HomeMy WebLinkAbout02-21-19 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room THURSDAY February 21, 2019 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. APPROVE A FIFTH AMENDMENT WITH CAROLLO ENGINEERS, INC. FOR THE DESIGN AND CONSTRUCTION SUPPORT OF THE 870-2 PUMP STATION PRO- JECT IN AN AMOUNT NOT-TO-EXCEED $88,352 (MARTIN) [5 minutes] 4. SECOND QUARTER OF FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM REPORT (MARTIN) [5 minutes] 5. FISCAL YEAR 2019 MID-YEAR STRATEGIC PLAN UPDATE (SEGURA) [10 minutes] 6. ADJOURNMENT BOARD MEMBERS ATTENDING: Tim Smith, Chair Gary Croucher 2 All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on February 15, 2019 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on February 15, 2019. /s/ Susan Cruz, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 6, 2019 SUBMITTED BY: Dan Martin Assistant Chief of Engineering PROJECT: P2083- 001103 DIV. NO. 2 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Fifth Amendment to Carollo Engineers, Inc. Professional Engineering Services Contract for Design and Construction Support of the 870-2 Pump Station Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) authorize the General Manager to execute a Fifth Amendment with Carollo Engineers, Inc. (Carollo) for design and construction support of the 870-2 Pump Station Project in an amount not-to-exceed $88,352.00 (see Exhibit A for Project location and Exhibit B for Project detail map). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to execute a Fifth Amendment with Carollo Engineers, Inc. (Carollo) (see Exhibit C) for design and construction support of the 870-2 Pump Station Project in an amount not-to-exceed $88,352.00. 2 ANALYSIS: On October 11, 2013, the District entered into an agreement in the amount of $624,910 with Carollo for preliminary and final design and construction support of the 870-2 Pump Station Project. The First Amendment, in the amount of $29,000, for a three dimensional model of the pump station building and associated mechanical and electrical equipment, was executed June 16, 2014. The Second Amendment, in the amount of $106,500, to perform additional surge analysis, prepare cost estimates, design a new Roll (571-1) Reservoir outlet, and perform additional survey and potholing work, was executed October 15, 2015. The Third Amendment, in the amount of $42,700, for the design and preparation of cost estimates for a new reservoir recirculation pipe for Roll (571-1) Reservoir, was executed on July 7, 2016. The Roll (571-1) recirculation and outlet piping was designed and included as part of the 870-2 Pump Station budget for the station’s yard piping. The Fourth Amendment in the amount of $209,418 was executed on July 19, 2017. The Fourth Amendment provided additional design support during construction based on the advertised construction contract and specifications. This support includes submittal review and responses to requests for information (RFIs). Examples of the critical items that have been reviewed by the designer during construction of the 870-2 Pump Station include, but are not limited to, the station pumps, engine drive systems, and building systems. The Fourth Amendment also provided for assistance during the startup and commissioning phase of the new 870-2 Pump Station. As of December 2018, the physical construction of the 870-2 Pump Station is approximately 56% percent complete. In total, the Construction team, which includes the Construction Manager, Project Design team, and District staff have responded to 292 submittals and 158 RFI’s from the contractor since July 2016. Due to the complexity of the Project, including the Roll (571-1) Reservoir recirculation system and the station’s chemical system and engines, the original level of submittal review and RFI response estimated for the Project has been exceeded. A review of the construction contact and specifications concludes that this level of response represents approximately 70 percent of the anticipated submittals and RFI’s needed to complete the Project. The proposed Fifth Amendment is to provide additional design support during the construction of the Project. The additional design support will provide an increased level of submittal review and responses to RFIs needed for contract completion. The Fifth 3 Amendment rebalances tasks that have been completed and also preserves remaining tasks including support for startup and commissioning, change orders, and issuance of record drawings. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP P2083, as approved in the FY 2019 budget, is $18,950,000. Total expenditures, plus outstanding commitments and forecast, are $18,949,586. See Attachment B for the budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP P2083 is sufficient to support the Project. The Finance Department has determined that, under the current rate model, 100% of the funding will be available from the Replacement Fund. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the District’s Vision, “To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices.” LEGAL IMPACT: None. DM/RP:jf P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Staff Reports\BD 03-06-19\BD-03-06-19 Carollo 5th Amendment_Construction Support (DM).docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map Exhibit B – Project Detail Map Exhibit C – Fifth Amendment ATTACHMENT A SUBJECT/PROJECT: P2083-001103 Fifth Amendment to Carollo Engineers, Inc. Professional Engineering Services Contract for Design and Construction Support of the 870-2 Pump Station Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 21, 2019. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: P2083-001103 Fifth Amendment to Carollo Engineers, Inc. Professional Engineering Services Contract for Design and Construction Support of the 870-2 Pump Station Project Date Updated: 1/31/19 Budget 18,950,000 Planning Consultant Contracts 48,000 31,005 16,995 48,000 HELIX ENVIRONMNTL PLANNING INC 17,094 17,094 - 17,094 JONES & STOKES ASSOCIATES INC 210,674 210,674 - 210,674 ICF JONES & STOKES INC Regulatory Agency Fees 2,109 2,109 - 2,109 CA DEPT OF FISH & WILDLIFE 720 720 - 720 CALIFORNIA REGIONAL WATER 1,570 1,570 - 1,570 SAN DIEGO COUNTY WATER AUTH 1,760 1,760 - 1,760 STATE WATER RESOURCES Service Contracts 2,260 2,260 - 2,260 COUNTY OF SAN DIEGO 164 164 - 164 SAN DIEGO DAILY TRANSCRIPT 505 505 - 505 THE SAN DIEGO UNION-TRIBUNE Standard Salaries 179,431 179,431 - 179,431 Fixed Asset 580,444 580,444 - 580,444 Total Planning 1,044,731 1,027,737 16,995 1,044,731 Design 001102 Consultant Contracts 136 136 - 136 THE WATCHLIGHT CORPORATION 4,850 4,850 - 4,850 BURKETT & WONG ENGINEERS INC 14,068 14,068 - 14,068 SOUTHERN CALIFORNIA SOIL 3,034 3,034 - 3,034 RICK ENGINEERING COMPANY 4,625 4,625 - 4,625 ROGER B WOODHULL 22,149 22,149 - 22,149 NINYO & MOORE GEOTECHNICAL AND 10,484 10,484 - 10,484 HUNSAKER & ASSOCIATES 6,086 6,086 - 6,086 HDR ENGINEERING INC 682,870 682,870 - 682,870 CAROLLO ENGINEERS INC 7,974 7,974 - 7,974 AEGIS ENGINEERING MGMT INC Regulatory Agency Fees 3,694 3,694 - 3,694 SAN DIEGO GAS & ELECTRIC 16,511 16,511 - 16,511 COUNTY OF SAN DIEGO Service Contracts 98 98 - 98 DAILY JOURNAL CORPORATION Standard Salaries 677,054 677,054 - 677,054 Supplier Contracts 5,350 5,350 - 5,350 INLAND AERIAL SURVEYS INC Total Design 1,458,983 1,458,983 - 1,458,983 Construction Construction Contracts - - - 13,688,835 6,585,021 7,103,814 13,688,835 PACIFIC HYDROTECH CORPORATION 720,465 346,580 373,885 720,465 PACIFIC WESTERN BANK Consultant Contracts 329,658 329,281 377 329,658 CAROLLO ENGINEERS INC 88,352 - 88,352 88,352 CAROLLO ENGINEERS INC AMENDMENT 5 1,319 1,319 - 1,319 NINYO & MOORE GEOTECHNICAL AND 17,623 17,623 - 17,623 RBF CONSULTING 780,772 395,496 385,277 780,772 MICHAEL BAKER INT'L INC 438 438 - 438 NINYO & MOORE GEOTECHNICAL OTHER AGENCY FEES 3,334 3,334 - 3,334 COUNTY OF SAN DIEGO 164,774 164,774 - 164,774 SAN DIEGO GAS & ELECTRIC Professional Legal Fees 276 276 - 276 ARTIANO SHINOFF 280 280 - 280 STUTZ ARTIANO SHINOFF Service Contracts 3,628 3,628 - 3,628 MAYER REPROGRAPHICS INC 119 119 - 119 SAN DIEGO DAILY TRANSCRIPT Standard Salaries 210,000 131,452 78,548 210,000 20,000 20,000 Security System 30,000 30,000 County Access Road Inspection 126,000 126,000 Environmental Offsite Mitigation 10,000 10,000 AT&T Connection Contingency 250,000 - 250,000 250,000 1.7% of Construction Contract Total Construction 16,259,872 7,979,620 8,466,252 16,445,872 Grand Total 18,763,586 10,466,339 8,483,247 18,949,586 Vendor/Comments Otay Water District p2083-PS -870-2 Pump Station Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost OTAY WATER DISTRICT870-2 PUMP STATIONLOCATION MAP EXHIBIT A CIP P2083F P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Graphics\Exhibits-Figures\Exhibit A, Location Map, May 2016.mxd ROLLRESERVOIR(571-1) LOW HEADPUMP STATION HIGH HEADPUMPSTATION FOR PROJECT DETAILSEE EXHIBIT B ACCESS FROMALTA RD OWD PROPERTY LINE(APPROX) FirearmsTrainingFacility VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ ?ò Aä ?Ë ;&s ?p F 0 250125 Feet OTAY WATER DISTRICT870-2 PUMP STATIONPROJECT DETAIL MAP EXHIBIT B CIP P2083F P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Graphics\Exhibits-Figures\Exhibit B, Project Detail Map, May 2016.mxd 0 10050 Feet Legend ExistingEasementOWD ExistingParcelOWD ExistingEasementSDGE ProposedStructure ProposedWater ProposedStormDrain ProposedSewer ProposedGas ProposedSiteCivil ExistingWaterOWD 1 P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Agreements-Contracts-RFPs\Civil Consultant\New Selection (Carollo)\Agreement\Amendments\Fifth Amendment\Fifth amendment to Carollo agreement.doc FIFTH AMENDMENT TO AGREEMENT BETWEEN OTAY WATER DISTRICT AND CAROLLO ENGINEERS, INC. RELATIVE TO PRELIMINARY AND FINAL DESIGN AND CONSTRUCTION SUPPORT FOR THE 870-2 PUMP STATION PROJECT This Fifth Amendment (“Amendment”) to the original Agreement for Preliminary and Final Design and Construction Support Services is made and entered into as of the _____ day of March, 2019, by and between OTAY WATER DISTRICT ("District"), and CAROLLO ENGINEERS, INC., a California corporation, ("Consultant"). R E C I T A L S A. District and Consultant entered into that certain Agreement for Professional Services dated October 11, 2013, (the "Original Agreement"), under which Consultant agreed to provide the services therein described in connection with the District’s 870-2 Pump Station Project (the “Services”). The Original Agreement was amended on June 16, 2014 (the “Amended Original Agreement”) and on October 15, 2015 (the “Second Amended Original Agreement”) and on July 7, 2016 (the “Third Amended Original Agreement”) and on July 19, 2017 (the “Fourth Amended Original Agreement”). . B. The Second Amended Original Agreement is due to expire on June 30, 2019, and the Design Services are complete. C. The Consultant has requested an increase in the Fourth Amended Original Agreement amount to provide additional construction services as requested by the District. D. District and Consultant desire to enter into this Fifth Amendment to increase the compensation to Consultant for the additional services requested, extend the term of completion of the Services, and to amend certain specific terms and conditions of the Fourth Amended Original Agreement as indicated below, NOW, THEREFORE, in consideration of the foregoing and the mutual promises and covenants hereinafter contained, the parties agree as follows: 1. Exhibit A to the Original Agreement, Exhibit A to the First Amendment, Exhibit A to the Second Amendment, Exhibit A to the Third Amendment, and Exhibit A to the Fourth Amendment, setting forth the Services to be provided by Consultant, is hereby amended and supplemented by the Consultant’s letter proposal dated January 8, 2019, attached to this Amendment and incorporated herein by reference. 2. The parties agree that the aggregate amount paid by the District to the Consultant for the Services rendered by Consultant in excess of the Original Agreement, as amended by the First, Second, Third, and Fourth Amendments, shall not exceed Eighty Eight Thousand Three Hundred Fifty Two Dollars ($88,352). Accordingly, the total compensation paid by the District for Services described in the Original Agreement, as amended by the First, Second, Third, and Fourth Amendment, and this Fifth Amendment shall not exceed One Million One Hundred Thousand Eight Hundred Eighty Dollars ($1,100,880). 3. Pursuant to the Second Amended Original Agreement, the parties agreed that the Services would be completed on or prior to June 30, 2019. The parties hereby agree that the term of the Original Agreement, as amended, is hereby extended to December 31, 2019 and all Services and work contemplated under the Original Agreement, as amended, shall be completed to the District’s satisfaction on or prior to that date. 4. The parties agree that all terms and conditions of the Original Agreement, as amended by the First, Second, Third, and Fourth Amendments, not modified or amended by this Amendment, including without limitation all indemnity and insurance requirements, are and shall remain in full force and effect. 5. This Fifth Amendment is subject to the venue, choice of law and interpretation provisions of the Original Agreement. IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as of the day and year first above written. OTAY WATER DISTRICT By: ____________________________ Mark Watton Its: General Manager Date: ___________________________ CONSULTANT: Carollo Engineers, Inc. 5075 Shoreham Place, Suite 120 San Diego, CA 92122 By: Name: Jeff Thornbury Its: Vice President Date: Approved as to form: By: _______________________ General Counsel Approved as to form: By: _______________________ Its: _______________________ P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Agreements-Contracts-RFPs\Civil Consultant\New Selection (Carollo)\Agreement\Amendments\Fifth Amendment\Fifth amendment to Carollo agreement.doc 5355 Mira Sorrento Place, Suite 270, San Diego, California 92121 P. 858.505.1020 F. 858.505.1015 January , Mr. Dan Martin Otay Water District Sweetwater Springs Boulevard Spring Valley, CA & Subject: 870-2 Pump Station Carollo Amendment #5 Request Dear Mr. Martin: Per recent discussions between Otay, Carollo, and the Construction Manager for the project, we have compiled an estimate of outstanding work required for Carollo to support Otay and the Construction Manager through the end of construction of the & - Pump Station project, which is anticipated to be complete by July of . Specifically, Carollo is requesting the following task budget transfers and additions: Existing Task Budget Transfer Requests . Transfer 9: . from Task (Change Order Review) to Task (Preconstruction Meeting) to account for a small overage in the Task expenditures. Task is considered % complete. . Transfer 9 .& from Task (Conformed Drawings & Specifications) to Task (Request for Information Review). Task is % complete and the 9 .& would otherwise be unused. :. Transfer 9 ,A& . from Task A (Partnering Session) to Task because the Partnering Session was not required for this project. . Transfer 9 ,A&A. from Task (Project Management and Administration) to Task . This will result in hours of remaining Task budget for the remainder of the project, which we believe to be sufficient. Additional Task Budget Requests . Add 9: , . to the original Task (Request for Information review) budget. With this addition and the total amount of existing budget transferred to Task , the new Task budget would be 9 A, . , which is sufficient for the review of & total RFI’s at . hours/review. Carollo’s original Task budget was based on the review of RFI’s at :. hours/review. . Add 9 , . . to the original Task : (Submittal review) budget. With this addition, the new Task : budget would be 9 , . , which is sufficient for the review of a total of : submittals and re-submittals at . hours/review. Carollo’s original Task : budget was based on the review of submittals and re-submittals at . hours/review. :. Add 9 A,& . to Task (Record Drawings). This would increase the total Task budget to 9: , A . , which is based on approximately half of the project drawings ( drawings) requiring revisions at hours per drawing. It is Carollo’s position that the original Task budget of 9 ,: A. is insufficient to provide Otay with a complete and accurate set of record drawings. Mr. Dan Martin Otay Water District January , Page The table below summarizes the proposed task budget transfers and additions: Original Budget Transfer Add New Budget 684.00$ 318.00$ -$ 1,002.00$ 78,660.00$ 7,389.75$ 30,850.25$ 116,900.00$ 159,598.00$ -$ 40,802.00$ 200,400.00$ 22,400.00$ (318.00)$ -$ 22,082.00$ 3,340.00$ (41.75)$ 3,298.25$ 2,672.00$ (2,672.00)$ -$ 6,860.00$ -$ -$ 6,860.00$ 17,368.00$ -$ -$ 17,368.00$ 13,360.00$ -$ 13,360.00$ 13,360.00$ -$ 16,700.00$ 30,060.00$ 11,356.00$ (4,676.00)$ -$ 6,680.00$ Total - All Tasks 329,658.00$ -$ 88,352.25$ 418,010.25$ Task 1 - Preconstruction Meeting Task 8 - Monthly Construction Meeting Task 9 - Startup & Commissioning Task 10 - Record Drawings Task 11 - Project Management and Administration Task 2 - Request for Information (RFI) Task 3 - Submittals/Resubmittals Task 4 - Change Orders (CO) Task 5 - Conformed Drawings & Specifications Task 6 - Partnering Session Task 7 - Site/Discipline Visits In total, this amendment would result in the addition of 9 ,: . to Carollo’s original Engineering Services During Construction budget for a total amended budget of 9 , . . Thank you for your consideration of this amendment request. Please do not hesitate to contact me directly with questions. Sincerely, Troy Hedlund, P.E. Vice President, Principal Engineer Carollo Engineers, Inc. - -A : (mobile) thedlund@carollo.com STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 6, 2019 SUBMITTED BY: Dan Martin Assistant Chief of Engineering PROJECT: Various DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – Second Quarter Fiscal Year 2019 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all CIP project expenditures and to highlight significant issues, progress, and milestones on major projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer's reimbursement projects. The Second Quarter Fiscal Year 2019 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $24.52 million. Expenditures through the Second Quarter totaled approximately $10.98 million. Approximately 45% of the Fiscal Year 2019 expenditure budget was spent (see Attachment B). FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." LEGAL IMPACT: None. DM/RP:jf P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2019\Q2\Staff Report\BD 03-06-19 Staff Report Second Quarter FY 2019 CIP Report (DM-RP).docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2019 Second Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – Second Quarter Fiscal Year 2019 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a Committee Meeting held on February 21, 2019. The Committee supported Staff’s recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. FISCAL YEAR 2019 2ND QUARTER REPORT (Expenditures through 12/31/2018)($000) ATTACHMENT B 2019 12/31/18 CIP No.Description Project Manager FY 2019 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Cameron 5$ 21$ (16)$ 420%3,400$ 553$ 2,847$ 16% Expenditures for this Fiscal Year are to update the Environmental documents. Expenses are within project budget. P2382 Safety and Security Improvements Payne 224 18 206 8%3,251 3,090 161 95% Projects are on schedule for CIP closure at end of Fiscal Year. P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Cameron 5 - 5 0%650 - 650 0% This project is tied to P2553 and is driven by the City of Chula Vista. Construction is scheduled for FY 2022. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 10 4 6 40%3,975 3,825 150 96% EIR/EIS complete and Presidential permit issued. Continue meetings with DDW and AdR. P2453 SR-11 Utility Relocations Marchioro 25 55 (30) 220%4,000 1,908 2,092 48% Schedule driven by Caltrans. Caltrans scheduled to bid work Q3 FY 2019. Completion of construction anticipated for FY 2021. Project expenditures within approved project budget. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 20 - 20 0%600 5 595 1% Environmental surveys proposed to be performed in FY 2020 with demolition proposed for FY 2022. P2485 SCADA - Infrastructure and Communications Replacement Kerr 162 45 117 28%2,428 2,071 357 85%On track for the remainder of the Fiscal Year. P2494 Multiple Species Conservation Plan Coburn-Boyd 50 18 32 36%1,000 928 72 93% The majority of this budget will be used in the remaining 2 quarters of FY 2019. P2500 Padre Dam - Otay Interconnection Dehesa Valley Marchioro 5 - 5 0%140 - 140 0% Project is driven by Padre Dam pipeline extension to District boundary. P2504 Regulatory Site Access Road and Pipeline Relocation Cameron 5 - 5 0%354 331 23 94%Project is driven by County Fire. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/Osage Marchioro - - - 0%900 - 900 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2024. P2521 Large Meter Vault Upgrade Program Carey 25 1 24 4%620 308 312 50% On track. Staff will be using the rest of the year to upgrade and fix various large meter vaults throughout the District. P2547 District Administration Vehicle Charging Stations Cameron 5 - 5 0%125 72 53 58% The project is complete and will be closed at the end of the Fiscal Year. P2553 Heritage Road Bridge Replacement and Utility Relocation Cameron 80 3 77 4%1,430 29 1,401 2% Project is in the Planning stage. Project is driven by the City of Chula Vista's schedule for replacement, the City has delayed the design, but has not updated the construction schedule. At this time construction is scheduled for FY 2022. P2571 Datacenter Network- Data, Storage, and Infrastructure Enhancements Kerr 100 81 19 81%200 81 119 41% Procured both hardware and implentation cost for new District Firewall and other security enhancements; remaining balance for CIP is $100K. Will initiaite the second phase of project/CIP next fiscal year. P2572 Enterprise Resource Planning (ERP) Replacement Kerr - - - 0%500 - 500 0%Project set to start in FY 2021. P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0%1 - 1 0% No expenditures anticipated in FY 2019. These reservoirs are scheduled to be removed at the end of their useful life. P2608 PL - 8-inch, 850 Zone, Coronado Ave, Chestnut/Apple Cameron 40 8 32 20%450 8 442 2% Consultant Selection going to February Board, planning work to begin in FY 2019 Q4. P2611 Quarry Road Bridge Replacement and Utility Relocation Cameron 10 10 - 100%1,000 22 978 2% Project is in the early Planning stage. Project is driven by County's schedule for replacement. P2612 PL - 12-inch, 711 Zone, Pas de Luz/Telegraph Canyon Rd Cameron 10 7 3 70%500 8 492 2% Consultant Selection going to February Board, planning work to begin in FY 2019 Q4. P2614 485-1 Reservoir Interior/Exterior Coating Cameron - - - 0%895 - 895 0%No expenditures in FY 2019. P2617 Lobby Security Enhancements Payne 145 - 145 0%150 1 149 1% First of 4 installs to be completed FY 2019 Q3 with 2 and 3 during FY 2019 Q4; final to be completed by FY 2020 Q2. P2619 PS - Temporary Lower Otay Pump Station Redundancy Marchioro 200 104 96 52%1,800 201 1,599 11% Delivery of redundant trailer and construction contract award to install redundant trailer scheduled for June 2019. Completion of construction anticipated FY 2020. Project on track. P2623 Central Area to Otay Mesa Interconnection Pipelines Combination Air/Vacuum Valve Replacements Marchioro 130 103 27 79%270 203 67 75% Construction completed FY 2019 Q1. Project one year warranty scheduled to complete in FY 2020 Q1. P2630 624-3 Reservoir Automation of Chemical Feed System Cameron 5 - 5 0%385 - 385 0%Budget for preliminary planning. P2635 Vista Diego Hydropneumatic Tank Replacement Marchioro 10 - 10 0%400 - 400 0% No expenditures anticipated in FY 2019. Commencement of planning and design phase pending coordination with P2640. P2636 980-2 PS Surge Tank Interior/Exterior Coating Cameron 150 5 145 3%175 5 170 3% Construction expenditures expected late in FY 2019 Q4. P2637 Survey Division Field GPS Equipment Replacement O'Donnell 35 35 - 100%35 35 - 100%Equipment purchased in FY 2019 Q1. P2638 Buildings and Grounds Refurbishments Payne 57 - 57 0%114 - 114 0% Exterior Admin paint to be completed FY 2019 Q4; landscape to be completed FY 2020 Q2. FISCAL YEAR-TO-DATE, 12/31/18 LIFE-TO-DATE, 12/31/18 Y:\Board\CurBdPkg\ENGRPLAN\2019\BD 03-06-2019\Q2 CIP Update(DanM)\FY19 2nd qtr exp-FINAL-rev1.xlsx Page 1 of 4 2/6/2019 FISCAL YEAR 2019 2ND QUARTER REPORT (Expenditures through 12/31/2018)($000) ATTACHMENT B 2019 12/31/18 CIP No.Description Project Manager FY 2019 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/18 LIFE-TO-DATE, 12/31/18 P2639 Vista Diego Hydropneumatic Pump Station Replacement Marchioro 5 - 5 0%175 - 175 0% No expenditures anticipated in FY 2019. Commencement of planning and design phase pending coordination with P2640. P2640 Portable Trailer Mounted VFD Pumps Marchioro 30 30 - 100%400 30 370 8% Board award for purchase order to procure trailer anticipated Q4 FY 2019. Project on track. P2641 Rancho Jamul Hydropneumatic Tank Replacement Marchioro 1 - 1 0%300 - 300 0% No expenditures anticipated in FY 2019. Commencement of planning and design phase pending coordination with P2040 and P2640. P2642 Rancho Jamul Pump Station Replacement Marchioro 5 - 5 0%2,500 - 2,500 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2024. P2643 980-1 Pump Station Surge Tanks Replacement Marchioro - - - 0%350 - 350 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2024. P2644 803-1 Pump Station Surge Tank Replacement Marchioro - - - 0%350 - 350 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2024. P2645 Rolling Hills Hydropneumatic Tank Interior/Exterior Coating Cameron 5 - 5 0%225 - 225 0%Budget for early planning. P2646 North District Area Cathodic Protection Improvements Marchioro - - - 0%800 - 800 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2024. P2647 Central Area Cathodic Protection Improvements Marchioro - - - 0%1,000 - 1,000 0% No expenditures anticipated in FY 2019. Completion of construction anticipated FY 2023. P2648 Otay Mesa Area Cathodic Protection Improvements Marchioro 40 1 39 3%400 1 399 0% Advanced planning work will begin FY 2019 Q3. Design scheduled for FY 2020. P2649 HVAC Equipment Purchase Payne 21 10 11 48%130 10 120 8% OPS HVAC unit to be replaced in FY 2019 Q4; subsequent replacement to follow per CIP schedule. R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications Marchioro 25 10 15 40%200 148 52 74% Pressure reducing station work completed underbudget FY 2019 Q1. Project on track. R2116 RecPL - 14-Inch, 927 Zone, Force Main Improvements Marchioro 24 18 6 75%2,159 2,142 17 99% Construction completed FY 2018 Q3. Project one year warranty scheduled to complete in FY 2019 Q3. R2118 Steele Canyon Sewer PS Large Solids Handling Improvements Beppler 105 5 100 5%175 38 137 22% Project awarded in FY 2019 Q2 and work to be performed in FY 2019 Q3. Budget increased to $175K with award of contract. R2120 RWCWRF Filtered Water Storage Tank Improvements Beppler 50 - 50 0%500 29 471 6% Project to be packaged with the coating of another storage tank scheduled for FY 2020. R2123 Repurpose Otay Mesa Recycled Water Lines Beppler 5 - 5 0%350 - 350 0%Planning work to begin in FY 2019 Q3. R2125 RecPRS - 927/680 PRS Improvements, Otay Lakes Road Marchioro 45 9 36 20%200 12 188 6% Project scope will be reduced as part of FY2020 budget process. R2146 Recycled Pipeline Cathodic Protection Improvements Marchioro 20 - 20 0%600 - 600 0% Planning phase scheduled to begin late FY 2019. Completion of construction anticipated FY 2022. R2149 680-1R PS Surge Tank Interior/Exterior Coating Cameron 5 - 5 0%175 - 175 0%Budget for early planning. R2150 RWCWRF - Secondary Chlorine Analyzer and Feed System Beppler 40 6 34 15%45 6 39 13%Work to be completed by FY 2019 Q4. S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 50 - 50 0%1,800 1,111 689 62% This CIP reimburses the County for work on transportation pipeline rehabilitation, dependent upon County scheduling. S2027 Rancho San Diego Pump Station Rehabilitation Beppler 5 1 4 20%3,500 3,050 450 87% Construction completed in FY 2019 Q1. Final budget adjustment with County to be confirmed in FY 2019 Q3. S2043 RWCWRF Sludge Handling System Beppler 5 - 5 0%51 40 11 78% Review draft report with latest Metro cost projections that include Pure Water Phase 1 spending to confirm assumptions during FY 2019 Q3. S2047 Asset Management - Info Master Sewer Implementation Zhao 28 - 28 0%58 38 20 66% No expenditures in FY 2019. Project start has been moved to FY 2020. S2061 RWCWRF Aeration Controls Consolidation & Optimization Upgrades (S)Beppler 10 - 10 0%190 - 190 0% Prepare scope of work in FY 2019 Q4 after aeration panels replacement and confirmation of aeration system operation. S2065 RWCWRF - TOC Monitor Beppler 30 23 7 77%30 23 7 77%Installation completed. S2067 RWCWRF Roofing Replacement and Natural Light Enhancement Payne 20 - 20 0%165 - 165 0% Consultant engaged in FY 2019 Q3 ; TP replacement FY 2020 Q1. Total Capital Facility Projects Total:2,087 631 1,456 30%46,576 20,362 26,214 44% REPLACEMENT/RENEWAL PROJECTS P2083 PS - 870-2 Pump Station Replacement Marchioro 7,900 3,430 4,470 43%18,950 9,788 9,162 52%Construction on track for completion in FY 2020 Q2. P2174 PS - 1090-1 Pump Station Replacement (400 gpm)Marchioro 150 3 147 2%2,500 8 2,492 0% Design scheduled for FY 2020. Advanced planning work will begin FY 2019 Q3 pending coordination with P2640. P2400 PL - 20-Inch Pipeline Replacement, 711 Zone, Otay Lakes Road - at Santa Paula Marchioro - - - 0%2,280 - 2,280 0%Planning phase scheduled for FY 2020. P2507 East Palomar Street Utility Relocation Cameron 5 3 2 60%735 728 7 99%Waiting for reimbursement from Caltrans. P2508 Pipeline Cathodic Protection Replacement Program Marchioro 542 136 406 25%1,250 859 391 69%Construction on track for completion in FY 2019 Q3. Y:\Board\CurBdPkg\ENGRPLAN\2019\BD 03-06-2019\Q2 CIP Update(DanM)\FY19 2nd qtr exp-FINAL-rev1.xlsx Page 2 of 4 2/6/2019 FISCAL YEAR 2019 2ND QUARTER REPORT (Expenditures through 12/31/2018)($000) ATTACHMENT B 2019 12/31/18 CIP No.Description Project Manager FY 2019 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/18 LIFE-TO-DATE, 12/31/18 P2529 711-2 Reservoir Interior & Exterior Coating Cameron 5 4 1 80%820 807 13 98%Budget is for warranty repairs; scheduled for Q3. P2530 711-1 Reservoir Interior & Exterior Coating Cameron 5 5 - 100%980 958 22 98%Budget is for warranty repairs; scheduled for Q3. P2531 944-1 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%345 321 24 93%Budget is for warranty repairs; scheduled for Q3.P2532 944-2 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%960 940 20 98%Budget is for warranty repairs; scheduled for Q3. P2533 1200-1 Reservoir Interior & Exterior Coating Cameron 5 - 5 0%810 7 803 1%Budget for preliminary planning. P2534 978-1 Reservoir Interior & Exterior Coating Cameron 5 1 4 20%650 595 55 92% Construction completed FY 2018. Project is in the two year warranty period. P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades Cameron 5 - 5 0%810 781 29 96%Budget is for warranty repairs; scheduled for Q3. P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations Cameron 45 10 35 22%1,090 937 153 86% Project is driven by SANDAG. Expenditures within overall project budget. P2543 850-1 Reservoir Interior/Exterior Coating Cameron 5 2 3 40%875 9 866 1%Budget for preliminary planning P2544 850-2 Reservoir Interior/Exterior Coating Cameron 5 13 (8) 260%980 834 146 85% Construction completed FY 2018. Project is in the two year warranty period. Project expenditures within approved project budget. P2545 980-1 Reservoir Interior Exterior Coating Cameron 5 5 - 100%1,215 1,194 21 98%Budget is for warranty repairs; scheduled for Q3. P2546 980-2 Reservoir Interior/Exterior Coating Cameron 695 340 355 49%1,690 1,686 4 100% More work was completed in FY 2018 Q4 than anticipated. Expenditures within budget. Project accepted in November 2018, and is in the 2 year warranty period. P2555 Administration and Operations Parking Lot Improvements Cameron 25 163 (138) 652%985 746 239 76% Phase II construction expenditures were expected to be completed in FY 2018, but the Contractor was delayed by an unresponsive sub-contractor. Expenditures for FY 2019 will be over the Fiscal Year budget, but all expenditures will be within the approved CIP budget. P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project Beppler 60 28 32 47%125 88 37 70% Project to be completed by OPS staff in FY 2019 Q3. P2561 Res - 711-3 Reservoir Cover/Liner Replacement Marchioro 2,195 1,034 1,161 47%2,300 1,087 1,213 47%Construction on track for completion in FY 2019 Q3. P2562 Res - 571-1 Reservoir Cover/Liner Replacement Marchioro 170 44 126 26%2,900 2,707 193 93% As part of the larger 870-2 Pump Station project, the 571-1 Reservoir was placed back into service April 2018. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,000 3 997 0% Replacement scheduled for FY 2022 to coincide with completion of new 870-2 Pump Station. Existing cover/liner materials analyzed by laboratory in FY 2017 suggested sufficient remaining life. P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Cameron 755 48 707 6%1,200 48 1,152 4% Construction to begin in December 2018. Project is on schedule. P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades Cameron 10 - 10 0%1,500 - 1,500 0%This project will be closed. P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%905 - 905 0%No expenditures for FY 2019. P2573 PL - 12-Inch Pipeline Replacement, 803 Zone, Hillsdale Road Beppler 150 241 (91) 161%2,580 2,571 9 100% Construction completed in FY 2019 Q1. Project expenditures are within the approved project budget. P2574 PL - 12-Inch Pipeline Replacement, 978 Zone, Vista Vereda Beppler 500 139 361 28%1,640 464 1,176 28% Project awarded in FY 2019 Q2 and construction to start in FY 2019 Q3. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 gpm Marchioro - - - 0%10,000 - 10,000 0% Replacement scheduled for FY 2023-2024 to coincide with development of Villages 4, 8, 9, & 3. P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%840 - 840 0%No expenditures for FY 2019. P2594 Large Meter Replacement Carey 95 13 82 14%625 354 271 57% Majority of change outs will be completed in FY 2019 Q3 & Q4. P2604 AMR Change Out Carey 1,800 1,770 30 98%6,290 3,964 2,326 63% On track. Majority of change outs will be completed in FY 2019 end of Q3. P2605 458/340 PRS Replacement, 1571 Melrose Ave Marchioro 75 14 61 19%325 18 307 6% Planning and design on track for completion FY 2019. Construction scheduled for FY 2020. P2607 Douglas Ave SWA and OWD Interconnection Upgrade Beppler 37 3 34 8%50 3 47 6% SWA design at 50% during FY 2019 Q2. Completion of design expected in FY 2019 Q4 with construction in FY 2020. P2609 PL - 8-inch, 1004 Zone, Eucalyptus St, Coronado/Date/La Mesa Cameron 10 8 2 80%540 8 532 1% Consultant Selection going to February Board, planning work to begin in FY 2019 Q4. P2610 Valve Replacement Program - Phase 1 Cameron 95 2 93 2%275 22 253 8% Delivery of this project is anticipated by FY 2019 Q4 in coordination with OPS. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Beppler 20 6 14 30%1,200 6 1,194 1% Design consultant selection occurred during FY 2019 Q2. Preliminary design to be performed in FY 2020. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Dr/Vista Sierra Dr Beppler 180 10 170 6%2,500 25 2,475 1% Design consultant selection occurred during FY 2019 Q2. Preliminary design to be performed in FY 2020. P2625 PL - 12-inch, 978 Zone, Hidden Mesa Road Beppler 1,000 85 915 9%2,210 220 1,990 10% Project awarded in FY 2019 Q2 and construction to start in FY 2019 Q3. P2627 458/340 PRS Replacement, 1505 Oleander Ave Marchioro 75 13 62 17%325 13 312 4% Planning and design on track for completion FY 2019. Construction scheduled for FY 2020. Y:\Board\CurBdPkg\ENGRPLAN\2019\BD 03-06-2019\Q2 CIP Update(DanM)\FY19 2nd qtr exp-FINAL-rev1.xlsx Page 3 of 4 2/6/2019 FISCAL YEAR 2019 2ND QUARTER REPORT (Expenditures through 12/31/2018)($000) ATTACHMENT B 2019 12/31/18 CIP No.Description Project Manager FY 2019 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/18 LIFE-TO-DATE, 12/31/18 P2631 1485-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%55 - 55 0%No expenditures in FY 2019. P2633 Otay Mesa Rd and Alta Rd Water Appurtenances Relocations Beppler 10 2 8 20%500 2 498 0% The District has shifted the required relocation to developers and will close out this project at the end of the Fiscal Year. P2634 Rolling Hills Hydropneumatic Pump Station Jockey Pump Replacement Anderson 35 35 - 100%35 35 - 100%Project completed in FY 2019 Q2. P2651 Automatic Data Processing Koeppen 20 - 20 0%20 - 20 0% ADP is incurring some challenges with the system design. This project will likely be shifted to FY 2020 budget. R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,400 19 1,381 1% Replacement scheduled for FY 2021 since dive inspection completed in FY 2016 suggested five years remaining life. R2139 RWCWRF - Filter Troughs Replacement Beppler 5 34 (29) 680%40 34 6 85%Construction completed during FY 2019 Q2. R2143 AMR Change Out Carey 165 110 55 67%525 215 310 41% Majority of change outs for FY 2019 will be completed by end of FY 2019 Q3. R2145 RWCWRF - Filter Media and Nozzles Replacement Beppler 130 2 128 2%130 2 128 2%Construction to be performed during FY 2019 Q3. R2147 RWCWRF Fuel Lines Replacement Marchioro 150 39 111 26%175 39 136 22% Design and construction on track for completion FY 2019. R2148 Large Meter Replacement - Recycled Carey 8 - 8 0%58 - 58 0% Large meter testing began in Q2 and change outs scheduled for FY 2019 Q3 and Q4. R2151 RWCWRF - Bulk Chlorine Vapor Scrubber System Refurbishment Lintner 35 - 35 0%37 - 37 0% This project is scheduled for the end of January 2019 through February 2019. P.O. created 9/12/2018 for Integrity Municipal Systems. S2024 Campo Road Sewer Main Replacement Beppler 4,000 2,162 1,838 54%10,530 7,206 3,324 68% Construction on track for substantial completion in FY 2019 Q4. S2044 Trenchless Sewer Rehabilitation Beppler 5 - 5 0%550 476 74 87% One year warranty was over in FY 2019 Q1. CIP to be closed. S2045 Fuerte Drive Sewer Relocation Beppler 10 18 (8) 180%370 278 92 75%Construction completed in FY 2019 Q1. S2046 RWCWRF - Aeration Panels Replacement Beppler 100 79 21 79%450 171 279 38% Replacement panels delivered in FY 2019 Q2 with installation to be performed in FY 2019 Q3. S2048 Hillsdale Road Sewer Repairs Beppler 10 77 (67) 770%720 691 29 96% Construction completed in FY 2019 Q1. Invoicing carried over from FY 2018. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 20 - 20 0%1,000 7 993 1% Planning to begin in FY 2019 Q3 during budget process. S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler 20 - 20 0%1,300 - 1,300 0% Planning to begin in FY 2019 Q3 during budget process. S2051 RWCWRF - Headworks Improvements Beppler 165 31 134 19%250 106 144 42% Project awarded in FY 2019 Q2; construction in FY 2019 Q3. S2053 RWCWRF - Sedimentation Basins Weirs Replacement Beppler 5 51 (46) 1020%60 53 7 88%Construction completed during FY 2019 Q2. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%1,300 - 1,300 0%No action planned for this fiscal year. S2060 Steele Canyon Pump Station Replacement Beppler - - - 0%200 - 200 0%No action planned for this fiscal year. S2066 Rancho San Diego Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%290 - 290 0%No action planned for this fiscal year. Total Replacement/Renewal Projects Total:21,534 10,213 11,321 47%97,250 42,133 55,117 43% CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 520 132 388 25%5,928 4,277 1,651 72% $286,625 for equipment + $20,000 for outfitting will be issued in Q4 FY 2019. P2286 Field Equipment Capital Purchases Rahders 363 - 363 0%2,250 1,470 780 65% $38,909 for equipment + $10,000 for outfitting will be issued in Q3 FY 2019; $304,173 for equipment + $10,000 for outfitting will be issued in Q4 FY 2019. Total Capital Purchase Projects Total:883 132 751 15%8,178 5,747 2,431 70% DEVELOPER REIMBURSEMENT PROJECTS P2595 PL - 16-inch, 624 Zone, Village 3N - Heritage Road, Main St/Energy Way Beppler 1 - 1 0%150 - 150 0%Project under construction. R2084 RecPL - 20-Inch, 680 Zone, Village 2 - Heritage/La Media Beppler 14 - 14 0%365 1 364 0%Project under construction. Total Developer Reimbursement Projects Total:15 - 15 0%515 1 514 0% 122 GRAND TOTAL 24,519$ 10,976$ 13,543$ 45%152,519$ 68,243$ 84,276$ 45% Y:\Board\CurBdPkg\ENGRPLAN\2019\BD 03-06-2019\Q2 CIP Update(DanM)\FY19 2nd qtr exp-FINAL-rev1.xlsx Page 4 of 4 2/6/2019 Otay Water District Capital Improvement Program Fiscal Year 2019 Second Quarter (through December 31, 2018) ATTACHMENT C 870-2 Pump Station –Station Construction 12/09/2018 Background The approved CIP Budget for Fiscal Year 2019 consists of 106 projects that total $24.5 million. These projects are broken down into four categories. 1.Capital Facilities $ 2.1 million 2.Replacement/Renewal $21.5 million 3.Capital Purchases $ 0.9 million 4.Developer Reimbursement $ 15.0 thousand Overall expenditures through the Second Quarter of Fiscal Year 2019 totaled $10.9 million, which is approximately 45% of the Fiscal Year budget. 2 Fiscal Year 2019 Second Quarter Update ($000) CIP CAT Description FY 2019 Budget FY 2019 Expenditures % FY 2019 Budget Spent Total Life-to-Date Budget Total Life-to-Date Expenditures % Life-to-Date Budget Spent 1 Capital Facilities $2,087 $631 30%$46,576 $20,362 44% 2 Replacement/ Renewal $21,534 $10,213 47%$97,250 $42,133 43% 3 Capital Purchases $883 $132 15%$8,178 $5,747 70% 4 Developer Reimbursement $15 $0 0%$515 $1 0% Total: $24,519 $10,976 45%$152,519 $68,243 45% 3 Fiscal Year 2019 Second Quarter CIP Budget Forecast vs. Expenditures 4 $10,976,000 $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FISCAL YEAR PERIOD IN MONTHS Budget Forecast Total Expenditures $24,519,000 5 CIP Projects in Construction 870-2 Pump Station Replacement Project (P2083/P2562) Replacement of existing 870 High Head and Low Head Pump Stations. Remove and Replace the existing 571-1 Reservoir liner and cover. $21.65M Budget Start: July 2017 Completion: October 2019 870-2 Pump Station –Construction of Station Roof Support System Division No. 2 Location: North East corner of Otay Mesa. Existing 571-1 Reservoir and High Head/Low Head Pump Station site. 6 12/09/2018 CIP Projects in Construction 803-2 Reservoir Interior/Exterior Coating & Upgrades Project (P2565) Remove and replace existing interior and exterior coatings. Construct structural upgrades to increase the service life. $1.20M Budget Start: December 2018 Completion: June 2019 803-2 (2.0 MG) –Inspection Blast of Interior Roof System Planned for Replacement Division No. 5 Location: 803-2 Reservoir is located adjacent to Willow Glen Drive. 7 12/14/2018 CIP Projects in Construction 711-3 Floating Cover and Liner Replacement (P2561) Remove and replace existing floating cover and liner with new reinforced Chlorosulfonated Polyethylene (CSPE) geomembrane cover and liner. $2.3M Budget Start: August 2018 Completion: April 2019 711-3 (16.0 MG) –Replacement of Geofabric Division No. 5 Location: 711-3 is located at the north end of Hunte Parkway in Chula Vista. 8 12/23/2018 CIP Projects in Construction Campo Road Sewer Replacement Project (S2024) Replace existing 10- inch sewer with 7,420 linear feet of new 15- inch sewer. Reconnection of sewer laterals. Night work. $10.10M Budget Start: July 2017 Estimated Completion: June 2019 Eastbound Campo Road / SR 94 – Night Work Sewer Main Installation Division No. 5 Location: Campo Road (SR 94) between Rancho San Diego Village Shopping Center and Rancho San Diego Towne Center. 9 11/27/2018 CIP Projects in Construction Pipeline Cathodic Protection Improvements Phase II (P2508) Installation of pipeline cathodic protection improvements at Willow Glen, Sweetwater Bridge, Proctor Valley Road, Salt Creek, and Interconnect Pipeline. $1.25M Budget Start: October 2018 Estimated Completion: March 2019 Interconnect Pipeline Site –Bonding Wire Installation within Flow Meter Vault Division Nos. 1 -3, & 5 Location: Various Locations. 10 11/06/2018 CIP Projects in Construction OWD Admin & Operations Parking Lot Improvements Project -Phase 2 (P2555) Seal parking lots. Install parking stalls and stripe. Install equipment canopy in Operations parking lot. $0.99M Budget Start: May 2018 Completion: December 2018 Operations Parking Lot Equipment Canopy Construction Division No. 3 Location: District Administration and Operations lots - Sweetwater Springs Blvd., Spring Valley. 11 12/14/2018 CIP Projects in Construction Vista Vereda and Hidden Mesa Road Water Line Replacement (P2574/P2625) Replace existing waterlines. Construct 3,700 LF of new 12-inch waterline. Construct 400 LF of new 8-inch waterline. $3.17M Budget Start: December 2018 Estimated Completion: July 2019 Hidden Mesa Road –Grind Existing Asphalt in Preparation for Excavation Division No. 5 Location: Hidden Mesa Road and Vista Vereda in El Cajon. 12 12/20/2018 Construction Contract Status 13 PROJECT TOTAL % S2045 Fuerte Drive Sewer Relocation Burtech Pipeline, Inc.$169,490 $193,690 $4,082 2.4%$179,572 $179,572 -7.3%100.0%July 2018 P2573 S2048 Hillsdale Road 12- inch Waterline Replacement and Sewer Repairs *** TC Construction Company, Inc.$2,245,060 $2,396,060 $332,569 14.8%$2,591,949 $2,591,949 8.2%100.0%July 2018 P2623 Interconnect AirVac Valve Replacement M-Rae Engineering Inc.$78,000 $83,000 $0 0.0%$79,310 $79,310 -4.4%100.0%August 2018 P2555 OWD Administration & Operations Parking Lot Improvements Ph. II - Pavement Restoration Frank and Son Paving, Inc.$152,646 $165,046 $0 0.0%$152,646 $86,191 -7.5%56.5%December 2018 P2546 980-2 Reservoir Interior/Exterior Coating & Upgrades Simpson Sandblasting & Special Coating, Inc. $998,502 $1,146,377 $229,249 23.0%$1,375,626 $1,375,576 20.0%100.0%September 2018 P2508 Pipeline CP Improvements - Phase II M-Rae Engineering Inc.$329,500 $347,000 $0 0.0%$333,119 $76,719 -4.0%23.0%March 2019 CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE CIP NO.PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* Construction Contract Status 14 PROJECT TOTAL % FY 2019 CIP CONSTRUCTION PROJECTS CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE CIP NO.PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* S2051/ R2118 RWCWRF Headworks Improvements and Steele Bridge Sewage PS Wet Well Improvements Tharsos Inc.$201,665 $223,490 $0 0.0%$201,665 $0 -9.8%0.0%April 2019 P2561 Reservoir 711-3 Floating Cover and Liner Replacement Layfield USA Corporation $1,947,000 $1,997,000 $0 0.0%$1,952,540 $1,003,250 -2.2%51.4%April 2019 P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Advanced Industrial Services Inc.$737,690 $951,690 $0 0.0%$737,690 $0 -22.5%0.0%June 2019 P2574/ P2625 Vista Vereda and Hidden Mesa Road Water Line Replacement Cass-Arrieta Construction $2,718,239 $2,848,364 $0 0.0%$2,718,239 $69,875 -4.6%2.6%July 2019 S2024 Campo Road Sewer Replacement Project Wier Construction Corporation $7,623,146 $7,816,646 $230,458 3.0%$7,967,604 $5,553,201 1.9%69.7%June 2019 P2083 P2562 870-2 Pump Station Replacement/ 571-1 Reservoir Liner and Cover Replacement Pacific Hydrotech Corporation $16,500,900 $16,925,900 $26,270 0.2%$16,570,421 $9,441,452 -2.1%57.0%October 2019 TOTALS:$33,701,838 $35,094,263 $822,628 2.4%$34,860,380 $20,457,095 -0.7% ***PROJECT DOES NOT INCLUDE $149,280 OF ADDITIONAL SCOPE FOR SDRMA FUNDED PAVEMENT, SIDEWALK, CURB AND GUTTER REPAIRS ON HILLDALE ROAD **THIS CHANGE ORDER RATE INCLUDES THE CREDIT FOR UNUSED ALLOWANCES *NET CHANGE ORDERS DO NOT INCLUDE ALLOWANCE ITEM CREDITS. IT'S A TRUE CHANGE ORDER PERCENTAGE FOR THE PROJECT Consultant Contract Status 15 Consultant Contract Status 16 Consultant Contract Status 17 QUESTIONS? 18   STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 6, 2019 PROJECT: Various DIV. NO. ALL SUBMITTED BY: Adolfo Segura, Chief of Administrative Services APPROVED BY: Mark Watton, General Manager SUBJECT: FY19 MID-YEAR REPORT FOR THE DISTRICT’S FY19-22 STRATEGIC PLAN   GENERAL MANAGER’S RECOMMENDATION:   No recommendation. This is an informational item only.   COMMITTEE ACTION:   Please see “Attachment A”.   PURPOSE:   To provide a mid-year report on the District’s FY19-22 Strategic Performance Plan for FY19.   ANALYSIS:   Summary   The current Otay Water District Strategic Plan is a four-year plan ranging from the start of FY19 through the end of FY22. This report details the mid-year results for the first year of our four-year plan.   Objectives – Target 90%  Strategic Plan objectives are designed to ensure the District is executing mission designed objectives and making the appropriate high- level changes necessary to guide the agency’s efforts to meet new challenges and positively adapt to change. FY19 mid-year results are on target at 91%, with 31 of 34 active items completed or on schedule. One objective is on hold and two are not on target.   Objectives Not on Target 1. Evaluate, and if beneficial, implement Cloud payroll service – Due to complexities of the design requirements, ADP is researching options to meet the District’s work schedule requirements, FLSA calculations, and time keeping requirements. Work on the project has paused until ADP can confirm they can meet the District’s functional requirements. 2. Customer electronic communication and outreach – Due to the retirement of the previous Customer Service Supervisor, staff has not explored exit surveys, options to expand text messaging to customers, as well as complete the evaluation form for customer service. This will not be completed until the new Supervisor is trained. The following objective has been put on hold: 1. Streamline contract and purchase order (contract) management and lifecycle – Staff has reviewed limitations of Eden’s contract capabilities regarding notification and visibility. At this time, workflow implementation has not matured enough for an assessment of its capabilities to enhance contract management. Staff will continue to explore options with Tyler.   Key Performance Indicators (KPI’s) – Target 75%   KPI’s are designed to track the District’s day-to-day performance. These items measure the effectiveness and efficiency of essential operational services. The overall goal is that at least 75% of these KPI’s be rated “on target”. FY19 mid-year results are above target with 32 of 35 (91%) items achieving the desired level or better. 0 2 4 6 8 10 12 14 16 18 ON SCHEDULE BEHIND ON HOLD NOT STARTED 31 2 1 15 On Schedule Behind On Hold Not Started 31 of 34 Active Objectives are On Target (91%) KPI’s are based on established AWWA performance benchmarks. Seven measures are reported at year’s end:  Water Debt Coverage  Sewer Debt Coverage  Reserve Level  Accounts Per FTE  Leak Detection Program  Injury Incident Rate  Enterprise Technology Services KPI’s Not On Target    1. Overtime Percentage – Year-to-date expenditures amounted to $99,928 vs. the budgeted amount of $73,700. Overtime exceeded budget due to multiple main breaks in the second quarter. 2. Recycled Water Shutdown Testing – Year-to-date 14 sites have been tested vs. the targeted amount of 22.5 sites. The Recycled Water team is currently in a transition period due to staff retirements. An action plan has been developed to reach the target by the end of FY19. 3. System Valve Exercising Program – Year-to-date number of valves exercised is 1483 vs. the targeted amount of 1540. The target was not met due to unplanned emergencies and weather. 0 2 4 6 8 10 12 14 16 18 ON TARGET NOT ON TARGET ANNUAL MEASURE 32 3 7 On Target Not on Target Annual Measure 32 of 35 Key Performance Indicators are On Target (91%) Next Steps Staff will continue to execute the plan’s objectives and key performance indicators and track emerging trends. Committee Reports – Slideshow   The Strategic Plan results are presented to both the Finance, Administration, and Communications Committee and the Engineering, Operations, and Water Resources Committee with a specific focus on the most relevant information for each Committee (see “Attachment B”).   Strategic Plan is available on the Board VPN   All of the Strategic Plan results and associated details are provided in a real-time, interactive web-based application available to the Board via secured remote access, VPN. The District Secretary can facilitate any password or access issues.   FISCAL IMPACT: Joe Beachem, Chief Financial Officer   Informational item only; no fiscal impact.   STRATEGIC GOAL:   Strategic Plan and Performance Measure reporting is a critical element in providing performance reporting to the Board and staff.   LEGAL IMPACT:   None.     ATTACHMENTS: Attachment A – Committee Action Report Attachment B – PowerPoint Presentation 5   ATTACHMENT A SUBJECT/PROJECT: FY19 MID-YEAR REPORT FOR THE DISTRICT’S FY19-22 STRATEGIC PLAN COMMITTEE ACTION: The Finance, Administration, and Communications Committee and the Engineering, Operations and Water Resources Committee reviewed this item at a meeting held on February 19 and 21, 2019, respectively. The Committees support presentation to the full Board for their consideration. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a committee approved item, or modified to reflect any discussion or changes as directed from the committee prior to presentation to the full Board.   1 STRATEGIC PLAN FY19 MID-YEAR REPORT 2 Introduction 3OWD Strategic Plan FY19-22 Customer Financial Internal BusinessProcesses Learning and Growth $ The District’s Strategic Plan is developed using Kaplan & Norton’s Balanced Scorecard (BSC) strategic planning and performance management system, which is used and widely adopted by businesses across the globe. The BSC performance system is now in its fourth-generation, which focuses on managing strategy, people, and performance in a changing environment. In brief, the BSC emphasizes alignment of business activities to the vision and strategy of the organization with goals and measures in four basic areas: customer, financial, internal business processes, and learning and growth. The District’s strategic plan also integrates elements from the five key water utility areas of structure: organizational development, business operations, customer relations, water operations, and wastewater operations. 4AWWA 2018 Business Drivers 5Strategies & Objectives “S&O’s are actionable steps or plans designed to achieve the vision/mission of the organization” 1 Customer: 2 strategies & 3 objectives Financial: 6 strategies & 17 objectives Internal Business Process: 10 strategies & 27 objectives Learning & Growth: 1 strategy & 2 objectives 2 3 4 6Objectives 91% are Completed or On Schedule 0 5 10 15 20 25 30 35 Completed On Target Not On Target On Hold Not Started 0 31 2 1 15 Completed On Target Not On Target On Hold Not Started Objective Report49 Total 7Objectives 1. Evaluate, and if beneficial, implement Cloud payroll service. 2. Customer electronic communication and outreach. NOT ON TARGET ON HOLD 1. Streamline contract and purchase order (contract) management and lifecycle. 8Benchmarks & Key Performance Indicators (KPI’s) “KPI’s indicate progress toward a desirable outcome & monitor operational performance”. 1 35 KPI’s reported quarterly & 7 annually KPI’s are based on AWWA utility benchmarks & operational best practices KPI’s establish and maintain historical trends Execute, maintain, & optimize performance targets 2 3 4 9Key Performance Indicators 91% On Target Measure Report42 Total 0 5 10 15 20 25 30 35 On Target Not on Target Annual Measure 32 3 7 On Target Not on Target Annual Measure 10Key Performance Indicators 1. Overtime Percentage 2.Recycled Water Shutdown Testing 3. System Valve Exercising Program NOT ON TARGET 11 Customer Execute and deliver services that meet or exceed customer expectations, and increase customer engagement in order to improve District Services 12 Measurement Method QTR:# of all calls answered/ # of all calls received during a quarter YTD:YTD # of all calls answered/ YTD # of all calls received Answer Rate Target: 97%average answer rate per quarter annually 98.19 97.94 98.06 97 97 97 97 97 97.82 97.27 95 95.5 96 96.5 97 97.5 98 98.5 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 13Technical Quality Complaint (AWWA) Target: No more than 7.1 complaints per 1000 customer accounts annually Measurement Method QTR:1000 (# of technical quality complaints per quarter)/# of active customer accounts per reporting period (i.e. taste, color, odor, etc.) YTD:1000 (YTD # of technical quality complaints per year)/ # of active customer accounts per reporting period) 0.93 0.73 1.66 7.1 1.78 1.78 1.78 1.78 7.1 1.49 1.19 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 YTD Result AWWA Target FY18 Strat Plan AWWA: 75th percentile for population served between 100,001-500,000 (combined utilities) 14Potable Water Compliance Rate (AWWA) Target: 100%of all health related drinking water standards each quarter annually Measurement Method 100 (# of days the primary health regulations are met)/ # of days in the reporting period 100 100 100 100 100 100 100 100 100 100 100 50 60 70 80 90 100 110 Q1 Q2 Q3 Q4 YTD Result AWWA Target FY18 Strat Plan AWWA: 75th percentile for population served between 100,001-500,000 (water) 15 Financial Plan and execute sound financial activities that are essential to running and sustaining District operations, with the lowest possible impact to customers 16CIP Project Expenditures vs. Budget Target: 95% of budget but not to exceed 100% annually Being below target gives the measure a “not on target” status Measurement Method OTR:Actual quarterly expenditures/Annual budget YTD:YTD expenditures/Annual budget 16.8 44.8 44.815 36 65 95 100 9.3 19.5 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 17Construction Change Order Incidence (w/o allowances) Target: No more than 5%per quarter annually 2.2 2.4 2.4 55555 0.1 0.5 0 1 2 3 4 5 6 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan *QTR and YTD result are the life to dare change order rates for all active projects in FY17 Measurement Method Total cost of Change Orders (not including allowances)/Total original construction contract amount (not including allowances) 18 Measurement Method QTR:Total operations O&M costs/ # of accounts YTD:YTD total operations O&M costs/ # of accounts O&M Cost Per Account Target: Less than $571.00 per account annually (Target is based on Operating Budget) 122 147 269 125 153 153 140 571 117 149 100 150 200 250 300 350 400 450 500 550 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 19Billing Accuracy (AWWA) 99.98 99.98 99.98 99.8899.8 99.8 99.8 99.8 99.8 99.97 99.99 98 98.2 98.4 98.6 98.8 99 99.2 99.4 99.6 99.8 100 Q1 Q2 Q3 Q4 YTD Result AWWA Target FY18 Strat Plan AWWA: Median for population served between 100,001-500,000 (combined utilities)Target: 99.8%billing accuracy per quarter annually Measurement Method QTR:# of correct bills during the reporting period/ # of total bills during the reporting period YTD:YTD # of correct bills during the reporting period/ YTD # of total bills during the reporting period 20Overtime Percentage Target: Less than 100%of budgeted overtime per quarter annually (Target is based on Operating Budget; FY19 Overtime Budget is $149,900) Measurement Method QTR: Actual overtime costs (including comp time)/ Budgeted overtime costs / Historical YTD:YTD actual overtime costs (including comp time)/ YTD budgeted overtime costs 104 162 135 100 100 100 100 100 103.4 117 0 20 40 60 80 100 120 140 160 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 21Sewer Rate Ranking Target: Bottom 50 percentile for the 28 sewer service providers in San Diego (Otay ranks 6 out of 28 sewer service providers) Measurement Method Otay ranking for the average bill for sewer/ # of sewer agencies 66 14 14 6 0 5 10 15 20 25 Q1 YTD Result Target FY18 Strat Plan 22 44 11 11 3 0 5 10 15 20 25 Q1 YTD Result Target FY18 Strat Plan Water Rate Ranking Target: Bottom 50 percentile for the 22 member agencies in San Diego (Otay ranks 4 out of 22 member agencies) Measurement Method Otay ranking for the average water bill among CWA member agencies 23Percent of Customers Paying Bills Electronically Target: No less than 75%per quarter annually Measurement Method YTD:YTD # of customers paying bills electronically/ Total # of customers QTR:# of customers paying bills electronically/ Total # of customers 78.25 77.51 77.88 75 75 75 75 75 76.95 76.78 0 10 20 30 40 50 60 70 80 90 100 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 24Distribution System Loss Target: Less than 5%of unaccounted water loss per quarter annually Measurement Method 100 [volume purchased (from CWA) – (volume sold (to customers) + volume used District usage)] / volume purchased (from CWA)) 3.6 3.6 3.6 55555 4.1 4 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 25Planned Potable Water Maintenance Ratio in $ Target: 66% or greater of all labor dollars spent on preventative maintenance per quarter annually Measurement Method Total planned maintenance cost/ Total maintenance cost (old is dollars, new is time) 75 72.8 74 66 66 66 66 66 72 72 50 55 60 65 70 75 80 85 90 95 100 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 26 Measurement Method Total planned maintenance costs/Total maintenance costs (old is dollars, new is time) Planned Recycled Water Maintenance Ratio in $ Target: 70%or greater of all labor spent on preventative maintenance per quarter annually 69 85 77 70 70 70 70 70 70 64 0 10 20 30 40 50 60 70 80 90 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 27Planned Wastewater Maintenance Ratio in $ Target: 77% or greater of all labor dollars spent on preventative maintenance per quarter annually Measurement Method Total planned maintenance cost/Total maintenance cost (old is dollars, new is time) 87 88 87 77 77 77 77 77 67.72 96.38 50 55 60 65 70 75 80 85 90 95 100 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 28Direct Cost of Treatment Per MGD Target: No more than $1050 per MG spent on wastewater treatment per quarter annually (Targets each quarter will vary based on high and low demand times) Measurement Method Total O&M costs directly attributable to sewer treatment/ Total volume in MG (dollars tracked for historical & budget) 760.36 895.49 821.11 900 1200 1200 900 1050 1238.54 0 200 400 600 800 1000 1200 1400 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 29Internal Business Processes Improve business services by continually improving essential processes, invest in strategic technology, and achieve new efficiencies. 30Mark-Out Accuracy Target: No less than 100%mark-out accuracy per quarter annually 99.91 100 100 100 100 100 100 100100 100 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4YTD Result Target FY18 Strat Plan Measurement Method # of mark-outs performed without an at-fault hit, which is damage to a District facility that results from a missing or erroneous mark- out/Total # of mark-outs performed 31Project Closeout Time Target: No more than a 45 day average per quarter annually 24.3 31.8 31.8 45 45 45 45 45 64.5 0 10 20 30 40 50 60 70 Q1 Q2 Q3 Q4 YTD Result Target FY Strat Plan Measurement Method QTR:# of days between NOSC and NOC for all construction projects within the quarter/# of construction projects within the quarter YTD:YTD # of days between NOSC and NOC for all construction projects within the quarter/YTD # of construction projects within the quarter 32Annual Recycled Water Site Inspections Target: 100%of recycled sites inspected annually (There are 102 recycled water use sites scheduled for FY19) Measurement Method Cumulative % of recycled sites inspected per quarter of those required by DEH 23 60 6025 50 75 100 100 44 54.9 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 33Recycled Water Shutdown Testing Target: 90%of recycled site shut down tests annually (There are 50 recycled water use sites due for shutdown in FY19) Measurement Method Cumulative % of recycled site shutdown tests performed per year compared to those scheduled 14 42 42 22.5 45 67.5 90 90 11 48.71 0 10 20 30 40 50 60 70 80 90 100 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 34Easement Evaluation and Field Inspection Target: 100%assigned easements evaluated via desktop tools and inspected annually (There are 100 easements assigned for FY19) Measurement Method Cumulative % of recycled site shutdown tests performed per year compared to those scheduled 42 101 101 25 50 75 100 100 0 20 40 60 80 100 120 Q1 Q2 Q3 Q4 YTD Result Target 35Percent of PMs Completed – Fleet Maintenance Target: No less than 90%of scheduled PM’s completed per quarter annually Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed 100 100 100 90 90 90 90 90 100 100 0 20 40 60 80 100 Q1 Q2 Q3 Q4 Annual Result Target FY18 Strat Plan 36Percent of PMs Completed – Reclamation Plant 100 100 100 90 90 90 90 90 100 95 75 80 85 90 95 100 105 110 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan Target: No less than 90%of scheduled PM’s completed per quarter annually Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed in a reporting period 37Percent of PMs Completed – Pump/Electric Section 100 100 100 90 90 90 90 90 100 100 75 80 85 90 95 100 105 110 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan Target: No less than 90%of scheduled PM’s completed per quarter annually Measurement Method # of PM’s completed/ # of PM’s scheduled to be completed in a reporting period 38System Valve Exercising Program Annual Target: 3080 valves exercised annually Measurement Method Actual number of valves exercised in the reporting period 835 648 1483770 770 770 770 3080 974 775 0 500 1000 1500 2000 2500 3000 3500 Q1 Q2 Q3 Q4 YTD Result Target FY 18 Strat Plan 39 Measurement Method 100 (# of days the primary health regulations are met)/ # of days in the reporting period 2.01 2.31 4.32 16.1 4444 16 3.26 1.82 0 2 4 6 8 10 12 14 16 18 20 Q1 Q2 Q3 Q4 YTD Result AWWA Target FY18 Strat Plan Potable Water Distribution System Integrity (AWWA) Target: Less than 16 leaks and breaks per 100 miles of distribution piping annually AWWA: Median for population served between 100,001-500,000 (water) 40Recycled Water System Integrity Target: No more than 6.6 leaks or breaks per 100 miles of recycled distribution system annually Measurement Method (100 x # of leaks or breaks)/ # of miles of distribution system 0.89 0.89 1.78 1.65 1.65 1.65 1.65 6.6 0.89 00 1 2 3 4 5 6 7 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 41Sewer Overflow Rate (AWWA) Target: 0 overflows per quarter annually Measurement Method QTR:100 (total number of sewer overflows during the reporting period) / total miles of pipe in the sewage collection system 0 0 0 000000000 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4YTD Result AWWA Target FY18 Strat Plan YTD:Cumulative number of overflows per quarter in a FY 0 Failures in Q1 & Q2 AWWA Benchmark is 0 AWWA: 75th percentile for collection systems (sewer overflow uncontrolled release) serving from 0-50,000 customers 42Emergency Facility Power Testing Target: 100%of the District’s facilities tested annually (The District currently has 34 powered ready facilities) Measurement Method Number of facilities tested / total facilities 100 100 100 100 100 100 100 100 10 6 0 20 40 60 80 100 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 43Potable Tank Inspection and Cleaning Annual Target: 8 potable water storage tanks and/or reservoirs cleaned annually. Measurement Method Number of tanks cleaned and inspected 1 6 7 88888 1 4 0 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 44Main Flushing and Fire Hydrant Maintenance Target: 215 or more mains flushed and fire hydrants maintained annually (The target of 215 is comprised of 165 hydrants and 50 mains) Measurement Method Number of mains flushed and hydrants maintained 169 144 313 54 54 54 54 215 50 141 0 50 100 150 200 250 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 45Critical Valve Exercising Annual Target: Exercise 631 identified critical valves annually Measurement Method Number of critical valves exercised in a reporting period 631 0 631 631 631 631 631 631 625 60 100 200 300 400 500 600 700 800 900 1000 Q1 Q2 Q3 Q4 YTD Result Target FY18 Strat Plan 46Learning and Growth Provide hands-on leadership, support, and empowerment of staff, in order to maintain an accountable high-performing workforce. 47Employee Turnover Rate Target: Less than 5%turnover annually 0 1.49 1.481.25 1.25 1.25 1.25 5 000 1 2 3 4 5 6 Q1 Q2 Q3 Q4YTD Result Target FY18 Strat Plan QTR:# of voluntary resignations (not including retirements)/average # of employees Measurement Method YTD:YTD # of voluntary resignations (not including retirements)/average # of employees No turnovers in Q1 48Training Hours Per Employee Target: 12 hours or more general formal training per employee annually (excludes safety training) 5.53 6.93 12.46 3333 12 4.94 5.5 0 2 4 6 8 10 12 14 Q1 Q2 Q3 Q4 YTD/AVG Result Target FY18 Strat Plan Measurement Method QTR:Total qualified training hours for all employees/average # of FTEs YTD:YTD Total qualified training hours for all employees/Average # of FTEs 49Safety Training Program Target: 24 hours or more safety training per field employee annually 6.9 11.42 18.32 6666 24 6.5 11.14 0 5 10 15 20 25 30 Q1 Q2 Q3 Q4 YTD/AVG Result Target FY18 Strat Plan Measurement Method QTR:# of safety training hours for the quarter/ # of field employees YTD:YTD Total qualified safety training hours for field employees/average # of field employees 50 Questions?