HomeMy WebLinkAbout12-12-17 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room TUESDAY December 12, 2017 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. APPROVE A PROFESSIONAL AGREEMENT WITH AIRX UTILITY SURVEYORS, INC. FOR AS-NEEDED UTILITY LOCATING SERVICES IN AN AMOUNT NOT-TO- EXCEED $500,000 FOR A PERIOD OF THREE (3) FISCAL YEARS (FY), FY 2018 THROUGH FY 2020 (ENDING JUNE 30, 2021) (O’DONNELL) [5 minutes] 4. APPROVE THE WATER SUPPLY ASSESSMENT REPORT AND VERIFICATION DATED NOVEMBER 2017 FOR THE COUNTY OF SAN DIEGO OTAY RANCH VIL- LAGE 14 AND PLANNING AREA 16/19 PROJECT, AS REQUIRED BY SENATE BILLS 610 AND 221 (COBURN-BOYD) [5 minutes] 5. UPDATE ON DISTRICT STAFF’S REQUEST FOR INFORMATION CONCERNING METHANE AND VOLATILE ORGANIC COMPOUNDS AT OTAY RANCH VILLAGE 3 AND THE DISTRICT’S COURSE OF ACTION (MARTIN) [5 minutes] 6. UPDATE ON THE NON-CONFORMANCE ISSUE ASSOCIATED WITH THE 20-INCH RECYCLED WATER MAIN CONSTRUCTED AS PART OF THE OTAY RANCH VIL- LAGE 2 EAST, OTAY RANCH VILLAGE 2 HERITAGE ROAD, AND OTAY RANCH VILLAGE 2 NORTH DEVELOPER PROJECTS (MARTIN) [5 minutes] 2 7. PRESENT INFORMATION GATHERED AND PREPARED IN EVALUATING SEISMIC RISK STUDIES AND THE POTENTIAL RISKS FROM A SEISMIC EVENT (KENNE- DY) [5 minutes] 8. FIRST QUARTER UPDATE ON THE FISCAL YEAR 2018 CAPITAL IMPROVEMENT PROGRAM (MARTIN) [5 min] 9. SAN DIEGO COUNTY WATER AUTHORITY UPDATE (SMITH/CROUCHER) [10 minutes] 10. ADJOURNMENT BOARD MEMBERS ATTENDING: Tim Smith, Chair Mitch Thompson All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on December 8, 2017 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on December 8, 2017. /s/ Susan Cruz, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Michael O’Donnell Supervising Land Surveyor Brandon DiPietro Field Services Manager Dan Martin Engineering Manager PROJECT: VARIOUS DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Award of As-Needed Utility Locating Services Contract to AIRX Utility Surveyors, Inc. for Fiscal Years 2018 through 2020 GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional As-Needed Utility Locating Services contract to AIRX Utility Surveyors, Inc. (AIRX) and to authorize the General Manager to execute an agreement with AIRX in an amount not-to-exceed $500,000 for a period of three (3) Fiscal Years (FY), FY 2018 through FY 2020 (ending June 30, 2021). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional As-Needed Utility Locating Services agreement with AIRX in an amount not-to-exceed $500,000 for FY 2018 through FY 2020 (ending June 30, 2021). 2 ANALYSIS: California Government Code 4216 requires operators of subsurface installations (including water and sewer facilities) to be a member of the DigAlert Regional Notification Center which includes the District’s Underground Service Alert (USA) of Southern California program. As a member, operators are required to locate and field mark their subsurface installations within two days of receiving timely notification. To meet this legal requirement and support the District’s USA program, the District will require the services of a professional utility locating services consultant for three (3) fiscal years, FY 2018 through FY 2020 (ending June 30, 2021). It is more efficient and cost effective to augment District staff by issuing an as-needed contract for utility locating services, which will provide the District with the ability to obtain consulting services in a timely and efficient manner. This concept has also been used in the past with other disciplines such as engineering design, construction management, electrical, and environmental services. The District has used an as-needed contract for utility locating services over the previous six (6) fiscal years. The annual effort of the As-Needed Utility Locating Services, used to support the District’s USA Mark-out program from July 2015 through June 2017, averaged hours that equated to less than a full-time employee (FTE) at a rate of 0.85 FTE per year. An analysis of the USA workload for FY 2018 through FY 2020 indicates a steadily increasing level of effort from prior years will be needed for utility locating services. It is estimated this steadily increasing level of effort will equate to a rate of 1.4 FTE per year. Staff will recommend budgeting for an additional employee during the FY 2019 budget process. The District will issue task orders to the consultant for specific projects during the contract period based on a detailed scope of work. The consultant will then prepare a schedule and fee estimate for each task order assigned under the contract. Upon written task order authorization from the District, the consultant shall then proceed with the project, as described in the scope of work. This As-Needed Utility Locating Services contract does not commit the District to any expenditure until a task order is approved to perform work on a USA project. The District does not guarantee work to the consultant, nor does the District guarantee that it will expend all of the funds authorized by the contract for professional services. 3 The District solicited for utility locating services by placing an advertisement on the Otay Water District’s website on September 5, 2017 and with various other publications including the San Diego Daily Transcript. Seven (7) firms submitted a Letter of Interest and a Statement of Qualifications. The Request for Proposal (RFP) for As-Needed Utility Locating Services was sent to the seven (7) firms resulting in three (3) proposals received by September 27, 2017.  AIRX Utility Surveyors, Inc., Escondido, CA  Cable Pipe and Leak Detection, Inc., El Cajon, CA  C Below, Chino, CA The four (4) firms that chose not to propose are Encompass Inspections, Temecula, CA, Kana Subsurface Engineering, Riverside, CA, SPEC Services Inc., Fountain Valley, CA, and Superior Leak Detection, Upland, CA. In accordance with the District’s Policy 21, staff evaluated and scored all written proposals and interviewed the top two (2) firms on October 24, 2017. AIRX received the highest score for their services based on their experience, understanding of the scopes of work, proposed method to accomplish the work, and their composite hourly rate. AIRX was the most qualified consultant with the best overall rating or ranking scores. A summary of the complete evaluation is shown in Attachment B. AIRX submitted the Company Background Questionnaire as required by the RFP and staff did not find any outstanding issues. In addition, staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. AIRX is providing these services to the District under the District’s current As-Needed Utility Locating Services contract, which expires on June 30, 2018. Staff found that AIRX’s performance under the current contract has been exceptional with a 100% accuracy rate of utility locations in support of the District’s USA Mark-out program. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The funds for this contract will be expended from the Fiscal Years 2018, 2019, and 2020 budgets for various CIP and developer projects or programs. This contract is for professional As-Needed Utility Locating Services based on the District's need and schedule, and expenditures will not be made until a task order is approved by the District for the consultant's services. 4 Based on a review of the financial budgets, the Project Manager anticipates that the budgets will be sufficient to support the professional as-needed consulting services required for the projects or programs. The Finance Department has determined that, under the current rate model, the funds to cover this contract will be available as budgeted for these projects or programs. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. MO/BD/DM:jf P:\WORKING\As Needed Services\Utility Locating\FY 2018- 2020\Staff Report\Staff Report As-Needed Utility Locating Services_mdo.docx Attachments: Attachment A – Committee Action Attachment B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: VARIOUS Award of As-Needed Utility Locating Services Contract to AIRX Utility Surveyors, Inc. for Fiscal Years 2018 through 2020 COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee reviewed this item at a meeting held on December 12, 2017. The Committee supported Staff’s recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. Qualifications of Staff Understanding of Scope, Schedule and Resources Soundness and Viability of Proposed Project Plan INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Proposed Rates* Consultant's Commitment to DBE AVERAGE TOTAL WRITTEN Additional Creativity and Insight Strength of Project Manager Presentation, Communication Skills Quality of Response to Questions INDIVIDUAL TOTAL - ORAL AVERAGE TOTAL ORAL 30 25 30 85 85 15 Y/N 100 15 15 10 10 50 50 150 Poor/Good/ Excellent Andrea Carey 28 25 29 82 15 15 8 9 47 Juan Tamayo 29 23 29 81 14 15 8 9 46 Lisa Coburn-Boyd 28 22 25 75 14 15 8 9 46 Brandon DiPietro 28 25 28 81 14 14 8 10 46 Kevin Cameron 28 24 28 80 15 15 8 9 47 Andrea Carey 26 22 24 72 13 13 10 7 43 Juan Tamayo 27 22 27 76 12 12 10 8 42 Lisa Coburn-Boyd 25 23 22 70 12 14 9 7 42 Brandon DiPietro 25 20 24 69 12 13 9 8 42 Kevin Cameron 27 23 26 76 13 14 10 7 44 Andrea Carey 20 15 17 52 Juan Tamayo 21 19 17 57 Lisa Coburn-Boyd 21 15 15 51 Brandon DiPietro 21 18 18 57 Kevin Cameron 22 16 17 55 *The fees were evaluated by comparing rates for four positions. The sum of these 4 rates are noted on the table to the left. Consultant Rate Score Note: The Review Panel does not see or consider rates when scoring other categories. Rates are scored by the PM, who is not on the Review Panel. Airx $1,000 15 CBELOW $1,330 1 CPL $1,120 10 ATTACHMENT B MAXIMUM POINTS CABLE PIPE AND LEAK DETECTION (CPL)Y10 15 54 64 95 Y 64 RATES SCORING CHART AIRX UTILITY SURVEYORS Y CBELOW SUBSURFACE IMAGING 73 1 74 REFERENCES 46 141 Excellent WRITTEN TOTAL SCORE SUMMARY OF PROPOSAL RANKINGS As-Needed Utility Locating Services 43 117 ORAL 80 FIRM NOT INTERVIEWED P:\WORKING\As Needed Services\Utility Locating\FY 2018- 2020\Staff Report\Attachment B FINAL.xls STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Lisa Coburn-Boyd Environmental Compliance Specialist Bob Kennedy Engineering Manager CIP./G.F. NO: D0956- 090248 DIV. NO. 5 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Approval of Water Supply Assessment and Verification Report (November 2017) for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve the Water Supply Assessment Report and Verification (WSA&V Report) dated November 2017 for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, as required by Senate Bills 610 and 221 (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board approval of the November 2017 WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, as required by Senate Bill 610 and Senate Bill 221 (SB 610 and SB 221). ANALYSIS: The County of San Diego submitted a request to the District for a WSA&V Report, pursuant to SB 610 and SB 221. SB 610 and SB 221 require that, upon the request of the City or County, a water purveyor, such as the District, prepare a water supply assessment and verification report to be included in the 2 California Environmental Quality Act (CEQA) environmental documentation. SB 610 requires a city or county to evaluate whether water supplies will be sufficient to meet the projected water demand for certain “projects” that are otherwise subject to the requirement of the CEQA. SB 610 provides its own definition of “project” in Water Code Section 10912. SB 221 requires affirmative written verification from the water purveyor of the public water system that sufficient water supplies are planned to be available for certain residential subdivisions of property. The requirements of SB 610 and SB 221 are addressed by the November 2017 WSA&V Report for this Project. The WSA&V Report was prepared by the District in consultation with Dexter Wilson Engineering, Inc., the San Diego County Water Authority (Water Authority), and the County of San Diego (County). Prior to transmittal to the County, the WSA&V Report must be approved by the Board of Directors. An additional explanation of the intent of SB 610 and SB 221 is provided in Exhibit B, the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 WSA&V Report is provided as Exhibit C. For the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, the County is the responsible land use agency that requested the SB 610 and SB 221 water supply assessment and verification report from the District. The request for the WSA&V Report, in compliance with SB 610 and SB 221 requirements, was made by the County because the Project meets or exceeds one or both of the following SB 610 and SB 221 criteria:  A proposed residential development of more than 500 dwelling units.  A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.  A mixed-use project that includes one or more of the land uses specified in SB 610.  A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500 dwelling unit project. 3 The County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project is located within the Otay Ranch General Development Plan along Proctor Valley Road, just east of the City of Chula Vista. Village 14 is planned for 994 homes in three distinct areas (referred to as the South, Central, and North Village 14). The plan includes 878 single-family homes located in gated enclaves and another 116 detached courtyard homes. Twelve neighborhoods are planned with approximate densities ranging from 0.2 to 10.0 dwelling units per acre. Otay Ranch Village 14 is planned around a “Village Core,” centrally located in the heart of the village and will include a 9.7-acre elementary school, a 7.2-acre Village Green (public park), and a 1.7-acre Mixed Use Site with up to 10,000 square feet of commercial/retail uses. There will also be a 2.3-acre public safety site for a fire station and satellite sheriff’s facility. Additional public and private parks, swim clubs, trails, and recreational facilities will be situated throughout South, Central, and North Village 14. Planning Area 19 is planned for 13 one-acre estate lots and Planning Area 16 is planned for 112 lots averaging 3 acres in size. The expected potable water demand for the Otay Ranch Village 14 and Planning Areas 16/19 Project is 797,970 gallons per day (GPD) or about 893.9 acre-feet per year (AFY). The number of dwelling units and the areas for commercial development, parks, schools, and public safety sites match the total approved units noted on Table C of the District’s Water Facilities Master Plan Update dated March 2016 (WFMP Update). The entire watershed of the Otay Ranch Village 14 and Planning Areas 16/19 Project is tributary to the Upper and Lower Otay Reservoirs. The use of recycled water within watersheds tributary to surface water storage reservoirs that provide supply for potable domestic water uses must be approved by the owners of the reservoirs in order to protect water quality in these reservoirs. The Applicants for other projects within this watershed have met with and discussed the use of recycled water with the City of San Diego, the operator of the reservoirs. The City of San Diego has requested all projects not use recycled water because they are concerned about the runoff from the project entering the reservoirs and increasing nutrients and salinity. For this reason, the projected water use within the Otay Ranch Village 14 and Planning Areas 16/19 Project has been estimated with the assumption that the use of recycled water within the project will not be allowed. However, prior to the approval of a Sub-area master Plan for this project, the 4 Developer will need to pursue the use of recycled water with the City of San Diego. The request for compliance with SB 221 requirements was made by the County because the Project will exceed the SB 221 criteria of a proposed residential development with more than 500 dwelling units. Pursuant to SB 610 and SB 221, the WSA&V Report incorporates by reference the current Urban Water Management Plans and other water resources planning documents of the District, the Water Authority, and the Metropolitan Water District of Southern California (Metropolitan). The District prepared the WSA&V Report in consultation with Dexter Wilson Engineering, Inc., the Water Authority, and the County, which demonstrates and documents that sufficient water supplies are planned for and are intended to be made available over a 20-year planning horizon under normal supply conditions, in single and multiple-dry years to meet the projected demand of the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project and other planned development projects within the District. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The District has been reimbursed $8,000 for all costs associated with the preparation of the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project WSA&V Report. The reimbursement was accomplished via an $8,000 deposit the Project proponents placed with the District. STRATEGIC GOAL: The preparation and approval of the WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: Approval of a WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project in form and content satisfactory to the Board of Directors would allow the 5 District to comply with the requirements of Senate Bills 610 and 221. LC-B/BK:jf P:\WORKING\WOD0956-090248 Proctor Valley Village 14 and Preserve\Staff Report\BD 01-03-18, Staff Report, County of San Diego Village 14 & PA 16-19 WSA&V Report(LCB-BK).doc Attachments: Attachment A – Committee Action Exhibit A – Location Map Exhibit B – Explanation of the Intent of SB 610 & SB 221 Exhibit C – County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project WSA&V Report Exhibit D – Presentation ATTACHMENT A SUBJECT/PROJECT: D0956-090248 Approval of Water Supply Assessment and Verification Report (November 2017) for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on December 12, 2017. The Committee supported Staff’s recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. EXHIBIT A LOCATION MAP 1 EXHIBIT B Background Information The Otay Water District (District) prepared the November 2017 Water Supply Assessment and Verification (WSA&V) Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project at the request of the County of San Diego (County). The County’s WSA&V request letter dated November 28, 2017 was received by the District on November 28, 2017 so the 90-day deadline for the District to provide the Board an approved WSA&V Report to the County ends February 26, 2018. The County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project is located within the jurisdictions of the District, the San Diego County Water Authority (Water Authority), and the Metropolitan Water District of Southern California (MWD). See Exhibit A for Project location. To obtain permanent imported water supply service, land areas are required to be within the jurisdictions of the District, Water Authority, and MWD. The November 2017 WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project has been prepared by the District in consultation with Dexter Wilson Engineering, Inc., the Water Authority, and the County, pursuant to Public Resources Code Section 21151.9 and California Water Code Sections 10631, 10656, 10910, 10911, 10912, and 10915 referred to as Senate Bill (SB) 610 and Government Code Sections 65867.5, 66455.3, and 66473.7 referred to as SB 221. SB 610 and SB 221 amended state law, effective January 1, 2002, intending to improve the link between information on water supply availability and certain land use decisions made by cities and counties. SB 610 requires that the water purveyor of the public water system prepare a water supply assessment to be included in the California Environmental Quality Act (CEQA) environmental documentation and approval process of certain proposed projects. SB 221 requires affirmative written verification from the water purveyor of the public water system that sufficient water supplies are to be available for certain residential subdivision of property. The requirements of SB 610 and SB 221 are addressed in the November 2017 WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project. The expected potable water demands for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project are 797,970 gallons per day (GPD) or about 893.9 acre-feet per year (AFY). Therefore, based on the findings from the Otay WD’s 2015 UWMP and the Water Authority’s 2015 UWMP, this Project will result in no unanticipated demands. The District currently depends on the Water Authority and the MWD for all of its potable water supplies and regional water resource planning. The District’s 2015 Urban Water Management Plan (UWMP) relies heavily on the UWMP’s and Integrated Water Resources Plans (IRPs) of the Water Authority and MWD for documentation of supplies available to meet projected demands. These plans are developed to manage the 2 uncertainties and variability of multiple supply sources and demands over the long-term through preferred water resources strategy adoption and resource development target approvals for implementation. MWD, in January 2016, approved the update of their Integrated Water Resources Plan (IRP). The 2015 IRP Update describes an adaptive management approach to mitigate against future water supply uncertainty. The new uncertainties that are significantly affecting California’s water resources include:  The State Water Project (SWP) supplies which are affected by a changing climate and the operational constraints in the ecologically struggling Sacramento- San Joaquin Delta.  Periodic extended drought conditions. These uncertainties have rightly caused concern among Southern California water supply agencies regarding the validity of the current water supply documentation. MWD is currently involved in several proceedings concerning Delta operations to evaluate and address environmental concerns. In addition, at the State level, the Delta Vision and Bay-Delta Conservation Plan processes are defining long-term solutions for the Delta. The SWP represents approximately 9% of MWD’s 2025 Dry Resources Mix, with the supply buffer included. A 22% cutback in SWP supply represents an overall 2% (22% of 9% is 2%) cutback in MWD supplies in 2025. Neither the Water Authority nor MWD has stated that there is insufficient water for future planning in Southern California. Each agency is in the process of reassessing and reallocating their water resources. Under preferential rights, MWD can allocate water without regard to historic water purchases or dependence on MWD. Therefore, the Water Authority and its member agencies are taking measures to reduce dependence on MWD through development of additional supplies and a water supply portfolio that would not be jeopardized by a preferential rights allocation. As calculated by MWD, the Water Authority’s current preferential right is 18.27% of MWD’s supply, while the Water Authority accounted for approximately 22% of MWD’s total revenue. So MWD could theoretically cut back the Water Authority’s supply and theoretically, the Water Authority should have alternative water supply sources to make up for the difference. In the Water Authority’s 2010 UWMP, they had already planned to reduce reliance on MWD supplies. This reduction is planned to be achieved through diversification of their water supply portfolio. The Water Authority’s Drought Management Plan (May 2006) provides the Water Authority and its member agencies with a series of potential actions to engage when faced with a shortage of imported water supplies due to prolonged drought conditions. 3 Such actions help avoid or minimize impacts of shortages and ensure an equitable allocation of supplies throughout the San Diego County region. The Otay Water District Board of Directors could acknowledge the ever-present challenge of balancing water supply with demand and the inherent need to possess a flexible and adaptable water supply implementation strategy that can be relied upon during normal and dry weather conditions. The responsible regional water supply agencies have and will continue to adapt their resource plans and strategies to meet climatological, environmental, and legal challenges so that they may continue to provide water supplies to their service areas. The regional water suppliers (i.e., the Water Authority and MWD), along with the District, fully intend to maintain sufficient reliable supplies through the 20-year planning horizon under normal, single, and multiple-dry year conditions to meet projected demand of the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, along with existing and other planned development projects within the District’s service area. If the regional water suppliers determine additional water supplies will be required, or in this case, that water supply portfolios need to be reassessed and redistributed with the intent to serve the existing and future water needs throughout Southern California, the agencies must indicate the status or stage of development of actions identified in the plans they provide. MWD’s 2015 IRP update will then cause the Water Authority to update its IRP, which will then provide the District with the necessary water supply documentation. Identification of a potential future action in such plans does not by itself indicate that a decision to approve or to proceed with the action has been made. The District’s Board approval of the Approval of Water Supply Assessment and Verification Report (November 2017) for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project WSA&V Report does not in any way guarantee water supply to the Project. Alternatively, if the WSA&V Report is written to state that water supply is or will be unavailable; the District must include, in the assessment, a plan to acquire additional water supplies. At this time, the District should not state there is insufficient water supply. At the present time, based on the information available, the District is able to clearly describe the current water supply situation clearly, indicating intent to provide supply through reassessment and reallocation by the regional, as well as, the local water suppliers. In doing so, it is believed that the Board has met the intent of the SB 610 statute, that the land use agencies and the water agencies are coordinating their efforts in planning water supplies for new development. With District Board approval of the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project WSA&V Report, the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project proponents can proceed with the draft environmental documentation required for the CEQA review process. The water supply 4 issues will be addressed in these environmental documents, consistent with the WSA&V Report. The District, as well as others, can comment on the draft EIR with recommendations that water conservation measures and actions be employed on the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project. Some recent actions regarding water supply assessments and verification reports by Otay Water District are as follows:  The Board approved the water supply assessment report for the Otay Ranch University Villages Project on November 6, 2013.  The Board approved the water supply assessment report for the Otay Ranch Resort Village Project on May 7, 2014.  The Board approved the water supply assessment report for the Otay Ranch Planning Area 12 Freeway Commercial Project on April 1, 2015.  The Board approved the water supply assessment report for the Otay 250 Sunroad East Otay Mesa Business Park Specific Plan Amendment Project on July 6, 2016.  The Board approved the water supply assessment report for the City of Chula Vista University Innovation District Project on October 5, 2016. Water supplies necessary to serve the demands of the proposed County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, along with existing and other projected future users, as well as the actions necessary to develop these supplies, have been identified in the water supply planning documents of the District, the Water Authority, and MWD. The WSA&V Report includes, among other information, an identification of existing water supply entitlements, water rights, water service contracts, or agreements relevant to the identified water supply needs for the proposed County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project. The WSA&V Report demonstrates and documents that sufficient water supplies are planned and are intended to be available over a 20-year planning horizon, under normal conditions and in single and multiple-dry years, to meet the projected demand of the proposed and the existing and other planned development projects within the District. Accordingly, after approval of a WSA&V Report for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project by the District's Board of Directors, the WSA&V Report may be used to comply with the requirements of the legislation enacted by Senate Bills 610 and 221 as follows: 5 Senate Bill (SB) 610 Water Supply Assessment: The District's Board of Directors approved WSA&V Report may be incorporated into the California Environmental Quality Act (CEQA) compliance process for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project as a water supply assessment report consistent with the requirements of the legislation enacted by SB 610. The County of San Diego, as lead agency under the CEQA for the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project environmental documentation, may cite the approved WSA&V Report as evidence that a sufficient water supply is planned and intended to be available to serve the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project. Senate Bill (SB) 221 Water Supply Verification: The District's Board of Directors approved WSA&V Report may be incorporated into the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project as a water supply verification report, consistent with the requirements of the legislation enacted by SB 221. The County, within their process of approving the County of San Diego Otay Ranch Village 14 and Planning Area 16/19 Project, may cite the approved WSA&V Report as verification of intended sufficient water supply to serve the Project. EXHIBIT C OTAY WATER DISTRICT WATER SUPPLY ASSESSMENT AND VERIFICATION REPORT for the County of San Diego Otay Ranch Village 14 and Planning Areas 16/19 Project Prepared by: Lisa Coburn-Boyd Environmental Compliance Specialist and Bob Kennedy, P.E. Engineering Manager Otay Water District In consultation with Dexter Wilson Engineering, Inc. And San Diego County Water Authority November 2017 Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project Otay Water District Water Supply Assessment and Verification Report November 2017 Otay Ranch Village 14 and Planning Areas 16/19 Project Table of Contents Executive Summary .................................................................................................................. 1 Section 1 - Purpose .................................................................................................................... 5 Section 2 - Findings ................................................................................................................... 6 Section 3 - Project Description ................................................................................................ 8 Section 4 – Otay Water District ............................................................................................... 9 Section 5 – Historical and Projected Water Demands ........................................................ 12 5.1 Demand Management (Water Conservation) .. Error! Bookmark not defined. Section 6 - Existing and Projected Supplies ......................................................................... 21 6.1 Metropolitan Water District of Southern California 2015 Urban Water Management Plan ......................................................................................... 21 6.1.2 MWD Capital Investment Plan .......................................................... 23 6.2 San Diego County Water Authority Regional Water Supplies ................ 23 6.2.1 Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies ............................................................................................. 25 6.2.1.2 All-American Canal and Coachella Canal Lining Projects .. 32 6.2.1.3 Carlsbad Seawater Desalination Project ............................... 36 6.2.2 Water Authority Capital Improvement Program and Financial Information ........................................................................... 39 6.3 Otay Water District ...................................................................................... 40 6.3.1 Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies ............................................................................................. 41 6.3.1.1 Imported and Regional Supplies ........................................... 42 6.3.1.2 Recycled Water Supplies ...................................................... 44 Section 7 – Conclusion: Availability of Sufficient Supplies ................................................ 52 Source Documents ................................................................................................................... 58 Appendices Appendix A: Otay Ranch Village 14 and Planning Areas 16/19 Project Vicinity Map Appendix B: Otay Ranch Village 14 and Planning Areas 16/19 Project Development Plan Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 1 Otay Water District Water Supply Assessment and Verification Report November 2017 Otay Ranch Village 14 and Planning Areas 16/19 Project Executive Summary The Otay Water District (Otay WD) prepared this Water Supply Assessment and Verification Report (WSA&V Report) at the request of the County of San Diego (County) for the Otay Ranch Village 14 and Planning Areas 16/19 Project. The County is having an environmental impact report (EIR) prepared for the development of this project. Jackson Pendo Development Company is the project applicant. Otay Ranch Village 14 and Planning Areas 16/19 Project Overview and Water Use The Otay Ranch Village 14 and Planning Areas 16/19 Project is located within the jurisdictions of the Otay WD, the San Diego County Water Authority (Water Authority), and the Metropolitan Water District of Southern California (MWD). In order to obtain permanent imported water supply service, land areas are required to be within the jurisdictions of the Otay WD, Water Authority, and MWD. The proposed project entitlement includes a Specific Plan entitled “Otay Ranch Village 14 and Planning Areas 16/19 Specific Plan”, General Plan Amendments, EIR, Rezone, Tentative Map, and an Otay Ranch Resource Management Plan Amendment. The County is having an EIR prepared for development of the 1,283.6 acre site (Otay Ranch Village 14 and Planning Areas 16/19 Project). The land use plan proposes a transitional village between the City of Chula Vista and community of Jamul with up to 1,119 residential units. The project is located within the Otay Ranch General Development Plan along Proctor Valley Road, just east of the City of Chula Vista. Village 14 is planned for 994 homes in three distinct areas (referred to as the South, Central and North Village 14) with 878 single-family homes located in gated enclaves and 116 will be detached courtyard homes. Twelve neighborhoods are planned with approximate densities ranging from 0.2 to 10.0 dwelling units per acre. Otay Ranch Village 14 is planned around a “Village Core”, centrally located in the heart of the village and will include a 9.7-acre elementary school; a 7.2-acre Village Green (public park); a 1.7-acre Mixed Use Site with up to 10,000 square feet of commercial/retail uses; and a 2.3-acre public safety site for a fire station and satellite sheriff’s facility. Additional public and private parks, swim clubs, trails and recreational facilities will be situated throughout South, Central and North Village 14. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 2 Planning Area 19 is planned for 13 one-acre estate lots and Planning Area 16 is planned for 112 lots averaging 3 acres in size. The expected potable water demand for the Otay Ranch Village 14 and Planning Areas 16/19 Project is 797,970 gallons per day (gpd) or about 893.9 acre feet per year (AFY). The number of dwelling units and the areas for commercial development, parks, schools and public safety sites match the total approved units noted on Table C of the District’s -Water Facilities Master Plan Update dated March 2016 (WFMP Update). The entire watershed of the Otay Ranch Village 14 and Planning Areas 16/19 Project is tributary to the Upper and Lower Otay Reservoirs. The use of recycled water within watersheds tributary to surface water storage reservoirs that provide supply for potable domestic water uses must be approved by the owners of the reservoirs in order to protect water quality in these reservoirs. The Applicants for other projects within this watershed have met with and discussed the use of recycled water with the City of San Diego, the operator of the reservoirs. The City of San Diego has requested all projects not use recycled water because they are concerned about the runoff from the project entering the reservoirs and increasing nutrients and salinity. For this reason, the projected water use within the Otay Ranch Village 14 and Planning Areas 16/19 Project has been estimated with the assumption that the use of recycled water within the project will not be allowed. Planned Imported Water Supplies from the Water Authority and MWD The Water Authority and MWD have an established process that ensures supplies are being planned to meet future growth. Any annexations and revisions to established land use plans are captured in the San Diego Association of Governments (SANDAG) updated forecasts for land use planning, demographics, and economic projections. SANDAG serves as the regional, intergovernmental planning agency that develops and provides forecast information. The Water Authority and MWD update their demand forecasts and supply needs based on the most recent SANDAG forecast approximately every five years to coincide with preparation of their UWMP’s. Prior to the next forecast update, local jurisdictions with land use authority may require water supply assessment and/or verification reports for proposed land developments that are not within the OTAY WD, Water Authority, or MWD jurisdictions (i.e. pending or proposed annexations) or that have revised land use plans with either lower or higher development intensities than reflected in the existing growth forecasts. Proposed land areas with pending or proposed annexations, or revised land use plans, typically result in creating higher demand and supply requirements than previously anticipated. The Otay WD, Water Authority, and MWD next demand forecast and supply requirements and associated planning documents would then capture any increase or decrease in demands and required supplies as a result of annexations or revised land use planning decisions. An important planning document utilized by MWD, the Water Authority and Otay WD is the Integrated Resources Plan (IRP) which describes an agency’s long term water plan. MWD’s Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 3 2015 IRP offers an adaptive management strategy to protect the region from future supply shortages. This adaptive management strategy has five components: achieve additional conservation savings, develop additional local water supplies, maintain Colorado River Aqueduct supplies, stabilize State Water Project supplies, and maximize the effectiveness of storage and transfer. MWD’s 2015 IRP has a plan for identifying and implementing additional resources that expand the ability for MWD to meet future changes and challenges as necessary to ensure future reliability of supplies. The proper management of these resources help to ensure that the southern California region, including San Diego County, will have adequate water supplies to meet long-term future demands. Another important planning document is the UWMP. The California Urban Water Management Planning Act (Act), which is included in the California Water Code, requires all urban water suppliers within the state to prepare an UWMP and update it every five years. The purpose and importance of the UWMP has evolved since it was first required 25 years ago. State agencies and the public frequently use the document to determine if agencies are planning adequately to reliably meet future demands. As such, UWMPs serve as an important element in documenting supply availability for the purpose of compliance with state laws, Senate Bills 610 and 221, linking water supply sufficiency to large land-use development approval. Agencies must also have a UWMP prepared, pursuant to the Act, in order to be eligible for state funding and drought assistance. MWD’s 2015 UWMP Findings state that MWD has supply capabilities that would be sufficient to meet expected demands from 2020 through 2040. MWD has plans for supply implementation and continued development of a diversified resource mix including programs in the Colorado River Aqueduct, State Water Project, Central Valley Transfers, local resource projects, and in-region storage that enables the region to meet its water supply needs. The County Water Authority Act, Section 5 subdivision 11, states that the Water Authority “as far as practicable, shall provide each of its member agencies with adequate supplies of water to meet their expanding and increasing needs.” As part of preparation of a written water supply assessment report, an agency’s shortage contingency analysis should be considered in determining sufficiency of supply. Section 11 of the Water Authority’s 2015 UWMP Update contain a detailed shortage contingency analysis that addresses a regional catastrophic shortage situation and drought management. The analysis demonstrates that the Water Authority and its member agencies, through the Integrated Contingency Plan, Emergency Storage Project, and Water Shortage and Drought Response Plan are taking actions to prepare for and appropriately handle an interruption of water supplies. The Water Shortage and Drought Response Plan, provides the Water Authority and its member agencies with a series of potential actions to take when faced with a shortage of imported water supplies from MWD due to prolonged drought or other supply shortfall conditions. The actions will help the region avoid or minimize the impacts of shortages and ensure an equitable allocation of supplies. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 4 Water supply agencies throughout California continue to face climate, environmental, legal, and other challenges that impact water source supply conditions, such as the court rulings regarding the Sacramento-San Joaquin Delta issues and reoccurring droughts impacting the western states. Even with these ever present challenges, the Water Authority and MWD, along with Otay WD fully intend to have sufficient, reliable supplies to serve demands. Otay Water District Water Supply Development Program In evaluating the availability of sufficient water supply, the Otay Ranch Village 14 and Planning Areas 16/19 Project will be required to participate in the water supply development program being implemented by the Otay WD. This is intended to be achieved through financial participation in several local and/or regional water supply development projects envisioned by the Otay WD. These water supply projects are in addition to those identified as sustainable supplies in the current Water Authority and MWD UWMP, IRP, Master Plans, and other planning documents, and are in response to the regional water supply issues. These new water supply projects are not currently developed and are in various stages of the planning process. Imported water supplies along with the development of these additional Otay WD water supply development projects supplies are intended to increase water supplies to serve the Otay Ranch Village 14 and Planning Areas 16/19 Project water supply needs and that of other similar development projects. The Otay WD water supply development program includes but is not limited to projects such as the Middle Sweetwater River Basin Groundwater Well project, the Rancho del Rey Groundwater Well project, the North District Recycled Water Supply Concept, and the Rosarito Ocean Desalination Facility project. The Water Authority and MWD’s next forecasts and supply planning documents would capture any increase in water supplies resulting from any new water resources developed by the Otay WD. Findings The WSA&V Report identifies and describes the processes by which water demand projections for the proposed Otay Ranch Village 14 and Planning Areas 16/19 project will be fully included in the water demand and supply forecasts of the Urban Water Management Plans and other water resources planning documents of the Water Authority and MWD. Water supplies necessary to serve the demands of the proposed project, along with existing and other projected future users, as well as the actions necessary and status to develop these supplies, have been identified in the Otay Ranch Village 14 and Planning Areas 16/19 project WSA&V Report and will be included in the future water supply planning documents of the Water Authority and MWD. This WSA&V Report includes, among other information, an identification of existing water supply entitlements, water rights, water service contracts, water supply projects, or agreements relevant to the identified water supply needs for the proposed Otay Ranch Village Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 5 14 and Planning Areas 16/19 project. The WSA&V Report demonstrates and documents that sufficient water supplies are planned for and are intended to be available over a 20-year planning horizon, under normal conditions and in single and multiple dry years to meet the projected demand of the proposed Otay Ranch Village 14 and Planning Areas 16/19 project and the existing and other planned development projects to be served by the Otay WD. Accordingly, after approval of a WSA&V Report for the Otay Ranch Village 14 and Planning Areas 16/19 project by the Otay WD Board of Directors (Board), the WSA&V Report may be used to comply with the requirements of the legislation enacted by Senate Bills 610 and 221 as follows: 1. Senate Bill 610 Water Supply Assessment: The Otay WD Board approved WSA&V Report may be incorporated into the California Environmental Quality Act (CEQA) Environmental Impact Report (EIR) compliance process for the Otay Ranch Village 14 and Planning Areas 16/19 project as a water supply assessment report consistent with the requirements of the legislation enacted by SB 610. The County, as lead agency under CEQA for the Otay Ranch Village 14 and Planning Areas 16/19 project EIR and Alternatives, may cite the approved WSA&V Report as evidence that a sufficient water supply is planned for and is intended to be made available to serve the Otay Ranch Village 14 and Planning Areas 16/19 project. 2. Senate Bill 221 Water Supply Verification: The Otay WD Board approved WSA&V Report may be incorporated into the County’s Tentative Map approval process for the Otay Ranch Village 14 and Planning Areas 16/19 project as a water supply verification report, consistent with the requirements of the legislation enacted by SB 221. The County, within their process of approving the Otay Ranch Village 14 and Planning Areas 16/19 project’s Tentative Map, may cite the approved WSA&V Report as verification of intended sufficient water supply to serve the Otay Ranch Village 14 and Planning Areas 16/19 project. Section 1 - Purpose The County of San Diego is having an environmental impact report (EIR) prepared for the development of the 1283.6 acre project (Otay Ranch Village 14 and Planning Areas 16/19 Project). The project is located within the Otay Ranch General Development Plan along Proctor Valley Road between the City of Chula Vista and the community of Jamul. The County requested that the Otay WD prepare a Water Supply Assessment and Verification (WSA&V) Report for the Otay Ranch Village 14 and Planning Areas 16/19 Project. The Otay Ranch Village 14 and Planning Areas 16/19 Project description is provided in Section 3 of this WSA&V Report. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 6 This WSA&V Report for the Otay Ranch Village 14 and Planning Areas 16/19 project has been prepared by the Otay WD in consultation with Dexter Wilson Engineering, Inc., the Water Authority, and the County pursuant to Public Resources Code Section 21151.9 and California Water Code Sections 10631, 10656, 10910, 10911, 10912, and 10915 referred to as Senate Bill (SB) 610 and Business and Professions Code Section 11010 and Government Code Sections 65867.5, 66455.3, and 66473.7 referred to as SB 221. SB 610 and SB 221 amended state law, effective January 1, 2002, is intended to improve the link between the information on water supply availability and certain land use decisions made by cities and counties. SB 610 requires that the water purveyor of the public water system prepare a water supply assessment to be included in the CEQA documentation and approval process of certain proposed projects. SB 221 requires affirmative written verification from the water purveyor of the public water system that sufficient water supplies are to be available for certain residential subdivisions of property prior to approval of a tentative map. The requirements of SB 610 and SB 221 are being addressed by this WSA&V Report. The County also requested, since the requirements of SB 610 and SB 221 are substantially similar, that Otay WD prepare both the water supply assessment and verification concurrently. This WSA&V Report evaluates water supplies that are planned to be available during normal, single dry year, and multiple dry water years during a 20-year planning horizon to meet existing demands, expected demands of the Otay Ranch Village 14 and Planning Areas 16/19 Project, and reasonably foreseeable planned future water demands to be served by Otay WD. The Otay Water District Board of Directors approved WSA&V Report is planned to be used by the County in its evaluation of the Otay Ranch Village 14 and Planning Areas 16/19 Project under the CEQA approval process procedures. Section 2 - Findings The Otay WD prepared this WSA&V Report at the request of the County for the Otay Ranch Village 14 and Planning Areas 16/19 Project. Jackson Pendo Development Company submitted an entitlement application to the County for the project. The Otay Ranch Village 14 and Planning Areas 16/19 Project is located within the jurisdictions of the Otay WD, the Water Authority, and MWD. To obtain permanent imported water supply service, land areas are required to be within the jurisdictions of the Otay WD, Water Authority, and MWD to utilize imported water supply. The expected potable water demand for the Otay Ranch Village 14 and Planning Areas 16/19 Project is 797,970 gallons per day (gpd) or about 893.9 acre feet per year (AFY). The number of dwelling units and the areas for commercial development, parks, schools and public safety sites match the total approved units noted on Table C of the District’s Water Facilities Master Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 7 Plan Update dated March 2016 (WFMP Update). Recycled water is not proposed to be used on the project due to its proximity to Upper Otay Reservoir. The Water Authority and MWD have an established process that ensures supplies are being planned to meet future growth. Any annexations and revisions to established land use plans are captured in the San Diego Association of Governments (SANDAG) updated forecasts for land use planning, demographics, and economic projections. SANDAG serves as the regional, intergovernmental planning agency that develops and provides forecast information. The Water Authority and MWD update their demand forecasts and supply needs based on the most recent SANDAG forecast approximately every five years to coincide with preparation of their urban water management plans. Prior to the next forecast update, local jurisdictions may require water supply assessment and/or verification reports for proposed land developments that are not within the Otay WD, Water Authority, or MWD jurisdictions (i.e. pending or proposed annexations) or that have revised land use plans with lower or higher land use intensities than reflected in the existing growth forecasts. Proposed land areas with pending or proposed annexations, or revised land use plans, typically result in creating higher demand and supply requirements than anticipated. The Otay WD, the Water Authority, and MWD next demand forecast and supply requirements and associated planning documents would then capture any increase or decrease in demands and required supplies as a result of annexations or revised land use planning decisions. This process is utilized by the Water Authority and MWD to document the water supplies necessary to serve the demands of the Otay Ranch Village 14 and Planning Areas 16/19 project, along with existing and other projected future users, as well as the actions necessary to develop any required water supplies. Through this process the necessary demand and supply information is thus assured to be identified and incorporated within the water supply planning documents of the Water Authority and MWD. This WSA&V Report includes, among other information, an identification of existing water supply entitlements, water rights, water service contracts, proposed water supply projects, and agreements relevant to the identified water supply needs for the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project. This WSA&V Report incorporates by reference the current Urban Water Management Plans and other water resources planning documents of the Otay WD, the Water Authority, and MWD. The Otay WD prepared this WSA&V Report to assess and document that sufficient water supplies are planned for and are intended to be acquired to meet projected water demands of the Otay Ranch Village 14 and Planning Areas 16/19 Project as well as existing and other reasonably foreseeable planned development projects within the Otay WD for a 20-year planning horizon, in normal supply years and in single dry and multiple dry years. The Otay Water District 2015 UWMP includes a water conservation component to comply with Senate Bill 7 of the Seventh Extraordinary Session (SBX 7-7), which became effective February 3, 2010. This new law was the water conservation component to the Delta legislation package, and seeks to achieve a 20 percent statewide reduction in urban per capita Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 8 water use in California by December 31, 2020. Specifically, SBX 7-7 from this Extraordinary Session requires each urban retail water supplier to develop urban water use targets to help meet the 20 percent reduction goal by 2020 (20x2020), and an interim water reduction target by 2015. Otay WD adopted Method 1 to set its 2015 interim and 2020 water use targets. Method 1 requires setting the 2020 water use target to 80 percent of baseline per capita water use target as provided in the State’s 20x2020 Water Conservation Plan. The Otay WD 2015 target was 172 gpcd which it met (2015 actual was 124 gpcd) and the 2020 gpcd target (80 percent of baseline) is 153 gpcd. The Otay WD’s recent per capita water use has been declining and current water use already meets the 2020 target as calculated using Method 1. This recent decline in per capita water use is largely due to drought water use restrictions, increased water costs, and economic conditions. However, Otay WD’s effective water use awareness campaign and enhanced conservation mentality of its customers will likely result in some long-term carryover of these reduced consumption rates. Based on a normal water supply year, the five-year increments for a 20-year projection indicate projected potable and recycled water supply is being planned for and is intended to be acquired to meet the estimated water demand targets of the Otay WD (42,720 acre-feet (ac-ft) in 2020 to 57,582 ac-ft in 2040) per the Otay Water District 2015 UWMP. Based on dry year forecasts, the estimated water supply is also being planned for and is intended to be acquired to meet the projected water demand, during single dry and multiple dry year scenarios. On average, the dry-year demands are about 6.64 percent higher than the normal year demands. The Otay WD recycled water supply is assumed to be drought-proof and not subject to reduction during dry periods. Together, these findings assess, demonstrate, and document that sufficient water supplies are planned for and are intended to be acquired for the Otay Ranch Village 14 and Planning Areas 16/19 Project. In addition, the actions necessary to develop these supplies are and will be further documented, to serve the proposed project and the existing and other reasonably foreseeable planned development projects within the Otay WD in both normal and single and multiple dry year forecasts for a 20-year planning horizon. Section 3 - Project Description The Otay Ranch Village 14 and Planning Areas 16/19 Project is located along Proctor Valley Road within the Proctor Valley Parcel of the Otay Ranch Development. Refer to Appendix A for a vicinity map of the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project. The project is proposed to be located on 1,283.6 acres within the Otay Ranch General Development Plan. Although the proposed development is located within the County and subject to the County’s land use jurisdiction, the Otay WD is the potable and recycled water Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 9 purveyor. The Otay Ranch Village 14 and Planning Areas 16/19 Project is within the jurisdictions of the Otay WD, the Water Authority, and MWD. The Otay Ranch Village 14 and Planning Areas 16/19 Project is planned to include up to 994 residential homes in the Village 14 core area that includes a school, public use facility, mixed use commercial site, parks, and open space. An additional 125 lower density residential units are proposed in Planning Areas 16/19 for a total of up to 1,119 residential units. Refer to Appendix B for the proposed development plan of the Otay Ranch Village 14 and Planning Areas 16/19 project. The EIR proposes a land exchange alternative for the project that would designate Planning Areas 16/19 as open space and allow for the development of up to 1,530 residential units in Village 14. This land use alternative includes lands within Village 14 and Planning Area 16 that are owned by the State of California. The State of California is considering, but has not approved, the land exchange alternative. The County has discretionary authority on land use decisions for the Otay Ranch Village 14 and Planning Areas 16/19 Project and can establish actions and/or permit approval requirements. The projected potable water demands associated with the Otay Ranch Village 14 and Planning Areas 16/19 Project EIR has considered the anticipated County discretionary actions and/or permit approvals and are incorporated into and used in this WSA&V Report. The water demands for the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project are included in the projected water demand estimates provided in Section 5 – Historical and Projected Water Demands. Section 4 – Otay Water District The Otay WD is a municipal water district formed in 1956 pursuant to the Municipal Water District Act of 1911 (Water Code §§ 71000 et seq.). The Otay WD joined the Water Authority as a member agency in 1956 to acquire the right to purchase and distribute imported water throughout its service area. The Water Authority is an agency responsible for the wholesale supply of water to its 24 public agency members in San Diego County. The Otay WD currently meets all its potable demands with imported treated water from the Water Authority. The Water Authority is the agency responsible for the supply of imported water into San Diego County through its membership in MWD. The Water Authority currently obtains about 40% of its imported supply from MWD, but is in the process of further diversifying its available supplies. The Otay WD provides water service to residential, commercial, industrial, and agricultural customers, and for environmental and fire protection uses. In addition to providing water throughout its service area, Otay WD also provides sewage collection and treatment services to a portion of its service area known as the Jamacha Basin. The Otay WD also owns and operates the Ralph W. Chapman Water Reclamation Facility (RWCWRF) which has an Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 10 effective treatment capacity of 1.2 million gallons per day (mgd) or about 1,300 acre feet per year to produce recycled water. On May 18, 2007, an additional source of recycled water supply of up to 6 mgd, or about 6,720 acre feet per year, became available to Otay WD from the City of San Diego’s South Bay Water Reclamation Plant (SBWRP). The Otay WD jurisdictional area is generally located within the south central portion of San Diego County and includes approximately 125 square miles. The Otay WD serves portions of the unincorporated communities of southern El Cajon, La Mesa, Rancho San Diego, Jamul, Spring Valley, Bonita, and Otay Mesa, the eastern portion of the City of Chula Vista and a portion of the City of San Diego on Otay Mesa. The Otay WD jurisdiction boundaries are roughly bounded on the north by the Padre Dam Municipal Water District, on the northwest by the Helix Water District, and on the west by the South Bay Irrigation District (Sweetwater Authority) and the City of San Diego. The southern boundary of Otay WD is the international border with Mexico. The planning area addressed in the Otay WD WFMP Update and the Otay WD 2015 UWMP includes both the land within the jurisdictional boundary of the Otay WD and those areas outside of the present Otay WD boundaries considered to be in the Area of Influence of the Otay WD. Figure 3-1 contained within the Otay WD 2015 UWMP shows the jurisdictional boundary of the Otay WD and the Area of Influence. The planning area is approximately 143 square miles, of which approximately 125 square miles are within the Otay WD current boundaries and approximately 18 square miles are in the Area of Influence. The area east of Otay WD is rural and currently not within any water purveyor jurisdiction and potentially could be served by the Otay WD in the future if the need for imported water becomes necessary, as is the case for the Area of Influence. The City of Chula Vista, the City of San Diego, and the County of San Diego are the three land use planning agencies within the Otay WD jurisdiction. Data on forecasts for land use planning, demographics, economic projections, population, and the future rate of growth within Otay WD were obtained from the San Diego Association of Governments (SANDAG). SANDAG serves as the regional, intergovernmental planning agency that develops and provides forecast information through the year 2050. Population growth within the Otay WD service area is expected to increase from the 2015 figure of 217,339 to an estimated 285,340 by 2040. Land use information used to develop water demand projections are based upon Specific or Sectional Planning Areas, the Otay Ranch General Development Plan/Sub- regional Plan, East Otay Mesa Specific Plan Area, San Diego County Community Plans, and City of San Diego, City of Chula Vista, and County of San Diego General Plans. The Otay WD long-term historic growth rate has been approximately 4 percent. The growth rate has significantly slowed due to the current economic conditions and it is expected to slow as the inventory of developable land is diminished. Climatic conditions within the Otay WD service area are characteristically Mediterranean near the coast, with mild temperatures year round. Inland areas are both hotter in summer and Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 11 cooler in winter, with summer temperatures often exceeding 90 degrees and winter temperatures occasionally dipping to below freezing. Most of the region’s rainfall occurs during the months of December through March. Average annual rainfall is approximately 10.08 inches per year. Historic climate data were obtained from the Western Regional Climate Center for Station 042706 (El Cajon). This station was selected because its annual temperature variation is representative of most of the Otay WD service area. While there is a station in the City of Chula Vista, the temperature variation at the City of Chula Vista station is more typical of a coastal environment than the conditions in most of the Otay WD service area. Urban Water Management Plan In accordance with the California Urban Water Management Planning Act and recent legislation, the Otay WD Board of Directors adopted an UWMP in June 2016 and subsequently submitted the plan to the California Department of Water Resources (DWR). As required by law, the Otay Water District 2015 UWMP includes projected water supplies required to meet future demands through 2040. In accordance with Water Code Section 10910 (c)(2) and Government Code Section 66473.7 (c)(3), information from the Otay WD 2015 UWMP along with supplemental information from the Otay WD WFMP Update have been utilized to prepare this WSA Report and are incorporated herein by reference. The state Legislature passed Senate Bill 7 as part of the Seventh Extraordinary Session (SBX 7-7) on November 10, 2009, which became effective February 3, 2010. This new law was the water conservation component to the Delta legislation package and seeks to achieve a 20 percent statewide reduction in urban per capita water use in California by December 31, 2020. Specifically, SBX 7-7 from this Extraordinary Session requires each urban retail water supplier to develop urban water use targets to help meet the 20 percent reduction goal by 2020 (20x2020), and an interim water reduction target by 2015. The SBX 7-7 target setting process includes the following: (1) baseline daily per capita water use; (2) urban water use target; (3) interim water use target; (4) compliance daily per capita water use, including technical bases and supporting data for those determinations. In order for an agency to meet its 2020 water use target, each agency can increase its use of recycled water to offset potable water use and also step up its water conservation measures. The required water use targets for 2020 and an interim target for 2015 are determined using one of four target methods – each method has numerous methodologies. In 2015, urban retail water suppliers were required to report interim compliance followed by actual compliance in 2020. Interim compliance is halfway between the baseline water use and 2020 target. Baseline, target, and compliance-year water use estimates are required to be reported in gallons per capita per day (gpcd). Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 12 Failure to meet adopted targets will result in the ineligibility of a water supplier to receive grants or loans administered by the State unless one (1) of two (2) exceptions is met. Exception one (1) states a water supplier may be eligible if they have submitted a schedule, financing plan, and budget to DWR for approval to achieve the per capita water use reductions. Exception two (2) states a water supplier may be eligible if an entire water service area qualifies as a disadvantaged community. Otay WD adopted Method 1 to set its 2015 interim and 2020 water use targets. Method 1 requires setting the 2020 water use target to 80 percent of baseline per capita water use target as provided in the State’s 20x2020 Water Conservation Plan. The Otay WD was well below its required 2015 target of 172 gpcd, with an actual 2015 gpcd of 124. The 2020 gpcd target which is 80 percent of baseline is 153 gpcd. The Otay WD’s recent per capita water use has been declining to the point where current water use already meets the 2020 target for Method 1. This recent decline in per capita water use is largely due to drought water use restrictions, increased water costs, and poor economic conditions. However, Otay WD’s effective water use awareness campaign and enhanced conservation mentality of its customers will likely result in some long-term carryover of these reduced consumption rates beyond the current drought period. Section 5 – Historical and Projected Water Demands The projected demands for Otay WD are based on Specific or Sectional Planning Areas, the Otay Ranch General Development Plan/Sub-regional Plan, the East Otay Mesa Specific Plan Area, San Diego County Community Plans, and City of San Diego, City of Chula Vista, and County of San Diego General Plans. This land use information is also used by SANDAG as the basis for its most recent forecast data. This land use information was utilized for the preparation of the Otay Water District WFMP Update and Otay Water District 2015 UWMP to develop the forecasted demands and supply requirements. In 1994, the Water Authority selected the Institute for Water Resources-Municipal and Industrial Needs (MAIN) computer model to forecast municipal and industrial water use for the San Diego region. The MAIN model uses demographic and economic data to project sector-level water demands (i.e. residential and non-residential demands). This econometric model has over a quarter of a century of practical application and is used by many cities and water agencies throughout the United States. The Water Authority’s version of the MAIN model was modified to reflect the San Diego region’s unique parameters and is known as CWA-MAIN. The foundation of the water demand forecast is the underlying demographic and economic projections. This was a primary reason why, in 1992, the Water Authority and SANDAG entered into a Memorandum of Agreement (MOA) in which the Water Authority agreed to Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 13 use the SANDAG current regional growth forecast for water supply planning purposes. In addition, the MOA recognizes that water supply reliability must be a component of San Diego County’s regional growth management strategy required by Proposition C, as passed by the San Diego County voters in 1988. The MOA ensures a strong linkage between local general plan land use forecasts and water demand projections and resulting supply needs for the San Diego region. Consistent with the previous CWA-MAIN modeling efforts, on October 15, 2013, the SANDAG Board of Directors accepted the Series 13: 2050 Regional Growth Forecast. The 2050 Regional Growth Forecast will be used by SANDAG as the foundation for the next Regional Comprehensive Plan update. SANDAG forecasts were used by local governments for planning, including the Water Authority 2015 UWMP update. The municipal and industrial forecast also included an updated accounting of projected conservation savings based on projected regional implementation of the California Urban Water Conservation Council (CUWCC) Best Management Practices and SANDAG demographic information for the period 2015 through 2050. These savings estimates were then factored into the baseline municipal and industrial demand forecast. Agricultural demand projections were developed through a cooperative effort between Water Authority staff, Water Authority member agencies, SANDAG, County of San Diego Agricultural Weights and Measures, and the California Avocado Commission. Forecast driver variables include irrigated acreage within the Water Authority’s service area, estimated crop type distribution, and calculated historic water-use factors. SANDAG’s projection of agricultural land conversions to other land use categories provides the long-term trend in acreage used to forecast agricultural water use. The total agricultural forecast is then separated into two categories: (1) projected demands in the Water Authority’s Transitional Special Agricultural Water Rate (TSAWR) program and (2) demands under the Water Authority M&I rate or agricultural demands met through local supplies. The Water Authority and MWD update their water demand and supply projections within their jurisdictions utilizing the SANDAG most recent growth forecast to project future water demands. This provides for the important strong link between demand and supply projections to the land use plans of the cities and the county. This provides for consistency between the retail and wholesale agencies water demand projections, thereby ensuring that adequate supplies are and will be planned for the Otay WD existing and future water users. Existing land use plans, any revisions to land use plans, and annexations are captured in the SANDAG updated forecasts. The Water Authority and MWD update their demand forecasts based on the SANDAG most recent forecast approximately every five years to coincide with preparation of their urban water management plans. Prior to the next forecast update, local jurisdictions may require water supply assessment and/or verification reports consistent with Senate Bills 610 and 221 for proposed land use developments that either have pending or proposed annexations into the Otay WD, Water Authority, and MWD or that have revised land use plans than originally anticipated. The Water Authority and MWD’s next forecasts Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 14 and supply planning documents would then capture any increase or decrease in demands caused by annexations or revised land use plans. In evaluating the availability of sufficient water supply, the Otay Ranch Village 14 and Planning Areas 16/19 Project proponents are required to participate in the development of alternative water supply project(s). This can be achieved through payment of the New Water Supply Fee adopted by the Otay WD Board in May 2010. These water supply projects are in addition to those identified as sustainable supplies in the current Water Authority and MWD UWMP, IRP, Master Plans, and other planning documents. These new water supply projects are in response to the regional water supply issues related to the Sacramento-San Joaquin Delta and the current ongoing western states drought conditions. These additional water supply projects are not currently developed and are in various stages of the planning process. A few examples of these alternative water supply projects include the Middle Sweetwater River Basin Groundwater Well project, the Otay WD Desalination project, and the Rancho del Rey Groundwater Well project. The Water Authority and MWD next forecast and supply planning documents would capture any increase in water supplies resulting from verifiable new water resources developed by the Otay WD. In addition, MWD’s 2015 UWMP identified potential reserve supplies in the supply capability analysis (Tables 2-4, 2-5, and 2-6), which could be available to meet any unanticipated demands. The Water Authority and MWD’s next forecasts and supply planning documents would capture any increase in necessary supply resources resulting from any new water supply resources. Demand Methodology The Otay WD water demand projection methodology in the WFMP Update utilizes a component land use approach. This is done by applying representative values of water use to the acreage of each land use type and then aggregating these individual land use demand projections into an overall total demand for the Otay WD. This is called the water duty method, and the water duty is the amount of water used in gallons per day per acre per year. This approach is used for all the land use types except residential development where a demand per dwelling unit was applied. In addition, commercial and industrial water use categories are further subdivided by type including separate categories for golf courses, schools, jails, prisons, hospitals, etc. where specific water demands are established. To determine water duties for the various types of land use, the entire water meter database of the Otay WD is utilized and sorted by the appropriate land use types. The metered consumption records are then examined for each of the land uses, and water duties are determined for the various types of residential, commercial, industrial, and institutional land uses. For example the water duty factors for commercial and industrial land uses are estimated using 1,785 and 893 gallons per day per acre (gpd/acre) respectively. Residential water demand is established based on the same data but computed on a per-dwelling unit basis. The focus is to ensure that for each of the residential land use categories (very low, low, medium, and high densities), the demand criteria Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 15 used is adequately represented based upon actual data. This method is used because residential land uses constitute a substantial percentage of the total developable planning area of the Otay WD. The WFMP Update calculates potable water demand by taking the gross acreage of a site and applying a potable water reduction factor (PWRF), which is intended to represent the percentage of acreage to be served by potable water and that not served by recycled water for irrigation. For industrial land use, as an example, the PWRF is 0.95 (i.e., 95% of the site is assumed to be served by potable water, 5% of the site is assumed to be irrigated with recycled water, if available). The potable net acreage is then multiplied by the unit demand factor corresponding to its respective land use. This approach is used in the WFMP Update for all the land use types except residential development where a demand per dwelling unit is applied. In addition, commercial and industrial water use categories are further subdivided by type including separate categories for golf courses, schools, jails, prisons, hospitals, etc. where specific water demands are allocated. Otay Water District Projected Demand By applying the established water duties to the proposed land uses, the projected water demand for the entire Otay WD planning area at ultimate development is determined. Projected water demands for the intervening years were determined using growth rate projections consistent with data obtained from SANDAG and the experience of the Otay WD. The historical and projected potable water demands for Otay WD are shown in Table 1. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 16 Table 1 Historical and Projected Potable Water Fiscal Year Demands (acre-feet) Water Use Sectors 2010 2015 2020 2025 2030 2035 2040 Single Family Residential 17,165 16,228 17,072 19,806 20,752 20,649 23,224 Multi-Family Residential 3,605 3,460 5,557 6,732 7,342 7,585 8,837 Commercial, Industrial & Institutional 4,110 4,953 6,577 7,949 8,653 8,923 10,378 Landscape 3,732 4,079 4,400 4,600 4,700 4,900 5,200 AFG* - University I. D. 11.7 11.7 11.7 11.7 11.7 AFG – PA 12 46 46 46 46 46 AFG – Otay 250 836 836 836 836 836 Near-term Annexations 2,973 2,973 2,973 2,973 2,973 Other 2,563 1,578 470 470 470 470 470 Totals 31,175 30,298 37,943 43,424 45,784 46,394 51,976 Source: Otay Water District 2015 UWMP. *Accelerated Forecasted Growth Increment Otay Ranch Village 14 and Planning Areas 16/19 Project Projected Water Demand Using the land use demand projection methodology noted above, the projected potable water demand for the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project is shown in Table 2. The projected potable water demand is 797,970 gpd, or about 893.9 ac-ft/yr. The number of dwelling units and the areas for commercial development, parks, schools and public safety sites match the total approved units noted on Table C of the District’s Water Facilities Master Plan Update dated March 2016 (WFMP Update). Table 2 Otay Ranch Village 14 and Planning Area 16/19 Project Projected Potable Water Annual Average Demands Neighborhood Land Use Designation Gross Acres Quantity, Units Water Duty Factor Total Average Water Demand, GPD 980 Zone R-1 SF Residential 18.0 81 435 gpd/unit 35,235 R-2 SF Residential 38.5 82 700 gpd/unit 57,400 Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 17 Neighborhood Land Use Designation Gross Acres Quantity, Units Water Duty Factor Total Average Water Demand, GPD R-3 SF Residential 41.1 73 700 gpd/unit 51,100 R-4 Residential 13.8 116 435 gpd/unit 50,460 R-5 (portion) SF Residential 30.0 88 700 gpd/unit 61,600 R-6 (portion) SF Residential 17.4 48 700 gpd/unit 33,600 R-7 (portion) SF Residential 2.6 7 700 gpd/unit 4,900 R-10 (portion) SF Residential 14.4 28 700 gpd/unit 19,600 R-11 (portion) SF Residential 6.1 13 700 gpd/unit 9,100 R-12 SF Residential 18.9 4 1,000 gpd/unit 4,000 MU-C Mixed Use-Com 1.7 --- 1,785 gpd/ac 3,035 P-1 Park 2.9 --- 1,900 gpd/ac 5,510 P-2 Park 7.2 --- 1,900 gpd/ac 13,680 P-3 Park 3.7 --- 1,900 gpd/ac 7,030 PP-1 Private Park 1.0 --- 1,900 gpd/ac 1,900 PP-4 Private Park 1.5 --- 1,900 gpd/ac 2,850 PPP Private Park 2.5 --- 1,900 gpd/ac 4,750 FS-1 Public Safety 2.3 --- 1,785 gpd/ac 4,105 S-1 School 9.7 971 435 gpd/unit 42,195 Subtotal 980 Zone 637 412,050 1296 Zone R-5 (portion) SF Residential 5.1 15 700 gpd/unit 10,500 R-6 (portion) SF Residential 8.3 23 700 gpd/unit 16,100 R-7 (portion) SF Residential 38.1 101 700 gpd/unit 70,700 R-8 SF Residential 28.7 75 700 gpd/unit 52,500 R-9 SF Residential 30.3 74 700 gpd/unit 51,800 R-10 (portion) SF Residential 10.7 21 700 gpd/unit 14,700 R-11 (portion) SF Residential 22.3 48 700 gpd/unit 33,600 R-13 SF Residential 14.3 13 1,000 gpd/unit 13,000 R-14 SF Residential 192.0 71 1,000 gpd/unit 71,000 R-16 (portion) SF Residential 27.1 7 1,000 gpd/unit 7,000 P-4 Park 1.4 --- 1,900 gpd/ac 2,660 Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 18 Neighborhood Land Use Designation Gross Acres Quantity, Units Water Duty Factor Total Average Water Demand, GPD PP-2 Private Park 1.2 --- 1,900 gpd/ac 2,280 PP-3 Private Park 0.7 --- 1,900 gpd/ac 1,330 PPP Private Park 2.5 --- 1,900 gpd/ac 4,750 Subtotal 1296 Zone 448 351,920 1460 Zone R-15 SF Residential 41.9 11 1,000 gpd/unit 11,000 R-16 (portion) SF Residential 89.2 23 1,000 gpd/unit 23,000 Subtotal 1460 Zone 34 34,000 TOTAL 1,119 797,970 5.1 Demand Management (Water-Use Efficiency) Demand management, or water-use efficiency is a critical part of the Otay Water District’s 2015 Urban Water Management Plan (UWMP) and its long-term strategy for meeting the water supply needs of its customers. Water conservation is frequently the lowest cost resource available to any water agency. The Otay WD’s water conservation program objectives are to: • Reduce the demand for more expensive, imported water. • Ensure a reliable water supply. The Otay WD was one of the original signatories to the Memorandum of Understanding (MOU) regarding Urban Water Conservation in California, which created the California Urban Water Conservation Council (CUWCC) in 1991 in an effort to reduce California's long-term water demands. The Otay WD has been a long-standing supporter of the CUWCC through its implementation of Best Management Practices (BMPs), which required the District to submit biannual reports that detailed the implementation of its conservation programs. As a result of the 2014-2017 drought and the state’s changing regulatory, political, social, economic, and environmental climate, CUWCC members and its Board, in 2017, restructured the organization and renamed it the California Water Efficiency Partnership (CWEP). The new framework allows the organization to better fulfill its members’ needs, quickly adapt to the changing climate, provide resources about water-use efficiency issues in California, and foster collaboration among a wide Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 19 variety of stakeholders. The Otay WD is currently a member of CWEP as part of its effort to continue upholding its long-term commitment in reducing the state’s water demands, diversifying local water supply, and encouraging its customer to make conservation a way of life. In addition to meeting customer demands during a drought, the District consistently advocates for state policies and legislation that include supply development and water-use efficiency. The District continues to work closely with the Water Authority, the Association of California Water Agencies, and other water agencies in the region to ensure that the targets and measures in the State Water Resources Control Board’s (SWRCB) long-term framework support a balanced approach and reflect local water supply investments and conditions. Water conservation programs are developed and implemented on the premise that water conservation increases the local water supply by reducing the demand on available imported supply, which is vital to the optimal utilization of a region's water supply resources. The Otay WD participates in many water conservation programs designed and typically operated on a shared cost-participation program basis among the Water Authority, MWD, and their member agencies. The demands shown in Tables 1 and 2 take into account implementation of water conservation measures within Otay WD. As part of the preceding CUWCC’s BMPs requirements, the Otay WD implemented water conservation programs and provided services to its customers to promote water-use efficiencies and water savings. It continues to do so today. As a member of the Water Authority, Otay WD also benefits from regional programs performed on behalf of its member agencies. In partnership with the Water Authority, the County of San Diego, City of San Diego, City of Chula Vista, and developers, the Otay WD water-use efficiency efforts are expected to grow and expand. The resulting savings directly relate to additional available water in the San Diego County region for beneficial use within the Water Authority service area, including the Otay WD. Additional conservation or water-use efficiency measures or programs practiced by the Otay WD include the following: Supervisory Control and Data Acquisition System The Otay WD implemented and has operated for many years a Supervisory Control and Data Acquisition (SCADA) system to control, monitor, and collect data regarding the operation of the water system. The major facilities that have SCADA capabilities are the water-flow control supply sources, transmission network, pumping stations, and water storage reservoirs. The SCADA system allows for many and varied useful functions. Some of the functions they provide for operating personnel are the ability to monitor the water supply source flow rates, reservoir levels, tum on or off pumping units, etc. The SCADA system aids in the prevention of water reservoir overflow events and increases energy efficiency. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 20 Water Conservation Ordinance California Water Code Sections 375 et seq. permit public entities, which supply retail water to adopt and enforce a water conservation program to reduce the quantity of water used by the customers, resulting in the conservation of water supplies for that public entity. In 1988, the Otay WD Board of Directors established a comprehensive water conservation program pursuant to California Water Code Sections 375 et seq., based upon the need to conserve water supplies and to avoid or minimize the effects of any future shortage. A water shortage could exist based upon the occurrence of one or more of the following conditions: 1. A general water supply shortage due to increased demand or limited supplies. 2. Distribution or storage facilities of the Water Authority or other agencies become inadequate. 3. A major failure of the supply, storage, and distribution facilities of MWD, Water Authority, and/or Otay WD. The Otay WD water conservation ordinance specifies that the conditions prevailing in the San Diego County area require that the available water resources be put to maximum beneficial use to the extent to which they are capable, and that the waste or unreasonable use, or unreasonable method of use, of water be prevented. In addition, the ordinance encourages the conservation of such water with a view to the maximum reasonable and beneficial use thereof in the interests of the people of the Otay WD and for the public welfare. Otay WD continues to promote water-use efficiency and conservation at community and business events, including those involving developers in its service area. In addition, Otay WD, working with the Water Authority and MWD manages a number of programs. Otay WD is currently engaged in a number of conservation and water-use efficiency activities. Listed below are programs that either are current or have been concluded: • Residential Water Surveys • Large Landscape Surveys • Cash for Water Smart Plants Landscape Retrofit Program • Rotating Nozzles Rebates • Residential Weather-Based Irrigation Controller (WBIC) Incentive Program • Residential High Efficiency Clothes Washers • Residential ULFT/HET Rebate Program • Outreach Efforts to Otay WD Customers - the Otay WD promotes its conservation programs through outreach at community and business events, bill inserts, articles in the Otay WD's quarterly customer Pipeline newsletter, direct mailings to Otay WD customers, the Otay WD's webpage and social media platforms, and through the Water Authority's marketing efforts. • School Education Programs - the Otay WD funds school tours of the Water Conservation Garden and school assemblies, co-funds Splash Labs, and maintains Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 21 school-age appropriate water-themed books, DVDs, and videos. • Water efficiency in new construction through Cal Green and the Model Water Efficient Landscape Ordinance • Focus on Commercial/Institutional/Industrial through Promoting MWD's Save a Buck (Commercial) Program in conjunction with the Otay WD's own Commercial Process Improvement Program • Landscape Contest for homeowners in the Otay WD’s service area The county’s residents and businesses also exceeded the SWRCB’s emergency water-use reduction mandates during 2015 and 2016, and they continue to use less water than they did in 2013 even though drought conditions have ended. Since the SWRCB’s conservation mandate began in June 2015, Otay customers have saved an average of 16 to 19 percent more water compared to 2013 water-use totals. Section 6 - Existing and Projected Supplies The Otay WD currently does not have an independent raw or potable water supply source. The Otay WD is a member public agency of the Water Authority and the Water Authority is a member public agency of MWD. The statutory relationships between the Water Authority and its member agencies, and MWD and its member agencies, respectively, establish the scope of the Otay WD entitlement to water from these two agencies. The Water Authority currently supplies the Otay WD with 100 percent of its potable water through two delivery pipelines, referred to as Pipeline No. 4 and the Helix Flume Pipeline. The Water Authority in turn, currently purchases the majority of its water from MWD. Due to the Otay WD reliance on these two agencies, this WSA&V Report includes referenced documents that contain information on the existing and projected supplies, supply programs, and related projects of the Water Authority and MWD. The Otay WD, Water Authority, and MWD are actively pursuing programs and projects to further diversify their water supply resources. The description of local recycled water supplies available to the Otay WD is also discussed below. 6.1 Metropolitan Water District of Southern California 2015 Urban Water Management Plan MWD has prepared its 2015 UWMP which was adopted on May 9, 2016. The 2015 UWMP provides MWD’s member agencies, retail water utilities, cities, and counties within its service area with, among other things, a detailed evaluation of the supplies necessary to meet future demands, and an evaluation of reasonable and practical efficient water uses, recycling, and conservation activities. During the preparation of the 2015 UWMP, MWD utilized the Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 22 previous SANDAG regional growth forecast in calculating regional water demands for the Water Authority service area. 6.1.1 Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies MWD is a wholesale supplier of water to its member public agencies and obtains its supplies from two primary sources: the Colorado River, via the Colorado River Aqueduct (CRA), which it owns and operates, and Northern California, via the State Water Project (SWP). The 2015 UWMP documents the availability of these existing supplies and additional supplies necessary to meet future demands. MWD’s IRP identifies a mix of resources (imported and local) that, when implemented, will provide 100 percent reliability for full-service demands through the attainment of regional targets set for conservation, local supplies, State Water Project supplies, Colorado River supplies, groundwater banking, and water transfers. The 2015 update to the IRP (2015 IRP Update) describes an adaptive management strategy to protect the region from future supply shortages. This adaptive management strategy has five components: achieve additional conservation savings, develop additional local water supplies, maintain Colorado River Aqueduct supplies, stabilize State Water Project supplies, and maximize the effectiveness of storage and transfer. MWD’s 2015 IRP Update has a plan for identifying and implementing additional resources that expand the ability for MWD to meet future changes and challenges as necessary to ensure future reliability of supplies. The proper management of these resources help to ensure that the southern California region, including San Diego County, will have adequate water supplies to meet long-term future demands. In May 2016, MWD adopted its 2015 UWMP in accordance with state law. The resource targets included in the preceding 2015 IRP Update serve as the foundation for the planning assumptions used in the 2015 UWMP. MWD’s 2015 UWMP contains a water supply reliability assessment that includes a detailed evaluation of the supplies necessary to meet demands over a 20-year period in average, single dry year, and multiple dry year periods. As part of this process, MWD also uses the current SANDAG regional growth forecast in calculating regional water demands for the Water Authority’s service area. As stated in MWD’s 2015 UWMP, the plan may be used as a source document for meeting the requirements of SB 610 and SB 221 until the next scheduled update is completed in 5 years (2020). The 2015 UWMP includes a “Justifications for Supply Projections” in Appendix A.3, that provides detailed documentation of the planning, legal, financial, and regulatory basis for including each source of supply in the plan. A copy of MWD’s 2015 UWMP can be found on the internet at the following site address: http://www.mwdh2o.com/PDF_About_Your_Water/2015_UWMP.pdf Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 23 The UWMP updates for both MWD and the Water Authority included the increase in demand projections included in SANDAG’s Series 13 Update and from the projections from Otay Water District WFMP Update. Water supply agencies throughout California continue to face climate, environmental, legal, and other challenges that impact water source supply conditions, such as the court rulings regarding the Sacramento-San Joaquin Delta and the current western states drought conditions. Challenges such as these essentially always will be present. The regional water supply agencies, the Water Authority and MWD, along with Otay WD nevertheless fully intend to have sufficient, reliable supplies to serve demands. 6.1.2 MWD Capital Investment Plan MWD prepares a Capital Investment Plan as part of its annual budget approval process. The cost, purpose, justification, status, progress, etc. of MWD’s infrastructure projects to deliver existing and future supplies are documented in the Capital Investment Plan. The financing of these projects is addressed as part of the annual budget approval process. MWD’s Capital Investment Plan includes a series of projects identified from MWD studies of projected water needs, which, when considered along with operational demands on aging facilities and new water quality regulations, identify the capital projects needed to maintain infrastructure reliability and water quality standards, improve efficiency, and provide future cost savings. All projects within the Capital Investment Plan are evaluated against an objective set of criteria to ensure they are aligned with the MWD’s goals of supply reliability and quality. 6.2 San Diego County Water Authority Regional Water Supplies The Water Authority has adopted plans and is taking specific actions to develop adequate water supplies to help meet existing and future water demands within the San Diego region. This section contains details on the supplies being developed by the Water Authority. A summary of recent actions pertaining to development of these supplies includes:  In accordance with the Urban Water Management Planning Act, the Water Authority adopted their 2015 UWMP in June 2016. The updated Water Authority 2015 UWMP identifies a diverse mix of local and imported water supplies to meet future demands. A copy of the updated Water Authority 2015 UWMP can be found on the internet at: http://www.sdcwa.org/sites/default/files/UWMP2015.pdf Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 24  As part of the October 2003 Colorado River Quantification Settlement Agreement (QSA), the Water Authority was assigned MWD’s rights to 77,700 acre feet per year of conserved water from the All-American Canal (AAC) and Coachella Canal (CC) lining projects. Deliveries of this conserved water from the CC reached the region in 2007 and deliveries from the AAC reached the region in 2010. Expected supplies from the canal lining projects are considered verifiable Water Authority supplies.  Deliveries of conserved agricultural water from the Imperial Irrigation District (IID) to San Diego County have increased annually since 2003, with 70,000 acre feet per year of deliveries in Fiscal Year (FY) 2010. The quantities will increase annually to 200,000 acre feet per year by 2021, and then remain fixed for the duration of the transfer agreement.  Development of seawater desalination in San Diego County assists the region in diversifying its water resources; reduces dependence on imported supplies; and provides a new drought‐proof, locally treated water supply. The Carlsbad Desalination Project is a fully operational seawater desalination plant and conveyance pipeline developed by Poseidon, a private investor–owned company that develops water and wastewater infrastructure. The Carlsbad Desalination Project, located at the Encina Power Station in Carlsbad, began commercial operation on December 23, 2015, and can provide a highly reliable local supply of up to 56,000 AF/YR for the region. Of the total Carlsbad Desalination Plant production, Vallecitos Water District has a direct connection and a contract to receive 4,083 AFY. Carlsbad MWD has agreed to a take or pay of 2,500 AFY but a direct connection has not been built. Through implementation of the Water Authority and member agency planned supply projects, along with reliable imported water supplies from MWD, the region anticipates having adequate supplies to meet existing and future water demands. To ensure sufficient supplies to meet projected growth in the San Diego region, the Water Authority uses the SANDAG most recent regional growth forecast in calculating regional water demands. The SANDAG regional growth forecast is based on the plans and policies of the land-use jurisdictions with San Diego County. The existing and future demands of the member agencies are included in the Water Authority’s projections. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 25 6.2.1 Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies The Water Authority currently obtains imported supplies from MWD, conserved water from the AAC and CC lining projects, an increasing amount of conserved agricultural water from IID, and desalinated seawater from the Carlsbad desalination plant. Of the twenty-seven member agencies that purchase water supplies from MWD, the Water Authority is MWD’s largest customer. Section 135 of MWD’s Act defines the preferential right to water for each of its member agencies. Currently, the Water Authority pays about 22 percent of MWD's total revenue, but has preferential rights to only 18.27 percent of MWD's water supply. Under preferential rights, MWD could allocate water without regard to historic water purchases or dependence on MWD. The Water Authority and its member agencies are taking measures to reduce dependence on MWD through development of additional supplies and a water supply portfolio that would not be jeopardized by a preferential rights allocation. MWD has stated, consistent with Section 4202 of its Administrative Code that it is prepared to provide the Water Authority’s service area with adequate supplies of water to meet expanding and increasing needs in the years ahead. When and as additional water resources are required to meet increasing needs, MWD stated it will be prepared to deliver such supplies. In Section ES-5 of their 2015 UWMP, MWD states that MWD has supply capacities that would be sufficient to meet expected demands from 2020 through 2040. MWD has plans for supply implementation and continued development of a diversified resource mix including programs in the Colorado River Aqueduct, State Water Project, Central Valley Transfers, local resource projects, and in-region storage that enables the region to meet its water supply needs. The Water Authority has made large investments in MWD’s facilities and will continue to include imported supplies from MWD in the future resource mix. As discussed in the Water Authority’s 2015 UWMP, the Water Authority and its member agencies are planning to diversify the San Diego regions supply portfolio and reduce purchases from MWD. As part of the Water Authority’s diversification efforts, the Water Authority is now taking delivery of conserved agricultural water from IID, water saved from the AAC and CC lining projects and desalinated seawater from the Carlsbad desalination plant. Table 3 summarizes the Water Authority’s supply sources with detailed information included in the sections to follow. Deliveries from MWD are also included in Table 3, which is further discussed in Section 6.1 above. The Water Authority’s member agencies provided the verifiable local supply targets for groundwater, recycled water, potable reuse and surface water, which are discussed in more detail in Section 5 of the Water Authority’s 2015 UWMP. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 26 Table 3 Projected Verifiable Water Supplies – Water Authority Service Area Normal Year (acre feet)1 Water Supply Sources 2020 2025 2030 2035 2040 Water Authority Supplies MWD Supplies 136,002 181,840 207,413 224,863 248,565 Water Authority/IID Transfer 190,000 200,000 200,000 200,000 200,000 AAC and CC Lining Projects 80,200 80,200 80,200 80,200 80,200 Regional Seawater Desalination 50,000 50,000 50,000 50,000 50,000 Member Agency Supplies Surface Water 51,580 51,480 51,380 51,280 51,180 Water Recycling 40,459 43,674 45,758 46,118 46,858 Seawater Desalination 6,000 6,000 6,000 6,000 6,000 Brackish GW Recovery 12,100 12,500 12,500 12,500 12,500 Groundwater 17,940 19,130 20,170 20,170 20,170 Potable Reuse 3,300 3,300 3,300 3,300 3,300 Total Projected Supplies 587,581 648,124 676,721 694,431 718,773 Source: Water Authority 2015 Urban Water Management Plan – Table 9-1. 1Normal water year demands based on 1960-2013 hydrology. Section 5.6.1 of the Water Authority’s 2015 UWMP also includes a discussion on the local supply target for seawater desalination. Seawater desalination supplies represent a significant local resource in the Water Authority’s service area. The Carlsbad Desalination Project (Project) is a fully-permitted seawater desalination plant and conveyance pipeline designed to provide a highly reliable local supply of up to 56,000 acre-feet (AF) per year for the region. In 2020, the Project would account for approximately 8% of the total projected regional supply and 30% of all locally generated water in San Diego County. The project became operational in late 2015 and it more than doubles the amount of local supplies developed in the region since 1991. The desalination plant itself was fully financed, built, and is being operated by Poseidon. The Water Authority purchases water from the plant under a water purchase agreement. The new pipeline connecting the desalination plant with the Water Authority’s Second Aqueduct is owned and operated by the Water Authority, but Poseidon had the responsibility for design and construction through a separate Design-Build Agreement. The Water Authority was responsible for aqueduct improvements, including the relining and rehabilitation of Pipeline 3 to accept desalinated water under higher operating pressures, modifications to the San Marcos Vent that allows the flow of water between Pipelines 3 and 4, and improvements at the Twin Oaks Valley Water Treatment Plant necessary to integrate desalinated water into the Water Authority’s system for optimal distribution to member agencies. The Water Authority’s existing and planned supplies from the IID transfer, canal lining, and desalination projects are considered “drought-proof” supplies and should be available at the Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 27 yields shown in Table 4 in normal water year supply and demand assessment. Single dry year and multiple dry year scenarios are discussed in more detail in Section 9 of the Water Authority’s 2015 UWMP. As part of preparation of a written water supply assessment and/or verification report, an agency’s shortage contingency analysis should be considered in determining sufficiency of supply. Section 11 of the Water Authority’s 2015 UWMP contains a detailed shortage contingency analysis that addresses a regional catastrophic shortage situation and drought management. The analysis demonstrates that the Water Authority and its member agencies, through the Emergency Response Plan, Emergency Storage Project, and Drought Management Plan (DMP) are taking actions to prepare for and appropriately handle an interruption of water supplies. The Water Authority’s Board of Directors approved the Drought Management Plan (DMP) in 2006. The DMP outlined a series of orderly, progressive steps for the Water Authority and its member agencies to take during shortages to minimize impacts to the region’s economy and quality of life. It also included an allocation methodology to equitably allocate water supplies to the member agencies. The DMP was first activated in 2007 in response to MWD drawing water from storage to meet demands, and deactivated in 2011 when supply conditions improved. In 2008, the Water Authority’s Board approved another drought management document, the Model Drought Response Conservation Program Ordinance. The model ordinance focuses on core water use restrictions and is intended to assist the member agencies when updating or drafting local drought response ordinances. The intent of the model ordinance is to provide regional consistency in drought response levels and messaging to the public and media. Also in 2008, the Water Authority’s Board adopted Resolution 2008-11, that established procedures to administer the supply allocation methodology contained in the DMP. In 2012, the DMP’s supply allocation methodology was updated, using lessons from the previous shortage periods, and the DMP was renamed the Water Shortage and Drought Response Plan (WSDRP). In 2014, the WSDRP was activated due to critically dry weather in California and the impact on water supply conditions. It deactivated in 2016 when supply conditions improved. In each instance when the DMP and WSDRP were activated, a smooth transition into and out of water allocations for the member agencies was possible due to the advanced planning of the Water Authority and its member agencies. Those planning efforts also resulted in an approach that allowed for regional consistency in public drought messaging. On August 24, 2017, the Water Authority’s Board approved proposed revisions of the WSDRP and renamed it the Water Shortage Contingency Plan (WSCP) to align the WSCP with the framework outlined in the April 2017 Final Report, Making Water Conservation a California Way of Life, Implementing Executive Order B-37-16 in the areas of water use efficiency and shortage response planning. The WSCP continues a proactive and comprehensive approach to shortage response planning for the region. The plan will be Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 28 reviewed and potentially updated at least every five years in coordination with the preparation of the Water Authority’s Urban Water Management Plan for 2020, which will include any final requirements approved through legislation implementing the state’s framework report. The approval of the WSCP does not require the member agencies to update their planning document or conservation ordinance at this time. 6.2.1.1 Water Authority-Imperial Irrigation District Water Conservation and Transfer Agreement The QSA was signed in October 2003, and resolves long-standing disputes regarding priority and use of Colorado River water and creates a baseline for implementing water transfers. With approval of the QSA, the Water Authority and IID were able to implement their Water Conservation and Transfer Agreement. This agreement not only provides reliability for the San Diego region, but also assists California in reducing its use of Colorado River water to its legal allocation. On April 29, 1998, the Water Authority signed a historic agreement with IID for the long-term transfer of conserved Colorado River water to San Diego County. The Water Authority-IID Water Conservation and Transfer Agreement (Transfer Agreement) is the largest agriculture-to- urban water transfer in United States history. Colorado River water will be conserved by Imperial Valley farmers who voluntarily participate in the program and then transferred to the Water Authority for use in San Diego County. Implementation Status On October 10, 2003, the Water Authority and IID executed an amendment to the original 1998 Transfer Agreement. This amendment modified certain aspects of the Transfer Agreement to be consistent with the terms and conditions of the QSA and related agreements. It also modified other aspects of the agreement to lessen the environmental impacts of the transfer of conserved water. The amendment was expressly contingent on the approval and implementation of the QSA, which was also executed on October 10, 2003. Section 6.2.1, “Colorado River,” contains details on the QSA. On November 5, 2003, IID filed a complaint in Imperial County Superior Court seeking validation of 13 contracts associated with the Transfer Agreement and the QSA. Imperial County and various private parties filed additional suits in Superior Court, alleging violations of the California Environmental Quality Act (CEQA), the California Water Code, and other laws related to the approval of the QSA, the water transfer, and related agreements. The lawsuits were coordinated for trial. The IID, Coachella Valley Water District, MWD, the Water Authority, and state are defending these suits and coordinating to seek validation of the contracts. In January 2010, a California Superior Court judge ruled that the QSA and 11 related agreements were invalid, because one of the agreements created an open-ended financial obligation for the state, Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 29 in violation of California’s constitution. The QSA parties appealed this decision and on July 2013, a Sacramento Superior Court judge entered a final judgment validating the QSA and rejecting all of the remaining legal challenges. The judge affirmed all of the contested actions, including the adequacy of the environmental documents prepared by the IID. In May 2015, the state Court of Appeal issued a ruling that dismissed all remaining appeals. Expected Supply Deliveries into San Diego County from the transfer began in 2003 with an initial transfer of 10,000 acre feet per year. The Water Authority received increasing amounts of transfer water each year, according to a water delivery schedule contained in the transfer agreement The quantities will increase annually to 200,000 acre feet per year by 2021 then remain fixed for the duration of the transfer agreement. The initial term of the Transfer Agreement is 45 years, with a provision that either agency may extend the agreement for an additional 30-year term. During dry years, when water availability is low, the conserved water will be transferred under IID’s Colorado River rights, which are among the most senior in the Lower Colorado River Basin. Without the protection of these rights, the Water Authority could suffer delivery cutbacks. In recognition for the value of such reliability, the 1998 contract required the Water Authority to pay a premium on transfer water under defined regional shortage circumstances. The shortage premium period duration is the period of consecutive days during which any of the following exist: 1) a Water Authority shortage; 2) a shortage condition for the Lower Colorado River as declared by the Secretary; and 3) a Critical Year. Under terms of the October 2003 amendment, the shortage premium will not be included in the cost formula until Agreement Year 16. Transportation The Water Authority entered into a water exchange agreement with MWD on October 10, 2003, to transport the Water Authority–IID transfer water from the Colorado River to San Diego County. Under the exchange agreement, MWD takes delivery of the transfer water through its Colorado River Aqueduct. In exchange, MWD delivers to the Water Authority a like quantity and quality of water. The Water Authority pays MWD’s applicable wheeling rate for each acre- feet of exchange water delivered. Under the terms of the water exchange agreement, MWD will make delivery of the transfer water for 35 years, unless the Water Authority and MWD elect to extend the agreement another 10 years for a total of 45 years. Cost/Financing The costs associated with the transfer are financed through the Water Authority’s rates and charges. In the agreement between the Water Authority and IID, the price for the transfer water started at $258 per acre-feet and increased by a set amount for the first seven years. In December 2009, the Water Authority and IID executed a fifth amendment to the water transfer agreement Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 30 that sets the price per acre-feet for transfer water for calendar years 2010 through 2015, beginning at $405 per acre-feet in 2010 and increasing to $624 per acre-feet in 2015. For calendar years 2016 through 2034, the unit price will be adjusted using an agreed-upon index. The amendment also required the Water Authority to pay IID $6 million at the end of calendar year 2009 and another $50 million on or before October 1, 2010, provided that a transfer stoppage is not in effect as a result of a court order in the QSA coordinated cases. Beginning in 2035, either the Water Authority or IID can, if certain criteria are met, elect a market rate price through a formula described in the water transfer agreement. The October 2003 exchange agreement between MWD and the Water Authority set the initial cost to transport the conserved water at $253 per acre-feet. Thereafter, the price is set to be equal to the charge or charges set by MWD’s Board of Directors pursuant to applicable laws and regulation, and generally applicable to the conveyance of water by MWD on behalf of its member agencies. The Water Authority is providing $10 million to help offset potential socioeconomic impacts associated with temporary land fallowing. IID will credit the Water Authority for these funds during years 16 through 45. In 2007, the Water Authority prepaid IID an additional $10 million for future deliveries of water. IID will credit the Water Authority for this up-front payment during years 16 through 30. As part of implementation of the QSA and water transfer, the Water Authority also entered into an environmental cost sharing agreement. Under this agreement the Water Authority is contributing a total of $64 million to fund environmental mitigation projects and the Salton Sea Restoration Fund. Written Contracts or Other Proof The supply and costs associated with the transfer are based primarily on the following documents: Agreement for Transfer of Conserved Water by and between IID and the Water Authority (April 29, 1998). This Agreement provides for a market-based transaction in which the Water Authority would pay IID a unit price for agricultural water conserved by IID and transferred to the Water Authority. Revised Fourth Amendment to Agreement between IID and the Water Authority for Transfer of Conserved Water (October 10, 2003). Consistent with the executed Quantification Settlement Agreement (QSA) and related agreements, the amendments restructure the agreement and modify it to minimize the environmental impacts of the transfer of conserved water to the Water Authority. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 31 Amended and Restated Agreement between MWD and Water Authority for the Exchange of Water (October 10, 2003). This agreement was executed pursuant to the QSA and provides for delivery of the transfer water to the Water Authority. Environmental Cost Sharing, Funding, and Habitat Conservation Plan Development Agreement among IID, Coachella Valley Water District (CVWD), and Water Authority (October 10, 2003). This Agreement provides for the specified allocation of QSA-related environmental review, mitigation, and litigation costs for the term of the QSA, and for development of a Habitat Conservation Plan. Quantification Settlement Agreement Joint Powers Authority Creation and Funding Agreement (October 10, 2003). The purpose of this agreement is to create and fund the QSA Joint Powers Authority and to establish the limits of the funding obligation of CVWD, IID, and Water Authority for environmental mitigation and Salton Sea restoration pursuant to SB 654 (Machado). Fifth Amendment to Agreement Between Imperial Irrigation District and San Diego County Water Authority for Transfer of Conserved Water (December 21, 2009). This agreement implements a settlement between the Water Authority and IID regarding the base contract price of transferred water. Federal, State, and Local Permits/Approvals Federal Endangered Species Act Permit. The U.S. Fish and Wildlife Service (USFWS) issued a Biological Opinion on January 12, 2001, that provides incidental take authorization and certain measures required to offset species impacts on the Colorado River regarding such actions. State Water Resources Control Board (SWRCB) Petition. SWRCB adopted Water Rights Order 2002-0016 concerning IID and Water Authority’s amended joint petition for approval of a long- term transfer of conserved water from IID to the Water Authority and to change the point of diversion, place of use, and purpose of use under Permit 7643. Environmental Impact Report (EIR) for Conservation and Transfer Agreement. As lead agency, IID certified the Final EIR for the Conservation and Transfer Agreement on June 28, 2002. U. S. Fish and Wildlife Service Draft Biological Opinion and Incidental Take Statement on the Bureau of Reclamation's Voluntary Fish and Wildlife Conservation Measures and Associated Conservation Agreements with the California Water Agencies (12/18/02). The U. S. Fish and Wildlife Service issued the biological opinion/incidental take statement for water transfer activities involving the Bureau of Reclamation and associated with IID/other California water agencies' actions on listed species in the Imperial Valley and Salton Sea (per the June 28, 2002 EIR). Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 32 Addendum to EIR for Conservation and Transfer Agreement. IID as lead agency and Water Authority as responsible agency approved addendum to EIR in October 2003. Environmental Impact Statement (EIS) for Conservation and Transfer Agreement. Bureau of Reclamation issued a Record of Decision on the EIS in October 2003. CA Department of Fish and Game California Endangered Species Act Incidental Take Permit #2081-2003-024-006). The California Department of Fish and Game issued this permit (10/22/04) for potential take effects on state-listed/fully protected species associated with IID/other California water agencies' actions on listed species in the Imperial Valley and Salton Sea (per the June 28, 2002 EIR). California Endangered Species Act (CESA) Permit. A CESA permit was issued by California Department of Fish and Game (CDFG) on April 4, 2005, providing incidental take authorization for potential species impacts on the Colorado River. 6.2.1.2 All-American Canal and Coachella Canal Lining Projects As part of the QSA and related contracts, the Water Authority was assigned MWD’s rights to 77,700 acre-feet per year of conserved water from projects that will line the All-American Canal (AAC) and Coachella Canal (CC). The projects will reduce the loss of water that currently occurs through seepage, and the conserved water will be delivered to the Water Authority. This conserved water will provide the San Diego region with an additional 8.5 million acre-feet over the 110-year life of the agreement. Implementation Status The CC lining project began in November 2004 and was completed in 2006. Deliveries of conserved water to the Water Authority began in 2007. The project constructed a 37-mile parallel canal adjacent to the CC. The AAC lining project was begun in 2005 and was completed in 2010. The lining project constructed a concrete-lined canal parallel to 24 miles of the existing AAC from Pilot Knob to Drop 3. In July 2005, a lawsuit (CDEM v United States, Case No. CV-S-05-0870-KJD-PAL) was filed in the U. S. District Court for the District of Nevada on behalf of U.S. and Mexican groups challenging the lining of the AAC. The lawsuit, which names the Secretary of the Interior as a defendant, claims that seepage water from the canal belongs to water users in Mexico. California water agencies note that the seepage water is actually part of California's Colorado River allocation and not part of Mexico's allocation. The plaintiffs also allege a failure by the United States to comply with environmental laws. Federal officials have stated that they intend to vigorously defend the case. Expected Supply Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 33 The AAC lining project makes 67,700 acre-feet of Colorado River water per year available for allocation to the Water Authority and San Luis Rey Indian water rights settlement parties. The CC lining project makes 26,000 acre-feet of Colorado River water each year available for allocation. The 2003 Allocation Agreement provides for 16,000 acre-feet per year of conserved canal lining water to be allocated to the San Luis Rey Indian Water Rights Settlement Parties. The remaining amount, 77,700 acre-feet per year, is to be available to the Water Authority, with up to an additional 4,850 acre-feet per year available to the Water Authority depending on environmental requirements from the CC lining project. For planning purposes, the Water Authority assumes that 2,500 acre-feet of the 4,850 acre-feet will be available each year for delivery, for a total of 80,200 acre-feet per year of that supply. According to the Allocation Agreement, IID has call rights to a portion (5,000 acre-feet per year) of the conserved water upon termination of the QSA for the remainder of the 110 years of the Allocation Agreement and upon satisfying certain conditions. The term of the QSA is for up to 75 years. Transportation The October 2003 Exchange Agreement between the Water Authority and MWD provides for the delivery of the conserved water from the canal lining projects. The Water Authority pays MWD’s applicable wheeling rate for each acre-foot of exchange water delivered. In the Agreement, MWD will deliver the canal lining water for the term of the Allocation Agreement (110 years). Cost/Financing Under California Water Code Section 12560 et seq., the Water Authority received $200 million in state funds for construction of the canal lining projects. In addition, $20 million was made available from Proposition 50 and $36 million from Proposition 84. The Water Authority was responsible for additional expenses above the funds provided by the state. The rate to be paid to transport the canal lining water will be equal to the charge or charges set by MWD’s Board of Directors pursuant to applicable law and regulation and generally applicable to the conveyance of water by MWD on behalf of its member agencies. In accordance with the Allocation Agreement, the Water Authority is responsible for a portion of the net additional Operation, Maintenance, and Repair (OM&R) costs for the lined canals. Any costs associated with the lining projects as proposed are to be financed through the Water Authority’s rates and charges. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 34 Written Contracts or Other Proof The expected supply and costs associated with the lining projects are based primarily on the following documents: U.S. Public Law 100-675 (1988). Authorized the Department of the Interior to reduce seepage from the existing earthen AAC and CC. The law provides that conserved water will be made available to specified California contracting water agencies according to established priorities. California Department of Water Resources - MWD Funding Agreement (2001). Reimburse MWD for project work necessary to construct the lining of the CC in an amount not to exceed $74 million. Modified by First Amendment (2004) to replace MWD with the Authority. Modified by Second Amendment (2004) to increase funding amount to $83.65 million, with addition of funds from Proposition 50. California Department of Water Resources - IID Funding Agreement (2001). Reimburse IID for project work necessary to construct a lined AAC in an amount not to exceed $126 million. MWD - CVWD Assignment and Delegation of Design Obligations Agreement (2002). Assigns design of the CC lining project to CVWD. MWD - CVWD Financial Arrangements Agreement for Design Obligations (2002). Obligates MWD to advance funds to CVWD to cover costs for CC lining project design and CVWD to invoice MWD to permit the Department of Water Resources to be billed for work completed. Allocation Agreement among the United States of America, The MWD Water District of Southern California, Coachella Valley Water District, Imperial Irrigation District, San Diego County Water Authority, the La Jolla, Pala, Pauma, Rincon, and San Pasqual Bands of Mission Indians, the San Luis Rey River Indian Water Authority, the City of Escondido, and Vista Irrigation District (October 10, 2003). This agreement includes assignment of MWD’s rights and interest in delivery of 77,700 acre-feet of Colorado River water previously intended to be delivered to MWD to the Water Authority. Allocates water from the AAC and CC lining projects for at least 110 years to the Water Authority, the San Luis Rey Indian Water Rights Settlement Parties, and IID, if it exercises its call rights. Amended and Restated Agreement between MWD and Water Authority for the Exchange of Water (October 10, 2003). This agreement was executed pursuant to the QSA and provides for delivery of the conserved canal lining water to the Water Authority. Agreement between MWD and Water Authority regarding Assignment of Agreements related to the AAC and CC Lining Projects. This agreement was executed in April 2004 and assigns MWD's rights to the Water Authority for agreements that had been executed to facilitate funding and construction of the AAC and CC lining projects: Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 35 Assignment and Delegation of Construction Obligations for the Coachella Canal Lining Project under the Department of Water Resources Funding Agreement No. 4600001474 from the San Diego County Water Authority to the Coachella Valley Water District, dated September 8, 2004. Agreement Regarding the Financial Arrangements between the San Diego County Water Authority and Coachella Valley Water District for the Construction Obligations for the Coachella Canal Lining Project, dated September 8, 2004. Agreement No. 04-XX-30-W0429 Among the United States Bureau of Reclamation, the Coachella Valley Water District, and the San Diego County Water Authority for the Construction of the Coachella Canal Lining Project Pursuant to Title II of Public Law 100-675, dated October 19, 2004. California Water Code Section 12560 et seq. This Water Code Section provides for $200 million to be appropriated to the Department of Water Resources to help fund the canal lining projects in furtherance of implementing California’s Colorado River Water Use Plan. California Water Code Section 79567. This Water Code Section identifies $20 million as available for appropriation by the California Legislature from the Water Security, Clean Drinking Water, Coastal, and Beach Protection Fund of 2002 (Proposition 50) to DWR for grants for canal lining and related projects necessary to reduce Colorado River water use. According to the Allocation Agreement, it is the intention of the agencies that those funds will be available for use by the Water Authority, IID, or CVWD for the AAC and CC lining projects. California Public Resources Code Section 75050(b) (1). This section identifies up to $36 million as available for water conservation projects that implement the Allocation Agreement as defined in the Quantification Settlement Agreement. Federal, State, and Local Permits/Approvals AAC Lining Project Final EIS/EIR (March 1994). A final EIR/EIS analyzing the potential impacts of lining the AAC was completed by the Bureau of Reclamation (Reclamation) in March 1994. A Record of Decision was signed by Reclamation in July 1994, implementing the preferred alternative for lining the AAC. A re-examination and analysis of these environmental compliance documents by Reclamation in November 1999 determined that these documents continued to meet the requirements of the NEPA and the CEQA and would be valid in the future. CC Lining Project Final EIS/EIR (April 2001). The final EIR/EIS for the CC lining project was completed in 2001. Reclamation signed the Record of Decision in April 2002. An amended Record of Decision has also been signed to take into account revisions to the project description. Mitigation, Monitoring, and Reporting Program for Coachella Canal Lining Project, SCH #1990020408; prepared by Coachella Valley Water District, May 16, 2001. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 36 Environmental Commitment Plan for the Coachella Canal Lining Project, approved by the US Bureau of Reclamation (Boulder City, NV) on March 4, 2003. Environmental Commitment Plan and Addendum to the All-American Canal Lining Project EIS/EIR California State Clearinghouse Number SCH 90010472 (June 2004, prepared by IID). Addendum to Final EIS/EIR and Amendment to Environmental Commitment Plan for the All-American Canal Lining Project (approved June 27, 2006, by IID Board of Directors). 6.2.1.3 Carlsbad Seawater Desalination Project Development of seawater desalination in San Diego County has assisted the region in diversifying its water resources, reduce dependence on imported supplies, and provide a new drought-proof, locally treated water supply. The Carlsbad Desalination Project is a fully- permitted seawater desalination plant and conveyance pipeline developed by Poseidon, a private investor–owned company that develops water and wastewater infrastructure. The project, located at the Encina Power Station in Carlsbad, has been in development since 1998 and was incorporated into the Water Authority’s 2003 Water Facilities Master Plan and the 2015 UWMP. The Carlsbad Desalination Project has obtained all required permits and environmental clearances and starting in late 2015 provides a highly reliable local supply of 48,000 to 56,000 acre-feet per year for the region. Implementation Status The Project has obtained all required permits and environmental clearances, including the following:  National Pollutant Discharge Elimination System (NPDES) Discharge Permit (Regional Water Quality Control Board)  Conditional Drinking Water Permit (California Department of Health Services)  State Lands Commission Lease (State Lands Commission)  Coastal Development Permit (California Coastal Commission) IDE Technologies, a worldwide leader in the design, construction, and operation of desalination plants, is the desalination process contractor for the Project. On July 22, 2010, the Board approved a Term Sheet between the Water Authority and Poseidon Resources that outlined the key terms and conditions that would be detailed and incorporated in a comprehensive Water Purchase Agreement (WPA). Beginning in October 2011 and under the direction of the Board’s Carlsbad Desalination Project Advisory Group, staff began developing and negotiating with Poseidon a WPA consistent with the July 22, Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 37 2010 Board approved Term Sheet. The July 2010 Term Sheet also identified specific conditions precedent to Board consideration of the WPA. On November 29, 2012, the Water Authority Board adopted a resolution approving the Design-Build Agreement between the Water Authority and Poseidon. The Design-Build Agreement established the commercial and technical terms for implementation of the desalination product pipeline improvements. These improvements consisted of an approximate 10-mile long, 54-inch diameter conveyance pipeline connecting the Desalination Plant to the Water Authority’s Second Aqueduct. The pipeline was generally be constructed within improved streets in commercial and industrial areas in the cities of Carlsbad, Vista, and San Marcos. The Water Authority owns the Project Water Pipeline Improvements and has assumed operational control of all pipeline improvements. This system was placed into service in late 2015. Expected Supply The Project provides a highly reliable local supply of 48,000 to 56,000 acre-feet per year of supply for the region, available in both normal and dry hydrologic conditions. In 2020, the Project would account for approximately 10% of the total projected regional supply and 30% of all locally generated water in San Diego County. The project more than doubles the amount of local supplies developed in the region since 1991. Transportation On November 29, 2012, the Water Authority Board adopted a resolution approving the Design-Build Agreement between the Water Authority and Poseidon. The Design-Build Agreement establishes the commercial and technical terms for implementation of the desalination product pipeline improvements. These improvements consisted of an approximate 10-mile long, 54-inch diameter conveyance pipeline connecting the Desalination Plant to the Water Authority’s Second Aqueduct. The pipeline was generally constructed within improved streets in commercial and industrial areas in the cities of Carlsbad, Vista, and San Marcos. The Water Authority owns the Project Water Pipeline Improvements and has assumed operational control of all pipeline improvements. The Water Authority was responsible for aqueduct improvements, including the relining and rehabilitation of Pipeline 3 to accept desalinated water under higher operating pressures, modifications to the San Marcos Vent that allows the flow of water between Pipelines 3 and 4, and improvements at the Twin Oaks Valley Water Treatment Plant necessary to integrate desalinated water into the Water Authority’s system for optimal distribution to member agencies. Cost/Financing Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 38 The plant and the offsite pipeline is being financed through tax exempt government bonds issued for the Water Authority by the California Pollution Control Financing Authority (CPCFA). On November 29, 2012, the Water Authority Board adopted a resolution approving agreements to accomplish tax exempt project financing through the CPCFA. Based on current electricity cost estimates, the Water Purchase Agreement sets the price of the water from the Carlsbad Desalination Project at $2,131 to $2,367 per acre foot in 2016. The Water Authority’s water purchase costs would be financed through Water Authority rates and charges. Poseidon is financing the capital cost of the Project with a combination of private equity and tax-exempt Private Activity Bonds. Written Contracts or Other Proof The expected supply and costs associated with the Carlsbad Desalination Project are based primarily on the following documents: Development Agreement between City of Carlsbad and Poseidon (October 2009). A Development Agreement between Carlsbad and Poseidon was executed on October 5, 2009 Agreement of Term Sheet between the Water Authority and Poseidon Resources (July 2010). The Water Authority approved the Term Sheet at its July 2010 Board Meeting. The Term Sheet outlines the terms and conditions of a future Water Purchase Agreement with Poseidon and allocates the resources to prepare the draft Water Purchase Agreement. Federal, State, and Local Permits/Approvals Carlsbad Desalination Project Final EIR The City of Carlsbad, acting as lead agency for Carlsbad Seawater Desalination Plant and appurtenant facilities proposed by Poseidon (the “Project”) prepared an Environmental Impact Report for the Project in compliance with the California Environmental Quality Act (“CEQA”), which the City of Carlsbad certified on June 13, 2006. http://www.sdcwa.org/rwfmp-peir Regional Water Facilities Master Plan EIR On November 20, 2003, the Water Authority Board of Directors adopted Resolution No. 2003-34 certifying the Final Program Environmental Impact Report (State Clearinghouse No. 2003021052) for the Water Authority’s Regional Water Facilities Master Plan Project (the “Master Plan EIR”), which evaluated, among other things, potential growth inducing impacts associated with new water supplies to the region including, but not limited to, up to 150 million gallons per day (“MGD”) of new supplies from seawater desalination. This certification included a 50 MGD plant located in the City of Carlsbad. The environmental documents and permits are found at the following links: http://www.sdcwa.org/rwfmp-peir Sub regional Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP) Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 39 On December 8, 2010, the Board adopted Resolution No. 2010-18 certifying a Final environmental Impact Report/Environmental Impact Statement for the San Diego County Water Authority Subregional Natural Community Conservation Plan/Habitat Conservation Plan (State Clearinghouse No. 2003121012) (the “Habitat Conservation Plan EIR/EIS”), which Plan was implemented on December 28, 201. The environmental documents and permits are found at the following links: http://www.sdcwa.org/nccp-hcp Twin Oaks Valley Water Treatment Plant EIR On September 8, 2005, the Board adopted Resolution No. 2005-31 certifying a Final Environmental Impact Report for the Twin Oaks Valley Water Treatment Plant Project (State Clearinghouse No. 20040071034) (the “Twin Oaks EIR”), which project was constructed as a 100 MGD submerged membrane water treatment facility, including treated water holding tanks and distribution pipelines and other facilities, consistent with the conditions and mitigation measures included in the Twin Oaks EIR. http://www.sdcwa.org/twin-oaks-valley-treatment-plant-final-eir Drinking Water Permit (October 2006). The California Department of Health Services approved the Conditional Drinking Water Permit on October 19, 2006. 6.2.2 Water Authority Capital Improvement Program and Financial Information The Water Authority’s Capital Improvement Program (CIP) can trace its beginnings to a report approved by the Board in 1989 entitled, The Water Distribution Plan, and a Capital Improvement Program through the Year 2010. The Water Distribution Plan included ten projects designed to increase the capacity of the aqueduct system, increase the yield from existing water treatment plants, obtain additional supplies from MWD, and increase the reliability and flexibility of the aqueduct system. Since that time the Water Authority has made numerous additions to the list of projects included in its CIP as the region’s infrastructure needs and water supply outlook have changed. The current list of projects included in the CIP is based on the results of planning studies, including the 2015 UWMP and the 2013 Regional Water Facilities Master Plan. These CIP projects, which are most recently described in the Water Authority’s Adopted Multi-Year Budget Fiscal Years 2018 and 2019, include projects valued at $118 million. These CIP projects are designed to meet projected water supply and delivery needs of the member agencies. The projects include a mix of new facilities that will add capacity to existing conveyance, storage, and treatment facilities, as well as repair and replace aging infrastructure: Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 40  Asset Management – The primary components of the asset management projects include relining and replacing existing pipelines and updating and replacing metering facilities.  New Facilities – These projects will expand the capacity of the aqueduct system and evaluate new supply opportunities.  Emergency Storage Project – Projects remaining to be completed under the ongoing ESP include the San Vicente Dam Raise, the Lake Hodges projects, and a new pump station to extend ESP supplies to the northern reaches of the Water Authority service area.  Other Projects – This category includes out-of-region groundwater storage, increased local water treatment plant capacity, and projects that mitigate environmental impacts of the CIP. The Water Authority Board of Directors is provided a semi-annual and annual report on the status of development of the CIP projects. As described in the Water Authority’s biennial budget, a combination of long and short term debt and cash (pay-as-you-go) will provide funding for capital improvements. Additional information is included in the Water Authority’s biennial budget, which also contains selected financial information and summarizes the Water Authority’s investment policy. 6.3 Otay Water District The Otay Water District WFMP Update and the 2015 UWMP contain comparisons of projected supply and demands through the year 2040. Projected potable water resources to meet planned demands as documented were planned to be supplied entirely with imported water received from the Water Authority. Recycled water resources to meet projected demands are planned to be supplied from local wastewater treatment plants. The Otay WD currently has no local supply of raw water, potable water, or groundwater resources. The development and/or acquisition of potential groundwater, recycled water market expansion, and seawater desalination supplies by the Otay WD have evolved and are planned to occur in response to the regional water supply issues. These water supply projects are in addition to those identified as sustainable supplies in the current Water Authority and MWD UWMP, IRP, Master Plans, and other planning documents. These new additional water supply projects are not currently developed and are in various stages of the planning process. These local and regional water supply projects will allow for less reliance upon imported water and are considered a new water supply resource for the Otay WD. The supply forecasts contained within this WSA Report do consider development and/or acquisition of potential groundwater, recycled water market expansion, and seawater desalination supplies by the Otay WD. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 41 6.3.1 Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies The availability of sufficient potable water supplies and plans for acquiring additional potable water supplies to serve existing and future demands of the Otay WD is founded upon the preceding discussions regarding MWD’s and the Water Authority’s water supply resources and water supplies to be acquired by the Otay WD. Historic imported water deliveries from the Water Authority to Otay WD and recycled water deliveries from the Otay WD Ralph W. Chapman Water Reclamation Facility (RWCWRF) are shown in Table 4. Since the year 2000 through mid-May 2007, recycled water demand has exceeded the recycled water supply capability typically in the summer months. The RWCWRF is limited to a maximum production of about 1,300 acre-feet per year. The recycled water supply shortfall had been met by supplementing with potable water into the recycled water storage system as needed by adding potable water supplied by the Water Authority. On May 18, 2007 an additional source of recycled water supply from the City of San Diego’s South Bay Water Reclamation Plant (SBWRP) became available. The supply of recycled water from the SBWRP is a result of completing construction and the operation of the transmission, storage, and pump station systems necessary to link the SBWRP recycled water supply source to the existing Otay WD recycled water system. Table 4 Otay Water District Historic Imported and Local Water Supplies Calendar Year Imported Water (acre-feet) Recycled Water (acre-feet) Total (acre-feet) 1980 12,558 0 12,558 1985 14,529 0 14,529 1990 23,200 0 23,200 1995 20,922 614 21,536 2000 29,901 948 30,849 2005 37,678 1,227 38,905 2010 29,270 4,090 33,270 2015 26,494 3,777 30,271 Source: Otay Water District operational records. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 42 6.3.1.1 Imported and Regional Supplies The availability of sufficient imported and regional potable water supplies to serve existing and planned uses within Otay WD is demonstrated in the above discussion on MWD and the Water Authority’s water supply reliability. The County Water Authority Act, Section 5 subdivision 11, states that the Water Authority “as far as practicable, shall provide each of its member agencies with adequate supplies of water to meet their expanding and increasing needs.” The Water Authority provides between 75 to 95 percent of the total supplies used by its 24 member agencies, depending on local weather and supply conditions. Potable Water System Facilities The Otay WD continues to pursue diversification of its water supply resources to increase reliability and flexibility. The Otay WD also continues to plan, design, and construct potable water system facilities to obtain these supplies and to distribute potable water to meet customer demands. The Otay WD has successfully negotiated two water supply diversification agreements that enhance reliability and flexibility, which are briefly described as follows.  The Otay WD entered into an agreement with the City of San Diego, known as the Otay Water Treatment Plant (WTP) Agreement. The Otay WTP Agreement provides for raw water purchase from the Water Authority and treatment by the City of San Diego at their Otay WTP for delivery to Otay WD. The supply system link to implement the Otay WTP Agreement to access the regions raw water supply system and the local water treatment plant became fully operational in August 2005. This supply link consists of the typical storage, transmission, pumping, flow measurement, and appurtenances to receive and transport the treated water to the Otay WD system. The City of San Diego obligation to supply 10 mgd of treated water under the Otay WTP Agreement is contingent upon there being available 10 mgd of surplus treatment capacity in the Otay WTP until such time as Otay WD pays the City of San Diego to expand the Otay WTP to meet the Otay WD future needs. In the event that the City of San Diego’s surplus is projected to be less than 10 mgd the City of San Diego will consider and not unreasonably refuse the expansion of the Otay WTP to meet the Otay WD future needs. The Otay WTP existing rated capacity is 40 mgd with an actual effective capacity of approximately 34 mgd. The City of San Diego’s typical demand for treated water from the Otay WTP is approximately 20 mgd. It is at the City of San Diego’s discretion to utilize either imported raw water delivered by the Water Authority Pipeline No. 3 or local water stored in Lower Otay Reservoir for treatment to supply the Otay WD demand.  The Otay WD entered into an agreement with the Water Authority, known as the East County Regional Treated Water Improvement Program (ECRTWIP Agreement). The ECRTWIP Agreement provides for transmission of raw water to the Helix WD R. M. Levy WTP for treatment and delivery to Otay WD. The supply system link to implement the ECRTWIP Agreement is complete allowing access to the regions raw water supply Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 43 system and the local water treatment plant. This supply link consists of the typical transmission, pumping, storage, flow control, and appurtenances to receive and transport the potable water from the R. M. Levy WTP to Otay WD. The Otay WD is required to take a minimum of 10,000 acre-feet per year of treated water from the R.M. Levy WTP supplied from the regions raw water system. Cost and Financing The capital improvement costs associated with water supply and delivery are financed through the Otay WD water meter capacity fee and user rate structures. The Otay WD potable water sales revenue are used to pay for the wholesale cost of the treated water supply and the operating and maintenance expenses of the potable water system facilities. Written Agreements, Contracts, or Other Proof The supply and cost associated with deliveries of treated water from the Otay WTP and the R.M. Levy WTP is based on the following documents. Agreement for the Purchase of Treated Water from the Otay Water Treatment Plant between the City of San Diego and the Otay Water District. The Otay WD entered into an agreement dated January 11, 1999 with the City of San Diego that provides for 10 mgd of surplus treated water to the Otay WD from the existing Otay WTP capacity. The agreement allows for the purchase of treated water on an as available basis from the Otay WTP. The Otay WD pays the Water Authority at the prevailing raw water rate for raw water and pays the City of San Diego at a rate equal to the actual cost of treatment to potable water standards. Agreement between the San Diego County Water Authority and Otay Water District Regarding Implementation of the East County Regional Treated Water Improvement Program. The ECRTWIP Agreement requires the purchase of at least 10,000 acre-feet per year of potable water from the Helix WD R.M. Levy WTP at the prevailing Water Authority treated water rate. The ECRTWIP Agreement is dated April 27, 2006. Agreement between the San Diego County Water Authority and Otay Water District for Design, Construction, Operation, and Maintenance of the Otay 14 Flow Control Facility Modification. The Otay WD entered into the Otay 14 Flow Control Facility Modification Agreement dated January 24, 2007 with the Water Authority to increase the physical capacity of the Otay 14 Flow Control Facility. The Water Authority and Otay WD shared the capital cost to expand its capacity from 8 mgd to 16 mgd. Federal, State, and Local Permits/Approvals The Otay WD acquired all the permits for the construction of the pipeline and pump station associated with the Otay WTP supply source and for the 640-1 and 640-2 water storage Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 44 reservoirs project associated with the ECRTWIP Agreement through the typical planning, environmental approval, design, and construction processes. The transmission main project constructed about 26,000 feet of a 36-inch diameter steel pipeline from the Otay 14 Flow Control Facility to the 640-1 and 640-2 Reservoirs project. The Otay 14 Flow Control Facility modification increased the capacity of the existing systems from 8 mgd to 16 mgd. CEQA documentation is complete for both projects. Construction of both of these projects was completed October 2010. The City of San Diego and the Helix Water District are required to meet all applicable federal, state, and local health and water quality requirements for the potable water produced at the Otay WTP and the R.M. Levy WTP respectively. 6.3.1.2 Recycled Water Supplies Wastewater collection, treatment, and disposal services provided by the Otay WD is limited to a relatively small area within what is known as the Jamacha Basin, located within the Middle Sweetwater River Basin watershed upstream of the Sweetwater Reservoir and downstream of Loveland Reservoir. Water recycling is defined as the treatment and disinfection of municipal wastewater to provide a water supply suitable for non-potable reuse. The Otay WD owns and operates the Ralph W. Chapman Water Reclamation Facility, which produces recycled water treated to a tertiary level for landscape irrigation purposes. The recycled water market area of the Otay WD is located primarily within the eastern area of the City of Chula Vista. The Otay WD distributes recycled water to a substantial market area that includes but is not limited to the U.S. Olympic Training Center, the Eastlake Golf Course, Otay Ranch, and other development projects. The Otay WD projects that annual average demands for recycled water will increase to 6,500 acre-feet per year by 2050. About 1,300 acre-feet per year of supply is generated by the RWCWRF, with the remainder planned to be supplied to Otay WD by the City of San Diego’s SBWRP. North District Recycled Water Concept The Otay WD is a recognized leader in the use of recycled water for irrigation and other commercial uses. The Otay WD continues to investigate all viable opportunities to expand the successful recycled water program into areas that are not currently served. One of these areas is in the portion of the service area designated as the North District, located within the Middle Sweetwater River Basin watershed upstream of the Sweetwater River. The close proximity of the recycled water markets in the North District to the Otay WD source of recycled water, the RWCWRF, means that the distribution system to serve this area could be constructed relatively cost effectively. This makes the North District a logical location for the expansion of the Otay WD recycled water system and market area. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 45 The purpose of the North District Recycled Water System Development Project, Phase I Concept Study, was to identify the feasibility of using recycled water in the North District and to investigate and assess any limitations or constraints to its use. The Phase I study components of the North District Recycled Water Concept encompassed the preparation of six technical memorandums including the project definition, a discussion of the regulatory process, a discussion of the protection of the watershed that would be affected by recycled water use in the North District, identification of stakeholders, public outreach, and an implementation plan. Several opportunities that could be realized with the implementation of the use of recycled water in the North District were identified. These include a reduction of demand on the potable water system and maximizing recycled water resources which in turn minimizes treated wastewater discharges to the local ocean outfall. Other opportunities are a possible partnership with Sweetwater Authority to monitor any benefits and impacts of increased recycled water use in the watershed and stakeholder outreach to resolve any water quality concerns and to retain consumer confidence. Also identified were two major constraints associated with the North District Recycled Water System Development Project. One constraint is the water quality objectives for the Middle Sweetwater Basin that will affect the effluent limitations for the recycled water produced at the RWCWRF. The effluent limit of concern was total nitrogen. The RWCWRF underwent an upgrade in 2012 to enhance nitrogen removal through the treatment process. The other major constraint is the cost of the infrastructure needed to convey and store recycled water in the North District. These costs are estimated to be in the range of $14 to $15 million dollars. There are two additional phases proposed for the North District Recycled Water System Development Project. Phase II would include further investigation of the issues identified in Phase I as requiring further study. These include stakeholder outreach, regulatory issues, and facility planning. The third phase of the effort would include the facility planning, permitting, environmental compliance, design, and construction of the improvements necessary for delivery of recycled water to the North District markets. The estimated amount of imported water saved at full implementation of the North District Recycled Water System Development Project is 1,200 acre-feet per year. This saved imported water could then be used to offset new potable water demands. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 46 Recycled Water System Facilities The Otay WD has constructed recycled water storage, pumping, transmission, and distribution facilities and will continue to construct these facilities to meet projected recycled water market demands. The Supply Link project consisting of a transmission main, storage reservoir, and a pump station to receive and transport the recycled water from the City of San Diego’s SBWRP was completed in 2007 and recycled water deliveries began on May 18, 2007. Cost and Financing The capital improvement costs associated with the recycled water supply and distribution systems are financed through the Otay WD water meter capacity fee and user rate structures. The Otay WD recycled water sales revenue, along with MWD and the Water Authority’s recycled water sales incentive programs are used to help offset the costs for the wholesale purchase and production of the recycled water supply, the operating and maintenance expenses, and the capital costs of the recycled water system facilities. Written Agreements, Contracts, or Other Proof The supply and cost associated with deliveries of recycled water from the SBWRP is based on the following document. Agreement between the Otay Water District and the City of San Diego for Purchase of Reclaimed Water from the South Bay Water Reclamation Plant. The agreement provides for the purchase of at least 6,721 acre-feet per year of recycled water from the SBWRP at an initial price of $350 per acre-foot. The Otay Water District Board of Directors approved the final agreement on June 4, 2003 and the San Diego City Council approved the final agreement on October 20, 2003. Effective January 1, 2016, the City of San Diego raised the cost of recycled water 116% to $754 per acre-foot. Federal, State, and Local Permits/Approvals The Otay WD has in place an agreement with MWD for their recycled water sales incentive program for supplies from the RWCWRF and the SBWRP. Also, the Otay WD has in place an agreement with the Water Authority for their recycled water sales incentive program for supplies from the RWCWRF and the SBWRP. The Water Authority sales incentive agreement was approved by Water Authority on July 26, 2007 and by Otay WD on August 1, 2007. All permits for the construction of the recycled water facilities to receive, store, and pump the SBWRP supply have been acquired through the typical planning, environmental approval, design, and construction processes. The California Regional Water Quality Control Board San Diego Region (RWQCB) “Master Reclamation Permit for Otay Water District Ralph W. Chapman Reclamation Facility” was adopted on May 9, 2007 (Order No. R9-2007-0038). This order establishes master Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 47 reclamation requirements for the production, distribution, and use of recycled water in the Otay WD service area. The order includes the use of tertiary treated water produced and received from the City of San Diego‘s SBWRP. Recycled water received from and produced by the SBWRP is regulated by Regional Board Order No. 2000-203 and addenda. The City of San Diego is required to meet all applicable federal, state, and local health and water quality requirements for the recycled water produced at the SBWRP and delivered to Otay WD in conformance with Order No. 2000-203. 6.3.1.3 Potential Groundwater Supplies The Otay Water District WFMP Update, 2015 UWMP, and the 2015 Integrated Water Resources Plan Update all contain a description of the development of potential groundwater supplies. Over the past several years, Otay WD has studied numerous potential groundwater supply options that have shown, through groundwater monitoring well activities, poor quality water and/or insufficient yield from the basins at a cost effective level. The Otay WD has developed capital improvement program projects to continue the quest to develop potential groundwater resources. Local Otay WD groundwater supply development is currently considered as a viable water supply resource to meet projected demands. The development and/or acquisition of potential groundwater supply projects by the Otay WD have been on hold in response to the regional water supply issues related to water source supply conditions. Local ground water supply projects will allow for less reliance upon imported water, achieve a level of independence of the regional wholesale water agencies, and diversify the Otay WD water supply portfolio consistent with the Otay Water District 2015 IRP Update. In recognition of the need to develop sufficient alternative water supplies, the Otay WD has taken the appropriate next steps towards development of production groundwater well projects. There are three groundwater well projects that the Otay WD is actively pursuing to develop as new local water supplies. They are known as the Middle Sweetwater River Basin Groundwater Well, the Otay Mesa Lot 7 Groundwater Well, and the Rancho del Rey Groundwater Well projects. Middle Sweetwater River Basin Groundwater Well The Middle Sweetwater River Basin Groundwater Well is an additional water supply project that was thoroughly studied and documented in the 1990s. The Middle Sweetwater River Basin is located within the Sweetwater River watershed and that reach of the river extends from Sweetwater Reservoir to the upstream Loveland Reservoir. The next step in development of the Middle Sweetwater River Basin Groundwater Well is the implementation of a pilot well project. The ultimate objective of the Otay WD is to develop a groundwater Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 48 well production system within the Middle Sweetwater River Basin capable of producing a sustainable yield of potable water as a local supply. The purpose of the Middle Sweetwater River Basin Groundwater Well Pilot project is to identify the feasibility of developing a groundwater resource production system and then determine and assess any limitations or constraints that may arise. The Middle Sweetwater River Basin Groundwater Well Pilot Project will accomplish six primary goals:  Update project setting  Update applicable project alternatives analysis  Prepare groundwater well pilot project implementation plan  Construct and test pilot monitoring and extraction wells  Provide recommendations regarding costs and feasibility to develop a groundwater well production system within the Middle Sweetwater River Basin capable of producing a sustainable yield of potable water  Prepare groundwater well production project implementation plan and scope of work The groundwater conjunctive use concept is described as the extraction of the quantity of water from the groundwater basin that was placed there by customers of the Otay Water District, Helix Water District, and Padre Dam Municipal Water District by means of their use of imported treated water that contributed to the overall volume of groundwater within the basin. An estimated quantity was developed to be approximately 12.5 percent of the total consumption of the Otay WD customers within that basin, as measured by water meters. In the 1994-1995 period, the quantity of water that was returned to the groundwater basin by Otay WD customers was estimated to be 810 acre-feet per year. Currently, that 12.5 percent quantity could be on the order of 1,000 acre-feet per year. A future scope of work will need to addresses this concept while considering further development of the groundwater basin as an additional supply resource. If it is deemed that a Middle Sweetwater River Basin Groundwater Well Production Project is viable then the consultant will develop and provide a groundwater well production project implementation plan, cost estimate, and related scope of work. Further development of the groundwater basin to enhance the total groundwater production could be accomplished by the Otay WD by means of additional extraction of water from the basin that is placed there by means of either injection and/or spreading basins using imported untreated water as the resource supply. The existing La Mesa Sweetwater Extension Pipeline, owned by the Water Authority, once converted to an untreated water delivery system, could be the conveyance system to transport untreated water for groundwater recharge in support of this conjunctive use concept. These two distinct water resource supply conjunctive use concepts will be addressed so they may coexist and to allow for their development as separate phases. The scope of work to complete Middle Sweetwater River Basin Groundwater Well Pilot Project consists of many major tasks and is to address the groundwater supply concepts Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 49 outlined above. It is anticipated that the cost for the entire scope of work, will be on the order of $2,000,000, which includes a contingency and may take up to one and a half years to complete. The primary desired outcome of the Middle Sweetwater River Basin Groundwater Well Pilot Project is for the engineering consultant to determine and make recommendations if it is financially prudent and physically feasible to develop a Phase I groundwater well production system within the Middle Sweetwater River Basin capable of producing a sustainable yield of up to 1,500 ac-ft/yr of potable water for the Otay WD. If it is deemed that a Middle Sweetwater River Basin Groundwater Well Production Project is viable then the consultant will develop and provide a groundwater well production project implementation plan and related scope of work. Otay Mesa Lot 7 Groundwater Well In early 2001 the Otay WD was approached by a landowner representative about possible interest in purchasing an existing well or alternatively, acquiring groundwater supplied from the well located on Otay Mesa. The landowner, National Enterprises, Inc., reportedly stated that the well could produce 3,200 acre-feet per year with little or no treatment required prior to introducing the water into the Otay WD potable water system or alternatively, the recycled water system. In March 2001 authorization to proceed with testing of the Otay Mesa Lot 7 Groundwater Well was obtained and the Otay WD proceeded with the investigation of this potential groundwater supply opportunity. The May 2001 Geoscience Support Services, Inc. completed for the Otay WD the preparation of a report entitled, “Otay Mesa Lot 7 Well Investigation,” to assess the Otay Mesa Lot 7 Well. The scope of work included a geohydrologic evaluation of the well, analyses of the water quality samples, management and review of the well video log, and documentation of well pump testing. The primary findings, as documented in the report, formed the basis of the following recommendations:  For the existing well to be use as a potable water supply resource, a sanitary seal must be installed in accordance with the DDW guidelines.  Drawdown in the well must be limited to avoid the possibility of collapsing the casing.  Recover from drawdown from pumping is slow and extraction would need to be terminated for up to 2 days to allow for groundwater level recovery.  The well water would need to be treated and/or blended with potable water prior to introduction into the potable water distribution system. The existing Otay Mesa Lot 7 Well, based upon the above findings, was determined not to be a reliable municipal supply of potable water and that better water quality and quantity perhaps could be discovered deeper or at an alternative location within the San Diego Formation. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 50 The Otay WD may still continue to pursue the Otay Mesa groundwater well opportunity with due consideration of the recommendations of the existing report. Based on the recommendations of the investigation report, a groundwater well production facility at Otay Mesa Lot 7 could realistically extract approximately 300 acre-feet per year. Rancho del Rey Groundwater Well In 1991, the McMillin Development Company drilled the Rancho del Rey Groundwater Well to augment grading water supplies for their Rancho del Rey development projects. Although the well was considered a “good producer,” little was known regarding its water quality and sustainable yield because the water was used solely for earthwork (i.e. dust control and soil compaction). The well was drilled to 865 feet, with a finished depth of 830 feet and produced approximately 400 acre-feet per year of low quality water for four years until its use was discontinued in April 1995 when the well was no longer needed. McMillin notified the Otay WD of its intent to sell off the groundwater well asset. In 1997, the Otay WD purchased an existing 7-inch well and the surrounding property on Rancho del Rey Parkway from the McMillin Company with the intent to develop it as a source of potable water. Treatment was required to remove salts and boron, among other constituents, using reverse osmosis membranes and ion exchange. In 2000, having received proposals for the design and construction of a reverse osmosis treatment facility that far exceeded the allocated budget, the Board of Directors instructed staff to suspend the project until such time as it became economically viable. In January 2010, citing the rising cost of imported water and the Otay WD's interest in securing its own water source for long-term supply reliability, the Board authorized Phase 1 for drilling and development of the Rancho del Rey Well. On March 3, 2010, the Board adopted the Mitigated Negative Declaration for this project and a Notice of Determination was filed with the County of San Diego on March 5, 2010. In September 2010, a new 12-inch production well was drilled to a depth of 900 feet through the groundwater formation and into fractured bedrock. Testing showed the long-term yield of the new well to be 450 gpm, higher than previous studies had estimated. Separation Processes, Inc. (SPI), a highly qualified membrane treatment firm, was hired to conduct a detailed economic feasibility study to confirm that the annualized unit cost of the new water source was economically competitive with other sources. The economic study estimated the unit cost of water to be $1, 500 to $2,000 per acre-feet for an alternative that utilizes a seawater membrane for treating both salts and boron. When compared with the current imported treated water rate from the Water Authority, and with the knowledge that this rate will continually increase as MWD and the Water Authority raise their rates, the Rancho del Rey Well project appears to be economically viable. The Otay WD is continuing to pursue the Rancho del Rey groundwater well opportunity with due consideration of the recommendations of the existing reports and plans to develop a Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 51 groundwater well production facility to extract approximately 500 acre-feet per year. For water planning purposes, production of groundwater from the Rancho del Rey well is considered “additional planned” for local supplies. 6.3.1.4 Otay Water District Desalination Project The Otay WD is currently investigating the feasibility of purchasing desalinated water from a seawater reverse osmosis plant that is planned to be located in Rosarito, Mexico, known as the Otay Mesa Desalinated Water Conveyance System (Desalination) project. The treatment facility is intended to be designed, constructed, and operated in Mexico by a third party. The Otay WD’s draft Desalination Feasibility Study, prepared in 2008, discusses the likely issues to be considered in terms of water treatment and monitoring, potential conveyance options within the United States from the international border to potential delivery points, and environmental, institutional, and permitting considerations for the Otay WD to import the Desalination project product water as a new local water supply resource. While the treatment facility for the Desalination project will not be designed or operated by the Otay WD , it is important that the Otay WD maintain involvement with the planning, design, and construction of the facility to ensure that the implemented processes provide a product water of acceptable quality for distribution and use within the Otay WD’s system as well as in other regional agencies’ systems that may use the product water, i.e. City of San Diego, the Water Authority, etc. A seawater reverse osmosis treatment plant removes constituents of concern from the seawater, producing a water quality that far exceeds established United States and California drinking water regulations for most parameters, however, a two-pass treatment system may be required to meet acceptable concentrations of boron and chlorides, similar to the levels seen within the existing Otay WD supply sources. The Desalination Feasibility Study addresses product water quality that is considered acceptable for public health and distribution. The Otay WD, or any other potential participating agencies, will be required to get approval from the DDW in order to use the desalinated seawater as a water source. Several alternative approaches are identified for getting this approval. These alternatives vary in their cost and their likelihood of meeting DDW approval. The Rosarito Desalination Facility Conveyance and Disinfection System Project report addresses two supply targets for the desalinated water (i.e. local and regional). The local alternative assumes that only Otay WD would participate and receive desalinated water, while the regional alternative assumes that other regional and/or local agencies would also participate in the Rosarito project. On November 3, 2010, the Otay WD authorized the General Manager to enter into an agreement with AECOM for the engineering design, environmental documentation, and the permitting for the construction of the conveyance pipeline, pump station, and disinfection Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 52 facility to be constructed within the Otay WD. The supply target is assumed to be 50 mgd while the ultimate capacity of the plant will be 100 mgd. The Otay WD is proceeding with negotiations among the parties. 6.3.2 Otay Water District Capital Improvement Program The Otay WD plans, designs, constructs, and operates water system facilities to acquire sufficient supplies and to meet projected ultimate demands placed upon the potable and recycled water systems. In addition, the Otay WD forecasts needs and plans for water supply requirements to meet projected demands at ultimate build out. The necessary water facilities and water supply projects are implemented and constructed when development activities proceed and require service to achieve timely and adequate cost effective water service. New water facilities that are required to accommodate the forecasted growth within the entire Otay WD service area are defined and described within the Otay Water District WFMP Update. These facilities are incorporated into the annual Otay WD Six Year Capital Improvement Program (CIP) for implementation when required to support development activities. As major development plans are formulated and proceed through the land use jurisdictional agency approval processes, Otay WD prepares water system requirements specifically for the proposed development project consistent with the Otay WD WFMP Update. These requirements document, define, and describe all the potable water and recycled water system facilities to be constructed to provide an acceptable and adequate level of service to the proposed land uses, as well as the financial responsibility of the facilities required for service. The Otay WD funds the facilities identified as CIP projects. Established water meter capacity fees and user rates are collected to fund the CIP project facilities. The developer funds all other required water system facilities to provide water service to their project. Section 7 – Conclusion: Availability of Sufficient Supplies The Otay Ranch Village 14 and Planning Areas 16/19 Project is currently located within the jurisdictions of the Otay WD, Water Authority, and MWD. To obtain permanent imported water supply service, land areas are required to be within the jurisdictions of the Otay WD, Water Authority, and MWD to utilize imported water supply. The Water Authority and MWD have an established process that ensures supplies are being planned to meet future growth. Any annexations and revisions to established land use plans are captured in the SANDAG updated forecasts for land use planning, demographics, and economic projections. SANDAG serves as the regional, intergovernmental planning agency that develops and provides forecast information. The Water Authority and MWD update their demand forecasts and supply needs based on the most recent SANDAG forecast Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 53 approximately every five years to coincide with preparation of their urban water management plans. Prior to the next forecast update, local jurisdictions with land use authority may require water supply assessment and/or verification reports for proposed land developments that are not within the Otay WD, Water Authority, or MWD jurisdictions (i.e. pending or proposed annexations) or that have revised land use plans with either lower or higher development intensities than reflected in the existing growth forecasts. Proposed land areas with pending or proposed annexations, or revised land use plans, typically result in creating higher demand and supply requirements than previously anticipated. The Otay WD, Water Authority, and MWD next demand forecast and supply requirements and associated planning documents would then capture any increase or decrease in demands and required supplies as a result of annexations or revised land use planning decisions. MWD’s IRP identifies a mix of resources (imported and local) that, when implemented, will provide 100 percent reliability for full-service demands through the attainment of regional targets set for conservation, local supplies, State Water Project supplies, Colorado River supplies, groundwater banking, and water transfers. The 2015 IRP Update describes an adaptive management strategy to protect the region from future supply shortages. This adaptive management strategy has five components: achieve additional conservation savings, develop additional local water supplies, maintain Colorado River Aqueduct supplies, stabilize State Water Project supplies, and maximize the effectiveness of storage and transfer. MWD’s 2015 IRP has a plan for identifying and implementing additional resources that expand the ability for MWD to meet future changes and challenges as necessary to ensure future reliability of supplies. The proper management of these resources help to ensure that the southern California region, including San Diego County, will have adequate water supplies to meet long-term future demands. MWD adopted its 2015 UWMP, in accordance with state law, on May 9, 2016. The resource targets included in the preceding 2015 IRP Update serve as the foundation for the planning assumptions used in the 2015 UWMP. MWD’s 2015 UWMP contains a water supply reliability assessment that includes a detailed evaluation of the supplies necessary to meet demands over a 20-year period in average, single dry year, and multiple dry year periods. As part of this process, MWD also uses the current SANDAG regional growth forecast in calculating regional water demands for the Water Authority’s service area. As stated in MWD’s 2015 UWMP, the plan may be used as a source document for meeting the requirements of SB 610 and SB 221 until the next scheduled update is completed in 5 years (2020). The 2015 UWMP includes a “Justifications for Supply Projections” in Appendix A.3, that provides detailed documentation of the planning, legal, financial, and regulatory basis for including each source of supply in the plan. In the Findings Section of the Executive Summary (Page ES-5) of their 2015 UWMP, MWD states that MWD has supply capacities that would be sufficient to meet expected demands from 2020 through 2040 under the single dry-year and multiple dry-year conditions. MWD has plans for supply implementation and continued development of a diversified resource mix Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 54 including programs in the Colorado River Aqueduct, State Water Project, Central Valley Transfers, local resource projects, and in-region storage that enables the region to meet its water supply needs. MWD’s 2015 UWMP identifies potential reserve supplies in the supply capability analysis (Tables 2-4, 2-5 and 2-6), which could be available to meet the unanticipated demands. The County Water Authority Act, Section 5 subdivision 11, states that the Water Authority “as far as practicable, shall provide each of its member agencies with adequate supplies of water to meet their expanding and increasing needs.” As part of preparation of a written water supply assessment report, an agency’s shortage contingency analysis should be considered in determining sufficiency of supply. Section 11 of the Water Authority’s 2015 Updated UWMP contains a detailed shortage contingency analysis that addresses a regional catastrophic shortage situation and drought management. The analysis demonstrates that the Water Authority and its member agencies, through the Emergency Response Plan, Emergency Storage Project, Carlsbad Desalination Project, and Drought Management Plan (DMP) are taking actions to prepare for and appropriately handle an interruption of water supplies. The DMP, adopted in May 2006, provides the Water Authority and its member agencies with a series of potential actions to take when faced with a shortage of imported water supplies from MWD due to prolonged drought or other supply shortfall conditions. The actions will help the region avoid or minimize the impacts of shortages and ensure an equitable allocation of supplies. The WSA&V Report identifies and describes the processes by which water demand projections for the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project will be fully included in the water demand and supply forecasts of the Urban Water Management Plans and other water resources planning documents of the Water Authority and MWD. Water supplies necessary to serve the demands of the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project, along with existing and other projected future users, as well as the actions necessary and status to develop these supplies, have been identified in the Otay Ranch Village 14 and Planning Areas 16/19 Project WSA&V Report and will be included in the future water supply planning documents of the Water Authority and MWD. This WSA&V Report includes, among other information, an identification of existing water supply entitlements, water rights, water service contracts, water supply projects, or agreements relevant to the identified water supply needs for the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project. This WSA Report assesses, demonstrates, and documents that sufficient water supplies are planned for and are intended to be available over a 20-year planning horizon, under normal conditions and in single and multiple dry years to meet the projected demand of the proposed Otay Ranch Village 14 and Planning Areas 16/19 Project and the existing and other planned development projects to be served by the Otay WD. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 55 Table 5 presents the forecasted balance of water demands and required supplies for the Otay WD service area under average or normal year conditions. The total actual demand for FY 2015 was 30,271 acre feet. The demand for FY 2015 is 2,999 acre feet lower than the demand in FY 2010 of 33,270 acre feet. The drop in demand is a result of the unit price of water, the conservation efforts of users as a result of the prolonged drought, and the economy. Table 5 presents the forecasted balance of water demands and supplies for the Otay WD service area under single dry year conditions. Table 6 presents the forecasted balance of water demands and supplies for the Otay WD service area under multiple dry year conditions for the three year period ending in 2019. The multiple dry year conditions for periods ending in 2025, 2030, and 2035 are provided in the Otay Water District 2015 UWMP. The projected potable demand and supply requirements shown the Tables 5 and 6 are from the Otay WD 2015 UWMP. Hot, dry weather may generate urban water demands that are about 6.4 percent greater than normal. This percentage was utilized to generate the dry year demands shown in Table 6. The recycled water supplies are assumed to experience no reduction in a dry year. Table 5 Projected Balance of Water Demands and Supplies Normal Year Conditions (acre feet) Description FY 2020 FY 2025 FY 2030 FY 2035 FY 2040 Demands Otay WD Demands 47,328 54,771 57,965 59,279 65,913 Active Conservation Savings (2,111) (1,844) (1,585) (1,538) (1,587) Accelerated Forecast Growth (AFG) – Planning Area 12 46 46 46 46 46 AFG – Otay Sunroad EOM SPA 836 836 836 836 836 AFG University Innovation District 11.7 11.7 11.7 11.7 11.7 Passive Conservation Savings (2,497) (4,497) (5,489) (6,040) (6,744) Total Demand 43,613.7 49,323.7 51,784.7 52,594.7 58,475.7 Supplies Water Authority Supply 37,943.7 43,423.7 45,784.7 46,394.7 51,975.7 Recycled Water Supply 5,670 5,900 6,000 6,200 6,500 Total Supply 43,613.7 49,323.7 51,784.7 52,594.7 58,475.7 Supply Surplus/(Deficit) 0 0 0 0 0 Table 6 presents the forecasted balance of water demands and supplies for the Otay WD service area under single dry year and multiple dry year conditions from the Otay Water District 2015 UWMP. Table 6 Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 56 Projected Balance of Water Demands and Supplies Single Dry and Multiple Dry Year Conditions (acre feet) Normal Year Single Dry Year Multiple Dry Years FY 2011 FY 2017 FY 2017 FY 2018 FY 2019 Demands Otay WD Demands 37,176 38,749 38,844 40,378 42,430 Total Demand 37,176 38,749 38,844 40,378 42,430 Supplies Water Authority Supply 33,268 33,877 33,972 35,240 37,026 Recycled Water Supply 3,908 4,872 4,872 5,138 5,404 Total Supply 37,176 34,639 38,844 40,378 42,430 Supply Surplus/(Deficit) 0 0 0 0 0 District Demand totals with SBX7-7 conservation target achievement plus single dry year increase as shown. The Water Authority could implement its DMP. In this instances, the Water Authority may have to allocate supply shortages based on it equitable allocation methodology in its DMP. Dry year demands assumed to generate a 7% increase in demand over normal conditions for a single dry year. For multiple dry years an 8% increase in demand over normal conditions is projected in the first year, 14% in the second year and 21% increase is projected in the third year in addition to new demand growth. In evaluating the availability of sufficient water supply, the Otay Ranch Village 14 and Planning Areas 16/19 Project development proponents will be required to participate in the development of alternative water supply project(s). This can be achieved through payment of the New Water Supply Fee adopted by the Otay WD Board in May 2010. These water supply projects are in addition to those identified as sustainable supplies in the current Water Authority and MWD UWMP, IRP, Master Plans, and other planning documents. These new water supply projects are in response to the regional water supply issues related to climatological, environmental, legal, and other challenges that impact water source supply conditions, such as the court rulings regarding the Sacramento-San Joaquin Delta and the current ongoing western states drought conditions. These new additional water supply projects are not currently developed and are in various stages of the planning process. The Otay WD water supply development program includes but is not limited to projects such as the Middle Sweetwater River Basin Groundwater Well project, the North District Recycled Water Supply Concept, the Otay WD Desalination project, and the Rancho del Rey Groundwater Well project. The Water Authority and MWD’s next forecasts and supply planning documents would capture any increase in water supplies resulting from any new water resources developed by the Otay WD. The Otay WD acknowledges the ever-present challenge of balancing water supply with demand and the inherent need to possess a flexible and adaptable water supply implementation strategy that can be relied upon during normal and dry weather conditions. The responsible regional water supply agencies have and will continue to adapt their resource Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 57 plans and strategies to meet climate, environmental, and legal challenges so that they may continue to provide water supplies to their service areas. The regional water suppliers along with Otay WD fully intend to maintain sufficient reliable supplies through the 20-year planning horizon under normal, single, and multiple dry year conditions to meet projected demand of the Otay Ranch Village 14 and Planning Areas 16/19 Project, along with existing and other planned development projects within the Otay WD service area. This WSA&V Report assesses, demonstrates, and documents that sufficient water supplies are planned for and are intended to be acquired, as well as the actions necessary and status to develop these supplies, to meet projected water demands of the Otay Ranch Village 14 and Planning Areas 16/19 Project as well as existing and other reasonably foreseeable planned development projects within the Otay WD for a 20-year planning horizon, in normal and in single and multiple dry years. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 58 Source Documents Otay Ranch Village 14 and Planning Areas 16/19 Project SB 610 and SB 221 Compliance request letter received November 28, 2017. CH2M and Otay Water District, “Otay Water District 2015 Urban Water Management Plan Update”, May 2016. City of Chula Vista, “Otay Ranch General Development Plan/Sub-regional Plan, The Otay Ranch Joint Planning Project,” October 1993 amended June 1996. Otay Water District, “2015 Water Facilities Master Plan Update,” dated March 2016. Carollo and Otay Water District, 2015 Integrated Water Resources Plan Update, June 2015. San Diego County Water Authority, “Final 2015 Urban Water Management Plan, June, 2016. MWD Water District of Southern California, “2015 Urban Water Management Plan,” June 2016. Camp Dresser & McKee, Inc., “Rosarito Desalination Facility Conveyance and Disinfection System Project,” June 21, 2010. PBS&J, “Draft Otay Water District North District Recycled Water System Development Project, Phase I Concept Study,” December 2008. NBS Lowry, “Middle Sweetwater River System Study Water Resources Audit,” June 1991. Michael R. Welch, “Middle Sweetwater River System Study Alternatives Evaluation,” May 1993. Michael R. Welch, “Middle Sweetwater River Basin Conjunctive Use Alternatives,” September 1994. Geoscience Support Services, Inc., “Otay Mesa Lot 7 Well Investigation,” May 2001. Boyle Engineering Corporation, “Groundwater Treatment Feasibility Study Ranch del Rey Well Site,” September 1996. Agreement for the Purchase of Treated Water from the Otay Water Treatment Plant between the City of San Diego and the Otay Water District. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 59 Agreement between the San Diego County Water Authority and Otay Water District regarding Implementation of the East County Regional Treated Water Improvement Program. Agreement between the San Diego County Water Authority and Otay Water District for Design, Construction, Operation, and Maintenance of the Otay 14 Flow Control Facility Modification. Agreement between the Otay Water District and the City of San Diego for Purchase of Reclaimed Water from the South Bay Water Reclamation Plant. Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 60 Appendix A Otay Ranch Village 14 and Planning Areas 16/19 Project Vicinity Map Otay Water District Water Supply Assessment and Verification Report Otay Ranch Village 14 and Planning Areas 16/19 Project 61 Appendix B Otay Ranch Village 14 and Planning Areas 16/19 Project Development Plan Otay Water District Board of Directors Meeting January 3, 2018 Water Supply Assessment & Verification Report for the Otay Ranch Village 14 and Planning Area 16/19 Project SB 610 & SB 221 Compliance EXHIBIT D BACKGROUND •Senate Bills 610 and 221, effective on 1/1/02, with the intent to improve the link between water supply availability and land use decisions. •SB 610 requires a Water Supply Assessment (WSA) and SB 221 requires a Water Supply Assessment & Verification (WSA&V) to be included in the CEQA documents for a project. •Board approval required for submittal of the WSA&V Report to the County of San Diego. Otay Ranch Village 14 & Planning Area 16/19 Project Located within the Otay Ranch General Development Plan Village 14 •994 homes in 3 distinct areas. •Planned around a village core which includes a school, a public park, and a mixed use site with commercial/retail uses. Village 16 •13 one-acre estate lots. Village 19 •112 three-acre lots. Potable Water Demand •Expected potable water demand is 893.8 acre- feet per year (797,970 GPD). •Recycled water use is not planned because the project is tributary to the Upper and Lower Otay Reservoirs. Otay Water District Projected Balance of Supply and Demand Description FY 2020 FY 2025 FY 2030 FY 2035 FY 2040 Demands Otay WD Demands 47,328 54,771 57,965 59,279 65,913 Active Conservation Savings (2,111)(1,844)(1,585)(1,538)(1,587) Accelerated Forecast Growth (AFG) - Planning Area 12 46 46 46 46 46 AFG –Otay Sunroad EOM SPA 836 836 836 836 836 AFG –University Innovation District 11.7 11.7 11.7 11.7 11.7 Passive Conservation Savings (2,497)(4,497)(5,489)(6,040)(6,744) Total Demand 43,613.7 49,323.7 51,784.7 52,594.7 58,475.7 Supplies Water Authority Supply 37,943.7 43,423.7 45,784.7 46,394.7 51,975.7 Recycled Water Supply 5,670 5,900 6,000 6,200 6,500 Total Supply 43,613.7 49,323.7 51,784.7 52,594.7 58,475.7 Supply Surplus/(Deficit)0 0 0 0 0 0 50 100 150 200 250 300 350 400 450 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2017 GP C D Fiscal Year Gallons per Capita per Day Fiscal Year 1970 to Present CONCLUSION •Water demand and supply forecasts are included in the planning documents of Metropolitan Water District of Southern California, San Diego County Water Authority, and the Otay Water District. •Actions necessary to develop the identified water supplies are documented. •The SB 610 & SB 221 WSA&V Report documents that sufficient water supplies are planned for and available over the next 20 years. •The Board has met the intent of the SB 610 and SB 221 statutes. Questions? STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: D0954- 090246 090274 090275 090287 DIV. NO. 1 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – Otay Ranch Village 3 – Request for Information Concerning Methane and VOC at Village 3 and Otay Water District’s Course of Action GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Otay Water District (District) Board regarding the District’s request for information concerning methane and volatile organic compounds (VOCs) at Otay Ranch Village 3 (Village 3) and the District’s course of action. ANALYSIS: Between February 2017 and April 2017, the District entered into four (4) construction agreements with HomeFed Village III Master, LLC, a Delaware limited liability company (Developer), to construct both potable and recycled water facilities for Otay Ranch Village 3. These developer funded construction agreements total $8.2 million. The 2 Developer, as part of the agreements, has provided bonding to the District for the construction of the facilities. Village 3 is located along the future extension of Heritage Road south of Otay Ranch Village 2 (Village 2), east of the Otay Landfill, and north of the future extension of Main Street in the City of Chula Vista, as shown on Exhibit A. Village 3 proposes to construct approximately 1,265 dwelling units that consists of single-family residential, single-family high density residential, multi-family residential, and commercial/mixed use. The development land use also includes office, industrial, a school, parks, and private open space. With the construction agreements in place, the Developer has constructed approximately 25,000 linear feet of distribution main to date. This main has not been tied directly into the District’s system. District staff has been notified by the Developer of the presence of methane and VOCs within the Village 3 development. The following summarizes the chronology of events to date: On August 3, 2017, District staff contacted the Developer and requested feedback to validate existing soils conditions within the Village 3 development prior to the approval of plans for additional potable water facilities within Village 3. Staff requested that the Developer provide visibility to any known issues. On October 18, 2017 the Developer met with District staff to discuss a proposed design for a Village 3 pressure reducing station (PRS). During the meeting the Developer stated that the proposed design was being modified to address methane and VOCs found within the Village 3 development. District staff noted that the presence of methane and VOCs represent a changed condition to the approved plans. District staff requested formal notification from the Developer and a report of the findings and mitigation strategies planned for the water infrastructure. District staff reached out to the City of Chula Vista. City staff verified that the Developer is implementing methane venting systems on the structures that are being constructed in Village 3. On October 24, 2017, the District received a public inquiry from a potential Village 3 home buyer regarding concerns over “VOCs and methane found in the soil and perched groundwater.” District staff immediately communicated the inquiry to the Developer and requested that the Developer provide all information available. 3 On November 2, 2017, the District sent the Developer a letter requesting information concerning methane and VOCs at Village 3 and communicated the District’s course of action (refer to Exhibit B). Within the letter the District noted the following course of action: 1. The District again demands the immediate provision of all reports and documents relating to the site conditions at or around Village 3 specifically including, but not limited to, methane and/or VOCs; 2. Following receipt of these reports and documents, the District will need time to perform a thorough analysis of the reports and documents and reserves the right to request additional studies and research of the site conditions and any proposed mitigation plans or efforts relating to the methane and/or VOCs; 3. Effective immediately, the District is suspending all approvals for projects within Village 3 until we understand the full extent of the site conditions and the mitigation measures for the water facilities that will be needed to address the site conditions; 4. No water meters will be set within Village 3 until District approved mitigation for the site conditions has been constructed; 5. HomeFed shall cover all costs associated with the investigation and remediation of the site conditions. On November 3, 2017, the Developer transmitted to the District a Site Assessment and Human Health Vapor Risk Assessment Report for Village 3 dated August 17, 2017. In addition, the Developer provided a response to the October 24, 2017 public inquiry. In response to the information provided by the Developer, the District retained consultant expertise from the District’s As-Needed contract with Ninyo & Moore to assist in the review and evaluation of the information provided by the Developer. On November 8, 2017, the Developer met with District staff to provide an overview of the transmitted information. During the meeting, the District expressed concerns in the following areas:  Reports provided by the Developer do not provide an ultimate projection of the Village 3 site conditions with respect to methane and VOCs. The District will need this information to evaluate what level of mitigation measures are needed;  Certification that the water facilities installed to date by the Developer are approved for use under the current known site 4 conditions and the ultimate projection of the Village 3 site conditions will be required;  Water facility methane and VOC mitigation measures may be required to maintain and operate the water system under the ultimate Village 3 site conditions. On November 20, 2017, the Developer requested a meeting with the District. During that meeting, the Developer requested that the District reverse its decision to suspend all approvals including the setting of water meters. District staff noted that the Developer has not provided information on the suitability of the water facility materials (including, but not limited to, gaskets that are used in the pipelines and appurtenances). Additionally, the Developer has not provided a plan that addresses any long-term mitigation requirements associated with operating and maintaining the water facilities for Village 3. Potable water for Village 3 will be imported and supplied from the San Diego County Water Authority. The water is planned to be delivered through water pipeline infrastructure constructed by the Village 2 development which is located immediately north of Village 3. On November 21, 2017, the developer for Village 2 verbally expressed concerns to District staff regarding the tie in of Village 3 infrastructure to the Village 2 infrastructure. The District’s understanding is that the Village 2 developer does not wish to allow the tie in until the Village 3 methane and VOC issues are understood and resolved. It is staff’s understanding that the Village 3 Developer is working towards assembling the needed information and certifications required to move the project forward. District staff is researching agency guidelines, both in the State of California and nationally, for the construction of water facilities in areas of methane and VOCs. District staff is also reaching out to the project’s material suppliers regarding the suitability of their materials in methane and VOC environments. The Developer has communicated with the District that their builder partners currently have contracts for the sale of approximately two hundred homes in Village 3. The District anticipates that meters that total seventy Equivalent Dwelling Units (EDUs) will be purchased and set once the methane and VOCs issue is resolved. Meter sets for future EDUs beyond the seventy mentioned above are pending the Developer establishing a secondary feed of water to Village 3 to support fire flow requirements for the development. 5 FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: The expansion of the distribution system through the construction developer projects supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient manner” and the General Manager’s Vision, "A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service." LEGAL IMPACT: None. DM/RP: P:\Public-s\STAFF REPORTS\2018\BD 01-03-18\Village 3\BD 01-03-18 Otay Ranch Village 3 Staff Report (DM_RP).docx Attachments: Attachment A – Committee Action Exhibit A – Location Map Exhibit B – District Letter to HomeFed Corporation ATTACHMENT A SUBJECT/PROJECT: D0954-090246 -090274 -090275 -090287 Informational Item – Otay Ranch Village 3 – Request for Information Concerning Methane and VOC at Village 3 and Otay Water District’s Course of Action COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this informational item at a Committee Meeting held on December 12, 2017. OTAY WATER DISTRICTOTAY RANCH VILLAGE 3LOCATION MAP EXHIBIT A D0954-090287F P: \ D R A F T I N G D E P A R T M E N T \ I n f o f o r O t h e r s \ O W D \ D a n M a r t i n \ E x h i b i t A - O t a y R a n c h V i l l a g e 3 . m x d 0 1,500750 Feet OTAY RANCHVILLAGE 3 HERIT A G E R D OTAY LANDFILL MAIN ST ENERGY WY MAIN ST WILE Y R D VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ ?ò Aä ?Ë ;&s ?p F D0954-090275D0954-090274D0954-090246 ..dedicated to Community SeMiee 2554 SWEETWATER SPRINGS BOULEVARD,SPRING VALLEY,CALIFORNIA91978-2004 TELEPHONE:670-2222, AREACODE619 WWW.Otaywater.gov COPY November 2,2017 Sent via USPS certifiedmailreceipt: #70151660000083624753 Project Nos:D0954-16-008,009,&012 Mr.Curt Smith HomeFed Corporation 1903 Wright Place,Suite 220 Carlsbad,Ca 92008 SUBJECT:Request for Information Concerning Methane and VOC at Village 3 and Otay Water District's Course of Action Dear Mr.Smith: This letter is intended to recount specific concerns and to set forth the Otay Water District's ("District")planned course of action relating to the Village 3 Development. As you may be aware, the District is a local government organized under the provisions of the Municipal Water District Act of 1911 to provide water and sewer service to the communities of eastern Otay Mesa,including eastern Chula Vista. Relating to this mandate, the District endeavors to work with developers to ensure the safe,timely,and efficient installation of piping and facilities necessary to deliver water and sewer services to developments within the District's service area.Typically,withthe cooperation ofdevelopers, the District is able to address site-specific issues,which may arise during the development and construction process.Unfortunately,the District has received minimal cooperation from you and HomeFed regarding the requests for information relating to the Village 3 development. The District is extremely concerned about the presence of methane gas and/or VOC hydrocarbons at the Village 3 development.Thisconcern began to manifeston orabout August2, 2017, when the District contacted you regarding the Village 3-Heritage Road Pressure Reducing Station Plans.Specifically,the District was seeking additional information to follow up on information it had received from independent sources that intimated ongoing issues involving methane gas and/or VOCs within the Village 3 development. On multiple additional occasions, the District has contacted you and requested information relating to Village 3,the possible presence ofmethane gas and/or VOCs,and any existing plansorstudies related thereto.Specifically,on August 3,2017,Dan Martin the District's Engineering Manager, sent an e-mail and spoke with you regarding the Village 3 Heritage Road Pressure Reducing Station Plans and Agreement.Mr.Martin requested feedback from you and HomeFed to validate existing soil conditions at the Mr.Curt Smith Request for Information Concerning Methane and VOC at Village 3 and Otay Water District's Course of Action November 2,2017 Page 2 of 3. facility location and along Heritage Road,and advised you that this information was necessary to evaluate whether any change in plans was necessary as a result of the site conditions and possible presence of methane and/or VOCs. You responded that HomeFed had not yet completed their assessment of the site, but agreed that the District should hold back on approving the agreement until HomeFed finalizes their assessment and presented the information to the District for consideration.The District has not received an assessment and HomeFed has not presented information. On October 18,2017,Dan Martin,Brandon DiPietro,Bob Kennedy,Jon Chambers,Jake Vaclavek,Oscar Ramirez,and Jose Martinez—employees of the District—met with you, Alisa Vialpando (from Hunsaker),Brian Canaris (from Terra Development),and Chris Conahan (from Methane Specialists)to discuss the Village 3 PRS and methaneA/OCs found within Village 3. At the meeting,methane mitigation measures for the Pressure Reducing Station Plans were presented by Mr.Conahan.You passed around an 8-1/4"x 11"map with information about the methane encountered on site at Village 3 and you disclosed that VOCs were encountered on site near Heritage Road and Energy Way. Mr.Martin advised you that the District had received no information from HomeFed concerning specific findings relating to methane found within Village 3.Mr.Martin again requested that HomeFed provide the District with their findings, in writing,as well as a comprehensive study of the area and plans that incorporate mitigation measures for planned water facilities for the District's consideration.Mr.Martin also informed those present that the District will need to retain expert(s) to review the information once HomeFed provides same.At the end of the meeting, you took the map with you.You indicated that you would provide the information,but you have not done so. On or about October 24,2017,the District received a public inquiry from an individual identifying himself as a potential buyer of a home within Village 3. This public inquiry specifically raised concerns over "VOCs and methane found in the soil and perched groundwater."In response, the District again contacted you seeking all information that is currently available to HomeFed relating to the methane and/or VOC issues and any future information,which may become available. To date, the District has not received any such information. This lack of disclosure and communication is not only unprofessional,but has now placed the District in a precarious position. Generally, the information regarding methane gas and/or VOCs is essential,as these compounds can impact pipes and facilities, which will become the District's responsibility upon acceptance of the Developer work.More specifically,the District had previously communicated that this information is needed as it may influence the design of current or future pipelines,routing of lines,facilities, construction timelines,and/or types of materials used at or around Village 3. Due to HomeFed's lack of cooperation and refusal to timely provide the information requested, the District shall proceed as follows: Mr.Curt Smith Request for Information Concerning Methane and VOC at Village 3 and Otay Water District's Course of Action November 2,2017 Page 3 of 3. 1.The District again demands the immediate provision of all reports and documents relating to the site conditions at or around Village 3 specifically including, but not limited to,methane and/or VOCs; 2. Following receipt of these reports and documents,the District will need time to perform a thorough analysis of the reports and documents and reserves the right to request additional studies and research of the site conditions and any proposed mitigation plans or efforts relating to the methane and/or VOCs; 3. Effective immediately,the District is suspending all approvals for projects within Village 3 until we understand the full extent ofthe site conditions and the mitigation measures for the water facilities that will be needed to address the site conditions; 4. No water meters will be set within Village 3 until District approved mitigation for the site conditions has been constructed; 5.HomeFed shall cover all costs associated with the investigation and remediation of the site conditions. We look forward to receiving pertinent documents as well as the necessary cooperation from you and HomeFed, so that we can work toward the completion of the Village 3 development.Please contact Dan Martin,P.E., Engineering Manager at (619)670-2243 or via e-mail at dan.martin(a)otavwater.gov,ifyou have any questions or wish to discuss the District's concerns further. Sincerely, OTAY^VATBR DISTRICT /jt/vLumr Mark Watton General Manager MW:jf P:\ENGRSEC\MarkWatton\Correspondence\HomeFed Pipes Methane (S0368565)_11-2-2017.docx STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: D0261- 010178 010181 010182 DIV. NO. 1 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – Otay Ranch Village 2 East, Otay Ranch Village 2 Heritage Road, and Otay Ranch Village 2 North Projects; 20-Inch Recycled Water Main – Outside Diameter Non- Conformance GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Otay Water District Board (Board) about a non- conformance issue associated with the 20—inch recycled water main constructed as part of the Otay Ranch Village 2 East, Otay Ranch Village 2 Heritage Road, and Otay Ranch Village 2 North developer Projects. ANALYSIS: Between November 2006 and March 2007, the District entered into three construction agreements with Otay Project, L.P. (Developer) to construct both potable and recycled water facilities for Otay Ranch Village 2. Each of the three agreements include the construction of a portion of 20-inch recycled water transmission main. In excess of 2 7,500 linear feet of the 20-inch recycled water main was constructed and placed into service prior to the downturn in the housing economy. The 20-inch recycled water main constructed under the developer construction agreements is located in Heritage Road, Santa Victoria Road, and Santa Venetia Street, as shown in Exhibit A. The construction agreements and associated bonding that includes the 20- inch recycled water main are still active pending completion and acceptance of the work. During the 2017 calendar year, the Developer had requested additional lateral services constructed on the 20-inch recycled water main located in Santa Venetia Street. During the construction of these services, it was discovered by District Inspection staff, that the outside diameter of the 20-inch main exceeded the AWWA C-900-16, C- 905-97, and the pipe manufacturer’s tolerances, raising District concerns regarding the longevity and integrity of the pipe. Saddles with a larger working range were required to perform the additional lateral services. The District brought the concern to the Developer, the Developer’s construction contractor, and the pipe manufacturer (JM Eagle Pipe) and additional potholing along the main for the purposes of measuring the pipe diameter was performed by the Developer. The potholing and pipe diameter measurements by the Developer and manufacturer have verified additional locations where the outside diameter of the 20-inch main exceeds the pipe manufacturer’s tolerances. The pipe diameter measurements also indicated that the 20-inch main was constrained in areas where saddles were installed as part of the original installation. This may be an indication that possible dimensional creep of the pipe has taken place since installation. Staff has sent a letter to the Developer (Exhibit B) to provide notification to the Developer that the non-conforming pipe poses a long-term risk of failure. Staff also notified the Developer that contract acceptance for the projects is pending remediation measures and/or replacement of the pipe by Otay Project, L.P. The District has requested that Otay Project, L.P. develop a plan to resolve this issue. FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: The expansion of the distribution system through the construction developer projects supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient 3 manner” and the General Manager’s Vision, "A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service." LEGAL IMPACT: None. DM/RP:jf P:\Public-s\STAFF REPORTS\2018\BD 01-03-18\Village 2 20 Inch Recycled Main\BD 01-03-18 Village 2_20 Inch Recycled Main Staff Report (DM_RP).docx Attachments: Attachment A – Committee Action Exhibit A – Location Map Exhibit B – District Letter to Otay Project, L.P. ATTACHMENT A SUBJECT/PROJECT: D0261-010178 -010181 -010182 Informational Item – Otay Ranch Village 2 East, Otay Ranch Village 2 Heritage Road, and Otay Ranch Village 2 North Projects; 20-Inch Recycled Water Main – Outside Diameter Non-Conformance COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this informational item at a Committee Meeting held on December 12, 2017. OTAY WATER DISTRICTVILLAGE 2 - 20-INCH RECYCLED WATER MAINLOCATION MAP EXHIBIT AP: \ D R A F T I N G D E P A R T M E N T \ I n f o f o r O t h e r s \ O W D \ D a n M a r t i n \ V I L L A G E 2 - 2 0 - I N R W M A I N . m x d F 0 900450 Feet 20" RW D0261-010182D0261-010181D0261-010178 F OLYM P I C P K W Y L A M E D I A R D H E R I T A G E R D 20" RW VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ ?ò Aä ?Ë ;&s ?p F S A N T A VENE T I A ST SA N T A V I C T O R I A R D ...dedicated to Community Sewice 2554 SWEETWATER SPRINGS BOULEVARD,SPRING VALLEY,CALIFORNIA 91978-2004 TELEPHONE:670-2222,AREA CODE 619 WWW.oteywafer.goi/ Sent via Certified Mail Receipt #70151660000083624807 and e-mail to nlee@baidwinsons.comNovember21,2017 Project Nos.:D0261-010178 D0261-010181 D0261-010182 Nick Lee,P.E. Vice President Baldwin &Sons 610 West Ash Street,Suite 1500 San Diego,CA 92101 SUBJECT:Otay Ranch Village 2 East (D0261-010178),Otay Ranch Village 2 Heritage Road (D0261-010181),and Otay Ranch Village 2 North (D0261-010182) Projects;20-Inch Recycled Main -Outside Diameter Non-Conformance Dear Mr.Lee: As you are aware,the Otay Ranch Village 2 development by Otay Project,L.P.has been under construction with the Otay Water District ("District")since 2006.Three projects within Otay Ranch Village 2,which are identified above,include the construction of a 20-inch recycled water main. On February 15,2017,District staff met with representatives of Otay Project L.P.,Cass Construction,and JM Eagle to review locations where the 20-inch recycled water main pipe was found to exceed the allowable outer dimension tolerances listed per AWWA C- 900-16 and C-905-97.The maximum outer diameter for this size and class of pipe is 21.625 inches per AWWA.As presented during the meeting,the outside diameter measurements documented by the District during developer requested wet taps along the 20-inch main performed in January 2017 were found to be in excess of 21.72 inches. As a result of the February 15,2017 meeting,JM Eagle,in cooperation with Cass Construction and Otay Project L.P.,initiated independent in-situ dimensional inspections at fourteen points within five locations along the length of the 20-inch recycled water main constructed under the subject projects.Those inspections were performed during April 2017.Reported findings of those inspections documented outside diameter measurements ranging from 21.625 inches to 21.712 inches.All but two of the in-situ dimensional inspections,conducted under JM Eagle's direction,were found to be in excess of the allowable outer dimension tolerances listed per AWWA. This was documented in the July 7,2017 Project Report produced by PSILab,Inc.In Mr.Nick Lee Otay Ranch Village 2 East (D0261-010178),Otay Ranch Village 2 Heritage Road (D0261- 010181),and Otay Ranch Village 2 North (D0261-010182)Projects;20-Inch Recycled Main - Outside Diameter Non-Conformance November 21,2017 Page 2 of 2. addition,the PSILab,Inc.report documented the observation of audible "creaking" noises coming from the pipeline while being operated within rated operating pressures. The PSILab,Inc.Project Report indicates that eighty-six percent (12 out of 14)of the points exposed and measured as part of the in-situ dimensional inspections are in excess of the allowable outer dimension tolerances listed per AVVWA.This non- conforming pipe poses a long-term risk of failure and may have a shortened life span.It is not clear how this non-conforming pipe will affect the pipeline bells and service saddles that were installed as part of the planned distribution system.As a result, contract acceptance for the subject projects is pending remediation measures and/or replacement of the pipe by Otay Project L.P.The District is requesting that Otay Project L.P.develop a plan to resolve this issue. Please do not hesitate to let me know if there are any questions.I can be reached at (619)670-2243 or via email at dan.martincgotaywater.gov. Sincerely, OTAY WATER DISTRICT Dan Martin,P.E. Engineering Manager DM:jf cc:Rod Posada Brandon DiPietro P:\Otay Ranch Village 2 20-inch RecycledWillage 2-20 inch RecycledWaterMam_11-21-2017.doc STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Bob Kennedy Engineering Manager PROJECT: P2304- 001101 DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – Seismic Risk Studies GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: No committee action. PURPOSE: To present to the Board of Directors (Board) information gathered and prepared in evaluating seismic risk studies and the potential risks from a seismic event. ANALYSIS: All of the potable water the District receives is imported water supplied by the State Water Project (SWP) and the Colorado River Aqueduct (CRA) purchased through the Municipal Water District of Southern California (MWD) and San Diego County Water Authority (Water Authority). This dependence on imported water poses challenges to meet water demands after an emergency seismic event. At the request of the Board, staff collected seismic risk studies on water facilities to provide an overview of the risks from a seismic event. 2 The attached Memorandum (Attachment B) summarizes the risks to the District’s water supply, the regional infrastructure built to address these risks, and also provides an overview of District facilities and the built in redundancy in its infrastructures that should help the District to continue to operate during an extreme event. FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. BK/RP:jf P:\Bob Kennedy\Seismic Research\Staff Report\BD 01-03-18 Staff Report - Info Item on Seismic Risk (BK-RP).docx Attachments: Attachment A - Committee Action Attachment B – Explanation on Seismic Risk Studies Attachment C - Presentation ATTACHMENT A SUBJECT/PROJECT: P2304-001101 Informational Item – Seismic Risk Studies COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this informational item at a Committee Meeting held on December 12, 2017. ATTACHMENT B Overview All of the potable water the District receives is imported water supplied by the State Water Project (SWP) and the Colorado River Aqueduct (CRA) purchased through the Municipal Water District of Southern California (MWD) and San Diego County Water Authority (Water Authority). This dependence on imported water poses challenges to meet water demands after an emergency seismic event. At the request of the Board, staff have collected seismic risk studies on water facilities to provide an overview of the risks from a seismic event. State Water Project The SWP facilities were built in the 1960s, however, over the last fifty years, the design and construction standards have improved in the area of seismic design requirements. Seismic loading on these facilities is considered to have the potential to do the most damage to the SWP facilities, which could interrupt water supplies to California. The September 2012 Seismic Loading Criteria Report, prepared by the California Department of Water Resources (DWR), is a guideline in selecting appropriate seismic loading criteria for the design and evaluation for a wide variety of SWP facilities, including dams, canals, pipelines, tunnels, check structures, bridges, buildings, pumping and power plants, and utility overcrossings. This report also offers an initial seismic hazard determination of SWP facilities. In August 2015, DWR. MWD and Los Angeles Department of Water and Power formed the Seismic Resilience Water Supply Task Force (SRWSTF) to improve the seismic resilience of imported water supplies to Southern California and to collaborate on studies and mitigation measures that address the vulnerabilities of aqueducts that cross faults. With this multiagency cooperation, they will be revisiting assumptions regarding potential outages from seismic events, establish a common understanding about individual aqueduct vulnerability assessments and projected damage scenarios. MWD Facilities Portions of the Colorado River Aqueduct are located near earthquake faults including the San Andreas Fault. The five pumping plants on the Colorado River Aqueduct have been buttressed to better withstand seismic events. Other components of the Colorado River Aqueduct are measured for any necessary rehabilitation and repair. Supplies are dispersed throughout MWD’s service area, and a six-month reserve supply of water normally held in local storage provides reasonable assurances of continuing water supplies following seismic events. MWD has developed an emergency plan that calls for specific levels of response appropriate to an earthquake magnitude and location. However, no assurance can be made that a significant seismic event would not cause damage to project structures, which could, thereby, interrupt the supply of water from the Colorado River Aqueduct. 2 MWD has adopted a Seismic Resiliency Strategy and has invested $257 million in this effort over the last 10 years. MWD’s Emergency Response Program includes a dedicated pipe manufacture facility in La Verne with materials and dedicated crew to fabricate pipe up to 20 feet in diameter. They have also prequalified contractors that can mobilize in an emergency. They estimate up to 6 large diameter repairs can be made in one week. Two by MWD’s staff and 4 by hired contractors. Annually MWD’s Board will received a report on this program. Water Authority Vulnerability Report The Water Authority facilities are designed to withstand earthquakes with minimal damage. Earthquake loads have been taken into consideration in the design of project structures such as pumping plants and hydroelectric plants. All known faults are crossed by pipelines at very shallow depths to facilitate repair in case of damage from movement along a fault. To date, no Water Authority facilities have suffered any material earthquake damage. In 1993, the Water Authority issued a vulnerability report entitled, Emergency Storage Project SDCWA Aqueducts Repair Time Estimate (see Attachment A), which estimated the degree of damage to pipelines and the amount of time required to restore services after a natural disaster, particularly earthquakes. The Water Authority has since implemented a number of procedures to respond to emergency events, including the Integrated Contingency Plan (ICP) and the Emergency Storage Program (ESP), both of which were developed to protect public health and safety. The Water Authority’s ICP and ESP provide actions to be taken in the event of an earthquake or power outage. The ESP was designed to allow continued water service to its member agencies at a 75 percent level of service or better up to six months, in the event of a complete interruption of water deliveries from MWD. A recommendation of the Water Authority’s 2013 Master Plan Update included a System Vulnerability Assessment focusing on structure integrity of critical facilities. This study will focus on facilities with limited condition assessment data or that are not fully covered by the Asset Management Program. At the August 24, 2017 Board meeting, the Board authorized the General Manager for the Water Authority to award a professional services contract to Kleinfelder, Inc., to complete the seismic vulnerability assessment. The City of San Diego Seismic Assessment The City of San Diego with G&E Engineering Systems prepared an abstract entitled, Seismic Assessment of the San Diego Water System. This report identified faults, landslide, and liquefaction prone areas of the City and estimated the length of pipe in each hazard zone. Their fragility model identified the bulk of damage is due to liquefaction, followed by landslides. They also identified the number of pump stations 3 expected to lose power from SDG&E and recommended portable power is needed where fire threat is high following an earthquake. County of San Diego Multi-jurisdictional Plan The federal Disaster Mitigation Act of 2000 requires all local governments to create a disaster plan in order to qualify for hazard mitigation funding. San Diego County Multi- jurisdictional Hazard Mitigation Plan was one of the first in the State to tackle this planning effort on a region-wide basis and was last revised in 2010. The plan is currently being reviewed and revised to reflect changes to both the hazards threatening San Diego as well as the programs in place to minimize or eliminate those hazards. This document also includes maps identifying earthquake, liquefaction, and rain induced landslide areas of the county. San Diego – Tijuana Metropolitan Area Planning Scenario An October 1991 study by the State of California Department of Conservation Division of Mines and Geology entitled, “Planning Scenario for a Major Earthquake, San Diego- Tijuana Metropolitan Area,” presented a regional perspective on the plausible consequences of credible damage from an earthquake of magnitude 6.8 on the Silver Strand fault south of downtown San Diego. This report notes historic seismic activity within the metropolitan area has been limited: damaging earthquakes occurred only in 1800, 1862, 1983, 1985, and 1986. None of these earthquakes produced serious damage. This report notes it is anticipated that all water systems within the region will suffer some damage. In areas of intense shaking and/or ground failure, two to four main breaks in every residential block will be common where cast iron or asbestos cement pipe is used. There were some reports of broken pipes following the October 28, 1986 earthquake in southeast San Diego (M4.1). The report recommends restoration of water mains begins at the lowest topographic point, progressing uphill so that broken sewers in the same areas do not contaminate still broken water lines. The extent of damage to the distribution system may not be known until water pressure is restored and leaks identified. For this reason, it could take weeks to totally repair damage in the densely populated, heavily damaged areas. Other Water Agencies Sweetwater Authority Several adjacent agencies were contacted to identify seismic studies on infrastructure. In 2006, Sweetwater Authority had GEI Consultants prepare a study on a tank built in 1950. Their study confirmed that this tank would experience significant bottom plate uplift, but suggest that it would be capable of resisting the specified earthquake loading 4 without experiencing global sliding and overturning/overstressing of its shell. However, uplift would be significant enough to potentially shear off the inlet/outlet and bottom drain piping, resulting in probable loss of the contained water. Newer AWWA D 100-96 standards would require a new tank of similar dimensional characteristics to be anchored or alternative procedures to be implemented (e.g., bottom plate thickening). Considering the age of this tank and the performance requirements outlined by Sweetwater Authority, they recommended adding flexibility to the attached piping and relocating the bottom drain outlet, which may provide a cost-effective way to maintain safe storage under earthquake shaking. An update on their current practices was requested, but to date no new information has been received. Helix Water District Helix Water District provided a report dated November 1988 entitled, Seismic Review of Storage Facilities, which provided a conceptual method of repair and an estimate of construction costs for 20 tanks (37 MG total). The fifteen page report used seismic evaluation criteria available at the time from Uniform Building Code and AWWA. Since this report, seven tanks (5.7 MG) have been replaced or retired. The total rudimentary cost for the retrofits for the seven tanks was estimated to be $1,114,900 (an average cost of $196,000/MG). Nine tanks (23 MG) had some seismic modification made that ranged from adding a flexible connection to adding thickening bottom plates and foundation anchors. The total rudimentary cost for the retrofits for the nine tanks was estimated to be $547,700 (an average cost of $23,800/MG). Padre Dam MWD Padre Dam deferred questions about their reservoirs to their consultant, Kleinfelder, Inc., who has not provided any information to date on what they have recommended. Padre Dam does have a CIP referred to as the “Five Reservoirs Retrofit Program.” The plan included the replacement of old wood roofs on their in ground reservoirs with new aluminum covers, extending the life of the reservoirs and bringing them into compliance with current building and seismic codes. Padre Dam has 25 water storage reservoirs with 56 MG of effective storage capacity, the majority of which is located in the Eastern Service Area, with 33 MG of storage (59 percent of total). The remaining 23 MG (41 percent) of storage is located in the Western Service Area. Padre Dam’s storage volume (30.7 MG, 55 percent) is stored in variable area concrete reservoirs that is part of the “Five Reservoirs Retrofit Program.” To date, Kleinfelder, Inc. has not provided any information about their work with Padre Dam. They did share information on the cost of a recently completed study of 24 reservoirs (half steel tanks and half concrete tanks) for the City of San Bernardino of about $10,000 per site. 5 Otay WD Facilities The District is not underlain by known active or potentially active faults (i.e., faults that exhibit evidence of ground displacement in the last 11,000 years and 2,000,000 years, respectively). Major known active faults in the region consist generally of en-echelon, northwest-striking, right-lateral, strike-slip faults. These include the Rose Canyon, Coronado Bank, San Diego Trough, and San Clemente faults located to the west of the District. The location of these faults are shown on Figure 1. Based on published geological data, the Rose Canyon fault is the closest active fault to the District capable of generating a maximum moment magnitude 6.9 earthquake. The La Nacion fault zone is not plotted within the District boundary on this exhibit, but is not considered active. It is located in the southwest portion of the District near the Rancho del Rey community of the City of Chula Vista. No District facilities are located within a State of California Alquist-Priolo Special Studies Zone for earthquake faults. Similar to the City of San Diego, the highest risk for the District are breaks in the pipelines that make up the District’s transmission and distribution system. The City of San Diego report notes liquefaction as the highest pipeline risk hazard followed by landslides and faults. On Figure 2, areas of liquefaction and landslide prone areas within the District are identified. Any pipeline crossing one of these zones could be affected during a seismic event. Unlike the City of San Diego, the District’s pump stations already have onsite generators to respond where fire threat is high following an earthquake. All reservoirs and pump stations constructed after 1988 are assumed to be resistant to earthquakes due to seismic requirements included in the 1988 Uniform Building Code (1988 UBC). Table-1 identifies District reservoirs and the date of construction. Approximately half (21 out of 40 total) of the District’s potable reservoirs were constructed after that 1988 UBC update. The District’s newer reservoirs would be relied on, following an earthquake, to continue to provide water to their pressure zone(s). The District’s oldest reservoir was constructed in 1957, but will be retired after it reaches the end of its useful life. This reservoir storage is not needed in the north district with the construction of the Jamacha Road 36-Inch pipeline to FCF No. 14 and the construction of the two 640 reservoirs in 2009. The 978-1 reservoir constructed in 1959 is the second oldest reservoir in the District and one of the smallest at 0.53 MG. The 978-2 reservoir was constructed in 1992 to provide an additional 2.5 MG of storage to this pressure zone. The District typically has multiple reservoirs for each pressure zone to provide more storage and add redundancy if one reservoir is taken out of service for maintenance or is damaged. Every time the District rehabilitates a reservoir, the components replaced are designed to meet the latest seismic requirements. Staff also contacted NV5 about their experience on reservoir retrofit recommendations. They noted that they have provided services for six reservoirs with some being roof rafter replacement with new center halo support and others more extensive adding 6 thickening bottom plates and foundation anchors. They noted the costs for the retrofit can approach the cost of replacement of the reservoir. Table-2 identifies District pump stations and the date of construction. Approximately 60% (13 out of 21 total) of the District’s pump stations were constructed after that 1988 UBC update. Many of these can pump to a closed pressure system, if a reservoir is out of service. Multiple pump stations serve the 980 pressure zone, one of the District’s largest service areas. Two trailer mounted portable pumps are also available to be put into service in critical areas of the District on an emergency basis. Table-3 identifies District sewer lift stations. Only one sewer pump station, of the five total, was constructed after the 1988 UBC update. Also, the RWCWRF treatment plant was built prior to the 1988 UBC update. All new and replacement District facilities are built to meet California seismic code requirements. The District has planned for and built in redundancy in its infrastructure that should help the District to continue to operate during an extreme event. The District will continue to monitor studies prepared by the Water Authority and other agencies on their emergency preparations. Attachments: Attachment A – Emergency Storage Project SDCWA Aqueducts Repair Time Estimate Figure 1 – Geohazard from Faults near the District Figure 2 – Geohazard from Liquefaction and Landslides Table 1 – Reservoir Data Table 2 – Pump Station Data Table 3 – Sewer Lift Station Data OTAY WATER DISTRICTGEOHAZARD WITHIN DISTRICT BOUNDARYVICINITY MAP FIGURE 1 F P:\DRAFTING DEPARTMENT\Info for Others\OWD\Bob K\Geohazard Research\Figure 1, Geohazard Vinicity Map.mxd §¨¦5 §¨¦8 §¨¦805 §¨¦15 §¨¦5 §¨¦15 §¨¦15 ÃÅ52 ÃÅ125 ÃÅ94 ÃÅ67 ÃÅ905ÃÅ905 ÃÅ125 ÃÅ94 ÃÅ52 ÃÅ905 ÃÅ94 0 52.5 Miles Legend GEO_POTENTIAL_LIQUEFACTION_CN LANDSLIDES-Confirmed, known, or highlysuspected LANDSLIDES-possible or conjectured LIQUEFACTION-High Potential-shallowgroundwater major drainages, hydraulic fills LIQUEFACTION-Low Potential-fluctuatinggroundwater minor drainages, hydraulic fills Earthquake_Faults_SD OWD Boundary OTAY WATER DISTRICTGEOHAZARD WITHIN DISTRICT BOUNDARYLOCATION MAP FIGURE 2 F P:\DRAFTING DEPARTMENT\Info for Others\OWD\Bob K\Geohazard Research\Figure 2, Geohazard within OWD Boundary.mxd §¨¦8 §¨¦805 §¨¦5 §¨¦8 §¨¦805 §¨¦8 §¨¦5 ÃÅ125 ÃÅ94 ÃÅ52 ÃÅ905 ÃÅ67 ÃÅ905 ÃÅ67 ÃÅ94 ÃÅ94 ÃÅ125 ÃÅ905ÃÅ905 0 31.5 Miles Legend GEO_POTENTIAL_LIQUEFACTION_CN LANDSLIDES-Confirmed, known, or highlysuspected LANDSLIDES-possible or conjectured LIQUEFACTION-High Potential-shallowgroundwater major drainages, hydraulic fills LIQUEFACTION-Low Potential-fluctuatinggroundwater minor drainages, hydraulic fills Earthquake_Faults_SD OWD Boundary Table-1 Reservoir Data Initial Potable Potable Potable Potable Total Storage Low Water Reservoir Reservoir Reservoir Reservoir Reservoir Capacity Diameter Elevation Construction Count I.D. Name Type (MG) (FT) (FT) Year 1 803-1 Vista Grande Reservoir Steel Ground n/a 68 764 n/a 2 546-1 1-3 Reservoir Steel Ground n/a 86 507 n/a 3 1004-1 1-4 Reservoir Steel Ground n/a 55 981 n/a 4 520-1 Regulatory Reservoir Circular Concrete Ground n/a 117 500 n/a 5 613-1 5-1 Reservoir Steel Ground n/a 85 590 n/a 6 451-1 1-2 Reservoir Steel Ground 0.98 80 425 1959 1 803-2 20-3 Reservoir Steel Ground 2.00 100 769 1979 2 803-3 Singing Hills Reservoir Steel Ground 2.15 106 771 1986 3 803-4 Vista Grande Reservoir Steel Ground 5.76 146 757 2006 4 978-1 3-2 Reservoir Steel Ground 0.53 54 947 1959 5 978-2 Filiponi Reservoir Rectangular Concrete Ground 2.50 n/a 950 1992 6 1200-1 Grant Reservoir Steel Ground 1.00 73 1168 1996 7 657-1 1-1 Reservoir Steel Ground 1.00 74 626 1957 8 657-2 1-1A Reservoir Steel Ground 0.84 68 626 1990 9 850-1 1-5 Reservoir Steel Ground 1.12 70 812 1959 10 850-2 20-1 Reservoir Steel Ground 3.10 130 819 1976 11 850-3 20-2 Reservoir Steel Ground 3.02 95 794 1984 12 850-4 20-2A Reservoir Steel Ground 2.20 112 821 2010 13 1004-2 Dictionary Hill Reservoir Steel Ground 1.40 82 972 2004 14 520-2 Regulatory Reservoir Steel Ground 5.10 208 500 1983 15 520-3 Regulatory Reservoir Rectangular Concrete Ground 20.00 n/a 496 1992 16 640-1 Regulatory Reservoir Rectangular Concrete Ground 10.00 268 616 2009 17 640-2 Regulatory Reservoir Rectangular Concrete Ground 10.00 268 616 2009 18 832-1 2-1 Reservoir Circular Concrete Ground 0.87 98 817 1962 19 832-2 2-1A Reservoir Steel Ground 1.96 103 801 1991 20 944-1 9-1 Reservoir Steel Ground 0.31 41 913 1962 21 944-2 9-1A Reservoir Steel Ground 3.08 130 913 1992 22 1090-1 2-2 Reservoir Circular Concrete Ground 0.47 73 1075 1962 23 1296-1 9-2 Reservoir Steel Ground 1.02 75 1979 1962 24 1296-2 9-2A Reservoir Steel Ground 2.01 105 1265 1991 25 1296-3 9-2B Reservoir Steel Ground 2.00 need data need data 2010 26 1485-1 9-3 Reservoir Steel Ground 0.31 41 1931 1962 27 1485-2 9-3A Reservoir Steel Ground 1.60 92 1453 2006 28 458-1 10-1 Reservoir Steel Ground 0.82 67 1975 1964 29 458-2 10-2 Reservoir Steel Ground 1.75 98 1933 1967 30 485-1 22-2 Reservoir Steel Ground 1.00 74 454 1983 31 624-1 Patzig Reservoir ned and Covered Earthen Embankme 12.40 n/a 600 1967 32 624-2 22-3 Reservoir Steel Ground 8.13 208 592 1988 33 624-3 EastLake Greens Reserv Rectangular Concrete Ground 30.00 n/a 599 1997 34 711-1 22-1 Reservoir Steel Ground 3.10 130 680 1976 35 711-2 22-1A Reservoir Steel Ground 2.30 112 680 1993 36 711-3 22-1B Reservoir ned and Covered Earthen Embankme 16.00 n/a 689 2002 37 980-1 22-4 Reservoir Steel Ground 5.02 160 946 1985 38 980-2 22-5 Reservoir Steel Ground 5.02 160 946 1989 39 571-1 Roll Reservoir ned and Covered Earthen Embankme 36.72 n/a 543 1967 40 870-1 Upper Reservoir ned and Covered Earthen Embankme 10.98 n/a 847 1963 218.59 Initial Recycled Recycled Recycled Recycled Total Storage Low Water Reservoir Reservoir Reservoir Reservoir Reservoir Capacity Diameter Elevation Construction Count I.D. Name Type (MG) (FT) (FT) Year 1 450-1 Land Fill Site Steel Ground 12.00 257 420 2007 2 680-1 Sunset View Park Circular Concrete Buried 3.40 155 656 2004 3 927-1 Pond No. 1 ned and Covered Earthen Embankme 12.00 n/a need data 1979 4 927-2 Pond No. 4 ned and Covered Earthen Embankme 16.30 n/a need data 1979 Demolished Currently in Service Recycled Currently in Service Table-2 Pump Station Data Existing Initial Potable Potable Potable Potable Firm Pump Station Pump Station Pump Station Pump Station Pump Station Capacity Construction Count I.D. Name Type (GPM) Year 1 1004-1 Buena Vista n/a n/a n/a 2 832-1 2-1 n/a n/a n/a 3 803-1 Hillsdale n/a n/a n/a 4 944-1 9-1 n/a n/a n/a 5 1296-1 9-2 n/a n/a n/a 6 1485-1 9-3 n/a n/a n/a 7 711-1 Central Area n/a n/a n/a 8 657-1 La Presa 657 No building 600 1989 9 850-1 La Presa 850 No building 2,400 1989 10 690-1 Dorchester No building 200 1959 1 850-2 Copps Lane Building 6,000 1996 2 1004-2 Buena Vista Building 1,000 2001 3 1050-1 Pointe Building 240 2002 4 803-2 Hillsdale Building 10,400 1996 5 978-1 Vista Grande No building 2,250 1959 6 1200-1 3-2 No building 1,000 1976 7 860-1 Cottonwood Concrete vault 100 1980 8 832-2 2-1A Building 5,200 1995 9 1090-1 2-2 Building 280 1962 10 944-2 9-1A Building 3,540 1988 11 1296-2 9-2A Building 3,300 1993 12 1485-2 9-3A Building 1,000 2010 13 1655-1 Rancho Jamul Building 600 1979 14 1530-1 Vista Diego No building 260 1965 15 711-2 Central Area Building 16,000 1992 16 980-1 EastLake Building 8,000 1988 17 980-2 EastLake Green Building 15,000 2006 18 624-1 Lower Otay Trailer Mounted 14,000 2006 19 1100-1 Rolling Hills Building 816 2006 20 571-1 Low Head No building 13,700 1966 21 870-1 High Head No building 13,400 1961 Initial Recycled Recycled Recycled Recycled Existing Pump Station Pump Station Pump Station Pump Station Pump Station Capacity Construction Count I.D. Name Type (GPM) Year 1 680-1 Land Fill Site Building 12,000 2007 2 944-1 Sunset Park Concrete vault 4,920 2004 3 927-1 Treatment Plant Building 1979 Demolished Currently in Service Recycled Currently in Service Table-3 Sewer Lift Station Data Initial Sewer Sewer Sewer Existing Pump Station Lift Station Lift Station Lift Station Capacity Construction Count Name Type (GPM)Year 1 Calavo Concrete vault 800 2009 2 Cottonwood Fiberglass vault 500 1985 3 Hidden Mountain Fiberglass 30 1978 4 Russell Square Concrete vault 10 1984 5 Steel Bridge Concrete vault 900 1971 6 Rancho SD Building 1990 Seismic Risks Otay Water District Board Presentation January 3, 2018 ATTACHMENT C 2 Earthquake Threats to Otay WD Water Supply Source: LA Times 3 Seismic Loading Criteria Report •Objective –Develop design criteria –Evaluation of SWP facilities –Seismic hazard determination of SWP facilities Source: http://www.water.ca.gov/pubs/swp/swp_seismic_loading_criteria_report/swp_seismic_loading_criteria_report.pdf 4 Earthquake threats to MWD & SDCWA facilities •Aqueducts –Check structures on fault crossings –Shallow facilities allow quicker repairs •5 Pump Stations on CRA have been buttressed •6 months supply in local storage 5 MWD Seismic Resiliency Strategy •MWD has invested $257 million in seismic resilience project over the last 10 years. •Emergency Response Program –La Verne facility maintains materials and dedicated crews that can fabricate pipe up to 20 feet in diameter –Urgent repair contractors have been prequalified and can quickly mobilize in an emergency –MWD estimates up to 6 large diameter repairs can be made in one week of a major seismic event •A report detailing seismic resiliency program will be presented to MWD’s Board annually. 6 SDCWA Aqueducts Repair Time Estimates •2013 Master Plan Limited Vulnerability Assessment •Emergency Storage Program –75% LOS for 2 months for pipeline repair and 6 months for MWD supply interruption •Complete System Vulnerability Assessment by Kleinfelder, Inc. (SDCWA August 24, 2017) 7 City of San Diego Assessment •Identified faults, landslide and liquefaction zones and length of pipe damaged from each fault •Identified the number of PS that would lose power –Recommend portable power will be needed where fire threat is high •Fragility model identified the bulk of the damage is due to liquefaction followed by landslides Source: http://www.geengineeringsystems.com/ewExternalFiles/SanDiegoWaterRisk.pdf 8 County of San Diego Multi-jurisdictional Plan •Federal Disaster Mitigation Act of 2000 requires all local government to create a disaster plan •Region-wide plan last revised in 2010 •Includes maps identifying hazards –Earthquake –Liquefaction –Landslides Source: http://www.sandiegocounty.gov/oes/emergency_management/oes_jl_mitplan.html 9 San Diego –Tijuana Metropolitan Area Planning Scenario •Report notes historic seismic activity within the metropolitan area has been limited. •Damaging earthquakes occurred only in 1800, 1862, 1983, 1985, and 1986. None of these earthquakes produced serious damage. •Anticipates two to four main breaks in every residential block will be common. •Extent of damage may not be known until water pressure restored. Source: https://archive.org/stream/planningscenario100reic/planningscenario100reic_djvu.txt 10 Other Agencies 11 Sweetwater Authority Investigations •1950 tank investigated by GEI in 2006. –Identified potential for uplift would require anchoring and thickening of bottom plate. –SWA considered cost, age, and service performance requirements and opted to add flexible connections and relocate the bottom drain. •An update of their current practices was requested, but no other information received to date. 12 Helix Water District Investigations •Provided a report dated November 1988. –Provided conceptual method of repair and estimate of cost to upgrade 20 tanks (37 MG total). –Fifteen page report used seismic criteria available at the time. –Since this report, 7 tanks (5.7 MG) have been replaced or retired. –Nine tanks had some seismic modifications made (adding flexible connections, thickening bottom plates, and foundation anchors estimated to be $550,000. •An update of their current practices was requested, but no other information received to date. 13 Padre Dam MWD •Deferred questions to their consultant, Kleinfelder, Inc. who has not provided any information to date on what they recommended. •Padre had a CIP known as the “Five Reservoirs Retrofit Program.” –Plan includes the replacement of old wood roofs on in ground reservoirs with seismic retrofits. •An update of their current practices was requested, but no other information received to date. 14 Otay WD Facilities 15 Otay WD Facilities •Alquist-Priolo Earthquake Fault Zoning Act (1972) and the Seismic Hazards Mapping Act (1990) direct the State Geologist to delineate regulatory "Zones of Required Investigation" to reduce the threat to public health and safety. Source: http://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=regulatorymaps 16 Geohazards within District Boundary 17 Otay WD Seismic Risks •The District has planned for and built in redundancy in its infrastructure that should help the District to continue to operate during an extreme event. •The District will continue to monitor studies prepared by the Water Authority and other agencies on their emergency preparations. 18 District Reservoirs Table-1 Reservoir Data Potable Potable Potable Potable Total Storage Low Water Reservoir Reservoir Reservoir Reservoir Reservoir Capacity Diameter Elevation Construction Count I.D.Name Type (MG)(FT)(FT)Year 1 803-2 20-3 Reservoir Steel Ground 2.00 100 769 1979 2 803-3 Singing Hills Reservoir Steel Ground 2.15 106 771 1986 3 803-4 Vista Grande Reservoir Steel Ground 5.76 146 757 2006 4 978-1 3-2 Reservoir Steel Ground 0.53 54 947 1959 5 978-2 Filiponi Reservoir Rectangular Concrete Ground 2.50 n/a 950 1992 6 1200-1 Grant Reservoir Steel Ground 1.00 73 1168 1996 7 657-1 1-1 Reservoir Steel Ground 1.00 74 626 1957 8 657-2 1-1A Reservoir Steel Ground 0.84 68 626 1990 9 850-1 1-5 Reservoir Steel Ground 1.12 70 812 1959 10 850-2 20-1 Reservoir Steel Ground 3.10 130 819 1976 11 850-3 20-2 Reservoir Steel Ground 3.02 95 794 1984 12 850-4 20-2A Reservoir Steel Ground 2.20 112 821 2010 13 1004-2 Dictionary Hill Reservoir Steel Ground 1.40 82 972 2004 14 520-2 Regulatory Reservoir Steel Ground 5.10 208 500 1983 15 520-3 Regulatory Reservoir Rectangular Concrete Ground 20.00 n/a 496 1992 16 640-1 Regulatory Reservoir Rectangular Concrete Ground 10.00 268 616 2009 17 640-2 Regulatory Reservoir Rectangular Concrete Ground 10.00 268 616 2009 18 832-1 2-1 Reservoir Circular Concrete Ground 0.87 98 817 1962 19 832-2 2-1A Reservoir Steel Ground 1.96 103 801 1991 20 944-1 9-1 Reservoir Steel Ground 0.31 41 913 1962 21 944-2 9-1A Reservoir Steel Ground 3.08 130 913 1992 22 1090-1 2-2 Reservoir Circular Concrete Ground 0.47 73 1075 1962 23 1296-1 9-2 Reservoir Steel Ground 1.02 75 1979 1962 24 1296-2 9-2A Reservoir Steel Ground 2.01 105 1265 1991 25 1296-3 9-2B Reservoir Steel Ground 2.00 need data need data 2010 26 1485-1 9-3 Reservoir Steel Ground 0.31 41 1931 1962 27 1485-2 9-3A Reservoir Steel Ground 1.60 92 1453 2006 28 458-1 10-1 Reservoir Steel Ground 0.82 67 1975 1964 29 458-2 10-2 Reservoir Steel Ground 1.75 98 1933 1967 30 485-1 22-2 Reservoir Steel Ground 1.00 74 454 1983 31 624-1 Patzig Reservoir Lined and Covered Earthen Embankment 12.40 n/a 600 1967 32 624-2 22-3 Reservoir Steel Ground 8.13 208 592 1988 33 624-3 EastLake Greens ReservoirRectangular Concrete Ground 30.00 n/a 599 1997 34 711-1 22-1 Reservoir Steel Ground 3.10 130 680 1976 35 711-2 22-1A Reservoir Steel Ground 2.30 112 680 1993 36 711-3 22-1B Reservoir Lined and Covered Earthen Embankment 16.00 n/a 689 2002 37 980-1 22-4 Reservoir Steel Ground 5.02 160 946 1985 38 980-2 22-5 Reservoir Steel Ground 5.02 160 946 1989 39 571-1 Roll Reservoir Lined and Covered Earthen Embankment 36.72 n/a 543 1967 40 870-1 Upper Reservoir Lined and Covered Earthen Embankment 10.98 n/a 847 1963 218.59 19 District Pump Stations Table-2 Pump Station Data Existing Initial Potable Potable Potable Potable Firm Pump Station Pump Station Pump Station Pump Station Pump Station Capacity Construction Count I.D.Name Type (GPM)Year 1 850-2 Copps Lane Building 6,000 1996 2 1004-2 Buena Vista Building 1,000 2001 3 1050-1 Pointe Building 240 2002 4 803-2 Hillsdale Building 10,400 1996 5 978-1 Vista Grande No building 2,250 1959 6 1200-1 3-2 No building 1,000 1976 7 860-1 Cottonwood Concrete vault 100 1980 8 832-2 2-1A Building 5,200 1995 9 1090-1 2-2 Building 280 1962 10 944-2 9-1A Building 3,540 1988 11 1296-2 9-2A Building 3,300 1993 12 1485-2 9-3A Building 1,000 2010 13 1655-1 Rancho Jamul Building 600 1979 14 1530-1 Vista Diego No building 260 1965 15 711-2 Central Area Building 16,000 1992 16 980-1 EastLake Building 8,000 1988 17 980-2 EastLake Greens Building 15,000 2006 18 624-1 Lower Otay Trailer Mounted 14,000 2006 19 1100-1 Rolling Hills Building 816 2006 20 571-1 Low Head No building 13,700 1966 21 870-1 High Head No building 13,400 1961 20 District Sewer Lift Stations Table-3 Sewer Lift Station Data Initial Sewer Sewer Sewer Existing Pump Station Lift Station Lift Station Lift Station Capacity Construction Count Name Type (GPM)Year 1 Calavo Concrete vault 800 2009 2 Cottonwood Fiberglass vault 500 1985 3 Hidden Mountain Fiberglass 30 1978 4 Russell Square Concrete vault 10 1984 5 Steel Bridge Concrete vault 900 1971 6 Rancho SD Building 1990 21 Questions? STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: January 3, 2018 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: VARIOUS DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Informational Item – First Quarter Fiscal Year 2018 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all CIP project expenditures and to highlight significant issues, progress, and milestones on major projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer's reimbursement projects. 2 The First Quarter Fiscal Year 2018 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $20.1 million. Expenditures through the First Quarter totaled approximately $1.9 million. Approximately 9% of the Fiscal Year 2018 expenditure budget was spent (see Attachment B). As part of the Fourth Quarter Fiscal Year 2017 Capital Improvement Program Report, staff was directed to explore the feasibility of providing a fiscal year graph showing a connection between total CIP project completion status vs. total CIP expenditures. In reviewing the feasibility of the requested graph, staff has noted that there are specific challenges with how to represent the different project phases for multi-year projects within a fiscal year and present them in a meaningful way that would add value to the Board’s decision- making process. Staff notes that visibility and transparency regarding an individual project’s progress is communicated within the comments provided in the Expenditure Report (see Attachment B) that is part of this staff report. Progress and CIP project completion is also provided on a project by project basis in the General Manager’s report. FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: The Capital Improvement Program supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the District’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:jf P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q1\Staff Report\BD 01-03-18 Staff Report First Quarter FY 2018 CIP Report (DM-RP).docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2018 First Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – First Quarter Fiscal Year 2018 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this informational item at a Committee Meeting held on December 12, 2017. FISCAL YEAR 2018 1st QUARTER REPORT (Expenditures through 09/30/2017) ($000) ATTACHMENT B 2018 09/30/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Cameron 20$ 12$ 8$ 60%3,400$ 514$ 2,886$ 15% Project is in the early planning stages. Construction is scheduled for FY 2020. P2267 36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations Martin 10 3 7 30%700 696 4 99% Construction complete in FY 2017 Q4. Project one year warranty scheduled to complete in FY 2018 Q4. P2382 Safety and Security Improvements Payne 150 78 72 52%3,251 2,885 366 89% On schedule 2018; anticipated completion 2019. P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Cameron 5 - 5 0%650 - 650 0% This is tied to P2553 and is driven by the City of Chula Vista. Construction is scheduled for FY 2022. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 50 18 32 36%4,300 3,783 517 88% EIR/EIS complete and Presidential permit issued. Continue meetings with DDW and AdR. Source water testing is ongoing. P2453 SR-11 Utility Relocations Marchioro 50 6 44 12%4,000 1,626 2,374 41% Project accelerated to meet Caltrans current schedule. Design consultant selection for Enrico Fermi and Alta Road crossings completed FY 2018 Q1. Completion of design anticipated March 2018. Completion of construction dependent on Caltrans contractor; however, anticipated FY 2020. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 5 - 5 0%600 5 595 1% Demolition scheduled for FY 2020, with environmental work to be performed in FY 2019. P2485 SCADA - Infrastructure and Communications Replacement Kerr 181 105 76 58%2,328 1,878 450 81% Expenses on target for remainder of fiscal year. P2494 Multiple Species Conservation Plan Coburn-Boyd 30 1 29 3%950 909 41 96%On track to be completed in FY 2018. P2500 Padre Dam - Otay Interconnection Dehesa Valley Marchioro 60 - 60 0%140 - 140 0% Project is driven by Padre Dam pipeline extension to District boundary. P2504 Regulatory Site Access Road and Pipeline Relocation Cameron 20 - 20 0%462 331 131 72%Project is driven by County Fire. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/Osage Marchioro - - - 0%900 - 900 0% No project expenditures anticipated in FY 2018. Construction is scheduled for FY 2021. P2520 Motorola Mobile Radio Upgrade Martinez 30 - 30 0%120 82 38 68% Anticipate this project to complete this Fiscal Year. P2521 Large Meter Vault Upgrade Program Carey 25 16 9 64%620 278 342 45%On track. P2547 District Administration Vehicle Charging Stations Cameron 20 13 7 65%125 45 80 36% Construction is complete. Project is in the Warranty period. P2553 Heritage Road Bridge Replacement and Utility Relocation Cameron 50 2 48 4%1,430 17 1,413 1% Project is in the Planning stage. Project is driven by City of Chula Vista's schedule for replacement. P2568 Technology Business Processes Improvement - Enterprise Content Management System Kerr 36 64 (28) 178%245 210 35 86% Plan on purchasing Psigen Scanning Solution ($36K). P2571 Datacenter Network- Data, Storage, and Infrastructure Enhancements Kerr - - - 0%200 - 200 0%Project on schedule for FY 2019. P2572 Enterprise Resource Planning (ERP) Replacement Kerr - - - 0%500 - 500 0%Project on schedule for FY 2021. P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0%35 - 35 0% No expenditures anticipated in FY 2018. These reservoirs are scheduled to be removed at the end of their useful life in FY 2023. P2608 PL - 8-inch, 850 Zone, Coronado Ave, Chestnut/Apple Cameron 10 - 10 0%350 - 350 0% Project is in the early Planning stage. Construction is scheduled for FY 2020. P2611 Quarry Road Bridge Replacement and Utility Relocation Cameron 5 - 5 0%1,000 - 1,000 0% Project is in the early Planning stage. Project is driven by County's schedule for replacement. P2612 PL - 12-inch, 711 Zone, Pas de Luz/Telegraph Canyon Rd Cameron 5 - 5 0%500 - 500 0% Project is in the early Planning stage. Construction is scheduled for FY 2021. P2613 PL - 12-inch, 520 Zone, Rancho San Diego Towne Center Loop Cameron 10 - 10 0%150 - 150 0% Project is in the early Planning stage. Construction is scheduled for FY 2020. P2614 485-1 Reservoir Interior/Exterior Coating Cameron - - - 0%895 - 895 0%No project expenditures in FY 2018. P2617 Lobby Security Enhancements Payne 75 - 75 0%75 - 75 0%In planning stage. P2619 PS - Temporary Lower Otay Pump Station Redundancy Marchioro 20 6 14 30%635 6 629 1% Project on track. District engineering staff commenced concept development/ alternatives analysis in house. Completion of construction anticipated FY 2020. P2620 Radio and Emergency Communication System Kerr 20 - 20 0%20 1 19 5%Project is on schedule. FISCAL YEAR-TO-DATE, 09/30/17 LIFE-TO-DATE, 09/30/17 P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q1\Expenditures\Copy of Copy of FY18 1st qtr exp_djm.xlsx Page 1 of 4 11/28/2017 FISCAL YEAR 2018 1st QUARTER REPORT (Expenditures through 09/30/2017) ($000) ATTACHMENT B 2018 09/30/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/17 LIFE-TO-DATE, 09/30/17 P2623 Central Area to Otay Mesa Interconnection Pipelines Combination Air/Vacuum Valve Replacements Marchioro 20 6 14 30%270 7 263 3% Project accelerated. Purchase order to procure long lead time valves issued October 2017. Award of a construction contract will coincide with valve delivery anticipated in March 2018. Completion of construction anticipated FY 2018. R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway Martin 20 - 20 0%2,920 2,920 - 100% Construction and reimbursement completed in FY 2017 Q4. Project complete. R2079 RecPL - 6-Inch, 450 Zone, Otay Valley Road - Otay Valley/Entertainment Beppler 10 - 10 0%150 - 150 0% Project is driven by City of Chula Vista's schedule for replacement of the Heritage Road Bridge. R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications Marchioro 20 - 20 0%200 130 70 65% Project on track. Pressure reducing station work will be completed FY 2018. R2116 RecPL - 14-Inch, 927 Zone, Force Main Improvements Marchioro 200 21 179 11%2,500 1,891 609 76% Completion of work impacted by heavy rains in FY 2017 Q3. Remaining work scheduled for FY 2018 Q2 per environmental window. R2118 Steele Canyon Sewer PS Large Solids Handling Improvements Beppler 50 1 49 2%75 23 52 31% Advertisement for bids to be performed in FY 2018 Q2, construction in FY 2018 Q3. R2120 RWCWRF Filtered Water Storage Tank Improvements Beppler 25 - 25 0%500 29 471 6%Construction is scheduled for FY 2020. R2123 Repurpose Otay Mesa Recycled Water Lines Beppler 5 - 5 0%350 - 350 0% Initial study this FY with construction scheduled for FY 2021. R2125 RecPRS - 927/680 PRS Improvements, Otay Lakes Road Marchioro 50 - 50 0%200 - 200 0%Construction scheduled for 2019. S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 20 - 20 0%2,540 1,111 1,429 44% This CIP reimburses the County for work on transportation pipeline rehabilitation. On track. S2027 Rancho San Diego Pump Station Rehabilitation Beppler 5 1 4 20%3,500 3,044 456 87% County invoiced in FY 2017, construction to be completed in FY 2018 Q4, final budget adjustment with County to be done in FY 2019. S2033 Sewer System Rehabilitation Martin 10 2 8 20%3,000 2,993 7 100% Construction complete in FY 2017 Q4. Project one year warranty began May 11, 2017. S2043 RWCWRF Sludge Handling System Beppler 30 - 30 0%76 40 36 53% Reassessment of feasibility to be performed upon determination of future Metro increases. Budget set to perform this during current fiscal year. S2047 Asset Management - Info Master Sewer Implementation Zhao 30 - 30 0%58 - 58 0% This program has been delayed until Fiscal Year 2019. S2061 RWCWRF Aeration Controls Consolidation & Optimization Upgrades (S)Beppler 30 - 30 0%190 - 190 0%Construction is scheduled for FY 2020. Total Capital Facility Projects Total:1,412 355 1,057 25%45,110 25,454 19,656 56% REPLACEMENT/RENEWAL PROJECTS P2083 PS - 870-2 Pump Station Replacement Martin 4,000 52 3,948 1%18,750 2,395 16,355 13% Construction contract awarded and Notice to Proceed issued in FY 2018 Q1. Project on track. P2174 PS - 1090-1 Pump Station Replacement (400 gpm)Marchioro 1 - 1 0%2,500 4 2,496 0%Planning phase deferred until FY 2019. P2400 PL - 20-Inch Pipeline Replacement, 711 Zone, Otay Lakes Road - at Santa Paula Marchioro - - - 0%2,280 - 2,280 0%Planning phase deferred until FY 2020. P2493 624-2 Reservoir Interior/Exterior Coating Cameron 35 10 25 29%1,610 1,579 31 98% Warranty work complete. Project is completed. P2507 East Palomar Street Utility Relocation Cameron 5 1 4 20%735 724 11 99%Waiting for reimbursement from Caltrans. P2508 Pipeline Cathodic Protection Replacement Program Marchioro 100 57 43 57%725 510 215 70% Completion of work impacted by heavy rains in FY 2017 Q3. Remaining work scheduled for FY 2018 Q2 per environmental window. P2518 803-3 Reservoir Interior/Exterior Coating Cameron 5 - 5 0%685 661 24 96%Expenditures anticipated in Q4 FY 2018. P2529 711-2 Reservoir Interior & Exterior Coating Martin 5 - 5 0%820 803 17 98% Construction completed FY 2017 Q2. Project is in the 2 year warranty period. P2530 711-1 Reservoir Interior & Exterior Coating Martin 5 - 5 0%980 954 26 97% Construction completed FY 2017 Q2. Project is in the 2 year warranty period. P2531 944-1 Reservoir Interior & Exterior Coating Martin 5 - 5 0%345 318 27 92% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2532 944-2 Reservoir Interior & Exterior Coating Martin 5 - 5 0%960 937 23 98% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q1\Expenditures\Copy of Copy of FY18 1st qtr exp_djm.xlsx Page 2 of 4 11/28/2017 FISCAL YEAR 2018 1st QUARTER REPORT (Expenditures through 09/30/2017) ($000) ATTACHMENT B 2018 09/30/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/17 LIFE-TO-DATE, 09/30/17 P2533 1200-1 Reservoir Interior & Exterior Coating Cameron 10 - 10 0%810 7 803 1%Project is in the Planning stage. P2534 978-1 Reservoir Interior & Exterior Coating Martin 10 72 (62) 720%650 569 81 88% Project is tied to P2544. Project behind schedule due to unsatisfactory progress by contractor. Reservoir placed back into service during FY 2018 Q1. P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades Martin 5 - 5 0%810 777 33 96% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations Cameron 5 1 4 20%1,090 889 201 82%Project is driven by SANDAG. P2542 850-3 Reservoir Interior Coating Martin 5 - 5 0%540 527 13 98% Construction contract completed FY 2016 Q2. Currently in two year warranty period. P2543 850-1 Reservoir Interior/Exterior Coating Cameron 5 - 5 0%875 5 870 1%No expenditures until Q4 FY 2018. P2544 850-2 Reservoir Interior/Exterior Coating Martin 700 269 431 38%980 356 624 36% Project behind schedule due to unsatisfactory progress by contractor. Reservoir scheduled to be completed and placed into service in FY 2018 Q2. P2545 980-1 Reservoir Interior Exterior Coating Martin 5 - 5 0%1,190 1,188 2 100% Construction completed FY 2017 Q2. Project is in the 2 year warranty period. P2546 980-2 Reservoir Interior/Exterior Coating Cameron 1,100 24 1,076 2%1,450 24 1,426 2% Construction contract award scheduled for FY 2018 Q2. P2555 Administration and Operations Parking Lot Improvements Cameron 265 264 1 100%775 384 391 50% Construction on Phase 1 complete. Phase II Design has begun. Construction contract acceptance scheduled for FY 2018 Q2. P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project Beppler 35 - 35 0%100 33 67 33% Advertisement for bids to be performed in FY 2018 Q2, construction in FY 2018 Q3. P2559 Pressure Vessel Repair and Replacement Program Martin 30 8 22 27%650 259 391 40% RWCWRF surge tank and piping completed in FY 2017 Q3. Currently in one year warranty period. P2561 Res - 711-3 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,800 8 1,792 0% Replacement deferred until FY 2020 since existing cover/liner materials analyzed by laboratory in FY 2017 suggested sufficient remaining life. P2562 Res - 571-1 Reservoir Cover/Liner Replacement Martin 2,700 - 2,700 0%2,900 46 2,854 2% Construction contract awarded and Notice to Proceed issued in FY 2018 Q1. Project on track. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,000 3 997 0% Replacement deferred until FY 2021 to coincide with completion of new 870-2 Pump Station. Existing cover/liner materials analyzed by laboratory in FY 2017 suggested sufficient remaining life. P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%940 - 940 0%No expenditures for FY 2018. P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%1,500 - 1,500 0%No expenditures for FY 2018. P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%905 - 905 0%No expenditures for FY 2018. P2573 PL - 12-Inch Pipeline Replacement, 803 Zone, Hillsdale Road Martin 1,600 33 1,567 2%2,450 271 2,179 11% Construction contract awarded in FY 2018 Q1. Notice to Proceed scheduled for early FY 2018 Q2. P2574 PL - 12-Inch Pipeline Replacement, 978 Zone, Vista Vereda Beppler 450 59 391 13%2,500 138 2,362 6% Draft PDR prepared in FY 2018 Q1. Finalize PDR in FY 2018 Q2 and complete design in FY 2018 Q4 is scheduled. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 gpm Marchioro - - - 0%10,000 - 10,000 0% Replacement deferred until FY 2022 to coincide with development of Villages 4, 8, 9 and 3. P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0%840 - 840 0%No expenditures for FY 2018. P2594 Large Meter Replacement Carey 150 6 144 4%485 259 226 53% Most work will take place in FY 2018 Q3 & Q4. P2604 AMR Change Out Carey 1,510 161 1,349 11%9,605 1,426 8,179 15%Work to begin in FY 2018 Q2. P2605 458/340 PRS Replacement, 1571 Melrose Ave Marchioro 1 - 1 0%250 - 250 0%Design deferred until FY 2019. P2606 803-2 Reservoir Repair/Replacement of Caulking and Tree Removal Marchioro 1 - 1 0%75 - 75 0%Design deferred until FY 2019 P2607 Douglas Ave SWA and OWD Interconnection Upgrade Beppler 10 - 10 0%50 - 50 0%Project is driven by Sweetwater Authority. P2609 PL - 8-inch, 1004 Zone, Eucalyptus St, Coronado/Date/La Mesa Cameron - - - 0%400 - 400 0% No expenditures for FY 2018. Construction scheduled for FY 2021. P2610 Valve Replacement Program - Phase 1 Cameron 30 - 30 0%150 - 150 0%Project is in the early planning stages. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Beppler - - - 0%1,200 - 1,200 0% No expenditures for FY 2018. Construction scheduled for FY 2021. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Dr/Vista Sierra Dr Marchioro 20 3 17 15%2,500 3 2,497 0% On track. District engineering staff commenced concept development/alternatives analysis in house. Construction scheduled for 2021. P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q1\Expenditures\Copy of Copy of FY18 1st qtr exp_djm.xlsx Page 3 of 4 11/28/2017 FISCAL YEAR 2018 1st QUARTER REPORT (Expenditures through 09/30/2017) ($000) ATTACHMENT B 2018 09/30/17 CIP No.Description Project Manager FY 2018 Budget Expenses Balance Expense to Budget %Budget Expenses Balance Expense to Budget %Comments FISCAL YEAR-TO-DATE, 09/30/17 LIFE-TO-DATE, 09/30/17 R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0%1,400 19 1,381 1% Replacement deferred until FY 2021 since dive inspection completed FY 2016 suggested five years remaining life. R2139 RWCWRF - Filter Troughs Replacement Beppler 30 - 30 0%30 - 30 0%Replacement to be performed FY 2018. R2143 AMR Change Out Carey 350 8 342 2%525 51 474 10%Work to begin in FY 2018 Q2. S2024 Campo Road Sewer Main Replacement Martin 4,250 398 3,852 9%10,100 1,965 8,135 19% Construction contract Notice to Proceed issued and construction began in FY 2018 Q1. S2044 Trenchless Sewer Rehabilitation Martin 75 33 42 44%550 138 412 25% Construction project scheduled to complete in FY 2018 Q2. S2045 Fuerte Drive Sewer Relocation Martin 100 12 88 12%250 71 179 28% Construction contract awarded in FY 2018 Q1. Field work to begin in FY 2017 Q3 per County to San Diego requirements. S2046 RWCWRF - Aeration Panels Replacement Beppler 50 - 50 0%450 78 372 17% Negotiations with existing aeration panels manufacturer are on-going; replacement options to be considered once completed. S2048 Hillsdale Road Sewer Repairs Martin 400 9 391 2%720 65 655 9% Construction contract awarded in FY 2018 Q1. Notice to Proceed scheduled for FY 2018 Q2. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 19 - 19 0%1,000 1 999 0% Planning to start in FY 2018; construction anticipated in FY 2020. S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler - - - 0%1,250 - 1,250 0% Planning to start in FY 2020; construction anticipated in FY 2022. S2051 RWCWRF - Headworks Improvements Beppler 50 2 48 4%150 2 148 1% Design to begin in FY 2018 Q2, with construction in FY 2019. S2053 RWCWRF - Sedimentation Basins Weirs Replacement Beppler 60 - 60 0%60 - 60 0%Replacement to be performed FY 2018. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0%1,290 - 1,290 0% Planning to start in FY 2021; construction anticipated in FY 2023. Total Replacement/Renewal Projects Total:18,200 1,482 16,718 8%97,635 18,447 79,188 19% CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 363 - 363 0%5,175 3,863 1,312 75% Purchase of six 1/2 ton pickups will be going to December Committee Meeting for January Board Meeting approval. Going out for bid in late November for January purchase. P2286 Field Equipment Capital Purchases Rahders 72 21 51 29%1,746 1,424 322 82% Items going out for bid in late November for January purchase. Total Capital Purchase Projects Total:435 21 414 5%6,921 5,287 1,634 76% DEVELOPER REIMBURSEMENT PROJECTS p2430 PL - 20-inch, 980 Zone, Proctor Valley Road – Village 14 Phase 1 Cameron 5 - 5 0%35 - 35 0%Developer driven project. P2595 PL - 16-inch, 624 Zone, Village 3N - Heritage Road, Main St/Energy Way Beppler - - - 0%150 - 150 0% Construction could potentially begin in FY 2018. R2084 RecPL - 20-Inch, 680 Zone, Village 2 - Heritage/La Media Martin 40 - 40 0%365 1 364 0%Under construction in FY 2018. Total Developer Reimbursement Projects Total:45 - 45 0%550 1 549 0% 103 20,092$ 1,858$ 18,234$ 9%150,216$ 49,189$ 101,027$ 33% GRAND TOTAL 20,092$ 1,858$ 18,234$ 9%150,216$ 49,189$ 101,027$ 33% P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2018\Q1\Expenditures\Copy of Copy of FY18 1st qtr exp_djm.xlsx Page 4 of 4 11/28/2017 Otay Water District Capital Improvement Program Fiscal Year 2018 First Quarter (through September 30, 2017) ATTACHMENT C Campo Road Sewer –Rancho Towne Center Sewer Construction Background The approved CIP Budget for Fiscal Year 2018 consists of 87 projects that total $20.1 million. These projects are broken down into four categories. 1.Capital Facilities $ 1.4 million 2.Replacement/Renewal $18.2 million 3.Capital Purchases $ 0.4 million 4.Developer Reimbursement $ 45.0 thousand Overall expenditures through the First Quarter of Fiscal Year 2018 totaled $1.9 million, which is approximately 9% of the Fiscal Year budget. 2 Fiscal Year 2018 First Quarter Update ($000) CIP CAT Description FY 2018 Budget FY 2018 Expenditures % FY 2018 Budget Spent Total Life-to-Date Budget Total Life-to-Date Expenditures % Life-to-Date Budget Spent 1 Capital Facilities $1,412 $355 25%$45,110 $25,454 56% 2 Replacement/ Renewal $18,200 $1,482 8%$97,635 $18,447 19% 3 Capital Purchases $435 $21 5%$6,921 $5,287 76% 4 Developer Reimbursement $45 $0 0%$550 $1 0% Total: $20,092 $1,858 9%$150,216 $49,189 33% 3 Fiscal Year 2018 First Quarter CIP Budget Forecast vs. Expenditures 4 $20,092,000 $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FISCAL YEAR PERIOD IN MONTHS Budget Forecast Total Expenditures $1,858,000 55 CIP Projects in Construction Trenchless Sewer Rehabilitation Project (S2044) 3,600 linear feet of 8- inch sewer Cured-In- Place-Pipe lining Re-establishment of 67 sewer laterals 86 lateral liners (Brim and T-Style) $0.65M Budget Start: April 2017 Substantial Completion: August 2017 6 Wind River Road –CIPP Lining 8-inch Pipe Division No. 5 Locations: Spot repairs at 60 locations within the Calavo and Rancho San Diego Sewer Basins. 07/25/2017 CIP Projects in Construction OWD Administration & Operations Parking Lot Improvements, Ph. I – Lighting & Electric Vehicle Charging Station (P2555/P2547) Upgrade existing lighting Install Electric Vehicle charging station $0.63M Budget Start: June 2017 Substantial Completion: September 2017 7 OWD Administration Driveway Entrance – Installed Lighting Division No. 3 Locations: Sweetwater Springs Boulevard, Otay Water District Administration and Operations Building Exteriors and Parking Lots 09/15/2017 CIP Projects in Construction 978-1 & 850-2 Reservoirs Interior/Exterior Coating & Upgrades Project (P2534/P2544) Remove and replace existing interior and exterior coatings. Construct structural upgrades to increase the service life. $1.79M Budget Start: November 2016 Estimated Completion: December 2017 8 850-2 (3.1 MG) –Ceiling Coating Progress Division Nos. 3 and 5 Locations: 978-1 is located on Pence Drive. 850-2 is located on Ledgeside Street. 09/28/2017 CIP Projects in Construction Campo Road Sewer Replacement Project (S2024) Replace existing 10- inch sewer with 7,420 linear feet of new 15- inch sewer. Reconnection of sewer laterals Night Work $10.10M Budget Start: July 2017 Estimated Completion: April 2019 9 Ranch Towne Center –Installation of 15-Inch Sewer Main Division No. 5 Location: Campo Road (SR 94) between Rancho San Diego Village Shopping Center and Rancho Towne Center Construction Contract Status 10 PROJECT TOTAL % S2044 Trenchless Sewer Rehabilitation Insituform Technologies, LLC $353,954 $373,954 ($24,120)-6.8%$333,467 $0 -10.8%0.0%August 2017 P2555 P2547 OWD Administration & Operations Parking Lot Improvements Ph. 1 - Lighting and Vehicle Charging Station Ace Electric, Inc.$344,495 $369,495 $1,090 0.3%$345,585 $341,305 -6.5%98.8%September 2017 P2534 P2544 978-1 & 850-2 Reservoir Interior/Exterior Coating & Upgrades Blastco Inc.$963,280 $1,106,200 $12,430 1.3%$1,092,560 $589,877 -1.2%54.0%December 2017 P2508 R2116 14-Inch Force Main Rehabilitation Project Charles King Company Inc.$1,045,100 $1,101,250 $36,285 3.5%$1,085,385 $877,435 -1.4%80.8%January 2018 S2045 Fuerte Drive Sewer Relocation Ortiz Corporation $131,000 $147,650 $0 0.0%$131,000 $0 -11.3%0.0%May 2018 P2573 S2048 Hillsdale Road 12- inch Waterline Replacement and Sewer Repairs TC Construction Company, Inc.$2,245,060 $2,396,060 $0 0.0%$2,245,060 $0 -6.3%0.0%May 2018 S2024 Campo Road Sewer Replacement Project Wier Construction Corporation $7,623,281 $7,816,781 $0 0.0%$7,630,601 $445,065 -2.4%5.8%April 2019 P2083 P2562 870-2 Pump Station Replacement/ 571-1 Reservoir Liner and Cover Replacement Pacific Hydrotech Corporation $16,500,900 $16,925,900 $0 0.0%$16,500,900 $0 -2.5%0.0%October 2019 TOTALS:$29,207,070 $30,237,290 $25,685 0.1%$29,364,558 $2,253,682 -2.9% FY 2018 CIP CONSTRUCTION PROJECTS CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE **THIS CHANGE ORDER RATE INCLUDES THE CREDIT FOR UNUSED ALLOWANCES *NET CHANGE ORDERS DO NOT INCLUDE ALLOWANCE ITEM CREDITS. IT'S A TRUE CHANGE ORDER PERCENTAGE FOR THE PROJECT CIP NO.PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* Consultant Contract Status 11 Consultant Contract Status 12 Consultant Contract Status 13 QUESTIONS? 14