HomeMy WebLinkAbout06-20-12 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room WEDNESDAY June 20, 2012 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. APPROVE CHANGE ORDER NO. 2 TO THE EXISTING CONTRACT WITH TC CONSTRUCTION, INC. IN AN AMOUNT NOT-TO-EXCEED $42,412.96 FOR THE LA PRESA SYSTEM IMPROVEMENTS PROJECT (KAY) [5 minutes] 4. INFORMATIONAL REPORT ON CAPITAL IMPROVEMENT PROGRAM QUARTER- LY REPORT FORMAT UPDATE (KAY) [5 minutes] 5. SAN DIEGO COUNTY WATER AUTHORITY UPDATE (WATTON) [10 minutes] 6. ADJOURNMENT BOARD MEMBERS ATTENDING: Gary Croucher, Chair David Gonzalez 2 All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on June 15, 2012 I posted a copy of the foregoing agenda near the regu- lar meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on June 15, 2012. ______/s/_ Susan Cruz, District Secretary _____ STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: July 11, 2012 SUBMITTED BY: Daniel Kay Associate Civil Engineer Ron Ripperger Engineering Manager PROJECT: P2370- 001103 DIV. NO. 3 APPROVED BY: Rod Posada, Chief of Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Change Order No. 2 to the Contract with TC Construction, Inc. for the La Presa System Improvements Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve Change Order No. 2 to the existing contract with TC Construction, Inc. in an amount not-to-exceed $42,412.96 for the La Presa System Improvements Project (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to execute Change Order No. 2 in an amount not-to-exceed $42,412.96 to the contract with TC Construction, Inc. for the La Presa System Improvements Project. ANALYSIS: At the November 2, 2011 Board Meeting, the Board awarded a construction contract in an amount of $978,995 to TC Construction for the La Presa System Improvements Project. Change Order No. 1 (see AGENDA ITEM 3 2 Exhibit B) was approved by the General Manager in February 2012 for $31,906.39, bringing the total contract amount to $1,010,901.39. The Project consists of several components which includes, the demolition to the existing facility at the La Presa Site, installation of a new pressure reducing station, installation of various interconnections throughout the 640 pressure zone, and the demolition of the Dorchester Reservoir and pressure reducing station. This Project eliminates the 590 pressure zone and those facilities that are no longer needed. It will improve the reliability of water delivery to the District’s customers and improve the operations and maintenance of the District’s system. TC Construction, Inc. is complete with the Project except for soil remediation at the Dorchester site and minor punch list items such as paving, painting of above ground piping, and clean up. Change Order No. 2 (Exhibit C) includes a variety of items including time and materials for additional potholing, revisions to the SDG&E connection at the La Presa site, and various credits for deleted items in the contract. The following is a table summarizing the items in Change Order No. 2. The Location column depicts the general location for each item as shown in Exhibit A: Item Description Location (Exhibit A) Amount 1 Additional Potholing at Paradise Valley Road Site 6 $13,554.83 2 Electrical and Control Revisions Site 1 $3,710.44 3 Additional Potholing at San Carlos and Grand Avenue Site 4 $1,611.45 4 Soil Remediation and Sound Wall Credit Site 1 <$25,910.00> 5 Paradise Valley Road Rock Excavation Site 6 $55,687.18 6 Pressure Transmitter Modifications Site 1 $317.21 7 Conduit Installation for Future Security Site 1 $3,157.37 8 Connection for SDG&E Service Site 1 $3,857.00 9 Not Used N/A $0.00 10 Security Site 1 $4,695.60 11 Dorchester Site Modifications Credit Site 2 <$9,021.99> 12 Dorchester Reservoir Delay Site 2 $753.87 13 Soil Remediation at Dorchester Site Site 2 $10,000.00 14 Dewatering Allowance Credit N/A <$20,000.00> TOTAL $42,412.96 3 In summary, the net increase to the Project for Change Order No. 2 is $42,412.96. Change Order No. 2 brings the total Change Order amount to $74,319.35 or 7.6% of the total contract value. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP P2370, as approved in the Fiscal Year 2013 budget, is $1,430,000. Total expenditures, plus outstanding commitments and forecast, are $1,429,262. See Attachment B for budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP P2370 will be sufficient to support the Project. Finance has determined that 100% of the funding is available from the Betterment Fund for CIP P2370. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide customers with the best quality water, wastewater, and recycled water service in a professional, effective, and efficient manner.” LEGAL IMPACT: None. DK/RR:jf P:\WORKING\CIP P2370 - Dorchester (see P2471)\Staff Reports\Change Order No. 2 to TC Construction\BD 07-11-2012, Change Order, No. 2 to TC Construction, (DK-RR).docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map Exhibit B – Change Order No. 1 Exhibit C – Change Order No. 2 ATTACHMENT A SUBJECT/PROJECT: P2370-001103 Change Order No. 2 to the Contract with TC Construction, Inc. for the La Presa System Improvements Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee reviewed this item at a meeting held on June 20, 2012. The Committee supported Staff’s recommendation. NOTE: The "Committee Action" is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B SUBJECT/PROJECT: P2370-001103 Change Order No. 2 to the Contract with TC Construction, Inc. for the La Presa System Improvements Project Date Updated: June 06, 2012 06/06/12 P2370 La Presa System Improvements Budget 1,430,000 Planning 001101 Labor 2,772 2,772 - 2,772 Regulatory Agency Fees 50 50 - 50 PETTY CASH CUSTODIAN Service Contracts 204 204 - 204 US BANK CORPORATE PAYMENT Total Planning 3,026 3,026 - 3,026 Design 001102 Labor 95,787 95,787 95,787 Professional Legal Fees 1,802 1,802 - 1,802 STUTZ ARTIANO SHINOFF Consultant Contracts 1,285 1,285 - 1,285 ALTA LAND SURVEYING INC Consultant Contracts 2,148 2,148 - 2,148 V & A CONSULTING ENGINEERS Consultant Contracts 8,550 8,550 - 8,550 ENGINEERING PARTNERS INC, THE Consultant Contracts 900 900 - 900 MTGL INC Construction Contracts 2,687 2,687 - 2,687 CPM PARTNERS INC Service Contracts 304 304 - 304 SAN DIEGO UNION-TRIBUNE LLC Service Contracts 175 175 - 175 SAN DIEGO DAILY TRANSCRIPT Total Design 113,638 113,638 - 113,638 Construction 001103 Labor 97,956 97,956 6,500 104,456 Regulatory Agency Fees 6,527 6,527 - 6,527 COUNTY OF SAN DIEGO - DPW Regulatory Agency Fees 2,100 2,100 - 2,100 COUNTY OF SAN DIEGO Other Agency Fees 12,326 12,326 - 12,326 SAN DIEGO GAS & ELECTRIC Consultant Contracts 64,000 35,149 28,851 64,000 MTGL INC Consultant Contracts 1,875 1,875 - 1,875 ENGINEERING PARTNERS INC, THE Construction Contracts 881,095 637,062 244,033 881,095 TC CONSTRUCTION INC 31,906 - 31,906 31,906 Change Order No. 1 42,413 - 42,413 42,413 Change Order No. 2 Construction Contracts 30,350 30,350 - 30,350 PACIFIC METER SERVICES INC Construction Contracts 6,801 6,801 - 6,801 SAN DIEGO GAS & ELECTRIC Construction Contracts 417 417 - 417 CLARKSON LAB & SUPPLY INC Construction Contracts 97,900 70,785 27,115 97,900 CALIFORNIA BANK & TRUST (Retention) Service Contracts 4,295 4,295 - 4,295 MAYER REPROGRAPHICS INC Infrastructure Equipment & Materials 778 778 - 778 PACIFIC PIPELINE SUPPLY Rebates 22,325 15,675 6,650 22,325 PRESSURE REGULATOR Inventory 1,357 1,357 - 1,357 Inventory Contracted Services 1,677 1,635 42 1,677 RICK POST WELDING Total Construction 1,306,098 925,087 387,511 1,312,598 Grand Total 1,422,762 1,041,751 387,511 1,429,262 Vendor/Comments Otay Water District P2370 - La Presa System Improvements Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost EXHIBIT C P:\WORKING\CIP P2370 - Dorchester (see P2471)\Construction\Change Orders\Change Order No. 2\CO #2.docx OTAY WATER DISTRICT 2554 SWEETWATER SPRINGS BLVD., SPRING VALLEY, CA. 91978, (619) 670-2222 CONTRACT/P.O. CHANGE ORDER No. 2 PROJECT/ITEM: La Presa System Improvements CONTRACTOR/VENDOR: TC Construction APPROVED BY: Board REF. P.O. No: 715479 & 715621 REF.CIP No.: P2370 DATE: 6/12/12 ________________________________________________________________________________________________ DESCRIPTION: There are fourteen (14) items as part of this change order resulting in a net increase to the contract in the amount of $42,412.96. Item 1: Additional Potholing at Paradise Valley Rd. (COR#9) Item 2: Electrical & Control Revisions (COR #10) Item 3: Additional Potholing at San Carlos and Grand Ave. (COR#11) Item 4: Soil Remediation and Sound Wall Credit (COR#12) Item 5: Paradise Valley Rd. Rock Excavation (COR#13) Item 6: Pressure Transmitter Modifications (COR#14) Item 7: Conduit Installation for Future Security (COR#15) Item 8: Connection for SDG&E Service (COR#16) Item 9: Not Used (COR#17) Item 10: Security (COR#18) Item 11: Dorchester Site Modifications Credit (COR#19) Item 12: Dorchester Reservoir Delay (COR#20) Item 13: Soil Remediation at Dorchester Site Item 14: Dewatering Allowance Credit See attached Change Order Requests 9 through 20 (COR #17 was not used) from TC Construction. REASON: Item 1: During the pothole excavation of the 42-Inch pipeline at the Paradise Valley Rd. interconnection, TC encountered ¾” rock backfill material. As this material was excavated, the excavation became much larger than anticipated because the rock would fall into the trench and undermine the road. The backfill material was unknown prior to excavation and this item represents the additional time and material to excavate the ¾” rock material to create a safe trench to perform the work. This item results in a cost of $13,554.83 Item 2: At the La Presa site, the connection to SDG&E was converted from an overhead source to an underground vault connection. This item covers the time and material to install additional conduit and relocate the transformer. This item results in a cost of $3,710.44 Item No. 3: TC could not locate the existing 6-Inch water main on San Carlos and Grand Ave. for the proposed interconnection. TC potholed the 6-inch water line in a different location and located the water line to perform the interconnection. This item is for the time and material for the additional pothole and results in a cost of $1,611.45 Item No. 4: The quantity of the contaminated soil removed at the La Presa Site exceeded the contract value. A portion of this item is for the additional costs to remove and haul off the additional material. This item also includes a credit to the contract for the deletion of the sound wall. During construction it was discovered that the sound wall was not necessary. Additional credits such as, P:\WORKING\CIP P2370 - Dorchester (see P2471)\Construction\Change Orders\Change Order No. 2\CO #2.docx reducing the DG paving, deleting support blocks, reducing the depth of excavation for the pipe at La Presa, and for deleting two cut and plugs are also included in this item. The net value of this item is a credit for <$25,910.00> Item No. 5: Rock was encountered during construction for the Paradise Valley Road Interconnection. This was an unknown condition and the contractor performed the rock excavation on a T&M basis. The alignment of the interconnection was in close proximity to the County Water Authorities’ aqueduct, therefore precautions and safe rock removal methods were used to perform the work. This resulted in a slower production (17 working days); however, it protected the surrounding utilities including the CWA aqueduct. The contractor used Dexpan which is a non- invasive rock breaking method by drilling holes into the rock profile, pouring the Dexpan material in the holes, then over time letting the material expand and crack the rock for removal. This item results in a cost of $55,687.18. Item No. 6: The original plan shows the pressure transmitters outside of the SCADA enclosure. To protect them from the outside elements, they were installed inside the enclosure. This items covers the time and material to install the transmitters inside the enclosure resulting in a cost of $317.21 Item No. 7: This item is the time and material to install additional conduits for future security use for automatic gate operators, security cameras, access cards, etc. and results in a cost of $3,157.37 Item No. 8: The conduit for the power connection from SDG&E was to be provided by the County’s contractor as part of the Jamacha Road Widening Project. The contractor installed the conduit to the District’s property line; however, an unknown utility conflicted with the connection point for the District’s property. This item covers the time and material to install conduit below the conflict to make the necessary connection to SDG&E and results in a cost of $3,857.00 Item No. 9: Not Used. This Change Order Request was for an additional enclosure inside the SCADA cabinet and was denied. The proposed modifications were not necessary. Item No. 10: The La Presa site experienced a number of break-ins, vandalism, and theft throughout the duration of the project. In an effort to curb the security breach, TC Construction hired a security guard for night and weekend watch to protect the facility. This action proved to be successful. This item is for half of the cost to cover the security guard expense and results in a cost of $4,695.60 Item No. 11: The interconnection at the Dorchester site required additional materials not shown on the plans to make the proper connection. In addition, the original plan at the Dorchester site required 4-inches of DG material to grade the site. The native material proved to be sufficient and the DG material was deleted from the contract. In lieu of the DG, hydroseed material was placed at the site to reduce erosion. Lastly, this item covers material credits for the 10-inch waterline relocation at the entrance to Pointe Parkway. It was discovered that the existing pipe to be removed was PVC, not asbestos cement pipe; therefore, the pipe was not considered hazardous and did not require special handling procedures. This item results in a credit of <$9,021.99> Item No. 12: The District delayed TC Construction by a half day due to water remaining in the Dorchester Reservoir when they were ready for demolition. This item covers the cost for a half day of standby delay to drain the last 4 feet of water from the reservoir. This item results in a cost of $753.87 Item No. 13: The quantity of the contaminated soil to be removed at the Dorchester site will exceed the contract value. This item is for the additional costs to remove and haul off the additional material. CIP Title - La Presa System Improvements Project: P2370 Consultant/Contractor:TC Construction Subproject: 001103 APPROVED C.O.AMOUNT BY DATE DESCRIPTION TYPE C.O. 1 $31,906.39 GM 2/10/2012 10-Inch Relocation, PLC Cabinet Changes, 12-Inch Gate Valve Replacement, 18-Inch Plug and Plate, 18-Inch Disconnect for SDCWA, 18-Inch Disconnect for District, Discharge Header Modifications, 16-Inch Disconnect for District Owner 2 $42,412.96 Board Thirteen items: Paradise Valley Rd. Pothole, Electrical & Contol Revisions, Additional Potholing at San Carlos and Grand Ave., Soil Remediation & Sound Wall Credit, Paradise Valley Rd. Rock Excavation, Pressure Transmitter Modifications, Conduit Installation for Future Security, Connection for SDG&E Service, Security, Dorchester Site Modifications, Dorchester Reservoir Delay, and Dewatering Allowance Credit Owner 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 3435 Total C.O.'s To Date: $74,319.35 7.6% Original Contract Amount:$978,995.00 Current Contract Amount:$1,053,314.35 Month Net C.O.$Limit Authorization Absolute C.O.$ C.O. % 6/12 $74,319.35 $5,000 PM 0.0% $10,000 Eng. Mgr.0.0% $15,000 Chief 0.0% $25,000 AGM 0.0% $50,000 GM 0.0% >$50000 Board $74,319.35 7.6% CHANGE ORDER LOG P:\WORKING\CIP P2370 - Dorchester (see P2471)\Construction\Change Orders\COLOG.XLS1 6/13/2012 STAFF REPORT TYPE MEETING: Engineering, Operations, and Water Resources Committee Meeting MEETING DATE: June 20, 2012 SUBMITTED BY: Daniel Kay Associate Civil Engineer Ron Ripperger Engineering Manager PROJECT: Various DIV. NO. ALL APPROVED BY: Rod Posada, Chief of Engineering German Alvarez, Asst. General Manager Mark Watton, General Manager SUBJECT: Informational Item – Capital Improvement Program Quarterly Report Format Update GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To receive Board of Directors (Board) comments on content and presentation. ANALYSIS: Staff presented the Third Quarter Fiscal Year 2012 Report to the Board at the June 6th Meeting. During the presentation, a Board member suggested that some enhancements to the formatting would help clarify the information presented in the report. It was decided to refer this matter to Committee for consideration. AGENDA ITEM 4 FISCAL IMPACT: Joe Beachem, Chief Financial Officer None. STRATEGIC GOAL: The Capital Improvement Program supports the District’s Mission statement, “To provide customers with the best quality water, wastewater, and recycled water service in a professional, effective, and efficient manner” and the District’s Vision, “A District that is innovative in providing water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DK/RR/RP:jf P:\CIP\CIP Quarterly Reports\2012\Q3\Staff Report\BD 06-20-12, Staff Report, Third Quarter FY 2012 CIP Report, (DK-RR-RP).docx Attachments: Attachment A – Committee Action ATTACHMENT A SUBJECT/PROJECT: Various Informational Item – Capital Improvement Program Quarterly Report Format Update COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee reviewed this item at a Committee Meeting held on June 20, 2012. The Committee supported Staff’s recommendation.