Loading...
HomeMy WebLinkAbout02-20-18 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room TUESDAY February 20, 2018 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. APPROVE A PAYMENT IN THE AMOUNT OF $129,248 TO SAN DIEGO GAS & ELECTRIC FOR NEW ELECTRIC SERVICE FOR THE 870-2 PUMP STATION RE- PLACEMENT PROJECT (MARCHIORO) [5 minutes] 4. APPROVE AN INCREASE TO THE CIP S2045 BUDGET IN THE AMOUNT OF $60,000 AND AWARD A CONSTRUCTION CONTRACT TO BURTECH PIPELINE INCORPORATED FOR THE FUERTE DRIVE SEWER RELOCATION PROJECT IN AN AMOUNT NOT-TO-EXCEED $193,690 (MARTIN) [5 minutes] 5. REJECT ALL BIDS FOR THE CONSTRUCTION OF THE STEELE BRIDGE SEWAGE PUMP STATION WET WELL IMPROVEMENTS PROJECT (R2118) (MARTIN) [5 minutes] 6. REJECT ALL BIDS FOR CONSTRUCTION OF THE 520 RESERVOIRS CHEMICAL FEED IMPROVEMENTS PROJECT (P2557) (MARTIN) [5 minutes] 7. SECOND QUARTER OF FISCAL YEAR 2018 CAPITAL IMPROVEMENT PROGRAM REPORT (MARTIN) [5 minutes] 2 8. FISCAL YEAR 2018 MID-YEAR STRATEGIC PLAN UPDATE (SEGURA) [10 minutes] 9. SAN DIEGO COUNTY WATER AUTHORITY UPDATE (SMITH) [10 minutes] 10. ADJOURNMENT BOARD MEMBERS ATTENDING: Tim Smith, Chair Mitch Thompson All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on February 16, 2018 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on February 16, 2018. /s/ Susan Cruz, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 SUBMITTED BY: Jeff Marchioro Senior Civil Engineer Bob Kennedy Engineering Manager PROJECT: P2083-001103 DIV. NO. 2 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Payment to SDG&E for New Electric Service for the 870-2 Pump Station Replacement Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) authorize the General Manager to approve payment in the amount of $129,248 to San Diego Gas & Electric (SDG&E) for new electric service for the 870-2 Pump Station Replacement Project (see Exhibits A and B for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to approve payment in an amount of $129,248 to SDG&E for new electric service for the 870-2 Pump Station Replacement Project (see Exhibit C). 2 ANALYSIS: The District entered into a $17 million contract with a contractor (Pacific Hydrotech) on August 1, 2017 for the construction of the 870-2 Pump Station Replacement Project. The construction contract also includes the replacement of the 571-1 (Roll) Reservoir floating cover and liner. Notice to Proceed was issued on July 27, 2017 and the contractor broke ground in November 2017. Early coordination of the utilities needed to support the new 870-2 Pump Station are in progress. In an effort to advance this work, a payment to SDG&E in the amount of $129,248 is required for SDG&E to engage Pacific Hydrotech, Pacific Hydrotech’s electrical and instrumentation subcontractor (Southern Contracting), the District’s Construction Management and Inspection Services consultant (Michael Baker International), and District staff to provide input on construction submittals, shop drawings, and requests for information. Once SDG&E receives the full payment, SDG&E will open a construction work order and assign an inspector(s) to coordinate with the construction project team. In addition to SDG&E construction inspection and coordination, the $129,248 payment also covers SDG&E material and installation costs to set a new power pole, a new 3,000 ampere transformer, and a new meter at the site. SDG&E will also pull conductors and make end connections to SDG&E’s equipment. A separate payment to SDG&E in the amount of $35,526 was made for the new gas service under the General Manager’s authority in February 2018. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP P2083, as approved in the FY 2018 budget, is $18,750,000.00. Total expenditures, plus outstanding commitments and forecast, including this contract, are $18,750,000. See Attachment B for the budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budgets are sufficient to support the Project. The Finance Department has determined that, under the current rate model, 100% of the funding will be available from the Replacement Fund for CIP P2083. 3 STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District, in a professional, effective and efficient manner” and the General Manager’s Vision, "A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service." LEGAL IMPACT: None. JM/BK/RP:mlc P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Staff Reports\2018-03-07 SDGE Electric Service\BD 03-07-18 Staff Report SDGE Elec Service for 870-2 PS.docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – 870-2 Pump Station Project Location Map Exhibit B – 870-2 Pump Station Project Detail Map Exhibit C – SDG&E Electric Service Cost ATTACHMENT A SUBJECT/PROJECT: P2083-001103 Payment to SDG&E for New Electric Service for the 870-2 Pump Station Replacement Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 20, 2018. The Committee supported Staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: P2083-001103 Payment to SDG&E for New Electric Service for the 870-2 Pump Station Replacement Project Date Updated: 2/2/2018 Budget 18,750,000 Planning Consultant Contracts 105,296 105,296 - 105,296 ICF JONES & STOKES INC 17,094 17,094 33,833 50,927 JONES & STOKES ASSOCIATES INC74,077 78,000 78,000 HELIX ENVIRONMENTAL Regulatory Agency Fees 2,109 2,109 - 2,109 CA DEPT OF FISH & WILDLIFE 720 720 - 720 CALIFORNIA REGIONAL WATER 1,570 1,570 - 1,570 SAN DIEGO COUNTY WATER AUTH 622 622 - 622 STATE WATER RESOURCES Service Contracts 2,260 2,260 - 2,260 COUNTY OF SAN DIEGO 164 164 - 164 SAN DIEGO DAILY TRANSCRIPT505 505 - 505 THE SAN DIEGO UNION-TRIBUNE Standard Salaries 153,480 153,480 - 153,480 Fixed Asset 580,444 580,444 - 580,444 Total Planning 938,342 864,265 111,833 976,098 Design 001102 Consultant Contracts 4,850 4,850 - 4,850 BURKETT & WONG ENGINEERS INC5,000 136 4,864 5,000 THE WATCHLIGHT CORPORATION 14,068 14,068 - 14,068 SOUTHERN CALIFORNIA SOIL 3,034 3,034 - 3,034 RICK ENGINEERING COMPANY 4,810 4,625 185 4,810 ROGER B WOODHULL 22,463 22,149 314 22,463 NINYO & MOORE GEOTECHNICAL AND 6,086 6,086 - 6,086 HDR ENGINEERING INC10,484 10,484 - 10,484 HUNSAKER & ASSOCIATES 682,870 682,870 - 682,870 CAROLLO ENGINEERS INC 7,974 7,974 - 7,974 AEGIS ENGINEERING MGMT INC Regulatory Agency Fees 3,694 3,694 - 3,694 SAN DIEGO GAS & ELECTRIC 14,264 14,264 - 14,264 COUNTY OF SAN DIEGO Service Contracts 98 98 - 98 DAILY JOURNAL CORPORATION Standard Salaries 676,838 676,838 - 676,838 Supplier Contracts 5,350 5,350 - 5,350 INLAND AERIAL SURVEYS INC Total Design 1,461,884 1,456,520 5,363 1,461,884 Construction Construction Contracts 13,688,835 384,703 13,304,132 13,688,835 PACIFIC HYDROTECH CORPORATION 720,465 20,248 700,218 720,465 PACIFIC WESTERN BANK Consultant Contracts 329,658 84,419 245,240 329,658 CAROLLO ENGINEERS INC789,762 66,927 722,835 789,762 MICHAEL BAKER INT'L INC OTHER AGENCY FEES 708 708 - 708 COUNTY OF SAN DIEGO Professional Legal Fees 276 276 - 276 ARTIANO SHINOFF 280 280 - 280 STUTZ ARTIANO SHINOFF Service Contracts 3,628 3,628 - 3,628 MAYER REPROGRAPHICS INC 119 119 - 119 SAN DIEGO DAILY TRANSCRIPTStandard Salaries 72,207 72,207 200,129 272,336 129,248 129,248 129,248 SDG&E Electric Service 35,526 35,526 35,526 SDG&E Gas Service 20,000 20,000 Security System 20,000 20,000 County Hazardous Materials Business Plan 30,000 30,000 County Access Road Inspection 80,000 80,000 Environmental Offsite Mitigation10,000 10,000 ATT Connection 181,177 181,177 Contingency @ 1.3% of Construction Contract Total Construction 15,770,712 633,514 15,678,505 16,312,018 Grand Total 18,170,938 2,954,299 15,795,701 18,750,000 Vendor/Comments Otay Water District P2083-PS - 870-2 Pump Station Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost OTAY WATER DISTRICT870-2 PUMP STATIONLOCATION MAP EXHIBIT A CIP P2083F P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Graphics\Exhibits-Figures\Exhibit A, Location Map, May 2016.mxd ROLLRESERVOIR(571-1) LOW HEADPUMP STATION HIGH HEADPUMPSTATION FOR PROJECT DETAILSEE EXHIBIT B ACCESS FROMALTA RD OWD PROPERTY LINE(APPROX) FirearmsTrainingFacility VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ ?ò Aä ?Ë ;&s ?p F 0 250125 Feet OTAY WATER DISTRICT870-2 PUMP STATIONPROJECT DETAIL MAP EXHIBIT B CIP P2083F P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Graphics\Exhibits-Figures\Exhibit B, Project Detail Map, May 2016.mxd 0 10050 Feet Legend ExistingEasementOWD ExistingParcelOWD ExistingEasementSDGE ProposedStructure ProposedWater ProposedStormDrain ProposedSewer ProposedGas ProposedSiteCivil ExistingWaterOWD soqf A ~ Sempra Energy ulilily" February 7, 2018 Jeff Marchioro Otay Water District 2554 Sweetwater Springs Blvd Spring Valley, CA 91978 Dear Mr. Marchioro, PROJECT: OTAYWATER DISTRICT FILE NO. PLA 580 Project No. 457584-020 Thank you for requesting that SDG&E provide gas and electric service to your project. Construction responsibilities are outlined following. And, the related costs are attached as the "Cost Summary Sheet". RATES Based on the information provided to your Planner, your project has been assigned a rate of "AL TOUCP2" for electric. Other optional rates may be available. If you are interested in talking with someone regarding your options, please contact the SDG&E Call Center at 1-800-411-7343. ELECTRIC SERVICE SDG&E must set a new pole to serve the project. The extension will require a construction advance as outlined in the Costs section of this letter. The advance was computed based on your selection of the option to pay a non-refundable advance (50% discount option). Underground service will be supplied under the provisions of Electric Rule 16. Accordingly, you are responsible for providing a clear path, the trench, backfill, conduit and concrete substructure(s) from pole to transformer and meter. (Also, you will be responsible for the on-going maintenance of these facilities.) To complete the underground service, we will install and connect the electric service conductors. Your cost for cable and/or cable pole material and/or service connectors is outlined in the Cost Summary Sheet. The manufacturer of your electrical equipment --if rated 1000 amperes or above--must submit four (4) copies of the drawings to: SDG&E ENERGY MEASUREMENT and SERVICE STANDARDS at 8316 Century Park Ct., Suite CP52F, San Diego, CA 92123-1582. The submittal must be made prior to fabrication and must include the project address. One copy will be returned with approvals or corrections, as needed. Please note that when five-inch service conduits are to be installed, a minimum of six-feet clear and level working space must be provided in front of the underground pull section to permit setup and operation of cable pulling equipment. PROJ# 457584-020 2 February 7, 2018 SITE ACCESS -LINE TRUCK, METER, SERVICE, AND TRANSFORMER SDG&E must have line truck access to gas and electric facilities for the purpose of installation, reading, testing, inspection, maintenance, and emergencies (refer to SDG&E Service Standards and guide sections 016, 005, 604, and 1006-1 008). If you are installing an electrically operated gate for your project, there are several things you need to know. First, 24-hour access to the gas and electric meters is required by the Fire Department and SDG&E. Because of the serious safety issues involved, we cannot set meters until access is guaranteed. You should contact the Fire Department to obtain their specific requirements, but our minimum requirements are: 1. A Schlage VTQP Quad Section cylinder in a key switch wired to the gate controller. A list of locksmiths authorized to sell SDG&E approved locks is available on request. 2. A means of opening the gate from the inside without the use of a vehicle to activate the controller. This will require the installation of an additional key switch inside the gate if there is no unsecured switch available. TRENCHING, CONSTRUCTION, INSPECTION After you have been notified by us that your construction order has been issued, you or your contractor must notify our Construction Department by phone, 48 hours prior to having the trench ready. Please call 619-699-1039 to arrange a pre-construction meeting or to discuss any construction-related questions. So that you may effectively schedule your work, you should know that our Inspector is required to inspect your work at the following stages and you will need to call 619-699-1039 as each stage is ready. [J Trenching [J Conduit installation and mandrelling [J Backfill and compaction [J Substructure installation [J Completion stage (final inspection) When calling our Construction Department, the following will identify your project: Project Name: OTAY WATER DISTRICT Work Order#: Electric: 2411580 TRENCHING ADVISORIES Prior to trenching /excavating, please contact DigAiert (USA Markout) at least 48 hours in advance at 811. We will locate and mark-out our facilities. Failure to call may result in serious injuries and/or substantial damage for which you will be responsible. PROJ# 457584-020 3 February 7, 2018 You, probably, will need an excavation permit from the City of San Diego prior to your excavation work. Additionally, you are responsible for obtaining any other necessary permits and for adhering to all applicable governmental and regulatory statutes, codes, and rules. Finally, before you begin trenching, I strongly suggest you contact the local telephone and cable television companies for their requirements and any charges they may have. CHECKLIST There are, of course, a few other things to be done before the meter can be set. I have prepared a checklist for your use. [J Your work must be completed and accepted, and SDG&E's portion of the work must be completed. [J Ensure that the address we have on record and your permit address match. [J Whoever is going to be responsible for the billing needs to call our Customer Contact Center and make application at 1-800-411 -SDGE (7343) or contact your assigned account representative. [J We must receive either permanent or temporary inspection clearances from the City of San Diego. COSTS All costs and offers quoted in this letter shall expire at the end of the business day on April 201h, 2018. If business negotiations are not completed, or if you request revised costs after that date, an engineering fee may be required. Also, please understand that SDG&E is subject to California Public Utilities Commission decisions -any changes directed by the Commission can affect the quotes. The costs quoted in this letter include a cost component to cover SDG&E's estimated liability for State and Federal Income Tax. Since a portion of the work required to complete your project is to be performed by you, it is imperative that you complete that work in a timely manner. Within one year of the date SDG&E first releases your job for construction, all trench, conduit, and substructure work required of you must be completed. Should you not complete that work within one year, subsequently not allowing SDG&E to complete its required work, your job will be placed on hold pending review. If, at that time, you wish to continue, SDG&E will re-estimate the cost of the job. You may be asked to pay a cost update fee and to submit additional funds, if applicable, to cover SDG&E's current cost of construction. If you elect not to proceed with your project it will be cancelled. Note: if you cancel your request, we will retain a portion of your payment to cover SDG&E's expense for processing. The remaining amount, if any, will be refunded to you. Project Management offices are unable to accept payments. If you wish to proceed, please mail all of the required paper work associated with the project, the enclosed Customer Payment Remittance, and your check for $129,248.00 to: Customer Payment Services -CP61 C San Diego Gas & Electric P.O. Box 129831 San Diego, CA 92112-9831 Once your check is received, your work order will be issued. PROJ# 457584-020 4 February 7, 2018 THANK YOU We appreciate your business and hope you are very satisfied with our service. For additional general information, you can visit our website at http://sdge.com. If I may be of further assistance or should you have any non-construction-related questions (easements, charges, etc.), please caH me or my assistant at the number below. Our normal office hours are 7:00 a.m. to 4:00 p.m., Monday through Friday. Sincerely, James Todd Sr. Customer Project Planner Telephone: (858) 636-3920 PROJ# 457584-020 COSTS SUMMARY SHEET Rule 16 Service-Electric a. Rule 16 OH/UG service costs (Combo) b. Tax c. Amount due d. Engineering fee e. Total electric service lateral cost Total Amount Due: 5 $ 106,493.00 $24.770.00 <$ 2,015.00> February 7, 2018 $131,263.00 $ 129,248.00 $ 129.248.00 PCRRemittance Ver 1.0 Page 1 of 1 Sf A~ Sempra Energy tstiliti'' CUSTOMER PAYMENT REMIITANCE Invoice/CR # 1 298369 I Project# 1 457584 I Date I February 07, 2018 I Preparer I Dors, Debra I Customer/Project Name: I OTAY WATER DISTRICT I Project Location: I 1240 ALTA RD SD I SDG&E Contact: I Todd,lim I Telephone: I 858-636-3920~ I PAYMENT DUE: I $129,248.00 I -Make checks payable to SDG&E - MAIL TO: Customer Payment Services -CP61C San Diego Gas & Electric PO Box 129831 San Diego, CA 92112-9831 THIS REMITTANCE MUST BE RETURNED WITH PAYMENT http:/ /infoweb.sdge.com/ departments/cac/cac _remittance.cfm 2/7/2018 1 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: S2045- 001103 DIV. NO. 5 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Approval to Increase the CIP S2045 Budget in an Amount of $60,000 and Award of a Construction Contract to Burtech Pipeline, Incorporated for the Fuerte Drive Sewer Relocation Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) increase the CIP S2045 budget in the amount of $60,000. Additionally, that the Board award a construction contract to Burtech Pipeline, Incorporated (Burtech) and to authorize the General Manager to execute an agreement with Burtech for the Fuerte Drive Sewer Relocation Project in an amount not-to-exceed $193,690.00 (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization to increase the CIP S2045 budget in the amount of $60,000 from $250,000 to $310,000 and to obtain Board authorization for the General Manager to enter into a construction contract with Burtech for the Fuerte Drive Sewer Relocation Project in an amount not-to-exceed $193,690.00. 2 ANALYSIS: The Fuerte Drive Sewer Relocation Project (Project) is for the relocation of approximately 255 linear feet of 8-inch sanitary gravity sewer related to the County of San Diego (County) realigning Fuerte Drive at the intersection of Alzeda Drive for safety issues. The District’s construction contract for the Project was advertised for bid on June 29, 2017 using BidSync, an online bid solicitation website. The Project was also advertised in the Daily Transcript. BidSync provided electronic distribution of the Bid Documents, including specifications, plans, and addenda. One (1) addendum was sent out to all bidders and plan houses to distribute the County of San Diego Permits and address questions and clarifications to the contract documents during the bidding period. Bids were publicly opened on July 26, 2017, with the following results: CONTRACTOR TOTAL BID AMOUNT 1 Ortiz Corporation (National City, CA) $147,650.00 2 Burtech Pipeline, Incorporated (Encinitas, CA) $193,690.00 3 El Cajon Grading and Engineering Co., Inc. (Lakeside, CA) $229,991.00 4 Bali Construction, Inc. (South El Monte, CA) $332,005.00 The construction contract for this work was awarded to Ortiz Corporation (Ortiz) at the September 6, 2017 Board Meeting. The original schedule provided to the District by the County for performing the Project was from November 21, 2017 to December 15, 2017. This schedule was incorporated into the construction contract’s bid documents. Since the award of the construction contract, the County initially notified the District that the District’s utility relocation schedule would be moved into January 2018. The County has since notified the District that the District’s relocation schedule has been moved to April 2018. In response, District staff followed up with Ortiz to verify their ability to meet the revised Project schedule. Ortiz indicated that they could not accommodate the new dates due to other obligations and requested to terminate the contract. At the February 7, 2018 Board Meeting, the Board approved a staff recommendation to terminate the contract with Ortiz. District staff has reached out to Burtech, who was the second lowest bidder when the Project was originally bid. District has communicated the new schedule to Burtech and has noted that the schedule could move to May 2018. 3 Burtech has stated that they would accept the Project and honor their original bid pricing. A review of the bids that were publicly opened on July 26, 2017 was performed by District staff for conformance with the contract requirements and validated that Burtech was the second lowest responsive and responsible bidder. Burtech holds a Class A, General Engineering, Contractor’s License in the State of California, which meets the contract document’s requirements, and is valid through January 31, 2020. The reference checks indicated a very good to excellent performance record on similar projects. Burtech has recently performed similar work for the City of San Diego and the City of Oceanside. An internet background search of the company was performed and revealed no outstanding issues with this company. Staff will verify that Burtech’s Performance Bond and Labor and Materials Bond are valid prior to execution of the contract. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The Fiscal Year 2018 budget for CIP S2045 is $250,000. Total expenditures, plus outstanding commitments and forecast, including this contract, are estimated to be $307,400. See Attachment B for budget detail. Based on a review of the financial budget, the Project Manager anticipates that with a budget increase of $60,000, the Project will be completed within the new budget amount of $310,000. The Finance Department has determined that under the current rate model, 100% of the funding is available from the Replacement Fund. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:mlc P:\WORKING\CIP S2045 Fuerte Drive Sewer Relocation\Staff Reports\BD 03-07-18\BD-03-07-18, Staff Report, Fuerte Drive Sewer Award Construction Contract, (DM-RP).docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map ATTACHMENT A SUBJECT/PROJECT: S2045-001103 Approval to Increase the CIP S2045 Budget in an Amount of $60,000 and Award of a Construction Contract to Burtech Pipeline, Incorporated for the Fuerte Drive Sewer Relocation Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 20, 2018. The Committee supported Staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: S2045-001103 Approval to Increase the CIP S2045 Budget in an Amount of $60,000 and Award of a Construction Contract to Burtech Pipeline, Incorporated for the Fuerte Drive Sewer Relocation Project 2/2/2018 Budget 310,000 Planning 50 50 - 50 Petty Cash Custodian Standard Salaries 21,949 21,949 - 21,949 Total Planning 21,999 21,999 - 21,999 Design 001102 Consultant Contracts 1,206 1,206 - 1,206 HUNSAKER & ASSOCIATES 7,797 7,797 - 7,797 RICK ENGINEERING COMPANY 12,780 12,780 - 12,780 AIRX UTILITY SURVEYORS INC 47 47 - 47 Daily Journal Corporation Standard Salaries 22,928 22,928 - 22,928 Total Design 44,758 44,758 - 44,758 Construction Consultant Contracts 7,000 - 7,000 7,000 Construction Management Construction Contract 193,690 - 193,690 193,690 BURTECH PIPELINE INCORPORATED 25,000 6,014 18,986 25,000 Standard Salaries 15,003 - 15,003 15,003 Contingency @ 7.7% of Construction Contract Total Construction 240,693 6,014 234,679 240,693 Grand Total 307,400 72,721 234,679 307,400 Vendor/Comments Otay Water District S2045 - Fuerte Drive Sewer Relocation Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost OTAY WATER DISTRICTFUERTE DR SEWER RELOCATIONLOCATION MAPEXHIBIT A CIP S2045F P:\WORKING\CIP S2045 Fuerte Drive Sewer Relocation\Graphics\Exhibits-Figures\Exhibit A, Fuerte Dr Sewer Relocation, Aug 2017.mxd AVOCADO BLVD FUERTE DR ALTA RICA DR CALAVO DR ALZEDA DR CRESTLAND DR PROJECT SITE VICINITY MAP PROJECT SITE NTS DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ?ò Aä%&s ?p ?Ë !\F 0 500250 Feet STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: R2118-001103 DIV. NO.: 3 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Reject all Construction Bids for the Steele Bridge Sewage Pump Station Wet Well Improvements Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) reject all bids for the construction of the Steele Bridge Sewage Pump Station Wet Well Improvements Project (CIP R2118) (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to reject all bids for the construction of the Steele Bridge Sewage Pump Station Wet Well Improvements Project (CIP R2118). 2 ANALYSIS: The District provides sanitary sewer collection service in the Jamacha drainage basin located in the northern area of the District. Clogging of the sewage suction lift wastewater pumps is a frequent occurrence at the station and requires significant maintenance staff time to clear debris. The addition of a bar screen within the wet well is expected to reduce the number of pump service calls by staff. To adequately access the wet well after the screen addition, a new top slab with access hatches on either side of the screen is required. Additional top slab openings for instrumentation and pump piping are also needed. The construction contract’s scope of work generally consists of removal and disposal of the existing wet well top slab, a replacement concrete top slab with access hatches and hand holes, furnishing and installing of a new stainless steel wastewater bar screen with grouting, wet well interior coating and all other appurtenant as required by the Contract Documents. The Project was advertised for bid on December 12, 2017 using BidSync, an online bid solicitation website. The Project was also advertised in the Daily Transcript. BidSync provided electronic distribution of the Bid Documents, including specifications, plans, and addenda. One (1) addendum was sent out to all bidders and plan houses to address questions and clarifications to the contract documents during the bidding period. Bids were publicly opened on January 23, 2018, with the following results: CONTRACTOR TOTAL BID AMOUNT 1 Tharsos, Inc., La Mesa, CA $98,000.00 2 Telliard Construction, San Diego, CA $147,100.00 3 Bali Construction, Inc., South El Monte, CA $158,000.00 The Engineer’s Estimate is $50,000. During the Project advertisement period, a copy of the Project advertisement was e-mailed directly to 22 contractors that had either performed work for the District or submitted a bid on a previous project. This is in addition to the notifications provided by BidSync to contractors in the Southern California area, with over several hundred identified for the project classifications checked for this Project. Subsequent contact with several of the contractors found that they were too busy to consider the Project. As the Project budget would need to be increased to award the higher than anticipated contract amount, staff recommends rejecting all bids and to consider repackaging the Project for rebid at a future date when a more favorable bid may be obtained. 3 FISCAL IMPACT: Joe Beachem, Chief Financial Officer None. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:jf P:\WORKING\CIP R2118 - Steele Bridge SPS\Staff Report\BD 03-07-18 Staff Report Steele Bridge SPS Improvements Award Construction Project_rev1.docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map ATTACHMENT A SUBJECT/PROJECT: R2118-001103 Reject all Construction Bids for the Steele Bridge Sewage Pump Station Wet Well Improvements Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 20, 2018. The Committee supported Staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: R2118-001103 Reject all Construction Bids for the Steele Bridge Sewage Pump Station Wet Well Improvements Project 14-Feb-18 Budget 75,000 Planning Regulatory Agency Fees 50 50 - 50 PETTY CASH CUSTODIAN Standard Salaries 3,854 3,854 - 3,854 Total Planning 3,904 3,904 - 3,904 Design 001102 Consultant Contracts 8,035 8,035 - 8,035 RICK ENGINEERING COMPANY Standard Salaries 20,476 20,476 - 20,476 Total Design 28,511 28,511 - 28,511 Construction Standard Salaries 399 399 - 399 Total Construction 399 399 - 399 Grand Total 32,814 32,814 - 32,814 Vendor/Comments Otay Water District R2118-Steele Canyon Sewer PS Chopper Pump Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost Bud STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: P2557-001103 DIV. NO.: 3 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Reject all Construction Bids for the 520 Reservoirs Chemical Feed Improvements Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) reject all bids for the construction of the 520 Reservoirs Chemical Feed Improvements Project (CIP P2557) (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to reject all bids for the construction of the 520 Reservoirs Chemical Feed Improvements Project (CIP P2557). 2 ANALYSIS: The District provides potable water distribution service in the northern area of the District with water imported from the Helix Water District’s R.M. Levy Water Treatment Plant. This water is already chlorinated, but the detention time in the two 520 Pressure Zone storage tanks requires additional disinfectants to be fed to maintain an adequate residual. The District uses chloramination, which consists of chlorine solution and ammonia, for disinfection purposes. The existing ammonia feed piping is constructed of iron pipe, which is deteriorating from use. The construction contract’s scope of work generally consists of removal and replacement of ammonia chemical piping (exposed and buried), injection vault modifications with addition of concrete floor, injector replacement, and valve additions and all other appurtenant as required by the Contract Documents. The Project was advertised for bid on December 12, 2017 using BidSync, an online bid solicitation website. The Project was also advertised in the Daily Transcript. BidSync provided electronic distribution of the Bid Documents, including specifications, plans, and addenda. One (1) addendum was sent out to all bidders and plan houses to make available the presentation prepared for the pre-bid meeting. Bids were publicly opened on January 25, 2018, with the following results: CONTRACTOR TOTAL BID AMOUNT 1 Tharsos, Inc. – La Mesa, Ca $93,000.00 2 Telliard Construction – San Diego, CA $121,900.00 The Engineer’s Estimate is $45,000. During the Project advertisement period, a copy of the Project advertisement was e-mailed directly to 22 contractors that had either performed work for the District or submitted a bid on a previous project. This is in addition to the notifications provided by BidSync to contractors in the Southern California area, with over several hundred identified for the project classifications checked for this Project. Subsequent contact with several of the contractors found that they were too busy to consider the Project. As the Project budget would need to be increased to award the higher than anticipated contract amount, staff recommends rejecting all bids and to consider either repackaging the Project for rebid at a future date when a more favorable bid may be obtained or use District forces to construct the Project at a cost below the low bid amount. 3 FISCAL IMPACT: Joe Beachem, Chief Financial Officer None. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:jf P:\WORKING\CIP P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement\Staff Reports\BD 03- 07-18 Staff Report 520 Res Chemical Feed Improvements Award Construction Project_rev1.docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map ATTACHMENT A SUBJECT/PROJECT: P2557-001103 Reject all Construction Bids for the 520 Reservoirs Chemical Feed Improvements Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 20, 2018. The Committee supported Staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: P2557-001103 Reject all Construction Bids for the 520 Reservoirs Chemical Feed Improvements Project 14-Feb-18 Budget 100,000 Planning Standard Salaries 8,825 8,825 - 8,825 Total Planning 8,825 8,825 - 8,825 Design 001102 Standard Salaries 32,077 32,077 - 32,077 Total Design 32,077 32,077 - 32,077 Construction Standard Salaries 570 570 - 570 Total Construction 570 570 - 570 Grand Total 41,472 41,472 - 41,472 Vendor/Comments Otay Water District P2557 - 520 Reservoir Recirculation Pipeline Chemical Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost Bud STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: VARIOUS DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – Second Quarter Fiscal Year 2018 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all CIP project expenditures and to highlight significant issues, progress, and milestones on major projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer's reimbursement projects. The Second Quarter Fiscal Year 2018 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $20.1 million. Expenditures through the Second Quarter totaled approximately $5.8 million. Approximately 29% of the Fiscal Year 2018 expenditure budget was spent (see Attachment B). FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: The Capital Improvement Program supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:jf P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q2\Staff Report\BD 03-07-18 Staff Report Second Quarter FY 2018 CIP Report (DM-RP).docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2018 Second Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – Second Quarter Fiscal Year 2018 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a Committee Meeting held on February 20, 2018. The Committee supported Staff’s recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. FISCAL YEAR 2018 2nd QUARTER REPORT (Expenditures through 12/31/2017) ($ In Thousands) ATTACHMENT B 2018 12/31/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Cameron 20$ 12$ 8$ 60%3,400$ 514$ 2,886$ 15% Project is in the early Planning stage. Construction is scheduled for FY 2020. P2267 36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations Marchioro 10 4 6 40%700 697 3 100% Construction completed in FY 2017 Q4. Project one year warranty scheduled to complete in FY 2018 Q4. P2382 Safety and Security Improvements Payne 150 158 (8) 105%3,251 2,965 286 91% For FY 2018, advancing $50K from FY 2019. CIP to close at the end of FY 2019. P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Cameron 5 - 5 0%650 - 650 0% This project is tied to P2553 and is driven by the City of Chula Vista. Construction is scheduled for FY 2022. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 50 41 9 82%4,300 3,806 494 89% EIR/EIS complete and Presidential Permit issued. Continue meetings with DDW and AdR. P2453 SR-11 Utility Relocations Marchioro 50 19 31 38%4,000 1,640 2,360 41% Project accelerated to meet Caltrans' current schedule. Completion of Design phase scheduled March 2018. Completion of construction dependent on Caltrans' contractor and anticipated for FY 2020. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 5 - 5 0%600 5 595 1% Demolition scheduled for FY 2020; environmental work to be performed in FY 2019. P2485 SCADA - Infrastructure and Communications Replacement Kerr 181 148 33 82%2,328 1,921 407 83%Expenses on target for remainder of fiscal year. P2494 Multiple Species Conservation Plan Coburn-Boyd 30 1 29 3%950 909 41 96%Project on schedule. P2500 Padre Dam - Otay Interconnection Dehesa Valley Marchioro 60 - 60 0%140 - 140 0% Project is driven by Padre Dam pipeline extension to District boundary. P2504 Regulatory Site Access Road and Pipeline Relocation Cameron 20 - 20 0%462 331 131 72%Project is driven by County Fire. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/Osage Marchioro - - - 0%900 - 900 0% No project expenditures anticipated in FY 2018. Construction scheduled for FY 2021. P2520 Motorola Mobile Radio Upgrade Martinez 30 - 30 0%120 82 38 68% Anticipate this project to be completed this Fiscal Year. P2521 Large Meter Vault Upgrade Program Carey 25 38 (13) 152%620 300 320 48% 2nd meter raise from Crossroads carried over from FY17 to FY18. No other work planned for FY18. Expenditures within overall project budget. P2547 District Administration Vehicle Charging Stations Cameron 20 36 (16) 180%125 69 56 55% Construction completed in FY 2018 Q2. Project one year warranty scheduled to complete in FY 2019 Q2. Expenditures originally anticipated for FY 2017 Q4 occurred in FY 2018. Expenditures within overall project budget. P2553 Heritage Road Bridge Replacement and Utility Relocation Cameron 50 4 46 8%1,430 19 1,411 1% Project is in the Planning stage. Project is driven by the City of Chula Vista's schedule for replacement. P2568 Technology Business Processes Improvement - Enterprise Content Management System Kerr 36 64 (28) 178%245 210 35 86% Purchases from FY 2017 were expensed in Q1 FY 2018. Budget of $36K on target to be expensed in FY 2018. Expenditures within overall project budget. This CIP will be closed at the end of FY 2018. P2571 Datacenter Network- Data, Storage, and Infrastructure Enhancements Kerr - - - 0%200 - 200 0%Project on schedule for FY 2019. P2572 Enterprise Resource Planning (ERP) Replacement Kerr - - - 0%500 - 500 0%Project on schedule for FY 2021. P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0%35 - 35 0% No expenditures anticipated in FY 2018. These reservoirs are scheduled to be removed at the end of their useful life. P2608 PL - 8-inch, 850 Zone, Coronado Ave, Chestnut/Apple Cameron 10 - 10 0%350 - 350 0% Project is in the early Planning stage and on schedule. P2611 Quarry Road Bridge Replacement and Utility Relocation Cameron 5 1 4 20%1,000 1 999 0% Project is in the early Planning stage. Project is driven by County's schedule for replacement. P2612 PL - 12-inch, 711 Zone, Pas de Luz/Telegraph Canyon Rd Cameron 5 - 5 0%500 - 500 0% Project is in the early Planning stage and on schedule. P2613 PL - 12-inch, 520 Zone, Rancho San Diego Towne Center Loop Cameron 10 2 8 20%150 2 148 1%This project is not needed and will be closed. P2614 485-1 Reservoir Interior/Exterior Coating Cameron - - - 0%895 - 895 0%No project expenditures in FY 2018. P2617 Lobby Security Enhancements Payne 75 1 74 1%75 1 74 1% Planning to be completed in FY 2018; construction during FY 2019. P2619 PS - Temporary Lower Otay Pump Station Redundancy Marchioro 20 13 7 65%635 13 622 2% Project on track. District engineering staff commenced concept development/alternatives analysis in-house. Completion of construction anticipated FY 2020. P2620 Radio and Emergency Communication System Kerr 20 - 20 0%20 1 19 5%Expenses on target for remainder of fiscal year. P2623 Central Area to Otay Mesa Interconnection Pipelines Combination Air/Vacuum Valve Replacements Marchioro 20 31 (11) 155%270 32 238 12% Project accelerated to advance work in FY 2018. Purchase Order to procure long lead-time valves issued October 2017. Award of a construction contract will coincide with valve delivery anticipated in March 2018. Completion of construction anticipated FY 2018. Expenditures within overall project budget. FISCAL YEAR-TO-DATE, 12/31/17 LIFE-TO-DATE, 12/31/17 P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q2\Expenditures\Copy of Copy of FY18 2nd qtr exp.xlsx Page 1 of 4 2/6/2018 FISCAL YEAR 2018 2nd QUARTER REPORT (Expenditures through 12/31/2017) ($ In Thousands) ATTACHMENT B 2018 12/31/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/17 LIFE-TO-DATE, 12/31/17 R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway Beppler 20 - 20 0%2,920 2,920 - 100% Construction and reimbursement completed in FY 2017 Q4. Project complete. R2079 RecPL - 6-Inch, 450 Zone, Otay Valley Road - Otay Valley/Entertainment Beppler 10 - 10 0%150 - 150 0% Project is driven by City of Chula Vista's schedule for replacement of the Heritage Road Bridge. R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications Marchioro 20 5 15 25%200 135 65 68% Project on track. Pressure reducing station work will be completed FY 2018. R2116 RecPL - 14-Inch, 927 Zone, Force Main Improvements Marchioro 200 129 71 65%2,500 1,999 501 80% Construction on schedule to complete in FY 2018 Q3. R2118 Steele Canyon Sewer PS Large Solids Handling Improvements Beppler 50 7 43 14%75 29 46 39% Construction bids received FY 2018 Q3 are higher than estimated and are being evaluated to determine if they will be repackaged and re-bid. R2120 RWCWRF Filtered Water Storage Tank Improvements Beppler 25 - 25 0%500 29 471 6%Construction is scheduled for FY 2020. R2123 Repurpose Otay Mesa Recycled Water Lines Beppler 5 - 5 0%350 - 350 0% Initiate study this fiscal year with construction scheduled for FY 2021. R2125 RecPRS - 927/680 PRS Improvements, Otay Lakes Road Marchioro 50 3 47 6%200 3 197 2%Construction scheduled for FY 2020. S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 20 - 20 0%2,540 1,111 1,429 44% This CIP reimburses the County for work on transportation pipeline rehabilitation. On track. S2027 Rancho San Diego Pump Station Rehabilitation Beppler 5 3 2 60%3,500 3,046 454 87% County invoiced in FY 2017. Construction to be completed in FY 2018 Q4. Final budget adjustment with County to be done in FY 2019. S2033 Sewer System Rehabilitation Beppler 10 3 7 30%3,000 2,993 7 100% Construction complete in FY 2017 Q4. Project one year warranty to complete in FY 2018 Q4. S2043 RWCWRF Sludge Handling System Beppler 30 - 30 0%76 40 36 53% Budget was set for outside consultant to reassess the project feasibility based on updated Metro costs. Adequate long-term Metro costs are now not anticipated to be available this fiscal year, so this report will be delayed. S2047 Asset Management - Info Master Sewer Implementation Zhao 30 - 30 0%58 - 58 0% Anticipate the purchase of the sewer master software within Fiscal Year 2018. S2061 RWCWRF Aeration Controls Consolidation & Optimization Upgrades (S)Beppler 30 - 30 0%190 - 190 0% Construction is scheduled for FY 2020, after replacement aeration process is confirmed. Total Capital Facility Projects Total:1,412 723 689 51%45,110 25,823 19,287 57% REPLACEMENT/RENEWAL PROJECTS P2083 PS - 870-2 Pump Station Replacement Marchioro 4,000 175 3,825 4%18,750 2,518 16,232 13% Construction on track for completion in FY 2020 Q2. P2174 PS - 1090-1 Pump Station Replacement (400 gpm)Marchioro 1 - 1 0%2,500 4 2,496 0%Planning phase deferred until FY 2019. P2400 PL - 20-Inch Pipeline Replacement, 711 Zone, Otay Lakes Road - at Santa Paula Marchioro - - - 0%2,280 - 2,280 0%Planning phase deferred until FY 2020. P2493 624-2 Reservoir Interior/Exterior Coating Cameron 35 37 (2) 106%1,610 1,605 5 100% Warranty work complete. Project is completed. Expenditures within overall project budget. P2507 East Palomar Street Utility Relocation Cameron 5 2 3 40%735 725 10 99% Waiting for reimbursement and As-Builts from Caltrans. P2508 Pipeline Cathodic Protection Replacement Program Marchioro 100 225 (125) 225%725 678 47 94% Construction for the first phase on schedule to complete in FY 2018 Q3. Second phase construction project scheduled to be awarded FY 2019 Q1. Expenditures originally anticipated for FY 2017 occurred in FY 2018 due to heavy rains and environmental requirements. Expenditures within overall project budget. P2518 803-3 Reservoir Interior/Exterior Coating Cameron 5 - 5 0%685 661 24 96%Expenditures anticipated in Q4 FY 2018. P2529 711-2 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%820 803 17 98% Construction completed FY 2017 Q2. Project is in the 2 year warranty period. P2530 711-1 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%980 954 26 97% Construction completed FY 2017 Q2. Project is in the 2 year warranty period. P2531 944-1 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%345 319 26 92% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2532 944-2 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%960 937 23 98% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2533 1200-1 Reservoir Interior & Exterior Coating Cameron 10 - 10 0%810 7 803 1%Project is in the Planning stage. P2534 978-1 Reservoir Interior & Exterior Coating Cameron 10 85 (75) 850%650 582 68 90% Construction contract completed FY 2017 Q4. Currently in two year warranty period. Expenditures originally anticipated for FY 2017 Q4 occurred in FY 2018 due to contractor delays. Expenditures within overall project budget. P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades Cameron 5 - 5 0%810 778 32 96% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations Cameron 5 10 (5) 200%1,090 897 193 82% Project is driven by SANDAG. More construction work was completed than anticipated. Expenditures within overall project budget. P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q2\Expenditures\Copy of Copy of FY18 2nd qtr exp.xlsx Page 2 of 4 2/6/2018 FISCAL YEAR 2018 2nd QUARTER REPORT (Expenditures through 12/31/2017) ($ In Thousands) ATTACHMENT B 2018 12/31/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/17 LIFE-TO-DATE, 12/31/17 P2542 850-3 Reservoir Interior Coating Cameron 5 1 4 20%540 528 12 98% Construction contract completed FY 2016 Q2. Warranty assessment complete. P2543 850-1 Reservoir Interior/Exterior Coating Cameron 5 - 5 0%875 5 870 1%No expenditures until Q4 FY 2018. P2544 850-2 Reservoir Interior/Exterior Coating Cameron 700 620 80 89%980 707 273 72% Construction completion anticipated in FY 2018 Q3. P2545 980-1 Reservoir Interior Exterior Coating Cameron 5 - 5 0%1,190 1,188 2 100% Construction completed FY 2017 Q2. Project is in the two year warranty period. P2546 980-2 Reservoir Interior/Exterior Coating Cameron 1,100 80 1,020 7%1,450 80 1,370 6%Construction began in FY 2018 Q2. P2555 Administration and Operations Parking Lot Improvements Cameron 265 417 (152) 157%775 537 238 69% Construction of Phase 1 improvements complete in FY 2018 Q2. Expenditures originally anticipated for FY 2017 Q4 occurred in FY 2018. Expenditures within overall project budget. P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project Beppler 35 6 29 17%100 39 61 39% Construction bids received FY 2018 Q3 are higher than estimated and are being evaluated to determine if they will be repackaged and re-bid. P2559 Pressure Vessel Repair and Replacement Program Marchioro 30 37 (7) 123%650 288 362 44% RWCWRF surge tank and piping completed in FY 2017 Q3. CIP P2559 will be closed and split into several new site specific CIP projects for FY 2019. Expenditures within overall project budget. P2561 Res - 711-3 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,800 8 1,792 0% Replacement deferred since existing cover/liner materials, analyzed by laboratory in FY 2017, suggested two years remaining life. P2562 Res - 571-1 Reservoir Cover/Liner Replacement Marchioro 2,700 6 2,694 0%2,900 52 2,848 2% Construction began in FY 2018 Q2. Reservoir scheduled to be placed back into service in FY 2018 Q4. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,000 3 997 0% Replacement deferred until FY 2022 to coincide with completion of new 870-2 Pump Station. Existing cover/liner materials analyzed by laboratory in FY 2017 suggested sufficient remaining life. P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%940 - 940 0%No expenditures for FY 2018. P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%1,500 - 1,500 0%No expenditures for FY 2018. P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%905 - 905 0%No expenditures for FY 2018. P2573 PL - 12-Inch Pipeline Replacement, 803 Zone, Hillsdale Road Beppler 1,600 643 957 40%2,450 881 1,569 36% Contract awarded and Notice to Proceed issued in FY 2018 Q1. Project on schedule to be completed by the end of the fiscal year. P2574 PL - 12-Inch Pipeline Replacement, 978 Zone, Vista Vereda Beppler 450 116 334 26%2,500 194 2,306 8% PDR completed in FY 2018 Q2; Public Outreach to occur in FY 2018 Q3; 60% Design in FY 2018 Q4. CIP P2625, established for Hidden Mesa portion of work, is to be completed prior to this project; schedule adjusted to reflect this. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 gpm Marchioro - - - 0%10,000 - 10,000 0% Replacement deferred until FY 2023-2024 to coincide with development of Villages 4, 8, 9, & 3. P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%840 - 840 0%No expenditures for FY 2018. P2594 Large Meter Replacement Carey 150 14 136 9%485 266 219 55%Most work will take place in FY 2018 Q3 & Q4. P2604 AMR Change Out Carey 1,510 907 603 60%9,605 2,173 7,432 23%Project on track. P2605 458/340 PRS Replacement, 1571 Melrose Ave Marchioro 1 2 (1) 200%250 2 248 1% Design scheduled for FY 2019. Advanced planning work performed in FY 2018. Expenditures within overall project budget. P2606 803-2 Reservoir Repair/Replacement of Caulking and Tree Removal Marchioro 1 - 1 0%75 - 75 0%Design scheduled for FY 2019. P2607 Douglas Ave SWA and OWD Interconnection Upgrade Beppler 10 - 10 0%50 - 50 0%Project is driven by Sweetwater Authority. P2609 PL - 8-inch, 1004 Zone, Eucalyptus St, Coronado/Date/La Mesa Cameron - - - 0%400 - 400 0% No expenditures for FY 2018. Construction scheduled for FY 2021. P2610 Valve Replacement Program - Phase 1 Cameron 30 - 30 0%150 - 150 0%Project is in the early Planning stage. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Beppler - - - 0%1,200 - 1,200 0% No expenditures for FY 2018. Construction scheduled for FY 2021. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Dr/Vista Sierra Dr Marchioro 20 5 15 25%2,500 5 2,495 0% On track. District engineering staff commenced concept development/alternatives analysis in house. Construction scheduled for 2020. P2625 PL - 12-inch, 978 Zone, Hidden Mesa Road Beppler 90 - 90 0%1,500 1 1,499 0% PDR under CIP P2574 completed in FY 2018 Q2. 60% Design underway with Final Design due in FY 2018 Q4. R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,400 19 1,381 1% Replacement scheduled for FY 2021 since dive inspection completed FY 2016 suggested five years remaining life. R2139 RWCWRF - Filter Troughs Replacement Beppler 30 - 30 0%30 - 30 0%Replacement to be performed FY 2018. R2143 AMR Change Out Carey 350 62 288 18%525 105 420 20% Project on track with additional changes scheduled for Q4 FY 2018. S2024 Campo Road Sewer Main Replacement Beppler 4,250 1,193 3,057 28%10,100 2,761 7,339 27%Construction on track to complete in FY 2019 Q4. P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q2\Expenditures\Copy of Copy of FY18 2nd qtr exp.xlsx Page 3 of 4 2/6/2018 FISCAL YEAR 2018 2nd QUARTER REPORT (Expenditures through 12/31/2017) ($ In Thousands) ATTACHMENT B 2018 12/31/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/17 LIFE-TO-DATE, 12/31/17 S2044 Trenchless Sewer Rehabilitation Beppler 75 372 (297) 496%550 476 74 87% Construction contract completed in FY 2018 Q1. In one year warranty period. Expenditures originally anticipated for FY 2017 Q4 occurred in FY 2018. Expenditures within overall project budget. S2045 Fuerte Drive Sewer Relocation Beppler 100 12 88 12%250 72 178 29% Project start date delayed to FY 2018 Q4 by County of San Diego. Construction contractor has requested termination due to delayed start. Staff has approached second low bidder for project. S2046 RWCWRF - Aeration Panels Replacement Beppler 50 7 43 14%450 85 365 19% Negotiations with existing aeration panels manufacturer are on-going; replacement options to be considered once completed. S2048 Hillsdale Road Sewer Repairs Beppler 400 14 386 4%720 71 649 10% Construction on track for completion in FY 2018 Q4. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 19 - 19 0%1,000 1 999 0% Planning to begin in FY 2018 Q3 and continue into FY 2019 with easement issues to be vetted before starting Design. S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler - - - 0%1,250 - 1,250 0% Planning to start in FY 2020; construction anticipated in FY 2022. S2051 RWCWRF - Headworks Improvements Beppler 50 9 41 18%150 9 141 6% Design consultant selection in FY 2018 Q3; Design to be completed in FY 2019 Q1. S2053 RWCWRF - Sedimentation Basins Weirs Replacement Beppler 60 - 60 0%60 - 60 0%Replacement to be performed FY 2018 Q4. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%1,290 - 1,290 0% Planning to start in FY 2021; construction anticipated in FY 2023. Total Replacement/Renewal Projects Total:18,290 5,057 13,233 28%99,135 22,024 77,111 22% CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 363 - 363 0%5,175 3,863 1,312 75% $278.6K encumbered. Anticipate 100% expensed in FY 2018. P2286 Field Equipment Capital Purchases Rahders 72 21 51 29%1,746 1,424 322 82% Out to bid on two of the three budget items. Anticipate 100% expensed in FY 2018. Total Capital Purchase Projects Total:435 21 414 5%6,921 5,287 1,634 76% DEVELOPER REIMBURSEMENT PROJECTS p2430 PL - 20-inch, 980 Zone, Proctor Valley Road – Village 14 Phase 1 Cameron 5 - 5 0%35 - 35 0%Developer driven project. P2595 PL - 16-inch, 624 Zone, Village 3N - Heritage Road, Main St/Energy Way Beppler - - - 0%150 - 150 0%Construction anticipated to begin in FY 2018 Q4. R2084 RecPL - 20-Inch, 680 Zone, Village 2 - Heritage/La Media Beppler 40 - 40 0%365 1 364 0%Under construction in FY 2018. Total Developer Reimbursement Projects Total:45 - 45 0%550 1 549 0% 104 20,182$ 5,801$ 14,381$ 29%151,716$ 53,135$ 98,581$ 35% GRAND TOTAL 20,182$ 5,801$ 14,381$ 29%151,716$ 53,135$ 98,581$ 35% P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q2\Expenditures\Copy of Copy of FY18 2nd qtr exp.xlsx Page 4 of 4 2/6/2018 Otay Water District Capital Improvement Program Fiscal Year 2018 Second Quarter (through December 31, 2017) ATTACHMENT C 571-1 Reservoir –Removal of Reservoir Floating Cover and Liner 11/27/2017 Background The approved CIP Budget for Fiscal Year 2018 consists of 87 projects that total $20.1 million. These projects are broken down into four categories. 1.Capital Facilities $ 1.4 million 2.Replacement/Renewal $18.3 million 3.Capital Purchases $ 0.4 million 4.Developer Reimbursement $ 45.0 thousand Overall expenditures through the Second Quarter of Fiscal Year 2018 totaled $5.8 million, which is approximately 29% of the Fiscal Year budget. 2 Fiscal Year 2018 Second Quarter Update ($000) CIP CAT Description FY 2018 Budget FY 2018 Expenditures % FY 2018 Budget Spent Total Life-to-Date Budget Total Life-to-Date Expenditures % Life-to-Date Budget Spent 1 Capital Facilities $1,412 $723 51%$45,110 $25,823 57% 2 Replacement/ Renewal $18,290 $5,057 28%$99,135 $22,024 22% 3 Capital Purchases $435 $21 5%$6,921 $5,287 76% 4 Developer Reimbursement $45 $0 0%$550 $1 0% Total: $20,182 $5,801 29%$151,716 $53,135 35% 3 Fiscal Year 2018 Second Quarter CIP Budget Forecast vs. Expenditures 4 $20,182,000 $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FISCAL YEAR PERIOD IN MONTHS Budget Forecast Total Expenditures $5,801,000 5 CIP Projects in Construction 870-2 Pump Station Replacement Project (P2083/P2562) Replacement of existing 870 High Head and Low Head Pump Stations Remove and Replace the existing 571-1 Reservoir liner and cover $18.75M Budget Start: July 2017 Completion: October 2019 6 870-2 Pump Station –New Inlet/Outlet Pipe Excavation Division No. 2 Location: North East corner of Otay Mesa. Existing 571-1 Reservoir and High Head/Low Head Pump Station Site. 12/12/2017 CIP Projects in Construction 978-1 & 850-2 Reservoirs Interior/Exterior Coating & Upgrades Project (P2534/P2544) Remove and replace existing interior and exterior coatings. Construct structural upgrades to increase the service life. $1.79M Budget Start: November 2016 Estimated Completion: January 2018 7 850-2 (3.1 MG) –Interior After Wash down Division Nos. 3 and 5 Locations: 978-1 is located on Pence Drive. 850-2 is located on Ledgeside Street. 12/29/2017 CIP Projects in Construction Campo Road Sewer Replacement Project (S2024) Replace existing 10- inch sewer with 7,420 linear feet of new 15- inch sewer. Reconnection of sewer laterals Night Work $10.10M Budget Start: July 2017 Estimated Completion: April 2019 8 Manhole No. 21 –Base Installation on Jamacha Blvd. Division No. 5 Location: Campo Road (SR 94) between Rancho San Diego Village Shopping Center and Rancho Towne Center. CIP Projects in Construction 14-Inch Force Main Rehabilitation (R2116/P2508) Replace force main blow-offs, valves, and piping at 15 locations. Rehabilitate force main’s cathodic protection system. Increase Service Life. $2.50M Budget Start: August 2016 Estimated Completion: January 2018 9 Station 51+43 -14-Inch Force Main Point Repair Location: From RWCWRF, Spring Valley to area North of Salt Creek Golf Course, Chula Vista. Division No. 3 11/17/2017 CIP Projects in Construction Hillsdale Road Waterline Replacement and Sewer Repairs (P2573/S2048) Replacement of 4,050 linear feet of 12-inch waterline. Replacement of 760 liner feet of 8-inch sewer. $3.17M Budget Start: October 2017 Estimated Completion: May 2018 10 Hillsdale Road across from Valhalla High School–Installation of Water Line Division No. 5 Location: Hillsdale Road between Jamacha Road and Vista Grande Road. 12/29/2017 Construction Contract Status 11 PROJECT TOTAL % S2044 Trenchless Sewer Rehabilitation Insituform Technologies, LLC $353,954 $373,954 ($24,120)-6.8%$333,467 $333,467 -10.8%100.0%August 2017 P2555 P2547 OWD Administration & Operations Parking Lot Improvements Ph. 1 - Lighting and Vehicle Charging Station Ace Electric, Inc.$344,495 $369,495 $34,408 10.0%$378,903 $378,903 2.5%100.0%October 2017 P2534 P2544 978-1 & 850-2 Reservoir Interior/Exterior Coating & Upgrades Blastco Inc.$963,280 $1,106,200 $16,208 1.7%$1,106,158 $722,125 0.0%65.3%January 2018 P2508 R2116 14-Inch Force Main Rehabilitation Project Charles King Company Inc.$1,045,100 $1,101,250 $112,228 10.7%$1,166,476 $1,059,333 5.9%90.8%January 2018 S2045 Fuerte Drive Sewer Relocation Ortiz Corporation $131,000 $147,650 $0 0.0%$131,000 $0 -11.3%0.0%June 2018 P2573 S2048 Hillsdale Road 12- inch Waterline Replacement and Sewer Repairs TC Construction Company, Inc.$2,245,060 $2,396,060 $0 0.0%$2,245,060 $543,223 -6.3%24.2%May 2018 P2546 980-2 Reservoir Interior/Exterior Coating & Upgrades Simpson Sandblasting & Special Coating, Inc. $998,502 $1,146,377 $0 0.0%$998,502 $24,964 -12.9%2.5%May 2018 S2024 Campo Road Sewer Replacement Project Wier Construction Corporation $7,623,281 $7,816,781 $0 0.0%$7,665,281 $1,255,785 -1.9%16.4%April 2019 P2083 P2562 870-2 Pump Station Replacement/ 571-1 Reservoir Liner and Cover Replacement Pacific Hydrotech Corporation $16,500,900 $16,925,900 $0 0.0%$16,500,900 $0 -2.5%0.0%October 2019 TOTALS:$30,205,572 $31,383,667 $138,723 0.5%$30,525,746 $4,317,799 -2.7% FY 2018 CIP CONSTRUCTION PROJECTS CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE **THIS CHANGE ORDER RATE INCLUDES THE CREDIT FOR UNUSED ALLOWANCES *NET CHANGE ORDERS DO NOT INCLUDE ALLOWANCE ITEM CREDITS. IT'S A TRUE CHANGE ORDER PERCENTAGE FOR THE PROJECT CIP NO.PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* Consultant Contract Status 12 Consultant Contract Status 13 Consultant Contract Status 14 QUESTIONS? 15   STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 7, 2018 PROJECT: Various DIV. NO. ALL SUBMITTED BY: Adolfo Segura, Chief of Administrative Services APPROVED BY: Mark Watton, General Manager SUBJECT: FY18 MID-YEAR REPORT FOR THE DISTRICT’S FY15-18 STRATEGIC PLAN   GENERAL MANAGER’S RECOMMENDATION:   No recommendation. This is an informational item only.   COMMITTEE ACTION:   Please see “Attachment A”.   PURPOSE:   To provide a mid-year report on the District’s FY15-18 Strategic Performance Plan for FY18.   ANALYSIS:   Summary   The current Otay Water District Strategic Plan is a four-year plan ranging from the start of FY15 through the end of FY18. This report details the mid-year results for the last year of our four-year plan.   Strategic Plan Objectives – Target 90%   Strategic Plan objectives are designed to ensure the District is executing mission designed objectives and making the appropriate high- level changes necessary to guide the agency’s efforts to meet new challenges and positively adapt to change. FY18 mid-year results are on target at 95%, with 19 of 20 active items completed or on schedule. One objective is on hold.   The following objective has been put on hold: 1. Streamline Input of Operations Data – The SCADA Roadmap has been received, however, review and implementation of the plan will be incorporated into the new 3-5 year Strategic Plan.   Performance Measures (Metrics) – Target 75%   Performance measures are designed to track the District’s day-to-day performance. These items measure the effectiveness and efficiency of daily operations and essential services. The overall goal is that at least 75% of these measures be rated “on target”. FY18 mid-year results are above target with 32 of 37 (86%) items achieving the desired level or better. Five measures are reported at year’s end:  Enterprise Technology Services Availability  Injury Incident Rate  Debt Coverage Ratio  Reserve Level  Accounts Per FTE 0 2 4 6 8 10 12 14 16 18 COMPLETED ON SCHEDULE BEHIND ON HOLD 2 17 0 1 Completed On Schedule Behind On Hold 19 of 20 Active Objectives are Completed or On Schedule (95%) Items Not On Target    1. CIP Project Expenditures vs. Budget – Year-to-date CIP expenditures amounted to $5,801,000 vs. the budgeted amount of $20,182,000. YTD result is approximately 7% below the established target. 2. Project Closeout – Second quarter results were influenced by the Trenchless Sewer Rehabilitation Project, S2044, by 103 days. Substantial completion was reached on August 3, 2017. At that point in time, Insituform Technologies (Insituform), the contractor for the project, was provided with a construction contract punch list of items required by the District for contract acceptance. Insituform did not complete all punch list items until November 13, 2017. Contract Acceptance and the Notice of Completion was processed by staff on November 14, 2017. 3. Overtime Percentage – Year-to-date expenditures amounted to $72,395 vs. the budgeted amount of $65,000. The primary reason overtime exceeded budget was due to disruptions in the treatment process caused by abnormal effluent characteristics, which led the Reclamation Plant to have unplanned overtime.   4. Planned Recycled Water Maintenance Ratio in $ – The year-to-date total spent on all recycled tasks amounted to $457,559.92, of which $306,826.74 (67%) was spent on preventative maintenance of effluent pumps, pumps, motors, etc. The second quarter was not on target due to the amount of corrective maintenance spent on a recycled lateral leak. 5. Direct Cost of Treatment per MGD – The year-to-date result is $1,380.45 vs. the year-to-date target of $1,050.00. The Reclamation Plant experienced process upsets and more material was used to improve effluent quality to meet regulatory compliance. 0 2 4 6 8 10 12 14 16 18 ON TARGET NOT ON TARGET 32 5 On Target Not on Target 32 of 37 Performance Measures are On Target (86%) Next Steps During FY18, which is the last phase of the plan, staff will focus on the completion of remaining objectives, prioritization of a project action list from a recently developed multi-year SCADA roadmap, improvement to our asset management decision analysis, and enhancements to the District’s CIP framework. Lastly, staff will also be working on the development of the District’s new 3-5 year Strategic Plan. Committee Reports – Slideshow   The Strategic Plan results are presented to both the Finance, Administration, and Communications Committee and the Engineering, Operations, and Water Resources Committee with a specific focus on the most relevant information for each Committee (see “Attachment B”).   Strategic Plan is available on the Board VPN   All of the Strategic Plan results and associated details are provided in a real-time, interactive web-based application available to the Board via secured remote access, VPN. The District Secretary can facilitate any password or access issues.   FISCAL IMPACT: Joe Beachem, Chief Financial Officer   Informational item only; no fiscal impact.   STRATEGIC GOAL:   Strategic Plan and Performance Measure reporting is a critical element in providing performance reporting to the Board and staff.   LEGAL IMPACT:   None.     ATTACHMENTS: Attachment A – Committee Action Report Attachment B – PowerPoint Presentation 5   ATTACHMENT A SUBJECT/PROJECT: FY18 MID-YEAR REPORT FOR THE DISTRICT’S FY15-18 STRATEGIC PLAN COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee met on February 20, 2018 and the Finance, Administration and Communications Committee met on February 21, 2018 and to review this item. The Committees support presentation to the full Board for their consideration. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a committee approved item, or modified to reflect any discussion or changes as directed from the committee prior to presentation to the full Board.       1 STRATEGIC PLAN FY18 MID-YEAR REPORT 2 Introduction 3OWD Strategic Plan FY15 – FY18: The District’s Strategic Plan is developed with the Balanced Scorecard (BSC) strategic planning and management methodology, which is used and widely adopted by businesses across the globe. The BSC itself was developed by Kaplan and Norton and was originally published in 1992, in the Harvard Business Review. The model has evolved over time and is now in its third-generation. In brief, the BSC emphasizes alignment of business activities to the vision and strategy of the organization with goals and measures in four basic areas: financial, customer, business processes, and learning and growth. The District’s strategic plan is designed to track key organizational project objectives, and essential day- to-day performance measures. During FY18, staff continues to execute the completion of targeted projects and evaluate the potential to further streamline work-group processes and elevate performance metrics if warranted. Additional improvements to our Asset Management program will also be addressed via a recently developed multi-year strategic SCADA roadmap and a planned update to our decision analysis CIP management framework. 4 Deliver high quality services to meet and increase confidence of the customer 1. Increase customer confidence in the District 2. Improve and expand communications 3. Provide effective water services Manage the financial issues that are critical to the District 1. Improve financial information and systems 2. Maintain District financial strength Maximize efficiency and effectiveness 1. Actively manage water supply as well as support for water and sewer services 2. Identify and evaluate improvements to enterprise and departmental business processes Provide leadership and management expertise 1. Reinforce a results-oriented and accountable culture 2. Focus on achieving a lean flexible workforce Balanced Scorecard Strategies and Goals Customer Financial Business Processes Learning & Growth $$ 5AWWA Benchmarks 1 Technical Quality Complaint Potable Water Compliance Rate Collection System Integrity Sewer Overflow Rate 2 3 4 6Objectives 95% are Completed or On Schedule 0 2 4 6 8 10 12 14 16 18 Completed On Schedule Behind On Hold 2 17 0 1 Completed On Schedule Behind On Hold Objective Report 20 Total 7 COMPLETED Objectives 1. Evaluate Implementation of an On-line Performance Management System 2. Electric Power and Fuel Management Practices 8 ON HOLD Objectives 1. Streamline Input of Operations Data 9Performance Measures 86% On Target Measure Report 37 Total 0 5 10 15 20 25 30 35 On Target Not on Target 32 5 On Target Not on Target 10Performance Measures 1. CIP Project Expenditures vs. Budget 2. Project Closeout Time 3. Overtime Percentage 4. Planned Recycled Water Maintenance Ratio in $ 5. Direct Cost of Treatment per MGD NOT ON TARGET 11 Mid-Year Results Administrative Services 12Employee Turnover Rate Target: Less than 5%turnover in a year 0 0 0 55555 0 1 2 3 4 5 6 Q1 Q2 Q3 Q4 YTD Result Target QTR:# of voluntary resignations (not including retirements)/average # of employees Measurement Method YTD:YTD # of voluntary resignations (not including retirements)/average # of employees No turnovers in Q1 & Q2 13Training Hours Per Employee Target: 12 hours or more general formal training per employee in a year (excludes safety training) 4.94 5.5 10.44 3333 12 0 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD/AVG Result Target Measurement Method QTR:Total qualified training hours for all employees/average # of FTEs YTD:YTD Total qualified training hours for all employees/Average # of FTEs 14Safety Training Program Target: 24 hours or more safety training per field employee in a year 6.5 11.14 17.56 6666 24 0 5 10 15 20 25 30 Q1 Q2 Q3 Q4 YTD/AVG Result Target Measurement Method QTR:# of safety training hours for the quarter/ # of field employees YTD:YTD Total qualified safety training hours for field employees/average # of field employees 15 Engineering 16CIP Project Expenditures vs. Budget Target: 95% of budget but not to exceed 100% in a year Being below target gives the measure a “not on target” status Measurement Method OTR:Actual quarterly expenditures/Annual budget YTD:YTD expenditures/Annual budget 9.3 19.5 28.715 21 29 35 100 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target 17Construction Change Order Incidence (w/o allowances) Target: No more than 5%per quarter in a year 0.1 0.5 0.5 55555 0 1 2 3 4 5 6 Q1 Q2 Q3 Q4 YTD Result Target *QTR and YTD result are the life to dare change order rates for all active projects in FY17 Measurement Method Total cost of Change Orders (not including allowances)/Total original construction contract amount (not including allowances) 18Mark-Out Accuracy Target: No less than 100%mark-out accuracy per quarter in a year 100 100 100 100 100 100 100 100 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target Measurement Method # of mark-outs performed without an at-fault hit, which is damage to a District facility that results from a missing or erroneous mark- out/Total # of mark-outs performed 19Project Closeout Time Target: No more than a 45 day average per quarter in a year 0 64.5 64.5 45 45 45 45 45 0 10 20 30 40 50 60 70 Q1 Q2 Q3 Q4 YTD Result Target Measurement Method QTR:# of days between NOSC and NOC for all construction projects within the quarter/# of construction projects within the quarter YTD:YTD # of days between NOSC and NOC for all construction projects within the quarter/YTD # of construction projects within the quarter 20Annual Recycled Water Site Inspections Target: 100%of recycled sites inspected in a year (There are 153 recycled water use sites scheduled for FY18) Measurement Method Cumulative % of recycled sites inspected per quarter of those required by DEH 28.75 54.9 54.9 25 50 75 100 100 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target 21Recycled Water Shutdown Testing Target: No less than 90%of recycled site shut down tests in a year (There are 39 recycled water use sites due for shutdown in FY18) Measurement Method Cumulative % of recycled site shutdown tests performed per year compared to those scheduled 28.2 48.71 48.71 22.5 45 67.5 90 90 0 10 20 30 40 50 60 70 80 90 100 Q1 Q2 Q3 Q4 YTD Result Target 22 Finance 23 Measurement Method QTR:# of all calls answered/ # of all calls received during a quarter YTD:YTD # of all calls answered/ YTD # of all calls received Answer Rate Target: No less than 97%average answer rate per quarter in a year 97.82 97.27 97.55 97 97 97 97 97 95 95.5 96 96.5 97 97.5 98 Q1 Q2 Q3 Q4 YTD Result Target 24 Measurement Method QTR:Total operations O&M costs/ # of accounts YTD:YTD total operations O&M costs/ # of accounts O&M Cost Per Account Target: Less than $561.00 per account in a single year (Target is based on Operating Budget) 117 149 265 122 153 143 143 561 100 150 200 250 300 350 400 450 500 550 Q1 Q2 Q3 Q4 YTD Result Target 25 Measurement Method QTR:# of correct bills during the reporting period/ # of total bills during the reporting period YTD:YTD # of correct bills during the reporting period/ YTD # of total bills during the reporting period Billing Accuracy Target: No less than 99.8%billing accuracy per quarter in a year 99.97 99.99 99.98 99.8 99.8 99.8 99.8 99.8 98 98.5 99 99.5 100 100.5 Q1 Q2 Q3 Q4 YTD Result Target 26Overtime Percentage Target: Less than 100%of budgeted overtime per quarter in a year (Target is based on Operating Budget; FY18 Overtime Budget is $133,800) Measurement Method QTR: Actual overtime costs (including comp time)/ Budgeted overtime costs YTD:YTD actual overtime costs (including comp time)/ YTD budgeted overtime costs 103.4 117 111 100 100 100 100 100 0 20 40 60 80 100 120 140 160 Q1 Q2 Q3 Q4 YTD Result Target 27Sewer Rate Ranking Target: Bottom 50 percentile for the 28 sewer service providers in San Diego (Otay ranks 6 out of 28 sewer service providers) Measurement Method Otay ranking for the average bill for sewer/ # of sewer agencies 66 14 14 0 5 10 15 20 25 Q1 YTD Result Target 28Water Rate Ranking Target: Bottom 50 percentile for the 22 member agencies in San Diego (Otay ranks 3 out of 22 member agencies) Measurement Method Otay ranking for the average water bill among CWA member agencies 11 11 33 0 5 10 15 20 Q1 YTD Target Result 29Percent of Customers Paying Bills Electronically Target: No less than 75%per quarter in a year Measurement Method YTD:YTD # of customers paying bills electronically/ Total # of customers QTR:# of customers paying bills electronically/ Total # of customers 76.95 76.78 76.86 75 75 75 75 75 0 10 20 30 40 50 60 70 80 90 100 Q1 Q2 Q3 Q4 YTD Result Target 30Distribution System Loss Target: Less than 5%of unaccounted water loss per quarter in a year Measurement Method 100 [volume purchased (from CWA) – (volume sold (to customers) + volume used District usage)] / volume purchased (from CWA)) 4.1 44 55555 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 YTD Result Target 31 Operations 32Technical Quality Complaint (AWWA) Target: No more than 9 complaints per 1000 customer accounts in a year Measurement Method QTR:1000 (# of technical quality complaints per quarter)/# of active customer accounts per reporting period YTD:1000 (YTD # of technical quality complaints per year)/ # of active customer accounts per reporting period) 1.49 1.19 2.68 13.1 2.25 2.25 2.25 2.25 9 0 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD Result AWWA Target AW W A B e n c h m a r k 33Planned Potable Water Maintenance Ratio in $ Target: 66% or greater of all labor dollars spent on preventative maintenance per quarter in a year Measurement Method Total planned maintenance cost/ Total maintenance cost 72 72 71 66 66 66 66 66 50 55 60 65 70 75 80 85 90 95 100 Q1 Q2 Q3 Q4 YTD Result Target 34 Measurement Method Total planned maintenance costs/Total maintenance costs Planned Recycled Water Maintenance Ratio in $ Target: 70%or greater of all labor spent on preventative maintenance per quarter in a year 70 64 67 70 70 70 70 70 0 10 20 30 40 50 60 70 80 Q1 Q2 Q3 Q4 YTD Result Target 35Planned Wastewater Maintenance Ratio in $ Target: 77% or greater of all labor dollars spent on preventative maintenance per quarter in a year Measurement Method Total planned maintenance cost/Total maintenance cost 67.72 96.38 80.95 77 77 77 77 77 50 55 60 65 70 75 80 85 90 95 100 Q1 Q2 Q3 Q4 YTD Result Target 36Direct Cost of Treatment Per MGD Target: No more than $1050 per MG spent on wastewater treatment per quarter in a single year (Targets each quarter will vary based on high and low demand times) Measurement Method Total O&M costs directly attributable to sewer treatment/ Total volume in MG 1238.54 1573.51 1380.45 900 1200 1200 900 1050 0 200 400 600 800 1000 1200 1400 Q1 Q2 Q3 Q4 YTD Result Target 37O&M Cost Per MG Processed of Wastewater Target: No more than $1925 per MG spent on O&M for wastewater treatment in a year (Targets each quarter will vary based on high and low demand times) Measurement Method QTR:Total O&M cost/ MGP FYTD O&M Cost = (Power Cost) + (Staff Cost) + (Equipment Cost) / FYTP MGP YTD:FYTD O&M Cost MGP/ FYTD Total MGP 1978.39 1825.9 1913.79 1550 2100 2100 1550 1925 0 500 1000 1500 2000 2500 Q1 Q2 Q3 Q4 YTD Result Target 38Percent of PMs Completed – Fleet Maintenance Target: No less than 90%of scheduled PM’s completed per quarter in a year Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed 100 100 100 90 90 90 90 90 0 20 40 60 80 100 Q1 Q2 Q3 Q4 Annual Result Target 39Percent of PMs Completed – Reclamation Plant 100 95 97 90 90 90 90 90 75 80 85 90 95 100 105 110 Q1 Q2 Q3 Q4 YTD Result Target Target: No less than 90%of scheduled PM’s completed per quarter in a year Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed in a reporting period 40Percent of PMs Completed – Pump/Electric Section 100 100 100 90 90 90 90 90 75 80 85 90 95 100 105 110 Q1 Q2 Q3 Q4 YTD Result Target Target: No less than 90%of scheduled PM’s completed per quarter in a year Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed in a reporting period 41System Valve Exercising Program Target: Exercise 770 valves per quarter or 3080 valves by the end of fiscal year Measurement Method Actual number of valves exercised in the reporting period 974 775 1749770 770 770 770 3080 0 500 1000 1500 2000 2500 3000 3500 Q1 Q2 Q3 Q4 YTD Result Target 42Potable Water Distribution System Integrity Target: No more than 16 leaks and breaks per 100 miles of distribution piping in a year Measurement Method 100 (annual total number of leaks + annual total number of breaks) / total miles of distribution piping 3.26 1.82 5.08 4444 16 0 2 4 6 8 10 12 14 16 18 20 Q1 Q2 Q3 Q4 YTD Result Target 43Potable Water Compliance Rate (AWWA) Target: No less than 100%of all health related drinking water standards each quarter in a year Measurement Method 100 (# of days the primary health regulations are met)/ # of days in the reporting period 100 100 100 100 100 100 100 100 100 50 60 70 80 90 100 110 Q1 Q2 Q3 Q4 YTD Result AWWA Target 44Collection System Integrity (AWWA) Target: No more than 3.6 system failures per 100 miles of collection system pipeline in a year Measurement Method QTR:100 (total number of collection system failures during the year) / total miles of collection system piping YTD:Cumulative number of failures per quarter in a FY 0 0 0 4.9 0.9 0.9 0.9 0.9 3.6 0 1 2 3 4 5 6 7 8 Q1 Q2 Q3 Q4 YTD Result AWWA Target 0 Failures in Q1 & Q2 45Recycled Water System Integrity Target: No more than 6.6 leaks or breaks per 100 miles of recycled distribution system in a year Measurement Method (100 x # of leaks or breaks)/ # of miles of distribution system 0.89 0 0.89 1.65 1.65 1.65 1.65 6.6 0 1 2 3 4 5 6 7 Q1 Q2 Q3 Q4 YTD Result Target 0 leaks or breaks Q2 46Sewer Overflow Rate (AWWA) Target: 0 overflows per quarter in a year Measurement Method QTR:100 (total number of sewer overflows during the reporting period) / total miles of pipe in the sewage collection system 0 0 0 14.7 000000 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD Result AWWA Target YTD:Cumulative number of overflows per quarter in a FY 0 Failures in Q1 & Q2 47Emergency Facility Power Testing Target: 100%of the District’s facilities tested per year (The District currently has 34 powered ready facilities) Measurement Method Number of facilities tested / total facilities 29 47 47 26 44 70 100 100 0 20 40 60 80 100 Q1 Q2 Q3 Q4 YTD Result Target 48Tank Inspection and Cleaning Annual Target: Clean and inspect 7 tanks or more per year Measurement Method Number of tanks cleaned and inspected 1 4 5 77777 0 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD Result Target 49Main Flushing and Fire Hydrant Maintenance Target: 215 or more mains flushed and fire hydrants maintained in a single year (The target of 215 is comprised of 165 hydrants and 50 mains) Measurement Method Number of mains flushed and hydrants maintained 50 141 191 54 54 54 54 215 0 50 100 150 200 250 Q1 Q2 Q3 Q4 YTD Result Target 50Critical Valve Exercising Annual Target: Exercise 631 identified critical valves in a year Measurement Method Number of critical valves exercised in a reporting period 625 6 631 631 631 631 631 631 0 100 200 300 400 500 600 700 800 900 1000 Q1 Q2 Q3 Q4 YTD Result Target 51 Next Steps 52 1 Complete remaining objectives Prioritization of a project action list from the SCADA roadmap Improvement to our asset management decision analysis and development of CIP framework Development of District’s new 3-5 year Strategic Plan 2 3 4