Loading...
HomeMy WebLinkAbout01-23-19 EO&WR Committee PacketOTAY WATER DISTRICT ENGINEERING, OPERATIONS & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room WEDNESDAY January 23, 2019 1:30 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JU- RISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA DISCUSSION ITEMS 3. AWARD A PROFESSIONAL ENGINEERING SERVICES AGREEMENT TO HAZEN AND SAWYER, INC. FOR THE DESIGN AND CONSTRUCTION SUPPORT OF FIVE (5) POTABLE WATER PIPELINE REPLACEMENT PROJECTS IN AN AMOUNT NOT-TO-EXCEED $335,110 (CAMERON) [5 minutes] 4. ADJOURNMENT BOARD MEMBERS ATTENDING: Tim Smith, Chair Gary Croucher 2 All items appearing on this agenda, whether or not expressly listed for action, may be delib- erated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the Dis- trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability that would require accommodation in order to enable you to partici- pate in this meeting, please call the District Secretary at 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on January 18, 2018 I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on January 18, 2018. /s/ Susan Cruz, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: February 6, 2019 SUBMITTED BY: Kevin Cameron Associate Civil Engineer PROJECTS: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 DIV. NO. 3,4,5 APPROVED BY: Bob Kennedy, Engineering Manager Dan Martin, Assistant Chief of Engineering Rod Posada, Chief, Engineering Mark Watton, General Manager SUBJECT: Award of a Professional Engineering Services Agreement for the Preliminary Design Report Preparation, Design, and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional engineering services agreement to Hazen & Sawyer, Inc. (Hazen) and authorize the General Manager to execute a professional services agreement with Hazen for the preliminary design report (PDR) preparation, design, and construction support of Five (5) Potable Water Pipeline Replacement Projects in an amount not-to- exceed $335,110.00 (see Exhibit A for project locations). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional engineering services agreement with Hazen for the PDR preparation, design, and construction support of Five (5) Potable 2 Water Pipeline Replacement Projects in an amount not-to-exceed $335,110.00. ANALYSIS: The District has five (5) pipeline replacement projects scheduled to be completed over the next 4 years. The projects and brief descriptions are listed below: P2608 PL - 8-Inch, 850 Zone, Coronado Avenue, Chestnut Street/Apple Street This project will replace 1,300 feet of the existing 6-inch water line with 8-inch water line to improve fire flow in the area. Consultant’s scope of services for this project will be to provide the PDR. P2609 PL - 8-Inch, 1004 Zone, Eucalyptus St, Coronado Avenue/Date Street/La Mesa Avenue This project will abandon the existing 6-inch water line in Eucalyptus Street, and install 1,600 feet of new 8-inch water line along Coronado Avenue, Date Street, and La Mesa Avenue to improve fire flow in the area. Consultant’s scope of services for this project will be complete design. P2612 PL - 12-Inch, 711 Zone, Paso de Luz/Telegraph Canyon Road This project will repair the existing 250 feet of 10-inch water line which has experienced leaks, and is located in a steep slope easement. The repair options include replacing it with a 12-inch water line, installing a new parallel pipe, or installing a cured in place pipe (CIPP) liner. Consultant’s scope of services for this project will be complete design. P2615 PL - 12-Inch Pipeline Replacement, 803 PZ, Vista Grande Road This project is for the replacement of approximately 2,500 feet of 12-inch and 14-inch potable water line in Vista Grande Road. This section of pipe is reaching the run of its useful life and has had a history of leaks. Consultant’s scope of services for this project will be to provide the PDR. P2616 PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Drive/Vista Sierra Drive This project is for the replacement of approximately 2,000 feet of 14-inch potable water main in Pence Drive and Vista Sierra Drive. The pipeline has a history of leaks, and will be replaced with a more common sized 12-inch pipeline, which will still meet the demands of the area. Consultant’s scope of services for this project will be complete design. 3 As District staff began to plan for these projects, staff was notified that the County of San Diego (County) was putting out several large multi-year paving projects. Some of the pipeline replacement projects were within the County’s paving extents. The County currently has a three (3) year moratorium (“no-cut” policy) once a County road is repaved or slurry sealed. Through discussions with County staff, some paving schedules were delayed to allow the District’s pipeline replacement projects to be completed before the road improvements. Although the County was able to delay some paving projects, the road improvements on the Vista Grande (P2615) and portions of Coronado Avenue (P2608) were already too far along to delay. These projects will need to be constructed after the paving moratorium, therefore, the consultant will provide PDR’s outlining the design and risks involved. These two (2) projects will be constructed after the County’s paving moratorium has expired. The consultant’s effort on the other three projects, P2609, P2612, and P2616, will be to provide PDR’s, 100% design including plans and specifications, and construction support. Designing three (3) of these projects together will allow the District the flexibility to combine them during the construction phase to present a more desirable project for contractors to bid on, and therefore, staff expects to get more interest from contractors and more competitive bid pricing. In accordance with the Board of Directors Policy Number 21, a Request for Proposal (RFP) was advertised on October 4, 2018 using BidSync, the District’s online bid solicitation website, and the Otay Water District’s website. The advertisements attracted Letters of Interest and Statements of Qualifications from fifteen (15) consulting firms. A Pre-Proposal Meeting was held on November 6, 2018, which was attended by nine (9) consultants. On November 28, 2018, proposals were received from the following seven (7) consulting firms: 1. Richard Brady & Associates (Brady) 2. Hazen & Sawyer (Hazen) 3. Horrocks 4. HydroScience Engineers 5. Michael Baker International, Inc. 6. West & Associates Engineering, Inc. 7. West Coast Civil The following firms submitted letters of interest, but did not submit a proposal: Guinn Consulting Engineering, Hunsaker & Associates, JWO Engineering, MurraySmith, NV5, Psomas, Rick Engineering Company, and SA Associates. 4 After the proposals were evaluated and ranked by a five-member review panel consisting of Engineering, Operations, and Finance staff, it was determined that four (4) proposals ranked sufficiently close to warrant being invited to make an oral presentation and respond to questions from the panel. After conducting the interviews on December 18, 2018, the panel completed the consultant ranking process. The scores for Total Fee were added and the sum of the scores concluded that Hazen & Sawyer had the best approach to the project and provided the best overall value to the District. A summary of the Proposal Ranking is shown in Exhibit B. FISCAL IMPACT: Joe Beachem, Chief Financial Officer Based on the Project Manager’s review of the current budgets, the budgets are insufficient in light of the current bidding climate and, therefore, they are being revised as a part of the current effort to prepare the FY 2020 budget, and to be included in the new rate setting. Most of these projects will not be built for at least another year, and the PDR’s will better define the scope of work for each project. The FY 2019 budgets and their proposed FY 2020 revised amounts are listed below. The total budget for CIP P2608, as approved in the FY 2019 budget, is $450,000. Total expenditures, plus outstanding commitments and forecast, are $32,497. See Attachment B-1 for the budget detail. The proposed new budget for CIP P2608 is $800,000. The total budget for CIP P2609, as approved in the FY 2019 budget, is $540,000. Total expenditures, plus outstanding commitments and forecast, are $110,804. See Attachment B-2 for the budget detail. The proposed new budget for CIP P2609 is $800,000. The total budget for CIP P2612, as approved in the FY 2019 budget, is $500,000. Total expenditures, plus outstanding commitments and forecast, are $109,975. See Attachment B-3 for the budget detail. The proposed new budget for CIP P2612 is $750,000. The total budget for CIP P2615, as approved in the FY 2019 budget, is $1,200,000. Total expenditures, plus outstanding commitments and forecast, are $31,997. See Attachment B-4 for the budget detail. The proposed new budget for CIP P2615 is $2,300,000. The total budget for CIP P2616, as approved in the FY 2019 budget, is $2,500,000. Total expenditures, plus outstanding commitments and forecast, are $161,886. See Attachment B-5 for the budget detail. Staff believes the current budget is sufficient. 5 The Finance Department has determined that, under the current rate model, 100% of the funding for all five (5) projects is available from the Replacement Fund. However, an overall increase in the CIP budget, due to the current bidding environment, may draw reserve projections down below target levels. The impacts to reserves, and therefore rates, will be evaluated and estimated in the current budget cycle. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." GRANTS/LOANS: Engineering staff researched and explored grants and loans and found none available for these potable water pipeline projects. LEGAL IMPACT: None. KC/BK:jf P:\WORKING\CIP P2616 12-inch 978 PZ, Pence Dr-Vista Sierra Dr\Staff Reports\Civil Consultant Selection\02-06-19, Staff Report Consultant Selection for design of 5 pipeline projects_kc-finalv4.docx Attachments: Attachment A – Committee Action Attachment B-1 – Budget Detail - P2608 Attachment B-2 – Budget Detail - P2609 Attachment B-3 – Budget Detail - P2612 Attachment B-4 – Budget Detail - P2615 Attachment B-5 – Budget Detail - P2616 Exhibit A – Location Map Exhibit B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on January 23, 2019. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B-1 – Budget Detail – P2608 SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. Date Updated: 12/21/18 FY2019 Budget Proposed FY2020 Budget $450,000 $800,000 8,000 6,171 1,829 8,000 8,000 6,171 1,829 8,000 10,000 - 10,000 10,000 13 13 - 13 DAILY JOURNAL CORP 14,484 - 14,484 14,484 HAZEN & SAWYER - PDR 24,497 13 24,484 24,497 - - - - - - - - 32,497 6,184 26,313 32,497 Vendor/Comments Otay Water District P2608 - PL 8" 850Z Coronado Ave Chestnut/Apple Committed Expenditures Outstanding Commitment & Forecast Current Projected Cost Planning Standard Salaries Total Planning Design Standard Salaries Total ConstructionGrand Total Service Contracts Total Design Construction Service Contracts ATTACHMENT B-2 – Budget Detail – P2609 SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. Date Updated: 12/21/18 FY2019 Budget Proposed FY2020 Budget $540,000 $800,000 7,500 6,171 1,329 7,500 7,500 6,171 1,329 7,500 10,000 - 10,000 10,000 13 13 - 13 DAILY JOURNAL CORP 90,066 - 90,066 90,066 HAZEN & SAWYER - DESIGN 100,079 13 100,066 100,079 3,225 - 3,225 3,225 HAZEN & SAWYER - CONSTRUCTION SUPPORT 3,225 - 3,225 3,225 110,804 6,184 104,620 110,804 Vendor/Comments Otay Water District P2609 - PL 8" 1004Z Eucalyptus St Coronado/Date Committed Expenditures Outstanding Commitment & Forecast Current Projected Cost Planning Standard Salaries Total Planning Design Standard Salaries Total Construction Grand Total Service Contracts Total Design Construction Service Contracts ATTACHMENT B-3 – Budget Detail – P2612 SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. Date Updated: 12/21/18 FY2019 Budget Proposed FY2020 Budget $500,000 $750,000 7,500 6,427 1,073 7,500 7,500 6,427 1,073 7,500 10,000 - 10,000 10,000 13 13 - 13 DAILY JOURNAL CORP 89,237 - 89,237 89,237 HAZEN & SAWYER - DESIGN 99,250 13 99,237 99,250 3,225 - 3,225 3,225 HAZEN & SAWYER - CONSTRUCTION SUPPORT 3,225 - 3,225 3,225 109,975 6,440 103,535 109,975 Total Construction Grand Total Service Contracts Total Design Construction Service Contracts Planning Standard Salaries Total Planning Design Standard Salaries Vendor/Comments Otay Water District P2612 - PL 12" 711Z Pas de Luz/Telegraph Cyn Rd Committed Expenditures Outstanding Commitment & Forecast Current Projected Cost ATTACHMENT B-4 – Budget Detail – P2615 SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. Date Updated: 12/21/18 FY2019 Budget Proposed FY2020 Budget $1,200,000 $2,300,000 7,500 5,342 2,158 7,500 7,500 5,342 2,158 7,500 10,000 - 10,000 10,000 13 13 - 13 DAILY JOURNAL CORP 14,484 - 14,484 14,484 HAZEN & SAWYER - PDR 24,497 13 24,484 24,497 - - - - - - - - 31,997 5,355 26,642 31,997 Total Construction Grand Total Service Contracts Total Design Construction Service Contracts Planning Standard Salaries Total Planning Design Standard Salaries Vendor/Comments Otay Water District P2615 - PL 12" Pipeline Repl 803Z Vista Grande Committed Expenditures Outstanding Commitment & Forecast Current Projected Cost ATTACHMENT B-5 – Budget Detail – P2616 SUBJECT/PROJECT: P2608-001102 P2609-001102 P2612-001102 P2615-001102 P2616-001102 Award of a Professional Engineering Services Agreement for the Design and Construction Support of Five (5) Potable Water Pipeline Replacement Projects to Hazen & Sawyer, Inc. Date Updated: 12/21/18 Budget $2,500,000 Planning Standard Salaries 18,000 11,678 6,322 18,000 Consultant Contracts 5,970 5,970 - 5,970 WATER SYSTEMS CONSULTING, INC. Total Planning 23,970 17,648 6,322 23,970 Design Standard Salaries 20,000 6,249 13,751 20,000 Service Contracts 13 13 - 13 DAILY JOURNAL CORP Consultant Contracts 113,603 - 113,603 113,603 HAZEN & SAWYER - DESIGN Total Design 133,616 6,262 127,354 133,616 Construction Consultant Contracts 4,300 - 4,300 4,300 HAZEN & SAWYER - CONSTRUCTION SUPPORT Total Construction 4,300 - 4,300 4,300 Grand Total 161,886 23,910 137,976 161,886 Vendor/Comments Otay Water District P2616 - PL - 12-Inch Pipeline Replacement, 978 Zone, Pence Dr/Vista Sierra Dr Committed Expenditures Outstanding Commitment & Forecast Current Projected Cost OTAY WATER DISTRICT5 POTABLE WATER PIPELINE REPLACEMENTSLOCATION MAP EXHIBIT A VARIOUS CIPsF P:\WORKING\CIP P2616 12-inch 978 PZ, Pence Dr-Vista Sierra Dr\Graphics\Exhibits-Figures\Exhibit A, Location Map.mxd 0 10,0005,000 Feet ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ ^_ ^_ ^_^_ ^_ P2616 (Pence Dr) P2615 (Vista Grande) P2609 (Eucalyptus/Coronado/Date/La Mesa)P2608 (Coronado Av) P2612 (Paso de Luz) 5 8 8 805 805 94 94 125 125 125 125 905 905 54 DIV. 5 DIV. 2 DIV. 3 DIV. 1 DIV. 4 Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Cost Proposal* Consultant's Commitment to DBE TOTAL - WRITTEN Additional Creativity and Insight Strength of Project Manager Presentation and Communication Skills Responses to Questions INDIVIDUAL TOTAL - ORAL AVERAGE TOTAL ORAL SCORE WITHOUT FEE TOTAL SCORE 30 25 30 85 85 15 Y/N 100 15 15 10 10 50 50 135 150 Poor/Good/ Excellent Dan Martin 27 23 26 76 12 11 7 7 37 Kevin Koeppen 24 23 25 72 10 10 8 6 34 Jake Vaclavek 26 23 28 77 12 12 8 8 40 Brandon DiPietro 28 24 26 78 12 12 8 7 39 Kevin Cameron 27 23 27 77 11 11 7 7 36 Dan Martin 26 23 27 76 14 13 9 8 44 Kevin Koeppen 26 20 26 72 13 12 8 9 42 Jake Vaclavek 25 21 26 72 14 12 9 9 44 Brandon DiPietro 27 23 26 76 15 13 9 8 45 Kevin Cameron 26 23 27 76 13 12 8 8 41 Dan Martin 25 20 25 70 Kevin Koeppen 22 24 24 70 Jake Vaclavek 21 21 26 68 Brandon DiPietro 24 20 20 64 Kevin Cameron 22 21 22 65 Dan Martin 24 21 25 70 Kevin Koeppen 22 21 22 65 Jake Vaclavek 24 21 26 71 Brandon DiPietro 24 21 23 68 Kevin Cameron 23 21 24 68 Dan Martin 28 24 28 80 13 13 8 9 43 Kevin Koeppen 26 24 24 74 12 13 9 9 43 Jake Vaclavek 28 23 28 79 12 13 9 9 43 Brandon DiPietro 28 23 28 79 14 12 8 8 42 Kevin Cameron 28 23 27 78 13 13 7 8 41 Dan Martin 25 21 25 71 Kevin Koeppen 21 18 26 65 Jake Vaclavek 23 21 27 71 Brandon DiPietro 25 21 24 70 Kevin Cameron 22 21 22 65 Dan Martin 27 23 25 75 11 11 8 8 38 Kevin Koeppen 25 22 23 70 10 10 7 7 34 Jake Vaclavek 25 22 25 72 11 10 7 8 36 Brandon DiPietro 27 23 25 75 10 12 7 8 37 Kevin Cameron 25 22 26 73 11 13 8 7 39 Consultant Proposed Rates Score Brady $369,779 10 Hazen and Sawyer $335,110 12 * Review Panel does not see or consider cost proposals when scoring other categories. The cost proposals are scored by District staff who is not on Review Panel. Horrocks $566,113 2 HydroScience Engineers $596,293 1 Michael Baker International $478,014 6 West & Associates Engineering $254,000 15 West Coast Civil $288,600 14 113 117 67 68 120 68 78 6 2 84 126 69 69 FIRM NOT INTERVIEWED 124 69 42 69 37 FIRM NOT INTERVIEWED FIRM NOT INTERVIEWED 110West Coast Civil 8773 83 West & Associates Engineering 68 14 Excellent12 76 Y 86 37 123 43 129 Michael Baker International HydroScience Engineers Y Horrocks 67 Y Y COST PROPOSAL SCORING CHART 15 Y 83 Y Y Hazen and Sawyer 74 68 1 EXHIBIT B SUMMARY OF PROPOSAL RANKINGS Design for 5 Pipeline Replacement Projects WRITTEN ORAL 86 MAXIMUM POINTS 10Brady REFERENCES