HomeMy WebLinkAbout1. Recycled Water - Plan Review, Inspection, and Approval Process RECYCLED WATER PLAN REVIEW,
INSPECTION & APPROVAL PROCESS
Page 1 of 4
INITIAL PLAN SUBMITTAL
Provide to the Otay Water District (District) the following items in order to initiate the
review, inspection and approval process:
1. Full electronic Plan Review submittal package to pscounter@otaywater.gov
containing the following:
One completed plan review checklist
Proposed 24x36 improvement plan
Reference grading plan
County of San Diego Department of Environmental Health (DEH)
Application
http://www.sandiegocounty.gov/content/sdc/deh/lwqd/lu_recycled_wat
er.html
2. District Application with an initial deposit of $5,295 (includes DEH initial
review fee of $2,295).
3. Adhere to the standard notes and signature blocks.
http://otaywater.gov/engineering-services/public-services/
Inspection deposit shall be determined during second plan review.
Meter quotes are issued upon developer’s request/application.
Title 22 Engineering Report fee shall be determined during plan review (or
may be requested by the County of San Diego Department of
Environmental Health).
PLAN REVIEW AND APPROVAL PROCESS:
1. District or our consultant (Consultant) receives complete first submittal packet
from the customer/developer/contractor/engineer.
2. District or Consultant will forward to DEH:
Electronic set of plans
DEH application
DEH plan check fee
3. District or Consultant will review plans according to the plan review checklist
and provide review comments back to the Landscape Architect via the checklist
and redlines on the plans.
RECYCLED WATER PLAN REVIEW,
INSPECTION & APPROVAL PROCESS
Page 2 of 4
4. DEH, following their review, will e-mail a “comments letter” directly to the
Landscape Architect. District or Consultant will also receive a copy of the
comments letter.
5. The Landscape Architect will incorporate the District and/or Consultant and DEH
comments for Second submittal to the District or Consultant, as well as the
updated plans and any previous review comments. In addition, the Landscape
Architect shall prepare and submit to the District or Consultant a written
response that addresses DEH comments.
6. District or Consultant will form an anticipated inspection cost and invoice the
responsible billing party (as indicated on the plan review application). A deposit
covering the estimated inspection costs is required prior to plan approval.
7. District or Consultant will request a final submittal to be provided via USB drive
for DEH approval once all comments have been incorporated and addressed.
8. After DEH electronic approval, Landscape Architect will be asked to print the
DEH approved plans on 24x36 and submit for approval by the District. District
will also approve the plan, then request the Landscape Architect to provide 2-
24x36 hard copies of the final approved plan.
9. Approval by DEH requires:
Landscape Architect response letter (see item 5).
One electronic final submittal by the District or Consultant (see item 7)
10. Approval by the District requires:
Check for inspection deposit made payable to “Otay Water District” (see item
6).
One bond copy or mylar (see item 8) approved by DEH.
11. Once approval has been granted, the Landscape Architect shall submit to the
District:
Two sets of approved drawings on 24x36 pink paper (bond duplicate of the
approved originals)
One set on USB Drive containing PDF files of the approved plan. Every sheet of
the plans shall have a corresponding PDF file.
If final plans are not submitted to the District or Consultant within six
months of initial submittal to the District, the Developer’s project
account will be closed and refunded back to the owner of the
parcel. The Landscape Architect will be required to resubmit per latest
District standards with a new review deposit for both District and DEH.
For plans that are delayed by other agencies, Landscape Architect shall
submit a letter of explanation to the District or Consultant prior to reaching
RECYCLED WATER PLAN REVIEW,
INSPECTION & APPROVAL PROCESS
Page 3 of 4
the six months review period. The letter should include the project status and
estimated schedule of the next submittal.
INSPECTION AND PROJECT ACCEPTANCE PROCESS:
1. District / Consultant inspector will coordinate a pre-construction meeting at the
request of the developer. Inspector will provide services to oversee the
completion of the approved work.
2. A written quote for any recycled water irrigation meters required will be issued
upon the developer’s request and should be paid for by the time of final steps
shown below.
3. Final steps for project acceptance include coordination with DEH:
District to coordinate the Payment from your deposit account to DEH
Shutdown Test Application Fees (a receipt confirmation can be sent to you)
Sufficient funds remaining in project account.
Pre-DEH Coverage Walk
Review Final AsBuilts
Obtain Controller Charts from final AsBuilts
Punch List Items
DEH Shutdown / Coverage Test
24 Hour Clock / 24-hour Irrigation shutdown
DISTRICT/Consultant Acceptance Recommendation
Final Walks at Project Site
Meter Set Coordination / Meter Unlock
DISTRICT/Consultant Project Close-Out
DISTRICT Project Acceptance & Close-Out
RECYCLED WATER PLAN REVIEW,
INSPECTION & APPROVAL PROCESS
Page 4 of 4
DISTRICT CONTACTS DISTRICT’S CONSULTANT
CONTACTS
Public Services Division
Otay Water District
2554 Sweetwater Springs Blvd
Spring Valley, CA 91978
Phone: (619) 670-2241
Fax: (619) 670-2754
Public Services Division
Permit Technicians
pscounter@otaywater.gov
Alex Bucher PE
Principal Engineer | Licensed in CA
West Yost
2173 Salk Ave, Suite 250, Carlsbad, CA
92008
P | D (858) 703-804
| O (760) 795-0365
https://www.westyost.com
abucher@westyost.com
thuynh@westyost.com