Loading...
HomeMy WebLinkAbout12-05-23 EO&WR Committee Packet 1 OTAY WATER DISTRICT ENGINEERING, OPERATIONS, & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Boardroom TUESDAY DECEMBER 5, 2023 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full Board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD’S JURISDICTION INCLUDING AN ITEM ON TODAY’S AGENDA. DISCUSSION ITEMS 3. AWARD A PROFESSIONAL SERVICES AGREEMENT FOR AS-NEEDED ASSET MANAGEMENT SERVICES TO RAFTELIS FINANCIAL CONSULTANTS, INC. IN AN AMOUNT NOT-TO-EXCEED $175,000. THE TOTAL AMOUNT OF THE CON- TRACT WILL NOT EXCEED $175,000 DURING FISCAL YEARS 2024, 2025, AND 2026 (ENDING JUNE 30, 2026) (KENNEDY) [5 MINUTES] 4. AWARD A PROFESSIONAL SERVICES CONTRACT TO VALLEY CONSTRUC- TION MANAGEMENT FOR CONSTRUCTION MANAGEMENT AND INSPECTION SUPPORT OF THE 870-2 RESERVOIR (3.4 MG) CONSTRUCTION AND 870-1 RESERVOIR LINER/COVER REPLACEMENT PROJECT IN AN AMOUNT NOT- TO-EXCEED $874,111.00 (CAMERON) [5 MINUTES] 5. FIRST QUARTER FISCAL YEAR 2024 CAPITAL IMPROVEMENT PROGRAM REPORT (CAMERON) [5 MINUTES] 6. ADJOURNMENT BOARD MEMBERS ATTENDING: Mark Robak, Chair Jose Lopez 2 All items appearing on this agenda, whether or not expressly listed for action, may be de- liberated and may be subject to action by the Board. The agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the agenda and all attachments are also available by contacting the District Secretary at (619) 670-2253. If you have any disability which would require accommodation in order to enable you to participate in this meeting, please call the District Secretary at 619-670-2253 at least 24 hours prior to the meeting. Certification of Posting I certify that on December 1, 2023, I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on December 1, 2023. /s/ Tita Ramos-Krogman, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2024 SUBMITTED BY: Bob Kennedy Engineering Manager PROJECT: P1210- 023000 DIV. NO. All APPROVED BY: Michael Long, Chief, Engineering Jose Martinez, General Manager SUBJECT: Award a Professional Services Contract for As-Needed Asset Management Services to Raftelis for Fiscal Years 2024, 2025, and 2026 GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional services agreement for As-Needed Asset Management Services and to authorize the General Manager to execute an agreement with Raftelis Financial Consultants, Inc. (Raftelis) in an amount not-to-exceed $175,000. The total amount of the contract will not exceed $175,000 during Fiscal Years 2024, 2025, and 2026 (ending June 30, 2026). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional services agreement for As-Needed Asset Management Services with Raftelis in an amount not-to-exceed $175,000. The total amount of the contract will not exceed $175,000 during Fiscal Years 2024, 2025, and 2026. AGENDA ITEM 3 2 ANALYSIS: The District will require the services of a professional asset management consultant on an as-needed basis in support of the District’s Asset Management Plan (AMP)for Fiscal Years 2024, 2025, and 2026. The District staff will identify tasks and request cost proposals from the consultant during the contract period. The consultant will prepare a detailed scope of work, schedule, and fee for each task order. Upon written task order authorization from the District, the consultant shall then proceed with the project, as described in the scope of work. The possible tasks that the consultants will be working on for Fiscal Years 2024, 2025, and 2026, and estimated costs, are listed below: DESCRIPTION COST ESTIMATE Update the AMP ensuring that it is consistent with industry best practices and will complete the tasks to support the improvement of the AMP. $15,000 Assist in the update of the AMP vision, mission, objectives, implementation plan, and outcomes including schedule and costs of a replacement and renewal program. $15,000 Review and recommend appropriate validation measures for the inventory of facilities and closing any data gaps. $20,000 Develop and prepare recommendations for future condition assessments for the District’s assets including recommend condition assessment methods that can be used and how the data will be incorporated into the information management system. $20,000 Develop and manage the implementation of a replacement and renewal Capital Improvement Program Plan for existing assets providing a best management framework. $25,000 Develop a list of facilities that need to be either replaced or rehabilitated with their respective due date and budget costs. $30,000 TOTAL: $125,000 Staff believes that a $175,000 cap on the As-Needed Asset Management Services agreement is adequate, while still providing a buffer for any unforeseen tasks. The As-Needed Asset Management Services contract does not commit the District to any expenditure until a task order is approved to perform the work. The District does not guarantee work to the consultant, 3 nor does the District guarantee to the consultant that it will expend all the funds authorized by the agreement for professional services. The District solicited Asset Management Services by placing an advertisement on the Otay Water District’s website and using Periscope S2G, the District’s online bid solicitation website, on June 13, 2023. Additional direct solicitation to 22 engineering consultant firms was also performed by staff. Six (6) firms submitted a Letter of Interest and a Statement of Qualifications. The Request for Proposal (RFP) was sent to all six (6) firms resulting in one (1) proposal received on June 29, 2023 from Raftelis. Firms that submitted Letters of Interest (LOI), but did not propose, were Arup, Dexter Wilson, Horrocks, Smart IT Pros, Inc., and West Yost. Outreach was performed to receive feedback from the consultants that did not propose. Reasons for not proposing include: 1) being selective on potential projects, 2) did not feel well positioned to receive the contract, and 3) did not feel the level of service would satisfy the District’s needs. In accordance with the District’s Policy 21, staff evaluated and scored Raftelis’ written proposal. Raftelis received high scores based on their experience, understanding of the scope of work, proposed method to accomplish the work, and their composite hourly rate. Raftelis has provided similar services to other local agencies. A summary of the complete evaluation is shown in Attachment B. Raftelis submitted a Company Background Questionnaire, as required by the RFP, and staff did not find any significant issues. In addition, staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The funds for this contract will be expended on a variety of tasks, as previously noted above. This contract is for as-needed professional services based on the District's need and schedule, and expenditures will not be made until individual main tasks or task orders under the as-needed portion of this agreement are authorized by District staff. 4 Based on a review of the financial budget, the Project Manager anticipates that the budgets will be sufficient to support the professional as-needed consulting services required for the tasks noted above. The Finance Department has determined that the funds to cover this contract will be available as budgeted for these projects. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." GRANTS/LOANS: Not applicable. LEGAL IMPACT: None. BS:BK/jf https://otaywater365.sharepoint.com/sites/engoperating/Shared Documents/As-Needed Services/Geotechnical/FY 2024- 2026/Staff Report/BD_01-03-2024_Staff Report_Award of As-Needed Geotechnical Engineering Services (BS-BK).docx Attachments: Attachment A – Committee Action Attachment B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: P1210-023000 Award a Professional Services Contract for As-Needed Asset Management Services to Raftelis for Fiscal Years 2024, 2025, and 2026 COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on December 5, 2023. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed by the Committee prior to presentation to the full Board. Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Proposed Rates* Consultant's Commitment to DBE TOTAL SCORE 30 25 30 85 85 15 Y/N 100 Poor/Good/ Excellent Andrew Jackson 26 22 24 72 Bernardo Separa 25 20 24 69 Charles Mederos 27 23 26 76 Marciano Santos 25 20 25 70 Alexander Schultz 23 23 27 73 *Note: Review Panel does not see or consider proposed fee when scoring other categories. The proposed fee is scored by Engineering staff, who is not on the Review Panel. REFERENCES 15 Excellent ATTACHMENT BSUMMARY OF PROPOSAL RANKINGS As-Needed Asset Management Services Raftelis 87 WRITTEN MAXIMUM POINTS N72 C:\OneDrive Work\Otay Water District\ENG OPERATING - Documents\As-Needed Services\Asset Management Plan\FY 2024 - FY 2026\Selection Process\Summary of Proposal Rankings-Asset Management.xls STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2024 SUBMITTED BY: Kevin Cameron Engineering Manager PROJECT: P2228-001103 P2563-001103 DIV. NO.2 APPROVED BY: Michael Long, Chief, Engineering Jose Martinez, General Manager SUBJECT: Award of a Professional Services Contract to Valley Construction Management for Construction Management and Inspection Support of the 870-2 Reservoir (3.4 MG) Construction and 870-1 Reservoir Liner/Cover Replacement project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional services contract to Valley Construction Management (Valley CM) and authorize the General Manager to execute an agreement with Valley CM for Construction Management and Inspection Support of the 870-2 Reservoir (3.4 MG) Construction and 870-1 Reservoir Liner/Cover Replacement project (Project) in an amount not-to-exceed $874,111.00 (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional engineering services contract with Valley CM for Construction Management and Inspection Support of the Project in an amount not-to-exceed $874,111. AGENDA ITEM 4 2 ANALYSIS: The 870 pressure zone (PZ) serves the southern portion of the District known as Otay Mesa. Storage in the 870 zone is provided by the 870-1 Reservoir, an 11 million gallon (MG) earthen embankment reservoir. The reservoir’s floating liner and cover have reached the end of their useful life and are scheduled for replacement, which requires the reservoir to be taken offline. Since this reservoir is the sole reservoir serving the 870 PZ, a redundant reservoir is needed at the same site to provide storage while the existing reservoir is offline for a duration of approximately six months. The Project includes construction of a new 3.4 MG pre-stressed concrete reservoir (870-2) and associated appurtenances. Upon completion of the new reservoir, the 870-1 reservoir will be taken out of service to replace the hypalon liner and cover. In addition, the inlet pipe will be replaced to remove a highpoint in the alignment which would restrict the flow between the two reservoirs. Wood Rodgers, Inc. was selected to provide the design for the prestressed concrete tank and pipeline realignment. The design for the 870-1 reservoir cover and liner replacement will done with in- house staff. The design is approaching 90%, and it is anticipated to go out to bid in the summer of 2024. The District will require the services of a construction management and inspection firm for the Project to provide pre-construction review, construction management, resident engineering, and inspection services including construction contract administration, and project start-up/commissioning for the delivery of the Project. The District solicited construction management and inspection services by placing an advertisement on the Otay Water District’s website and using Periscope S2G, the District’s online bid solicitation website on August 23, 2023. The advertisement was also placed in the Daily Transcript. Five (5) firms submitted a letter of interest and a Statement of Qualifications. The Request for Proposal (RFP) was sent to all five (5) firms resulting in two (2) proposals received on October 10, 2023. They are as follows: 1. CDM Smith (Irvine, CA) 2. Valley Construction Management (San Diego, CA) Firms that submitted Letters of Interest but did not propose were Butier, Capo Projects Group, Arcadis. All three stated that they did not have the resources to dedicate to this large project. 3 In accordance with the District’s Policy 21, staff evaluated and scored all written proposals and interviewed the two (2) firms. Valley CM received the highest scores based on their experience, understanding of the scope of work, proposed method to accomplish the work, and their composite hourly rate. Valley CM has provided similar services to other local agencies and are readily available to provide the services required. A summary of the complete evaluation is shown in Attachment B. Valley CM’s Cost Proposal for the scope outlined in the RFP was $866,111. Valley CM’s proposal offered a Time Lapse Camera line item which was not included in the RFP scope. Staff agreed this added value to the project and added $7,500 to Valley CM’s overall cost for a total of $874,111. Valley CM submitted the Company Background Questionnaire as required by the RFP and staff did not find any significant issues. In addition, staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. Valley CM has worked with the District on a number of projects including providing construction manager services on the District’s 2.0 MG 1296-3 Reservoir which was the first TYPE III prestressed concrete tank in southern California. The District has found Valley CM’s work in support of construction to be excellent. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The Fiscal Year 2024 budget for CIP P2228 is $11,000,000. Total expenditures, plus outstanding commitments and forecast, including this contract, are $1,463,708. See Attachment B-1 for budget detail. The Fiscal Year 2024 budget for CIP P2563 is $3,500,000. Total expenditures, plus outstanding commitments and forecast, including this contract, are $359,966. See Attachment B-2 for budget detail. Based on a review of both financial budgets, the Project Manager anticipates that the budget for CIP P2228 and P2563 is sufficient to support the Project. The Finance Department has determined that, under the current rate model for CIP P2228, 31% of the funding is available from the Expansion Fund and 69% of the funding is available from the Betterment ID 22 Fund, and for CIP P2563, 30% of the funding is available from the Replacement Fund and 70% of the funding is available from the Betterment ID 22 Fund. 4 GRANTS/LOANS: Engineering staff researched and explored grants and loans and found none available for this Project. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." LEGAL IMPACT: None. KC/MJL:jf C:\OneDrive\Otay Water District\ENG CIP - Documents\P2228 870-2 Reservoir 3.4 MG\Staff Reports\BD 01-03- 24 870-2 Reservoir CM and Inspection.docx Attachments: Attachment A – Committee Action Attachment B-1 – CIP P2228 Budget Detail Attachment B-2 – CIP P2563 Budget Detail Exhibit A – Location Map Exhibit B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: P2228-001103 P2563-001103 Award of a Professional Services Contract to Valley Construction Management for Construction Management and Inspection Support of the 870-2 Reservoir (3.4 MG) Construction and 870-1 Reservoir Liner/Cover Replacement project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on December 5, 2023. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B-1 – CIP P2228 Budget Detail SUBJECT/PROJECT: P2228-001103 P2563-001103 Award of a Professional Services Contract to Valley Construction Management for Construction Management and Inspection Support of the 870-2 Reservoir (3.4 MG) Construction and 870-1 Reservoir Liner/Cover Replacement project 11/13/2023 Budget 11,000,000 Planning Consultant Contracts 46,936 5,763 41,173 46,936 HELIX ENVIRONMENTAL 66,000 66,000 - 66,000 CAROLLO ENGINEERS INC 21,984 21,984 - 21,984 WATER SYSTEMS CONSULTING INC Standard Salaries 86,826 86,826 - 86,826 Total Planning 221,746 180,573 41,173 221,746 Design 001102Consultant Contracts 55,282 55,282 - 55,282 ATLAS TECHNICAL CONSULTANT LLC38,926 25,433 13,493 38,926 BSE ENGINEERING INC9,465 - 9,465 9,465 JDH CORROSION CONSULTANTS INC306,515 291,257 15,259 306,515 WOOD RODGERS INCStandard Salaries 98,627 98,627 - 98,627 Total Design 508,815 470,598 38,217 508,815 Construction Consultant Contracts 4,950 - 4,950 4,950 ARCADIS US INC 23,680 - 23,680 23,680 WOOD RODGERS INC 700,000 - 700,000 700,000 VALLEY CONSTRUCTION MANAGEMENT35 35 - 35 DAILY JOURNAL CORPORATIONStandard Salaries 4,483 4,483 - 4,483 Total Construction 733,148 4,518 728,630 733,148 Grand Total 1,463,708 655,689 808,019 1,463,708 Vendor/Comments Otay Water District P2228-Res 870-2 Reservoir 3.4 MG Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost ATTACHMENT B-2 – CIP P2563 Budget Detail SUBJECT/PROJECT: P2228-001103 P2563-001103 Award of a Professional Services Contract to Valley Construction Management for Construction Management and Inspection Support of the 870-2 Reservoir (3.4 MG) Construction and 870-1 Reservoir Liner/Cover Replacement project 11/13/2023 Budget 3,500,000 Planning Consultant Contracts 2,377 2,377 - 2,377 LAYFIELD USA CORPORATION4,722 4,722 - 4,722 CONTERRA INC35,400 30,408 4,992 35,400 HILTS CONSULTING GROUP INCStandard Salaries 31,100 31,100 - 31,100 Total Planning 73,599 68,607 4,992 73,599 Design 001102Consultant Contracts 68,840 13,080 55,760 68,840 WOOD RODGERS INC53 35 18 53 DAILY JOURNAL CORPORATION Standard Salaries 36,905 36,905 - 36,905 Total Design 105,798 50,020 55,778 105,798 Construction Consultant Contracts 2,640 2,640 - 2,640 ALYSON CONSULTING 35 35 - 35 DAILY JOURNAL CORPORATION 174,111 174,111 174,111 VALLEY CM Standard Salaries 3,782 3,782 - 3,782 Total Construction 180,569 6,458 174,111 180,569 Grand Total 359,966 125,085 234,881 359,966 Vendor/Comments Otay Water District P2563-870-1 Reservoir Cover/Liner Replacement Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost OTAY WATER DISTRICT870-2 RESERVOIR (3.4 MG) & 870-1 RESERVOIRCOVER/LINER REPLACEMENTLOCATION MAP EXHIBIT A CIP P2228 & P2563F C:\OneDrive\Otay Water District\ENG CIP - Documents\P2228 870-2 Reservoir 3.4 MG\Graphics\Exhibits-Figures 0 800400 Feet EAST MESADETENTIONFACILITY 571-1RESERVOIR A L T A R O A D OTAY WATER DISTRICT BOUNDARY PROJECT SITE FUTURE 870-2RESERVOIR EXISTING 870-1RESERVOIR !\ VICINITY MAP PROJECT SITE DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ÃÅ54 ÃÅ125 ÃÅ94 ÃÅ905 §¨¦805 F Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Consultant's Commitment to DBE Additional Creativity and Insight Strength of Project Manager Presentation and Communication Skills Responses to Questions INDIVIDUAL TOTAL - ORAL AVERAGE TOTAL ORAL TOTAL SCORE WITHOUT FEE Proposed Rates*TOTAL SCORE 30 25 30 85 85 Y/N 15 15 10 10 50 50 135 15 150 Poor/Good/ Excellent Kevin Cameron 25 23 26 74 13 13 8 8 42 Brandon DiPietro 26 22 26 74 12 14 8 8 42 J.Luengas/L. Santos 24 22 22 68 11 12 7 7 37 Jeff Marchioro 25 22 25 72 12 13 8 8 41 Marciano Santos 25 21 27 73 13 12 9 9 43 Kevin Cameron 27 24 27 78 13 14 9 8 44 Brandon DiPietro 27 25 27 79 14 14 9 10 47 J.Luengas/L. Santos 23 24 28 75 14 14 9 9 46 Jeff Marchioro 26 22 24 72 13 14 8 9 44 Marciano Santos 28 24 27 79 14 13 9 9 45 Notes:Selected Firm Consultant Cost Score 1. Review Panel does not see or consider rates when scoring other categories. Rates are scored by a staff member who is not on the Review Panel.CDM Smith $869,420 1Valley CM $866,611 15 REFERENCES 15 ORAL 77 Y 45 1 EXHIBIT B SUMMARY OF PROPOSAL RANKINGS Construction Management and Inspection Services for 870-2 Reservoir & 870-1 Cover/Liner Replacement WRITTEN Valley Construction Management Excellent137 MAXIMUM POINTS 113 122 RATES SCORING CHART CDM Smith 72 41 114Y STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2024 SUBMITTED BY: Kevin Cameron Engineering Manager PROJECT: Various DIV. NO. ALL APPROVED BY: Michael J. Long, Chief of Engineering Jose Martinez, General Manager SUBJECT: Informational Item – First Quarter Fiscal Year 2024 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all Capital Improvement Program (CIP) expenditures and to highlight significant issues, progress, and milestones on major active construction projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer reimbursement projects. AGENDA ITEM 5 2 The First Quarter Fiscal Year 2024 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $15.411 million. Expenditures through the First Quarter totaled approximately $1.565 million. Approximately 10% of the Fiscal Year 2024 expenditure budget was spent (see Attachment B). FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: This Program supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." LEGAL IMPACT: None. KC/MJL:jf C:\OneDrive\Otay Water District\ENG CIP - Documents\X-CIP Quarterly Reports\CIP Qtr Reports\FY 2024\Q1\Staff Report\BD 01-04-2024 Staff Report First Quarter FY 2024 CIP Update.docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2024 First Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – First Quarter Fiscal Year 2024 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on December 5, 2023. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed by the Committee prior to presentation to the full Board. FISCAL YEAR 2024 1ST QUARTER REPORT (Expenditures through 9/30/23) ($000) ATTACHMENT B 2024 09/30/23 CIP No.Description Project Manager FY 2024 Budget Expenses Balance Expense to Budget % Overall Budget Expenses Balance Expense to Budget %Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Marchioro 100$ 1$ 99$ 1%7,300$ 1,114$ 6,186$ 15% The construction schedule for this project was pushed out to the FY 2028-2029 timeframe as part of the FY 2024 budget cycle. Subsequently, other design phase efforts have been prioritized. P2228 Res - 870-2 Reservoir 3.4 MG Marchioro 200 79 121 40%11,000 617 10,383 6% 60% design completed Q1 FY 2024. Final design and public advertisement for construction bid is scheduled for Q4 FY 2024. Expenditures on track. P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Beppler 35 - 35 0%1,000 65 935 7%Related to P2553. See P2553 for comments. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 1 - 1 0%35,700 3,823 31,877 11% If the project moves forward, the District's project has completed the environmental review as required by CEQA and NEPA. The Presidential permit has expired and a new permit would be required. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 50 12 38 24%900 254 646 28% Environmental report is complete and accepted; discussions on necessary permits from the City of Chula Vista and County of SD are in progress. Demolition expected to be performed in Fall 2024.P2485 SCADA - Infrastructure and Communications Replacement Kerr 35 - 35 0%2,550 2,503 47 98%Project closed 6/30/2023. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/Osage Marchioro 5 - 5 0%1,000 - 1,000 0%No expenditures anticipated in FY 2024. P2521 Large Meter Vault Upgrade Program Carey 40 - 40 0%710 476 234 67%Work will be done in Q3 & Q4 FY 2024. P2553 Heritage Road Bridge Replacement and Utility Relocation Santos 200 - 200 0%5,050 279 4,771 6%Sent final design responses and plans provided to City of Chula Vista. P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0%720 - 720 0%No expenditures anticipated in FY 2024. P2608 PL - 8-inch, 850 Zone, Coronado Avenue, Chestnut/Apple Santos 30 - 30 0%1,820 403 1,417 22%Preliminary design has been initiated. P2611 Quarry Road Bridge Replacement and Utility Relocation Beppler 1 - 1 0%3,600 124 3,476 3%This is a County of San Diego driven project and the County has put this project on hold. P2612 PL - 12-inch, 711 Zone, Paso de Luz/Telegraph Canyon Road Beppler 500 62 438 12%1,250 814 436 65% Project is substantially complete and project warranty period began in Q1 FY 2024. P2614 485-1 Reservoir Interior/Exterior Coating Santos 375 234 141 62%1,375 744 631 54%Construction in progress. P2617 Lobby Security Enhancements Payne 1 - 1 0%225 179 46 80%Pending a needs assessment with Safety & Security and IT. P2623 Central Area to Otay Mesa Interconnection Pipelines Combination Air/Vacuum Valve Replacements Marchioro 5 - 5 0%600 219 381 37%No expenditures anticipated in FY 2024. P2630 624-3 Reservoir Automation of Chemical Feed System Beppler 15 - 15 0%675 16 659 2%No activity in Q1 FY 2024; project on hold until additional resources are made available. P2638 Buildings and Grounds Refurbishments Payne 175 14 161 8%745 270 475 36%FY 2025: Admin Phase II upgrade. P2639 Vista Diego Hydropneumatic Pump Station Replacement Marchioro 175 57 118 33%3,700 544 3,156 15% 60% design completed Q1 FY 2024. Final design and public advertisement for construction bid is scheduled for Q2 FY 2025. Expenditures on track. P2642 Rancho Jamul Pump Station Replacement Marchioro 25 - 25 0%2,500 142 2,358 6% Project coordinated with 1655-1 Reservoir (P2040). See P2040 for updates. P2646 North District Area Cathodic Protection Improvements Marchioro 15 - 15 0%1,200 1 1,199 0% Anode replacement along Willow Glen Drive (PL100) scheduled to be completed by District in-house forces Q3 FY 2024. Expenditures on track. P2647 Central Area Cathodic Protection Improvements Marchioro 75 74 1 99%2,000 214 1,786 11%Anode replacements completed along Hunte Parkway (PL215) Q1 FY 2024. Expenditures on track. P2649 HVAC Equipment Purchase Payne 43 18 25 42%279 123 156 44% FY 2024 Q2: Admin AC4-Finance on order; FY 2025: RTU7-Lunchroom & RTU9-Computer Training; FY 2026: RTU4-Board & RTU8-Training. P2652 520 to 640 Pressure Zone Conversion Marchioro 5 - 5 0%250 37 213 15% Project is on hold until PDR for P2195 & P2196 is completed. P2654 Heritage Road Interconnection Improvements Marchioro 10 - 10 0%200 40 160 20%No expenditures anticipated in FY 2024. Project on hold pending coordination with City of San Diego. P2658 832-2 Pump Station Modifications Marchioro 5 - 5 0%600 10 590 2%No expenditures anticipated in FY 2024. P2659 District Boardroom Improvements Kerr 50 - 50 0%300 185 115 62% Staff is working with the integrator on a few modern technology enhancements. P2663 Potable Water Pressure Vessel Program Marchioro 100 7 93 7%3,200 342 2,858 11% Design to replace 711 Pump Station surge tank and Rolling Hills Hydropneumatic tank in progress. Completion of Rolling Hills Hydro Tank Replacement scheduled for Q2 FY 2025. Expenditures on track. P2664 Otay Mesa Dual Piping Modification Program Beppler 25 - 25 0%350 36 314 10% Alternatives have been identified; coordination with Finance is required to consider financial implications of potential changes. P2665 PL - 12-inch Pipeline Replacement, 870 Zone, Cactus Road Marchioro 5 - 5 0%200 - 200 0% No expenditures anticipated in FY 2024. Completion of construction scheduled beyond six-year planning budget. P2666 Low Head and High Head Pump Stations Demolition Marchioro 5 - 5 0%750 - 750 0% No expenditures anticipated in FY 2024. Completion of construction scheduled beyond six-year planning budget. P2674 System Pressure Reducing Program Beppler 10 - 10 0%100 16 84 16% Updates to hydraulic modeling of hydropneumatic zones has corrected several potential high pressure areas. Additional areas will be researched as time and budget allow. P2676 980-2 PS Motors and Motor Control Center Replacements Marchioro 100 1 99 1%3,150 645 2,505 20% Expenditures will be accelerated in FY 2024 since Pump #2 motor will be replaced rather than rebuilt. P2683 Pump Station Safety, Monitoring, and Automation Improvements Marchioro 40 - 40 0%500 16 484 3%Completion of construction scheduled FY 2029. P2684 Zero Emission Vehicles and Charging Infrastructure Santos 175 25 150 14%2,000 45 1,955 2%Issued task order to initiate EV station master plan. P2688 Standby Power Renovations - Potable Water Rahders 150 - 150 0%1,500 11 1,489 1%Anticipate $51.9K to be expensed in Q2 FY 2024. P2693 PL – 12 & 16-inch, 1296 Zone, Jefferson Rd., Lyons Valley Rd to Jamul Dr.Santos 20 - 20 0%3,950 - 3,950 0% Draft RFP in 2nd quarter. No expeditures expected in the 2nd quarter FY 2024. FISCAL YEAR-TO-DATE, 09/30/23 LIFE-TO-DATE, 09/30/23 https://otaywater365.sharepoint.com/sites/engcip/Shared Documents/X-CIP Quarterly Reports/CIP Qtr Reports/FY 2024/Q1/Expenditures/FY2024 1st Qtr Exp - working copy.xlsx Page 1 of 4 11/20/2023 FISCAL YEAR 2024 1ST QUARTER REPORT (Expenditures through 9/30/23) ($000) ATTACHMENT B 2024 09/30/23 CIP No.Description Project Manager FY 2024 Budget Expenses Balance Expense to Budget % Overall Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/23 LIFE-TO-DATE, 09/30/23 P2694 Operations Replacement Communication Radios Rahders 75 - 75 0%155 - 155 0%No activity Q1 FY 2024. P2696 1296-1 Reservoir Interior/Exterior Coating Santos - - - 0%1,400 - 1,400 0%No expected expenditures in FY 2024. P2698 Improve Fire Sprinkler Protection System at RWCWRF (P)Payne 5 - 5 0%75 - 75 0%FY 2024 Engineering; FY 2025 install. R2117 RWCWRF Disinfection System Improvements Beppler 200 14 186 7%4,275 664 3,611 16%Construction contract awarded in Q1 FY 2024; submittal review to begin in Q2 FY 2024. R2146 Recycled Pipeline Cathodic Protection Improvements Marchioro 35 3 32 9%1,200 838 362 70% Construction completed Q1 FY 2024. End of one year warranty period scheduled for Q1 FY 2025. R2153 Recycled Water Pressure Vessel Program Marchioro 5 - 5 0%1,000 29 971 3%No expenditures anticipated in FY 2024. R2165 Recycled HVAC Equipment Purchase Payne 1 - 1 0%75 - 75 0%FY 2024 Engineering; FY 2025 install. R2166 RWCWRF Effluent Pump Station Compressors Marchioro 60 - 60 0%175 - 175 0% District staff have been informally soliciting quotes for replacement compressors based on what vendors have to offer for this application. R2168 Improve Fire Sprinkler Protection System at RWCWRF (R)Payne 5 - 5 0%75 - 75 0%FY 2024 engineering; FY 2025 install. s2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 200 - 200 0%3,550 1,355 2,195 38%County invoicing usually received in Q4 FY 2024. S2043 RWCWRF Sludge Handling System Beppler 1 - 1 0%1,500 129 1,371 9%No activities in Q1 FY 2024; limited planning work anticipated in FY 2024. S2061 RWCWRF Aeration Controls Consolidation & Optimization Upgrades (S)Beppler 20 - 20 0%220 78 142 35% Project implementation is complete; operation being monitored to ensure system is acceptable; should be able to close CIP at end of FY 2024. S2071 San Diego Metro Wastewater Capital Improvements Kennedy 80 16 64 20%8,300 270 8,030 3% Annual City of San Diego invoicing covers this project. No District involvement in design and construction. S2081 Improve Fire Sprinkler Protection System at RWCWRF (S)Payne 5 - 5 0%75 - 75 0%FY 2024 Engineering; FY 2025 install. Total Capital Facility Projects Total:3,493 617 2,876 18%125,024 17,670 107,354 14% REPLACEMENT/RENEWAL PROJECTS P2058 PL - 20-Inch, 1296 Zone, Proctor Valley Road from Melody Road to Highway 94 Santos 120 21 99 18%2,750 62 2,688 2% PDR in progress; easement aquisition will be needed. Appraisal services RFP in process. P2171 PL - 20-Inch, 1296 Zone, Proctor Valley Road from Pioneer Way to Melody Road Santos 160 17 143 11%3,600 61 3,539 2%PDR in progress; easement aquisition has been initiated. P2195 PL - 24 - Inch, 640 Zone, Campo Road - Regulatory Site/Millar Ranch Santos 20 - 20 0%9,500 17 9,483 0%Planning phase has been initiated. P2196 PL - 24 - Inch, 640 Zone, Millar Ranch Road to 832-1 Pump Station Santos 20 - 20 0%5,100 17 5,083 0%Planning phase has been initiated. P2533 1200-1 Reservoir Interior & Exterior Coating Santos 5 - 5 0%1,275 1,171 104 92%Project is in warranty period. P2543 850-1 Reservoir Interior/Exterior Coating Santos 5 - 5 0%1,270 1,087 183 86%Project is in warranty period. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 50 6 44 12%3,500 123 3,377 4% Project will be designed as part of the larger 870-2 Reservoir Project (CIP P2228). See P2228 for updates.P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Santos 325 337 (12) 104%1,375 1,299 76 94%Project is in warranty period. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 GPM Marchioro 100 - 100 0%8,000 52 7,948 1%Design of a cost savings solution to restore Pump #3 original capacity in progress. P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Santos 10 - 10 0%1,050 921 129 88%Project is in warranty period. P2594 Large Meter Replacement Carey 25 16 9 64%815 566 249 69%On track. P2605 458/340 PRS Replacement, 1571 Melrose Ave Beppler 5 - 5 0%750 669 81 89% Project warranty completed in Q4 FY 2023. Project can be closed at end of FY 2024. P2609 PL - 8-inch, 1004 Zone, Eucalyptus Street, Coronado/Date/La Mesa Beppler 20 - 20 0%2,100 1,132 968 54%Phase I of project accepted by the District FY 2021; Phase II starts after 3 year paving moratorium. P2610 Valve Replacement Program - Phase 1 Mederos 325 - 325 0%2,325 1,825 500 78% CIP is complete and within budget. Total expenditures were $1.8M. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Santos 250 17 233 7%2,600 88 2,512 3%PDR in progress. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Drive/Vista Sierra Drive Beppler 600 16 584 3%4,200 1,642 2,558 39% Phase 1 of project is substantially complete and project warranty period began in Q1 FY 2024. Assessment of old pipeline to be performed in Q2 FY 2024 to determine timing on Phase 2. P2627 458/340 PRS Replacement, 1505 Oleander Avenue Beppler 5 - 5 0%750 702 48 94%Project warranty completed in Q4 FY 2023. Project can be closed at end of FY 2024. P2631 1485-2 Reservoir Interior/Exterior Coating & Upgrades Santos 40 2 38 5%1,450 2 1,448 0%Planning and design anticipated to be completed Q3/Q4 FY 2024. P2655 La Presa Pipeline Improvements Beppler 25 - 25 0%1,750 281 1,469 16% No activity in Q1 FY 2024; project on hold until additional resources are made available. P2656 Regulatory Site Desilting Basin Improvements Beppler 5 - 5 0%150 7 143 5%No activities occurred during Q1 FY 2024. Operations to implement improvements as time allows. P2657 1485-1 Reservoir Interior/Exterior Coating & Upgrades Santos 5 25 (20) 500%1,150 25 1,125 2%Planning and Design anticipated to be completed Q2/Q3 FY 2024. P2661 Replacement of Backflow Prevention Devices on Pipeline Interconnections on Otay Mesa Beppler 25 111 (86) 444%400 273 127 68% Work is substantially complete. Project may be closed at end of FY 2024. P2662 Potable Water Meter Change Out Carey 1,000 3 997 0%17,100 3 17,097 0%RFP will be released in Q3 FY 2024. P2670 Administration and Operations Roof Repairs and Replacement Payne 20 - 20 0%350 - 350 0%Ongoing maintenance; replacements FY 2025-2028. P2671 980 Reservoirs Altitude Valve Vaults Renovation Beppler 25 - 25 0%682 679 3 100% Project warranty completed in Q4 FY 2023. Project can be closed at end of FY 2024. P2672 District Roof Repairs and Replacement Program Payne 35 - 35 0%340 - 340 0%Ongoing maintenance; replacements FY 2025-2028. P2673 803-4 Reservoir Interior/Exterior Coating Santos - - - 0%2,350 - 2,350 0%No expenditures anticipated in FY 2024. P2675 458-1 and 458-2 Reservoirs Site Pavement Refurbishment Cameron 150 - 150 0%450 15 435 3%Design is at 50%. Project paused. P2677 PL - 16-Inch, 870 Zone, La Media Road and Airway Road Utility Relocations Beppler 700 23 677 3%3,100 2,298 802 74%Construction continued in Q1 FY 2024. P2678 Jamacha Boulevard Utility Relocation Beppler 25 - 25 0%250 - 250 0%No activity in Q1 FY 2024; project on hold until additional resources are made available. https://otaywater365.sharepoint.com/sites/engcip/Shared Documents/X-CIP Quarterly Reports/CIP Qtr Reports/FY 2024/Q1/Expenditures/FY2024 1st Qtr Exp - working copy.xlsx Page 2 of 4 11/20/2023 FISCAL YEAR 2024 1ST QUARTER REPORT (Expenditures through 9/30/23) ($000) ATTACHMENT B 2024 09/30/23 CIP No.Description Project Manager FY 2024 Budget Expenses Balance Expense to Budget % Overall Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/23 LIFE-TO-DATE, 09/30/23 P2680 PL - 12-inch Pipeline Replacement, 1530 Zone, Vista Diego Road Marchioro 40 7 33 18%425 77 348 18% Project will be designed as part of the larger Vista Diego Hydropneumatic Pump Station Replacement Project (CIP P2639). See P2639 for updates. P2681 PL-12-Inch, 1655 Zone, Presilla Drive Pipeline Replacement Marchioro 25 - 25 0%1,800 130 1,670 7% Project will be designed as part of the larger 1655-1 Reservoir Project (CIP P2040). See P2040 for updates.P2682 AMI Project Carey 70 8 62 11%650 560 90 86%On track. P2685 980/711 PRS Renovation - Proctor Valley Rd Marchioro 5 - 5 0%850 - 850 0%No expenses anticipated in FY 2024 P2686 870 PZ Seismic Vault Renovation Beppler 5 - 5 0%400 - 400 0%Planning level work may occur in FY 2024. P2687 Steele Canyon Rd Bridge 803 PZ 20-inch WL Renovation Beppler 100 3 97 3%600 40 560 7% Sample repair performed in Q2 FY 2023. Evaluation of the work delayed by water in Sweetwater River; to be done in Q2 FY 2024 to determine the project scope of work. P2689 944-1-9 Pump Station Meter Vault Renovation Beppler 20 - 20 0%200 - 200 0%No activity in Q1 FY 2024; project on hold until additional resources are made available. P2690 850-4 Reservoir Interior/Exterior Coating Santos - - - 0%1,850 - 1,850 0%No expenditures anticipated in Fiscal Year 2024. P2691 City of San Diego - Otay 2nd Pipeline Phase 4 Interconnections Relocation Beppler 50 6 44 12%1,000 6 994 1% Assessment and hydraulic modeling of alternative interconnection locations performed in Q1 FY 2024. P2692 1485-2 PS Yard Piping Modifications Marchioro 1 - 1 0%600 - 600 0%No expenses anticipated in FY 2024. P2695 Relocation of Data Center Kerr 25 - 25 0%250 - 250 0% Staff conducted preliminary assessment with NV5. Concluded that minor restructuring is recommended. Staff will consult with Facilities Manager for further instructions. P2697 Valve Replacement Program - Phase 2 Mederos 350 2 348 1%12,000 2 11,998 0%Within budget and in progress. P2699 Miscellaneous Replacements and Improve Fire Sprinkler Protection System in the Warehouse Payne 25 5 20 20%325 5 320 2%FY 2024 Warehouse and Operations replacements; FY 2024 sprinkler engineering; FY 2025 install. P2700 Pump Station Equipment Replacement Program Mederos 150 7 143 5%1,250 7 1,243 1%Within budget and in progress. R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 5 - 5 0%3,500 25 3,475 1%Replacement scheduled for FY 2028. R2148 Large Meter Replacement - Recycled Carey 10 - 10 0%135 54 81 40%Replacements will be completed Q3 & Q4 FY 2024.R2152 Recycled Water Meter Change-Out Carey 10 - 10 0%550 - 550 0%RFP will be released in Q3. R2156 RecPL - 14-inch RWCWRF Effluent Force Main Improvements Marchioro 10 4 6 40%1,300 259 1,041 20%No furtherl expenses anticipated in FY 2024. R2157 RWCWRF Backwash Supply Pumps Upgrade Beppler 220 1 219 0%500 82 418 16%Construction contract awarded in Q1 FY 2024; submittal review to begin in Q2 FY 2024. R2158 RWCWRF Stormwater Pond Improvements (R)Beppler 10 - 10 0%175 - 175 0%No activities occurred during Q1 FY 2024. Planning to be coordinated with R2117 to determine impacts. R2159 RecPL - 16-Inch, 680 Zone, Olympic Parkway Recycled Pipeline Replacement Beppler 3,500 2 3,498 0%6,000 468 5,532 8% Construction contract awarded in Q3 FY 2023 and materials acquisition in progress. Construction expected to begin in Q3 FY 2024. R2161 450-1R Reservoir Interior/Exterior Coating & Upgrades Santos - - - 0%2,500 - 2,500 0%No expenditures anticipated in current Fiscal Year. R2163 450-1 RW Res Disinfection Injection Vault Renovation Marchioro - - - 0%300 - 300 0%No expenses anticipated in FY 2024. R2164 450-1 RW Res Stormwater Improvements Marchioro 70 18 52 26%800 24 776 3% GM authorization to advance CIP R2167 was provided Q1 FY 2024. R2167 RecPL - 14-Inch, 927 Zone, Force Main Road Improvements and Erosion Repairs Marchioro 25 5 20 20%225 5 220 2% A possible long-term solution which exceeds the current CIP budget will be vetted during the FY 2025 budget cycle. R2169 Pump Station Equipment Replacement Program (R)Mederos 50 - 50 0%600 - 600 0%Within budget and in progress. S2024 Campo Road Sewer Main Replacement Beppler 25 7 18 28%11,130 11,074 56 99%Revegetation efforts continued as needed to comply with Caltrans permit. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 50 - 50 0%1,150 68 1,082 6% Planning activities will review scope of work; design is scheduled to recommence in Q2 FY 2024. https://otaywater365.sharepoint.com/sites/engcip/Shared Documents/X-CIP Quarterly Reports/CIP Qtr Reports/FY 2024/Q1/Expenditures/FY2024 1st Qtr Exp - working copy.xlsx Page 3 of 4 11/20/2023 FISCAL YEAR 2024 1ST QUARTER REPORT (Expenditures through 9/30/23) ($000) ATTACHMENT B 2024 09/30/23 CIP No.Description Project Manager FY 2024 Budget Expenses Balance Expense to Budget % Overall Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/23 LIFE-TO-DATE, 09/30/23 S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler 20 - 20 0%1,100 7 1,093 1%Planning level work may occur in FY 2024. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%1,300 - 1,300 0%No activity in Q1 FY 2024. S2060 Steele Canyon Pump Station Replacement Beppler 10 - 10 0%1,900 - 1,900 0%No activity in Q1 FY 2024. S2066 Rancho San Diego Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%950 - 950 0%No activity in Q1 FY 2024. S2069 Cottonwood Sewer Pump Station Renovation Beppler 300 45 255 15%3,000 446 2,554 15%Final preliminary design in progress in Q1 FY 2024; design will continue for rest of FY 2024. S2072 RWCWRF Rotary Screen Replacement Beppler 100 - 100 0%600 2 598 0% No activities occurred during Q1 FY 2024; planning work expected to resume in Q2 FY 2024. S2074 RWCWRF Stormwater Pond Improvements (S)Beppler 5 - 5 0%175 - 175 0%No activities occurred during Q1 FY 2024. Planning to be coordinated with R2117 to determine impacts. S2076 RWCWRF Grit Chamber Improvements Beppler 5 - 5 0%250 - 250 0%No expenditures in Q1 FY 2024; planning level work may occur in FY 2024. S2077 RWCWRF Blowers Renovation Beppler 120 - 120 0%400 - 400 0% No expenditures in Q1 FY 2024. Scheduling of the refurbishment of the first blower to start in Q2 FY 2024. S2079 Steele Canyon Rd Bridge 6-inch Sewer FM Renovation Beppler 50 - 50 0%350 - 350 0% Project design waiting on scope of work for P2687 to be determined; the two projects will be designed together. S2080 Standby Power Renovations - Sewer Rahders 10 - 10 0%200 - 200 0%No activity in Q1 FY 2024. Total Replacement/Renewal Projects Total:9,571 714 8,857 7%141,772 28,358 113,414 20% CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 1,821 155 1,666 9%12,000 5,777 6,223 48%CP#16 $155K expensed Q1, CP#15 $208K & CP#14 $310K expected Q3 FY 2024. P2286 Field Equipment Capital Purchases Rahders 219 79 140 36%3,500 2,424 1,076 69% CP#6 $79K expensed, deliever of outstanding items ($38K) expected Q2 FY 2024. CP#7 $80K expected Q3 FY 2024. P2571 Data Center Network Data Storage and Infrastructure Enhancements Kerr 15 - 15 0%530 455 75 86%Project is on target and anticipated to be completed by end of FY 2024. P2572 Enterprise Resource Planning (ERP) Replacement Kerr 280 - 280 0%795 - 795 0%Staff is making preparations for a January 2024 kick-off implementation. R2160 Recycled Water Field Equipment Capital Purchases Rahders - - - 0%700 221 479 32%No expenditures FY 2024. R2162 Vehicle Capital Purchases - Recycled Rahders - - - 0%500 93 407 19%No expenditures FY 2024. S2078 Vehicle Capital Purchases - Sewer Rahders - - - 0%750 - 750 0%No expenditures FY 2024. Total Capital Purchase Projects Total:2,335 234 2,101 10%18,775 8,970 9,805 48% DEVELOPER REIMBURSEMENT PROJECTS P2595 PL - 16-inch, 624 Zone, Village 3N - Heritage Road, Main St/Energy Way Cameron 1 - 1 0%336 - 336 0%This is a developer reimbursement project. P2596 PL – 16-inch, 624 Zone, Village 3N – Main St, Heritage Rd/Wolf Canyon Cameron 1 - 1 0%900 - 900 0%This is a developer reimbursement project. P2598 PL-16-Inch, 624 Zone, Village 8W – Main St, La Media/Village 4 Cameron 1 - 1 0%280 - 280 0%This is a developer reimbursement project. P2599 PL-16-Inch, 624 Zone, Village 8W- Otay Valley Rd, School/Village 8E Cameron 1 - 1 0%500 - 500 0%This is a developer reimbursement project. P2602 PL - 16-inch, 624 Zone, Otay Valley Road, SR 125 Bridge Cameron 1 - 1 0%280 - 280 0%This is a developer reimbursement project.P2603 PL - 16-inch, 711 Zone, Hunte Parkway, SR 125 Bridge Cameron 1 - 1 0%340 - 340 0%This is a developer reimbursement project. R2028 RecPL – 8-in, 680 Zone, Heritage Road to Main Street Cameron 1 - 1 0%900 - 900 0%This is a developer reimbursement project. R2037 RecPL – 8-in, 680 Zone, Main Street/Otay Valley Road – Village 8W Cameron 1 - 1 0%620 - 620 0%This is a developer reimbursement project. R2038 RecPL – 8-in, 680 Zone, Village 3N – Main St, Heritage Rd/Wolf Canyon Cameron 1 - 1 0%470 - 470 0%This is a developer reimbursement project.R2047 RecPL – 12-in, 680 Zone, La Media Road - Birch/Main St Cameron 1 - 1 0%550 - 550 0%This is a developer reimbursement project. R2136 RecPL – 8-in, 680 Zone, Otay Valley Rd, SR 125 Bridge Cameron 1 - 1 0%140 - 140 0%This is a developer reimbursement project. R2137 RecPL - 8-in, 815 Zone, Hunte Parkway, SR 125 Bridge Cameron 1 - 1 0%170 - 170 0%This is a developer reimbursement project. Total Developer Reimbursement Projects Total:12 - 12 0%5,486 - 5,486 0% 139 GRAND TOTAL 15,411$ 1,565$ 13,846$ 10%291,057$ 54,998$ 236,059$ 19% https://otaywater365.sharepoint.com/sites/engcip/Shared Documents/X-CIP Quarterly Reports/CIP Qtr Reports/FY 2024/Q1/Expenditures/FY2024 1st Qtr Exp - working copy.xlsx Page 4 of 4 11/20/2023 Otay Water District Capital Improvement Program Fiscal Year 2024 First Quarter (through September 30, 2023) 1004-2 Roof Vent ATTACHMENT C 9/29/23 485-1 Sample Port 9/29/23 Background The approved CIP Budget for Fiscal Year 2024 consists of 139 projects that total $15.41 million. These projects are broken down into four categories. 1.Capital Facilities $ 3.49 million 2.Replacement/Renewal $ 9.57 million 3.Capital Purchases $ 2.33 million 4.Developer Reimbursement $ 12 thousand Overall expenditures through the First Quarter of Fiscal Year 2024 totaled nearly $1.56 million, which is approximately 10% of the Fiscal Year budget. 2 Fiscal Year 2024 First Quarter Update ($000) CIP CAT Description FY 2024 Budget FY 2024 Expenditures % FY 2024 Budget Spent Total Life-to- Date Budget Total Life-to-Date Expenditures % Life-to-Date Budget Spent 1 Capital Facilities $3,493 $617 18%$125,024 $17,670 14% 2 Replacement/ Renewal $9571 $714 7%$141,772 $28,358 20% 3 Capital Purchases $2,335 $234 10%$18,775 $8,970 48% 4 Developer Reimbursement $12 $0 0%$5,486 $0 0% Total: $15,411 $1,565 10%$291,057 $54,998 19% 3 Fiscal Year 2024 First Quarter CIP Budget Forecast vs. Expenditures 4 $15,411,000 $14,640,000 $- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 $16,000,000 $18,000,000 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun July FISCAL YEAR PERIOD IN MONTHS FY 2024 Budget Forecast Total Expenditures Through 9/30/24 5 CIP Projects in Construction Recycled Water Pipeline Cathodic Protection Improvements Project (R2146) Replacement and repairs of existing cathodic protection systems on seven (7) recycled water pipelines Budget: $1.2M NTP: June 2022 Project was accepted in July 2023 6 Division No. 1, 2, 3 Location: Chula Vista, various locations CIP Projects in Construction Paso de Luz/Telegraph Canyon and Vista Grande Vista Sierra Water Line Replacement Project (P2612 & P2616) Replacement of approx. 1,750 linear feet of 12- inch water line, reconnect existing water services and associated work Combined Budget: $5.45M NTP: Aug. 2022 Project 95% complete and within budget 7 Division No. 4 Location: Chula Vista, south of Telegraph Canyon Division No. 5 Location: El Cajon west of Vista Sierra CIP Projects in Construction Paso de Luz 8 8/4/23 9/8/23 8/23/23 Vista Sierra CIP Projects in Construction 1004-2 & 485-1 Reservoir Coating and Upgrades (P2567 & P2614) Work includes removing and replacing the interior and exterior coatings of the welded steel reservoirs and structural modifications Combined Budget: $2.75M NTP: Jan. 3, 2023 1004-2 to be returned to service in early October Project ~90% complete and within budget 9 Division No. 3, 4 Location: Spring Valley & Chula Vista CIP Projects in Construction 10 8/21/23 9/21/23 8/14/23 7/31/23 485 1004 CIP Projects in Construction Advance Metering Infrastructure (AMI) Project (P2682) Project includes installing equipment, network hardware, upgrading meter data management software, and firmware upgrades to approx. 24,000 existing AMI- capable meters Budget: $650,000 NTP: Mar. 1 , 2023 2 base stations and 7 repeater locations Project expected to be accepted in 2nd quarter and within budget 11 Various Locations CIP Projects in Construction Olympic Parkway Recycled Water Pipeline Replacement (R2159) Project will install approximately 5,730 linear feet of 16-inch recycled water line in Olympic Parkway, and removal/abandonment of the existing 20-inch recycled water line. Budget: $6,000,000 NTP: May 1, 2023 Lead-time for high pressure valves is longer than expected. (March 2024) Project is within budget 12 Chula Vista Otay Ranch High School CIP Projects in Construction RWCWRF Disinfection System Improvements (R2177 & R2157) Project will replace existing chlorine system with Trojan UV system and replacement of existing filter backwash supply pumps with higher capacity pumps. Combined Budget: $4,000,000 ($4,775,000) NTP: May 1, 2024 Trojan UV system will take approx. 10 months to procure Project is within budget 13 Construction Contract Status 14 Consultant Contract Status 15 Consultant Contract Status 16 Consultant Contract Status 17 QUESTIONS? 18