Loading...
HomeMy WebLinkAbout04-16-19 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room TUESDAY April 16, 2019 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. APPROVE CHANGE ORDER NOS. 4 AND 5 TO THE EXISTING CONSTRUCTION CONTRACT WITH WIER CONSTRUCTION CORPORATION FOR THE CAMPO ROAD SEWER REPLACEMENT PROJECT IN A TOTAL AMOUNT OF $70,970 (MARTIN) [5 minutes] 4. AWARD TWO (2) PROFESSIONAL SERVICE CONTRACTS FOR AS-NEEDED EN- GINEERING DESIGN SERVICES TO NV5, INC. AND RICK ENGINEERING COM- PANY, EACH IN AN AMOUNT NOT-TO-EXCEED $600,000. THE TOTAL AMOUNT OF THE TWO (2) CONTRACTS WILL NOT EXCEED $600,000 DURING FISCAL YEARS 2020-2022 (ENDING JUNE 30, 2022) (CAMERON) [5 minutes] 5. AWARD A CONTRACT TO KIRK PAVING IN AN AMOUNT NOT-TO-EXCEED $200,000 FOR AS-NEEDED ASPHALT PAVING SERVICES FROM JULY 1, 2019 THROUGH JUNE 30, 2020 WITH FOUR (4) OPTIONS FOR RENEWAL AT THE GENERAL MANAGER’S DISCRETION (MARTINEZ) [5 minutes] 6. ADJOURNMENT 2 BOARD MEMBERS ATTENDING: Tim Smith, Chair Gary Croucher All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on April 12, 2019 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on April 12, 2019. /s/ Susan Cruz, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: May 1, 2019 SUBMITTED BY: Dan Martin Assistant Chief of Engineering PROJECT: S2024-001103 DIV. NO. 5 APPROVED BY: Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Approval of Change Order Nos. 4 and 5 to the Construction Contract with Wier Construction Corporation for the Campo Road Sewer Replacement Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve: 1. Change Order No. 4 to the existing construction contract with Wier Construction Corporation (Wier Construction) in the amount of $70,970.00 for the Campo Road Sewer Replacement Project. 2. Change Order No. 5 to the existing construction contract with Wier Construction in the amount of $0.00 for the Campo Road Sewer Replacement Project. See Exhibit A for Project location. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to execute Change Order No. 4 in the amount of $70,970.00 and to execute Change Order No. 5 in the amount of $0.00 to the construction contract with Wier Construction for the Campo Road Sewer Replacement Project. 2 ANALYSIS: The District’s Campo Road Sewer Replacement project is replacing an existing 10-inch sewer pipeline, located within and south of Campo Road between Avocado Boulevard and Singer Lane, which is undersized to handle current sewer flows. To accommodate current and future flows, approximately 7,420 linear feet of 15-inch gravity sewer main will be installed to replace the existing 9,225 feet of 10-inch sewer main. The eastern terminus of the new 15-inch sewer main will be located at the intersection of Avocado Boulevard/Rancho San Diego Village Shopping Center driveway. The new main’s western terminus will be located in the Rancho San Diego Towne Center where it will connect to the existing 27-inch sewer main within the shopping center’s parking lot. Sewer laterals stemming from the existing pipe will be reconnected to the proposed new pipeline. The majority of the pipeline will be installed with open trench construction except in two (2) locations where horizontal auger boring will be used for crossing Campo Road. These two (2) locations are Campo Road east of Via Mercado, and at the intersection of Campo Road/Jamacha Boulevard. The existing sewer will be abandoned in place with the exception of a 210-feet long section of aboveground pipeline and seven (7) supporting pillars that will be removed. At the May 3, 2017 Board Meeting, the Board awarded a construction contract in the amount of $7,816,645.95 to Wier Construction. Since the award of the construction contract, there have been three (3) change orders approved for the contract. Change Order No. 1, which totaled $74,266.00, compensated the contractor for a realignment of the planned sewer main due to a utility conflict. This Change Order also increased the quantity for rock removal and disposal due to rock encountered on the Project and provided for additional Class 2 base due to field conditions at the Rancho San Diego Town Center parking lot. Lastly, this Change Order issued a credit for modifications to traffic control requirements. In total, Change Order No. 1 added 46 days to the contract as a result of the added work. Change Order No. 2 provided for modifications to the planned grade of the jack and bore pipe at the Campo Road West Bore crossing, which is located east of Via Mercado. This change also included the removal of the internal beading, which is generated during the field construction of the fusible pipe. This was a no-cost change and did not include adjustments to contract time. 3 Board approved Change order No. 3, which totaled $156,192.12, compensated the contractor for realignment of the East Bore launch pit due to a communications utility conflict with the shoring limits indicated on the contract plans. This Change Order also included addressing other unmarked utilities found to be in conflict with the planned sewer installation. Lastly, Change Order No. 3 increased bid item quantity for rock removal and disposal due to rock encountered on the Project. Change Order No. 3 added 29 days to the contract as a result of the added work. Change order No. 4, which is the subject of this staff report, provides for the following six (6) items: 1. Removal and disposal of an unmarked abandoned 24-inch storm drain. 2. Removal and disposal of an unmarked abandoned storm drain slot drain and concrete encasement. 3. Additional trench excavation and backfill associated with field conditions of the existing sewer alignment being different than the contract plans. 4. Removal and replacement of a Caltrans fiber optic traffic signal interconnection conduit and cable not shown on the plans. 5. Granting contract time in accordance with the contract due to weather impacts. 6. Granting contract time for delays associated with unforeseen rock encountered on the project. In total, the cost associated with the items in Change Order No. 4 is $70,970.00. Time impacts associated with this change are also provided in Exhibit B. In total, the fifty-three (53) additional days added to the contract will result in a revised total contract duration of 758 calendar days. Change Order No. 5, which is also the subject of this staff report is for a contractor requested change to the horizontal and vertical alignment of the planned East Bore sewer main located at the intersection of Jamacha Boulevard and Campo Road. The planned work at the East Bore location involved the jack and bore installation of a 30-inch steel casing from the jacking pit located at the north-east corner of the intersection diagonally across the intersection to the receiving pit located on the south-west corner of the intersection. The 30-inch steel casing will contain the District’s new 15-inch sewer main. The resulting installation of the 30-inch steel casing by the subcontractor performing the work deviated from the planned construction both horizontally and vertically. While the subcontractor’s means and methods resulted in a longer bore (addition of approximately 90-linear feet), the resulting horizontal and 4 vertical alignments for the new 15-inch sewer main in the casing are within the Project’s design criteria and tolerances. District staff notified the contractor that the District is willing to consider acceptance of the changed alignment at no additional cost and with no additional time added to the construction contract. Change Order No. 5 (Exhibit C) memorializes the revised alignment to the construction contract with no additional construction cost or time granted. Change Order No. 5 also states that there will be no claims allowed as part of this change. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The Fiscal Year 2019 budget for CIP S2024 is $10,530,000. Total expenditures, plus outstanding commitments and forecast, including the contract change orders, are $10,529,644. See Attachment B for budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP S2024 is sufficient to support the Project. The Finance Department has determined that, under the current rate model, 50% of the funding is available from the Betterment ID 18 fund and 50% of the funding is available from the Replacement Fund for CIP S2024. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the District’s Vision, “To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices.” LEGAL IMPACT: None. DM:jf P:\WORKING\CIP S2024 Campo Road Sewer Replacement\Staff Reports\BD 05-01-19\BD 05-01-19, Staff Report Campo Road Sewer Replacement - CO Nos. 4 and 5.docx Attachments: Attachment A – Committee Action Attachment B – S2024 Budget Detail Exhibit A – Project Location Map Exhibit B – Change Order No. 4 Exhibit C – Change Order No. 5 ATTACHMENT A SUBJECT/PROJECT: S2024-001103 Approval of Change Order Nos. 4 and 5 to the Construction Contract with Wier Construction Corporation for the Campo Road Sewer Replacement Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on April 16, 2019. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – S2024 Budget Detail SUBJECT/PROJECT: S2024-001103 Approval of Change Order Nos. 4 and 5 to the Construction Contract with Wier Construction Corporation for the Campo Road Sewer Replacement Project 4/3/2019 Budget 10,530,000 Planning Consultant Contracts 20,020 20,020 - 20,020 AEGIS ENGINEERING MGMT INC 2,119 2,119 - 2,119 HELIX ENVIRONMNTL PLANNING INC Regulatory Agency Fees 2,260 2,260 - 2,260 COUNTY OF SAN DIEGO 894 894 - 894 STATE WATER RESOURCES 132 132 - 132 US BANK Service Contracts 43 43 - 43 EAST COUNTY GAZETTE 162 162 - 162 SAN DIEGO DAILY TRANSCRIPT Standard Salaries 147,748 147,748 - 147,748 Total Planning 173,377 173,377 - 173,377 Design 001102 Consultant Contracts 9,315 9,315 - 9,315 WATER SYSTEMS CONSULTING INC 4,025 4,025 - 4,025 MICHAEL D KEAGY REAL ESTATE 3,508 3,508 - 3,508 NINYO & MOORE GEOTECHNICAL AND 691,074 691,074 - 691,074 RICK ENGINEERING COMPANY 735 735 - 735 AIRX UTILITY SURVEYORS INC Professional Legal Fees 182 182 - 182 STUTZ ARTIANO SHINOFF 1,910 1,910 - 1,910 ARTIANO SHINOFF Regulatory Agency Fees 956 956 - 956 COUNTY OF SAN DIEGO Service Contracts 158 158 - 158 SAN DIEGO DAILY TRANSCRIPT 62 62 - 62 DAILY JOURNAL CORPORATION Settlements 190,000 190,000 - 190,000 VESTAR CALIFORNIA XVII LLC 144,950 144,950 - 144,950 GRI-REGENCY LLC Standard Salaries 299,842 299,842 - 299,842 Total Design 1,346,718 1,346,718 - 1,346,718 Construction Construction Contracts 402,355 300,855 101,500 402,355 WESTERN ALLIANCE BANK 7,644,749 5,716,253 1,928,495 7,644,749 WIER CONSTRUCTION CORP 70,970 - 70,970 70,970 Change Order No. 4 - - - - Change Order No. 5 Consultant Contracts 8,444 8,444 - 8,444 AIRX UTILITY SURVEYORS INC 17,400 17,400 - 17,400 ALYSON CONSULTING 8,112 8,112 - 8,112 HUNSAKER & ASSOCIATES 116,461 83,311 33,150 116,461 RICK ENGINEERING COMPANY 12,258 12,258 - 12,258 NINYO & MOORE GEOTECHNICAL AND 418,531 348,858 69,673 418,531 VALLEY CONSTRUCTION MANAGEMENT Regulatory Agency Fees 9,000 6,125 2,875 9,000 COUNTY OF SAN DIEGO 20,000 - 20,000 20,000 CALTRANS PERMIT FEE Service Contracts 3,270 3,270 - 3,270 MAYER REPROGRAPHICS INC Standard Salaries 278,000 252,020 25,980 278,000 - - - - Total Construction 9,009,550 6,756,906 2,252,644 9,009,550 Grand Total 10,529,644 8,277,001 2,252,644 10,529,644 Vendor/Comments Otay Water District S2024-Campo Road Sewer Main Replacement Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost SKYLINEWESLEYANCHURCH ?Ë AV O C A D O B L V D FURY LANE JAMA C H A B L V D JAMAC H A R D CUYAMACACOLLEGE C A M P O R D C A M P O R D ?Ë PROJECTALIGNMENT OWDREGULATORYSITE Ralph W. ChapmanWater ReclamationFacility SINGER L N RANCHOSAN DIEGOVILLAGE RANCHOSAN DIEGOTOWNECENTER Existing 10-inchGravity Sewer tobe Replaced VICINITY MAP PROJECT SITE NTS DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ?ò Aä;&s ?p ?Ë !\ OTAY WATER DISTRICTCAMPO ROAD SEWER MAIN REPLACEMENTLOCATION MAP EXHIBIT A CIP S2024 0 1,000500 Feet F F P: \ W O R K I N G \ C I P S 2 0 2 4 C a m p o R o a d S e w e r R e p l a c e m e n t \ G r a p h i c s \ E x h i b i t s - F i g u r e s \ E x h i b i t A , L o c a t i o n M a p , O c t 2 0 1 5 . m x d Legend Proposed 15-Inch Sewer Main Alignment Existing 10-inch Gravity Sewer to be Replaced Existing Sewer Mains Description Increase Decrease Time Item No. 1 – An unmarked abandoned 24-inch storm drain not shown on plans was found to conflict with the alignment of the sewer at Sta. 17+29 and required removal. PCO #12 $10,750.60 2 Item No. 2 – An unmarked abandoned storm drain encasement not shown on plans was encountered at Sta. 85+05 that required removal. PCO #13 $12,951.71 3 Item No. 3– Additional work due to existing sewer not following the planned alignment between Sta. 85+00 and 84+40. PCO #14 $12,020.00 2 Item No. 4 – Relocate conflicting Caltrans fiber optic traffic signal interconnection conduit between Sta. 36+60 and 40+50. PCO #15 $35,247.69 1 Item No. 5 - Delays due to inclement weather. $0.00 28 Item No. 6 - Delays due to rock encountered per Bid Item #43-Rock Removal and Disposal. $0.00 17 Subtotal Amount: $70,970.00 53 Total Net Change Order Amount: $70,970.00 Reason: Item No. 1: During sewer main installation, an unmarked 24-inch storm drain not shown on plans was found to conflict with the sewer alignment. Additional work was required to determine it was abandoned and remove the conflicting portion to allow the sewer main installation. See RFI #72 and PCO #12 for details. Two (2) days were added for this work. Item No. 2: During sewer main installation, an unmarked, abandoned storm drain slot drain encased in concrete not shown on plans was found to conflict with the sewer main alignment and required removal. See RFI #74 and PCO #13 for details. Three (3) days were added for this work. Item No. 3: During sewer main installation that followed the existing sewer, the existing sewer alignment was found to be not per plan and to vary as much as 6-feet from the plan alignment. This result in increased trench width, additional excavation and backfill for the construction of the new sewer. See RFI #75 and PCO #14 for details. Two (2) days were added for this work. Item No. 4: During sewer installation, a Caltrans fiber optic traffic signal interconnection conduit not shown on plans was found to conflict with the sewer alignment and required relocation. See RFI #80 and PCO #15 for details. One (1) day was added for this work. Item No. 5: The contractor was prevented from working twenty-eight (28) days due to inclement weather on the following dates: 12/20/17, 12/21/17, 1/8/18, 1/9/18, 1/11/18, 2/11/18, 2/26/18, 3/13/18, 3/14/18, 3/22/18, 10/14/18, 11/28/18, 11/29/18, 12/5/18, 12/6/18, 1/14/19, 1/15/19, 1/16/19, 1/17/19, 1/31/19, 2/3/19, 2/4/19, 2/5/19, 2/13/19, 2/14/19, 2/19/19, 2/20/19, and 2/21/19. Item No. 6: The contractor was delayed seventeen (17) days due to rock encountered per Bid Item #43-Rock Removal and on the following dates: 9/16/18, 9/25/18, 10/18/18, 12/11/18, 12/12/18, 12/13/18, 12/16/18, 12/17/18, 12/18/18, 1/10/19, 1/20/19, 1/21/19, 1/22/19, 1/23/19, 1/28/19, 1/29/19 and 1/30/19. Contact/P.O. Change Order No. 4 Page 2 of 2 OTAY WATER DISTRICT 2554 SWEETWATER SPRINGS BLVD., SPRING VALLEY, CA. 91978, (619) 670-2222 CONTRACT/P.O. CHANGE ORDER No. 5 PROJECT/ITEM: Campo Road Sewer Replacement Project CONTRACTOR/VENDOR: Wier Construction Corporation REF.CIP No.: S2024-001103 APPROVED BY: General Manager REF. P.O. No: 719982 DATE: 4/4/19 _________________________________________________________________________________________________ DESCRIPTION: 1. Revise the horizontal and vertical alignment between MH 14 (Sta. 63+41), MH 13 (Sta. 59+26/56+26) and MH 12A (Sta. 56+26) per revised Drawings C-6 and C-7. 2. Remove the internal joint bead resulting from the construction of the fusible C900 PVC pipe between MH 13 (Sta. 59+26/56+26) and Sta. 60+06 (approximately 80 LF) to construct a smooth surface on the inside wall of the pipe. 3. CCTV inspection of the fusible C900 PVC pipe is required before and after placing grout in the annular space located between the fusible C900 PVC pipe and steel casing. Contractor to provide a copy of the CCTV inspection to the District for review and approval prior to placing grout in the annular space. 4. Total compensation for sewer main installed as part of this change order between MH 14 and MH 12A will be made in accordance with the original contract horizontal and vertical plan lengths and unit prices (except as modified by Change Order No. 3). 5. No contractor claims for additional compensation or time are allowed for any work related to changed contract work between MH #14 and MH #12A. This work includes but is not limited to shaft construction, shaft removal, horizontal auger boring, carrier pipe installation, annular space and contact grouting, manhole installation, storm drain removal and replacement, adjacent pipe installation and any other related work. REASON: Item No. 1-5: The installation of the 30-inch steel casing between MH #14 and MH #13 via Horizontal Auger Boring was not completed within the horizontal and vertical alignment tolerances as required by the contract documents. This also affected the slope of the pipe between MH 13 and MH 12A. Based on a review of the hydraulic requirements of the system, the final horizontal and vertical alignment is determined to be acceptable to the District. The work associated with this Contractor requested change order will be performed at no additional cost to the District and no increase in the contract duration. CIP S2024 - Campo Road Sewer Replacement Project Project: S2024 Consultant/Contractor:Wier Construction Corporation Subproject: 001103 APPROVED C.O.AMOUNT BY DATE DESCRIPTION TYPE C.O. 1 $74,266.00 GM 1/12/2018 Utility Conflict per RFI #10 and PCO #1A, Traffic control credit per RFI #4 and PCO #2. Base material at RSD Towne Center parking lot. Rock removal and disposal increase in quantity. Add 46 days. Contractor 2 $0.00 RP 4/5/2018 Revise sewer slope between MH #7 and MH# 8 to a minimum of 1%.Contractor 3 $156,192.12 Board 11/8/2018 East Bore Pit Realignment PCO #3, Cut and Cap Irrigation PCO #5, Sewer Main Realignment MH #18A to MH 17A PCO #7, Remove abandoned utilities PCO #8, Repair Offset Pipe at MH #20 PCO #9, and Increase Bid Item No. 43 Rock Removal and Disposal. Contractor 4 $70,970.00 Board Unmarked 24-inch storm drain, abandoned storm drain along SR 94, Increased excavation due to existing sewer alignment, removal and replacement of Caltrans traffic signal interconnect conduit and fiber optic cable, weather days. Contractor 5 $0.00 Board No cost/time contractor requested change to revise the horizontal and vertical alignment for the sewer main between MH 12A and MH 14 due to East Pit Jack and Bore. Contractor 6 7 8 9 10 11 12 13 14 15 Total C.O.'s To Date: $301,428.12 3.9% Original Contract Amount:$7,816,645.95 Current Contract Amount:$8,118,074.07 Month Net C.O.$ Limit Authorization Absolute C.O.$ C.O. % 4/19 $70,970.00 $2,000 Insp $70,970.00 0.9% $10,000 PM/Sr. Engr. 0.0% $20,000 DivM 0.0% $25,000 Chief 0.0% $75,000 GM 0.0% >$75000 Board 0.0% CHANGE ORDER LOG P:\WORKING\CIP S2024 Campo Road Sewer Replacement\Construction\Change Orders\S2024_COLOG_190408 1 4/8/2019 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: May 1, 2019 SUBMITTED BY: Kevin Cameron Associate Civil Engineer PROJECT: Various DIV. NO. All APPROVED BY: Bob Kennedy, Engineering Manager Dan Martin, Assistant Chief, Engineering Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Award of Two (2) Professional Services Contracts for As-Needed Engineering Design Services to NV5, Inc. and Rick Engineering Company for Fiscal Years 2020-2022 GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award two (2) professional service contracts for As-Needed Engineering Design Services and to authorize the General Manager to execute two agreements with NV5, Inc. (NV5) and Rick Engineering Company (Rick Engineering), each in an amount not-to-exceed $600,000. The total amount of the two (2) contracts will not exceed $600,000 during Fiscal Years 2020-2022 (ending June 30, 2022). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into two (2) professional services contracts for As-Needed Engineering Design Services with NV5 and Rick Engineering, with each contract in an amount not-to-exceed $600,000 for Fiscal Years 2020-2022. The total amount of the two (2) contracts will not exceed $600,000 during Fiscal Years 2020-2022. 2 ANALYSIS: The District will require the services of two (2) professional engineering design consultants on an as-needed basis in support of Capital Improvement Program (CIP) projects for Fiscal Years 2020- 2022. It is more efficient and cost effective to issue as-needed contracts for engineering design, which will provide the District with the ability to obtain consulting services in a timely and efficient manner. This concept has also been used in the past for other disciplines, such as construction management, geotechnical, electrical, and environmental services. The District staff will identify tasks and request cost proposals from the two (2) consultants during the contract period. Each consultant will prepare a detailed scope of work, schedule, and fee for each task order, with the District evaluating the proposals based upon qualifications and cost. The District will enter into negotiations with the consultants, selecting the proposal that has the best value for the District. Upon written task order authorization from the District, the selected consultant shall then proceed with the project, as described in the scope of work. The CIP projects that are estimated to require engineering design services for Fiscal Years 2020-2022, at this time, are listed below: CIP DESCRIPTION ESTIMATED COST P2174 1090-1 Pump Station Replacement $75,000 P2405 624/340 PRSs Paseo Ranchero and Otay Valley Road $25,000 P2453 SR-11 Utility Relocations $50,000 P2553 Heritage Road Bridge Replacement and Utility Relocation $175,000 P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande $125,000 P2635 Vista Diego Hydropneumatic Tank Replacement $35,000 P2641 Rancho Jamul Hydropneumatic Tank Replacement $35,000 S2049 Calavo Basin Sewer Rehabilitation - Phase 2 $50,000 TOTAL: $570,000 3 Staff believes that a $600,000 cap on each of the As-Needed Engineering Design Services contracts is adequate, while still providing a buffer for any unforeseen tasks. Fees for professional services will be charged to the CIP projects. The As-Needed Engineering Design Services contracts do not commit the District to any expenditure until a task order is approved to perform the work. The District does not guarantee work to the consultants, nor does the District guarantee to the consultants that it will expend all the funds authorized by the contract on professional services. The District solicited engineering design services by placing an advertisement on the Otay Water District’s website and using BidSync, the District’s online bid solicitation website on January 22, 2019. The advertisement was also placed in the Daily Transcript. Eighteen (18) firms submitted a Letter of Interest and a Statement of Qualifications. The Request for Proposal (RFP) for Engineering Design Services was sent to all eighteen (18) firms resulting in nine (9) proposals received on February 27, 2019. They are as follows: • Brandow & Johnston (Newport Beach, CA) • Carollo (San Diego, CA) • Hazen and Sawyer (San Diego, CA) • Horrocks Engineers (San Diego, CA) • HydroScience Engineers (Carlsbad, CA) • Lee & Ro (San Diego, CA) • NV5, Inc. (San Diego, CA) • Rick Engineering Company (San Diego, CA) • Wood Rodgers (San Diego, CA) Firms that submitted Letters of Interest (LOI), but did not propose, were Engineering Resources of Southern California, Kennedy Jenks, Michael Baker, MurraySmith, Psomas, and West & Associates Engineering. Beyaz & Patel, Peterson Structural Engineers, and Brady & Associates submitted LOI’s, but elected to be sub-consultants on various proposals listed above. In accordance with the District’s Policy 21, staff evaluated and scored all written proposals and interviewed the top five (5) firms on March 21, 2019. NV5 and Rick Engineering received the highest scores based on their experience, understanding of the scope of work, proposed method to accomplish the work, and their composite hourly rate. Both consultants have provided similar services to the District in the past as well as to other local agencies, and are readily available to provide the services required. A summary of the complete evaluation is shown in Attachment B. 4 NV5 and Rick Engineering submitted the Company Background Questionnaire, as required by the RFP, and staff did not find any significant issues. In addition, staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The funds for these contracts will be expended on a variety of projects, as previously noted above. These contracts are for as- needed professional services based on the District's need and schedule, and expenditures will not be made until a task order is approved by the District for the consultant's services on a specific CIP project. Based on a review of the financial budget, the Project Manager anticipates that the budgets will be sufficient to support the professional as-needed consulting services required for the CIP projects noted above. The Finance Department has determined that the funds to cover these contracts will be available as budgeted for these projects. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." GRANTS/LOANS: Not applicable. LEGAL IMPACT: None. KC/BK:jf P:\WORKING\As Needed Services\Engineering Design\FY 2020-2022\Staff Report\BD_05-01-2019_Staff Report_Award of As-Needed Engineering Design Services (KC-BK).docx Attachments: Attachment A – Committee Action Attachment B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: Various Award of Two (2) Professional Services Contracts for As- Needed Engineering Design Services to NV5, Inc. and Rick Engineering Company for Fiscal Years 2020-2022 COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on April 16, 2019. The Committee supported Staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Proposed Fee*Consultant's Commitment to DBE TOTAL - WRITTEN Additional Creativity and Insight Strength of Project Manager Presentation and Communication Skills Responses to Questions INDIVIDUAL TOTAL - ORAL AVERAGE TOTAL ORAL TOTAL SCORE WITHOUT FEE TOTAL SCORE 30 25 30 85 85 15 Y/N 100 15 15 10 10 50 50 135 150 Poor/Good/ Excellent Jose Martinez 20 18 20 58 Brandon DiPietro 22 20 22 64 Ming Zhao 23 18 19 60 Eid Fakhouri 20 19 19 58 Kevin Cameron 23 19 22 64 Jose Martinez 26 22 26 74 11 11 8 6 36 Brandon DiPietro 29 23 28 80 13 12 8 7 40 Ming Zhao 27 21 26 74 10 10 7 7 34 Eid Fakhouri 25 23 26 74 13 9 8 8 38 Kevin Cameron 27 23 27 77 12 12 8 8 40 Jose Martinez 24 20 22 66 Brandon DiPietro 25 20 23 68 Ming Zhao 26 20 24 70 Eid Fakhouri 24 20 22 66 Kevin Cameron 25 21 25 71 Jose Martinez 22 21 22 65 Brandon DiPietro 26 21 24 71 Ming Zhao 25 18 23 66 Eid Fakhouri 24 21 20 65 Kevin Cameron 24 22 24 70 Jose Martinez 24 23 24 71 11 11 8 7 37 Brandon DiPietro 26 20 23 69 11 12 7 6 36 Ming Zhao 26 20 25 71 12 12 7 7 38 Eid Fakhouri 25 22 24 71 11 11 7 7 36 Kevin Cameron 25 22 25 72 11 12 7 6 36 Jose Martinez 23 19 20 62 Brandon DiPietro 25 20 23 68 Ming Zhao 24 21 23 68 Eid Fakhouri 23 19 20 62 Kevin Cameron 24 21 23 68 Jose Martinez 25 23 24 72 13 13 8 9 43 Brandon DiPietro 28 23 26 77 14 14 8 8 44 Ming Zhao 27 23 26 76 14 13 8 9 44 Eid Fakhouri 28 22 24 74 12 12 9 7 40 Kevin Cameron 28 23 27 78 14 14 9 9 46 Jose Martinez 25 20 23 68 13 12 8 8 41 Brandon DiPietro 26 21 21 68 12 13 8 7 40 Ming Zhao 27 22 26 75 13 13 8 8 42 Eid Fakhouri 24 24 23 71 12 11 7 6 36 Kevin Cameron 25 22 24 71 13 13 8 8 42 Jose Martinez 25 23 27 75 14 13 9 8 44 Brandon DiPietro 27 21 22 70 15 14 9 8 46 Ming Zhao 26 20 25 71 12 14 8 8 42 Eid Fakhouri 23 23 23 69 14 14 9 9 46 Kevin Cameron 26 21 26 73 13 13 10 8 44 Consultant Weighted Fee ScoreB&J HBK $152 7Carollo$150 8 *The fees were evaluated by comparing weighted rates for seven positions. The sum of the weighted rates are noted on the table to the left.Hazen and Sawyer $169 1 Horrocks $154 7 Hydroscience Engineers $154 7 Lee & Ro $166 2 NV5 $137 13 Rick Engineering $131 15 Wood Rodgers $157 5 FIRM NOT INTERVIEWED 38 122 FIRM NOT INTERVIEWED 43 Y 44 68 114 108 118 67 Y 66 2 Excellent88131 FIRM NOT INTERVIEWED ATTACHMENT B SUMMARY OF PROPOSAL RANKINGS As-Needed Engineering Design Services - Fiscal Years 2020 - 2022 WRITTEN ORAL FEE SCORING CHART Wood Rodgers NV5 75 13 MAXIMUM POINTS 8Carollo 37 74 74 FIRM NOT INTERVIEWED 7 72 121Y REFERENCES 68 Y 69 76 Y 5 Y 86 40 12615Y111 116 Excellent Hydroscience Engineers Y Hazen and Sawyer Lee & Ro Horrocks Engineers 71 Rick Engineering 71 7 1 84 69 115 68 78 77 68B&J HBK 61 7 Y 68 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: May 1, 2019 SUBMITTED BY: Jose Martinez, Assistant Chief of Water Operations PROJECT: DIV. NO. All APPROVED BY: Pedro Porras, Chief of Water Operations Mark Watton, General Manager SUBJECT: ANNUAL AS-NEEDED PAVING SERVICES GENERAL MANAGER’S RECOMMENDATION: That the Board authorize entering into an agreement with Kirk Paving in an amount not to exceed $200,000 for as-needed asphalt paving services from July 1, 2019 through June 30, 2020, and with four (4) one-year options for renewal at the General Manager’s discretion. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To perform the needed and critical asphaltic concrete paving work the District is responsible for in a cost effective and timely manner. ANALYSIS: As a regular course of business, the District is required to maintain and repair its water delivery infrastructure. Routinely this work requires the removal and re-installation of asphalt paving in public roadways. It has been shown more effective and efficient for the District to use outside contractors for its asphalt paving work. Therefore, the District has used outside asphalt paving contract services for more than fourteen (14) years. As-needed paving services have been included in the FY 2019 Operating Budget under Contracted Services. The FY 2020 budget for annual as-needed paving under Contracted Services is $200,000. In accordance with the District’s purchasing requirements, a notice was published and bids were solicited for this work on a “unit price” basis. The solicitation was completed via BidSync with 230 companies successfully invited and viewed by over 30 contractors including the Associated General Contractors of America San Diego Chapter Plan Room which provides members complete access to bidding projects, both public and private, including plans and specifications in San Diego, Imperial, Orange, Riverside, and San Bernardino counties, and some projects within other Southern California areas. On March 19, three contractors attended a mandatory pre-bid meeting and on April 4, 2019, one bid was received and publicly opened with the following result: Bidder Weighted Score Kirk Paving, Lakeside 630.50 Although only one bid was received by Kirk Paving of Lakeside, CA it should be noted that Kirk Paving served as the FY 2019 as- needed paving service contractor for the District and has performed all required work with no issues noted. Staff is confident that they will be able to perform the required work. Furthermore, staff has compared the aggregate unit pricing submitted and against those submitted in the 2017 solicitation determined the prices to be less than the increases in the California Statewide Crude Oil Price Index (used by CALTRANS in determining price adjustments in paving projects) over the past two years. Bids have been submitted on a unit-cost basis for the different types of work typically required during paving. The types of work are assigned a weight factor based on the District’s experience of the frequency they will be employed during the term of the agreement and these weights are multiplied by the unit cost to determine a unit score. Unit scores are totaled to provide the overall score of the bid and the contractor with the lowest overall score is the low bidder. Please refer to Attachment B. Under Contracted Services for Utility Maintenance staff budgeted $200,000 per year for this paving service, therefore, near the completion of FY20, staff will assess the cost of paving, which we believe may go up due to increases in construction activities. At that time staff will ask the contractor to let us know if its unit price will remain the same or if any adjusted increase is reasonable for an additional year contract. At that point, staff will either propose to renew its contract or will go over the process again requesting additional proposals from other contactors. Consequently, staff would like to negotiate an optional second-year contract that remains competitive. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The FY 2020 budget request includes $200,000 for as-needed paving services. The project manager has projected that this requested amount is sufficient to cover the anticipated expenses for the paving needs in the 2020 fiscal year. STRATEGIC GOAL: Strategy: Stewards of Public Infrastructure. Goal: Conduct the best practice preventative maintenance activities. LEGAL IMPACT: None. Attachment A: Committee Action Form Attachment B: FY 2020 As-Needed Paving Services Score Sheet ATTACHMENT A SUBJECT/PROJECT: ANNUAL AS-NEEDED PAVING SERVICES COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee reviewed this item at a meeting held on April 16, 2019, and the following comments were made: Note: The ‘‘Committee Action’’ is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a committee-approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B Item Wght Type of Service Unit Bid Price Total Score 1 10 Asphalt 0"-6"15.75$ 157.5 2 10 1.5" Grind & Pav 3.00$ 30 3 3 Asphalt 7"-12"16.25$ 48.75 4 3 Traffic Stripping 0.20$ 0.6 5 3 Grinding 1.50$ 4.5 6 3 Sand/Seal 0.50$ 1.5 7 3 Thermo Plastic*10.00$ 30 8 3 Thermo Plastic Striping*10.00$ 30 9 1 Cap/Sheet 0"-1"0.50$ 0.5 10 1 Satin Seal 0.35$ 0.35 11 1 Traffic Loops 10.00$ 10 12 1 Base Rem/Rep 0.10$ 0.1 13 1 Saw Cut 0"-6"0.10$ 0.1 14 1 Saw Cut 6"-12"0.10$ 0.1 15 1 Saw Cut 12"+0.25$ 0.25 16 1 Chip Seal 1.00$ 1 315.25 Item Score Type of Service Unit Bid Price Total Score 1 10 Asphalt 0"-6"15.75$ 157.5 2 10 1.5" Grind & Pav 3.00$ 30 3 3 Asphalt 7"-12"16.25$ 48.75 4 3 Traffic Stripping 0.20$ 0.6 5 3 Grinding 1.50$ 4.5 6 3 Sand/Seal 0.50$ 1.5 7 3 Thermo Plastic*10.00$ 30 8 3 Thermo Plastic Striping*10.00$ 30 9 1 Cap/Sheet 0"-1"0.50$ 0.5 10 1 Satin Seal 0.35$ 0.35 11 1 Traffic Loops 10.00$ 10 12 1 Base Rem/Rep 0.10$ 0.1 13 1 Saw Cut 0"-6"0.10$ 0.1 14 1 Saw Cut 6"-12"0.10$ 0.1 15 1 Saw Cut 12"+0.25$ 0.25 16 1 Chip Seal 1.00$ 1 315.25 630.5 Score Month 1-6 Months 7-12 Score Month 7-12 Total Score FY 2020 As-Needed Paving Services Bid Score Sheet Months 1-6 Kirk Paving