HomeMy WebLinkAbout02-17-21 EO&WR Committee Packet 1 OTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS BY TELECONFERENCE 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA WEDNESDAY February 17, 2021 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE COMMITTEE ON ANY SUBJECT MATTER WITHIN THE COMMITTEE'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA This meeting is being held via teleconference. Members of the public may submit their comments on agendized and non-agendized items by either of the following two meth- ods: a) No later than a half hour before the start of the meeting, complete the Request to Speak Form and email it to BoardSecretary@otaywater.gov. Your request to speak will be acknowledged during the “Public Participation” portion of the meeting when the committee will hear your public comment. When called to speak, please state your Name and the City in which you reside. You will be provided three minutes to speak. OR b) No later than a half hour before the start of the meeting, email your comment to BoardSecretary@otaywater.gov and it will be read aloud during the “Public Par- ticipation” portion of the meeting. Please provide your Name and the City in which you reside, with your comment. Your comment must not take more than three minutes to read. The District’s meeting is live streamed. Information on how to watch and listen to the District’s meeting can be found at this link: https://otaywater.gov/board-of- directors/agenda-and-minutes/committee-meetings/ 2 DISCUSSION ITEMS 3. GENERAL MANAGER’S EXECUTION OF AN EMERGENCY AGREEMENT WITH CASS-ARRIETA CONSTRUCTION TO REPAIR THE DISTRICT’S 16-INCH WATER MAIN AND ROAD ON PASEO LADERA IN CHULA VISTA, CAUSED BY A MAIN BREAK, UPDATE (MEDEROS) [5 minutes] 4. SECOND QUARTER OF FISCAL YEAR 2021 CAPITAL IMPROVEMENT PROGRAM REPORT (LONG) [5 minutes] 5. FISCAL YEAR 2021 MID-YEAR STRATEGIC PLAN UPDATE (KERR) [10 minutes] 6. ADJOURNMENT BOARD MEMBERS ATTENDING: Tim Smith, Chair Gary Croucher All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the Senior Confidential Executive As- sistant by contacting her at (619) 670-2253. If you have any disability which would require accommodation in order to enable you to par- ticipate in this meeting, please call the Senior Confidential Executive Assistant at 670-2253 at least 24 hours prior to the meeting. Certification of Posting I certify that on February 12, 2021 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on February 12, 2021. /s/ Tita Ramos-Krogman, Senior Confidential Executive Assistant STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 3, 2021 SUBMITTED BY: Charles Mederos, Utility Services Manager PROJECT: Various DIV. NO. 4 APPROVED BY: Pedro Porras, Chief Water Operations Jose Martinez, General Manager SUBJECT: INFORMATIONAL ITEM – JANUARY 3, 2021 PASEO LADERA WATER MAIN BREAK AND EMERGENCY REPAIR. GENERAL MANAGER’S RECOMMENDATION: None. This is an informational item only. COMMITTEE ACTION: None. This is an informational item only. PURPOSE: To inform the Board of the General Manager’s execution of an emergency agreement with Cass-Arrieta Construction to repair the District’s 16-inch water main and road on Paseo Ladera in Chula Vista caused by a main break. ANALYSIS: As defined in the District Code of Ordinances Article I, Section 2.01, Paragraph I, “In a declared emergency, the General Manager may direct employees, take action to continue or restore service capability, and execute any contracts for necessary equipment, services, or supplies directly related and required by the emergency.” AGENDA ITEM 3 2 On Sunday, January 3, 2021, at approximately 9:30 PM, the District experienced a main break on a 16-inch polyvinyl chloride (PVC) water main in the northbound lanes of Paseo Ladera between Givens Street and Telegraph Canyon Road in Chula Vista (Attachment B). District crew responded and isolated the water main. Upon clean-up activities and further inspection of the break, District crews concluded that the damage to the road and water main on Paseo Ladera was extensive and the amount of work required to complete the repairs safely was beyond the District’s resources. Therefore, a contractor equipped to handle a repair of this magnitude was required. The 16-inch main line is the redundant source to feed Sharp Chula Vista Hospital from Telegraph Canyon Road and Paseo Ladera into Medical Center Drive. According to the as built, the main line was installed in February 2005 and is approximately four and five feet in depth. As a precaution, District crews also isolated the 16-inch 624 Pressure Zone line due to the proximity of the damage and it was unknown if the bedding was compromised from the water main break. This did not impact water services to customers. Consequently, it was imperative for the General Manager to declare the situation an emergency to expedite the repair and to prevent the loss or impairment of essential public services. Therefore, the General Manager declared the emergency on Monday, January 4th and the Board ratified the decision during their regular Board meeting on Wednesday, January 6th. The value of the loss is estimated to be $1.25 million, including third party damages. On Monday, January 4th, the District reached out to three construction contractors with a crew and equipment available to complete the repair. Cass-Arrieta Construction was selected and began coordinating with the City of Chula Vista ensuring all necessary permits were obtained and mobilized on Thursday, January 7th to begin the repairs. Upon excavation and exposing the pipe, it was determined that the cause of the break was improper fitting at the pipe which caused a deformity at the joint gasket (Attachment C). Cass-Arrieta Construction replaced 700 feet of 16-inch PVC that was compromised by the break. The pipe was hydro-tested, passed all bacteriological sample tests, as required by the State Water Resources Control Board, and was put back in service on Sunday, January 24th, along with the 16-inch 624 Pressure Line. Cass- Arrieta Construction is also replacing 36,000 square feet of asphalt, per City of Chula Vista codes and regulations standards, to ensure the road is back in service by mid to end of February. 3 FISCAL IMPACT: Joe Beachem, Chief Financial Officer This incident is an insurable event, and a claim has been opened with the District’s insurance carrier Association of California Water Agencies Joint Powers Insurance Authority (ACWA JPIA). The road repair expenses, along with all third-party damages, will be submitted to the District’s insurance carrier for reimbursement under the District’s insurance coverage. All labor and materials related to the pipe replacement are not covered under the District’s insurance. The estimated amount is $500,000. STRATEGIC GOAL: Key Performance Indicator (KPI) I1.11 – Potable Water Distribution System Integrity. Maintaining a safe and continuous water supply and safety to the general public. LEGAL IMPACT: This emergency was enacted in accordance with the District Code of Ordinances Article I, Chapter 2, Section 2.01, Paragraph I. Attachments: Attachment A – Committee Action Attachment B – Map of Area Attachment C – Photos ATTACHMENT A SUBJECT/PROJECT: INFORMATIONAL ITEM – JANUARY 3, 2021 PASEO LADERA WATER MAIN BREAK AND EMERGENCY REPAIR. COMMITTEE ACTION: None. This is an informational item only. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for board approval. This report will be sent to the Board as a committee approved item, or modified to reflect any discussion or changes as directed from the committee prior to presentation to the full board. 16-INCH PVC POTABLE WATER MAINEMERGENCY REPAIR ON PASEO LADERA OTAY WATER DISTRICT EXHIBIT A\\ O t a y W a t e r D i s t r i c t \ E N G O P E R A T I N G - D o c u m e n t s \ T e c h n i c i a n \ P r o j e c t s \ O W D \ O p e r a t i o n s \ 1 6 - I n c h P W M a i n o n P a s e o L a d e r a \ E x h i b i t A - L o c a t i o n M a p , E m e r g e n c y R e p a i r o n P a s e o L a d e r a P A S E O L A D E R A GIVENS ST TELEGRAPH CANYON RD 16-Inch PVC PW Main Repair(Approx 700 feet) Telegr a p h C a n y o n R d Sag e V w Tu r m e r i c T e r VICINITY MAP PROJECT SITE DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ÃÅ54 !\ ÃÅ125 ÃÅ94 ÃÅ905 §¨¦805 FNTS F 0 250125 Feet JAN 2021 Legend EXISTING POTABLE WATER MAINS 16-INCH PVC PW MAIN REPAIR Attachment B Paseo Ladera main break road damage Attachment C Paseo Ladera main break damage with 16-inch pipe exposed Paseo Ladera and Telegraph Canyon Road conditions after main break District crews working on initial clean up City of Chula Vista assisting with road clean up. Rubber gasket on 16-inch pipe Close up of gasket and pipe Contractor mobilizing Contractor working New 16-inch pipe on the ground Road ready for paving STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 3, 2021 SUBMITTED BY: Michael J. Long Engineering Manager PROJECT: Various DIV. NO.ALL APPROVED BY: Rod Posada, Chief, Engineering Jose Martinez, General Manager SUBJECT: Informational Item – Second Quarter Fiscal Year 2021 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all CIP project expenditures and to highlight significant issues, progress, and milestones on major projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer's reimbursement projects. The Second Quarter Fiscal Year 2021 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $8.5 million. Expenditures through the AGENDA ITEM 4 2 Second Quarter totaled approximately $4.637 million. Approximately 55% of the Fiscal Year 2021 expenditure budget was spent (see Attachment B). FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." LEGAL IMPACT: None. MJL/RP:jf https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Staff Report/BD 03-03-21 Staff Report Second Quarter FY 2021 CIP Update(ML-RP).docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2021 Second Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – Second Quarter Fiscal Year 2021 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on February 17, 2021. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. FISCAL YEAR 2021 2ND QUARTER REPORT (Expenditures through 12/31/2020)($ In Thousands) Attachment B 2021 12/31/20 CIP No.Description Project Manager FY 2021 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Cameron 25$ 16$ 9$ 64%5,750$ 658$ 5,092$ 11%The project is in the planning phase. Design to start in Q4 FY 2021. P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Cameron 25 - 25 0%1,500 - 1,500 0% Project is driven by the City of Chula Vista's schedule for replacement; the City has delayed the design. Design began in Q4 FY 2020. Tied to P2553. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 5 - 5 0%3,968 3,823 145 96% EIR/EIS complete and Presidential permit issued. Continue meetings with DDW and AdR. P2453 SR-11 Utility Relocations Marchioro 50 145 (95) 290%3,000 2,137 863 71% Schedule driven by Caltrans. Caltrans issued construction contract notice to proceed Q1 FY 2020. Completion of construction anticipated for Q2 FY 2022. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 50 24 26 48%750 67 683 9% Environmental documentation preparation continued in Q2 and is expected to be completed in FY 2022. Outreach to City of Chula Vista and County of San Diego begun on access issues. P2485 SCADA - Infrastructure and Communications Replacement Kerr 100 70 30 70%2,450 2,300 150 94%Currently on target; no additional funding. P2494 Multiple Species Conservation Plan Coburn-Boyd 25 4 21 16%1,000 937 63 94% Continuing minor expenses as staff responds to USFWS questions. Project should be completed this fiscal year. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/Osage Marchioro - - - 0%1,000 - 1,000 0% No expenditures anticipated in FY 2021. Completion of construction anticipated FY 2026. P2521 Large Meter Vault Upgrade Program Carey 75 81 (6) 108%620 454 166 73% Installation of the Cuyamaca College vault top occurred in Q1 FY 2021. No activities are proposed for the remainder of FY 2021. P2553 Heritage Road Bridge Replacement and Utility Relocation Cameron 25 39 (14) 156%3,613 102 3,511 3% Project is driven by the City of Chula Vista's schedule for replacement; the City has delayed the design. Design began in Q4 FY 2020. Waiting for 90% Drawings from the City P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0%720 - 720 0% No expenditures anticipated in FY 2021. These Reservoirs are scheduled to be removed at the end of their useful life. P2608 PL - 8-inch, 850 Zone, Coronado Ave, Chestnut/Apple Cameron 200 144 56 72%1,820 382 1,438 21% Construction will be completed in Q2 FY 2021. Project acceptance expected in Q3 P2611 Quarry Road Bridge Replacement and Utility Relocation Cameron 25 - 25 0%399 124 275 31% Construction will be completed in Q2 FY 2021. P2612 PL - 12-inch, 711 Zone, Paso de Luz/Telegraph Canyon Rd Cameron 75 14 61 19%1,250 125 1,125 10% Project design started in Q2, expected to continue through the remainder of FY 2021. Project expected to start construction in FY 2022.P2614 485-1 Reservoir Interior/Exterior Coating Cameron - - - 0%1,150 - 1,150 0%No expenditures in FY 2021. P2617 Lobby Security Enhancements Payne 20 1 19 5%225 179 46 80% Pending completion of security study recommendations. P2619 PS - Temporary Lower Otay Pump Station Redundancy Marchioro 500 546 (46) 109%3,300 2,419 881 73% Construction completion anticipated Q3 FY 2021. P2623 Central Area to Otay Mesa Interconnection Pipelines Combination Air/Vacuum Valve Replacements Marchioro 30 - 30 0%600 218 382 36% Easement offer sent to property owner Q4 FY 2019. Design phase for valve relocations commenced Q4 FY 2020. Completion of construction anticipated FY 2022. P2626 803-4 Reservoir Water Quality Improvements – PAX System Purchase Coburn-Boyd 25 37 (12) 148%325 297 28 91% This project is complete. There may be minor additional charges if an issue comes up during the warranty period that requires staff time. P2630 624-3 Reservoir Automation of Chemical Feed System Cameron 25 - 25 0%625 - 625 0% The project is in the planning phase. Design to start in Q4 FY 2021. P2638 Buildings and Grounds Refurbishments Payne 25 - 25 0%114 36 78 32% Q4 FY 2021 Admin Plaza vegetation refurbishment. P2639 Vista Diego Hydropneumatic Pump Station Replacement Marchioro 50 27 23 54%2,800 50 2,750 2% Design consultant agreement executed Q1 FY 2021. Completion of construction anticipated FY 2024. P2640 Portable Trailer Mounted VFD Pumps Marchioro 30 94 (64) 313%550 497 53 90% Portable Trailer Mounted Pumps delivered Q4 FY 2020 with defects. Trailer defects will be completed Q3 FY 2021. This project has experienced delays associated COVID-19. FISCAL YEAR-TO-DATE, 12/31/20 LIFE-TO-DATE, 12/31/20 https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Expenditures/FY2021 2nd Qtr CIP Exp-Final.xlsx Page 1 of 5 2/10/2021 FISCAL YEAR 2021 2ND QUARTER REPORT (Expenditures through 12/31/2020)($ In Thousands) Attachment B 2021 12/31/20 CIP No.Description Project Manager FY 2021 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/20 LIFE-TO-DATE, 12/31/20 P2642 Rancho Jamul Pump Station Replacement Marchioro 5 8 (3) 160%2,500 10 2,490 0% Project will be coordinated with 1655-1 Reservoir (P2040). Completion of construction currently scheduled for FY 2026. P2646 North District Area Cathodic Protection Improvements Marchioro 25 - 25 0%1,200 - 1,200 0% No expenditures anticipated in FY 2021. Completion of construction anticipated FY 2025. P2647 Central Area Cathodic Protection Improvements Marchioro 5 1 4 20%1,300 1 1,299 0% Advance planning work commenced Q1 FY 2021. Completion of construction anticipated FY 2024. P2648 Otay Mesa Area Cathodic Protection Improvements Marchioro 200 442 (242) 221%700 623 77 89% Construction contract awarded and executed Q1 FY 2021. Completion of construction anticipated Q3 FY 2021. P2649 HVAC Equipment Purchase Payne 20 36 (16) 180%130 54 76 42% Q1 FY 2021 Operations installed; Q4 FY 2021 AC-2 Accounting and AC-4 Finance. P2652 520 to 640 Pressure Zone Conversion Cameron 60 5 55 8%250 37 213 15%The project is in the planning phase. Design to start in Q4 FY 2021. P2654 Heritage Road Interconnection Improvements Marchioro 10 7 3 70%200 35 165 18% Project scope will change pending City preference. Completion of construction anticipated FY 2023. P2658 832-1 Pump Station Modifications Marchioro 50 - 50 0%600 10 590 2% Advance planning work commenced FY 2020. Completion of construction anticipated FY 2026. P2659 District Boardroom Improvements Kerr 20 11 9 55%300 185 115 62% Project has been approved for a budget increase to cover additional non-technical upgrades; extended through FY 2023. P2663 Potable Water Pressure Vessel Program Marchioro 25 65 (40) 260%1,696 86 1,610 5% Construction work to replace Rancho Jamul Hydropneumatic Pump Station pressure vessel began in Q1 FY 2021. Completion of construction scheduled for Q4 FY 2021. P2664 Otay Mesa Dual Piping Modification Program Beppler 55 10 45 18%350 31 319 9% Outreach to other utilities occurred during Q2, implementation of recommendations to be investigated during the remainder of FY 2021. P2665 PL - 12-inch Pipeline Replacement, 870 Zone, Cactus Road Marchioro 5 - 5 0%110 - 110 0% No expenditures anticipated in FY 2021. Completion of construction scheduled beyond six-year planning budget. P2666 Low Head and High Head Pump Stations Demolition Marchioro 25 - 25 0%200 - 200 0% Advanced planning work scheduled to commence Q4 FY 2021. Completion of construction scheduled beyond six-year planning budget. P2667 Small Meter Testing Bench Carey 150 - 150 0%250 - 250 0%Planned for Q3 or Q4 FY 2021. P2669 Fuel Tank Safety and Integrity Rahders 26 - 26 0%100 - 100 0%Anticipate $18,000 will be charged to this CIP Q3 FY 2021. P2674 System Pressure Reducing Program Beppler 50 - 50 0%100 - 100 0%No activities occurred during Q2. Planning work expected to begin later in FY 2021. R2117 RWCWRF Disinfection System Improvements Beppler 240 58 182 24%1,500 171 1,329 11% Planning completed during Q2. Consultant selection to occur in Q3 of FY 2021. R2120 RWCWRF Filtered Water Storage Tank Improvements Cameron 400 35 365 9%700 86 614 12% Construction began in Q2 FY 2021. Expected Completion in Q3 FY 2021. R2146 Recycled Pipeline Cathodic Protection Improvements Marchioro 25 35 (10) 140%700 57 643 8% Advanced planning work commenced Q3 FY 2020. Completion of construction anticipated FY 2025. R2153 Recycled Water Pressure Vessel Program Marchioro 1 - 1 0%50 - 50 0%No expenditures anticipated in FY 2021. S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 5 - 5 0%1,646 1,111 535 67%No activities occurred during Q2; project subject to County direction. S2043 RWCWRF Sludge Handling System Beppler 1 - 1 0%184 129 55 70% No activities occurred during Q2; limited planning work anticipated this fiscal year. S2047 Asset Management - Info Master Sewer Implementation Zhao 5 - 5 0%58 38 20 66% No activity planned until completion of potable asset management. S2061 RWCWRF Aeration Controls Consolidation & Optimization Upgrades (S)Beppler 50 - 50 0%220 6 214 3% Review of blower equipment and instrumentation to be reviewed in Q3 to confirm any potential change in scope of work. S2067 RWCWRF Roofing Replacement and Natural Light Enhancement (S)Payne 75 - 75 0%190 16 174 8%Scheduled for Q4 2021; solicitation for RFP is currently out ending Feb 18, 2021. S2071 San Diego Metro Wastewater Capital Improvements Kennedy 40 18 22 45%553 150 403 27% Annual City of S.D. invoicing covers this project. No District involvement in design and construction. Total Capital Facility Projects Total:2,958 1,973 985 67%53,316 17,641 35,675 33% https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Expenditures/FY2021 2nd Qtr CIP Exp-Final.xlsx Page 2 of 5 2/10/2021 FISCAL YEAR 2021 2ND QUARTER REPORT (Expenditures through 12/31/2020)($ In Thousands) Attachment B 2021 12/31/20 CIP No.Description Project Manager FY 2021 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/20 LIFE-TO-DATE, 12/31/20 REPLACEMENT/RENEWAL PROJECTS P2083 PS - 870-2 Pump Station Replacement Marchioro 46 290 (244) 630%19,550 19,513 37 100%Completion of construction anticipated Q3 FY 2021. P2174 PS - 1090-1 Pump Station Upgrade Beppler 375 47 328 13%2,000 208 1,792 10%Construction contract awarded in Q2, construction to begin in Q3. P2508 Pipeline Cathodic Protection Replacement Program Marchioro 10 2 8 20%1,250 1,247 3 100% Construction completed Q1 FY 2020. Project one year warranty ended Q1 FY 2021. P2533 1200-1 Reservoir Interior & Exterior Coating Cameron 400 84 316 21%1,275 129 1,146 10%Construction to begin in Q3 FY 2021. P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations Cameron 40 14 26 35%1,090 1,014 76 93% Project is driven by SANDAG. Expenditures within overall project budget. P2543 850-1 Reservoir Interior/Exterior Coating Cameron 375 116 259 31%1,270 167 1,103 13%Construction began in Q2 FY 2021. Expected Completion in Q4 FY 2021. P2546 980-2 Reservoir Interior/Exterior Coating Cameron 15 1 14 7%1,705 1,686 19 99% This project is in the 2 yr. warranty period. Warranty dive inspection performed in Q2 FY 2021. Warranty Repairs to be done during winter months of FY 2022. P2555 Administration and Operations Parking Lot Improvements Cameron 30 - 30 0%935 905 30 97%This project is complete. P2561 Res - 711-3 Reservoir Cover/Liner Replacement Marchioro 30 5 25 17%2,450 2,446 4 100% Construction completed Q3 FY 2020. Project one year warranty ended Q2 FY 2021. P2562 Res - 571-1 Reservoir Cover/Liner Replacement Marchioro 10 102 (92) 1020%2,900 2,809 91 97% As part of the larger 870-2 Pump Station project, the 571-1 Reservoir was placed back into service April 2018. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 5 15 (10) 300%188 27 161 14% Existing cover/liner material testing completed Q4 FY 2020 suggests 1-3 years remaining useful life. Construction schedule will be moved up during annual FY 2022 budget cycle. Advance planning work to confirm replacement alternative commenced Q1 FY 2021. P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Cameron 10 - 10 0%1,200 986 214 82% This project is in the 2 yr. warranty period. Warranty dive inspection scheduled for Q4 FY 2021. P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%1,150 - 1,150 0%No expenditures in FY 2021. P2573 PL - 12-Inch Pipeline Replacement, 803 Zone, Hillsdale Road Beppler 4 - 4 0%2,580 2,572 8 100%Warranty period is over and CIP to be closed. P2574 PL - 12-Inch Pipeline Replacement, 978 Zone, Vista Vereda Beppler 5 2 3 40%1,785 1,766 19 99% Construction is complete and warranty period concludes in Q4 FY 2021. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 gpm Beppler 25 - 25 0%13,775 - 13,775 0% No activities occurred during Q2 FY 2021. Planning work to be performed later in Fiscal Year 2021.P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Cameron 10 - 10 0%1,050 - 1,050 0%Planning to begin in Q4 FY 2021. P2594 Large Meter Replacement Carey 1 14 (13) 1400%650 486 164 75% A couple of change-outs carried over from FY 2020 and two large meters failed that were not repairable during testing. P2604 AMR Change-Out Carey 250 241 9 96%6,290 5,979 311 95%On track. P2605 458/340 PRS Replacement, 1571 Melrose Ave Beppler 60 - 60 0%750 97 653 13% Project to be rebid in Q3 FY 2021 with CIPs P2627 & P2671. P2607 Douglas Ave SWA and OWD Interconnection Upgrade Beppler 45 1 44 2%50 5 45 10% SWA awarded construction project in Q2, OWD to monitor construction progress through remainder of FY 2021. P2609 PL - 8-inch, 1004 Zone, Eucalyptus St, Coronado/Date/La Mesa Cameron 900 851 49 95%2,100 1,055 1,045 50% Construction will be completed in Q2 FY 2021. Project acceptance expected in Q3. P2610 Valve Replacement Program - Phase 1 Cameron 100 52 48 52%2,000 74 1,926 4% Operations has begun replacement in critical areas. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Beppler 10 - 10 0%2,600 35 2,565 1% No activities occurred during Q2 FY 2021. Planning work to be performed later in FY 2021. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Dr/Vista Sierra Dr Cameron 425 22 403 5%4,200 186 4,014 4% Project design started in Q2, expected to continue through the remainder of FY 2021. Project expected to start construction in FY 2022. P2625 PL - 12-inch, 978 Zone, Hidden Mesa Road Beppler 10 1 9 10%2,210 2,205 5 100% Construction is complete and warranty period concludes in Q4 FY 2021. P2627 458/340 PRS Replacement, 1505 Oleander Avenue Beppler 60 - 60 0%750 125 625 17% Project to be rebid in Q3 FY 2021 with CIPs P2605 & P2671. P2631 1485-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%1,250 - 1,250 0%No expenditures in FY 2021. P2653 1200 Pressure Zone Improvements Marchioro 150 32 118 21%650 257 393 40% Construction of Phase 1 completed Q4 FY 2020. Completion of Phase 2 construction scheduled for FY 2022. https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Expenditures/FY2021 2nd Qtr CIP Exp-Final.xlsx Page 3 of 5 2/10/2021 FISCAL YEAR 2021 2ND QUARTER REPORT (Expenditures through 12/31/2020)($ In Thousands) Attachment B 2021 12/31/20 CIP No.Description Project Manager FY 2021 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/20 LIFE-TO-DATE, 12/31/20 P2655 La Presa Pipeline Improvements Cameron 180 71 109 39%1,750 258 1,492 15%Construction will be completed in Q2 FY 2021. Project acceptance expected in Q3. P2656 Regulatory Site Desilting Basin Improvements Beppler 30 - 30 0%150 7 143 5% No activities occurred during Q2 FY 2021. Operations to implement improvements as time allows. P2657 1485-1 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%950 - 950 0%No expenditures in FY 2021. P2661 Replacement of Backflow Prevention Devices on Pipeline Interconnections on Otay Mesa Beppler 75 2 73 3%375 7 368 2% Minimal activities occurred during Q2 FY 2021. Operations to implement improvements as time allows. P2662 Potable Water Meter Change Out Carey - - - 0%16,500 - 16,500 0%No expenditures planned in FY 2021. P2670 Administration and Operations Roof Repairs and Replacement Payne 5 - 5 0%325 - 325 0% Q4 FY 2021 minor maintenance; major work in future fiscal years. P2671 980 Reservoirs Altitude Valve Vaults Renovation Beppler 120 45 75 38%300 45 255 15% Design initiated in Q2 and is expected to be completed in Q3. Project to be bid in Q3 FY 2021 with CIPs P2605 & P2627. P2672 District Roof Repairs and Replacement Program Payne 25 - 25 0%375 - 375 0% Q4 FY 2021 minor maintenance; major work future FY's. P2673 803-4 Reservoir Interior/Exterior Coating Cameron - - - 0%2,100 - 2,100 0%No expenditures in FY 2021. P2675 458-1 and 458-2 Reservoirs Site Pavement Refurbishment Cameron 5 - 5 0%450 - 450 0% Planning to coincide with 458-1 Reservoir Coating (P2593). R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 5 - 5 0%2,400 25 2,375 1% Replacement scheduled for FY 2025 since existing cover/liner testing completed in FY 2020 suggested four to six years remaining life. R2143 AMR Change-Out Carey 130 36 94 28%525 369 156 70%Most work in Q2 and Q3 FY 2021. R2144 RWCWRF Roofing Replacement and Natural Light Enhancement (R)Payne 100 - 100 0%175 - 175 0% Scheduled for Q4 2021; solicitation for RFP is currently out ending Feb 18, 2021. R2147 RWCWRF Fuel Lines Replacement Marchioro 2 - 2 0%230 222 8 97% Construction completed Q1 FY 2020. Project one year warranty ended Q1 FY 2021. R2148 Large Meter Replacement - Recycled Carey 10 6 4 60%58 20 38 34%On track.R2152 Recycled Water Meter Change-Out Carey - - - 0%550 - 550 0%No expenditures planned in FY 2021. R2154 RWCWRF Entrance Storm Water Improvements (R)Beppler 115 21 94 18%125 21 104 17% Scope of work modifications identified during Q2, implementation to be completed during FY 2021. R2156 RecPL - 14-inch RWCWRF Effluent Force Main Improvements Marchioro 250 202 48 81%500 202 298 40% Construction contract awarded and executed Q1 FY 2021. Completion of construction anticipated Q3 FY 2021. R2157 RWCWRF Backwash Supply Pumps Upgrade Beppler 100 - 100 0%300 - 300 0%No activities occurred during Q2. Planning to begin in Q3 FY 2021. R2158 RWCWRF Stormwater Pond Improvements (R)Beppler 40 - 40 0%175 - 175 0% No activities occurred during Q2. Planning to begin in Q3 FY 2021. S2024 Campo Road Sewer Main Replacement Beppler 10 7 3 70%11,000 10,988 12 100% Construction is complete and warranty period concludes in Q4 FY 2021. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 25 3 22 12%1,050 67 983 6% Planning activities occurred during Q2 FY 2021. Limited design to be completed in Fiscal Year 2021. S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler 5 - 5 0%1,100 7 1,093 1% No activities occurred during Q2 FY 2021. Limited design to be completed in Fiscal Year 2021. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%1,150 - 1,150 0%No activities planned for FY 2021. S2060 Steele Canyon Pump Station Replacement Beppler - - - 0%1,700 - 1,700 0%No activities planned for FY 2021. S2066 Rancho San Diego Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%950 - 950 0%No activities planned for FY 2021. S2069 Cottonwood Sewer Pump Station Renovation Beppler 75 16 59 21%2,500 36 2,464 1% Surveying of the site occurred during Q2. Property assessment to be performed in Q3 FY 2021. S2070 Hidden Mountain Sewer Pump Station Wet Well Renovation Beppler 5 7 (2) 140%215 215 - 100% Construction is complete and warranty period concludes in Q4 FY 2021. S2072 RWCWRF Rotary Screen Replacement Beppler 1 - 1 0%115 - 115 0%No activities planned for FY 2021. S2073 RWCWRF Entrance Storm Water Improvements (S)Beppler 115 22 93 19%125 22 103 18% Scope of work modifications identified during Q2, implementation to be completed during FY 2021. S2074 RWCWRF Stormwater Pond Improvements (S)Beppler 40 - 40 0%175 - 175 0% No activities occurred during Q2. Planning to begin in Q3 FY 2021. Total Replacement/Renewal Projects Total:4,869 2,330 2,539 48%128,046 58,490 69,556 46% CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 315 42 273 13%6,500 5,033 1,467 77% $283,866.78 encumbered. There will be additional charges against P2282 once vehicles arrive in Q3 FY 2021. Anticipate 100% expense in this area FY 2021. https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Expenditures/FY2021 2nd Qtr CIP Exp-Final.xlsx Page 4 of 5 2/10/2021 FISCAL YEAR 2021 2ND QUARTER REPORT (Expenditures through 12/31/2020)($ In Thousands) Attachment B 2021 12/31/20 CIP No.Description Project Manager FY 2021 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 12/31/20 LIFE-TO-DATE, 12/31/20 P2286 Field Equipment Capital Purchases Rahders 57 143 (86) 251%2,500 2,169 331 87% $57,038.36 for field equipment; $70,449.98 for the repair of Pump 4 at 927-1 RPS and Pump 1 at 680 RPS putting this CIP over budget in FY 2021. P2571 Data Center Network Data Storage and Infrastructure Enhancements Kerr 130 149 (19) 115%450 294 156 65% Project is on schedule; recently purchased new hardware (approved by Board); anticipating using remainder of funds prior to year-end. P2572 Enterprise Resource Planning (ERP) Replacement Kerr 80 - 80 0%130 - 130 0%Project on hold. p2668 Implementation of PSIcapture Software for Accounts Payable Invoice Kerr 25 - 25 0%25 - 25 0%Project on hold. s2075 Field Equipment Capital Purchases Rahders 25 - 25 0%300 - 300 0%$21,693.31 - skimmings pump and motor ordered for Treatment Plant pump. Total Capital Purchase Projects Total:632 334 298 53%9,905 7,496 2,409 76% DEVELOPER REIMBURSEMENT PROJECTS P2595 PL - 16-inch, 624 Zone, Village 3N - Heritage Road, Main St/Energy Way Beppler 1 - 1 0%150 - 150 0% Project under construction; awaiting developer submission for reimbursement. R2084 RecPL - 20-Inch, 680 Zone, Village 2 - Heritage/La Media Beppler 1 - 1 0%365 1 364 0% Project under construction; awaiting developer submission for reimbursement. Total Developer Reimbursement Projects Total:2 - 2 0%515 1 514 0% 117 GRAND TOTAL 8,461$ 4,637$ 3,824$ 55%191,782$ 83,628$ 108,154$ 44% https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/Forms_New/D-Construction/CIP Quarterly Reports/CIP Qtr Reports/FY 2021/Q2/Expenditures/FY2021 2nd Qtr CIP Exp-Final.xlsx Page 5 of 5 2/10/2021 Otay Water District Capital Improvement Program Fiscal Year 2021 Second Quarter (through December 31, 2020) Ralph W. Chapman Water Reclamation Facility Recycled Water Storage Tank Coating and Rehabilitation 12/21/20 Attachment C Background The approved CIP Budget for Fiscal Year 2021 consists of 105 projects that total $8.5 million. These projects are broken down into four categories. 1.Capital Facilities $ 3.0 million 2.Replacement/Renewal $ 4.9 million 3.Capital Purchases $ 0.6 million 4.Developer Reimbursement $ 2.0 thousand Overall expenditures through the Second Quarter of Fiscal Year 2021 totaled approximately $4.637 million, which is 55% of the Fiscal Year budget. 2 Fiscal Year 2021 Second Quarter Update ($000) CIP CAT Description FY 2021 Budget FY 2021 Expenditures % FY 2021 Budget Spent Total Life-to-Date Budget Total Life-to-Date Expenditures % Life-to-Date Budget Spent 1 Capital Facilities $2,958 $1,973 67%$53,316 $17,641 33% 2 Replacement/ Renewal $4,869 $2,330 48%$128,046 $58,490 46% 3 Capital Purchases $632 $334 53%$9,905 $7,496 76% 4 Developer Reimbursement $2 $0 0%$515 $1 0% Total: $8,461 $4,637 55%$191,782 $83,628 44% 3 Fiscal Year 2021 Second Quarter CIP Budget Forecast vs. Expenditures 4 $4,637,000 $8,037,950 5 CIP Projects in Construction 850-1 and 1200-1 Reservoir Coatings and Upgrades Project (P2543 & P2533) Removing and replacing the interior and exterior coatings of the 850-1 (1.15 MG) and 1200-1 (1.00 MG) reservoirs including structural modifications and upgrades. $2.55M Combined Budget Construction Began: November 2020 Estimated Completion: July 2021 Reservoir Coatings and Upgrades Project Installing Roof Patches 850-1 Reservoir Division No. 3 & 5 Locations: Sweetwater Springs/Jamacha (850-1) and Hillsdale (1200-1) areas 6 CIP Projects in Construction 7 850-1 Reservoir Interior Scaffolding CIP Projects in Construction Temporary Lower Otay Pump Station (TLOPS) Redundancy Project (P2619) Add a second pump to the TLOPS. Project includes site work, yard piping, instrumentation and controls, and security improvements. $3.20M Budget Start: Sept 2019 Est. Completion: February 2021 8 Division No. 1 Location: TLOPS is located south of Wueste Road at the south end of the Lower Otay Reservoir TLOPS –Discharge Pipe Replacement TLOPS – Suction Pipe Installation CIP Projects in Construction Ralph W. Chapman Recycled Water Facility (RWCRWF) 0.43 MG Tank Coating and Repair Project (R2120) Provide and install interior/exterior coating and upgrades to the storage reservoir including removal and replacement of deteriorating reservoir coatings and providing upgrades to increase the service life and maintain compliance with drinking water standards. $700K Budget Construction Began: November 2020 Estimated Completion: February 2021 Division No. 3 Location: Ralph W. Chapman Water Recycling Facility 9 CIP Projects in Construction 10 Recycled Water Tank Tenting, Exterior Scaffolding, and Existing Outlet Corrosion Repairs 12/15/20 Construction Contract Status 11 PROJECT TOTAL % P2083 P2562 870-2 Pump Station Replacement/ 571-1 Reservoir Liner and Cover Replacement Pacific Hydrotech Corporation $16,500,900 $16,925,900 $763,719 4.6%$17,371,211 $17,371,211 2.6%100.0%February 2021 P2619 P1320*** Temporary Lower Otay Pump Station Redundancy Tharsos, Inc.$1,600,500 $1,647,000 $99,832 6.2%$1,704,133 $629,997 3.5%37.0%February 2021 P2608 P2609 P2655 Dictionary Hill Waterline Replacement - 2019 LB Civil Construction, Inc.$1,125,315 $1,345,315 $71,819 6.4%$1,215,784 $1,242,892 -9.6%102.2%January 2021 P2648 Otay Mesa Pipeline CP Improvements Kay Construction $368,740 $379,115 ($10,375)-2.8%$368,740 $0 -2.7%0.0%January 2021 R2156 14-Inch Force Main Air-Vac Replacements Burtech Pipeline, Inc.$147,000 $212,100 $0 0.0%$147,000 $0 -30.7%0.0%February 2021 P2533/ P2543 850-1 & 1200-1 Reservoirs Interior/Exterior Coatings & Upgrades Capital Industrial Coatings, LLC $1,329,210 $1,443,000 $0 0.0%$1,329,210 $0 -7.9%0.0%June 2021 R2120 Recycled Water Storage Tank Coating Unified Field Service Corporation $364,242 $506,252 $0 0.0%$364,242 $0 -28.1%0.0%February 2021 TOTALS:$21,435,907 $22,458,682 $924,995 4.3%$22,500,320 $19,244,100 0.2% FY 2021 CIP CONSTRUCTION PROJECTS as of December 31, 2021 CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE CIP NO.PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES ***ADDITIONAL SCOPE WAS ADDED TO THIS CONTRACT VIA CHANGE ORDER TO PERFORM FUEL LEAK REMEDIATION AT THE 1485 PUMP STATION **THIS CHANGE ORDER RATE INCLUDES THE CREDIT FOR UNUSED ALLOWANCES *NET CHANGE ORDERS DO NOT INCLUDE ALLOWANCE ITEM CREDITS. IT'S A TRUE CHANGE ORDER PERCENTAGE FOR THE PROJECT % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* Consultant Contract Status 12 Consultant Contract Status 13 Consultant Contract Status 14 QUESTIONS? 15 1 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 3, 2021 PROJECT: Various DIV. NO.ALL SUBMITTED BY: Michael Kerr, Information Technology Manager APPROVED BY: Adolfo Segura, Chief of Administrative Services Jose Martinez, General Manager SUBJECT: FY21 MID-YEAR REPORT FOR THE DISTRICT’S FY19-22 STRATEGIC PLAN GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see “Attachment A”. PURPOSE: To provide a mid-year report of the District’s FY19-22 Strategic Performance Plan for FY21. ANALYSIS: Summary The current Otay Water District Strategic Plan is a four-year plan ranging from FY19 through the end of FY22. This report details the mid- year results for the third year. Objectives – Target 90% Strategic Plan objectives are designed to ensure the District is executing mission developed strategies and making appropriate changes necessary to guide the agency, meet new challenges, and positively adapt to change. FY21 mid-year results are below target at 88%, with 45 of 51 active items completed or on schedule; six (6) objectives are on hold. AGENDA ITEM 5 2 Objectives on Hold (6): CUSTOMER Strategy #1: Enhance and build awareness and engagement among the District’s customers and stakeholders, and within the San Diego Region of the District’s strategies, policies, projects, programs, and legislative/regulatory issues. Objective: Ensure consistency of branding and representation across the District, using consistent logos, colors, messaging, communications tools, and other collaterals through enhancement of internal and external marketing materials. This objective was placed on hold as COVID-19-related outreach and communication was a priority for staff. Assuming budget availability; this objective will resume in FY22. FINANCIAL Strategy #3: Enhancement of business systems. Objective: Enterprise Resource Planning (ERP)/Customer Information System (CIS)/Customer Relationship Management (CRM) validation and replacement evaluation This objective was placed on hold in the first quarter due to COVID- 19. Project is scheduled to resume in FY22. Objective: Evaluate enhancements to, or replacement, of the rate model program. 0 5 10 15 20 25 30 35 40 45 45 0 6 1 On Schedule/Completed Behind On Hold Not Started 45 of 51 Active Objectives are On Target (88%) 3 Through the reporting period ending December 31, 2020, this objective was placed on hold due to the additional work required to complete the capacity fee study. The capacity fee study was completed in December 2020, and staff resumed this effort in January 2021. Objective: Re-evaluate prior payroll solutions and identify any new cloud-based payroll solutions. Through the reporting period ending December 31, 2020, this objective was placed on hold for six months due to the additional work required to complete the capacity fee study. The capacity fee study was completed in December 2020. In January 2021, staff re-engaged with the vendor on this objective to evaluate their ability to meet the District's requirements. INTERNAL BUSINESS PROCESSES Strategy #2: Enhance customer experience. (collaboration between Customer Service and Communications) Objective: Enterprise Resource Planning (ERP)/Customer Information System (CIS)/Customer Relationship Management (CRM) validation and replacement evaluation. This objective was placed on hold in the first quarter due to COVID- 19. Objective had in-person planned meetings and demonstrations. Project is scheduled to resume in FY22. Strategy #10: Optimize District’s Hazardous Waste Operations and Emergency Response (HAZWOPER) and Confined Space Emergency Response Team. Objective: Certify at Industry State Level and under the Incident Command System, streamline chlorine gas and confined space rescue training, operations, response, and areas of responsibility and convert to inventory lists and equipment logs to electronic form. Due to COVID-19, chlorine gas training has been put on hold until conditions allow the HAZWOPER Team to meet in-person and complete this training, including hands-on practical exercises as part of its completion. Key Performance Indicators (KPI’s) – Target 75% KPI’s are designed to track the District’s day-to-day performance. These items measure the effectiveness and efficiency of essential operational services. The District’s overall goal of 75% is considered “on target”. For FY21, mid-year results are above target at 83%, with 29 of 35 items achieving the desired level or better. KPI’s are based on established AWWA performance benchmarks, water agency standards, and historical trends. Seven (7) measures are reported at year’s end: 4 • Water Debt Coverage • Sewer Debt Coverage • Reserve Level • Accounts Per FTE • Leak Detection Program • Injury Incident Rate • Enterprise Technology Services KPI’s Not on Target (6): FINANCIAL Overtime Percentage Target: Less than 100% of the budgeted overtime per quarter Year-to-date overtime expenditures amounted to $88,901 vs. the budgeted amount of $78,800. Second-quarter results were below target ($41,105 actuals vs. $42,500 budgeted); however, the year-to-date overtime variance was primarily driven by main breaks in the first quarter. Planned Recycled Water Maintenance Ratio in $ Target: 70% of all labor dollars spent on preventative maintenance per quarter. Year-to-date 61% of labor dollars were spent on preventative maintenance. 0 5 10 15 20 25 30 35 40 29 6 On Target Not on Target 29 of 35 Key Performance Indicators are On Target (83%) 5 Reasons target was not met: 1. Repair effluent pump #4 for the 927 PS at the Treatment Plant was repaired (amount: $69,517) 2. Repair effluent pump engine #1 for the 927 PS at the Treatment Plant (amount: $39,207) 3. Repair gear head for pump #5 for the 927 PS at the Treatment Plant (amount: $6,655) 4. Repair/replace surge tank sight glass at the 927 PS at the Treatment Plant (amount: $2,821) 5. Repaired 20" Recycled main on Olympic Parkway (amount $146,315.28) Direct Cost of Treatment per MGD Target: No more than $1050 per million gallons spent on wastewater. The year-to-date amount spent on wastewater treatment per million gallons was $1,295.00 vs. the target of $1,050. The target was not met because the Treatment Plant was off-line for planned CIP work (Force Main Air-Vac repairs and Filter Storage Tank recoating) in November and December 2020. The Treatment Plant is projected to go back online on March 1, 2021. INTERNAL BUSINESS PROCESSES Annual Recycled Water Site Inspections Target: 100% recycled water sites inspected annually (125 sites are scheduled for FY21) 68% of site inspections have been completed (85 of 125). The year- to-date target was 71%. Due to COVID–19 impacts, annual inspections for several customers were shifted to the third quarter. Sewer Overflow Rate (AWWA) Target & AWWA: Zero (0) overflows per quarter There were zero (0) overflows in the second quarter; however, the year- to-date target was not met due to one (1) sewer overflow in the first quarter caused by root intrusion on top of a manhole located upstream of MH-354-074. The collection system in this area was televised and flushed to assure all debris was located and removed. LEARNING AND GROWTH Safety Training Program Target: 24 hours per field employee annually. Due to COVID-19 and work shift rotations, staff completed 7.48 training 6 hours during the second quarter but fell short of the year-to-date target of 12 hours for the mid-year. The annual target for training is 24 hours for field employees. The total training hours, to date, is 10.66. Next Steps Staff will continue to execute the plan’s objectives and key performance indicators and track emerging trends. Staff will also begin strategic plan discussions late this summer for the development of new strategic objectives. Committee Reports – Slideshow The Strategic Plan results are presented to both the Finance & Administration, and the Engineering, Operations, & Water Resources Committee with a specific focus on the most relevant information for each Committee (see “Attachment B”). FISCAL IMPACT: Joe Beachem, Chief Financial Officer Informational item only; no fiscal impact. STRATEGIC GOAL: Strategic Plan and Performance Measure reporting is a critical element in providing performance reporting to the Board and staff. LEGAL IMPACT: None. ATTACHMENTS: Attachment A – Committee Action Report Attachment B – PowerPoint Presentation Attachment C – List of Strategic Objectives and KPI’s 7 ATTACHMENT A SUBJECT/PROJECT: FY21 MID-YEAR REPORT FOR THE DISTRICT’S FY19-22 STRATEGIC PLAN COMMITTEE ACTION: The Finance & Administration, and the Engineering, Operations & Water Resources Committees reviewed this item at meetings held on February 16 and 17, 2021, respectively. The Committees support presentation to the full Board for their consideration. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a committee approved item or modified to reflect any discussion or changes as directed from the committee prior to presentation to the full Board. FY21 Mid-Year Report Otay Water District FY19-22 Strategic Plan Attachment B Contoso Pharmaceuticals Employee growth/ Retention Financial Results and Growth Increase Customer Satisfaction/Engagement Improve Operational Efficiency Customer Financial Internal Business Processes Learning & Growth 2 88% 45 Objectives TRENDS ON TARGET/COMPLETED OVERALL TARGET 90% TOTAL OBJECTIVES 52 NOT ON TARGET OBJECTIVES ON HOLD 0% 0 Objectives 12% 6 Objectives 75% 85% 95% FY16 FY17 FY18 FY19 FY20 NOT STARTED 1 RESULT TARGET ACTIVE LEARNING AND GROWTH CUSTOMER FINANCIAL INTERNAL BUSINESS PROCESSES 51 45/51 = 88%6/51 = 12% 3 C01. Enhance and build awareness and engagement among the District’s customers and stakeholders and within the San Diego Region of the District’s strategies, policies, projects, programs, and legislative/regulatory issues Continue implementation of and enhance the District’s community and business outreach, media, and government relations programs *Ensure consistency of branding and representation across the District, using consistent logos, colors, messaging, communications tools, and other collaterals through enhancement of internal and external marketing materials Evaluate and enhance the District’s water conservation programs CUSTOMER | 4 ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED C02. Assess and enhance communications tools and increase online presence and social media exposure Assess communication tools (social media presence) *Objective placed on hold due to COVID-19 4 F01. Integrated resource planning and facility optimization Recycled water long-term business plan South District Potable Water Supply Alternatives to San Diego County Water Authority (SDCWA) Pipeline 4 Supply Interruption (catastrophic event) Treatment Plant long-term business plan (sewer portion) F02. Evaluation of key system alternatives and financial impact Conduct desalination (Rosarito) financial analysis In support of the Engineering Department, conduct recycled water and sewer business financial analysisFINANCIAL | 19 ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED 5 F03. Enhancement of business systems *Enterprise Resource Planning (ERP)/Customer Information System (CIS)/Customer Relationship Management (CRM) validation and replacement evaluation Evaluate, and if beneficial, implement cloud-based payroll service Evaluate enhancements to, or replacement, of the rate model program Implement Paperless Account Payable (AP) solution Re-evaluate prior payroll solutions and identify any new cloud-based payroll solutions Complete a sewer cost of service study and recommend a rate structure that will provide for more stable sewer revenues Evaluate the Capacity and New Water Supply Fees, including an update of applicable costs, and, if possible, recommend a fee structure that is more efficient and effective than the current structure *Objective has been placed on hold due to COVID-19. FINANCIAL | 19 (cont’d) ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED 6 F04. Enhancement of the Asset Management (AM) and Capital Improvement Programs (CIP) Enhancement of the framework for systematic development, validation, and implementation of new CIPs Enhancements of the AM Program Financial activity-based cost cross-training In support of the Engineering Department, enhance financial impact forecasting and analysis of future CIPs F05. Develop alternative Public Employees Retirement System (PERS) financing strategy to fund ahead of PERS schedule Optimize funding and liability schedule FINANCIAL | 19 (cont’d) F06. Negotiate and implement a new labor agreement and optimize employee benefit programs Negotiate and implement new labor agreement Review Deferred Compensation Program for reduced fees and streamlined approach and ensure offerings are fully utilized ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED 7 I01. Optimize meter activity operations Evaluation of Advanced Metering Infrastructure (AMI) technology Explore web-based options for meter reading and backflow test entry Optimize Global Positioning System (GPS) fleet assignment and routing operation I02. Enhance customer experience (collaboration between Customer Service and Communications) Customer electronic communication and outreach *Enterprise Resource Planning (ERP)/Customer Information System (CIS)/ Customer Relationship Management (CRM) validation and replacement evaluationINTERNAL BUSINESS PROCESSES | 27 ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED8 *Objective has been placed on hold due to COVID-19. I03. Evaluate and leverage the use of available Human Resources self-service and capital management technology solutions Evaluate on-boarding programs and implement, if determined necessary Implement Human Resource Information System (HRIS) in coordination with payroll conversion Pilot cloud-based human capital performance management system and implement, if determined necessary I04. Maintain a reliable, scalable, secure, and high-performing technology infrastructure to support current and future service needs Adopt National Institute of Standards and Technology (NIST) cyber security framework and enhance disaster recovery planning Advance business processes and operational efficiencies through effective implementation of information technology Create framework to evaluate cost efficiency of new technology services and cloud vs. on-premise selection Deploy next generation storage services and communication architecture INTERNAL BUSINESS PROCESSES | 27 (cont’d) ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED9 I05. Enhance SCADA system services via SCADA roadmap project Prioritize fourteen strategic project/initiatives, recently developed I06. Enhancement of enterprise geographic data Deploy ArcGIS Pro for 3D analysis Evaluate the use of Drone2Map technology for asset, field inspections, and condition assessment Migrate Geographic Information System (GIS) data structure from geometric network to utility dashboard Standardization of District asset data and collection processINTERNAL BUSINESS PROCESSES | 27 (cont’d) ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED 10 I07. Enhancement of maintenance and program standards Analyze electric energy-saving programs as they become available Evaluate the effectiveness of various methods to reduce nitrification events Evaluate the efficiency and effectiveness of the District’s valve exercise preventative maintenance including proposed recommendations Evaluate the impacts as a result of recent and upcoming regulatory changes including, but not limited to, Air Pollution Control District (APCD), State Water Resource Control Board (SWRCB), and Occupational Safety and Health Administration (OSHA), etc. Establish an access and defensible space vegetation mitigation program with maintenance schedules for District remote facilities, access roads, and off-road appurtenances I08. Enhancement of contracting and facility services Enhance Customer and Public Service security in public lobby areas Evaluate feasibility of incorporating electric and hybrid vehicles into District fleet Streamline contract and purchase order (contract) management and lifecycle INTERNAL BUSINESS PROCESSES | 27 (cont’d) ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED11 I09. Enhancement of the Confined Space Program Automate confined space regulatory and work forms (electronic conversion), add confined space data layer in the District’s enterprise Geographic Information System (GIS), and use data to electronically automate the District’s confined space inventory INTERNAL BUSINESS PROCESSES | 27 (cont’d) I10. Optimize District’s Hazardous Waste Operations and Emergency Response (HAZWOPER) Confined Space Rescue Team *Certify at Industry Level and under the Incident Command System, streamline chlorine gas and confined space rescue training, operations, response and areas of responsibility and convert to inventory lists and equipment logs to electronic form ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED 12 *Objective has been placed on hold due to COVID-19. L01. Enhance Leadership and employee training programs, and knowledge transfer process Continue development of leadership and District-wide training programs Review and enhance knowledge transfer process to ensure retention of District knowledge (FY22 Q1) LEARNING AND GROWTH | 2 ON TARGET NOT ON TARGET ON HOLD COMPLETED NOT STARTED13 50% 60% 70% 80% 90% 100% FY16 FY17 FY18 FY19 FY20 LEARNING AND GROWTH CUSTOMERTRENDS ON TARGET KEY PERFORMANCE INDICATORS FINANCIAL OVERALL TARGET INTERNAL BUSINESS PROCESSES 75% TOTAL KPIs 42 REPORTED QUARTERLY 35 REPORTED ANNUALLY 7 17% 6 KPIs NOT ON TARGET 83% 29 KPIs RESULT TARGET 6/35 = 17%29/35= 83% 14 ANSWER RATE Target: 97% average answer rate per quarter annually Calculation: Number of all calls answered/Number of all calls received 15 98.48%98.41% 96% 97% 97% 98% 98% 99% 99% Q1 Q2 Q3 Q4 TARGET Customer Service staff answering a customer call TECHNICAL QUALITY COMPLAINT (AWWA) (Customer Service) Target & AWWA: No more than 7.1 complaints per 1000 customer accounts annually 75th Percentile for population served between 100,001-500,000 (combined utilities) Calculation: Number of technical quality complaints per year/Number of active customer accounts per reporting period Water Operations staff at the 870-2 Pump Station 16 1.06 1.27 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 AWWA BENCHMARK TARGET POTABLE WATER COMPLIANCE RATE (AWWA) (Water Operations) Target & AWWA: 100% of all health-related drinking water standards per quarter annually 75th Percentile for population served between 100,001-500,000 (water) Calculation: Number of days the primary health regulations are met/Number of days in the reporting period 17 100%100% 90% 95% 100% Q1 Q2 Q3 Q4 TARGET & AWWA BENCHMARK CIP PROJECT EXPENDITURES VS. BUDGET Target: 95% of budget but not to exceed 100% annually Calculation: Actual Expenditures/Annual budget 18 25.0% 30.0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4870-2 Pump Station CONSTRUCTION CHANGE ORDER INCIDENCE Target: No more than 5% annually Calculation: Total cost of Change Orders (not including allowances)/Total original construction contract amount (not including allowances) Temporary Lower Otay Pump Station 19 TARGET 4.5% 4.3% 4% 4% 4% 4% 5% 5% 5% 5% Q1 Q2 Q3 Q4 O&M COST PER ACCOUNT Target: Less than $552.00 per account annually (based on Operating budget) Calculation: Total operations O&M costs/Number of accounts Meter Maintenance staff testing a large water meter to ensure accuracy TARGET 20 $127.00 $138.00 -$50 $50 $150 $250 $350 $450 $550 Q1 Q2 Q3 Q4 BILLING ACCURACY (Customer Service) Target: 99.8% billing accuracy per quarter annually Calculation: Number of correct bills/Total number of bills during the reporting period 21 99.99%99.94% 95% 96% 97% 98% 99% 100% 101% Q1 Q2 Q3 Q4 TARGET Customer Service staff reviewing integrity checks to ensure billing accuracy OVERTIME PERCENTAGE Target: Less than 100% of budgeted overtime per quarter annually (based on Operating budget and historical trends; FY20 Overtime budget is $185,500) Calculation: Actual overtime costs (including comp time)/Budgeted overtime costs Utility Maintenance staff conducting street repairs 22 132% 97% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 110% 120% 130% 140% 150% Q1 Q2 Q3 Q4 TARGET SEWER RATE RANKING Calculation: Ranking for the average monthly sewer bill Utility Maintenance staff holding a CCTV camera, which are used to inspect the District’s collection system Target: Bottom 50th percentile for the 28 sewer service providers in San Diego (Otay ranks 5th out of 28 sewer service providers) 23 5 0 5 10 15 20 25 YTD Reported in Q1 TARGET WATER RATE RANKING Calculation: Ranking for the average monthly water bill among CWA member agencies Target: Bottom 50th percentile for the 22 member agencies in San Diego (Otay ranks 5th out of 22 member agencies) Accounting staff preparing the budget book 24 5 0 5 10 15 20 25 YTD Reported in Q1 TARGET PERCENT OF CUSTOMERS PAYING BILLS ELECTRONICALLY Target: No less than 75% per quarter annually Calculation: Number of customers paying bills electronically/Total number of customers District customer making an online bill payment 25 82.03%82.50% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4 TARGET DISTRIBUTION SYSTEM LOSS Target: Less than 5%of unaccounted water annually 26 3.7% 3.2% 0% 1% 2% 3% 4% 5% 6% Q1 Q2 Q3 Q4 TARGET Calculation: Volume purchased from CWA, City of San Diego & RWCTP Production –volume sold to customers + volume used by District/Volume purchased from CWA, City of San Diego & RWCTP Production Regulatory site in Rancho San Diego. Site includes four reservoirs, two pump stations, and disinfection facilities. PLANNED POTABLE WATER MAINTENANCE RATIO IN $ Target: 66% of all labor costs spent on preventative maintenance per quarter annually Calculation: Total Planned Maintenance Cost/Total Maintenance Cost Utility Maintenance staff connecting a customer’s meter after pulling a new copper service 27 70.8% 66.0% 50% 60% 70% 80% Q1 Q2 Q3 Q4 TARGET PLANNED RECYCLED WATER MAINTENANCE RATIO IN $ Target: 70% of all labor costs spent on preventative maintenance per quarter annually Calculation: Total Planned Maintenance Cost/Total Maintenance Cost 28 63% 59% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4 TARGET PLANNED WASTEWATER MAINTENANCE RATIO IN $ Target: 77% of all labor costs spent on preventative maintenance per quarter annually Calculation: Total Planned Maintenance Cost/Total Maintenance Cost Aerial view of the Ralph W. Chapman Recycling Plant 29 94.8% 99.9% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4 TARGET DIRECT COST OF TREATMENT PER MGD Calculation: Total O&M costs directly attributable to sewer treatment/Total volume in MG for one quarter 30 $877.59 $2,586.84 $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 Q1 Q2 Q3 Q4 Target: No more than $1,050 per MGD spent on wastewater treatment annually Reclamation Plant staff taking samples of Mixed Liquor Suspended Solids (MLSS) to be weighed MARK-OUT ACCURACY Target: 100% mark-out accuracy per quarter annually Calculation: Number of mark-outs performed without an at-fault hit, which is damage to a District facility that results from a missing or erroneous mark-out/Total number of mark-outs Utility Locator staff conducting a mark-out 31 100.00%100.00% 95% 96% 97% 98% 99% 100% 101% Q1 Q2 Q3 Q4 TARGET PROJECT CLOSEOUT TIME Target: 45-day average annually Calculation: Number of days between NOSC and NOC for all construction projects within the quarter/ Number of construction projects within the quarter 32 7.5 7.5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Q1 Q2 Q3 Q4 TARGET Recycled Water Tank ANNUAL RECYCLED WATER SITE INSPECTIONS Target: 100% of recycled sites inspected annually (125 recycled water sites scheduled for FY21) Calculation: Cumulative percentage of recycled water sites inspected per quarter of those required by DEH 33 36.00% 68.00% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4 RECYCLED WATER SHUTDOWN TESTING Target: 90% of recycled site shutdown tests performed annually (55 recycled water sites scheduled for shutdown in FY21) Calculation: Cumulative percentage of recycled site shutdown tests performed per year compared to those scheduled 34 Recycled Water staff conducting a shutdown test at Veterans Elementary in Chula Vista 36% 62% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Q1 Q2 Q3 Q4 EASEMENT EVALUATION AND FIELD INSPECTION Target: 100% assigned easements, evaluated via desktop tools, and inspected annually (100 easements were assigned for FY21) 35 28.0% 57.0% 0% 20% 40% 60% 80% 100% 120% Q1 Q2 Q3 Q4 Calculation: Number of easements evaluated and inspected/Total easements assigned for the period Construction Inspection staff conducting an easement evaluation PERCENT OF PM’S COMPLETED –FLEET MAINTENANCE Target: 90% of scheduled preventative maintenance completed per quarter annually 36 100%100% 80% 85% 90% 95% 100% Q1 Q2 Q3 Q4 TARGET Calculation: Number of PM’s completed/Number of PM’s scheduled Fleet staff performing maintenance on an air relief valve for a vactor truck PERCENT OF PM’S COMPLETED –RECLAMATION PLANT Target: 90% of scheduled preventative maintenance completed each quarter annually Calculation: Number of PM’s completed/Number of PM’s scheduled 37 100%100% 80% 85% 90% 95% 100% Q1 Q2 Q3 Q4 TARGET Reclamation Plant staff moving chlorine gas containers after a delivery PERCENT OF PM’S COMPLETED –PUMP/ELECTRIC SECTION Target: 90% of scheduled preventative maintenance completed per quarter annually Calculation: Number of PM’s completed/Number of PM’s scheduled Motor Control Center at the 803-1 Pump Station 38 100%100% 80% 85% 90% 95% 100% Q1 Q2 Q3 Q4 TARGET SYSTEM VALVE EXERCISING PROGRAM Target: 3,080 valves exercised annually Calculation: Total number of valves exercised per year Utility Maintenance staff performing a valve exercise 39 1492 1068 0 200 400 600 800 1,000 1,200 1,400 1,600 Q1 Q2 Q3 Q4 TARGET POTABLE WATER DISTRIBUTION SYSTEM INTEGRITY (Water Operations) Target: No more than 16 leaks or breaks per 100 miles of distribution system annually AWWA: 16.1 leaks and breaks per 100 miles of distribution system (50th percentile Potable Water System Integrity: Leaks and Breaks for population served between 100,000-500,000) Calculation: [100 (annual total number of leaks + annual total number of breaks)] /total miles of distribution piping 805-2 Pump Station 40 4.27 3.70 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Q1 Q2 Q3 Q4 AWWA BENCHMARK TARGET RECYCLED WATER SYSTEM INTEGRITY Target: No more than 6.6 leaks or breaks per 100 miles of recycled distribution system annually Calculation: (100 x Number of leaks and breaks)/Number of miles of recycled distribution system 41 0.95 0.95 0 1 2 3 4 5 Q1 Q2 Q3 Q4 TARGET SEWER OVERFLOW RATE (AWWA) (Wastewater Operations) Target & AWWA: 0 overflows per quarter 75th Percentile for Sewer Overflow rate for population served between 0-50,000 Calculation: 100 x Total number of sewer overflows during the reporting period/Total miles of pipe in the sewage collection system Utility Maintenance staff operating and documenting the condition of the collection system 42 1.14 0.000 1 2 Q1 Q2 Q3 Q4 TARGET & AWWA BENCHMARK is 0 EMERGENCY FACILITY POWER TESTING Target: Test 100% of all facilities scheduled per quarter to have all emergency facilities tested annually (36 powered ready facilities) Calculation: Number of facilities tested/Total number of facilities Emergency standby genset at the Cottonwood Sewer Lift Station *Due to COVID-19, all site testing was halted in 4th quarter 43 100%100% 75% 80% 85% 90% 95% 100% 105% 110% Q1 Q2 Q3 Q4 ANNUAL TARGET POTABLE TANK INSPECTION AND CLEANING Target: 8 potable water storage tanks and/or reservoirs cleaned annually Calculation: Total number of tanks cleaned and inspected annually 1004-2 Reservoir Tank 44 0 6 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 ANNUAL TARGET MAIN FLUSHING AND HYDRANT MAINTENANCE Target: 215 mains flushed and fire hydrants maintained annually Calculation: Total number of mains flushed and fire hydrants maintained per year Utility Maintenance staff exercising a hydrant valve and flushing a hydrant at the same time 45 235 131 0 50 100 150 200 250 300 350 400 450 500 Q1 Q2 Q3 Q4 TARGET CRITICAL VALVE EXERCISING Target: 631 critical valves exercised annually Calculation: Total number of critical valves exercised in a year Utility Maintenance staff exercising a District valve 46 631 00 100 200 300 400 500 600 700 Q1 Q2 Q3 Q4 ANNUAL TARGET EMPLOYEE VOLUNTARY TURNOVER RATE (Organizational Development) Target: Less than 5% turnover annually Calculation: Number of voluntary terminations (not including retirements)/Average number of employees 2019 Employee Appreciation Luncheon 47 0%0%0% 1% 2% 3% 4% 5% 6% Q1 Q2 Q3 Q4 ANNUAL TARGET TRAINING HOURS PER EMPLOYEE (Organizational Development) Target: 12 hours per employee annually Calculation: Total qualified training hours for all employees/Average number of FTEs District staff attending the “Women in Water Symposium“ 48 2.71 4.54 0 1 2 3 4 5 6 7 8 9 10 Q1 Q2 Q3 Q4 TARGET SAFETY TRAINING PROGRAM Target: 24 hours per field employee annually Calculation: Total qualified safety training hours for field employees/Average number of field employees Utility Maintenance staff completing a service replacement 49 4.00 7.48 0 5 10 15 20 25 Q1 Q2 Q3 Q4 TARGET Questions? C01.2 Ensure consistency of branding and representation across the District, using consistent logos, colors, messaging, communications tools, and other collaterals through enhancement of internal and external marketing materials. 6/30/2022 ON HOLD C01.3 Evaluate and enhance the District’s water conservation programs.6/30/2022 ON TARGET F01.2 South District Potable Water Supply Alternatives to San Diego County Water Authority (SDCWA) Pipeline 4 Supply Interruption (catastrophic event).12/31/2021 ON TARGET F01.3 Treatment Plant long-term business plan (sewer portion).12/31/2021 ON TARGET F02.2 In support of the Engineering Department, conduct recycled water and sewer business financial analysis.6/30/2021 COMPLETED F03.2 Evaluate, and if beneficial, implement Cloud payroll service.6/30/2019 COMPLETED F03.3 Evaluate enhancements to, or replacement, of the rate model program.6/30/2021 ON HOLD F03.4 Implement Paperless Account Payable (AP) solution.6/30/2021 COMPLETED F03.5 Re-evaluate prior payroll solutions and identify any new cloud-based payroll solutions.12/31/2021 ON HOLD F03.6 Complete a sewer cost of service study and recommend a rate structure that will provide for more stable sewer revenues.12/31/2020 COMPLETED F03.7 Evaluate the Capacity and New Water Supply Fees, including an update of applicable costs, and, if possible, recommend a fee structure that is more efficient and effective than the current structure. 6/30/2020 COMPLETED F04.2 Enhancement of the AM Program.12/31/2021 ON TARGET F04.3 Financial activity-based cost cross-training.6/30/2022 ON TARGET F04.4 In support of the Engineering Department, enhance financial impact forecasting and analysis of future CIPs.12/31/2018 COMPLETED F06.2 Review Deferred Compensation Program for reduced fees and streamlined approach and ensure program offerings are fully utilized.3/31/2020 COMPLETED F03. Enhancement of business systems. F02. Evaluation of key system alternatives and financial impact. F01. Integrated resource planning and facility optimization. FINANCIAL F06. Negotiate and implement a new labor agreement and optimize employee benefit programs. F05. Develop alternative Public Employees Retirement System (PERS) financing strategy to fund ahead of PERS schedule. F04. Enhancement of the Asset Management (AM) and Capital Improvement Programs (CIP). I01 1 Evaluation of Advanced Metering Infrastructure (AMI) technology 6/30/2022 ON TARGET F06.1 Negotiate and implement new labor agreement.9/30/2019 COMPLETED F05.1 Optimize funding and liability schedule.6/30/2019 COMPLETED 9/30/2019 COMPLETED F01.1 Recycled water long-term business plan.12/31/2021 ON TARGET F02.1 Conduct desalination (Rosarito) financial analysis.6/30/2019 COMPLETED F03.1 Enterprise Resource Planning (ERP)/Customer Information System (CIS)/Customer Relationship Management (CRM) validation and replacement evaluation. 12/31/2021 ON HOLD F04.1 Enhancement of the framework for systematic development, validation, and implementation of new CIPs. Status CUSTOMER C01. Enhance and build awareness and engagement among the District’s customers and stakeholders and within the San Diego Region of the District’s strategies, policies, projects, programs, and legislative/regulatory issues. C02. Assess and enhance communications tools and increase online presence and social media exposure. Perspective Objectives Target Date C01.1 Continue implementation of and enhance the District’s community and business outreach, media, and government relations programs.6/30/2022 ON TARGET C02.1 Assess communications tools.6/30/2022 ON TARGET Strategy Attachment C I01.2 Explore web-based options for meter reading and backflow test entry.6/30/2019 COMPLETED I01.3 Optimize Global Positioning System (GPS) fleet assignment and routing operation.6/30/2020 COMPLETED I02.2 Enterprise Resource Planning (ERP)/Customer Information System (CIS)/Customer Relationship Management (CRM) validation and replacement evaluation. 6/30/2022 ON HOLD I03.2 Implement Human Resource Information System (HRIS) in coordination with payroll conversion.6/30/2020 COMPLETED I03.3 Pilot cloud-based human capital performance management system and implement, if determined necessary.6/30/2021 ON TARGET I04.2 Advance business processes and operational efficiencies through effective implementation of information technology.6/30/2019 COMPLETED I04.3 Create framework to evaluate cost efficiency of new technology services and cloud vs. on-premise selection.12/31/2019 COMPLETED I04.4 Deploy next generation storage services and communication architecture.6/30/2019 COMPLETED I06.2 Evaluate the use of Drone2Map technology for asset, field inspections, and condition assessment.12/31/2020 COMPLETED I06.3 Migrate Geographic Information System (GIS) data structure from geometric network to utility dashboard.6/30/2022 ON TARGET I06.4 Standardization of District asset data and collection process.6/30/2020 COMPLETED I07.2 Evaluate the effectiveness of various methods to reduce nitrification events.6/30/2022 ON TARGET I07.3 Evaluate the efficiency and effectiveness of the District’s valve exercise preventative maintenance including proposed recommendations.6/30/2021 ON TARGET I07.4 Evaluate the impacts as a result of recent and upcoming regulatory changes including, but not limited to, Air Pollution Control District (APCD), State Water Resource Control Board (SWRCB), Occupational Safety and Health Administration (OSHA), etc. 6/30/2021 ON TARGET I07. Enhancement of maintenance and program standards. INTERNAL BUSINESS PROCESSES I06. Enhancement of enterprise geographic data. I05. Enhance SCADA system services via SCADA roadmap project. I04. Maintain a reliable, scalable, secure, and high-performing technology infrastructure to support current and future service needs. I03. Evaluate and leverage the use of available Human Resources self- service and capital management technology solutions. I02. Enhance customer experience. (collaboration between Customer Service and Communications) I01. Optimize meter activity operations. I02.1 Customer electronic communication and outreach.6/30/2022 ON TARGET I01.1 Evaluation of Advanced Metering Infrastructure (AMI) technology.6/30/2022 ON TARGET COMPLETED I06.1 Deploy ArcGIS Pro for 3D analysis.6/30/2021 ON TARGET I05.1 Prioritize fourteen strategic project/initiatives, recently developed.6/30/2020 COMPLETED I04.1 Adopt National Institute of Standards and Technology (NIST) cyber security framework and enhance disaster recovery planning.12/31/2018 COMPLETED I03.1 Evaluate on-boarding programs and implement, if determined necessary.12/31/2020 I07.1 Analyze electric energy-saving programs as they become available.6/30/2022 ON TARGET I07.5 Establish an access and defensible space vegetation mitigation program with maintenance schedules for District remote facilities, access roads, and off-road appurtenances. 3/31/2020 COMPLETED I08.2 Evaluate feasibility of incorporating electric and hybrid vehicles into District fleet.6/30/2022 COMPLETED I08.3 Streamline contract and purchase order (contract) management and lifecycle.12/31/2019 COMPLETED L01.2 Review and enhance knowledge transfer process to ensure retention of District knowledge 6/30/2022 NOT STARTED LEARNING AND GROWTH L01. Enhance Leadership and employee training programs, and knowledge transfer process. I09. Enhancement of the Confined Space Program. I08. Enhancement of contracting and facility services. I10. Optimize District’s Hazardous Waste Operations and Emergency Response (HAZWOPER) and Confined Space Emergency Response Team. L01.1 Continue development of leadership and District-wide training programs.6/30/2022 ON TARGET I10.1 Certify at Industry State Level and under the Incident Command System, streamline chlorine gas and confined space rescue training, operations, response and areas of responsibility and convert to inventory lists and equipment logs to electronic form. 6/30/2023 ON HOLD I09.1 Automate confined space regulatory and work forms (electronic conversion), add confined space data layer in the District’s enterprise Geographic Information System (GIS) and use data to electronically automate the District’s confined space inventory. 6/30/2023 ON TARGET I08.1 Enhance Customer and Public Service security in public lobby areas.6/30/2020 COMPLETED