Loading...
HomeMy WebLinkAbout01-17-23 EO&WR Committee Packet 1 OTAY WATER DISTRICT ENGINEERING, OPERATIONS, & WATER RESOURCES COMMITTEE MEETING and SPECIAL MEETING OF THE BOARD OF DIRECTORS 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA Board Room TUESDAY JANUARY 17, 2023 12:00 P.M. This is a District Committee meeting. This meeting is being posted as a special meeting in order to comply with the Brown Act (Government Code Section §54954.2) in the event that a quorum of the Board is present. Items will be deliberated, however, no formal board actions will be taken at this meeting. The committee makes recommendations to the full Board for its consideration and formal action. AGENDA 1. ROLL CALL 2. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD’S JU-RISDICTION INCLUDING AN ITEM ON TODAY’S AGENDA Additionally, members of the public may submit their comments on agendized and non-agendized items by either of the following two methods: a) If you wish to provide public comment directly - that is, live during the “Public Par-ticipation” portion of the meeting - please complete and submit a Request to Speak Form before the start of the meeting. Call-in instructions will be sent to the email provided on the form. Your request to speak will be acknowledged during the “Public Participation” portion of the meeting when the Committee will hear your comment. You will be provided three minutes to speak. The Committee is not permitted to enter into a dialogue with the speaker during this time. OR b) If you wish to have your comment read to the Committee during the “Public Partic-ipation” portion of the meeting, please email your comment to BoardSecretary@otaywater.gov at least thirty minutes prior to the start of the meeting, and it will be read aloud during the “Public Participation” portion of the meeting. Your comment must not take more than three minutes to read. The Board is not permitted to respond to written public comment during this time. The District’s meeting is live streamed. Information on how to watch and listen to the District’s meeting can be found at this link: https://otaywater.gov/board-of-directors/agenda-and-minutes/committee-meetings/ 2 DISCUSSION ITEMS 3. AWARD A PROFESSIONAL ENGINEERING SERVICES AGREEMENT TO WOOD RODGERS, INC. FOR DESIGN AND CONSTRUCTION SUPPORT OF THE COT-TONWOOD SEWER PUMP STATION REPLACEMENT PROJECT IN AN AMOUNT NOT-TO-EXCEED $577,800.00 (BEPPLER) [5 MINUTES] 4. AWARD A CONTRACT TO MERINO LANDSCAPE, INC. TO UPDATE THE LAND-SCAPING IN AND AROUND THE ENTRANCE TO THE ADMINISTRATION BUILD-ING IN THE AMOUNT OF $190,360 (PAYNE) [5 MINUTES] 5. ADJOURNMENT BOARD MEMBERS ATTENDING: Mark Robak, Chair Ryan Keyes All items appearing on this agenda, whether or not expressly listed for action, may be delib-erated and may be subject to action by the Board. The agenda, and any attachments containing written information, are available at the Dis-trict’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the agenda and all attachments are also available by contacting the District Secretary at (619) 670-2253. If you have any disability which would require accommodation in order to enable you to par-ticipate in this meeting, please call the District Secretary at 619-670-2253 at least 24 hours prior to the meeting. Certification of Posting I certify that on January 12, 2023, I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 24 hours in advance of the meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on January 12, 2023. /s/ Tita Ramos-Krogman, District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: February 1, 2023 SUBMITTED BY: Stephen Beppler Senior Civil Engineer PROJECT: S2069-001102 DIV. NO.5 APPROVED BY: Bob Kennedy, Engineering Manager Michael Long, Chief, Engineering Jose Martinez, General Manager SUBJECT: Award of a Professional Engineering Services Agreement for design and construction support of the Cottonwood Sewer Pump Station Replacement Project to Wood Rodgers, Inc. GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a Professional Engineering Services Agreement to Wood Rodgers, Inc. (Wood Rodgers) and authorize the General Manager to execute a Professional Engineering Services Agreement with Wood Rodgers for design and construction support of the Cottonwood Sewer Pump Station (Cottonwood SPS) Replacement Project in an amount not-to-exceed $577,800.00 (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a Professional Engineering Services Agreement with Wood Rodgers for design and construction support of the Cottonwood SPS Replacement Project in an amount not-to-exceed $577,800.00. AGENDA ITEM 3 2 ANALYSIS: The Cottonwood SPS Replacement Project (Project) includes a new sewer pump station to replace the District’s existing facility. The station serves the area south of the Sweetwater River, which contains both District and County of San Diego Sanitation District customers. Per the June 22, 1997 Agreement between Spring Valley Sanitation District and Otay Water District for Joint Use of Sewer Facilities and Cost Sharing, costs for the Project will be paid proportionally by the agencies per their Equivalent Dwelling Unit (EDU) count served by the station. Staff is working with the County on a reimbursement agreement to supplement the 1997 agreement and reflect current conditions, similar to the one executed on April 30, 2014 for the County led Rancho San Diego Pump Station Improvements project. Additional property was obtained from the Cottonwood Golf Course owner in July 2022 to enable adequate space for the Replacement Station. The existing facility was built in 1986 and has a number of access and operational issues necessitating its replacement. The Replacement Station will have an increased capacity to handle additional development in the sewer shed. The District requires a consulting firm to provide a range of professional services, including architectural, civil, hydraulic and surge modeling, potholing, survey, demolition, grading & drainage, structural, mechanical, HVAC, electrical, instrumentation & control, cathodic protection, coatings, and constructability reviews associated with the Project. In accordance with the Board of Directors Policy Number 21, a Request for Proposal (RFP) was advertised on September 9, 2022 using Periscope S2G (formally BidSync), the District’s online bid solicitation website, the Daily Transcript, and the Otay Water District’s website. The advertisement was also emailed directly to twenty (20) engineering firms that have previously proposed or done work for the District. The advertisements attracted Letters of Interest and Statements of Qualifications from six (6) consulting firms. A Pre-Proposal Meeting was held on October 6, 2022 via Zoom video online conference, which was attended by five (5) consultants. On October 25, 2022, proposals were received from the following three (3) consulting firms: 1.Carollo Engineers, Inc. (San Diego, CA) 2.Horrocks Engineers, Inc. (San Diego, CA) 3.Wood Rodgers, Inc. (San Diego, CA) 3 The following firms submitted letters of interest, but did not submit a proposal: Arcadis US, Inc. (Los Angeles, CA), Dexter Wilson Engineering, Inc. (Carlsbad, CA), and Water Works Engineers, LLC (San Diego, CA). After the proposals were evaluated and ranked by a five-member review panel consisting of Engineering, Operations, and Finance staff, it was determined that the three (3) proposals ranked sufficiently to warrant being invited to make an oral presentation and respond to questions from the panel. After conducting the interviews on December 8, 2022 via Zoom video online conferences, the panel completed the consultant ranking process. The scores for Total Fee were added last and the sum of the scores concluded that Wood Rodgers had the best approach to the Project and provided the best overall value to the District. To ensure that all of the proposals had comparable services and costs for the construction support phase of the Project, an allowance of $25,000 was dictated to be used by all firms. Scope and fee negotiations with Wood Rodgers on the construction services resulted in the allowance to be increased to $60,000.00, resulting in a total revised fee of $577,800.00 for the entire Project. The adjusted construction services allowance was used for all of the firms in their total proposed fee evaluation. A summary of the Proposal Ranking is shown in Exhibit B. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP S2069, as approved in the FY 2023 budget, is $2,750,000.00. Total expenditures, plus outstanding commitments and forecast, are $2,746,112.00. See Attachment B for the budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP S2069 is sufficient to support the Project. The Finance Department has determined that, under the current rate model, 50% of the funding is available from the Replacement Fund, 25% of the funding is available from the Expansion Fund, and 25% of the funding is available from the Betterment Fund. GRANTS/LOANS: Engineering staff researched and explored grants and loans and found none was available for this Project, but will continue to pursue alternative funding for this Project. 4 STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide exceptional water and wastewater service to its customers, and to manage District resources in a transparent and fiscally responsible manner” and the General Manager’s Vision, "To be a model water agency by providing stellar service, achieving measurable results, and continuously improving operational practices." LEGAL IMPACT: None. SB/BK:jf Https://otaywater365.sharepoint.com/sites/engcip/Shared Documents/S2069 Cottonwood Sewer Pump Station Expansion/Staff Reports/2-1-2023/02-01-23 Staff Report Consultant Selection for Cottonwood SPS.docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map Exhibit B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: S2069-001102 Award of a Professional Engineering Services Agreement for design and construction support of the Cottonwood Sewer Pump Station Replacement Project to Wood Rodgers, Inc. COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on January 17, 2023. The Committee supported staff's recommendation. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item, or modified to reflect any discussion or changes as directed from the Committee prior to presentation to the full Board. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: S2069-001102 Award of a Professional Engineering Services Agreement for design and construction support of the Cottonwood Sewer Pump Station Replacement Project to Wood Rodgers, Inc. 12/9/2022 Budget Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost Vendor/Comments 2,750,000 Planning Consultant Contracts $34,280 $34,280 $0 $34,280 HELIX ENVIRONMENTAL $8,390 $8,390 $0 $8,390 RFYEAGER ENGINEERING LLC Other Legal Expenses $44,000 $44,000 $0 $44,000 COTTONWOOD CAJON ES LLC Regulatory Agency Fees $2,530 $2,530 $0 $2,530 COUNTY OF SAN DIEGO Service Contracts $113 $113 $0 $113 DAILY JOURNAL CORP $784 $784 $0 $784 SAN DIEGO UNION TRIBUNE Standard Salaries $110,000 $105,003 $4,997 $110,000 Total Planning $200,097 $195,100 $4,997 $200,097 Design Regulatory Agency Fees $3,000 $0 $3,000 $3,000 COUNTY OF SAN DIEGO Consultant Contracts $11,800 $11,800 $0 $11,800 HENDRICKSON APPRAISAL CO INC $28,715 $24,515 $4,200 $28,715 PSOMAS $30,000 $0 $30,000 $30,000 NINYO & MOORE $517,800 $0 $517,800 $517,800 WOOD RODGERS Service Contracts $200 $56 $144 $200 DAILY JOURNAL CORP $1,500 $1,500 $0 $1,500 FIRST AMERICAN TITLE INS Standard Salaries $80,000 $19,641 $61,359 $80,000 Total Design $673,015 $57,512 $615,503 $673,015 Construction Regulatory Agency Fees $3,000 $0 $3,000 $3,000 COUNTY OF SAN DIEGO Consultant Contracts $60,000 $0 $60,000 $60,0000 WOOD RODGERS $40,000 $0 $40,000 $40,000 Construction Management Construction Contract $1,600,000 $0 $1,600,000 $1,600,000 Estimated $80,000 $0 $80,000 $80,000 Contingency @ 5% Standard Salaries $90,000 $0 $90,000 $90,000 Total Construction $1,873,000 $0 $1,873,000 $1,873,000 Grand Total $2,746,112 $252,612 $2,493,500 $2,746,112 OTAY WATER DISTRICT COTTONWOOD SEWER LIFT STATION REPLACEMENT PROJECTLOCATION MAP EXHIBIT AC: \ U s e r s \ d o n a l d . b i e n v e n u e \ O t a y W a t e r D i s t r i c t \ E N G O P E R A T I N G - D o c u m e n t s \ T e c h n i c i a n \ G I S \ S t a f f R e p o r t E x h i b i t A . m x d !\ VICINITY MAP PROJECT SITE DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ÃÅ54 ÃÅ125 ÃÅ94 ÃÅ905 §¨¦805 FNTS PROJECT SITE CIP S2069F 0 4020 Feet PAR FOUR DRIVE Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL TOTAL - WRITTEN AVERAGE WRITTEN TOTAL Consultant's Commitment to DBE Additional Creativity and Insight Strength of Project Manager Presentation & Communication Skills Responses to Questions INDIVIDUAL TOTAL - ORAL AVERAGE ORAL TOTAL TOTAL SCORE WITHOUT FEE Proposed Fee1&2 TOTAL SCORE 30 25 30 85 85 Y/N 15 15 10 10 50 50 135 15 150 Poor/Good/ Excellent Stephen Beppler 27 22 25 74 11 12 8 7 38 Lisa Coburn-Boyd 28 22 25 75 12 12 8 7 39 Damon Newman 27 21 25 73 12 12 8 8 40 Kent Payne 27 22 25 74 13 12 8 7 40 Bruno Burgin 25 22 25 72 12 13 8 7 40 Stephen Beppler 27 22 26 75 14 14 9 9 46 Lisa Coburn-Boyd 27 20 26 73 14 14 9 9 46 Damon Newman 27 21 26 74 14 13 9 9 45 Kent Payne 27 21 25 73 13 14 10 9 46 Bruno Burgin 25 23 26 74 14 15 8 9 46 Stephen Beppler 27 23 27 77 13 14 9 8 44 Lisa Coburn-Boyd 28 24 28 80 13 14 9 8 44 Damon Newman 28 23 27 78 13 13 9 8 43 Kent Payne 28 24 28 80 13 13 8 9 43 Bruno Burgin 25 24 28 77 14 14 8 8 44 Notes: Consultant Fee Score 1. Review Panel does not see or consider proposed fee when scoring other categories. The proposed fee is scored by Engineering staff not on the Review Panel.Carollo $722,793 1Horrocks$579,568 15Wood Rodgers $577,800 15 Wood Rodgers 12244 Carollo Y 15 1 74 FEE SCORING CHART YHorrocks EXHIBIT BSUMMARY OF PROPOSAL RANKINGS Cottonwood Sewer Pump Station Replacement - Design Consultant WRITTEN ORAL 120 MAXIMUM POINTS 74 Y 78 137 39 113 114 13546 15 E REFERENCES STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: February 1, 2023 PROJECT: Various DIV. NO. ALL SUBMITTED BY: Kent Payne Purchasing and Facilities Manager APPROVED BY: Adolfo Segura, Chief of Administrative Services Jose Martinez, General Manager SUBJECT: AWARD A CONTRACT TO MERINO LANDSCAPE, INC. TO UPDATE THE ADMINISTRATION BUILDING LANDSCAPING IN THE AMOUNT OF $190,360 GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors award a contract to Merino Landscape, Inc. (Merino) to update the landscaping in and around the entrance to the Administration Building in the amount of $190,360. COMMITTEE ACTION: See “Attachment A”. PURPOSE: To obtain Board authorization for the General Manager to execute an agreement with Merino to update the landscaping in and around the entrance to the Administration Building in the amount of $190,360. ANALYSIS: The existing landscape installation at the Administration Building is thirty years old and was initially designed as a water conservation demonstration garden that outlined typical “Xeriscape” water conservation measures promoted at that time. Over the years, the landscape has established but is currently in need of rehabilitation and enhancement in design, materials, irrigation systems and new available plant species that promote water conservation. Staff engaged Wimmer Yamada and Caughey Landscape Architects (WYAC), AGENDA ITEM 4 who are the original designers of the “Xeriscape” plan, to update their design to meet current standards while utilizing original features and utilities to conserve costs (see “Attachment C” for drawings and specifications). The engineering estimate for the project is $160,723 and at this budget level, the District is authorized per California Uniform Public Construction Cost Accounting Act (CUPCCAA), to procure public works bids up to $200,000 informally from pre-qualified contractors. For this project, the District requested licensed (C-27) irrigation and landscape construction contractors, which cover all works that improve ground elements, including aesthetics, architecture, horticulture, and functionality. Staff issued a request for bids through its online solicitation portal BidSync/Periscope. Four (4) firms attended a mandatory pre-proposal meeting and site walk held in person at the Administration building. The District received two (2) bids with Merino being the lowest responsible bidder. The two firms who attended the pre-proposal meeting and decided not to bid indicated that, due to current labor shortages and schedules, they couldn’t guarantee that they could complete the project as required. Bidder Bid Amount Merino Landscape, Inc. $212,100 BrightView Landscape Development, Inc. $266,278 Aztec Landscaping, Inc. No Bid Benchmark Landscape, Inc No Bid In that the low bid exceeded the Assumption of Project Costs (“Attachment D”) prepared by WYAC in January 2022 by 32% and that it exceeded the $200,000 informal CUPCCAA bid limit, staff met with WYAC and Merino to value engineer the scope without altering the overall project design and purpose. Merino submitted a final proposal of $190,360 on December 14, 2022. Phase General Description Fee Mobilization Site preparation including preservation of existing utilities and materials. $18,000 Site Construction Demolition, re-grading, cobble infill, decomposed granite, and bark mulch. $31,100 Irrigation Install Drip, rotator, bubbler irrigation systems. Upgrade master valve & flow sensor. $59,000 Landscape Install Box trees select species. Hydroseed native hillside. 1 gal. shrubs and groundcover, 5 gal. shrubs/groundcover. $82,260 Total Fee To include 90 days of maintenance from day of acceptance. $190,360 FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP P2638, as approved in the FY 2023 budget, is $400,000. Total expenditures, plus outstanding commitments including this item, are $248,107 (see “Attachment B” for the budget detail). Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP P2638 is sufficient to support the Project in the amount of $190,360. The Finance Department has determined that, under the current rate model, 100% of the funding is available from the Replacement Fund. STRATEGIC GOAL: Supports the District’s Strategy: Ensure financial health through formalized policies, prudent investing, and efficient operations. LEGAL IMPACT: None. ATTACHMENTS: Attachment A – Committee Action Report Attachment B – Budget Detail Attachment C – Drawings and Specifications/Scope of Work Attachment D - Assumption of Project Costs ATTACHMENT A SUBJECT/PROJECT: AWARD A CONTRACT TO MERINO LANDSCAPE, INC. TO UPDATE THE ADMINISTRATION BUILDING LANDSCAPING IN THE AMOUNT OF $190,360 COMMITTEE ACTION: The Finance, Administration, and Communications Committee reviewed this item at a meeting held on January 17, 2023. The Committee supports presentation to the full Board for their consideration. NOTE: The “Committee Action” is written in anticipation of the Committee moving the item forward for Board approval. This report will be sent to the Board as a Committee approved item or modified to reflect any discussion or changes as directed by the Committee prior to presentation to the full Board. ATTACHMENT B SUBJECT/PROJECT: AWARD A CONTRACT TO MERINO LANDSCAPE, INC. TO UPDATE THE ADMINISTRATION BUILDING LANDSCAPING IN THE AMOUNT OF $190,360 Project Budget Detail P2638-Buildings and Grounds Refurbishments 1/9/2023 Budget Category Committed Expenditures Outstanding Commitment Projected Final Cost Vendor $400,000.00 Consultant Contracts $15,900.00 $10,600.00 $5,300.00 $15,900.00 WIMMER YAMADA AND CAUGHEY For Ops Only - Contracted Services $5,547.00 $5,547.00 $0.00 $5,547.00 ADVANCED SPRINKLER DR $9,780.00 $9,780.00 $0.00 $9,780.00 AZTEC LANDSCAPING INC $4,800.00 $4,800.00 $0.00 $4,800.00 HOMESTEAD TREE SERVICE INC $20,083.16 $20,083.16 $0.00 $20,083.16 GREENRIDGE LANDSCAPE INC Standard Salaries $1,636.48 $1,636.48 $0.00 $1,636.48 Landscape Contract $190,360.00 $190,360.00 $190,360.00 MERINO LANDSCAPE, INC Totals $248,106.64 $52,446.64 $195,660.00 $248,106.64 Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S TITLE SHEET T-1 OTAY WATER DISTRICT HEADQUARTERS LANDSCAPE AND IRRIGATION PLANS FOR: SHEET INDEX PLAN SHEET -TITLE SHEET T-1 -IRRIGATION PLAN LI-1 -IRRIGATION NOTES AND LEGEND LI-2 -IRRIGATION DETAILS LI-3 LI-4 -PLANTING PLAN LP-1 -PLANTING DETAILS LP-2 2554 SWEETWATER SPRINGS BLVD, SPRING VALLEY, CA N.T.S. VICINITY MAP - N.T.S. L I M I T O F W O R K L I M I T O F W O R K LIM I T O F W O R K L I M I T O F W O R K ATTACHMENT C 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18181818 1" 3 4" 1"3 4" 3 4" 3 4" 3 4" 3 4" 1" 3 4" 3 4" 1" 1" 3 4" 1" 3 4" 1" 114" 114" 1" 114" 114" 1" 114" 3 4" ID ID2 ID3 ID4 ID5 F F F F F 9.651 1" 8.282 1" 33.45 1" 42.15 1" 1.795 1" 619.2 1" 718.5 1" 821.6 1" USE SLEEVES WHERE PIPES AND WIRING CROSS PAVING AREAS. USE SEPARATE SLEEVES FOR PIPES AND WIRING. (TYP.) DRAWING IS DIAGRAMMATIC. INSTALL PIPE, WIRING, VALVES, AND EQUIPMENT WITHIN PLANTER AREAS UNLESS NOTED OTHERWISE (TYP.) SYMBOL MANUFACTURER/MODEL ARC RAIN BIRD R-VAN18 RD-12-SAM-P45-NP ADJ RAIN BIRD R-VAN18 RD-12-SAM-P45-NP 360 SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD XCZ-100-PRB-R WIDE FLOW DRIP CONTROL KIT FOR COMMERCIAL APPLICATIONS. PURPLE CAP DESIGNATES FOR RECLAIMED WATER, NON-POTABLE USE. 1" PESBR VALVE AND 1" PRESSURE REGULATING 40PSI BASKET FILTER. 0.3-20 GPM. RAIN BIRD MDCFPCAP DRIPLINE FLUSH VALVE PURPLE CAP IN COMPRESSION FITTING COUPLER. FOR NON-POTABLE WATER USE. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. AREA TO RECEIVE DRIPLINE RAIN BIRD XFS-CV-09-18-NP XFS-CV NON POTABLE SUB-SURFACE LANDSCAPE DRIPLINE WITH A HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, W/ EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT FITTINGS. SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD PESBR-PRS-D 1", 1-1/2", 2" DURABLE CHLORINE-RESISTANT VALVES FOR RECLAIMED WATER APPLICATIONS. WITH SCRUBBER MECHANISM TECHNOLOGY, PURPLE FLOW CONTROL HANDLE, AND PRESSURE REGULATOR MODULE. BALL VALVE SPEARS PVC COMPACT 2000 BALL VALVE SIZE PER THE LARGEST REMOTE CONTROL VALVE IN THE MANIFOLD. IRRIGATION LATERAL LINE: PVC SCHEDULE 40 IRRIGATION MAINLINE: PVC SCHEDULE 40 PIPE SLEEVE: PVC CLASS 200 SDR 21 18 18 F ID ID2 ID3 ID4 ID5 Valve Number Valve Size Valve Flow Valve Callout ## #" IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD ESP12LXMEF-LXMM-LXMMPED W/ (3) ESPLXMSM12 48 STATION, TRADITIONALLY-WIRED, FLOW SMART (MODULE INCLUDED), COMMERCIAL CONTROLLER. (1) ESP12LXMEF 12-STATION, INDOOR/OUTDOOR, PLASTIC WALL-MOUNT ENCLOSURE W/ (3) ESPLXMSM12 - 12-STATION EXPANSION MODULES. INSTALL IN LXMM-LXMMPED POWDER COATED, METAL WALL-MOUNTED CABINET W/PEDESTAL. RAIN BIRD WR2-RFC WIRELESS RAIN AND FREEZE SENSOR COMBO, INCLUDES 1 RECEIVER AND 1 RAIN/FREEZE SENSOR TRANSMITTER. C RS IRRIGATION SCHEDULE CONTROLLER Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S IRRIGATION SYSTEM NOTES: CONTRACTOR SHALL NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THESE DRAWINGS WHEN IT IS OBVIOUS THAT FIELD OBSTRUCTIONS AND/OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MAY NOT HAVE BEEN CONSIDERED IN THE SYSTEM ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE RESIDENT ENGINEER. IN THE EVENT THAT THIS NOTIFICATION IS NOT GIVEN, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. NOTES: 1. SEE SHEET LI-03 THROUGH LI-04 FOR IRRIGATION DETAILS. 2. SEE SHEET LI-02 NOTES AND IRRIGATION LEGEND IRRIGATION PLAN LI-10 SCALE: feet102030 1" = 10' SYMBOL MANUFACTURER/MODEL ARC PSI GPM RADIUS RAIN BIRD R-VAN18 RD-12-SAM-P45-NP ADJ 45 17' RAIN BIRD R-VAN18 RD-12-SAM-P45-NP 360 45 1.85 17' SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD XCZ-100-PRB-R WIDE FLOW DRIP CONTROL KIT FOR COMMERCIAL APPLICATIONS. PURPLE CAP DESIGNATES FOR RECLAIMED WATER, NON-POTABLE USE. 1" PESBR VALVE AND 1" PRESSURE REGULATING 40PSI BASKET FILTER. 0.3-20 GPM. RAIN BIRD MDCFPCAP DRIPLINE FLUSH VALVE PURPLE CAP IN COMPRESSION FITTING COUPLER. FOR NON-POTABLE WATER USE. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. RAIN BIRD OPERIND DRIP SYSTEM OPERATION INDICATOR, STEM RISES 6" FOR CLEAR VISIBILITY WHEN DRIP SYSTEM IS CHARGED TO A MINIMUM OF 20PSI. INCLUDES 16" OF 1/4" DISTRIBUTION TUBING WITH CONNECTION FITTING PRE-INSTALLED. AREA TO RECEIVE DRIPLINE RAIN BIRD XFS-CV-09-18-NP XFS-CV NON POTABLE SUB-SURFACE LANDSCAPE DRIPLINE WITH A HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, W/ EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT FITTINGS. SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD PESBR-PRS-D 1", 1-1/2", 2" DURABLE CHLORINE-RESISTANT VALVES FOR RECLAIMED WATER APPLICATIONS. WITH SCRUBBER MECHANISM TECHNOLOGY, PURPLE FLOW CONTROL HANDLE, AND PRESSURE REGULATOR MODULE. BALL VALVE SPEARS PVC COMPACT 2000 BALL VALVE SIZE PER THE LARGEST REMOTE CONTROL VALVE IN THE MANIFOLD. IRRIGATION LATERAL LINE: PVC SCHEDULE 40 IRRIGATION MAINLINE: PVC SCHEDULE 40 PIPE SLEEVE: PVC CLASS 200 SDR 21 18 18 F ID ID2 ID3 ID4 ID5 Valve Number Valve Size Valve Flow Valve Callout ## #" IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEL/DESCRIPTION RAIN BIRD ESP12LXMEF-LXMM-LXMMPED W/ (3) ESPLXMSM12 48 STATION, TRADITIONALLY-WIRED, FLOW SMART (MODULE INCLUDED), COMMERCIAL CONTROLLER. (1) ESP12LXMEF 12-STATION, INDOOR/OUTDOOR, PLASTIC WALL-MOUNT ENCLOSURE W/ (3) ESPLXMSM12 - 12-STATION EXPANSION MODULES. INSTALL IN LXMM-LXMMPED POWDER COATED, METAL WALL-MOUNTED CABINET W/PEDESTAL. RAIN BIRD WR2-RFC WIRELESS RAIN AND FREEZE SENSOR COMBO, INCLUDES 1 RECEIVER AND 1 RAIN/FREEZE SENSOR TRANSMITTER. C RS IRRIGATION SCHEDULE CONTROLLER Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S IRRIGATION NOTES AND LEGEND LI-2 1. THE SPRINKLER SYSTEM DESIGN IS BASED ON THE MAXIMUM FLOW DEMAND OF 22 GPM AT THE WATER POINT OF CONNECTION (P.O.C.). THE IRRIGATION CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TO CONSTRUCTION AND SHALL REPORT ANY DIFFERENCES BETWEEN THE DESIGN WATER PRESSURE AND THE ACTUAL WORKING PRESSURE READING AT THE IRRIGATION P.O.C. TO OWNER'S REPRESENTATIVE. 2. THIS DESIGN IS DIAGRAMMATIC. THESE DRAWINGS ARE INTENDED TO BE A SCHEMATIC REPRESENTATION OF THE FINISHED IRRIGATION SYSTEM.ALL PIPING, VALVES, ETC. SHOWN WITHIN PAVED AREAS ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREASWHERE POSSIBLE. AVOID ANY CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING, AND ARCHITECTURAL FEATURES. CONTRACTOR SHALL MAKE ALL NECESSARY FIELD ADJUSTMENTS TO ACCOMMODATE ACTUAL SITE CONDITIONS. 3. CONTRACTOR TO VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THESE PLANS AT THE SITE PRIOR TO COMMENCEMENT OF WORK. 4. CONTRACTOR SHALL NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THESE DRAWINGS WHEN IT IS OBVIOUS THAT FIELD OBSTRUCTIONS AND/OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MAY NOT HAVE BEEN CONSIDERED IN THE SYSTEM ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNER'S REPRESENTATIVE. IN THE EVENTTHAT THIS NOTIFICATION IS NOT GIVEN, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. 5. CONTRACTOR TO COORDINATE SLEEVING UNDER ALL PAVING WITH OTHER TRADES AS NECESSARY. NO TEES OR ELLS SHALL BE INSTALLEDUNDER PAVING. ALL SLEEVES SHALL EXTEND A MINIMUM OF TWENTY-FOUR INCHES (24") BEYOND EDGE OF PAVING. ALL SLEEVING LOCATED UNDER PAVING SHALL BE TWO (2) TIMES THE OUTSIDE DIAMETER OF THE PIPE TO BE SLEEVED, MINIMUM TWO-INCH (2") DIAMETER. CONTRACTOR TO INSTALL METALLIC BACKED TAPE ALONG THE ENTIRE LENGTH OF THE SLEEVE, TWELVE INCHES (12") DIRECTLY ABOVE THE SLEEVE. TAPE SHALL BE MARKED "IRRIGATION" IN TWO INCH (2") CAPITAL LETTERS EVERY THREE FEET ALONG THE TAPE. 6. CONCRETE THRUST BLOCKS SHALL BE USED ON ALL IRRIGATION MAINLINES WHERE CHANGES OF DIRECTION OF FORTY-FIVE (45) DEGREES OR MORE SHOULD OCCUR. 7. CONTRACTOR SHALL FLUSH ALL MAIN LINES PRIOR TO INSTALLATION OF THE VALVES, AND SHALL FLUSH ALL LATERAL LINES PRIOR TOINSTALLATION OF THE DRIP TUBING. 8. CONTRACTOR SHALL FINE-TUNE AND ADJUST ALL SPRINKLER SYSTEMS TO ACHIEVE OPTIMUM PERFORMANCE AND COMPLETE COVERAGE. THIS INCLUDES ADJUSTMENT OF THE FLOW CONTROL STEM AT EACH REMOTE CONTROL VALVE TO OBTAIN THE OPTIMUM OPERATING FLOW / PRESSURE FOR THAT SYSTEM. 9. COORDINATE IRRIGATION WORK WITH PLANTING PLANS TO AVOID CONFLICTING LOCATIONS BETWEEN PIPING AND PLANT PITS. SPECIMEN TREE LOCATIONS TAKE PRECEDENCE OVER IRRIGATION PIPING. LOCATE SPECIMEN TREES PRIOR TO TRENCHING FOR IRRIGATION PIPING. 10. ALL LATERAL END RUNS ARE AS PER CONTRACT DOCUMENTS. 11. TRENCH MARKER: ALL DIRECT BURIAL WIRES SHALL BE MARKED WITH A CONTINUOUS RED COLORED TRENCH MARKER TAPE PLACED NINEINCHES (9") BELOW FINISH GRADE DIRECTLY ABOVE THE BURIED WIRES. MARKER TAPE SHALL BE EQUAL TO "ALAMA TAPE" AS MANUFACTURED BYPAUL POTTER WARNING TAPE INC. TAPE SHALL BE FOUR INCHES (4") WIDE. 12. IRRIGATION SYSTEMS ARE TO BE INSTALLED AS DESIGNED AND IN ACCORDANCE WITH THE CRITERIA AND APPLICABLE STANDARDS AS OF THE APPROVED DATE OF THESE PLANS. ALL IRRIGATION SYSTEM COMPONENTS SHALL BE INSTALLED PER LOCAL CODE. CONTRACTORS SHALL SECURE ALL NECESSARY PERMITS. 13. FOR REMOTE CONTROL VALVE MANIFOLDS, BALL VALVE SIZE SHALL EQUAL THE SIZE OF THE LARGEST REMOTE CONTROL VALVE IN THE MANIFOLD. 14. PROVIDE PULL BOXES FOR CONTROL WIRING AT ALL CHANGES IN DIRECTION GREATER THAN FORTY-FIVE (45) DEGREES AND WHERE WIRE RUNSEXCEED THREE HUNDRED FEET (300') IN LENGTH. IN-LINE WIRE SPLICES SHALL BE MADE ONLY IN PULL BOXES, WITH WATERPROOF CONNECTORS. 15. CONTRACTOR SHALL PROVIDE ONE (1) SET OF EXTRA CONTROL WIRES PER MANIFOLD. 16. BACKFILL MATERIAL SHALL BE CLEAN AND FREE OF DEBRIS, ROCKS LARGER THAN ONE INCH (1"), AND OBJECTS WITH SHARP EDGES. 17. CONTRACTOR SHALL INSTALL IN-LINE ANTI-DRAIN VALVES AS WARRANTED BY SITE CONDITIONS TO ALLEVIATE LOW-HEAD DRAINAGE. 18. OHM TESTING REQUIRED FOR ALL WIRE PRIOR TO CONNECTIONS BEING MADE AND BACKFILLING; OHM TESTING TO BE COMPLETED USING A MEGA OHM TESTER. 19. OPERATING WATER VELOCITY NOT TO EXCEED 5 FEET PER SECOND. IRRIGATION NOTES: Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S IRRIGATION DETAILS LI-3 NOTES: 1. BACKFLOW PREVENTER ASSEMBLY SHALL BE TESTED UPON INSTALLATION BY A CERTIFIED BACKFLOW DEVICE TESTER. CONTRACTOR SHALL PROVIDE THE OWNER'S REPRESENTATIVE WITH WRITTEN TEST RESULTS COMPLETED BY A CERTIFIED BACKFLOW TESTER PRIOR TO BACKFLOW PREVENTER ASSEMBLY'S ACCEPTANCE BY THE OWNER'S REPRESENTATIVE. 2. ALL METAL IN CONTACT WITH CONCRETE SHALL BE POLYETHYLENE WRAPPED USING TWO-INCH (2") WIDE PLASTIC BACKED ADHESIVE TAPE, MINIMUM EIGHT (8) MILS. THICK WITH ONE-HALF INCH (1/2") OVERLAP. 3. FINISH SURFACE OF CONCRETE PAD SHALL BE TWO-INCHES (2") ABOVE SURROUNDING FINISH GRADE WITHIN LANDSCAPE AREAS, OR FLUSH WITH FINISH GRADE IN TURF AREAS. CONCRETE PAD SHALL BE FOUR-INCHES (4") THICK AND EIGHTEEN-INCHES (18") WIDE MINIMUM, AND SHALL BE 520-C-2500 GRADE. CONCRETE PAD SHALL BE LOCATED, STAKED, AND APPROVED BY OWNER'S REPRESENTATIVE BEFORE CONCRETE IS POURED. 4. FACTORY ASSEMBLED REDUCED PRESSURE PRINCIPLE ASSEMBLY SHALL BE INCLUDED IN THE LATEST EDITION OF THE "APPROVED FOR SERVICE ISOLATION IN CALIFORNIA PUBLIC WATER SYSTEMS" ISSUED BY THE STATE OF CALIFORNIA DEPARTMENT OF HEALTH SERVICES, OFFICE OF DRINKING WATER. 5. PRESSURE REGULATOR AND WYE STRAINER SHALL BE LOCATED DOWNSTREAM OF THE #2 SHUT-OFF VALVE. 6. PRESSURE REGULATOR SHALL BE INSTALLED UPSTREAM OF THE BACKFLOW PREVENTER ASSEMBLY WHEN WATER PRESSURE EXCEEDS BACKFLOW PREVENTER ASSEMBLY INLET RATING. 7. LOCATE BACKFLOW PREVENTER ASSEMBLY AS CLOSE TO WATER METER AS PRACTICAL, AS APPROVED BY THE AGENCY. 8. ALL RISERS, ELBOWS, AND UNDERGROUND PIPING UPSTREAM OF BACKFLOW PREVENTER ASSEMBLY SHALL BE COPPER . BRASS UNIONS ARE ACCEPTABLE. 9. PROVIDE REINFORCED STEEL SUPPORT SADDLE AT MIDPOINT OF VALVE MANIFOLD. ANCHOR SADDLE IN CONCRETE PAD. SEE NOTE NUMBER 8 BELOW MI N . 12 " 18 " MA X . ALL SIDES 8" A BACKFLOW PREVENTER ASSEMBLY N.T.S. SECTION FLOW COPPER PIPING FROM WATER METER THRUST BLOCK, 480-C-2000, 1 CU. FT. CONCRETE MIN. THRUST BLOCK, 480-C-2000, 1 CU. FT. CONCRETE MIN. #1 SHUT-OFFVALVE CONCRETE PAD, 2% MIN. SLOPE. SEE NOTE NUMBER 3 BELOW BACKFLOW PREV. CAGE PRESSURE REGULATOR COPPER NIPPLE, TYP. COPPER ELLS, TYP. UNION, TYP. COPPER RISER, LENGTH AS REQ'D. FINISH GRADE COMPACTED SUB-GRADE PVC PIPE (MAINLINE) ADAPTER(S) COPPER NIPPLE, 8" MIN. WYE STRAINER #2 SHUT-OFF VALVE REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY 9"8"8"9"6"15" PE R M F G / M O D E L 6"15" 1- 1 / 2 " B BACKFLOW PREVENTER CAGE N.T.S. SECTION 6" x 4" x 1/8" STEEL PLATES (2) WITH HOLES FOR PADLOCK STAINLESS STEEL FRAME AND CAGE, SEE SCHEDULE STAINLESS STEEL BAR HINGE PIPE SLEEVE IN PAD OPENING TO HAVE A 1-1/2" LARGER DIA. THAN PIPE CONCRETE PAD, 2% SLOPE TO DRAIN PIPE SLEEVE, 1-1/2" LARGER DIA. THAN PIPE SIZE 1/4" ANCHOR BOLTS POURED-IN-PLACE TYP. FOUR CORNERS COMPACTED SUB-GRADE (TYP. THROUGHOUT BASE) 4" 1/2" ABOVE FINISH GRADE IN TURF AREAS, 2" IN SHRUB AND GROUND COVER AREAS SEE SPECIFICATIONS FOR PIPE DEPTHS PVC SCHEDULE 80 S X T ADAPTER ONE CUBIC FOOT CONCRETE FOOTING UNMORTARED BRICK SUPPORTS (4 MIN) PVC SCHEDULE 80 NIPPLE (TYP.) CONTINUE STRAIGHT AT VALVE MANIFOLDS PVC SCHEDULE 80 FITTING (TYP.) UNDISTURBED OR 90% COMPACTED SUBGRADE 1 2 3 9 10 11 4 5 6 7 12 14 13 3 8 4 5 6 7 8 9 10 11 12 13 14 - - - - - - - - - - - - G BALL VALVE N.T.S. SECTION VALVE BOX WITH LOCKING COVER, PER SPECIFICATIONS 1 2 - - PVC SCHEDULE 80 UNION BALL VALVE FINISH GRADE 6" DEEP PEA GRAVEL SUMP FINISH GRADE ELECTRIC REMOTE CONTROL VALVE WATERPROOF WIRE CONNECTORS VALVE BOX WITH COVER 2" MI N . 3" PVC SCHEDULE 80 S X T ADAPTER UNMORTARED BRICK SUPPORTS (ALL AROUND) UNDISTURBED OR 90% COMPACTED SUBGRADE PVC SCHEDULE 80 UNION PVC SCHEDULE 80 NIPPLE (TYP.) PVC SCHEDULE 80 FITTING (TYP.) 2' LONG WIRE EXPANSION LOOPS 6" DEEP PEA GRAVEL SUMP SEE SPECS FOR PIPE DEPTHS 1 2 3 4 9 10 11 5 5 6 7 8 12 13 14 15 - - - - 2 3 4 1/2" ABOVE FINISH GRADE IN TURF AREAS, 2" IN SHRUB AND GROUND COVER AREAS 5 - - - - - - - - - - - 6 7 8 9 10 11 12 13 14 15 H REMOTE CONTROL VALVE N.T.S. SECTION PVC LATERAL LINE 1 4 3 2 SWING JOINT ASSEMBLY PLAN VIEW J POP-UP BUBBLER HEAD N.T.S. SECTION 1 9 10 7 6 7 8 6 5 1 - POP-UP BUBBLER HEAD 2 - 2" IN SHRUB AREAS 3 - FINISH GRADE 4 - PVC SCHEDULE 80 NIPPLE (3" MIN.) 5 - THREADED ELL (FIPT X FIPT) 6 - PVC SCHEDULE 40 STREET ELL 7 - PVC SCHEDULE 80 NIPPLE 8 - ANTI-DRAIN VALVE (HUNTER "HCV" IF NOT FACTORY INSTALLED IN SPRINKLER) 9 - PVC SCHEDULE 40 THREADED ELL OR THREADED TEE (SLIP X FIPT) 10 - PVC LATERAL LINE (SEE SPECIFICATIONS FOR PIPE DEPTH) NOTE: ALL CONNECTIONS ARE TO BE TEFLON TAPED. NO MARLEX STREET ELLS. I QUICK COUPLING VALVE POTABLE N.T.S. SECTION AND PARTIAL PLAN FLUSH IN TURF AREAS,2" IN SHRUB AND GROUNDCOVER AREAS VALVE BOX WITH COVER (SEE SPECIFICATIONS) 5 4 3 2 3- - 1 2 - 1 2" 10 7 8 9 11 19 7 FINISH GRADE - -64 1" QUICK COUPLING VALVE (SEELEGEND AND SPECIFICATIONS) UNMORTARED BRICK SUPPORTS (2 MIN.) 12 12 14 12 15 14 MAINLINE CONNECTION - PLAN MAINLINE CONNECTION - SECTION SECTION 14 12 16 17 16 18 17 RED BRASS COUPLING, EXTEND 1/2" ABOVE TOP OF CONCRETE THRUSTBLOCK 9 - RED BRASS NIPPLE, LENGTH AS REQUIRED10- 6 PEA GRAVEL SUMP, 6"DEPTH 13 11 UNDISTURBED OR 90%COMPACTED SUBGRADE - 13 ONE CUBIC FOOTCONCRETETHRUST BLOCK - RED BRASS ELL12- RED BRASS NIPPLE, 8" LENGTH MIN.14 - RED BRASS STREET ELL15- PVC ELL OR TEE ONMAINLINE PIPE16- PVC IRRIGATION MAINLINE PIPE17- SCHEDULE 80 PVCNIPPLE, 2" LENGTH MIN.18 - 6" MIN. TO 18" MAX. FROM EDGE OF CURBS, WALKS, ETC. 19- 8 -RED BRASS NIPPLE, 6"LENGTH MIN. SEE SPECIFICATIONS FORPIPE DEPTHS5- - 14 SEE SPECS. FOR DEPTHSPVC PRESSURE PIPE7- UNDISTURBED / COMPACTEDCONTROL WIRES, BUNDLE & TAPE 1 (SEE SPECS.) SOLENOID UNION CONNECTORS (SEE SPECS.) (W/ 4 FT. MIN. EXTRA WIRE) VALVE BOX (SEE SPECS.) WATERPROOF WIRE SPLICE 5 6 - - 4 - 3 - 2 - - 11 7 8 2" IN GROUNDCOVER) BRICK OR CONCRETE SUPPORTS 1 CU. FT. MIN. PEE GRAVEL PVC SCH 40 FEMALE ADAPTER FINISH GRADE (FLUSH IN TURF, 12 11 13 - - - - 10 9 - - SHORT RED BRASS NIPPLE 13 - 2" M I N . 5 12 10 4 88 2 1 3 6 9 7 14 REMOTE CONTROL VALVE (SEE SPECS.) SUB-GRADE TYP. D MASTER CONTROL VALVE POTABLE N.T.S. SECTION A-2 1'-6"1'-6"1'-6" QC KEYNOTES LEGEND: 1 PRESSURE SUPPLY LINE (MAINLINE). 2 ISOLATION VALVE. 3 QUICK COUPLER VALVE. 4 HEAT BRAND ALL VALVES. 5 REMOTE CONTROL VALVE. 6 LATERAL PIPE (TYP). 7 MANIFOLD PIPE. 1 2 3 2 4 555 4 FLOW7 GENERAL NOTES: 1. ALL MANIFOLD AND ISOLATION VALVE PIPING TO BE SAME SIZE AS THE LARGEST SIZE LATERAL LINE ON ANY REMOTE CONTROL VALVE IN THE MANIFOLD. 2. EACH MANIFOLD SHALL HAVE A MINIMUM OF 15 FEET SEPARATION. 3. ALL MANIFOLDS ARE TO BE INSTALLED IN PLANTER AREAS, UNLESS NOTED OTHERWISE. E MANIFOLD CONFIGURATION N.T.S. PLAN FL O W A-3 A-1 6 1'-0" PAVING OR OTHER HARDSCAPE BV BV 2 10 x PIPE DIA. MAINLINE EXTENSION RED BLACK BLACK RED 5 x PIPE DIA. FINISH GRADE JUMBO BOX EXTENSION F FLOW SENSOR INSTALLATION POTABLE WATER N.T.S. SECTION FLOW SENSOR PEA GRAVEL DRAIN SUMP 30" MIN. DIA. x 6" MIN. DEEP 1" IN TURF AREAS 2" IN SHRUB AREAS JUMBO PURPLE PLASTIC VALVE BOX W/ 2-6" EXTENSIONS AND LOCKING COVER, AMETEK OR EQUAL WATERPROOF CONNECTIONS TWO (2) CONDUCTOR SHIELDED CABLE CONNECTION TO TRANSMITTER 8 5 7 7 8 4 1 3 2 SWING JOINT ASSEMBLY PLAN VIEW 6 9 K POP-UP SPRAY HEAD POTABLE SCALE: N.T.S. SECTION 10 11 1 - 3" MINIMUM, 6" MAXIMUM, 18" AT BUILDING WALLS 2 - POP-UP SPRAY HEAD 3 - FLUSH IN TURF AREAS, 2" IN SHRUB AREAS 4 - FINISH GRADE 5 - PVC SCHEDULE 80 NIPPLE (3" MIN.) 6 - THREADED ELL (FIPT X FIPT) 7 - PVC SCHEDULE 40 STREET ELL 8 - PVC SCHEDULE 80 NIPPLE 9 - ANTI-DRAIN VALVE (HUNTER "HCV" IF NOT FACTORY INSTALLED IN SPRINKLER) 10 - PVC SCHEDULE 40 ELL OR TEE 11 - PVC LATERAL LINE (SEE SPECIFICATIONS FOR PIPE DEPTH) NOTE: ALL CONNECTIONS ARE TO BE TEFLON TAPED. NO MARLEX STREET ELLS. 8" \" 1" CONTROLLER BEYOND 120V SERVICE QUICKPAD MOUNTING PAD-STRONG BOX V.I.T. 8' COPPER GROUND ROD (SET PLUMB) CONDUIT FOR 1-1/4" CABLE CONDUIT FOR CONTROLLER CABLE C CONTROLLER ASSEMBLY PEDESTAL MOUNT N.T.S. SECTION CONTROLLER ENCLOSURE NOTE: 1. LABEL IRRIGATION CONTROLLER WITH "DO NOT DRINK SIGN" DECAL PER WM-08 2. INSTALL PER MANUFACTURER'S DETAILS AND SPECIFICATIONS. RAIN-SENSING DEVICE IN STAINLESS STEEL, VANDAL-RESISTANT ENCLOSURE 90^ SWEEP ELLS (TYP.) CLR. ALL SIDES SLOPE TO DRAIN, ALL SIDES Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S IRRIGATION DETAILS LI-4 TECHLINE 3/4" MALE ADAPTER PVC TEE (SxSxT) EXHAUST HEADER: 3/4" SCH 40 PVC PIPING TECHLINE CV TUBING O TECHLINE CV START CONNECTION (FOR EXHAUST HEADERS - PVC TO TEE) N.T.S. ELEVATION FINISH GRADE TECHLINE TEE TECHLINE TUBING PVC TEE (SxSxT) BLANK TECHLINETUBING TECHLINE 3/4"MALE ADAPTER 3"- 4" P TECHLINE START CONNECTION (FOR SUPPLY HEADERS - PVC TO TEE) SCALE: N.T.S. SECTION 12" MIN. TO TOP OF PVC PIPE SUPPLY HEADER: 3/4" SCH 40 PVC PIPING LEGEND: 1. SLIP BASE SOCKET OVER END OF WIRES. 2. CLEANLY STRIP WIRES APPROXIMATELY 5/8" FROM END. 3. PUT CRIMP SLEEVE OVER WIRE ENDS - CRIMP SLEEVES AND CUT OFF EXCESS. 4. APPLY SEALER TO INSIDE OF SEALING PLUG - FILL CAVITY WITH SEALER. 5. PULL BASE SOCKET BACK OVER END OF WIRES AS FAR AS POSSIBLE. 6. PUSH SEALING PLUG INTO BASE SOCKET. 7. PUSH WIRES TO END OF BASE SOCKET TO ASSURE COMPLETE SEALING OF CONNECTION. 8. USE DRI-SPLICE MFG. BY SPEARS, OR APPROVED EQUAL. 56 8 7 112 34 S WIRE CONNECTOR POTABLE SCALE: N.T.S. T PIPE TRENCHING POTABLE WATER N.T.S. SECTION 4" 2" 6"6" . PRESSURIZED MAINLINE: -24" IN OPEN AREAS LATERAL LINE: -15" IN OPEN AREAS CONTROL WIRE: -24" IN OPEN AREAS HORIZONTALLY PARALLEL WITH MAINLINE 1 UNDISTURBED SOIL 2 NATIVE BACKFILL AT 95% RELATIVE COMPACTION, FREE OF ROCK AND DEBRIS 3 CLEAN SAND COMPACTED TO 70% RELATIVE DENSITY 4 3" WIDE TRENCH MARKER TAPE (2) 5 PVC PIPE 6 FINISH GRADE 1 2 3 4 5 NOTE: EXCAVATE TRENCHES WIDE ENOUGH TO ALLOW A MINIMUM OF 6 INCHES BETWEEN PARALLEL PIPE LINES AND 8 INCHES FROM LINES OF OTHER TRADES. DO NOT INSTALL IRRIGATION LINES DIRECTLY PARALLEL OR VERTICALLY OVER ONE ANOTHER. MAINTAIN 3 INCHES VERTICAL CLEARANCE BETWEEN IRRIGATION LINES. 6 12" 4 U PIPE SLEEVING POTABLE WATER N.T.S. SECTION 4" 2" 6"6" . PRESSURIZED MAINLINE: -24" IN OPEN AREAS -36" UNDER PAVEMENT BASE LATERAL LINE: -15" IN OPEN AREAS -24" UNDER PAVEMENT BASE CONTROL WIRE IN SLEEVE: -24" IN OPEN AREAS -36" UNDER PAVEMENT BASE HORIZONTALLY PARALLEL WITH MAINLINE 1 PAVEMENT 2 AGGREGATE COURSE BASE 3 UNDISTURBED SOIL 4 BACKFILL AT 95% RELATIVE COMPACTION, FREE OF ROCK AND DEBRIS 5 CLEAN SAND COMPACTED TO 70% RELATIVE DENSITY 6 3" WIDE TRENCH MARKER TAPE (2) 7 PVC PIPE, SLEEVED UNDER PAVEMENT 1 2 3 4 6 5 7 NOTE: 1. PIPE UNDER PAVEMENT SHALL BE INSTALLED IN A SCH 40 PVC SLEEVE, TWICE THE DIAMETER OF THE PIPE (4" MIN.) AND EXTEND 12" BEYOND THE PAVEMENT ON EITHER SIDE. 2. ALL MAINLINE SLEEVES MUST END IN A SOFT WORKABLE LANDSCAPE AREA AND EXTEND 12" FROM BACK OF CURB/HARDSCAPE EDGES. 6 12" FINISH GRADE OF SOIL SUB GRADE TECHLINE CV LATERALS BURIED 18"TECHLINE CV LATERALSPACING V TECHLINE CV SUBGRADE INSTALLATION SCALE: N.T.S SECTION 3" - 4" BELOW FINISH GRADE OF SOIL FINISH GRADE OF BARK MULCH BARK MULCH TECHLINE CV LATERAL (TYP.) M TECHLINE HCVXR CENTER FEED LAYOUT SCALE: N.T.S. SECTION REMOTE CONTROL VALVE WITH DISC FILTER AND PRV AREA PERIMETER PERIMETER LATERALS 2" TO 4" FROM EDGE Techline® HCVXR DRIPLINE SEE IRRIGATION LEGEND FOR ROW SPACING PVC OR POLY EXHAUST HEADER PVC OR POLY SUPPLY HEADER Techline® START CONNECTION PVC OR POLY EXHAUST HEADER NOTE: 1. RECOMMENDED MINIMUM FILTRATION: 120 MESH 2. PRESSURE AT FLUSH VALVE SHALL BE MIN 21.8 PSI 3. HIGH CHECK VALVE (MAX 8.5' OF WATER (ELEVATION CHANGE)) 4. REFER TO MAXIMUM LENGTH OF A SINGLE LATERAL CHART N TECHLINE HCVXR IRREGULAR AREAS SCALE: N.T.S. SECTION Techline® START CONNECTION AREA PERIMETER Techline® HCVXR DRIPLINE REMOTE CONTROL VALVE WITH DISC FILTER AND PRV PVC OR POLY SUPPLY HEADER Techline® TEE EXHAUST HEADER PVC OR POLY PERIMETER LATERALS 2" TO 4" FROM EDGE SEE IRRIGATION LEGEND FOR SPACING NOTE: 1. RECOMMENDED MINIMUM FILTRATION: 120 MESH 2. PRESSURE AT FLUSH VALVE SHALL BE MIN 21.8 PSI 3. HIGH CHECK VALVE (MAX 8.5' OF WATER (ELEVATION CHANGE)) 4. REFER TO MAXIMUM LENGTH OF A SINGLE LATERAL CHART R ECO INDICATOR - SWING JOINT SCALE: N.T.S. SECTION 1 2 3 4 5 1 2 LEGEND: ECO INDICATOR 3 4 PVC LATERAL PIPE FINISHED GRADE ADJACENT MULCH 5 SWING JOINT L LOW FLOW CONTROL ZONE ASSEMBLY SCALE: N.T.S. SECTION W GATE VALVE N.T.S. SECTION UNDISTURBED OR 90% COMPACTED SUBGRADE PVC SCHEDULE 80 FITTING (TYP.) CONTINUE STRAIGHT AT VALVE MANIFOLDS PVC SCHEDULE 80 NIPPLE (TYP.) UNMORTARED BRICK SUPPORTS (4 MIN) ONE CUBIC FOOT CONCRETE FOOTING PVC SCHEDULE 80 S X T ADAPTER SEE DETAILS AND SPECIFICATIONS FOR PIPE DEPTHS 1/2" ABOVE FINISH GRADE IN TURF AREAS, 2" IN SHRUB AND GROUND COVER AREAS VALVE BOX WITH LOCKING COVER, PER SPECIFICATIONS 5 7 6 4 13 14 12 14 - 13 - 12 - 11 - 10 - 9 - 8 - 1 2 3 2 9 10 11 7 - 6 - 5 - 4 - 3 - - 1 - 8 6" DEEP PEA GRAVEL SUMP FINISH GRADE GATE VALVE PVC SCHEDULE 80 UNION NOTE: 1. ALLOW A MINIMUM OF 6-INCHES OF DRIPLINE TUBING IN VALVE BOX IN ORDER TO DIRECT FLUSHED WATER OUTSIDE VALVE BOX. 1 - 2 - 3 - 4 - 5 - 6 - 7 - FINISH GRADE FLUSH CAP FOR EASY FIT COMPRESSION FITTINGS: POTABLE:RAIN BIRD MDCFCAP NON-POTABLE: RAIN BIRD EASY FIT COUPLING: RAIN BIRD MDCFCOUP SUBTERRANEAN EMITTER BOX: RAIN BIRD SEB 7XB W/ LOCKING LID SUB-SURFACE DRIPLINE: RAIN BIRD XF SERIES DRIPLINE POTABLE: XFS DRIPLINE NON-POTABLE: XFSP DRIPLINE 3-INCH MINIMUM DEPTH OF 3/8-INCH WASHED GRAVEL BRICK (1 OF 2) MDCFPCAP 1 2 3 4 5 6 7 Q DRIPLINE FLUSH POINT XFS SUBGRADE N.T.S. SECTION AN ANAN AN AN AN AN AN AN AN AN AN AN AN AN ANAN AN AN AN ANAN AN ANAN AN AN AN AN AN AN AN AN AN AN CHCH CH CH CH CH CH CH CH CH CH CH CH DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC AFAFAFAF AF AF AF AF AF AF AF AF AFAFAFAF AF AF AF SM SM SMSM CONTRACTOR TO REMOVE ALL RIVER COBBLE THAT IS GLUED TO TOP OF EXISTING WALKWAY WALLS (2). ALL RESIDUAL MORTAR, GLUE AND ROCK FRAGMENTS ARE TO BE SCRAPPED FROM TOP AND SIDE OF WALL. REPAIR ANY DAMAGED PORTION OF THE WALL WITH CONCRETE PATCH. ANY CLEAN AND USABLE COBBLE THAT HAS BEEN REMOVED FROM THE WALL WILL BE DISPERSED ALONG WITH OTHER COBBLE BEING SPECIFIED FOR ROCK MULCH AREAS. EXISTING TREE, TYP. NOTE: SCREENED DG AND LARGE RIVER COBBLE GROUND COVER REMAINS AS SHOWN IN THIS AREA ONLY. NOTE: IN THIS LARGE PLANTING ISLAND, BERM TO 2' HEIGHT IN CENTER - WOOD MULCH IN CENTER WITH LARGE COBBLE RETAINING EDGE AROUND PERIMETER (18' WIDTH). ALL REMAINING AREAS TO HAVE DG INSTEAD OF CONTINUED COBBLE AND BASE GROUND COVER. NOTE: ALL TREES SHOWN ARE TO REMAIN AND BE PROTECTED IN PLACE DURING LANDSCAPE CONSTRUCTION. 12" BAND OF HAND SET LARGE COBBLE (6"-8" ALONG BACK OF CURB/WALL/WALK - OVER FILTER FABRIC. FOR USE IN RETAINING WOOD MULCH ON SLOPE AND FLAT AREAS. 12" BAND OF HAND SET LARGE COBBLE (6"-8" ALONG BACK OF CURB/WALL/WALK - OVER FILTER FABRIC. FOR USE IN RETAINING WOOD MULCH ON SLOPE AND FLAT AREAS. INSTALL "GORILLA WOOD" MULCH TO UNIFORM DEPTH OVER FILTER FABRIC IN ALL CONTAINER PLANTED SLOPE AND FLAT LYING AREAS THAT ARE NOT IDENTIFIED AS INERT ROCK MATERIALS (DG OR COBBLE) INSTALL "GORILLA WOOD" MULCH TO UNIFORM DEPTH OVER FILTER FABRIC IN ALL CONTAINER PLANTED SLOPE AND FLAT LYING AREAS THAT ARE NOT IDENTIFIED AS INERT ROCK MATERIALS (DG OR COBBLE) TREES CODE BOTANICAL / COMMON NAME SIZE QTY ALO BAI ALOE BAINESII 36" BOX 11 TREE ALOE SHRUBS CODE BOTANICAL / COMMON NAME SIZE QTY AEO HAW AEONIUM HAWORTHII 5 GAL. PINWHEEL TO BE LOCATED ON SITE AN AGAVE CELSII 'NOVA'5 GAL.35 NOVA CENTURY PLANT AGA BAC AGAVE CHAZAROI 5 GAL.20 AGAVE CHAZAROI AF AGAVE FERNANDI-REGIS 5 GAL.19 FERDINAND AGAVE AGA GEM AGAVE GEMINIFLORA 5 GAL.20 TWIN FLOWERED AGAVE ALO NOB ALOE X NOBILIS 5 GAL.7 VARIEGATED ALOE NOBILIS CB CALLISTEMON VIMINALIS 'LJ1' TM 5 GAL.57 BETTER JOHN BOTTLEBRUSH CEA ATJ CEANOTHUS SPP.5 GAL.11 CALIFORNIA LILAC CIS PUR CISTUS X PURPUREUS 5 GAL.82 ORCHID ROCKROSE CH CRASSULA OVATA 'HOBBIT'5 GAL.13 HOBBIT JADE DC DIANELLA CAERULEA 'DBB03' TM 5 GAL.18 CASSA BLUE FLAX LILY ENC FER ENCEPHALARTOS FEROX 5 GAL.7 CHIHANGA CYCAD EUP COT EUPHORBIA COTINIFOLIA 15 GAL. CARIBBEAN COPPER PLANT EUP STI EUPHORBIA TIRUCALLI 'STICKS ON FIRE'5 GAL.17 STICKS ON FIRE PENCIL TREE FUR GEG FURCRAEA GIGANTEA 5 GAL.3 FALSE AGAVE GAL FIR GALVEZIA SPECIOSA 'FIRECRACKER'5 GAL.12 FIRECRACKER ISLAND SNAPDRAGON GRE NOE GREVILLEA X 'NOELLII'5 GAL.31 NOEL GREVILLEA HES WHI HESPEROYUCCA WHIPPLEI 5 GAL. CHAPARRAL YUCCA TO BE LOCATED ON SITE. HET ARB HETEROMELES ARBUTIFOLIA 5 GAL.25 TOYON LEU COM LEUCOPHYLLUM FRUTESCENS 'COMPACTA'5 GAL.14 COMPACT TEXAS RANGER MAC UNG MACFADYENA UNGUIS-CATI 5 GAL.14 CAT'S CLAW CREEPER MAH NEV MAHONIA NEVINII 5 GAL.12 NEVIN MAHONIA PED MAC PEDILANTHUS MACROCARPUS 5 GAL.15 SLIPPER SAL BEE SALVIA X 'BEE'S BLISS'5 GAL.12 BEE'S BLISS SAGE SAN CYL SANSEVIERIA CYLINDRICA 5 GAL. DEVIL'S TONGUE TO BE LOCATED ON SITE. SM SEDUM MORGANIANUM 5 GAL.4 BURRO'S TAIL SEN DEC SENECIO DECARYI 5 GAL.5 MADAGASCAR SENECIO GROUND COVERS CODE BOTANICAL / COMMON NAME SIZE SPACING QTY ARC ECP ARCTOSTAPHYLOS X 'EMERALD CARPET'5 GAL.36" o.c.661 SF EMERALD CARPET MANZANITA COT LOW COTONEASTER DAMMERI 'LOWFAST'5 GAL. 48" o.c.556 SF LOWFAST BEARBERRY COTONEASTER DG DECOMPOSED GRANITE 5 GAL.1,937 SF 3/8" SCREENED CALIFORNIA GOLD D.G. - 3" DEPTH OVER FILTER FABRIC. HYD MIX HYDROSEED MIX FOR SLOPES SEED 6,197 SF TO BE CONSULTED WITH S&S SEEDS RIV RIVER COBBLE - 1 LAYER DEPTH -HAND LAID ---1,149 SF TO PROVIDE GENERAL FLAT LEVEL INSTALLED OVER FILTER FABRIC. (NO BROKEN PIECES TO BE USED) 6"-8" IN SIZE, ARIZONA BLEND, AVAILABLE THROUGH SOUTHWEST BOULDERS. INFILL BETWEEN VOIDS WITH 38" TO 34" PEA GRAVEL SIZE ROCK OF SAME BLEND AS SPECIFIED. AN AF CH DC SM PLANT SCHEDULE BOULDER CLUSTER LOCATIONS - TO BE SPOTTED BY LANDSCAPE ARCHITECT IN FIELD FROM FOLLOWING INVENTORIES - 30% 3'X3'X3', 20" 4'X4'X4', 10% 5'X5X5' - ARIZONA BLEND, AVAILABLE THROUGH SOUTHWEST BOULDERS. TOTAL BOULDER COUNT 120. Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S NOTES: 1. SEE SHEET LP-2 FOR PLANTING NOTES AND DETAILS TREE CLEARANCES: 1. DRIVEWAYS - 10' 2. TRAFFIC SIGNALS/STOP SIGNS - 20' 3. INTERSECTIONS - 25' 4. UTILITIES - UNDERGROUND - 5'; ABOVE GROUND - 10' 5. FIRE HYDRANT - 10' 6. LIGHT STANDARDS - 110' 7. SIDEWALK UNDERDRAINS - 3' PLANTING PLAN & LEGEND LP-10 SCALE: feet204060 1" = 20' GENERAL NOTE: 1. THIS DRAWING IS BASED OFF OF SITE OBSERVATIONS, CONTRACTOR TO VERIFY EXISTING MATERIAL AND ENSURE PROPOSED MATERIAL BLENDS. 2. QUANTITIES SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PLANTS AND OTHER MATERIALS SUFFICIENT TO COVER AREAS SHOWN ON THE DRAWINGS AT THE SPECIFIED SPACING AND LOCATIONS. 3. THE CONTRACTOR SHALL CONFIRM ALL UTILITIES & SIGNAGE ON SITE BEFORE CONSTRUCTION. 4. ALL PLANTING AREAS SHALL RECEIVE AMENDMENTS PER SOILS TEST RECOMMENDATIONS. 5. PROTECT-IN-PLACE ALL EXISTING TREES AND PLANT MATERIAL NOTED. 6. SHRUBS & TREES SHALL BE INSTALLED PER SAN DIEGO REGIONAL STANDARD DRAWINGS. 7. REMOVE AND DISPOSE OF OFF-SITE ALL TURF AND PLANT MATERIAL IN PROPOSED PLANTING AREAS. 8. PRUNE, TRIM, AND LACE ALL EXISTING TREES AND PLANT MATERIAL TO REMAIN TO A HEALTHY APPEARANCE AND GROWING CONDITION. 9. PROVIDE FILTER FABRIC UNDER 100% OF ROCK COBBLE AREAS. 10. CONTRACTOR SHALL ADJUST, REPAIR AND REPLACE AS NEEDED ALL EXISTING IRRIGATION PER THE PROPOSED RENOVATIONS AND GRASS REMOVAL. ENSURE PROPER WORKING ORDER OF IRRIGATION DURING AND AFTER CONSTRUCTION. MAINTAIN AND ADJUST SYSTEM TO ENSURE 100% HEAD-TO-HEAD COVERAGE AND NO OVERSPRAY. Sheet Title: Drawn: Date: Checked: RevisionDateNo. RR 1/20/2022 PC WYAC Project Number Sheet Number: OT A Y W A T E R D I S T R I C T CALL B E F O R E Y O U D I G CO R P O R A T E O F F I C E S PLANTING DETAILS LP-2 2X ROOTBALL WIDTH TYP.TY P . ROOTBALLORIGINAL PREVAILING CU T 6 " B E L O W BR A N C H C A N O P Y WIND FINISH GRADE 12" MIN.ALL SIDES COLLAR 1"-2" ABOVE 4" DIA. PEFORATED RIGID PVC PIPE WITH FILTER SOCK AND GRATE (TYP.), IN TWO PLACES. DO NOT FILL PIPE WITH GRAVEL. UNDISTURBED SOIL PLANTING BACKFILL (PER SPECS). BACKFILL AND COMPACT IN 8" LIFTS (PUDDLE & SETTLE AFTER SETTING TREE). ROUGHEN SIDES & BOTTOM OF PLANTING PIT PLANTING TABLETS (PER SPECS) BARK MULCH (PER SPECS.) 4" HIGH WATER BASIN (DURING THE MAINTENANCE PERIOD). OMIT IN TURF AREAS. TREE STAKE-ALL STAKES CUT 6" BELOW BRANCH CANOPY 4 TREE TIES MIN. (2 @ TOP OF STAKE, OTHERS WHERE NECESSARY TO SUPPORT TREE). TIE IN FIGURE-8 FASHION. GALVANIZED NAIL TYP. FINISH GRADE PREVAILING WIND 8'- 0 " BE L O W 12" 4" A TREE PLANTING AND STAKING N.T.S. SECTION BO T T O M O F RO O T B A L L BACKFILL HOLESBELOW ROOTBALLWITH GRAVEL.SEE SPECS. RO O T B A L L DE P T H O F PRIVATE NOTE: 1. REMOVE ALL NURSERY STAKES. 2. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL 6' - 1 " BR A N C H TR E E C L E A R A N C E B PLANT MATERIAL SPACING N.T.S. PLAN LOCATE PLANTS EQUALLY SPACED PER DISTANCE INDICATED ON PLANS. (TRIANGULAR SPACED) KEEP PLANTS FROM EDGE OF PAVING EQUAL TO A DISTANCE 75% OF PLANT SPACING SHOWN ON PLANS. EQUAL PLANTER AREA HARDSCAPE/PAVING PLANT (TYP.) EQUA L NOTE: 1. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL MINIMUM PLANTING PIT SIZING GRADE 1 GAL. CONTAINER 15 GAL. CONTAINER5 GAL. CONTAINER 18" DIAMETER24" DIAMETER30" DIAMETER PLANTING BACKFILL. BACKFILL AND COMPACT IN 8" LIFTS (PUDDLE & SETTLE AFTER SETTING SHRUB). C SHRUB PLANTING N.T.S. SECTION UNDISTURBED SOIL ROUGHEN SIDES AND BOTTOM OF PLANTING PIT PLANTING TABLET (TYP.) PER SPECIFICATIONS ROOTBALL FINISH BERM 12" MIN. FROM TRUNK 3" DEPTH WATERING BASIN BARK MULCH PER SPECIFICATIONS SHRUB COLLAR 1" ABOVE FINISH GRADE SLOPE 1/4" / FT NOTE: 1. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL 1.ALL PLANTING AND FINISH GRADING OPERATIONS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE PROJECT DRAWINGS, DETAILS, AND PROJECT SPECIFICATIONS. REFER TO PROJECT SPECIFICATIONS FOR ALL PLANTING REQUIREMENTS. FINE GRADE ALL PLANTING AREAS PRIOR TO COMMENCEMENT OF PLANTING OPERATIONS. 2. SEE THIS SHEET LP-101 & LP-102 AND FOR PLANTING PLAN AND THIS SHEET FOR SCHEDULE. 3. CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE AND THE LANDSCAPE ARCHITECT IMMEDIATELY OF ANY CHANGED CONDITIONS WHICH OCCUR ON PROJECT SITE WHICH ARE NOT REFLECTED ON PLANS. 4. REMOVE ALL WEEDS, DEBRIS, AND ROCKS LARGER THAN ONE-HALF-INCH (1/2") FROM ALL PLANTING AREAS, AND DISPOSE OF APPROPRIATELY OFF-SITE. 5. FINISH GRADE OF SOIL SHALL BE TWO-INCHES (2") BELOW ADJACENT FINISH PAVING SURFACE. 6. CONTRACTOR SHALL PROVIDE ELECTRONIC PHOTOGRAPHS OF ALL PROPOSED TREES TO BE INSTALLED, TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION. EACH TREE PHOTOGRAPH SHALL INCLUDE GRAPHIC INFORMATION ABOUT THE TREE INCLUDING, BUT NOT LIMITED TO: DIAMETER AT BREAST HEIGHT, OVERALL HEIGHT, TRUNK HEIGHT, CROWN WIDTH AND HEIGHT, AND NURSERY SOURCE. 7. ALL TREES SHALL BE SINGLE-TRUNK STANDARDS, UNLESS NOTED OTHERWISE ON THE DRAWINGS. FOR TREES WITHIN FIVE FEET FROM HARDSCAPE AREAS, CONTRACTOR TO INSTALL ROOT BARRIERS PER SPECIFICATIONS AND DETAILS. 8. ALL PLANTS SHALL BE PROTECTED FROM SUN, WIND, HEAT, AND FROST DURING TRANSPORTATION TO THE SITE AND DURING STORAGE AT THE SITE. DO NOT STORE PLANTS IN TOTAL DARKNESS FOR MORE THAN ONE DAY. 9. DO NOT DAMAGE PLANT ROOT BALL DURING TRANSPORTATION OR PLANTING PROCESS. 10. CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AT THE TIME OF DELIVERY OF ANY PLANT MATERIAL WHICH HAS BEEN DAMAGED OR IS IN POOR CONDITION. THE OWNER'S REPRESENTATIVE SHALL DETERMINE ACCEPTABILITY OF SUBJECT PLANT MATERIAL. 11. PLANT MATERIAL SHALL BE INSPECTED BY THE OWNER'S REPRESENTATIVE OR LANDSCAPE ARCHITECT BEFORE PLANTING. PLANT MATERIAL MAY BE REJECTED AT ANY TIME BY THE OWNER'S REPRESENTATIVE DUE TO POOR CONDITION, FORM, OR DAMAGE PRIOR TO, DURING, OR AFTER THE PLANTING PROCESS. ANY PLANT BROUGHT TO THE CONSTRUCTION SITE WHICH IS FOUND TO HAVE DISEASE OR INVASIVE SPECIES SHALL BE REMOVED IMMEDIATELY. 12. ALL ON-SITE PLANT MATERIALS (BALL AND BURLAP, CONTAINERS, TEMPORARILY STAGED IN BARK MULCH, AND/OR PLANTED IN THE GROUND) SHALL BE PROPERLY WATERED AND MAINTAINED TO ENSURE HEALTHY GROWTH. 13. AT LEAST ONE PLANT OF EACH SPECIES DELIVERED TO THE SITE SHALL HAVE AN IDENTIFICATION TAG FROM THE SUPPLYING NURSERY SHOWING BOTH COMMON AND SCIENTIFIC NAMES. 14. THE PLANTING PLANS ARE DIAGRAMMATIC. PLANT MATERIALS SHALL BE SPOTTED APPROXIMATELY AS SHOWN ON THE DRAWINGS. TREE LOCATIONS ARE TO BE APPROVED BY THE OWNER'S REPRESENTATIVE OR LANDSCAPE ARCHITECT PRIOR TO EXCAVATION FOR PLANTING PITS AND REMOVAL FROM CONTAINERS. FINAL LAYOUT OF ALL OTHER PLANT MATERIALS SHALL BE APPROVED IN THE FIELD BY THE OWNER'S REPRESENTATIVE OR LANDSCAPE ARCHITECT PRIOR TO PLANTING. 15. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PLANT MATERIALS SUFFICIENT TO COVER AREAS SHOWN ON THE DRAWINGS AT THE SPECIFIED SPACINGS. QUANTITIES ARE PROVIDED ON THE PLANS FOR REFERENCE ONLY. 16. CONTRACTOR SHALL SUBMIT AN AGRICULTURAL SUITABILITY AND FERTILITY ANALYSIS REPORT (SOILS ANALYSIS REPORT FROM REPRESENTATIVE ON-SITE SOIL SAMPLES - SEE SPECIFICATIONS) TO THE LANDSCAPE ARCHITECT AND THE OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO ANY PLANTING WORK OR SOIL AMENDMENT INCORPORATION. THE RECOMMENDATIONS OF THE SOILS ANALYSIS REPORT FOR TOPSOIL AMENDMENT AND BACKFILL MIX AMENDMENT SHALL SUPERSEDE THE RECOMMENDATIONS LISTED IN THE SPECIFICATIONS. 17. CONTRACTOR SHALL COORDINATE PLANTING WORK WITH THE WORK OF OTHER TRADES AND PROFESSIONS. CONTRACTOR SHALL MAINTAIN PROPER DRAINAGE DURING THE COURSE OF CONSTRUCTION. 18. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF EXISTING PROPOSED UTILITIES WITHIN THE PROJECT LIMITS WHICH MAY BE AFFECTED BY INSTALLATION. IMMEDIATELY CONTACT THE OWNER'S REPRESENTATIVE AND THE LANDSCAPE ARCHITECT IF A CONFLICT IS EVIDENT. 19. REMOVE ALL TYING MATERIALS, MARKING TAPES, AND NURSERY STAKES AT THE TIME OF PLANTING. 20. TREE ROOT BARRIERS SHALL BE INSTALLED WHERE TREES ARE PLACED WITHIN 10 FEET OF PUBLIC IMPROVEMENTS INCLUDING WALKS, CURBS, OR STREET PAVEMENTS OR WHERE NEW PUBLIC IMPROVEMENTS ARE PLACED ADJACENT TO EXISTING TREES. THE ROOT BARRIER WILL NOT WRAP AROUND THE ROOT BALL. ROOT BARRIER SHALL BE 20' IN LENGTH, CENTERED ON CENTERLINE OF TREE TRUNK (10' TO EACH SIDE). 21. CONTRACTOR SHALL INSTALL EROSION CONTROL MATTING ON ALL SLOPES WITH THREE-TO-ONE (3:1) GRADIENT AND GREATER. 22. CONTRACTOR SHALL PROTECT EXISTING VEGETATION TO REMAIN AND OTHER IMPROVEMENTS WITHIN AND OUTSIDE THE LIMITS OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF ANY DAMAGES INCURRED. 23. THE MAINTENANCE PERIOD SHALL BEGIN ONLY UPON WRITTEN ACCEPTANCE OF THE COMPLETED PLANTED AREAS BY THE OWNER'S REPRESENTATIVE AND THE LANDSCAPE ARCHITECT. PLANTING NOTES: 1. FURNISH NURSERY-GROWN PLANTS TRUE TO SPECIFIED GENUS, SPECIES, SUBSPECIES, VARIETY, CULTIVAR (CULTIVATED VARIETY), STEM FORM, SHEARING, AND OTHER FEATURES INDICATED IN PLANT SCHEDULE AND COMPLYING WITH ANSI Z60.1-2014 (APRIL 14, 2014 EDITION). 2. PLANT PHOTOGRAPHS: SUBMIT COLOR PHOTOGRAPHS IN DIGITAL FORMAT OF EACH REQUIRED SPECIES AND SIZE OF PLANT MATERIAL AS IT WILL BE FURNISHED TO THE PROJECT. TAKE PHOTOGRAPHS FROM AN ANGLE DEPICTING TRUE SIZE AND CONDITION OF THE TYPICAL PLANT TO BE FURNISHED. INCLUDE A SCALE ROD, PERSON, OR OTHER MEASURING DEVICE IN EACH PHOTOGRAPH. FOR SPECIES WHERE MORE THAN TWENTY PLANTS ARE REQUIRED, INCLUDE A MINIMUM OF 3 PHOTOGRAPHS SHOWING THE AVERAGE PLANT, THE BEST QUALITY PLANT, AND THE WORST QUALITY PLANT TO BE FURNISHED. IDENTIFY EACH PHOTOGRAPH WITH THE FULL BOTANICAL NAME OF THE SPECIFIED PLANT (INCLUDING GENUS, SPECIES, SUBSPECIES, VARIETY, CULTIVAR, ETC.), PLANT SIZE, AND NAME OF THE GROWING NURSERY. PHOTOGRAPHS SHALL BE SUBMITTED TO LANDSCAPE ARCHITECT PRIOR TO COMPLETION OF ROUGH GRADING. 3. PROVIDE WELL-SHAPED, FULLY BRANCHED, VIGOROUS STOCK, WITH HEALTHY FOLIAGE AND HEALTHY ROOT SYSTEMS, DENSELY FOLIATED WHEN IN LEAF AND FREE OF DISEASE, PESTS, EGGS, LARVAE, AND DEFECTS SUCH AS KNOTS, SUN SCALD, INJURIES, ABRASIONS, AND DISFIGUREMENT. 4. COLLECTED STOCK: DO NOT USE PLANTS HARVESTED FROM THE WILD, FROM NATIVE STANDS, FROM AN ESTABLISHED LANDSCAPE PLANTING, OR NOT GROWN IN A NURSERY UNLESS OTHERWISE INDICATED. 5. PROVIDE PLANTS OF SIZES, GRADES, AND BALL OR CONTAINER SIZES COMPLYING WITH ANSI Z60.1-2014 FOR TYPES AND FORM OF PLANTS REQUIRED. PLANTS OF A LARGER SIZE MAY BE USED IF ACCEPTABLE TO LANDSCAPE ARCHITECT, WITH A PROPORTIONATE INCREASE IN SIZE OF ROOTS OR BALLS, AND AT NO ADDITIONAL COST TO THE OWNER. 6. ROOT-BALL DEPTH: FURNISH TREES AND SHRUBS WITH ROOT BALLS MEASURED FROM TOP OF ROOT BALL, WHICH SHALL BEGIN AT ROOT FLARE ACCORDING TO ANSI Z60.1-2014. ROOT FLARE SHALL BE VISIBLE BEFORE PLANTING. 7. LABELING: LABEL AT LEAST ONE PLANT OF EACH TYPE, SIZE, AND CALIPER WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING LEGIBLE DESIGNATION OF COMMON NAME AND FULL BOTANICAL NAME (INCLUDING GENUS, SPECIES, SUBSPECIES, VARIETY, CULTIVAR, ETC.). HOWEVER, FINAL DETERMINATION OF PLANT GENUS, SPECIES, SUBSPECIES, VARIETY, CULTIVAR, ETC. WILL BE MADE BY THE LANDSCAPE ARCHITECT AND WHOSE DECISION WILL BE FINAL. ALL PATENTED PLANTS REQUIRED BY THE PLANT SCHEDULE SHALL BE DELIVERED WITH A PROPER PLANT PATENT LABEL ATTACHED. 8. AS PLANTS ARE LIVING OBJECTS, HORTICULTURAL DEFECTS/DEFICIENCIES AND PESTS/DISEASES THAT CAUSE REJECTION MIGHT NOT BE NOTED UNTIL OBSERVATION OF EACH PLANT IN THE FIELD. IN ADDITION, UNFORESEEN DAMAGES MIGHT OCCUR DURING SHIPPING, HANDLING, AND INSTALLATION. THE LANDSCAPE ARCHITECT AND OWNER RESERVE THE RIGHT TO EVALUATE PLANT MATERIALS ON-SITE AFTER DELIVERY AND INSTALLATION. 9. TREES WITH DAMAGED, CROOKED, OR MULTIPLE LEADERS; TIGHT VERTICAL BRANCHES WHERE BARK IS SQUEEZED BETWEEN TWO BRANCHES OR BETWEEN BRANCH AND TRUNK ("INCLUDED BARK"); CROSSING TRUNKS; CUT-OFF LIMBS MORE THAN 3/4 INCH (19 MM) IN DIAMETER; OR WITH STEM GIRDLING ROOTS WILL BE REJECTED. PLANT MATERIALS NOTES: EXISTING CRUB/GUTTER GEOTEXTILE FILTER FABRIC (TYP.) ROCK COBBLE MULCH PER SCHEDULE, TO COVER 100% OVER FILTER FABRIC FINISH GRADE OF ADJACENT PLANTING SOIL SHALL BE 3" BELOW TOP OF PAVING TO ALLOW FOR COBBLE MULCH NOTE: COBBLE MULCH TO COVER 100% OVER FILTER FABRIC. FILTER FABRIC SHALL NOT BE VISIBLE THROUGHOUT AREA OF APPLICATION. ALL SOIL REMOVED FOR EDGE COBBLE TREATMENT AND TREE/SHRUB PLANTING TO BE RETAINED WITHIN MEDIANS AS A CENTRAL LINEAR BERM. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL 8-12"1/4"-3/8" INFILL D ROCK COBBLE MULCH N.T.S. SECTION MINIMUM TREE SEPARATION DISTANCES: DRIVEWAYS -10 FEET (5' AT RESIDENTIAL DRIVEWAYS) TRAFFIC SIGNALS / STOP SIGNS -20 FEET INTERSECTIONS -25 FEET (TRIANGLE SPACING FOR RESIDENTIAL) UTILITIES -UNDERGROUND 5' ; ABOVE GROUND 10' FIRE HYDRANTS -10 FEET LIGHT STANDARDS -10 FEET SIDEWALK UNDERDRAINS -3 FEET TREE NOTES FOR PUBLICLY OWNED AREAS 1. ALL STANDARD FORM (SINGLE TRUNK) TREES TO INCLUDE A SINGLE STRONG CENTRAL LEADER WITH NO BRANCHES EXTENDING AT AN ANGLE NARROWER THAN 30 DEGREES FROM THE MAIN TRUNK. IF THE TREE DOES NOT DISPLAY A SINGLE STRONG CENTRAL LEADER, A TREE MAY BE APPROVED IF THE DEVELOPER'S ARBORIST OR LANDSCAPE ARCHITECT OF RECORD CAN DEMONSTRATE THAT A SINGLE STRONG CENTRAL LEADER CAN BE ACHIEVED THROUGH STRUCTURAL PRUNING. ALL TREES REQUIRING STRUCTURAL PRUNING FOR THE PURPOSES OF ACHIEVING A STRONG CENTRAL LEADER SHALL BE PRUNED BY THE NURSERY'S ARBORIST PRIOR TO LANDSCAPE ARCHITECT OF RECORD APPROVAL OF TREE SUBMITTAL (SEE NOTE #5 BELOW) OR BY THE DEVELOPER'S ARBORIST AT PLANTING. 2.NO GRAFTED SPECIES WILL BE ALLOWED AS A STREET TREE. 3. TREE SIZING BASED ON CALIPER AND TREE HEIGHT PER AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014): O 15-GAL: 1” - 1-1/2” CALIPER; 5'-7' HEIGHTO 24” BOX: 1-1/2” - 1-3/4” CALIPER; 7'-12' HEIGHT O 36” BOX: 1-3/4” - 3” CALIPER; 8'-14' HEIGHT O 48” BOX: 3”- 4” CALIPER; 14'-18' HEIGHT *NOTE: CALIPER TO BE MEASURED AT 6” ABOVE THE ROOT CROWN 4.LIVE CROWN RATIO SHALL BE A MINIMUM OF 50%, MEANING THERE SHALL BE LIVE BRANCHES IN THE UPPER 50% OF THE TRUNK TO DISTRIBUTE WIND STRESS AND DEVELOP TRUNK TAPER FOR STABILITY. 5. THE LANDSCAPE ARCHITECT OF RECORD SHALL SUBMIT TO THE CITY'S LANDSCAPE ARCHITECT ACOPY OF THE APPLICANT'S APPROVED TREE SUBMITTAL WITH PHOTOS REPRESENTATIVE OF THOSE TREES TO BE DELIVERED TO THE SITE, INCLUDING REPRESENTATIVE MEASUREMENTS. THE CITY'S LANDSCAPE ARCHITECT WILL REVIEW THE SUBMITTAL TO VERIFY THE INCLUDED TREES COMPLY WITHTHE NOTED REQUIREMENTS PRIOR TO ANY TREES BEING DELIVERED TO THE SITE. 6.ALL 36” BOX TREES AND LARGER, MULTI-TRUNK AND OTHER SPECIMEN TREES SHALL BE TAGGED ATTHE NURSERY BY THE LANDSCAPE ARCHITECT OF RECORD AND PHOTOS SUBMITTED TO THE CITY'S LANDSCAPE ARCHITECT AS DESCRIBED ABOVE. CURB, WALL, OR EDGE OF PAVING < PROPOSED TREE LIMITS OF ROOT BARRIER TO BE 10' FROM CENTER OF TREE ON EITHER SIDE INSTALL ROOT BARRIER ADJACENT TO CURB, WALL, OR EDGE OF PAVING INSTALL ROOT BARRIER TO ALL TREES WITHIN 10' OF CURB OR PAVING PLANTING AREA F ROOT BARRIER N.T.S. PLAN NOTE: 1. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL PROPOSED TREE FINISH GRADE CURB, WALL, OR EDGE OF PAVING ROOT BARRIER PER SPECIFICATIONS ROOT BARRIER SHALL BE INSTALLED ADJACENT TO HARDSCAPE ELEMENT E ROOT BARRIER N.T.S. SECTION NOTE: 1. MULCH SHALL BE KEPT 4-6" AWAY FROM TRUNK, STEMS, AND TAPER AT ROOT BALL Wood Mulch - Large Shavings - from Agri-Service Boulder cluster locations - to be spotted by LA in field from following inventories - 30% 2'X2'X2', 30% 3'X3'X3', 20" 4'X4'X4', 10% 5, X5'X5' - Arizona Blend - Southwest Boulders (total boulder count 120) 3/8" Screened California Gold Decomposed Granite - stabilized and 3" depth over filter fabric Ceanothus spp. - California Lilac Cistus purpureus – Purple Rockrose Cotoneaster dammeri 'Lowfast' – Bearberry Cotoneaster Crassula hobbit – Hobbit Fine Jade Dianella tasmanica "little gem" Galvezia speciosa - Island Bush“Firecracker” Snapdragon Grevillea noellii - Hummingbird Bush Heteromeles arbutifolia - California Toyon Leucophyllum frutescens ‘compactum’ - Texas Sage Mahonia nevinii - Nevin’s Barberr Cycad - Encephalartos ferox Agave celsii nova Agave geminiflora Agave chazaroi Agave ferdinand-regis Aloe bainesii specimen Aloe nobilis variegated Arctostaphylos 'Emerald Carpet' Salvia 'Bee's Bliss' Furcraea gigantea striata mediopicta alba Senecio decaryii Pedilanthus macrocarpus Euphorbia tirucalli, Sticks on Fire" Callistemon viminalis - Little John Aeonium haworthii - Pinwheel (to be located) Hesperoyucca whipplei (to be located) Euphorbia Cotinifolia (to be located) Sansevieria cylindrica, African Spear Plant (to be located) Sedum burrito, Donkey's Tail Select Hydroseed slope - 'specific seed mix to be identified' 6"-8" river cobble - Arizona Blend Southwest Boulders Note refrence on detail sheet for removal of glued cobble on ramp wall (both sides) and repair as noted (to be determined) Note - in this large planting island - berm to 2' height in center - wood mulch in center with large cobble retaining edge around perimeter (18' width) Note -screened DG and Large river cobble ground cover remains as shown in this area only. Macfadyena unguis cati, Cats Claw Vine - espalier on stucco walll All trees shown are to remain and be protected in place during landscape construction 3/8" river cobble for infill between larger cobble NEW DROUGHT TOLORENT LANDSCAPE DESIGN FOR OWD COPPORATE OFFICES JANUARY 2023 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 OTAY WATER DISTRICT CORPORATE OFFICES - LANDSCAPE - PRELIMINARY DESIGN - ENHANCEMENT PROGRAM 4-15-21 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 |||||||||||||||||||||||||||||||||||||||| NORTH 0 SCALE: feet4080120 1" = 40' NEW DROUGHT TOLORENT LANDSCAPE DESIGN FOR OWD COPPORATE OFFICES JANUARY 2023 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 NEW DROUGHT TOLORENT LANDSCAPE DESIGN FOR OWD COPPORATE OFFICES JANUARY 2023 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 OTAY WATER DISTRICT CORPORATE OFFICES - LANDSCAPE - PRELIMINARY DESIGN - ENHANCEMENT PROGRAM 4-15-21 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 |||||||||||||||||||||||||||||||||||||||| NORTH 0 SCALE: feet4080120 1" = 40' NEW DROUGHT TOLORENT LANDSCAPE DESIGN FOR OWD COPPORATE OFFICES JANUARY 2023 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 OTAY WATER DISTRICT CORPORATE OFFICES - LANDSCAPE - PRELIMINARY DESIGN - ENHANCEMENT PROGRAM 4-15-21 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 |||||||||||||||||||||||||||||||||||||||| NORTH 0 SCALE: feet4080120 1" = 40' NEW DROUGHT TOLORENT LANDSCAPE DESIGN FOR OWD COPPORATE OFFICES JANUARY 2023 P.O. Box 231323 Encinitas, CA 92023wyac.com 619.232.4004 OWD Corporate Office Landscape Upgrade $2,021 PROJECT NAME: OWD Corporate Office Landscape Upgrade PHASE: CLIENT: Kent Payne - OWD Facilities Director PROJECT NUMBER: DATE: General Area Take -off Description / Deliverables:Quantity Unit Total New Landscape 12,500 SF $12,500 New Hardscape 0 SF $0 Subtotal Site $12,500 Site Development - Projects Costs Site Mobilization Description / Deliverables:Quantity Unit Unit Cost TotalMobilization (Includes preservation of existing trees, shrubs & ground covers to be protected in place.1 LS $7,500.00 $5,000 Subtotal Mobilization $5,000 Site Construction Description / Deliverables:Quantity Unit Unit Cost Total Demolition of existing planting, removal and general re-grading 5,500 SF $2.00 $11,000 Rock Cobble infill -6"-10" single course hand laid over filter fabric 1,600 SF $4.00 $6,400 Rock Cobble infill - 3/8" screened 1,600 SF $2.00 $3,200 Decomposed Granite Ground Mulch 3" uniform depth (over filter fabric)2,000 EA $2.50 $5,000 Boulders (2' x 2' x 3')20 Allow $200.00 $4,000 Gorilla Bark Mulch 3" uniform depth (over filter fabric)4,000 SF $3.00 $12,000 Remove large river cobble from top of walk walls (2), clean cobble and place as specified, repair and patch wall top.1 Allow $5,000.00 $5,000 Subtotal Site Construction $29,200 Irrigation Description / Deliverables:Quantity Unit Unit Cost Total Drip Irrigation System 5,500 SF $4.00 $22,000 Rotator Irrigation system 7,500 SF $2.50 $18,750 Bubbler Irrigation system 2,500 SF $1.50 $3,750 Connect to existing point of connection 1 EA $2,500.00 $2,500 Upgrade Smart Controller (replacing existing controller)1 EA $3,500.00 $3,500 Upgrade master valve & flow sensor 1 EA $3,500.00 $3,500 Subtotal Irrigation $54,000 Site Landscape Description / Deliverables:Quantity Unit Unit Cost Total 24" Box Trees- Specimen Select Species 12 EA $1,200.00 $14,400 Root Barriers 12 EA $250.00 $3,000 Hydroseed- Native Hillside - Double Bonded Matrix Application 6,400 SF $1.10 $7,040 1 Gal. Shrubs / Groundcover 1,217 EA $22.50 $27,383 5 Gal. Shrubs / Groundcover 460 EA $45.00 $20,700 Preliminary Assumption of Projected Costs 2022 1/25/2022 CD-Bid Phase 21-012.000 ATTACHMENT D Subtotal Landscape $72,523 Summary Based on Design Development as proposed Site Mobilization $5,000 Site Construction $29,200 Irrigation $54,000 Landscape $72,523 Subtotal $160,723 10% Contingency $16,072 TOTAL $176,795