Mesa Distribution Pipelines andConversions Tue7/1/08 Sun 6/30/13 36 R2053 RWCWRF - R.O. Building Remodel and OfficeFurniture Tue7/1/97 Mon8/31/09 37 R2058 RecPL - 16-Inch, 860 Zone, Airway Road - OtayMesa/Alta Mon7/2/01 Sun 6/30/13 38 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - AltaGate/Airway Mon7/2/01 Sun 6/30/13 39 R2081 RecPL - 20-Inch, 944 Zone, Lane Avenue - ProctorValley/Pond No. 1 Mon7/3/06 Mon8/31/09 40 R2087 RecPL - 20-Inch, 944 Zone, Wueste Road -Olympic/Otay WTP Fri 9/1/06 Sat 6/30/12 41 R2088 RecPL - 20-Inch, 860 Zone, County Jail - Roll Reservoir/860-1 Reservoir Fri 9/1/06 Mon 6/30/14 42 R2089 North District Recycled Water Regulatory Compliance Tue 5/1/07 Thu 12/31/09 43 R2091 RecPS - 944-1 Pump Station Upgrade Mon 7/2/07 Sun 5/30/10 44 R2092 Dis - 450-1 Reservoir Disinfection Facility Mon 7/2/07 Thu 12/30/10 45 R2093 MBR City of Chula Vista Thu 7/31/08 Tue 6/30/15 46 R2094 Potable Irrigation Meters to Recycled Water Conversions Wed 7/1/09 Sat 6/30/12 47 R2097 RWCWRF - Salt Creek Live Stream Discharge Wed 7/1/09 Sat 6/30/12 48 S2018 RWCWRF - Secondary Process Automation Wed 7/1/09 Mon 8/30/1049 50 Project Category: Replacement/RenewalProjects Fri 12/1/00 Tue 6/30/15 51 P2356 PL - 12-Inch, 803 Zone, Jamul Drive Permastran Pipeline Replacement Fri 7/1/05 Mon 8/31/09 1 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Otay Water District FY 2010 - FY 2015 CIP Project Schedules Project: OWD FY 2009 CIP ScheduleDate: Fri 8/14/09 30 ID CIP CIP Project Title Start Finish 52 P2366 APCD Engine Replacements and Retrofits Fri 12/1/00 Tue 6/30/15 53 P2382 Safety and Security Improvements Mon 7/1/02 Tue 6/30/15 54 P2416 SR-125 Utility Relocations Tue10/1/02 Wed6/30/10 55 P2440 I-905 Utility Relocations Wed1/1/03 Thu6/30/11 56 P2453 SR-11 Utility Relocations Mon7/3/06 Sat 6/30/12 57 P2456 Air and Vacuum Valve Upgrades Mon7/3/06 Sat 6/30/12 58 P2458 AMR Manual Meter Replacement Mon7/3/06 Mon6/30/14 59 P2477 Res - 624-1 Reservoir Cover Replacement Tue7/1/08 Mon8/30/10 60 P2483 PS - 870-1Pump Motor and Switch GearReplacement Wed7/1/09 Wed6/30/10 61 P2484 Large Water Meter Replacement Program Wed7/1/09 Mon6/30/14 62 P2485 SCADA Communication System and SoftwareReplacement Wed7/1/09 Sat 6/30/12 63 P2486 Asset Management Plan Condition Assessmentand Data Acquisition Wed7/1/09 Sat 6/30/12 64 P2490 1296-1 Reservoir Interior/Exterior Coating andUpgrades Wed7/1/09 Thu6/30/11 65 P2491 850-3 Reservoir Exterior Coating Wed7/1/09 Thu6/30/11 66 P2492 1296-2 Reservoir Interior/Exterior Coating andUpgrades Wed7/1/09 Sat 6/30/12 67 P2493 624-2 Reservoir Interior Coating and Upgrades Wed 7/1/09 Sat 6/30/12 68 P2494 Multiple Species Conservation Plan Wed 7/1/09 Sat 6/30/12 69 P2495 San Miguel Habitat Management/Mitigation Area Wed 7/1/09 Tue 6/30/15 70 P2496 Otay Lakes Road Utility Relocations Wed 7/1/09 Thu 6/30/11 71 R2086 RWCWRF Force Main AirVac Replacements and Road Improvements Fri 7/1/05 Wed 9/30/0972R2095RWCWRF - Filter Storage Reservoir Cover Replacement Wed 7/1/09 Wed 6/30/1073R2096RWCWRF - Blower System Rehabilitation/Replacement Wed 7/1/09 Thu 6/30/1174S2012SVSD Outfall and RSD Replacement and OM Reimbursement Tue 7/1/03 Tue 6/30/15 75 S2015 Calavo Lift Station Replacement Thu 12/1/05 Wed 12/30/0976S2019Avocado Boulevard 8-Inch Sewer Main Improvement Wed 7/1/09 Thu 6/30/11 77 S2020 Calavo Drive 8-Inch Sewer Main Replacement Wed 7/1/09 Thu 6/30/11 78 S2021 Jamacha Road 8-Inch Sewer Main Replacement Wed 7/1/09 Thu 6/30/11 79 S2022 Hidden Mesa Drive 8-Inch Sewer MainRehabilitation Wed7/1/09 Thu6/30/11 80 S2023 Calavo Drive Sewer Main Utility Relocation Wed7/1/09 Wed6/30/10 81 82 Project Category: Capital Purchase Projects Tue 12/5/00 Tue 6/30/15 83 P2282 Vehicle Capital Purchases Tue 12/5/00 Tue 6/30/15 84 P2285 Office Equipment and Furniture Capital Purchases Tue 12/5/00 Tue 6/30/15 85 P2286 Field Equipment Capital Purchases Tue 12/5/00 Tue 6/30/15 86 P2443 Information Technology Mobile Services Fri 7/1/05 Sun 6/30/13 87 P2461 Records Management System Upgrade Mon7/2/07 Wed6/30/10 88 P2469 Information Technology Network and Hardware Tue7/1/08 Tue 6/30/15 89 P2470 Application Systems Development and Integration Tue7/1/08 Tue 6/30/15 90 P2478 Administration Building Engine/Generator Set Tue7/1/08 Wed6/30/10 91 P2479 Operations Yard Property Acquisition Mon11/3/08 Tue 6/29/10 92 93 Project Category: Developer Reimbursement Projects Thu7/1/04 Thu6/30/11 94 P2325 PL - 10" to 12" Oversize, 1296 Zone, PB Road -Rolling Hills Hydro PS/PB Bndy Thu7/1/04 Thu6/30/11 1 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Otay Water District FY 2010 - FY 2015 CIP Project Schedules Project: OWD FY 2009 CIP ScheduleDate: Fri 8/14/09 31 Item#Amount Type Field Equipment (CIP P2286) N 47 Replacement of filter equipment cover at the treatment plant.R R R R N Total of Field Equipment Office Equipment and Furniture (CIP P2285) Administration 46 To replace copier, printer at the Treatment Plant R R Total of Office Equipment Heavy Truck R R R Subtotal Heavy Truck Light Duty Vehicles R R R R R R R R R R R Subtotal Light Duty Vehicles Total of Vehicles N -New R - Replacement Total Capital Purchases Budget 75,000$ Description Administration 37 Storage Container 10,000$ Operations Skid-steer wheel-loader with ripper bucket, finish bucket, and sweeper attachments. 48,000 44 Crew truck cross-mounted air compressor.15,000 20,000$ 43 183,000 Operations 45 Five-ton cable operated power with manual extend power rotating crane. 13,000 39 Water leak detection system consisting of eight data loggers, field docking station, and leak correlation software. 22,000 Operations 40 2009 F550 or equivalent equipped with a custom made and POT/engine-driven hydraulic system, 220 gallon vacuum tank, power wash gun, racks, cabinets, and hose reels. 90,000$ 38 Replacement copier.20,000 40,000 41 2009 Class 8 ten-wheel dump truck with a 10-12 yard dump bed.78,000 42 2009 Ford F550 or equivalent with a service body and pipe rack.56,000 26 Toyota Matrix.20,000$ 27 Ford F-150 Supercab Four-door or equivalent.23,000 28 Ford Explorer or equivalent.25,000 29 Ford F-150 Supercab Four-door 4X4 or equivalent.26,000 23,000 33 Ford F-150 Supercab Four-door or equivalent.23,000 30 Ford F-150 Supercab Four-door or E150 Van. Vehicle assignment due to for re-evaluation. 23,000 31 Ford Explorer 4X4 or equivalent.25,000 707,000$ 224,000 260,000 484,000 34 Ford F-150 Supercab Four-door 4X4 or equivalent.26,000 35 Capital Purchases Budget Capital purchases are non-recurring operating expense items for District-wide use that cost more than $10,000 each and have an estimated useful life of two years or more. The Capital Purchase Projects include Field Equipment, Office Equipment and Furniture, and Vehicle purchases. Vehicles (CIP P2282) 36 Ford F-150 Supercab Four-door or equivalent.23,000 Ford F-150 Supercab Four-door or equivalent.23,000 32 Ford F-250 or equivalent. 32 CIP Project Sheet Description  The following pages describe each information item on the individual CIP project sheets included in this section. CIP Number: The CIP project number for all projects is assigned by the Engineering Project Manager, and is a unique identifying code on all District records for the specified project. Project Title: Project titles follow a set format as described herein. The type of project should be identified first. For example, if a project were a 711 Pressure Zone 24-inch pipeline, the title would read “PL - 24-Inch, 711 Zone, Location - From A to B.” Pump stations and reservoirs are identified similarly with abbreviations for type and size. Director Division: All projects are located within a Board of Director’s division boundary unless they apply to the entire District or are outside of the District boundaries. The Director division where the majority of the physical project is located is listed. If it is a District-wide project it is listed as “District-wide.” If it is outside the District boundary it is listed as “None.” Project Manager: The person responsible for managing the project from inception through completion. I.D. Location: Most projects are located within one or more improvement districts. The I.D. location listed is where the majority of the physical project is located. However, projects located in portions of the District which have not yet been annexed into an improvement district are listed as “None.”. Original Approved Date: The date the project was originally approved with budget expenditures for the corresponding fiscal year by the Board of Directors. Priority: The priority of the project is listed in this field as one of the following: 1. HIGH: Safety, restoration of service to customers, obligation that requires immediate action, directed by the Board of Directors, and/or critical system need. 2. MEDIUM: Upgrade of system or expansion requirement to maintain system reliability not critical. Identified through planning effort as required within next few fiscal years. 3. LOW: Identified through planning effort as required in future years to support development; not anticipated in the immediate future. 4. VERY LOW: Requirement may have low probability of need in the future. Related CIP Projects: A maximum of three CIP project numbers that affect the scheduling and/or is related to the subject project and/or could provide important information. Budget Amount: The estimated budget includes all costs needed to complete a project including land, right-of-way, consultants, contractors, District staff time, etc. All prior years’ costs are part of the total cost and dollars are rounded up to the nearest $1,000. 33 Description of Project: A brief description of a project which typically includes size, length, capacity, etc. Justification of Project: A brief explanation of why a project is required which addresses flexibility, reliability, water quality, safety, contractual obligation, immediate growth, etc., as appropriate. Comments: Pertinent information that should be known about a project that is not shown elsewhere on the project sheet, including details of funding sources, including grant funding or contributions from other agencies. Funding Detail: The funding sources are listed along with the percentage of distribution to expansion, betterment, and/or replacement. Expenditure Schedule: The breakdown of a project’s expenditures by fiscal year – prior years’ cost along with a six-year budget schedule. Included in each year are all costs to complete the work scheduled in that year rounded up to the nearest $1,000. Project Schedule: The schedule of the primary project phase shown with the estimated start date (month/year) and finish date (month/year). The schedule time frames and estimated cost for each major phase of the project, correspond with the expenditure schedule information. Project Incremental Operation Expenditures: To determine the cost to maintain these new assets, the District looks at the cost of maintaining similar assets through the Infrastructure Management System and financial system. Costs are tracked by three main infrastructure asset groups of pipes, pump stations, and reservoirs, as well as capital purchases and other types. Pipes typically have only operation and maintenance (O&M) costs associated with them, pump stations have O&M as well as power cost, and reservoirs have O&M and chemical cost. Each of the capital purchases and other types has its own unique O&M cost. See page 28-29 for a further explanation of these expenditures. Project Location: A vicinity map is drawn in AutoCAD format using the GIS database as the foundation showing the approximate location and limits of a project within the District. Some projects do not have a specific location. In this case, a map of the entire District will then be shown as the project location. Thomas Bros. Map: The Thomas Brothers’ map page is inserted in this field to show where the project is primarily located. Some projects do not have a specific location in which case the words “District-wide” will be shown. OWD Map Book: The page in the District’s facility map book where a project is primarily located. Some projects do not have a specific location in which case the words “District-wide” will be shown. Submitted By: The project manager who originally submitted or the project manager who revised the project sheet along with the date of submittal or last revision date of the CIP project sheet. 34 CIP No.PROJECT DESCRIPTION PAGE CAPITAL FACILITY PROJECTS P2009 PL - 36-Inch, SDCWA Otay FCF No. 14 to Regulatory Site 37 P2010 PL - 24-Inch, Sweetwater Authority Perdue WTP to 36-Inch Main 39 P2038 PL - 12-Inch, 978 Zone, Jamacha, Hidden Mesa, and Chase Upsize and Replacements 41 P2040 Res - 1655-1 Reservoir 0.5 MG 43 P2143 Res - 1296-3 Reservoir 2 MG 45 P2172 PS - 1485-1 Pump Station Replacement 47 P2181 PL - 30-Inch, 1296 Zone, Proctor Valley Road - Proctor Valley PS/Millar Ranch 49 P2185 Res - 640-1 Reservoir 20.0 MG 51 P2191 Res - 850-4 Reservoir 2.2 MG 53 P2203 PL - 36-Inch, 1296 Zone, Proctor Valley Road - Millar Ranch/Pioneer 55 P2204 PL - 24-Inch, 1296 Zone, Pioneer Way - Proctor Valley/1296 Reservoirs 57 P2318 PL - 20-Inch, 657 Zone, Summit Cross-Tie and 36-Inch Main Connections 59 P2387 PL - 12-Inch, 832 Zone, Steele Canyon Road - Via Caliente/Campo 61 P2391 PS - Perdue WTP Pump Station (5 MGD)63 P2430 PL - 30-Inch, 980 Zone, Proctor Valley Road - PB Bndy/Proctor Valley PS 65 P2434 Rancho Del Rey Groundwater Well Development 67 P2450 Otay River Groundwater Well Demineralization Project 69 P2451 Rosarito Desalination Facility Conveyance System 71 P2465 Regulatory Site Material Storage Bins 73 P2466 Regional Training Facility 75 P2467 San Diego Formation Groundwater Feasibility Study 77 P2471 850/657 PRS at La Presa Pump Station 79 P2472 Water Supply Feasibility Studies 81 P2473 PS - 711-1 Pump Station Improvement 83 P2474 Fuel Storage Covers and Containment 85 P2475 Pump Station Fire Hydrant Installations 87 P2481 Middle Sweetwater River Basin Groundwater Well System 89 P2482 Otay Mesa Lot 7 Groundwater Well System 91 P2487 Sir Francis Helix and Otay Valley Cal American Agency Interconnections 93 P2488 Del Rio Road Helix and Otay Agency Interconnection 95 P2489 Gillespie Drive Helix and Otay Agency Interconnection 97 P2497 Solar Power Feasibility Study 99 P2498 Brine Disposal Pipeline Otay River Demineralization Plant to South Bay Outfall 101 R2048 RecPL - Otay Mesa Distribution Pipelines and Conversions 103 R2053 RWCWRF - R.O. Building Remodel and Office Furniture 105 R2058 RecPL - 16-Inch, 860 Zone, Airway Road - Otay Mesa/Alta 107 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway 109 R2081 RecPL - 20-Inch, 944 Zone, Lane Avenue - Proctor Valley/Pond No. 1 111 R2087 RecPL - 20-Inch, 944 Zone, Wueste Road - Olympic/Otay WTP 113 R2088 RecPL - 20-Inch, 860 Zone, County Jail - Roll Reservoir/860-1 Reservoir 115 R2089 North District Recycled Water Regulatory Compliance 117 R2091 RecPS - 944-1 Pump Station Upgrade 119 R2092 Dis - 450-1 Reservoir Disinfection Facility 121 R2093 MBR City of Chula Vista 123 R2094 Potable Irrigation Meters to Recycled Water Conversions 125 R2097 RWCWRF - Salt Creek Live Stream Discharge 127 S2018 RWCWRF - Secondary Process Automation 129 CIP Project Index 35 CIP Project Index CIP No.PROJECT DESCRIPTION PAGE REPLACEMENT/RENEWAL PROJECTS P2356 PL - 12-Inch, 803 Zone, Jamul Drive Permastran Pipeline Replacement 131 P2366 APCD Engine Replacements and Retrofits 133 P2382 Safety and Security Improvements 135 P2416 SR-125 Utility Relocations 137 P2440 I-905 Utility Relocations 139 P2453 SR-11 Utility Relocations 141 P2456 Air and Vacuum Valve Upgrades 143 P2458 AMR Manual Meter Replacement 145 P2477 Res - 624-1 Reservoir Cover Replacement 147 P2483 PS - 870-1Pump Motor and Switch Gear Replacement 149 P2484 Large Water Meter Replacement Program 151 P2485 SCADA Communication System and Software Replacement 153 P2486 Asset Management Plan Condition Assessment and Data Acquisition 155 P2490 1296-1 Reservoir Interior/Exterior Coating and Upgrades 157 P2491 850-3 Reservoir Exterior Coating 159 P2492 1296-2 Reservoir Interior/Exterior Coating and Upgrades 161 P2493 624-2 Reservoir Interior Coating and Upgrades 163 P2494 Multiple Species Conservation Plan 165 P2495 San Miguel Habitat Management/Mitigation Area 167 P2496 Otay Lakes Road Utility Relocations 169 R2086 RWCWRF Force Main AirVac Replacements and Road Improvements 171 R2095 RWCWRF - Filter Storage Reservoir Cover Replacement 173 R2096 RWCWRF - Blower System Rehabilitation/Replacement 175 S2012 SVSD Outfall and RSD Replacement and OM Reimbursement 177 S2015 Calavo Lift Station Replacement 179 S2019 Avocado Boulevard 8-Inch Sewer Main Improvement 181 S2020 Calavo Drive 8-Inch Sewer Main Replacement 183 S2021 Jamacha Road 8-Inch Sewer Main Replacement 185 S2022 Hidden Mesa Drive 8-Inch Sewer Main Rehabilitation 187 S2023 Calavo Drive Sewer Main Utility Relocation 189 CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases 191 P2285 Office Equipment and Furniture Capital Purchases 193 P2286 Field Equipment Capital Purchases 195 P2443 Information Technology Mobile Services 197 P2461 Records Management System Upgrade 199 P2469 Information Technology Network and Hardware 201 P2470 Application Systems Development and Integration 203 P2478 Administration Building Engine/Generator Set 205 P2479 Operations Yard Property Acquisition 207 DEVELOPER REIMBURSEMENT PROJECTS P2325 PL - 10" to 12" Oversize, 1296 Zone, PB Road - Rolling Hills Hydro PS/PB Bndy 209 36 PROJECT TITILE: PL - 36-Inch, SDCWA Otay FCF No. 14 to Regulatory Site PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2038, P2185 5 3 1 $22,200,000 DESCRIPTION OF PROJECT: Construction of approximately 27,300 feet of 36-inch pipeline from San Diego County Water Authority Otay FCF No. 14 to the Regulatory Site and fund 50% of the cost to upgrade FCF No. 14 to a capacity of 16 million gallons per day. JUSTIFICATION OF PROJECT: The East County Regional Treated Water Improvement Program (ECRTWIP) Agreement was approved by Otay WD Board in December 2005 and by the San Diego County Water Authority (SDCWA) Board in February 2006. Per terms of the agreement Otay WD is obligated to construct the pipeline by March 1, 2010 and SDCWA is have operational FCF No. 14 as well. COMMENTS: The San Diego County Water Authority (SDCWA) will provide $4.2 million in funds towards construction the pipeline per terms of the Agreement Between the San Diego County Water Authority and Otay Water District Regarding Implementation of the East County Regional Treated Water Improvement Program. The cost estimate includes the payment of $620,000 to SDCWA. General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2009 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $15,000 $3,200 General Fund Various I.D.'s 40%40% 60%60% $4,000 40%60%100% $22,200 2010 2011 2012 2013 2014 2015 7/16/1997 37 CIP Number: P2009 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 356 Submitted By: Ron Ripperger Date: 07/97 11/07 07/09 06/09 10/07 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $9,300 $9,600 $9,900 $10,200 $39,000 ESTIMATED COST (X $1,000): $309 $2,703 $19,188 38 PROJECT TITILE: PL - 24-Inch, Sweetwater Authority Perdue WTP to 36-Inch Main PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2391 3 1 1 $4,000,000 DESCRIPTION OF PROJECT: Construction of a 24-inch pipeline from the Sweetwater Authority Perdue Water Treatment Plant to the existing 36-inch main in Akard Street. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2010 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $135 $400 $1,600 $1,600 General Fund Various I.D.'s 40%40% 60%60% $265 40%60%100% $4,000 2010 2011 2012 2013 2014 2015 39 CIP Number: P2010 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 184 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $1,400 $1,400 $2,800 ESTIMATED COST (X $1,000): $160 $440 $3,400 40 PROJECT TITILE: PL - 12-Inch, 978 Zone, Jamacha, Hidden Mesa, and Chase Upsize and Replacements PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay P2009 5 3 1 $2,500,000 DESCRIPTION OF PROJECT: Construction of approximately 8,600 feet of 12-inch pipeline located within Jamacha Road, Hidden Mesa Road, and Chase Avenue. This project includes construction of a looped system between Hidden Mesa Road and Penasco Road. JUSTIFICATION OF PROJECT: The existing pipelines in Chase Avenue and Jamacha Boulevard are undersized and the existing pipeline in Hidden Mesa Road is deteriorated steel pipe that needs to be replaced and located within the roadway right-of-way away from the existing residences. COMMENTS: The Jamacha Road portion of this project is intended to be designed and constructed as part of CIP project P2009. General Fund at 50% replacement and ID 3 at 50% betterment. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2038 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1,100 $200 General Fund I.D. 3 50%50% 50%50% $1,200 50%50%100% $2,500 2010 2011 2012 2013 2014 2015 7/16/1997 41 CIP Number: P2038 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 368 Submitted By: Daniel Kay Date: 07/05 11/07 07/09 06/09 06/06 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $1,500 $1,500 $1,500 $1,500 $6,000 ESTIMATED COST (X $1,000): $100 $275 $2,125 42 PROJECT TITILE: Res - 1655-1 Reservoir 0.5 MG PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 5 - 3 $2,055,000 DESCRIPTION OF PROJECT: Construction of a 0.5 million gallon reservoir and approximately 1,500 feet of 12-inch pipeline to connect to the existing system in Presilla Drive. These improvements are located within the Rancho Jamul Estates area. JUSTIFICATION OF PROJECT: The project will increase system reliability, increase service capabilities, and provide adequate fire protection for the Rancho Jamul Estates area within the 1655 Pressure Zone. The existing system is currently served with a hydropneumatic pump station. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2040 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1 $1 $1 $78 $700 $795 I.D. 9 100%100% $479 100%100% $2,055 2010 2011 2012 2013 2014 2015 8/19/1992 43 CIP Number: P2040 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1293 OWD Map Book: 310 Submitted By: Ron Ripperger Date: 07/93 07/97 07/13 06/13 06/97 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $82 $226 $1,747 44 PROJECT TITILE: Res - 1296-3 Reservoir 2 MG PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 5 9 1 $3,640,000 DESCRIPTION OF PROJECT: Construction of a 2 million gallon steel reservoir on Otay WD property adjacent to the Otay WD existing 1296-1 and 1296-2 Reservoirs at the west terminus of Bear Mountain Way. JUSTIFICATION OF PROJECT: This project will provide additional storage in the 1296 Pressure Zone. The 1296 Pressure Zone has an existing storage deficiency of about 0.3 million gallons. An additional 12 million gallons of storage is projected to be required at ultimate development. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2143 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $2,000 $40 General Fund 100%100% $1,600 100%100% $3,640 2010 2011 2012 2013 2014 2015 5/17/1995 45 CIP Number: P2143 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 307 Submitted By: Daniel Kay Date: 11/01 06/07 09/08 08/08 05/07 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $3,800 $3,900 $4,000 $4,100 $4,200 $20,000 ESTIMATED COST (X $1,000): $266 $398 $2,976 46 PROJECT TITILE: PS - 1485-1 Pump Station Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 5 9 1 $2,475,000 DESCRIPTION OF PROJECT: Construction of a new pump station to replace the existing pump station and to expand capacity as projected within the Water Resources Master Plan. JUSTIFICATION OF PROJECT: The existing pump station is near capacity and has reached the end of its useful life. The improved pump station systems and additional capacity are required to meet projected demands of the 1485 and higher pressure zones. COMMENTS: General Fund at 50% replacement and ID 9 at 50% betterment. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2172 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1,550 $25 General Fund I.D. 9 50%50% 50%50% $900 50%50%100% $2,475 2010 2011 2012 2013 2014 2015 6/16/1993 47 CIP Number: P2172 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 323 Submitted By: Ron Ripperger Date: 07/01 07/07 08/08 07/08 06/07 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/27/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $7,400 $7,600 $7,800 $8,000 $8,200 $39,000 ESTIMATED COST (X $1,000): $155 $310 $2,010 48 PROJECT TITILE: PL - 30-Inch, 1296 Zone, Proctor Valley Road - Proctor Valley PS/Millar Ranch PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2203, P2204, P2430 5 9 1 $4,200,000 DESCRIPTION OF PROJECT: Construction of a 30-inch pipeline in Proctor Valley Road from the proposed Proctor Valley Pump Station to Millar Ranch Road. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2181 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $100 $400 $2,000 $1,700 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $4,200 2010 2011 2012 2013 2014 2015 49 CIP Number: P2181 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 189 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $1,800 $1,900 $3,700 ESTIMATED COST (X $1,000): $168 $462 $3,570 50 PROJECT TITILE: Res - 640-1 Reservoir 20.0 MG PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2009 5 20 1 $28,750,000 DESCRIPTION OF PROJECT: This project consists of two 10 million gallon structures where one will provide operational storage for ultimate projected demand conditions for the planned La Presa System 640 Pressure Zone. The other 10 million gallon reservoir will provide emergency storage for the North District systems. JUSTIFICATION OF PROJECT: Storage for the La Presa System is needed to correct existing substantial deficiencies and to operate in conjunction with the existing 36-inch transmission pipeline to prevent depressurization of the La Presa System. The reservoirs will provide higher suction pressures to the 803-1 Pump Station and 832-1 Pump Station resulting in significant energy savings. The 640 Reservoir storage is required to be able to meet the 10,000 acre-feet per year take requirement from the Helix WD Levy WTP per terms of the ECRTWIP agreement. COMMENTS: General Fund at 3% expansion, North District Storage at 50% expansion, and ID 1 at 47% betterment. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2185 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $550 General Fund North District Storage I.D. 1 3%3% 50%50% 47%47% $28,200 53%47%100% $28,750 2010 2011 2012 2013 2014 2015 8/19/1992 51 CIP Number: P2185 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 343 Submitted By: Ron Ripperger Date: 11/91 09/04 12/06 11/06 08/04 10/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $18,800 $37,600 $38,700 $39,900 $41,100 $176,100 ESTIMATED COST (X $1,000): $483 $1,171 $27,096 52 PROJECT TITILE: Res - 850-4 Reservoir 2.2 MG PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 3 20 1 $3,435,000 DESCRIPTION OF PROJECT: Construction of a 2.2 million gallon steel reservoir on Otay WD property adjacent to the existing 850-2 Reservoir in the La Presa System 850 Pressure Zone. The project is located at the South terminus of Ledge Avenue in Spring Valley. JUSTIFICATION OF PROJECT: This project is required to increase operational, emergency, and fire storage in the 850 Pressure Zone. The 850 Pressure Zone storage is currently at capacity and will require this additional storage volume to meet the projected ultimate storage volume. COMMENTS: General Fund at 27% expansion and ID 20 at 73% betterment. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2191 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $435 General Fund I.D. 20 27%27% 73%73% $3,000 27%73%100% $3,435 2010 2011 2012 2013 2014 2015 7/16/1997 53 CIP Number: P2191 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 317 Submitted By: Daniel Kay Date: 07/03 01/05 01/08 12/07 12/04 12/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $2,100 $4,200 $4,300 $4,400 $4,500 $4,600 $24,100 ESTIMATED COST (X $1,000): $270 $495 $2,670 54 PROJECT TITILE: PL - 36-Inch, 1296 Zone, Proctor Valley Road - Millar Ranch/Pioneer PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2181, P2204, P2430 5 9 1 $1,500,000 DESCRIPTION OF PROJECT: Construction of a 36-inch pipeline in Proctor Valley Road from Millar Ranch Road to Pioneer Way JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2203 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $120 $140 $800 $440 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $1,500 2010 2011 2012 2013 2014 2015 55 CIP Number: P2203 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 203 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $1,000 $1,000 $2,000 ESTIMATED COST (X $1,000): $60 $165 $1,275 56 PROJECT TITILE: PL - 24-Inch, 1296 Zone, Pioneer Way - Proctor Valley/1296 Reservoirs PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2181, P2203, P2430 5 9 1 $2,000,000 DESCRIPTION OF PROJECT: Construction of a 24-inch pipeline in Pioneer Way from Proctor Valley Road to the 1296 Reservoirs. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2204 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $100 $200 $1,100 $600 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $2,000 2010 2011 2012 2013 2014 2015 57 CIP Number: P2204 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 204 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $700 $700 $1,400 ESTIMATED COST (X $1,000): $80 $220 $1,700 58 PROJECT TITILE: PL - 20-Inch, 657 Zone, Summit Cross-Tie and 36-Inch Main Connections PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy P2185, P2370 3 1 2 $600,000 DESCRIPTION OF PROJECT: Construction of a 20-inch pipeline between the two existing 18-inch mains to allow for bypass of the existing 36-inch transmission main near the old San Diego County Water Authority Otay FCF No. 5 that was on Pipeline No. 3. Also includes construction of several system connections to the existing 36-inch transmission main within the La Presa System. JUSTIFICATION OF PROJECT: This will provide adequate and enhanced pipeline transmission capacity, increase reliability, and provide operational flexibility for the existing La Presa System network. This project is required when the 36-inch Jamacha Road pipeline is complete. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2318 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1 $99 $230 $200 North District Fee 100%100% $70 100%100% $600 2010 2011 2012 2013 2014 2015 7/16/1997 59 CIP Number: P2318 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 198 Submitted By: Bob Kennedy Date: 11/97 01/11 01/13 12/12 11/07 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $100 $100 $200 ESTIMATED COST (X $1,000): $24 $66 $510 60 PROJECT TITILE: PL - 12-Inch, 832 Zone, Steele Canyon Road - Via Caliente/Campo PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 5 20 1 $440,000 DESCRIPTION OF PROJECT: Replacement of the existing 12-inch pipeline along Steele Canyon Road with approximately 1,800 feet of 12-inch main within the 832 Pressure Zone. JUSTIFICATION OF PROJECT: The existing pipeline is within front yards of several homes and it poses a potential threat to cause significant property damage. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2387 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $15 I.D. 2 100%100% $425 100%100% $440 2010 2011 2012 2013 2014 2015 6/5/2002 61 CIP Number: P2387 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 321 Submitted By: Daniel Kay Date: 07/05 09/06 04/08 03/08 08/06 08/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $500 $600 $600 $600 $600 $600 $3,500 ESTIMATED COST (X $1,000): $18 $48 $374 62 PROJECT TITILE: PS - Perdue WTP Pump Station (5 MGD) PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2010 3 1 1 $5,200,000 DESCRIPTION OF PROJECT: Construction of at least a 5 million gallons per day pump station the Sweetwater Authority Perdue Water Treatment Plant. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2391 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $200 $300 $2,700 $2,000 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $5,200 2010 2011 2012 2013 2014 2015 63 CIP Number: P2391 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 184 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $51,800 $53,400 $105,200 ESTIMATED COST (X $1,000): $208 $572 $4,420 64 PROJECT TITILE: PL - 30-Inch, 980 Zone, Proctor Valley Road - PB Bndy/Proctor Valley PS PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger P2181, P2203, P2204 4 22 1 $5,200,000 DESCRIPTION OF PROJECT: Construction of a 30-inch pipeline in Proctor Valley Road from the existing pipeline at the Pacific Bay Homes project to the proposed Proctor Valley Pump Station. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2430 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $150 $450 $2,400 $2,200 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $5,200 2010 2011 2012 2013 2014 2015 65 CIP Number: P2430 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1293 OWD Map Book: 161 Submitted By: Ron Ripperger Date: 01/10 07/11 07/12 06/12 06/11 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $2,700 $2,800 $5,500 ESTIMATED COST (X $1,000): $208 $572 $4,420 66 PROJECT TITILE: Rancho Del Rey Groundwater Well Development PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley 22 2 1 $3,650,000 DESCRIPTION OF PROJECT: Production well development of approximately 300 gallons per minute for potable water use. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. Funding opportunity is the American Recovery and Reinvestment Act of 2009 United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2434 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1,450 $1,648 General Fund Various I.D.'s 40%40% 60%60% $552 40%60%100% $3,650 2010 2011 2012 2013 2014 2015 67 CIP Number: P2434 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1310 OWD Map Book: 127 Submitted By: Jim Peasley Date: 07/94 07/10 12/10 11/10 06/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $5,700 $5,900 $6,100 $6,300 $24,000 ESTIMATED COST (X $1,000): $146 $402 $3,102 68 PROJECT TITILE: Otay River Groundwater Well Demineralization Project PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley P2467 District Wide District Wide 1 $11,030,000 DESCRIPTION OF PROJECT: The Sweetwater Authority and Otay WD are investigating the possibility to develop a brackish water demineralization facility within the Otay River to produce say 5 million gallons per day of potable water. JUSTIFICATION OF PROJECT: This project will provide for a level of water supply independence from San Diego County Water Authority. COMMENTS: The Sweetwater Authority was awarded a Proposition 50 grant to help pay for 50% of the cost of the feasibility study. General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. Funding opportunity is the South San Diego County Water Supply Strategy and DWR Proposition 50 Grant Funds Chapter 6(a) Desalination Grant. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2450 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $20 $100 $500 $1,000 $5,000 $4,400 General Fund Various I.D.'s 40%40% 60%60% $10 40%60%100% $11,030 2010 2011 2012 2013 2014 2015 5/23/2006 69 CIP Number: P2450 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/07 01/12 07/13 06/13 12/11 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $441 $1,213 $9,376 70 PROJECT TITILE: Rosarito Desalination Facility Conveyance System PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley District Wide District Wide 1 $30,000,000 DESCRIPTION OF PROJECT: The San Diego Region could potentially receive a potable water supply source from the planned Rosarito Desalination Facility via a conveyance system or an exchange arrangement. JUSTIFICATION OF PROJECT: The conveyance system or exchange concept could provide for a independent water source to the San Diego County Region. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2451 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $500 $850 $12,000 $14,000 $2,450 General Fund Various I.D.'s 40%40% 60%60% $200 40%60%100% $30,000 2010 2011 2012 2013 2014 2015 5/23/2006 71 CIP Number: P2451 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/06 07/11 07/12 06/12 06/11 06/14 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $3,400 $3,400 ESTIMATED COST (X $1,000): $1,200 $3,300 $25,500 72 PROJECT TITILE: Regulatory Site Material Storage Bins PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay P2185 5 20 1 $310,000 DESCRIPTION OF PROJECT: This project is to install material storage bins at the Regulatory Site. JUSTIFICATION OF PROJECT: The material storage bins will improve the efficiency of the Otay WD operations for their installation and construction efforts. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2465 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $10 General Fund 100%100% $300 100%100% $310 2010 2011 2012 2013 2014 2015 5/29/2007 73 CIP Number: P2465 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 343 Submitted By: Daniel Kay Date: 07/07 10/07 09/08 08/08 09/07 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/27/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $8 $300 74 PROJECT TITILE: Regional Training Facility PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Coburn-Boyd 5 20 1 $252,000 DESCRIPTION OF PROJECT: The project is the construction of a Regional Training Facility at the Regulatory Site through a partnership with the San Miguel Consolidated Fire Protection District. JUSTIFICATION OF PROJECT: The Otay WD needs a training center to train staff on trenching, shoring, fire safety, rescue, and confined space. The San Miguel Consolidated Fire Protection District has secured funding for this project and will be the lead agency in the development of the training facility. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2466 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $90 $60 General Fund 100%100% $102 100%100% $252 2010 2011 2012 2013 2014 2015 5/29/2007 75 CIP Number: P2466 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 343 Submitted By: Lisa Coburn-Boyd Date: 08/06 07/07 07/09 06/09 06/07 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $252 76 PROJECT TITILE: San Diego Formation Groundwater Feasibility Study PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley P2450 District Wide District Wide 1 $1,800,000 DESCRIPTION OF PROJECT: This project is a research and data gathering effort to enhance the ongoing USGS study of the concept to potentially develop a groundwater supply from the San Diego Formation. The project is planned to be jointly funded by Sweetwater Authority and Otay WD. A proposal for the San Diego County Water Authority LISA grant program was developed to fund up to 50% of the cost of the effort. JUSTIFICATION OF PROJECT: The potential of an agreement for the development of a potable water production well within the San Diego Formation could provide the possibility of an independent local water supply resource for the Otay WD and others. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. Funding opportunity is the San Diego County Water Authority Local Investigations and Studies Assistance (LISA) Grant Funding Program for Groundwater Conjunctive Use Studies and Investigations. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2467 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $600 $600 General Fund Various I.D.'s 40%40% 60%60% $600 40%60%100% $1,800 2010 2011 2012 2013 2014 2015 5/29/2007 77 CIP Number: P2467 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/07 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $1,800 78 PROJECT TITILE: 850/657 PRS at La Presa Pump Station PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy P2357 4 20 1 $310,000 DESCRIPTION OF PROJECT: Construct a 850 to 657 Pressure Zone pressure reducing station at the La Presa Pump Station. The project consists of installing pressure reducing valves and installation of SCADA monitoring systems. JUSTIFICATION OF PROJECT: The pressure reducing station will allow for necessary increased flow rates into the 657 Pressure Zone to meet supply requirements. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2471 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $80 $225 I.D. 1 100%100% $5 100%100% $310 2010 2011 2012 2013 2014 2015 6/23/2008 79 CIP Number: P2471 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 317 Submitted By: Bob Kennedy Date: 07/08 04/10 11/10 10/10 03/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/04/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $12 $34 $264 80 PROJECT TITILE: Water Supply Feasibility Studies PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley District Wide District Wide 1 $175,000 DESCRIPTION OF PROJECT: This project provides funding for general water supply feasibility planning study efforts that benefit existing and future customers. JUSTIFICATION OF PROJECT: Implementation of the Integrated Water Resources Plan to enhance reliability, achieve diversification, increase flexibility, etc. require funding to continue to pursue alternative supply opportunities, etc. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2472 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $150 General Fund Various I.D.'s 40%40% 60%60% $25 40%60%100% $175 2010 2011 2012 2013 2014 2015 6/23/2008 81 CIP Number: P2472 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/08 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $175 82 PROJECT TITILE: PS - 711-1 Pump Station Improvement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 1 22 1 $425,000 DESCRIPTION OF PROJECT: Replace existing pumps and potentially the suction manifold at the 711-1 Pump Station to resolve vibration and cavitation issues. JUSTIFICATION OF PROJECT: This project is to redesign the existing suction system and installation of different pumps at the pump station to resolve vibration and cavitation issues. The existing pumps have a useful life of about two years or less and where they should last seven to ten years. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2473 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $325 $50 General Fund 100%100% $50 100%100% $425 2010 2011 2012 2013 2014 2015 6/23/2008 83 CIP Number: P2473 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 114 Submitted By: Bob Kennedy Date: 01/09 05/09 11/10 10/10 04/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $17 $47 $361 84 PROJECT TITILE: Fuel Storage Covers and Containment PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy District Wide District Wide 1 $125,000 DESCRIPTION OF PROJECT: Construction of eight permanent covers for remote pump station diesel fuel storage tanks and one fuel containment system at the 870-1 Pump Station. JUSTIFICATION OF PROJECT: The existing diesel fuel tanks are exposed to direct sunlight and the elements causing extreme temperature fluctuations which promotes fuel contamination problems from condensation and algae growth. The 870-1 Pump Station requires a fuel spill containment system. COMMENTS: The fuel storage tanks supply a fuel source to the emergency engine/generator sets and direct engine driven pumping units. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2474 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $100 General Fund 100%100% $25 100%100% $125 2010 2011 2012 2013 2014 2015 6/23/2008 85 CIP Number: P2474 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bob Kennedy Date: 07/08 07/09 01/10 12/09 06/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $5 $14 $106 86 PROJECT TITILE: Pump Station Fire Hydrant Installations PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy District Wide District Wide 1 $50,000 DESCRIPTION OF PROJECT: This project is to provide funding for the installation of fire hydrants near pump stations where required and installation of fine mesh screens for wind blown debris control. JUSTIFICATION OF PROJECT: The project is required to lower the risk of wild fire related hazards. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2475 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $40 General Fund 100%100% $10 100%100% $50 2010 2011 2012 2013 2014 2015 6/23/2008 87 CIP Number: P2475 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bob Kennedy Date: 04/09 09/09 08/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $48 88 PROJECT TITILE: Middle Sweetwater River Basin Groundwater Well System PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley 5 20 1 $8,000,000 DESCRIPTION OF PROJECT: Production well development of approximately 1,000 acre feet per year for potable water use. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. Funding opportunity is the American Recovery and Reinvestment Act of 2009 United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2481 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1,000 $2,000 $4,000 General Fund Various I.D.'s 40%40% 60%60% $1,000 40%60%100% $8,000 2010 2011 2012 2013 2014 2015 89 CIP Number: P2481 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 357 Submitted By: Jim Peasley Date: 07/08 01/11 01/12 12/11 12/10 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $9,700 $10,000 $10,300 $30,000 ESTIMATED COST (X $1,000): $320 $880 $6,800 90 PROJECT TITILE: Otay Mesa Lot 7 Groundwater Well System PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley 2 7 1 $3,200,000 DESCRIPTION OF PROJECT: Production well development of approximately 300 acre feet per year for potable water use. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2482 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $150 $1,700 $1,200 General Fund Various I.D.'s 40%40% 60%60% $150 40%60%100% $3,200 2010 2011 2012 2013 2014 2015 91 CIP Number: P2482 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1351 OWD Map Book: 12 Submitted By: Jim Peasley Date: 07/08 01/11 01/12 12/11 12/10 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $3,200 $3,300 $3,400 $9,900 ESTIMATED COST (X $1,000): $128 $352 $2,720 92 PROJECT TITILE: Sir Francis Helix and Otay Valley Cal American Agency Interconnections PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay District Wide District Wide 1 $250,000 DESCRIPTION OF PROJECT: This project will provide funding to improve the existing interconnections with the Helix Water District located at Sir Frances Drake and with Cal-American at Otay Valley Road. JUSTIFICATION OF PROJECT: The existing interconnections play a vital role in supplying the Otay WD with alternative water resources during an outage or supply shortfall from the normal San Diego County Water Authority (SDCWA) facility, known as Pipeline No. 4. Typically on an annual basis, the SDCWA shuts down Pipeline No. 4 for inspection, maintenance, and/or installation of new system components. COMMENTS: This project will allow potable water to be transferred from the Helix Water District and Cal-American in an emergency. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2487 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $200 General Fund 100%100% $50 100%100% $250 2010 2011 2012 2013 2014 2015 93 CIP Number: P2487 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Daniel Kay Date: 07/08 09/08 11/08 10/08 08/08 11/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $10 $28 $212 94 PROJECT TITILE: Del Rio Road Helix and Otay Agency Interconnection PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 3 20 1 $150,000 DESCRIPTION OF PROJECT: This project provide for a new interconnection located at Del Rio Road with the Helix Water District that will be capable of flowing potable water to either agency at the 850 elevation hydraulic grade. JUSTIFICATION OF PROJECT: This interconnection would provide a vital role in supplying Otay WD with an alternative water source during an outage or water supply shortage. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2488 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $25 $125 General Fund 100%100% 100%100% $150 2010 2011 2012 2013 2014 2015 95 CIP Number: P2488 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 342 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $6 $17 $127 96 PROJECT TITILE: Gillespie Drive Helix and Otay Agency Interconnection PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 3 1 1 $150,000 DESCRIPTION OF PROJECT: This project provide for a new interconnection located at Gillespie Drive with the Helix Water District that will be capable of flowing potable water to either agency at the 657 elevation hydraulic grade. JUSTIFICATION OF PROJECT: This interconnection would provide a vital role in supplying Otay WD with an alternative water source during an outage or water supply shortage. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2489 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $25 $125 General Fund 100%100% 100%100% $150 2010 2011 2012 2013 2014 2015 97 CIP Number: P2489 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 302 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $6 $17 $127 98 PROJECT TITILE: Solar Power Feasibility Study PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 4 20 1 $150,000 DESCRIPTION OF PROJECT: This project provides funding of a feasibility study to asses solar power installation of a 100 KW AC solar system at the roof of the operations building or on the administration building. JUSTIFICATION OF PROJECT: The installation of the solar panels will potentially assist in reducing electrical costs and aid in the effort to provide a clean environment. The photovoltaic system can produce electricity from a clean, renewable resource without noise or air pollution. COMMENTS: An average commercial photovoltaic system costs from about $8 to $10 per AC watt. The California Public Utilities Commission approved the California Solar Initiative (CSI) in November 2006. The CSI program provides public sector owners such as Otay WD $0.50 per kwh generated every month to five years. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2497 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $50 General Fund 100%100% $100 100%100% $150 2010 2011 2012 2013 2014 2015 99 CIP Number: P2497 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 318 Submitted By: Bob Kennedy Date: 07/06 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $150 100 PROJECT TITILE: Brine Disposal Pipeline Otay River Demineralization Plant to South Bay Outfall PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley R2093, R2097 - - 2 $5,600,000 DESCRIPTION OF PROJECT: This project provides funding of a potential brine disposal pipeline in cooperation with Sweetwater Authority in conjunction with the Otay River Groundwater Desalination project and potentially the City of Chula Vista MBR Treatment Plant. JUSTIFICATION OF PROJECT: This project is needed to meet the IRP water supply goals. COMMENTS: General Fund at 40% expansion and betterment funds from ID 1 at 5%, ID 2 at 2%, ID 3 at 4%, ID 5 at 1%, ID 7 at 5%, ID 9 at 2%, ID 10 at 4%, ID 20 at 7%, and ID 22 at 30%. Funding opportunity is the South San Diego County Water Supply Strategy. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2498 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $5 $10 $40 $100 $4,000 $1,445 General Fund Various I.D.'s 40%40% 60%60% 40%60%100% $5,600 2010 2011 2012 2013 2014 2015 101 CIP Number: P2498 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1330 OWD Map Book: - Submitted By: Jim Peasley Date: 03/10 07/11 04/14 03/14 06/11 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $224 $616 $4,760 102 PROJECT TITILE: RecPL - Otay Mesa Distribution Pipelines and Conversions PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger R2058, R2077, R2087, R2088 2 7 1 $2,000,000 DESCRIPTION OF PROJECT: Construction of various distribution pipeline links and conversion of existing pipelines for recycled water use within the 860 Pressure Zone of the Otay Mesa System. JUSTIFICATION OF PROJECT: This project will connect the existing distribution recycled water pipelines, currently supplied with potable water, to the planned construction of pipeline links to supply all those existing water demands within the Otay Mesa System with recycled water. COMMENTS: Funding opportunity is the American Recovery and Reinvestment Act of 2009 United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2048 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $150 $250 $1,500 $90 General Fund 100%100% $10 100%100% $2,000 2010 2011 2012 2013 2014 2015 6/23/2008 103 CIP Number: R2048 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Ron Ripperger Date: 07/08 01/09 07/11 06/11 12/08 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $10,200 $10,200 ESTIMATED COST (X $1,000): $80 $220 $1,700 104 PROJECT TITILE: RWCWRF - R.O. Building Remodel and Office Furniture PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 3 20 1 $590,000 DESCRIPTION OF PROJECT: Installation of offices and training room and purchasing of furniture upon the existing reverse osmosis building site at the RWCWRF. JUSTIFICATION OF PROJECT: This project will eliminate the rental costs for trailers that currently contain the required offices space. The existing systems at the RWCWRF will be used in a more effective and cost efficient manner. COMMENTS: Funding opportunity is the United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2053 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $15 General Fund 100%100% $575 100%100% $590 2010 2011 2012 2013 2014 2015 7/16/1997 105 CIP Number: R2053 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 319 Submitted By: Ron Ripperger Date: 07/97 02/06 08/07 07/07 01/06 08/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $24 $65 $501 106 PROJECT TITILE: RecPL - 16-Inch, 860 Zone, Airway Road - Otay Mesa/Alta PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy R2048, R2077, R2087, R2088 2 7 1 $3,000,000 DESCRIPTION OF PROJECT: Construction of approximately 10,700 feet of 16-inch pipeline within the 860 Pressure Zone in Airway Road from Otay Mesa Road to Alta Road. Portions of this project will be constructed by developers and these are subject to reimbursement at actual cost per Board policy. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Mesa within the 860 Pressure Zone. COMMENTS: Funding opportunity is the United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2058 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $350 $775 $775 $700 General Fund 100%100% $400 100%100% $3,000 2010 2011 2012 2013 2014 2015 6/16/1999 107 CIP Number: R2058 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1351 OWD Map Book: 12 Submitted By: Bob Kennedy Date: 07/01 01/10 07/11 06/11 12/09 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $3,600 $3,700 $7,300 ESTIMATED COST (X $1,000): $120 $330 $2,550 108 PROJECT TITILE: RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy R2048, R2058, R2087, R2088 2 7 1 $4,100,000 DESCRIPTION OF PROJECT: Construction of approximately 9,300 feet 24-inch pipeline within the 860 Pressure Zone in Alta Road from the Alta Gate location to Airway Road. This project will be constructed as part of the Otay Mesa recycled water system. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Mesa and link the planned 860-1 Reservoir with the recycled water transmission system in Otay Mesa. COMMENTS: Funding opportunity is the United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2077 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $295 $3,150 $400 $55 General Fund 100%100% $200 100%100% $4,100 2010 2011 2012 2013 2014 2015 5/23/2006 109 CIP Number: R2077 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1332 OWD Map Book: 39 Submitted By: Bob Kennedy Date: 07/01 01/10 07/11 06/11 12/09 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $3,200 $3,300 $6,500 ESTIMATED COST (X $1,000): $164 $451 $3,485 110 PROJECT TITILE: RecPL - 20-Inch, 944 Zone, Lane Avenue - Proctor Valley/Pond No. 1 PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 4 22 1 $1,210,000 DESCRIPTION OF PROJECT: Construction of a 20-inch pipeline within the 944 Pressure Zone in Lane Avenue from Proctor Valley Road to Pond No. 1 within the Use Area. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Ranch and other areas within the 944 Pressure Zone. COMMENTS: Funding opportunity is the United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2081 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $70 General Fund 100%100% $1,140 100%100% $1,210 2010 2011 2012 2013 2014 2015 5/23/2006 111 CIP Number: R2081 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 159 Submitted By: Daniel Kay Date: 07/06 09/06 01/08 12/07 08/06 08/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/27/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $2,250 $2,300 $2,400 $2,500 $2,600 $2,700 $14,750 ESTIMATED COST (X $1,000): $38 $173 $999 112 PROJECT TITILE: RecPL - 20-Inch, 944 Zone, Wueste Road - Olympic/Otay WTP PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy R2048, R2058, R2077, R2088 2 22 1 $4,500,000 DESCRIPTION OF PROJECT: Construction of approximately 15,100 feet of 20-inch pipeline within the 944 Pressure Zone in Wueste Road from Olympic Parkway to near the existing City of San Diego Otay WTP. This project will be constructed as part of the Otay Mesa recycled water system supply link. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Mesa and is a part of the link to the 944 Pressure Zone supply to the planned 860-1 Reservoir within the Otay Mesa recycled water system. COMMENTS: Funding opportunity is the American Recovery and Reinvestment Act of 2009 United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2087 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $350 $3,500 $450 General Fund 100%100% $200 100%100% $4,500 2010 2011 2012 2013 2014 2015 5/23/2006 113 CIP Number: R2087 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1312 OWD Map Book: 85 Submitted By: Bob Kennedy Date: 09/06 01/10 07/11 06/11 12/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $5,100 $5,300 $5,500 $15,900 ESTIMATED COST (X $1,000): $180 $495 $3,825 114 PROJECT TITILE: RecPL - 20-Inch, 860 Zone, County Jail - Roll Reservoir/860-1 Reservoir PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy R2048, R2058, R2077, R2087 2 7 1 $3,500,000 DESCRIPTION OF PROJECT: Construction of two 20-inch pipelines within the 860 Pressure Zone from the 571-1 Reservoir site to the planned 860-1 Reservoir. This project will be constructed as part of the Otay Mesa recycled water system supply link. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Otay Mesa and link the planned 944 Pressure Zone supply to the planned 860-1 Reservoir within the Otay Mesa recycled water system. COMMENTS: General Fund at 50% expansion and ID 22 at 50% betterment. Funding opportunity is the American Recovery and Reinvestment Act of 2009 United States Bureau of Reclamation Water Reclamation and Reuse Program, Title XVI of P.L. 102-575. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2088 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $5 $20 $200 $1,700 $1,510 General Fund I.D. 22 50%50% 50%50% $65 50%50%100% $3,500 2010 2011 2012 2013 2014 2015 5/23/2006 115 CIP Number: R2088 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1332 OWD Map Book: 55 Submitted By: Bob Kennedy Date: 09/06 07/12 04/13 03/13 06/12 06/14 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $1,800 $1,800 ESTIMATED COST (X $1,000): $140 $385 $2,975 116 PROJECT TITILE: North District Recycled Water Regulatory Compliance PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Coburn-Boyd District Wide District Wide 1 $220,000 DESCRIPTION OF PROJECT: This project is to fund any RWQCB Basin Plan revisions, State Department of Health Services reporting requirements addressing health, safety, institutional, and water quality concerns and potential CEQA compliance requirements. JUSTIFICATION OF PROJECT: Regulatory and institutional requirements for recycled water use within the Jamacha Basin identified in the Phase I Study must be addressed to further the vision for eventual development of recycled water infrastructure within the North District. COMMENTS: The necessary infrastructure of storage, transmission mains, and distribution pipelines for recycled water will be budgeted under another CIP project once the regulatory and institutional issues resolve into a successful outcome. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2089 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $20 I.D. 22 100%100% $200 100%100% $220 2010 2011 2012 2013 2014 2015 5/23/2006 117 CIP Number: R2089 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Lisa Coburn-Boyd Date: 05/07 12/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $220 118 PROJECT TITILE: RecPS - 944-1 Pump Station Upgrade PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 1 22 1 $550,000 DESCRIPTION OF PROJECT: This project consists of adding two new pump and modifying two existing pumps to operate within the system at higher efficiencies. JUSTIFICATION OF PROJECT: The overall operating conditions of the pump station have been modified as a result of the planned service to the Otay Mesa System recycled water system from the Central Area System and the conversion of a existing potable water pipeline within the Use Area for recycled water service. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2091 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $500 General Fund 100%100% $50 100%100% $550 2010 2011 2012 2013 2014 2015 5/29/2007 119 CIP Number: R2091 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 115 Submitted By: Bob Kennedy Date: 07/07 05/08 01/09 12/08 04/08 05/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/27/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $107,900 $111,100 $114,400 $117,800 $121,300 $572,500 ESTIMATED COST (X $1,000): $22 $61 $467 120 PROJECT TITILE: Dis - 450-1 Reservoir Disinfection Facility PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 1 10 1 $830,000 DESCRIPTION OF PROJECT: This project consists of construction of a disinfection system facility at the 450-1 Reservoir. JUSTIFICATION OF PROJECT: The recycled water received from the City of San Diego South Bay Water Reclamation Plant is not planned to be sufficiently disinfected with chemicals. The recycled water will be disinfected prior to deliver to the Otay WD customers. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2092 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $70 General Fund 100%100% $760 100%100% $830 2010 2011 2012 2013 2014 2015 5/29/2007 121 CIP Number: R2092 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1330 OWD Map Book: 66 Submitted By: Daniel Kay Date: 07/07 11/07 04/08 03/08 10/07 12/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $5,350 $10,700 $11,000 $11,300 $11,600 $49,950 ESTIMATED COST (X $1,000): $57 $105 $668 122 PROJECT TITILE: MBR City of Chula Vista PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley P2498, R2097 District Wide District Wide 1 $5,000,000 DESCRIPTION OF PROJECT: This project is to fund the joint water recycling facility feasibility efforts for future recycled water supply needs. The potential partners for this effort are the City of Chula Vista and Otay WD. JUSTIFICATION OF PROJECT: This project has the potential to create a new and much needed recycled water supply source for the Otay WD. COMMENTS: Funding opportunity is the South San Diego County Water Supply Strategy. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2093 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $50 $50 $50 $50 $1,500 $3,280 General Fund 100%100% $20 100%100% $5,000 2010 2011 2012 2013 2014 2015 6/23/2008 123 CIP Number: R2093 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/08 07/13 02/14 01/14 06/13 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $200 $550 $4,250 124 PROJECT TITILE: Potable Irrigation Meters to Recycled Water Conversions PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Charles 1 22 1 $2,000,000 DESCRIPTION OF PROJECT: This project is to fund the conversion of existing potable water irrigation systems to use recycled water within existing multifamily and commercial type developments located adjacent to existing recycled water mains within the City of Chula Vista. JUSTIFICATION OF PROJECT: The expansion of recycled water development allows for potable water savings and increases the purchases of supply from the SBWRP. COMMENTS: Funding opportunity is the United States Department of Interior, Bureau of Reclamation, for the American Recovery and Reinvestment Act of 2009 Water Marketing and Efficiency Grants Program. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2094 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $500 $500 $1,000 General Fund 100%100% 100%100% $2,000 2010 2011 2012 2013 2014 2015 125 CIP Number: R2094 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bob Kennedy Date: 07/09 01/10 07/11 06/11 12/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $80 $220 $1,700 126 PROJECT TITILE: RWCWRF - Salt Creek Live Stream Discharge PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Coburn-Boyd P2498, R2093 1 22 2 $320,000 DESCRIPTION OF PROJECT: This project is to fund the possibility of discharge of recycled water in the winter months to save money relative to alternative disposal options in conjunction with the joint water recycling facility feasibility MBR efforts for future recycled water supply needs. The potential partners for this effort are the City of Chula Vista and Otay WD. JUSTIFICATION OF PROJECT: This project has the potential to saving large sums of capital resources and to create a new and much needed recycled water supply source for the Otay WD. COMMENTS: Funding opportunity is the South San Diego County Water Supply Strategy. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2097 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $26 $160 $100 General Fund 100%100% $34 100%100% $320 2010 2011 2012 2013 2014 2015 127 CIP Number: R2097 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Lisa Coburn-Boyd Date: 07/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $320 128 PROJECT TITILE: RWCWRF - Secondary Process Automation PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Stalker 3 20 1 $50,000 DESCRIPTION OF PROJECT: This project provides funding for the automation of the return activated sludge system, the waste activated sludge system, and the chlorination feed system. It includes replacement of existing chart recorders and electronic systems and the installation of a fiber optic communication system. JUSTIFICATION OF PROJECT: The automation of the various processes will increase water quality production, decrease manpower resource requirements, increase reliability, and provide for remote monitoring and operational capabilities. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2018 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $50 Sewer 100%100% 100%100% $50 2010 2011 2012 2013 2014 2015 129 CIP Number: S2018 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 319 Submitted By: Gary Stalker Date: 07/09 07/09 01/10 12/09 06/10 08/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $6 $42 130 PROJECT TITILE: PL - 12-Inch, 803 Zone, Jamul Drive Permastran Pipeline Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 5 20 1 $765,000 DESCRIPTION OF PROJECT: Replacement of the existing 12-inch permastran pipeline within Jamul Drive with approximately 3,600 feet of 12-inch main in the 803 Pressure Zone. JUSTIFICATION OF PROJECT: The existing permastran pipeline has experienced failures and is fragilely sensitive to the normally occurring pressure changes. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2356 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $15 General Fund 100%100% $750 100%100% $765 2010 2011 2012 2013 2014 2015 5/23/2005 131 CIP Number: P2356 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 332 Submitted By: Daniel Kay Date: 07/05 09/06 04/08 03/08 08/06 08/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $31 $84 $650 132 PROJECT TITILE: APCD Engine Replacements and Retrofits PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Rahders District Wide District Wide 1 $2,834,000 DESCRIPTION OF PROJECT: This project is to replace and/or retrofit 14 diesel fuel burning engines with best technology exhaust gas control systems throughout the Otay WD to comply with APCD engine emission regulations. The Otay WD also needs to replace, repower, and/or retrofit the heavy vehicle diesel fleet to comply with upcoming emissions regulations. JUSTIFICATION OF PROJECT: The Otay WD is required to replace and/or retrofit its engines to meet current APCD requirements including the Air Toxics Control Measures, and to be consistent with the intended operation of the engines to meet system demands. The Otay WD also needs to replace, repower, and/or retrofit the heavy vehicle diesel fleet to meet future emissions requirements. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2366 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $180 $190 $220 $200 $200 $200 General Fund 100%100% $1,644 100%100% $2,834 2010 2011 2012 2013 2014 2015 12/6/2000 133 CIP Number: P2366 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Doug Rahders Date: 12/00 07/01 07/05 06/10 06/01 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/09/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $113 $312 $2,409 134 PROJECT TITILE: Safety and Security Improvements PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Cudal District Wide District Wide 1 $1,539,000 DESCRIPTION OF PROJECT: This project is to improve the security of the Otay WD facilities by developing a response plan, installing protection systems, and contracting with a protection monitoring and response service. This project will also include additional safety and security improvements as required throughout the Otay WD. The security improvements are a result of the Otay WD Vulnerability Assessment Report completed in March 2003. JUSTIFICATION OF PROJECT: Although existing facilities are relatively safe and secure, the Federal government may mandate that security of water systems be improved by monitoring and response to intrusions. The security improvements are in response to the September 11, 2001 incident and potential future acts of terrorism. The current HIRSCH system needs to be updated and integrated into the FOB and SCADA systems. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2382 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $70 $50 $50 $50 $50 $50 General Fund 20%80%100% $1,219 20%80%100% $1,539 2010 2011 2012 2013 2014 2015 6/5/2002 135 CIP Number: P2382 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Ted Cudal Date: 07/02 09/03 08/04 06/10 08/03 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $62 $169 $1,308 136 PROJECT TITILE: SR-125 Utility Relocations PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy District Wide District Wide 1 $900,000 DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required due to construction of SR-125. Facility relocations vary in size from 8-inch to 24-inch and they impact both the potable and recycled water systems. JUSTIFICATION OF PROJECT: Otay River Constructors, under contract with California Transportation Ventures, is constructing SR-125, which conflicts with existing Otay WD facilities at various locations. In some cases, the Otay WD does have prior and superior rights. Various facilities must be relocated to avoid physical conflicts. COMMENTS: A master agreement has been signed with Otay River Constructors to define the relationship between the two entities and outline the process for defining the scope and cost of each required facility relocation. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2416 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $40 General Fund 100%100% $860 100%100% $900 2010 2011 2012 2013 2014 2015 6/4/2003 137 CIP Number: P2416 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bob Kennedy Date: 10/02 01/04 10/04 12/05 12/03 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $36 $99 $765 138 PROJECT TITILE: I-905 Utility Relocations PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 2 7 1 $3,016,000 DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required due to construction of I-905 on the Otay Mesa. Pipeline relocations vary from 12-inch to 24-inch. Five locations have been identified where existing facilities are in conflict with I-905. JUSTIFICATION OF PROJECT: Caltrans is constructing I-905, which has resulted in utility conflicts with Otay WD pipelines. In all cases, the Otay WD has prior and superior rights. The facilities must be relocated prior to Caltrans construction of I-905. The cost of the facilities relocations that have prior rights will be reimbursed by Caltrans. COMMENTS: Utility agreements were developed by Caltrans for each of the required facility relocations. Any betterment work such as pipeline size increase and/or additional length are at the Otay WD expense. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2440 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $200 $63 General Fund 100%100% $2,753 100%100% $3,016 2010 2011 2012 2013 2014 2015 6/2/2004 139 CIP Number: P2440 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1351 OWD Map Book: 10 Submitted By: Ron Ripperger Date: 01/03 10/03 10/06 09/06 09/06 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $121 $332 $2,563 140 PROJECT TITILE: SR-11 Utility Relocations PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 2 7 1 $500,000 DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required due to construction of SR-11 on the Otay Mesa. Facility relocations vary in size from 8-inch to 24-inch. Both the potable and recycled water systems are impacted. JUSTIFICATION OF PROJECT: Caltrans will construct SR-11, which will result in utility conflicts with existing Otay WD facilities at various locations. In most cases, the Otay WD does have prior and superior rights. The facilities must be relocated prior to Caltrans construction of SR-11. The cost of the facilities relocations that have prior rights will be reimbursed by Caltrans. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2453 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $75 $175 $245 General Fund 100%100% $5 100%100% $500 2010 2011 2012 2013 2014 2015 5/23/2006 141 CIP Number: P2453 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1351 OWD Map Book: 5 Submitted By: Bob Kennedy Date: 07/06 07/09 11/10 10/10 06/10 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $20 $55 $425 142 PROJECT TITILE: Air and Vacuum Valve Upgrades PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Acuna District Wide District Wide 1 $2,624,000 DESCRIPTION OF PROJECT: This project is to provide funding for the upgrading of approximately 750 existing air and vacuum valves that are currently below grade. JUSTIFICATION OF PROJECT: The current Department of Health regulations require that all potable air and vacuum valves be installed above grade to eliminate the possibility of back siphoning ground water into the potable water system in the event of pressure loss within the water system. COMMENTS: Some of the existing air and vacuum valves are located in streets and roadways. These facilities will require extension of the piping outside of the traveled way. There are approximately 457 units to be completed. General Fund at 74% replacement, ID 1 at 14% betterment, and ID 20 at 12% betterment. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2456 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $500 $450 $450 General Fund I.D. 1 I.D. 20 74%74% 14%14% 12%12% $1,224 26%74%100% $2,624 2010 2011 2012 2013 2014 2015 5/23/2006 143 CIP Number: P2456 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Rick Acuna Date: 07/06 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/20/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2,624 144 PROJECT TITILE: AMR Manual Meter Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Keeran District Wide District Wide 1 $10,447,000 DESCRIPTION OF PROJECT: This project will provide funding to replace all manually read meters with AMR meters. Approximately 34,700 existing manual 3/4-inch meters will be replaced with the AMR meter. JUSTIFICATION OF PROJECT: This program will benefit the Otay WD in the form of reducing manpower resources as the water systems are expanded. The goal is to complete twelve routes or approximately 5,760 existing meters per year. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2458 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1,400 $1,500 $1,650 $1,700 $1,650 General Fund 100%100% $2,547 100%100% $10,447 2010 2011 2012 2013 2014 2015 5/23/2006 145 CIP Number: P2458 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Tim Keeran Date: 07/06 06/14 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/12/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $-36,500 $-34,500 $-34,700 $-39,300 $-40,400 $-41,000 $-226,400 ESTIMATED COST (X $1,000): $10,447 146 PROJECT TITILE: Res - 624-1 Reservoir Cover Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 1 22 1 $450,000 DESCRIPTION OF PROJECT: This project is for the replacement of the existing membrane floating cover with new membrane material system. JUSTIFICATION OF PROJECT: The existing floating membrane cover has reached the end of its useful life and requires replacement to meet regulatory requirements. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2477 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $325 $100 General Fund 100%100% $25 100%100% $450 2010 2011 2012 2013 2014 2015 6/23/2008 147 CIP Number: P2477 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 114 Submitted By: Bob Kennedy Date: 07/08 07/09 01/10 12/09 06/09 08/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $8 $20 $422 148 PROJECT TITILE: PS - 870-1Pump Motor and Switch Gear Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Anderson 2 7 1 $130,000 DESCRIPTION OF PROJECT: This project will provide funding to replace the high voltage (i.e. 2,300 volt) motors and switch gear with 480 volt equipment along with replacement of the SDG&E power system. JUSTIFICATION OF PROJECT: The existing motor control center equipment is obsolete and repair parts are no longer available. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2483 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $130 General Fund 100%100% 100%100% $130 2010 2011 2012 2013 2014 2015 149 CIP Number: P2483 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1332 OWD Map Book: 55 Submitted By: Don Anderson Date: 07/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/12/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $5 $14 $111 150 PROJECT TITILE: Large Water Meter Replacement Program PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Keeran District Wide District Wide 1 $535,000 DESCRIPTION OF PROJECT: This project is for testing and any necessary replacement of water meters larger than 2-inch that do not meet the AWWA standards. The are a total of about 220 meters. JUSTIFICATION OF PROJECT: To be assured that all of the larger meters are registering accurately and the billing system is collecting the proper funds for water consumed. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2484 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $135 $100 $100 $100 $100 General Fund 100%100% 100%100% $535 2010 2011 2012 2013 2014 2015 151 CIP Number: P2484 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Tim Keeran Date: 07/09 06/14 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $531 152 PROJECT TITILE: SCADA Communication System and Software Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Stalker District Wide District Wide 1 $915,000 DESCRIPTION OF PROJECT: This project is for the replacement of the existing SCADA software and radio communication system. JUSTIFICATION OF PROJECT: The vendor will no longer be upgrading or supporting the existing system beginning 2012. The existing SCADA software is from Factory Link. The radio equipment needs replacement to allow for increased the band width capability to increase security systems functionality. COMMENTS: The SCADA and radio equipment replacement will include the potable and recycled water systems along with the RWCWRF and sewer collection system. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2485 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $265 $350 $300 General Fund 100%100% 100%100% $915 2010 2011 2012 2013 2014 2015 153 CIP Number: P2485 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Gary Stalker Date: 07/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $3 $912 154 PROJECT TITILE: Asset Management Plan Condition Assessment and Data Acquisition PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Stevens District Wide District Wide 1 $800,000 DESCRIPTION OF PROJECT: This project is for the development of an integrated Asset Management Plan. JUSTIFICATION OF PROJECT: Implementation of an Asset Management Plan is best practice and will provide for a formal means of maintaining, replacing, and funding the existing fixed assets. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2486 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $300 $300 $200 General Fund 100%100% 100%100% $800 2010 2011 2012 2013 2014 2015 155 CIP Number: P2486 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/10/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $800 156 PROJECT TITILE: 1296-1 Reservoir Interior/Exterior Coating and Upgrades PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 9 1 $350,000 DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 1296-1 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the most recent reservoir assessment report dated August 8, 2008 the 1296-1 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2490 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $340 $10 General Fund 100%100% 100%100% $350 2010 2011 2012 2013 2014 2015 157 CIP Number: P2490 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 307 Submitted By: Bob Kennedy Date: 07/09 09/09 01/10 12/09 08/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $15 $331 158 PROJECT TITILE: 850-3 Reservoir Exterior Coating PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 20 1 $300,000 DESCRIPTION OF PROJECT: This project provides funding for the exterior coating of the 850-3 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: The 850-3 Reservoir exterior coating is in poor condition and is in need of replacement. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2491 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $290 $10 General Fund 100%100% 100%100% $300 2010 2011 2012 2013 2014 2015 159 CIP Number: P2491 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 355 Submitted By: Bob Kennedy Date: 07/09 09/09 01/10 12/09 08/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $15 $281 160 PROJECT TITILE: 1296-2 Reservoir Interior/Exterior Coating and Upgrades PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 9 1 $600,000 DESCRIPTION OF PROJECT: This project provides funding for the interior and exterior coating of the 1296-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the most recent reservoir assessment report dated August 8, 2008 the 1296-2 Reservoir interior and exterior coatings are in relatively poor condition and are in need of replacement. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2492 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $30 $560 $10 General Fund 100%100% 100%100% $600 2010 2011 2012 2013 2014 2015 161 CIP Number: P2492 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1292 OWD Map Book: 307 Submitted By: Bob Kennedy Date: 07/09 09/10 01/11 12/10 08/10 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $15 $581 162 PROJECT TITILE: 624-2 Reservoir Interior Coating and Upgrades PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 1 22 1 $950,000 DESCRIPTION OF PROJECT: This project provides funding for the interior coating of the 624-2 Reservoir. In addition, an assessment of the facility will be accomplished to assure compliance to all applicable codes and OSHA standards. JUSTIFICATION OF PROJECT: Based upon the most recent reservoir assessment report dated August 8, 2008 the 624-2 Reservoir interior coating is in relatively poor condition and is in need of replacement. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2493 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $30 $910 $10 General Fund 100%100% 100%100% $950 2010 2011 2012 2013 2014 2015 163 CIP Number: P2493 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 130 Submitted By: Bob Kennedy Date: 07/09 09/10 01/11 12/10 08/10 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $15 $931 164 PROJECT TITILE: Multiple Species Conservation Plan PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Coburn-Boyd P2495 District Wide District Wide 1 $226,000 DESCRIPTION OF PROJECT: This project is to provide funding to develop a plan to streamline the environmental permitting processes for the capital improvement program projects to be constructed. JUSTIFICATION OF PROJECT: The project will save time and money when compared to environmental permitting each capital improvement program project individually. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2494 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $141 $75 $10 General Fund 100%100% 100%100% $226 2010 2011 2012 2013 2014 2015 165 CIP Number: P2494 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Lisa Coburn-Boyd Date: 07/09 06/12 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $226 166 PROJECT TITILE: San Miguel Habitat Management/Mitigation Area PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Coburn-Boyd P2494 4 22 1 $1,000,000 DESCRIPTION OF PROJECT: This project is to provide funding for the establishment and management of mitigation areas on capital improvement program projects sites and at the San Miguel Habitat Management Area to offset environmental impacts due to construction activities. JUSTIFICATION OF PROJECT: The resource agencies (USFWS, CDFG, etc.) require areas of land to be set aside, established, managed, and maintained in order to mitigate for impacts due to contraction activities. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2495 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $225 $150 $150 $175 $150 $150 General Fund 100%100% 100%100% $1,000 2010 2011 2012 2013 2014 2015 167 CIP Number: P2495 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 159 Submitted By: Lisa Coburn-Boyd Date: 07/09 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $100 $900 168 PROJECT TITILE: Otay Lakes Road Utility Relocations PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 4 5 1 $100,000 DESCRIPTION OF PROJECT: This project provides funding for all utility relocations required to accommodate the City of Chula Vista road improvement project located along Otay Lakes and Telegraph Canyon Roads. JUSTIFICATION OF PROJECT: The Otay WD will be required to relocate all conflicting systems at its own expense for the City of Chula Vista has prior and superior rights. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2496 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $75 $25 General Fund 100%100% 100%100% $100 2010 2011 2012 2013 2014 2015 169 CIP Number: P2496 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 113 Submitted By: Ron Ripperger Date: 07/09 09/09 01/09 10/09 08/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/24/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4 $11 $85 170 PROJECT TITILE: RWCWRF Force Main AirVac Replacements and Road Improvements PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 3 - 1 $1,325,000 DESCRIPTION OF PROJECT: Replacement of 21 existing two inch air release and vacuum valves on the recycled water force main from the RWCWRF to the Use Area with improved capacity and corrosion resistance features. The existing seven isolation valves on the force main will be replaced. The existing roadway along the force main will be improved. JUSTIFICATION OF PROJECT: The existing air release and vacuum valves on the force main have failed frequently, which causes unauthorized discharges of recycled water. The existing isolation valves are corroded and exhibit signs of leakage. The existing access road along the force main is damaged and improvements will increase safety for operations personnel. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2086 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $40 General Fund 100%100% $1,285 100%100% $1,325 2010 2011 2012 2013 2014 2015 5/23/2005 171 CIP Number: R2086 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 319 Submitted By: Daniel Kay Date: 07/05 08/06 06/08 05/08 07/06 09/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/22/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $53 $146 $1,126 172 PROJECT TITILE: RWCWRF - Filter Storage Reservoir Cover Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 3 20 1 $75,000 DESCRIPTION OF PROJECT: This project funds the replacement of the existing flexible membrane cover on the filter water storage tank. JUSTIFICATION OF PROJECT: The existing cover is damaged and is in need of replacement. Recycled water quality is currently being comprised. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2095 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $75 General Fund 100%100% 100%100% $75 2010 2011 2012 2013 2014 2015 173 CIP Number: R2095 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 319 Submitted By: Ron Ripperger Date: 07/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $3 $8 $64 174 PROJECT TITILE: RWCWRF - Blower System Rehabilitation/Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 3 20 1 $1,000,000 DESCRIPTION OF PROJECT: This project includes the rehabilitation of the RWCWRF blower system and air pipeline replacement along with the identification and implementation of modifications for optimization of the air system and other treatment systems to control total nitrogen. JUSTIFICATION OF PROJECT: The existing blowers are old and not efficient and the existing air piping system is leaking due to corrosion. The plant effluent is exceeding its discharge limit for total nitrogen thus the treatment process must be modified and optimized so that all discharge requirements can be met. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: R2096 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $800 $200 General Fund 100%100% 100%100% $1,000 2010 2011 2012 2013 2014 2015 175 CIP Number: R2096 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 319 Submitted By: Lisa Coburn-Boyd Date: 07/09 10/09 01/11 12/10 09/09 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $40 $110 $850 176 PROJECT TITILE: SVSD Outfall and RSD Replacement and OM Reimbursement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Peasley District Wide District Wide 1 $3,030,000 DESCRIPTION OF PROJECT: This project provides funding for the Otay WD proportionate share of the SVSD total costs for replacement of various system components of the existing Spring Valley and Rancho San Diego Outfall Systems per terms of an existing agreement with the SVSD. The reimbursement also includes a proportionate share of operating and maintenance costs. JUSTIFICATION OF PROJECT: Various components of the SVSD Spring Valley Outfall and the Rancho San Diego Outfall are in very bad condition and are need of repair and/or replacement. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2012 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $300 $130 $100 $100 $100 $100 General Fund 100%100% $2,200 100%100% $3,030 2010 2011 2012 2013 2014 2015 6/4/2003 177 CIP Number: S2012 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Jim Peasley Date: 07/03 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/13/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $121 $333 $2,576 178 PROJECT TITILE: Calavo Lift Station Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kay 5 14 1 $560,000 DESCRIPTION OF PROJECT: Construction of a new sewer lift station to replace the existing lift station. JUSTIFICATION OF PROJECT: The existing lift station has no remaining useful life, has groundwater intrusion problems, and replacement and repair components are hard to find. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2015 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $10 General Fund 100%100% $550 100%100% $560 2010 2011 2012 2013 2014 2015 5/23/2005 179 CIP Number: S2015 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 342 Submitted By: Daniel Kay Date: 12/05 09/06 03/08 02/08 08/06 12/09 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/27/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $58 $125 $377 180 PROJECT TITILE: Avocado Boulevard 8-Inch Sewer Main Improvement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 18 1 $1,632,000 DESCRIPTION OF PROJECT: This project provides sewer main capacity upgrades for approximately 3,200 feet of existing 8-inch ABS sewer main in Avocado Boulevard. JUSTIFICATION OF PROJECT: The existing sewer main is under sized and must of increased capacity and has debris deposit problems. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2019 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $600 $1,032 Sewer 100%100% 100%100% $1,632 2010 2011 2012 2013 2014 2015 181 CIP Number: S2019 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 342 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $65 $180 $1,387 182 PROJECT TITILE: Calavo Drive 8-Inch Sewer Main Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 18 1 $350,000 DESCRIPTION OF PROJECT: This project provides funds to replace approximately 600 feet of existing 8-inch ABS sewer main in Calavo Drive. JUSTIFICATION OF PROJECT: The existing sewer main is under sized and must of increased capacity and has debris deposit problems. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2020 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $40 $300 $10 General Fund 100%100% 100%100% $350 2010 2011 2012 2013 2014 2015 183 CIP Number: S2020 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 342 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $14 $39 $297 184 PROJECT TITILE: Jamacha Road 8-Inch Sewer Main Replacement PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 18 1 $150,000 DESCRIPTION OF PROJECT: This project provides funds to replace approximately 335 feet of existing 8-inch PVC sewer main in Jamacha Road. JUSTIFICATION OF PROJECT: The existing sewer main is under sized and must of increased capacity and has debris deposit problems. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2021 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $30 $110 $10 General Fund 100%100% 100%100% $150 2010 2011 2012 2013 2014 2015 185 CIP Number: S2021 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 368 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $6 $17 $127 186 PROJECT TITILE: Hidden Mesa Drive 8-Inch Sewer Main Rehabilitation PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Kennedy 5 18 1 $50,000 DESCRIPTION OF PROJECT: This project provides funds to replace approximately 315 feet of existing 8-inch VCP sewer main in Hidden Mesa Drive. JUSTIFICATION OF PROJECT: The existing sewer main is under sized and must of increased capacity and has debris deposit problems. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2022 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $5 $40 $5 Sewer 100%100% 100%100% $50 2010 2011 2012 2013 2014 2015 187 CIP Number: S2022 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1272 OWD Map Book: 368 Submitted By: Bob Kennedy Date: 07/09 03/10 10/10 09/10 02/10 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/17/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $6 $42 188 PROJECT TITILE: Calavo Drive Sewer Main Utility Relocation PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Ripperger 5 14 1 $50,000 DESCRIPTION OF PROJECT: This project provides funds to replace approximately 230 feet of existing 8-inch ABS sewer main in Calavo Drive. JUSTIFICATION OF PROJECT: The County of San Diego plans to install a new storm drain culvert that conflicts with the existing sewer main. The County of San Diego has prior and superior rights thus Otay WD will be responsible for the cost to replace the sewer main. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: S2023 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $50 General Fund 100%100% 100%100% $50 2010 2011 2012 2013 2014 2015 189 CIP Number: S2023 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1271 OWD Map Book: 342 Submitted By: Ron Ripperger Date: 07/09 10/09 02/10 01/10 09/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 04/15/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $6 $42 190 PROJECT TITILE: Vehicle Capital Purchases PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Rahders District Wide District Wide 1 $4,311,000 DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various vehicles for daily Otay WD functions. JUSTIFICATION OF PROJECT: Replacements or newly acquired vehicles will be used for operational and administrative functions throughout the entire Otay WD. COMMENTS: It is planned to purchase twelve vehicles in fiscal year 2009. FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2282 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $484 $410 $420 $640 $392 $382 General Fund 100%100% $1,583 100%100% $4,311 2010 2011 2012 2013 2014 2015 6/3/1996 191 CIP Number: P2282 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Doug Rahders Date: 12/00 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/09/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $4,311 192 PROJECT TITILE: Office Equipment and Furniture Capital Purchases PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Dobrawa District Wide District Wide 1 $532,000 DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various office equipment and furniture items used for daily Otay WD functions. JUSTIFICATION OF PROJECT: Replacements or new acquisitions of office equipment and furniture will be used for operational and administrative functions throughout the entire Otay WD. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2285 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $40 $20 $20 $20 $20 $20 General Fund 100%100% $392 100%100% $532 2010 2011 2012 2013 2014 2015 6/3/1996 193 CIP Number: P2285 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Steve Dobrawa Date: 12/00 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $532 194 PROJECT TITILE: Field Equipment Capital Purchases PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Rahders District Wide District Wide 1 $1,075,000 DESCRIPTION OF PROJECT: This project provides funding for capital purchase of various pieces of field equipment used for daily Otay WD functions. JUSTIFICATION OF PROJECT: Replacements or new acquisitions of field equipment will be used for operational functions throughout the entire Otay WD. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2286 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $183 $65 $50 $50 $50 $15 General Fund 100%100% $662 100%100% $1,075 2010 2011 2012 2013 2014 2015 6/3/1996 195 CIP Number: P2286 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Doug Rahders Date: 12/00 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/11/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $1,075 196 PROJECT TITILE: Information Technology Mobile Services PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Stevens District Wide District Wide 1 $1,352,000 DESCRIPTION OF PROJECT: This project will provide for the testing and integration of mobile data and information services to field staff members. JUSTIFICATION OF PROJECT: The Otay WD is implementing new work processes that will require field access to GIS data and support field automation such as GPS expansion. This project will ensure that the technology is appropriate and implemented in a planned and cost effective manner. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2443 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $150 $100 $100 $100 General Fund 25%75%100% $902 25%75%100% $1,352 2010 2011 2012 2013 2014 2015 5/23/2005 197 CIP Number: P2443 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Geoff Stevens Date: 07/05 06/13 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $18,000 $18,500 $19,100 $19,700 $20,300 $20,900 $116,500 ESTIMATED COST (X $1,000): $5 $1,347 198 PROJECT TITILE: Records Management System Upgrade PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Jenkins District Wide District Wide 1 $256,000 DESCRIPTION OF PROJECT: This project will continue with the expansion of the current records management system to capture existing paper records, scan, categorize, and expand scanning capabilities to all Otay WD departments. JUSTIFICATION OF PROJECT: This project is required to achieve strategic objectives for business process improvements. Also, required to meet demands for business backup and recovery goals. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2461 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $100 General Fund 25%75%100% $156 25%75%100% $256 2010 2011 2012 2013 2014 2015 5/29/2007 199 CIP Number: P2461 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bill Jenkins Date: 07/07 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $5 $251 200 PROJECT TITILE: Information Technology Network and Hardware PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Jenkins District Wide District Wide 1 $1,900,000 DESCRIPTION OF PROJECT: This project is to provide hardware and operating system improvements to the data center, network, and communications infrastructure. JUSTIFICATION OF PROJECT: The network facilities require additions of hardware and software to meet new demands. These needs support OIS, network switch, and servers. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2469 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $300 $200 $300 $300 $300 $250 General Fund 40%60%100% $250 40%60%100% $1,900 2010 2011 2012 2013 2014 2015 6/23/2008 201 CIP Number: P2469 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Bill Jenkins Date: 07/08 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/19/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $6 $1,894 202 PROJECT TITILE: Application Systems Development and Integration PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Stevens District Wide District Wide 1 $1,810,000 DESCRIPTION OF PROJECT: This project is for to develop enhancements and new integration functionality for Eden, GIS, IMS, and related core application systems. JUSTIFICATION OF PROJECT: New business processes and enhanced capabilities require current systems to be modified to achieve required integration. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2470 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $430 $200 $200 $200 $200 $200 General Fund 40%60%100% $380 40%60%100% $1,810 2010 2011 2012 2013 2014 2015 6/23/2008 203 CIP Number: P2470 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: District Wide OWD Map Book: District Wide Submitted By: Geoff Stevens Date: 07/08 06/15 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 02/26/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $5 $1,805 204 PROJECT TITILE: Administration Building Engine/Generator Set PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Anderson 4 20 1 $120,000 DESCRIPTION OF PROJECT: This project is to provide funding for a new engine and generator package to provide backup electrical power for the Administration building. The existing Administration building engine and generator package will be relocated to provide backup electrical power for the Operations building. JUSTIFICATION OF PROJECT: The existing engine and generator package to provide backup electrical power for the Administration building is under sized for the electrical load requirements. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2478 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $120 General Fund 100%100% 100%100% $120 2010 2011 2012 2013 2014 2015 6/23/2008 205 CIP Number: P2478 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 318 Submitted By: Don Anderson Date: 07/08 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 05/12/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $2 $4 $114 206 PROJECT TITILE: Operations Yard Property Acquisition PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Dobrawa 4 20 1 $370,000 DESCRIPTION OF PROJECT: The project is to purchase property and to provide site improvements such as fencing, grading, and paving for vehicle parking and equipment storage. JUSTIFICATION OF PROJECT: The additional land is required to provide flexibility in operations and for future expansion purposes. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2479 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $20 General Fund 100%100% $350 100%100% $370 2010 2011 2012 2013 2014 2015 11/13/2008 207 CIP Number: P2479 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1291 OWD Map Book: 318 Submitted By: Steve Dobrawa Date: 11/08 07/09 01/10 12/09 06/09 06/10 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/04/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $0.00 ESTIMATED COST (X $1,000): $370 208 PROJECT TITILE: PL - 10" to 12" Oversize, 1296 Zone, PB Road - Rolling Hills Hydro PS/PB Bndy PROJECT MANAGER: ORIGINAL APPROVED DATE: RELATED CIP PROJECTS: DIRECTOR DIVISION: I.D. LOCATION: PRIORITY: BUDGET AMOUNT: Charles 4 22 2 $50,000 DESCRIPTION OF PROJECT: Construction of approximately 6,900 feet of 12-inch pipeline within the 1296 Pressure Zone from the Rolling Hills Hydropneumatic Pump Station to the future 1296 Reservoir. A portion of the project will be constructed by the developer and is subject to reimbursement at actual cost for the oversize portion per Board policy. JUSTIFICATION OF PROJECT: This project will provide transmission capacity for development of Rolling Hills Ranch, Bello Lago, and possible future adjacent areas within the Rolling Hills Hydropneumatic Pressure Zone. COMMENTS: FUND DETAIL: FUNDING SOURCE:Expansion Betterment Replacement Total TOTAL: OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM CIP Number: P2325 EXPENDITURE SCHEDULE (X $1,000): PRIOR YEARS: TOTAL FY FY FY FY FY FY TOTAL $1 $49 General Fund 100%100% 100%100% $50 2010 2011 2012 2013 2014 2015 6/7/2000 209 CIP Number: P2325 OTAY WATER DISTRICT CAPITAL IMPROVEMENT PROGRAM PROJECT SCHEDULE: PROJECT PHASE:ESTIMATED START DATE: ESTIMATED FINISH DATE: PLANNING: DESIGN: CONSTRUCTION: PROJECT LOCATION:Thomas Bros. Map: 1311 OWD Map Book: 160 Submitted By: David Charles Date: 07/04 09/04 01/10 12/04 08/04 06/11 PROJECTED INCREMENTAL OPERATING EXPENDITURES SCHEDULE ($): 03/14/2009 TOTAL201520142013201220112010 FY FY FY FY FY FY $2,300 $2,400 $2,500 $2,600 $9,800 ESTIMATED COST (X $1,000): $2 $6 $42 210 Effective 7/1/09 IMPROVEMENT CAPACITY ZONE TOTAL NAME DISTRICT (ID) FEE CHARGE CHARGE Rancho Jamul Estates Units 1 & 2 ID 9 WITH 1655 ZONE FEE $5,442 $25,664 $31,106 Capacity Fee Section 28.01 1,2,3,4,9,10, 19, 20,22,25,27 $5,442 $0 $5,442 TRIAD CAPACITY FEE ID 22/27-BASE $4,097 $0 $4,097 Note: This is based on a 3/4 inch water meter. For a full listing of fees per meter size visit the District's website at: www.otaywater.gov, Engineering Public Services, General District Fees and Deposits form. Water Meter Capacity Fees 211 The Fiscal Budget contains terminology that is unique to public finance and budgeting. The following budget glossary provides assistance in understanding these terms. Accrual Basis of Accounting: The basis of accounting under which transactions are recognized when they occur, regardless of the timing of cash receipts and disbursements. Acre-Foot: The volume of water that will cover one acre to a depth of one foot. One acre- foot equals 435.6 units or 325,850 gallons. Additional Systems Fees: Effective May 1, 1986, each customer receiving water service in the Improvement District 9 water service zone pays an additional monthly meter system charge of $2.00 for each meter in service. Annexation Fees: Whenever utility service is requested for land outside the boundaries of an improvement district, the land to be serviced must first be annexed. The annexation fee for water was set on May 30, 2006 at $1,411 per EDU. The fee for sewer annexation was set at $3,819 on December 16, 1998. These base rates are adjusted quarterly according to a cost of living index. The rates as of July 1, 2009 are $1,603 and $5,450 for water and sewer, respectively. Appropriation: The annual budget adopted by the District’s Board for monitoring and control purposes, serving as a financial plan. Assets: Resources owned or held by the District that have monetary value. Availability Fees: The District levies charges each year in developed areas to be used for general purposes for construction of facilities, and in undeveloped areas to provide a source of funding for planning, mapping, and preliminary design of facilities to meet future development. Current legislation provides that any availability charge in excess of $10.00 per acre shall be restricted only for the purpose of constructing facilities in the improvement district for which it was assessed. Balanced Budget: A balanced financial plan, for a specified period of time that matches all planned revenues and expenditures with various services. The District uses a fiscal year beginning each July 1 and ending each June 30 for budgetary and financial reporting purposes. Betterment Fees: In addition to other applicable water rates and charges, certain water customers pay a fee based on water service zone or improvement district. These are restricted for the use in the area where they are collected and may be used for the construction and maintenance of facilities. Glossary  212 Betterment Fees for Maintenance: The Operating Budget earns betterment fees for maintenance work performed on infrastructure within special betterment zones, where fees are collected for the construction and maintenance of these specific assets. Bond: A written promise to pay a sum of money on a specific date at a specified interest rate. The interest payments and the repayment of the principal are authorized in a District bond resolution. The most common types of bonds are general obligation (GO) bonds and Certificates of Participation (COPs). These are frequently used for construction of large capital projects such as buildings, reservoirs, pipelines and pump stations. Budget Basis: The budget and accounting basis for the District is recognized on an accrual basis. Accrual basis means that revenues are recognized when earned and expenses are recognized when incurred. Capacity Fee: A connection fee is charged when a new water meter is placed into service. This fee is based on the estimated construction cost of expansion of the system to meet the needs of all future customers. This fee covers the cost including, but is not limited to, planning, design, construction, and financing of expansion of the system. Capacity Fee Revenues: These fees are earned by the Operating Budget as the Engineering Department supports expansion functions. Capacity Reservation Charge: An MWD charge passed on by CWA to individual agencies. This fee is paid based on the District’s peak water demand. Capital Budget: The portion of the annual budget that appropriates funds for the purchase of capital equipment items and capital improvements. These expenditures are separated from regular operating items, such as salaries, utilities and office supplies. The Capital Budget includes funds for capital equipment purchases over $10,000, such as vehicles, furniture, machinery, microcomputers and special tools or $20,000 for infrastructure related items, which are distinguished from operating items according to their value and projected useful life. Capital Equipment: Fixed assets such as vehicles, marine equipment, computers, furniture, technical instruments, etc. which have a life expectancy of more than two years and a value over $10,000 or $20,000 for infrastructure related items (this may not extend useful life of the infrastructure, but without it, the whole asset is rendered useless). Capital Improvement Program: A long-range plan of the District for the construction, rehabilitation and modernization of the District-owned and operated infrastructure. Glossary  213 Class of Service: All customers are classified based on the type of service used. For example, the water rate per unit is determined by a classification such as residential versus business. CWA: The County Water Authority was organized in 1944 under the State County Water Authority Act for the primary purpose of importing Colorado River water to augment the local water supplies of the Authority's member agencies. The Authority purchases water from MWD which imports water from the Colorado River and the State Water Project. Deannexation Fees: Each request for detachment of land from an improvement district is reviewed on a case-by-case basis. The fees are determined based on the present value of future debt service requirements. Debt Service: The District's obligation to pay the principal and interest of bonds and other debt instruments according to a predetermined payment schedule. Depreciation: An expense recorded to allocate a tangible asset’s cost over its useful life. Desalination: The removal of dissolved minerals (including salts) from seawater or brackish water. Engineered water desalination processes, which produce potable water from seawater or brackish water, have become important because many regions throughout the world suffer from water shortages. Energy Fees: Water customers are charged an energy pumping charge based on the quantity of water used and the elevation to which the water has been lifted to provide service. The energy pumping charge is the rate of $.037 (to increase on September 1, 2009 to $.038) per 100 cubic feet of water for each 100 feet of lift above the base elevation of 450 feet. All water customers are in one of 29 zones based on elevation. Enterprise Fund: Fund that provides goods or services to the public for a fee that makes the entity self-supporting. Expenditures/Expenses: These terms refer to the outflow of funds paid or to be paid for an asset, goods or services obtained regardless of when actually paid for. (Note: An encumbrance is not expenditure). An encumbrance reserves funds to be expended in a future period. Fire Service: Water service is provided by the District solely for use in fire hydrants or fire sprinkler systems from lines or laterals connected to the District’s water mains. The monthly system charge is $28.55 per month (to increase to $30.11 on September 1, 2009) for each connection for fire protection service. Glossary  214 Fiscal Year: Twelve-month term designating the beginning and ending period for recording financial transactions. The District has specified July 1 to June 30 as its fiscal year. Fund Balance: The current funds on hand resulting from the historical collection and use of monies. The difference between assets and liabilities reported in the District’s Operating Fund plus residual equities or balances and changes therein, from the result of operations. General Fund: The District’s general fund is an enterprise fund – one for each of the District’s three business lines Potable, Recycled and Sewer services. Each is an accounting entity with a self-balancing set of accounts established to record the financial position and results that pertain to a specific activity. The activities of enterprise funds closely resemble those of ongoing businesses in which the purpose is to conserve and add to basic resources while meeting operating expenses from current revenues. Enterprise funds account for operations that provide services on a continuous basis and are substantially financed by revenues derived from user charges. Grants: Contributions or gifts of cash or other assets from another governmental agency to be used or expended for a specified purpose, activity, or facility. Capital grants are restricted by the grantor for the acquisition and/or construction of fixed assets. Operating grants are restricted by the grantor for operating purposes or may be used for either capital or operating purposes at the discretion of the grantee. Infrastructure Access Charge (IAC): A pass-through charge from CWA to each member agency. The charge is to finance a portion of CWA’s fixed annual costs including the construction, operation and maintenance of aqueducts and emergency storage projects. The fee was adopted in January of 1999. Interest Income: Earnings from the investment portfolio. Per District Policy Number 25, interest income will be allocated to improvement districts each month based upon each fund’s prior month-ending balance. Late Charges/Penalties: Charges and penalties are imposed on delinquent accounts. A late payment charge of 5% of the most recent delinquent amount is added to the account. Other miscellaneous late fees and penalties are detailed in the District’s Code of Ordinances. Meter and Lateral Fees: Charge includes the material costs for the meter, meter box, and the labor cost for installation to connect a new service to the distribution system. Metropolitan Water District (MWD) Standby Charges: Revenue generated from property taxes by MWD to cover the Readiness-to-Serve (RTS) Charge for the new debt service for construction projects necessary to meet reliability and quality needs. The RTS Charge was adopted in 1996. Glossary  215 Net Assets: The difference between total assets and total liabilities. Increases or decreases in net assets may serve as a useful indicator of whether the financial position of the District is strengthening or weakening. 1% General Tax: In 1978, Proposition 13 limited general levy property tax rates for all taxing authorities to a total rate of 1% of full cash value. Subsequent legislation, AB8, established that the receipts from the 1% levy were to be distributed to taxing agencies according to approximately the same proportions received prior to Proposition 13. Funds received are to be used for facilities construction or debt service on bonds sold to build facilities. Operating Budget: The portion of the budget that pertains to daily operations that provide basic governmental services. The operating budget contains appropriations for such expenditures as personnel, supplies, utilities, materials, travel and fuel, and does not include purchases of major capital plant or equipment which is budgeted for separately in the Capital Budget. Other Income: Revenues that are not directly related to the business of providing water and sewer services. For example, contract billing service for the City of Chula Vista and the City of San Diego to bill their sewer customers based on water consumption. Property Rental Income: Rent or lease agreements for the use of District property. QualServe: a voluntary quality improvement program designed exclusively for water and wastewater utilities. Recycled Water Rates: Non-potable water service provided from water produced by the District’s reclamation plant and other non-potable sources. Recycled water is not used for domestic purposes and all other uses must comply with federal, state and local laws and regulations regarding the use of recycled water. Reserve Fund: The District maintains Reserve Funds per the District’s policy for both designated and restricted balances. Designated Reserve Funds are “general use” funds designated by the Board. Restricted reserves are those that are legally set aside for a particular purpose and cannot be used for any other purpose. Residential Conservation: The water rates for residential customers are based on an accelerated block structure; as more units are consumed, a higher unit rate is charged. The District has established a water conservation program to promote water conservation and planning. Glossary  216 Revenue: Monies that the District receives as income. It includes such items as water sales and sewer fees. Estimated revenues are those expected to be collected during the fiscal year. Readiness-to-Serve Charge (RTS): was adopted by MWD in Fiscal 1996. The charge serves as a foundation of fixed revenue for MWD. It covers the new debt service for construction projects necessary to meet reliability and quality needs of current water-users as opposed to new customers. Sale of Fixed Assets: District equipment, which has been determined by the Board to be of no use, obsolete and/or beyond the useful life and therefore, may be sold. Set-up Fees for Accounts: A charge of $10 is added for each account transferred to another customer. System Fees: Each water service customer pays a monthly system charge for water system replacement, maintenance and operation expenses. The charge is based on the size of the meter and class of service. Taxes: California Water Code Section 72091 authorizes the District, as a municipal water district, to levy ad valorem property taxes which are equal to the amount required to make annual payments for principal and interest on general obligation bonds approved by the voters prior to July 1, 1978. Temporary Water Charge: The rate for temporary water service is two times the rate for permanent service. The additional charge is to offset the cost of construction of facilities for larger capacity. Tier 2 Charge: An MWD charge passed on by CWA to individual agencies. This is an added charge on all water sales by CWA in excess of the District’s 90% baseline water usage. Water Capacity Fees: Charges paid by customers to connect to a District water system for potable or recycled water service. Fees are determined by multiplying the demand factor for the meter size by the total of the District-wide capacity fee and applicable zone charge Water Rates: Rates vary among classes of service and are measured in units. The water rates for residential customers are based on an accelerated block structure. As more units are consumed, a higher unit rate is charged. On January 1, 2009 the District implemented a tiered rate structure for all customer types to encourage conservation and bring equity among the classes. Working Capital: A financial measure which represents available operating liquidity. It is calculated as current assets minus current liabilities. Glossary  217 AF Acre-Foot/Feet AMR Automated Meter Reader/Reading APCD Air Pollution Control District ASCE American Society of Civil Engineers ASU Assigned Service Unit AWWA American Water Works Association BIT Bi-annual Inspection Terminals BMP Best Management Practices BOD Biological Oxygen Demand BRP Business Resumption Plan CADD Computer Aided Design & Drafting CARB California Air Resources Board CDPH California Department of Public Health CAFR Comprehensive Annual Financial Report CCV City of Chula Vista CEQA California Environmental Quality Act CFS Cubic Foot per Second CHP California Highway Patrol CIP Capital Improvement Program CIS Customer Information System CIT Collaborative Improvement Teams CMOM Capacity, Management, Operations & Maintenance CMTA California Municipal Treasurers Association COD Chemical Oxygen Demand COPS Certificates of Participation CRC Capacity Reservation Charge CSC Customer Service Charge CSD City of San Diego CSMFO California Society of Municipal Finance Officers CWA County Water Authority (San Diego) DBMS Database Management System DBP Disinfectant By-Products DEH Department of Environmental Health DHS Department of Health Services DVP Delivery-versus-Payment EDU Equivalent Dwelling Unit EIR Environmental Impact Review EOC Equal Opportunity Commission ERP Enterprise Resource Planning List of Acronyms 218 List of Acronyms ESC Emergency Storage Charge FCF Flow Control Facility FHLMC Freddie Mac or Federal Home Loan Mortgage Corporation FNMA Fannie Mae or Federal National Mortgage Association FTE Full-time Equivalent FY Fiscal Year GASB Government Accounting Standards Board GFOA Government Finance Officers Association GIS Geographic Information System GO General Obligation (bonds) GPM Gallons per Minute GPS Global Positioning System HCF Hundred Cubic Foot HMA Habitat Management Area HR Human Resources HRIS Human Resources Information System HWD Helix Water District IAC Infrastructure Access Charge ID Improvement District IID Imperial Irrigation District IIPP Injury and Illness Prevention Program IMS Infrastructure Management System IRP Integrated Water Resources Plan IRS Internal Revenue Service IT Information Technology IVR Interactive Voice Response LAFCO Local Agency Formation Commission LAIF Local Agency Investment Fund LMSE La Mesa Sweetwater Extension LOPS Lower Otay Pump Station MBR Membrane Bioreactor MG Million Gallons MGD Million Gallons per Day MISAC Municipal Information Systems Association of California MH Man-hours MOU Memorandum of Understanding MSCP Multiple Species Conservation Program MSRB Municipal Securities Rulemaking Board MWD Metropolitan Water District 219 List of Acronyms MWWD Metropolitan Waste Water Department (City of San Diego) NCCP Natural Community Conservation Plan NEPA National Environmental Policy Act NIMS National Incident Management System NOC Notice of Completion NOSC Notice of Substantial Completion NPDES National Pollution Discharge Elimination System O&M or O/M Operations and Maintenance OES Office of Emergency Services (State) OIS Otay Information System OPEB Other Post Employee Benefits OWD Otay Water District PB Pacific Bay PDR Preliminary Design Report PEIR Program Environmental Impact Report PERS Public Employees' Retirement System PL Pipeline POU Principles of Understanding PRS Pressure Reducing Station PS Pump Station PT Part-time RFID Radio Frequency Identification RFP Request for Proposal RSD Rancho San Diego RTS Readiness-to-Serve R/W Right-of-Way RWCWRF Ralph W. Chapman Water Recycling Facility SAMP Sub-Area Master Plan SANDAG San Diego Association of Governments SCADA Supervisory Control and Data Acquisition SBWRP South Bay Water Reclamation Plant SDRMA San Diego Risk Management Association SEC Securities and Exchange Commission SHRM Society of Human Resources Management SLMA Sallie Mae or Student Loan Marketing Association SS Suspended Solids SSMP Sewer System Management Plan SVSD Spring Valley Sanitation District SWA Sweetwater Authority 220 List of Acronyms SWRCB State Water Resources Control Board USBR U.S. Bureau of Reclamation UWMP Urban Water Management Plan WADG Water Agency Design Guideline WD Water District WER Work Environment Review WRMP Water Resources Master Plan WTP Water Treatment Plant 221 Awards 5-7 Budget Calendar 12 Budget Guide 1 Budget Process 13-14 Capital Facility Projects 37-130 Capital Improvement Program Narrative 16-17 Capital Purchases Budget 32 Capital Purchase Projects 191-208 CIP Funding Source and Category 25 CIP Justification and Impact on Operating Budget 28-29 CIP Project Index 35-36 CIP Project Schedules 30-31 CIP Project Sheet Description 33-34 CIP Projects 26-27 CIP Projects in Construction 22-23 CIP Reserve Funds 24 Demographics 10 Developer Reimbursement Projects 209-210 Economic Conditions 8-9 Financial Awards 4 Flagship CIP Projects in Construction 19-21 General Information 3 Glossary 212-217 Index 222 Letter of Transmittal ii-vi List of Acronyms 218-221 Major CIP Projects 18 Organization Chart 11 Otay Water District At-A-Glance 2 Replacement/Renewal Projects 131-190 Resolution No. 4136 15 Water Meter Capacity Fees 211 Index  222