HomeMy WebLinkAbout3. Onsite Recycled Water System - Check List OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 1 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
I. TITLE SHEET
1ST
Check
2nd
Check
3rd
Check
4th
Check
Comments
A. Medium
1. 24"x36" in size conforming to District format
2. No "sticky back", glued or taped on sections
ENG OWD ENG OWD ENG OWD ENG OWD
B. Signed by the Landscape
Architect-of-Work, date of
expiration of registration adjacent
to signature
C. Marked with the name, address
and telephone number of the firm
preparing the plans and date of
preparation
D. Consecutively numbered with
total number of sheets
E. Lettered in a neat and legible
style, no hand lettering smaller
than 1/8" and no machine letter
smaller than 1/10”
F. OWD Project# shown vertically
on right margin
G. OWD Inspection Note
H. Landscape Architect As-Built
Block.
I. OWD permit# shown at bottom
right-side corner of the plan
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 2 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
J. DEHQ RW or LRWS shown
vertically on top right margin
II. TITLE SHEET
1ST
Check
2nd
Check
3rd
Check
4th
Check
Comments
A. OWD Signature Block –
Including:
1. OWD Project #
2. Recycled Water Pressure Zone
3. Potable Water Pressure Zone
ENG OWD ENG OWD ENG OWD ENG OWD
B. DEHQ Signature Block
C. Declaration of Responsible
Charge
D. Responsibility Disclaimer –
Including Reference Drawing
information:
1. OWD Project # 2. City Drawing #
E. Meter Information Table –
Including
1. POC ID
2. POC STA
3. IRR AREA (SQ. FT.) 4. TOTAL GPM
5. ANNUAL USAGE (AC. FT.)
6. LATERAL SIZE (All irrigation laterals are 2”) 7. METER SIZE
F. OWD As-Built Block
G. Marked with the name, address
and telephone number of the
owner and developer
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 3 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
II. TITLE SHEET
(continued)
1ST
Check
2nd
Check
3rd
Check
4th
Check
Comments
H. Name and phase of
development (to be consistent
throughout the drawing)
ENG OWD ENG OWD ENG OWD ENG OWD
K. OWD Revision Block
I. OWD Inspection Note
J. Omission Statement
K. Index/Site Map
1. Scale is 1"= 200' minimum
2. Sheet coverage shown
3. North arrow
4. Street names
5. Location of all irrigation meters
6. Point of connection
7. Show existing & proposed utilities in street (type & size)
8. Fire Hydrants
9. Recycled Water “Do Not Drink” Sign locations
L. Vicinity Map
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 4 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
1. Orient north arrow as on key map
2. Arterial streets shown
3. Project boundary street shown
4. APN or site address
M. OWD Water Notes
N. DEHQ Water Notes
III. LEGEND, DETAILS & SPECS
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
A. Non-standard symbols and
abbreviations used are listed
and described
ENG OWD ENG OWD ENG OWD ENG OWD
B. For sprinklers, show radius &
pattern, flow pressure, material,
manufacturer & model number
C. Water Agencies’ Standards,
Materials list or Specs when
applicable
D. Water Agencies’ Standards,
Section 15152
E. Water Agencies’ Standards,
show details WR-01 or WR-02,
WR-03, WR-04 & WM-08
F. Show symbols of potable water
meter and potable mains
G. For temporary potable connection:
Water Agencies’ Standards, show detail
WR-05 (if applicable)
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 5 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
III. LEGEND, DETAILS &
SPECS (continued)
1ST
Check
2nd
Check
3rd
Check
4th
Check Comments
H. Show cross connection test
station details
ENG OWD ENG OWD ENG OWD ENG OWD
I. Pressure regulator and Master
Valve at POC
J. OWD 10-foot separation detail
K. Show potable/recycled crossing
and trench details
L. All valve boxes shall have 3/8”
pea gravel
M. Booster pumps and fertigation
units shall have a bypass
IV. DESIGN ON‐SITE
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
A. Show potable water, recycled
water, and sewer lines
ENG OWD ENG OWD ENG OWD ENG OWD
B. Show point of connection
1. To potable: show use of WR-01 or WR-02
2. To recycled: show use of WR-03
C. Connections of hose bibs and
hydrants are not allowed
D. Cross connection between
recycled and potable is strictly
prohibited
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 6 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
IV. DESIGN ON‐SITE
(continued)
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
E. Potable & recycled not in same
trench and have 10 feet of
separation running parallel
ENG OWD ENG OWD ENG OWD ENG OWD
F. Drinking fountains and outdoor
eating facilities are to be protected
from spray of irrigation lines
G. Recycled water system does not
discharge onto areas not under the
owner's control
H. Minimum separation between
areas irrigated with recycled
water, those irrigated with potable
water = 10’, Concrete mow curb
acceptable
I. Recycled water quick couplers
are not allowed except for single
source streetscapes and slopes
J. Potable and Recycled water lines
shall be differentiated on plans
K. All dripline irrigation shall have
a dripline indicator.
V. IRRIGATION PLANS
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 7 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
A. Show: ENG OWD ENG OWD ENG OWD ENG OWD
1. Point of connection per WR-01,
02,03, 04 as appropriate
a. Meters (Existing / Proposed)
b. Verify w/ OWD & Civil that lateral stub out
exists
c. Lateral size (2" min.)
d. Meter size & location (Road Stationing)
e. Proposed Max Flow (GPM)
f. Size of irrigated area (SF)
g. Estimated yearly demand (Ac. Ft.)
h. Design operating pressure (psi)
2. All appurtenances near POC (blow
offs, air valves, fire hydrants, etc.)
3. Gate valves are required for 4” and
greater installations
4. Control Valves
5. Control stations
6. Signage
7. Cross connection test stations
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 8 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
V. IRRIGATION PLANS
(continued)
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
8. Adjacent parcels ENG OWD ENG OWD ENG OWD ENG OWD
9. Backflow prevention device
10. Potable water lines
11. Buildings
12. Decorative fountains
13. Exterior drinking fountains
14. Routing of all irrigation pipes
15. Area controlled by each controller
station
16. Separation of irrigation system
used (fence, mow curbs, walls, ..)
17. Swimming pools (No QCV within
50’, drip or bubbler subgrade
installation only, not potable QCV
within 75’, Plants must be 4 feet away
from the pool or spa)
18. Playgrounds
19. Eating areas
B. If none of the above are
present, include an omission
paragraph specifically stating
none exist
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 9 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
V. IRRIGATION PLANS
(continued)
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
E. Additional notes are designated
as "Special Notes"
ENG OWD ENG OWD ENG OWD ENG OWD
F. Inspection note shown on each
sheet of irrigation plans
G. Reference all Existing OWD
Project#, RW/LRWS# @ system
connections
H. Depth of pipe
1. From top of pipe, intermittent
pressure for 2" or less, 12" min
2. From top of pipe, constant
pressure for less than 6", 18" min
3. From top of pipe, constant
pressure 6" or more, 30" min
4. From top of pipe, constant
pressure for less than 6” at street
crossings and under paving, 18” min -24”
max
I. Warning/identification tape
J. Horizontal separation between
recycled & potable is 10 feet
K. Vertical separation is 12" OD
recycled below potable
1. Recycled may be above if is intermittent
pressure
2. Recycled may be above if constant pressure line has auto flow control/shut-
off device or is sleeved
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 10 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
L. Cross connection test station is
directly downstream of meter
and/or pressure reducing valve
M. Fertigation system or booster
pump requires RP device instead
of check valve. Fertigation device
located at end of POC
VI. MATERIALS
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
A. 3" or smaller pipe - solid purple
ASTM-D1784 type 1 grade 1 PVC
1120 for Son. 40 or 80 or ASTM-
D2241 type 1 grade 1 PVC 1120
for SDR rated pipe
ENG OWD ENG OWD ENG OWD ENG OWD
B. 4" or greater AWWA C-900 or
C-905
C. Sprinklers, valves boxes, valves
w/ exterior exposure are to be
purple.
VII. MISCELLANEOUS
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
A. Installation and materials for
recycled water irrigation system shall
conform the Water Agencies Standards
and Specifications, section 15152
recycled water facilities
ENG OWD ENG OWD ENG OWD ENG OWD
OTAY WATER DISTRICT
ONSITE RECYCLED WATER SYSTEM CHECKLIST
PROJECT NAME: _________________________________________PROJECT NO.: _____________________________
PLAN REVIEWER: ________________________________________PEER REVIEWER: _________________________
DISTRICT REQUEST MYLAR:_____________
Page 11 of 11
https://otaywater365.sharepoint.com/sites/ENGRECYCLEDWATER/Shared Documents/Check List - Onsite Recycled Water System Plan Review Master2021.docx
VII. MISCELLANEOUS
(continued)
1st
Check
2nd
Check
3rd
Check
4th
Check Comments
B. All shrub heads shall have
purple caps. Decal on risers will
not be accepted
ENG OWD ENG OWD ENG OWD ENG OWD
C. Sign and date the
engineer/architect stamp on all
sheets.
D. Sign and date the declaration
of responsibility on the title sheet.
E. All RW appurtenances to have
“DO NOT DRINK” tags.
F. “DO NOT DRINK” and POC ID
decal on irrigation controller.
G. Details for all appurtenances in
POC sequence (pressure
regulator, master valve, flow
sensor, etc.)
H. POC sequence is hard piped up
to flow sensor.
I. No red brass in materials.
END