HomeMy WebLinkAbout08-07-13 Board Packet 1 OTAY WATER DISTRICT BOARD OF DIRECTORS MEETING DISTRICT BOARDROOM 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA WEDNESDAY August 7, 2013 3:30 P.M. AGENDA 1. ROLL CALL 2. PLEDGE OF ALLEGIANCE 3. APPROVAL OF AGENDA 4. APPROVE THE MINUTES OF THE REGULAR MEETING OF JULY 3, 2013 AND SPECIAL MEETING OF JUNE 13, 2013 5. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA CONSENT CALENDAR 6. ITEMS TO BE ACTED UPON WITHOUT DISCUSSION, UNLESS A REQUEST IS MADE BY A MEMBER OF THE BOARD OR THE PUBLIC TO DISCUSS A PARTICULAR ITEM: a) APPROVE CHANGE ORDER NO. 3 TO THE EXISTING CONTRACT WITH LAYFIELD ENVIRONMENTAL SYSTEMS CORPORATION FOR A CREDIT IN THE AMOUNT OF <$39,618.43> FOR THE 624-1 RESER- VOIR FLOATING COVER REPLACEMENT PROJECT b) AWARD A PROFESSIONAL CONTRACT FOR AS-NEEDED PLAN RE- VIEW, INSPECTION, AND PROJECT MANAGEMENT SERVICES TO AEGIS ENGINEERING MANAGEMENT, INC. FOR DEVELOPER POTA- BLE AND RECYCLED WATER PROJECTS IN AN AMOUNT NOT-TO- 2 EXCEED $350,000 FOR A PERIOD OF TWO (2) FISCAL YEARS (FYs 2014 AND 2015) c) APPROVE A PROFESSIONAL COATING INSPECTION SERVICES CONTRACT WITH HARPER & ASSOCIATES ENGINEERING, INC. IN AN AMOUNT NOT-TO-EXCEED $75,160 FOR A PERIOD OF ONE (1) YEAR (AUGUST 2013 THROUGH JULY 2014) d) APPROVE TWO (2) AGREEMENTS WITH BMB TOWER HOLDINGS, LLC, AN OKLAHOMA LIMITED LIABILITY COMPANY, FOR THE IN- STALLATION OF A COMMUNICATIONS FACILITIES AT THE 485-1 AND 458-1 RESERVOIR SITES e) DECLARE THE IDENTIFIED VEHICLES AND EQUIPMENT AS SUR- PLUS TO THE DISTRICT’S NEEDS f) APPROVE A ONE-YEAR FIXED WITH FOUR OPTION YEAR RENEW- ALS (FIVE-YEAR TERM) AGREEMENT WITH PAYMENTUS TO PRO- VIDE PHONE PAYMENT SERVICES IN AN AMOUNT NOT-TO-EXCEED $250,000 ($50,000 ANNUALLY) ACTION ITEMS 7. ENGINEERING AND WATER OPERATIONS a) APPROVE RECOMMENDATIONS IN THE PUBLIC HEALTH GOAL RE- PORT (PHG) THAT NO FURTHER ACTIONS ARE NECESSARY TO REDUCE THE LEVELS OF THE SEVEN CONSTITUENTS LISTED IN THE REPORT TO LEVELS AT OR BELOW THE PHG’s (STALKER) 8. BOARD a) DISCUSSION OF 2013 BOARD MEETING CALENDAR REPORTS 9. GENERAL MANAGER’S REPORT a) SAN DIEGO COUNTY WATER AUTHORITY UPDATE 10. DIRECTORS' REPORTS/REQUESTS 11. PRESIDENT’S REPORT/REQUESTS 3 RECESS TO CLOSED SESSION 12. CLOSED SESSION a) CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION [GOVERNMENT CODE §54956.9] 1 CASE b) CONFERENCE WITH LEGAL COUNSEL – PENDING LITIGATION [GOV- ERNMENT CODE §54956.9(a)] THE AFFORDABLE HOUSING COALITON OF SAN DIEGO CO. v. SAND-OVAL, et. al.; CASE NO. 34-2012-80001158-CU-WM-GD RETURN TO OPEN SESSION 13. REPORT ON ANY ACTIONS TAKEN IN CLOSED SESSION. THE BOARD MAY ALSO TAKE ACTION ON ANY ITEMS POSTED IN CLOSED SESSION 14. ADJOURNMENT All items appearing on this agenda, whether or not expressly listed for action, may be deliberated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the District’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability which would require accommodation in order to enable you to participate in this meeting, please call the District Secretary at (619) 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on August 2, 2013, I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 72 hours in advance of the regular meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on August 2, 2013. /s/ Susan Cruz, District Secretary 1 MINUTES OF THE BOARD OF DIRECTORS MEETING OF THE OTAY WATER DISTRICT July 3, 2013 1. The meeting was called to order by President Lopez at 3:46 p.m. 2. ROLL CALL Directors Present: Gonzalez, Lopez, Robak, and Thompson Directors Absent: Director Croucher Staff Present: General Manager Mark Watton, Attorney Richard Romero, Asst. GM German Alvarez, Chief Financial Officer Joe Beachem, Chief of Engineering Rod Posada, Chief of Information Technology Geoff Stevens, Chief of Administration Rom Sarno, Chief of Water Operations Pedro Porras and District Secretary Susan Cruz and others per attached list. 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF AGENDA A motion was made by Director Thompson, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak, and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the agenda. 5. APPROVE THE MINUTES OF THE REGULAR MEETING OF JUNE 5, 2013 AND SPECIAL MEETING OF MAY 14, 2013 A motion was made by Director Thompson, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak, and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the minutes of the regular meeting of June 5, 2013 and special meeting of May 14, 2013. AGENDA ITEM 4 2 6. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA No one wished to be heard. CONSENT CALENDAR 7. ITEMS TO BE ACTED UPON WITHOUT DISCUSSION, UNLESS A REQUEST IS MADE BY A MEMBER OF THE BOARD OR THE PUBLIC TO DISCUSS A PARTICULAR ITEM: Director Robak pulled Items 6c, APPROVE THE WATER SUPPLY ASSESSMENT AND VERIFICATION REPORT DATED MAY 2013 FOR THE OTAY RANCH PLANNING AREA 12 FREEWAY COMMERCIAL PROJECT, for discussion. Upon a motion by Director Gonzalez, seconded by Director Robak and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the following consent calendar items: a) APPROVE CHANGE ORDER NO. 3 TO THE EXISTING CONTRACT WITH BASILE CONSTRUCTION, INC. IN THE AMOUNT OF $19,289.50 FOR THE 12-INCH POTABLE WATER PIPELINE IN ORANGE AVENUE I-805 CROSSING PROJECT b) APPROVE UTILITY AGREEMENT NO. 33592 WITH CALTRANS FOR SR-11, SEQUENCE I UTILITY RELOCATIONS PROJECT d) APPROVE LEASE AMENDMENTS WITH SPRINT PCS ASSETS, LLC, A DELAWARE LIMITED LIABILITY COMPANY (SPRINT PCS) FOR MODIFICATIONS TO SIX (6) EXISTING COMMUNICATIONS FACILITIES LOCATED THROUGHOUT THE DISTRICT e) ADOPT RESOLUTION NO. 4211 TO CONTINUE WATER AND SEWER AVAILABILITY CHARGES FOR DISTRICT CUSTOMERS FOR FISCAL YEAR 2013-2014 TO BE COLECTED THROUGH PROPERTY TAX BILLS f) ADOPT RESOLUTION NO. 4212 TO ESTABLISH THE TAX RATE FOR IMPROVEMENT DISTRICT NO. 27 AT $0.005 FOR FISCAL YEAR 2013- 2014 3 g) ADOPT RESOLUTION NO. 4215 FOR THE ELECTION OF FOUR (4) CANDIDATES FOR THE SPECIAL DISTRICT RISK MANAGEMENT AUTHORITY’S (SDRMA) BOARD OF DIRECTORS h) APPROVE INFORMATION TECHNOLOGY CONTRACTS FOR PHONE SERVICES, MANAGED SERVICES FOR THE DATA CENTER AND GPS TRACKING President Lopez presented item 6c for discussion: c) APPROVE THE WATER SUPPLY ASSESSMENT AND VERIFICATION REPORT DATED MAY 2013 FOR THE OTAY RANCH PLANNING AREA 12 FREEWAY COMMERCIAL PROJECT Engineering Manager Kennedy presented the Water Supply Assessment and Verification Report dated May 2013 for the Otay Ranch Planning Area 12 Freeway Commercial Project for the Board’s approval. Please reference the Committee Action notes (Attachment A) attached to staffs’ report for the details of his report. Director Robak commented on the variance between the District’s original demand estimate and current demand estimate. Mr. Kennedy stated that although the demand for this Project is 127 AFY, which is higher than the demand estimate in the District’s 2010 Urban Water Management Plan (UWMP), the increase is accounted for through the Accelerated Forecasted Growth demand increment of the San Diego County Water Authority’s (CWA) 2010 UWMP. It was noted that based on the findings from the District’s and CWA’s 2010 UWMPs, this Project will result in no unanticipated demands. In response to a question from Director Robak, Mr. Kennedy stated that the Rosarito Desalination Project and the Rancho del Rey Groundwater Well Project are not factored into the District’s water supply mix at this time. Both Projects are included in the District’s 2010 UWMP, but only to provide an update on their status. General Manager Watton stated that as projects get closer to completion and are more defined, they are considered “fully entitled” and are then factored into the water supply mix. Director Thompson inquired with regard to the Carlsbad Desalination Project, if a financial commitment determines a project’s inclusion in the supply mix. Mr. Kennedy stated that all of the environmental documents approved related to the Carlsbad Desalination Project have been approved. Therefore, it was felt that the project was far enough along to be included in CWA’s 2010 UWMP supply portfolio. General Manager Watton stated that a financial commitment to a project does not determine if the project should be included in a supply mix, a project just needs to be identified as a supply resource. Director Robak inquired about the water supply plans for the next 20 years and industry discussions regarding the uncertainty of water supply for California in the future. General Manager Watton stated that California’s water supply from the 4 Colorado River is pretty much secure through transfer rights that include water supply from a reliable source, the Imperial Irrigation District. As to Director Robak’s concerns with climate impacts that may affect water supply, General Manager Watton stated that there will likely be more agriculture to urban transfers in the future. He believes that 20 years of water supply is secure as CWA, MWD, and other resources from water districts in the region are prepared to provide supply. Upon a motion by Director Robak, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak and Thompson Noes: None Abstain: None Absent: Croucher to approve staffs’ recommendation. ACTION ITEMS 8. ENGINEERING AND WATER OPERATIONS a) APPROVE THE ADOPTION OF A MITIGATED NEGATIVE DECLARATION FOR THE REGULATORY SITE ACCESS ROAD IMPROVEMENTS PROJECT Environmental Compliance Specialist Lisa Coburn-Boyd provided a report on the Mitigated Negative Declaration (MND) for the Regulatory Site Access Road Improvements Project. Please reference the Committee Action notes (Attachment A) attached to staffs’ report for the details of her report. General Manager Watton indicated that the District had quite a bit of interaction with the Valle de Oro Planning group regarding the project and had addressed their concerns. Mr. Watton also indicated that the District plans to pay a portion of the MND costs from its Mitigation Bank allocation. Legal Counsel Richard Romero indicated that at the June 19, 2013 Engineering, Operations and Water Resources Committee meeting, Director Croucher recused himself from discussing this item because of his employment with the San Miguel Fire Protection District (SMFPD) and the agency’s involvement with the Regulatory Site Access Road Improvement Project. General Manager Watton indicated that SMFPD plans to fund the access road once it is approved by all parties involved with this Project. He stated that the road will provide better access for District staff as it will not require staff to make a u-turn in order to access the regulatory site. In response to a question from Director Robak, General Manager Watton stated that the construction of the access road will be placed on hold until SMFPD is 5 able to fund it. SMFPD is looking for charitable contributions that will go towards the construction of the access road. In response to several questions from Director Robak, Environmental Compliance Specialist Lisa Coburn-Boyd stated that although SMFPD did not participate in the cost for the preparation of the MND, they plan to pay for the remaining construction of the access road. Ms. Coburn-Boyd stated that construction of the access road has also been delayed to avoid disturbing migrating birds during the nesting season. Upon a motion by Director Gonzalez, seconded by Director Thompson and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak and Thompson Noes: None Abstain: None Absent: Croucher to approve staffs’ recommendation. b) APPROVE THE WATER SUPPLY ASSESSMENT AND VERIFICATION REPORT DATED MAY 2013 FOR THE CITY OF SAN DIEGO OTAY MESA COMMUNITY PLAN UPDATE Engineering Manager Kennedy provided a report on the Water Supply Assessment and Verification Report dated May 2013 for the City of San Diego Otay Mesa Community Plan Update. Please reference the Committee Action notes (Attachment A) attached to staff’s report for the details of his report. In response to Director Robak’s inquiry about shifting water use from single- family to multi-family units, Mr. Kennedy stated that SANDAG maintains its projections for each planning area and also assigns density to each community. It is not certain what the water use is for Multi-family, but the District’s per capita use is approximately 135. Director Robak indicated he believes that the District’s projection is generous and stated that he felt the figures were good because it is better to calculate more than less with the uncertainty of the future projection for the number of people residing in a household. Director Thompson indicated that he agreed with Director Robak that it is better to be generous with the District’s per capita use estimates to assure that the District meets water supply needs. He inquired if estimated projections are updated at some point in time to reflect actual water usage. Mr. Kennedy stated that the District updates project estimates in its Water Resources Master Plan every 5 years and makes adjustments based on development. He also shared that the District revisits population data as well. In response to several inquiries from Director Robak, General Manager Watton stated that the Otay Water District would be the responsible party to construct the pipelines and provide water service to the Otay Mesa Community Plan Area . He 6 indicated that there was a possibility that the City of San Diego could acquire the District’s jurisdictional boundary after the District has constructed its portion of the infrastructure. However, such action would be time-consuming as it would need to go through LAFCO for approval and would involve de-annexing from the District and annexing to the City. He noted that there are areas in Otay Mesa (in the area of Brownfield) that the District is providing water service to the City of San Diego through a mutual agreement as the City did not have adequate water supplies. The City then serves this water to their customers and handles the billing services. Upon a motion by Director Robak, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak and Thompson Noes: None Abstain: None Absent: Croucher to approve staffs’ recommendation. c) CERTIFY THE FINAL SUPPLEMENTAL PROGRAM ENVIRONMENTAL IMPACT REPORT (SPEIR) FOR THE 2013 WASTEWATER MANAGEMENT PLAN (WWMP) AND FIND THAT THE POTENTIALLY SIGNIFICANT EFFECTS OF THE DISTRICT’S WWMP WILL BE AVOIDED THROUGH THE ADOPTION OF FEASIBLE MITIGATION MEASURES SHOWN IN THE SPEIR; AND APPROVE THE 2013 WWMP AS A FINAL PLAN AND DOCUMENT Both Environmental Compliance Specialist Lisa Coburn-Boyd and Engineering Manager Bob Kennedy provided a report on this agenda item. Please reference the Committee Action notes (Attachment A) attached to staffs’ report for the details of their report. Ms. Coburn-Boyd noted that the District decided to perform a Supplemental PEIR for the 2009 WRMP because the planning area for the WWMP was covered in the previous PEIR plan and the environmental impacts analyzed in that plan have not changed, however, it required coverage for the waste water projects that were identified in the WWMP. Thus, most of the existing PEIR is incorporated by reference in the Supplemental PEIR. The changes are in the list of projects in the waste water collection and treatment projects. Director Thompson had several inquiries regarding the partnership with the City of Chula Vista and the possibility of a regional Water Reclamation Facility as an option for potential additional recycled water supply. In response, Mr. Kennedy stated that the District and the City of Chula Vista have equally contributed to the cost of drafting a study for a potential 2MG/day MBR Plant that would provide recycled water supplies to the District and provide additional capacity to the City of Chula Vista. General Manager Mark Watton indicated that the City of Chula Vista’s original purpose for considering the MBR Plant was to obtain additional 7 capacity for increasing development years ago. Now that development has slowed, the City wants to preserve the option to use it as a potential resource. He stated the City of Chula Vista’s preferred option is to have additional capacity in the City of San Diego’s Metro system. The Otay WD then would get additional recycled water capacity from the City of San Diego’s South Bay Water Reclamation Plant. Mr. Watton stated that if the preferred option did not work out, then Plan B is the MBR Plant. In order for the MBR Plant to be feasible, it would need to produce 4 MGD. The water produced would go into the District’s existing recycled distribution system and the additional capacity for sewer processing would be provided to the City of Chula Vista. Currently, recycled water is used by new development in the City of Chula Vista and it is anticipated that it will be used by future new development in the City of Chula Vista and recycled services would be expanded to the Otay Mesa area. In summary, General Manager Watton stated that the City of Chula Vista is researching the cost for additional capacity from the Metro system versus the cost of establishing a new MBR Plant. The nexus/partnership between the City and the Otay Water District is the possibility of utilizing the recycled water from the new MBR Plant in the District’s service area. Director Thompson commented that the District’s projection for water supply included a conservation estimate and inquired if recycled water was included in that estimate. Engineering Manager Kennedy stated that conservation is considered to be more of an offset and structural element that forces customers to use less water. However, the District is considering the use of recycled water at institutional establishments for toilet/urinal flushing which will offset potable water use. Director Robak indicated that he reviewed the District’s WWMP options and commented that, at one point in time, he thought there was discussion of pushing at the state level the possibility of Direct Potable Reuse (DPR). He stated that he was disappointed that this possibility was not considered as a supply option in the District’s WSA. Mr. Kennedy stated that there is an incremental cost each time you treat IPR and DPR water. He stated that if the water will be utilized outside for landscaping purposes, it is much less expensive to take it off tertiary treated water than to treat it through an RO system, etc. to potable level. It would be best to utilize the water through the recycled system as it would save a lot of money. General Manager Watton also noted that the region does not have the facilities to distribute DPR and if an IPR pipe is connected to San Vicente, it would cost approximately $200 million. Director Robak indicated that such a pipe would be a waste of money. It would be more cost effective to distribute DPR water directly into the raw water system. Director Thompson inquired about the purpose of DPR when there is a demand for recycled water. He stated that he felt it would be more cost effective to use purple pipelines. Director Robak indicated that it is anticipated that purple pipes will go away in the future and that he felt that there was no need for the District to continue building them. He stated he believes that the District should start 8 looking into DPR as an option as it is heading in that direction in the future. Eventually it will become all one system. General Manager Watton stated that in the South Bay area, the opportunity to go to an IPR or DPR system is much more limited for the foreseeable future. Continuing to construct purple pipe and utilize recycled water still make sense. In the North City area, the City of San Diego wishes to build a 15 million gallon system, and the region is suggesting 80 million gallon system. Upon a motion by Director Thompson, seconded by Director Lopez and carried with the following vote: Ayes: Directors Gonzalez, Lopez and Thompson Noes: Director Robak Abstain: None Absent: Director Croucher to approve staffs’ recommendation. 9. ADMINISTRATIVE SERVICE, FINANCE AND INFORMATION TECHNOLOGY a) RECEIVE THE DISTRICT’S INVESTMENT POLICY (POLICY 27) FOR REVIEW, AND ADOPT RESOLUTION NO. 4213 AMENDING THE POLICY AND RE-DELEGATING AUTHORITY FOR ALL INVESTMENT RELATED ACITIVITIES TO THE CHIEF FINANCIAL OFFICER IN ACCORDANCE WITH GOVERNMENT CODE SECTION §53607 Finance Manager Kevin Koeppen provided a report for this agenda item. Please reference the Committee Action notes (Attachment A) attached to staff’s report for the details of his report. Mr. Koeppen indicated that at the last Finance, Administration and Communications (FA&C) Committee meeting, there was a discussion to consider if the District should implement a restriction for government agencies (section 8.03) whose government implied guarantee has been reduced or eliminated. Subsequently, staff recommended adding the following statement to the District’s Policy 27 in relation to government agencies (section 8.03): “Government agencies whose implied guarantee has been reduced or eliminated shall require an “A” rating or higher by a nationally recognized statistical rating organization.” It was noted that the condition requiring an “A” rating or higher is consistent with the limitations governing commercial paper and medium- term notes set forth in California Government Code Section §53601 Mr. Koeppen noted that a slide was added to staff’s PowerPoint presentation with information about investments allowed/not allowed under the District’s current Policy (California Government Code vs. OWD). 9 Mr. Kevin Koeppen shared that the FA&C Committee discussed the possibility of reducing the short-term commercial debt limit to 10% (the current limit is 15%) and review all limitations for their alignment with Management’s current practice. In response to the Committee’s comments, staff added two alternative options for investment limits: Alternative Option A: Reduce the allowable investment in commercial notes and debt categories to 10% Alternative Option B: Remove commercial notes and debt instruments as allowable investments (Policy Section 8.05 and 8.06) Director Thompson indicated that the FA&C Committee felt that the risk in investing in commercial notes is higher than other investment options and recommended that the District’s allowable investment in commercial notes be reduced to a level that is lower than what is allowed by State Code (State Code allows 15%) as the Committee believes that the District should be more restrictive. Director Thompson also shared that the Committee and staff discussed concerns with government sponsored enterprises (GSE) investments which the Federal Government does not support. With the Federal Government considering reducing guarantees and partial guarantees, and weaning itself off the GSE investments, the Committee and staff felt the need to look into alternative investment options. If the Federal Government reduced its guarantees, it is believed that the District would still maintain its investment objectives and a good credit rating. Director Thompson thanked staff for their alternative option that makes sense for the District’s investment policy. With no further discussion by the Board, staff recommended the following: 1) Select Alternative Option A (Reduce the allowable commercial notes and debt categories to 10%) 2) Adopt Resolution No. 4213 to amend Investment Policy No. 27 using the selected Alternative Option A 3) Re-delegate authority for all investment related activities to the Chief Financial Officer Upon a motion by Director Thompson, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Robak and Thompson Noes: None Abstain: None Absent: Director Croucher to approve staffs’ recommendation. 10 10. BOARD a) CONSIDER CASTING A VOTE TO ELECT A MEMBER TO THE CALIFORNIA SPECIAL DISTRICTS ASSOCIATION’S BOARD OF DIRECTORS General Manager Mark Watton provided a report on this item and indicated that the Finance, Administration and Communications Committee recommended that the District’s vote be cast for Mr. George McManigle, a Rainbow Municipal Water District board member. Upon a motion by Director Gonzalez, seconded by Director Thompson and carried with the following vote: Ayes: Directors Gonzalez, Lopez and Thompson Noes: None Abstain: Director Robak Absent: Director Croucher to approve staffs’ recommendation. b) DISCUSSION OF 2013 BOARD MEETING CALENDAR There were no changes to the board meeting calendar. REPORTS 11. GENERAL MANAGER’S REPORT General Manager Mark Watton shared that there were discussions in Sacramento as to how the water bond should be configured. He stated that CWA drafted its 2014 Water Bond Priorities and a copy has been provided to each member of the board. He suggested that the board support CWA’s Water Bond Priorities. General Manager Watton provided an update on the latest City of San Diego Recycled Water Cost of Service Study (COSS) which was released on June 20, 2013 without notice from city staff. The study was reviewed at an IROC Committee meeting held June 24, 2013. He stated that District staff had a limited review of the COSS and drafted a list of comments which was brought to the IROC Committee meeting. Mr. Watton indicated that the IROC Committee made a motion for the COSS to be brought back at a later time for further review. The COSS will also be considered at a meeting of the City of San Diego Committee on Natural Resources and Culture (NRC) on July 10, 2013. District staff plans to bring forth the District’s issues with the COSS at that meeting as well. Mr. Watton stated that it was a surprise to District staff that the City did not honor its promise to allow time for review and comments by affected parties; it was also a surprise that the COSS was not done at industry standard level. Mr. Watton 11 indicated that the COSS was completed by Raftelis Financial Consultants. He stated that the City is proposing a recycled rate increase of 180%, effective January 1, 2014; which means the District would see its recycled services rate increase from $350 to $1,500 in a year’s time. It is likely that this proposed rate increase will encourage less recycled water use. Mr. Watton also shared, to further complicate this issue, that Mr. Roger Bailey, the City’s Director of Public Utilities, will be leaving the City to take another position. In response to a question from Director Robak, General Manager Watton stated that the District would prefer to work through the necessary steps prior to taking any legal actions concerning the COSS. In response to a question from Director Thompson, General Manager Watton stated that the following individuals are on the NRC Committee: City Councilmembers David Alvarez, Scott Sherman, Lorie Zapf, and Marti Emerald. General Manager Watton presented additional information from his report that included the District’s Landscape Contest, 2012 CAFR Award, and that the California Water Environment Association (CWEA) – San Diego Section had hosted a meeting at the Otay WD on June 20, 2013. He indicated Otay WD staff provided several presentations to CWEA on several of the District’s projects and also provided a tour of the Chapman Facility to its members. General Manager Watton stated that CWA is continuing with routine business, and is starting to move forward with contracts and activities related to the Poseidon Desalination Project. He reminded the board that the District had taken a “no” position on the Project and that he and Director Croucher would like to be consistent with the District’s decision. As the minority on CWA’s board with regard to this project, both have decided to leave CWA meetings prior to voting on the Project’s contracts to avoid any discord. 12. DIRECTORS' REPORTS/REQUESTS Director Robak commented on the low pressure incident in his Division and thanked staff for resolving the incident. He also inquired about the copy of the Proposition 218 Notice provided to the board on the dias, which Communications Officer Armando Buelna stated was an additional Notice sent to individuals who own land within the District’s service area, but who do not currently have an account, but may potentially have one in the future. Mr. Buelna also indicated that at the request of the board, additional information was added to the Notices to include conservation information and impacts (i.e. Carlsbad Desalination Project) that impacted the District’s rates. Director Thompson thanked staff for the facilities tour held last month and for all their efforts and good work. Director Gonzalez reported that he attended a Metro Commission meeting where they discussed potable water alternatives. He stated that the meeting was very informative and he anticipates positive outcomes from the meeting. 12 President Lopez requested a briefing on the Metro Commission meeting the Director Gonzalez attended. 13. PRESIDENT’S REPORT President Lopez reported on meetings he attended during the month of June 2013 (a list of meetings he attended is attached). He also noted that he attended a Water Conservation Garden Board Meeting on June 12, 2013, where they considered the Garden’s financials for FY 2014. He shared that one of the agencies has indicated that they may terminate their membership with the Garden. President Lopez stated that the Garden is a great institution that is prioritizing its long-term strategic plan. RECESS TO CLOSED SESSION 14. CLOSED SESSION The board recessed to closed session at 5:42 p.m. to discuss the following matter: b. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION [GOVERNMENT CODE §54956.9] 1 CASE RETURN TO OPEN SESSION 15. REPORT ON ANY ACTIONS TAKEN IN CLOSED SESSION. THE BOARD MAY ALSO TAKE ACTION ON ANY ITEMS POSTED IN CLOSED SESSION The board reconvened at 6:37 p.m. and Attorney Richard Romero indicated that no reportable actions were taken in closed session. 16. ADJOURNMENT With no further business to come before the Board, President Lopez adjourned the meeting at 6:39 p.m. ___________________________________ President ATTEST: District Secretary 13 President’s Report July 3, 2013 Board Meeting A) Meetings attended during the Month of June 2013: 1) June 5: Attended the District’s Regular Board Meeting 2) June 12: Water Conservation Garden Board Meeting 3) June 13: a. Special Board Meeting. The members of the board were provided a tour of the Ralph W. Chapman Water Recycling Facility and the Hillsdale and Copps Lane Pump Stations. b. Committee Agenda Briefing. Met with Director Thompson and General Manager Watton to review items that will be presented at the June Committee meetings. 4) June 24: Attended the District’s Finance, Administration and Communications Committee. Reviewed, discussed, and made recommendation on items that will be presented at the June Committee Meetings. 5) June 25: a. Attended the District’s Desalination Project Committee Meeting. Discussed the Rosarito Desalination Project. Also in attendance were the various consultants for the project: i. Dr. Michael Welch who is a prominent expert on water quality ii. Mr. Pete Silva, Silva-Silva International, former Presidential appointee to the Environmental Protection Agency (EPA). He also has connections with the International Boundary and Water Commission (IBWC) and will assist the District with the Federal permitting process. iii. Mr. Dan McFarlan, AECOM Project Manager, who is involved with the planning and design of the District’s facilities in the United States, the permitting process, and preparation of Project Environmental Impact Report. 14 b. Board Agenda Briefing. Met with Director Thompson, General Manager Watton, General Counsel Dan Shinoff and Attorney Richard Romero to review items that will be presented at the July Board Meeting. 6) June 26: Completed a Webinar on Sexual Harassment Training. The District is working to attain the designation as a “District of Distinction” from the Special District Leadership Foundation. One of the criteria is all board members must receive Sexual Harassment Training. All board members have been tasked to take the online training. 1 MINUTES OF THE SPECIAL MEETING OF THE BOARD OF DIRECTORS OTAY WATER DISTRICT June 13, 2013 1. The meeting was called to order by President Lopez at 9:04 a.m. 2. ROLL CALL Directors Present: Gonzalez, Lopez, Robak (met the group at the Ralph W. Chapman Water Recycling Facility at 9:40 a.m.) and Thompson Directors Absent: Croucher (due to a work commitment) Staff Present: General Manager Mark Watton, General Counsel Dan Shinoff, Asst. GM German Alvarez, Chief of Operations, Pedro Porras, Chief of Engineering Rod Posada, System Operations Manager Gary Stalker, District Secretary Susan Cruz and others per attached list. 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF AGENDA A motion was made by Director Thompson, seconded by Director Gonzalez and carried with the following vote: Ayes: Directors Gonzalez, Lopez and Thompson Noes: None Abstain: None Absent: Director Croucher and Robak to approve the agenda. 5. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA No one wished to be heard. AGENDA ITEM 4 2 TOUR 6. TOUR OF RALPH W. CHAPMAN WATER RECYCLING FACILITY Upon arrival at the Ralph W. Chapman Water Recycling Facility, the tour group was asked to sign the visitor sign-in log sheet. Chief of Operations Pedro Porras then introduced the recycling facility staff members who included Mr. Gene Palop, Reclamation Plant Supervisor; Mr. Damon Newman, Lead Reclamation Plant Operator; Mr. E.J. Colia, Reclamation Plant Operator III; Rob Leigh, Reclamation Plant Operator III; and Ms. Alma Ortega-Carrillo, Laboratory Analyst. As standard procedure, the group was provided a review of safety and evacuation procedures prior to the tour. The review is mandatory should an emergency occur during the tour. Staff toured the group through the Water Testing Laboratories for both potable and recycled. They also demonstrated the SCADA System and how it is utilized to monitor the District’s sewer system. It was indicated that should the District’s reclamation plant be shut down for any reason, the sewage flow would be pumped to the City of San Diego’s Metro System for processing. Staff then took the group through the treatment plant and explained the treatment process from sewage to recycled water and the recently completed upgrades to the facility. It was indicated that it takes approximately 20 hours to treat sewer water to the level of recycled water from inlet to outlet. The water is then utilized to irrigate commercial and public landscape areas within the eastern areas of the City of Chula Vista and the Otay Mesa. 7. TOUR OF THE HILLSDALE AND COPPS LANE PUMP STATIONS The group then toured the Hillsdale and Copps Lane pump stations within the District’s Regulatory Site. Chief of Operations Porras introduced Operations staff members Mr. Don Henderson, Pump/Electrical Supervisor, and Mr. Jake Vaclavek, Water Systems Supervisor. Staff indicated that treated water comes into the District’s system through its Regulatory Site. It is then pumped throughout the District’s northern distribution system. Mr. Vaclavek walked the group through the pump stations including the pump stations’ control room and back-up power generation facilities. Director Robak departed at 11:20 a.m. It was discussed that a new access road is also being considered to the Regulatory Site. The access road point of entry is located at the traffic light near Skyline Church and will pass the new Sherriff’s substation. This will provide better access and District staff will no longer need to u-turn at the Jamacha Road and Campo Road intersection to access the Regulatory Site. 3 8. ADJOURNMENT With no further business to come before the Board, President Lopez adjourned the meeting at 11:44 a.m. ___________________________________ President ATTEST: District Secretary STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: P2477- 001103 DIV. NO. 1 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Approve Change Order No. 3 to the Contract with Layfield Environmental Systems Corporation for the 624-1 Reservoir Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve Change Order No. 3 to the existing contract with Layfield Environmental Systems Corporation (Layfield) for a credit in the amount of <$39,618.43> for the Floating Cover Replacement at the 624- 1 Reservoir Project (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to approve Change Order No. 3 (see Exhibit B) to the existing contract with Layfield for a credit in an amount of <$39,618.43> for the Floating Cover Replacement at the 624-1 Reservoir Project. ANALYSIS: At the October 9, 2012 Board Meeting, the Board awarded a construction contract in an amount not-to-exceed of $497,050 to Layfield to replace the 624-1 Reservoir floating cover and protect, clean, and inspect the existing liner for this 12.0 MG reservoir. AGENDA ITEM 6a 2 Since the award of the construction contract, two contract change orders have been approved. The Board approved contract change order No. 1 in the amount of $183,026.00 to replace the existing liner which was found to be unsuitable for reuse during construction. Change Order No. 2 was a no cost change and was approved to reconcile time associated with the liner replacement. Change Order No. 3 (Exhibit B) which serves as a close-out Change Order for the contract, consists of credit items including reconciling unused allowances associated with Allowance Bid Item 7 “Repair Existing Liner” and Item 8 “Replace rather than reuse BID ITEM #2 components” and a credit for the re-use of existing vent screens determined suitable for re-use. Additionally, Change Order No. 3 provides for a reimbursement of lost water costs associated with a leaking underwater fitting until the Contractor corrected the problem with a diver. A complete breakdown of these credit and reimbursement items is included in Exhibit B. Change Order No. 3 also adds 3 calendar days due to the weather impacts on the Project’s progress. In summary, Change Order No. 3 results in a credit in the amount of <$39,618.43> and adds 3 days time for a total contract amount of $640,457.57 with a contract duration of 211 calendar days. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The Fiscal Year 2014 budget for CIP P2477 is $1,000,000. Total expenditures, plus outstanding commitments and forecast, including this contract change order, are $906,967. See Attachment B for budget detail. Based on a review of the financial budget, the Project Manager anticipates that these budgets will be sufficient to support the Project. Finance has determined that 100% of the funding is available from the Replacement Fund for CIP P2477. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” 3 LEGAL IMPACT: None. D M/RP:jf P:\WORKING\CIP P2477 Reservoir Cover Replacement\Staff Reports\CO #3\BD 8-7-13, Staff Report, 624-1 Res Floating Cvr Repl CO #3.docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map Exhibit B – Change Order No. 3 ATTACHMENT A SUBJECT/PROJECT: P2477-001103 Approve Change Order No. 3 to the Contract with Layfield Environmental Systems Corporation for the 624-1 Reservoir Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on July 24, 2013, and the following comments were made:  Staff requested that the Board approve Change Order No. 3 to the existing contract with Layfield Environmental Systems Corporation (Layfield) for a credit in the amount of <$39,618.43> for the Floating Cover Replacement at the 624-1 Reservoir Project.  Staff provided a background of the Project and indicated that two contract change orders have been approved since the award of the contract. Details of the two change orders are provided on page 2 of the staff report.  Staff indicated that Change Order No. 3 serves as a close-out Change Order for the contract and consists of credit items that are listed on page 2 of Attachment B. Staff noted that Change Order No. 3 also adds 3 calendar days due to weather impacts.  In summary, Change Order No. 3 results in a credit amount of <$39,618.43> and adds 3 days time for a total contract amount of $640,457.57 with a contract duration of 211 calendar days.  In response to a question by the Committee regarding project contingency, staff stated that Change Order No. 3 included credits for the unused bid items and that Change Order No. 1 that was approved by the Board expended the construction contract contingency. Following the discussion, the committee supported staffs’ recommendation and presentation to the full board as a consent item. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: P2477-001103 Approve Change Order No. 3 to the Contract with Layfield Environmental Systems Corporation for the 624-1 Reservoir Project Date Updated: 6/28/2013 Budget 1,000,000 Planning Regulatory Agency Fees 50 50 - 50 PETTY CASH CUSTODIAN Service Contracts 4,000 4,000 - 4,000 FIRST AMERICAN TITLE CO Standard Salaries 18,083 18,083 - 18,083 Total Planning 22,133 22,133 - 22,133 Design 001102 Consultant Contracts 70,620 70,620 - 70,620 ATKINS 1,810 1,810 - 1,810 ALTA LAND SURVEYING INC Service Contracts 84 84 - 84 SAN DIEGO DAILY TRANSCRIPT 1,823 1,547 276 1,823 MAYER REPROGRAPHICS INC 1,062 1,062 - 1,062 LAYFIELD ENVIRONMENTAL SYSTEMS Standard Salaries 45,175 45,175 - 45,175 Total Design 120,574 120,298 276 120,574 Construction Consultant Contracts 26,400 6,450 19,950 26,400 ALYSON CONSULTING 195 195 - 195 ATKINS Professional Legal Fees 1,883 1,883 - 1,883 STUTZ ARTIANO SHINOFF Service Contracts 2,000 2,000 - 2,000 DIVE/CORR INC 696,180 645,010 51,170 696,180 LAYFIELD ENVIRONMENTAL SYSTEMS (39,618) (39,618) (39,618) Change Order No. 3 Standard Salaries 77,221 67,221 10,000 77,221 0 - - - - 0 0 - - - - 0 Total Construction 764,261 722,759 41,502 764,260 Grand Total 906,967 865,189 41,778 906,967 Vendor/Comments Otay Water District p2477-Res - 624-1 Reservoir Cover Replacement Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Dan Martin Engineering Manager PROJECT NO./ SUBPROJECT: P1438- 010000 DIV. NO. ALL APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Award of As-Needed Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects Contract for Fiscal Years 2014 and 2015 GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional As-Needed Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects contract to Aegis Engineering Management, Inc. (AegisEM) and authorize the General Manager to execute an agreement with AegisEM in an amount not-to-exceed $350,000, for a period of two (2) fiscal years (FY 2014, FY 2015). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional As-Needed Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects agreement with AegisEM in an amount not-to-exceed $350,000, for a period of two (2) fiscal years (FY 2014, FY 2015). AGENDA ITEM 6b 2 ANALYSIS: The District will require the services of a consulting firm in support of developer projects to provide professional services for Plan Review, Inspection, and Project Management for Developer Potable and Recycled Water Projects. The Consultant assists the Public Services Division of the Engineering Department in processing and performing plan check review, approvals, inspection, and project close-out for both developer and retrofit projects. The inspection services require the Consultant to be a Cross-Connection Control Specialist certified through the American Water Works Association (AWWA) or American Backflow Prevention Association (ABPA). Proof of certification was required at the time of proposal. The inspection services shall coordinate coverage testing as well as cross- connection tests, as mandated by the California Department of Public Health. It is anticipated that the Consultant will review and inspect approximately fifty (50) projects or more. Over the same period, staff estimates the cost to perform this responsibility will not exceed $350,000. On February 6, 2013, the District initially solicited for Plan Review Inspection and Project Management Services for Developer Potable and Recycled Water Projects by placing an advertisement on the District’s website and several other publications, including the San Diego Daily Transcript. Eleven (11) firms submitted a letter of interest and a statement of qualifications. The Request for Proposal (RFP) for Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects was sent to the eleven (11) firms resulting in four (4) proposals received by March 13, 2013 from the following firms:  AEGIS Engineering Management  Krazan & Associates  Brady  Atkins The seven (7) firms that chose not to propose are Valley Cooper & Associates, Jacobs, PSOMAS, J.C. Heden & Associates, Nuera Contracting and Consulting, The “G” Crew, and Alyson Consulting. Of the four (4) proposals received, only one (1) was found to be responsive with respect to the District’s requirement for AWWA or ABPA cross-connection control specialist certification. The remaining seven (7) declined to propose due to various reasons including expressing difficulty with finding inspectors with AWWA or ABPA certified cross-connection control specialist certifications. 3 As a result, staff decided to strengthen the procurement outreach and re-advertize. On April 8, 2013, the District re-solicited Plan Review Inspection and Project Management Services for Developer Potable and Recycled Water Projects by placing an advertisement on the District’s website and several other publications, including the East County Gazette and San Diego Daily Transcript. Staff also reached out to firms to notify them of the contracting opportunity. Additionally, the advertisement included notification of the AWWA or ABPA certified cross-connection control specialist certification requirement. Six (6) firms submitted a letter of interest and a statement of qualifications. The Request for Proposal (RFP) for Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects was sent to six (6) firms resulting in three (3) proposals received by May 13, 2013 from the following firms:  AEGIS Engineering Management  Brady  Atkins The three (3) firms that chose not to participate were Wallace and Associates Consulting, Alyson Consulting, and PSOMAS. In accordance with the District’s Policy 21, Staff evaluated and scored all written proposals and interviewed the three (3) firms on June 17 and June 18, 2013. AegisEM received the highest score for their services based on their experience, understanding of the scope of work, proposed method to accomplish the work, and their composite hourly rate. AegisEM was the most qualified with the best overall rating or ranking. A summary of the complete evaluation is shown in Attachment B. AegisEM submitted the Company Background Questionnaire, as required by the RFP, and staff did not find any significant issues. Staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. AegisEM’s project manager and inspector listed in the proposal are AWWA or ABPA certified cross-connection control specialists and have vast plan checking, inspection, and retrofitting experience. Staff estimated that an average of $7,000 will be needed per project to perform the plan check review and inspections. The District recuperates these funds by billing directly to the developer. 4 FISCAL IMPACT: Joe Beachem, Chief Financial Officer Plan check and inspection services are an on-going effort provided by the District to developers. This particular expense is completely funded by developer deposits and does not affect the District’s operating budget. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:jf P:\Public-s\STAFF REPORTS\2013\BD 08-07-13\As-Needed Plan_Inspect_PM for Recycled\BD 08-07-13, Staff Report, Award Contract for Plan Check Inspection (Recy-Pot-Retro).doc Attachments: Attachment A – Committee Action Attachment B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: P1438-010000 Award of As-Needed Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects Contract for Fiscal Years 2014 and 2015 COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on July 24, 2013 and the following comments were made:  Staff requested that the Board award a professional As-Needed Plan Review, Inspection, and Project Management Services for Developer Potable and Recycled Water Projects contract to Aegis Engineering Management, Inc. (AegisEM) and authorize the General Manager to execute an agreement with AegisEM in an amount not-to-exceed $350,000, for a period of two (2) fiscal years.  Staff indicated that the Consultant would assists Public Services Division of the Engineering Department in processing and performing plan check review, approvals, inspection, and project close-out for developer projects.  Staff stated that the inspection services shall coordinate coverage testing as well as cross-connection tests, as mandated by the California Department of Public Health. It was noted that inspection services require the Consultant to be a Cross-Connection Control Specialist certified through the American Water Works Association (AWWA) or the American Backflow Prevention Association (ABPA).  Staff stated that it is estimated that the Consultant will review and inspect approximately fifty (50) projects over the term of this contract.  Staff provided a background of the Request for Proposal process that was originally advertised on February 6, 2013. With only one firm found to be responsive with respect to the District’s requirement for AWWA or ABPA cross-connection control specialist certification, staff decided to strengthen the procurement outreach and re- advertise.  Staff stated that the District re-advertised a Request for Proposal on April 8, 2013 that included notification of the AWWA or ABPA certified cross-connection control specialist certification requirement. Results of the April 8, 2013 Request for Proposal are shown in Attachment B of the staff report.  Staff indicated that AegisEM received the highest score for their services based on experience, understanding of the scope of work, proposed method to accomplish work, and their composite hourly rate. AegisEM was the most qualified with the best overall rating or ranking. Staff checked their references and performed an internet search on the company and found their references to be excellent and did not find any outstanding issues with the internet search. Following the discussion, the committee supported staffs’ recommendation and presentation to the full board as a consent item. Qualifications of Team Responsiveness, Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Proposed Rates*Consultant's Commitment to DBE AVERAGE TOTAL WRITTEN Additional Creativity and Insight Strength of Project Manager Presentation, Communication Skills Quality of Response to Questions INDIVIDUAL TOTAL - ORAL AVERAGE TOTAL ORAL 30 25 30 85 85 15 Y/N 100 15 15 10 10 50 50 150 Poor/Good/ Excellent BOB KENNEDY 27 22 27 76 14 14 9 9 46 JEFF MARCHIORO 28 23 28 79 14 14 9 9 46 ROGER HOLLY 28 24 28 80 15 14 9 9 47 JOSE MARTINEZ 27 23 28 78 14 13 9 8 44 BRANDON DIPIETRO 27 24 26 77 15 14 9 9 47 BOB KENNEDY 25 20 24 69 12 12 7 7 38 JEFF MARCHIORO 25 19 25 69 11 11 8 6 36 ROGER HOLLY 22 21 22 65 11 11 7 7 36 JOSE MARTINEZ 23 21 23 67 11 13 7 5 36 BRANDON DIPIETRO 25 22 22 69 12 14 7 7 40 BOB KENNEDY 26 21 26 73 13 13 8 8 42JEFF MARCHIORO 27 22 25 74 11 12 9 7 39ROGER HOLLY 24 23 23 70 12 12 7 8 39JOSE MARTINEZ 25 23 25 73 13 12 9 7 41BRANDON DIPIETRO 26 22 23 71 13 14 8 8 43 *The fees were evaluated by comparing rates for seven positions. The sum of these seven rates are noted on the table to the left. Consultant Proposed Rates Position Score Note: The Review Panel does not see or consider rates when scoring other categories. Rates are scored by the PM, who is not on the Review Panel. Aegis $700 lowest 15 Brady $800 8 Atkins $900 highest 1 72 1 Y 93 46 139 SUMMARY OF PROPOSAL RANKINGS RATES SCORING CHART ATTACHMENT B AS-NEEDED PLAN REVIEW, INSPECTION, AND PROJECT MANAGEMENT CONSULTING SERVICES WRITTEN ORAL Atkins 37 113 TOTAL SCORE REFERENCES MAXIMUM POINTS Aegis 78 15 Y Brady 68 8 Y Excellent 73 41 114 76 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Kevin Cameron Assistant Civil Engineer II Bob Kennedy Engineering Manager PROJECT: P2493-001103 P2535-001103 DIV. NOs.: 2,4 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Award a Professional Services Agreement with Harper & Associates Engineering, Inc. for Coating Inspection Services on the 624-2 and 458-2 Reservoir Coating Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) award a professional Coating Inspection Services contract to Harper & Associates Engineering, Inc. (Harper) and to authorize the General Manager to execute an agreement with Harper in an amount not-to- exceed $75,160 for a period of one (1) year (August 2013 through July 2014)(see Exhibits A-1 & A-2 for Project locations). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to enter into a professional services agreement with Harper in an amount not-to- exceed $75,160 for a period of one (1) year (August 2013 through July 2014) for coating inspection services on the 624-2 Reservoir Interior/Exterior Coating (CIP 2493) and the 458-2 Reservoir Interior Coating (CIP P2535) Projects. AGENDA ITEM 6c 2 ANALYSIS: In June 2013, the District’s corrosion consultant, V&A Consulting Engineers, completed a Corrosion Control Program (CCP) that addressed the installation, maintenance, and monitoring of corrosion protection systems for the District’s steel reservoirs and buried metallic piping. The CCP included a reservoir maintenance schedule that showed the 624-2 Reservoir is due to be recoated on both the interior and exterior surfaces, and the 458-2 Reservoir is due to be recoated on the interior only. The exterior coating of the 458-2 was replaced in 2004. The coating replacement on steel reservoirs requires specialty inspection to ensure the application is applied according to the manufacturer’s specifications and complies with state health regulations. In the past, the District has used the as-needed corrosion engineer to perform coating inspection, and many of the corrosion engineers have to sub-contract the work of coating inspection. By contracting directly with the coating inspector, the District is expected to get the best value for each dollar spent. The District solicited coating inspection services by placing an advertisement on the Otay Water District’s website on May 13, 2013 with various other publications including the San Diego Daily Transcript. Eight (8) firms submitted a letter of interest and a statement of qualifications. The Request for Proposal (RFP) for Coating Inspection Services was sent to the eight (8) firms resulting in four (4) proposals received by June 18, 2013 from the following firms: • Bay Area Coating Consultants, Inc. • Corrpro Companies, Inc. • CSI Services • Harper & Associates Engineering, Inc. The four (4) firms that chose not to propose were HDR, MCS Inspection Group, Shawn Pablo, and Tank Industry Consultants. In accordance with the District’s Policy 21, staff evaluated and scored all written proposals. Harper received the highest score for their services based on their experience, understanding of the scope of work, proposed method to accomplish the work, and their hourly rate. Harper was the most qualified consultant with the best overall rating or ranking score. A summary of the complete evaluation is shown in Exhibit B. 3 Harper submitted the Company Background Questionnaire as required by the RFP and staff did not find any outstanding issues. In addition, staff checked their references and performed an internet search on the company. Staff found the references to be excellent and did not find any outstanding issues with the internet search. Staff has worked with Harper on numerous occasions over the last twenty years, and they have performed at a high level. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP P2493, as approved in the FY 2014 budget, is $1,950,000. Total expenditures, plus outstanding commitments and forecast, are $1,883,726. The total budget for CIP P2535, as approved in the FY 2014 budget, is $425,000. Total expenditures, plus outstanding commitments and forecast, are $401,434. Based on a review of the financial budget, the Project Manager anticipates that both budgets are sufficient to support the Project. See Attachment B-1 for the budget detail for CIP P2493 and Attachment B-2 for the budget detail for CIP P2535. Finance has determined that 100% of the funding is available from the Replacement Fund for both CIP P2493 and CIP P2535. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high value water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is at the forefront in innovations to provide water services at affordable rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. KC/BK:jf P:\WORKING\CIP P2493 & P2535 624-2 & 458-2 Reservoir Coating\Staff Reports\BD 08-07-13, Staff Report, Coating Inspection Services for 624-2 & 458-2 Reservoirs (KC-BK).docx Attachments: Attachment A – Committee Action Attachment B-1 – Budget Detail for CIP P2493 Attachment B-2 – Budget Detail for CIP P2535 Exhibit A-1 – Location Map for CIP P2493 Exhibit A-2 – Location Map for CIP P2535 Exhibit B – Summary of Proposal Rankings ATTACHMENT A SUBJECT/PROJECT: P2493-001103 P2535-001103 Award a Professional Services Agreement with Harper & Associates Engineering, Inc. for Coating Inspection Services on the 624-2 and 458-2 Reservoir Coating Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on July 24, 2013 and the following comments were made:  Staff requested that the Board award a professional Coating Inspection Services contract to Harper & Associates Engineering, Inc. (Harper) and to authorize the General Manager to execute an agreement with Harper in an amount not-to-exceed $75,160 for a period of one (1) year (August 2013 through July 2014).  Staff indicated that the District’s 2013 Corrosion Control Program (CCP) shows the 624-2 Reservoir is due to be recoated in the interior and exterior surfaces and the 458-2 Reservoir is due to be recoated on the interior surface. The existing coatings on both tanks are 20 years old and at the end of their useful life. The exterior coating of the 458-2 Reservoir was replaced in 2004 and it is not needed to be rehabilitated at this time.  Staff noted that the coating replacement on steel reservoirs requires specialty inspection to ensure the application is in accordance to the manufacturer’s specifications and the process complies with all State health regulations. The inspector ensures that the coatings are mixed properly, applied at the specified thicknesses, and allowed the appropriate times to cure.  Staff discussed the selection process and indicated that the process was performed in accordance of the District’s Policy 21. Results of the analysis are shown in Attachment B of the staff report. Staff indicated that Harper received the highest score.  Staff performed a reference check and internet search on Harper and did not find any significant issues. Staff indicated that the District has successfully worked with Harper in the past and noted that the company has performed multiple steel tank evaluations over the last 20 years.  In response to a question by the Committee, staff indicated that the 458-1 Reservoir tank was last coated (interior) in 2008. Replacement coatings for both 458-1 and 458-2 Reservoir tanks are done staggered because it is more efficient as it allows the District to maintain water supply in one tank while the other one is being maintained. Following the discussion, the committee supported staffs’ recommendation and presentation to the full board as a consent item. ATTACHMENT B-1 – Budget Detail SUBJECT/PROJECT: P2493-001103 P2535-001103 Award a Professional Services Agreement with Harper & Associates Engineering, Inc. for Coating Inspection Services on the 624-2 and 458-2 Reservoir Coating Project ATTACHMENT B-2 – Budget Detail SUBJECT/PROJECT: P2493-001103 P2535-001103 Award a Professional Services Agreement with Harper & Associates Engineering, Inc. for Coating Inspection Services on the 624-2 and 458-2 Reservoir Coating Project Gotham St Lakeshore Dr Lakeridge Cir Lehigh Ave B ro o k sto n e R d Crosscreek Rd Lafayette Pl M a r q u e t t e R d Woodspring Dr Creekwood Way Kent St Du k e S t Clearbrook Dr Wildbrook Pl Mead owb r ook LnColdbrook Ct Willowbrook Ct 130 VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 P:\WORKING\CIP P2493 & P2535 624-2 & 458-2 Reservoir Coating\Graphics\Exhibits-Figures\624-2 Location.mxd OTAY WATER DISTRICT624-2 Reservoir Interior/ExteriorCoating and Upgrades EXHIBIT A-1 CIP P2493 624-2 Tank8.0 MG Steel Reservoir O l y m p i c P k w y Morro Point Dr Point Barrow Dr Point la Jolla Dr W e s t P o i n t D r P o i n t D e f i a n c e C t Laguna Point Ct Malibu Point Ct Diablo Point Ct San Pedro Point Ct O l y m p i c P k w y 066065 VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 P:\WORKING\CIP P2493 & P2535 624-2 & 458-2 Reservoir Coating\Graphics\Exhibits-Figures\458-2 Location.mxd OTAY WATER DISTRICT458-2 Reservoir Interior Coating and Upgrades EXHIBIT A-2 CIP P2535 458-2 Tank1.75 MG Steel Reservoir P:\WORKING\CIP P2493 & P2535 624-2 & 458-2 Reservoir Coating\Agreements-Contracts-RFPs\Coating Inspection\Selection Process\Summary of Proposal Rankings.xls Qualifications of Team Responsiveness and Project Understanding Technical and Management Approach INDIVIDUAL SUBTOTAL - WRITTEN AVERAGE SUBTOTAL - WRITTEN Proposed Rates* Consultant's Commitment to DBE TOTAL SCORE 30 25 30 85 85 15 Y/N 100 Poor/Good/ Excellent Dan Martin 26 23 28 77 Bob Kennedy 26 23 28 77 Brandon DiPietro 28 23 26 77 Jeff Marchioro 29 20 23 72 Kevin Schmidt 24 22 25 71 Dan Martin 24 22 24 70 Bob Kennedy 24 22 25 71 Brandon DiPietro 25 22 24 71 Jeff Marchioro 26 18 23 67 Kevin Schmidt 22 20 23 65 Dan Martin 25 22 25 72 Bob Kennedy 21 20 21 62 Brandon DiPietro 25 22 25 72 Jeff Marchioro 24 22 26 72 Kevin Schmidt 24 21 21 66 Dan Martin 27 23 29 79 Bob Kennedy 26 23 28 77 Brandon DiPietro 27 23 25 75 Jeff Marchioro 27 23 27 77 Kevin Schmidt 24 23 26 73 Consultant Rate Position Score Bay Area Consultants $105.70 highest 1 Corrpro $100.00 4 CSI Services $86.50 12 Harper & Associates $82.00 lowest 15 *The fees were evaluated by comparing hourly rates for NACE Level III Coating Inspector position. The sum of these rates are noted in the above table. Note: Review Panel does not see or consider rates when scoring other categories. Rates are scored by the PM, who is not on Review Panel. EXHIBIT B SUMMARY OF PROPOSAL RANKINGS Coating Inspection Services For the 624-2 & 458-2 Reservoir Coating (P2493 & P2535) RATES SCORING CHART WRITTEN Y MAXIMUM POINTS Bay Area Coating Consultants 76 CSI Services 69 12 Y 75 Harper & Associates 81 76 15 91 REFERENCES 1 Y Y Corrpro 69 4 73 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Dan Martin Engineering Manager PROJECT/ SUBPROJECT: AS588- CS0001 & AS588- CS0002 DIV. NO. 2, 4 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Request to Approve Two (2) Agreements with BMB Tower Holdings, LLC, an Oklahoma Limited Liability Company, for the Installation of a Communications Facility at the 485-1 & 458-1 Reservoir Sites GENERAL MANAGER'S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) authorize the General Manager to execute two (2) agreements with BMB Tower Holdings, LLC, an Oklahoma Limited Liability Company, (BMB) for the installation of a communications facility at the 485-1 & 458-1 Reservoir Sites (see Exhibit A for Project location). COMMITTEE ACTION: See Attachment A. PURPOSE: To obtain Board approval authorizing the General Manager to execute two (2) agreements (see Attachments B-1 and B-2) with BMB that allows the installation of a communications facility at the 485-1 & 458-1 Reservoir Sites. The agreement will grant BMB the right to use approximately 177 square feet of leased area at the 458-1 Reservoir Site and approximately 147 square feet of leased area at the 485-1 Reservoir Site. AGENDA ITEM 6d 2 ANALYSIS: The District currently has two lease agreements with BMB, as reflected in Exhibit A: 1. Point Barrow Drive (458-1 Reservoir) 2. East H Street (485-1 Reservoir) The original leases for the sites were signed in September 2006 between the District and Cricket Communications (Cricket). Subsequently, in April 2011 the leases were assigned from Cricket to Global Tower Partners, LLC (GTP). Lastly, in June 2011, the leases were assigned from GTP to BMB. In June 2012, the District was made aware that BMB was subleasing both the Point Barrow Drive site and the East H Street site back to Cricket. The agreements that BMB assumed under the assignment specifically prohibit subleasing of the sites without the District’s prior written consent. As a result, letters were sent to BMB notifying them of the default of the agreement for each site along with a request to cure. As a requirement to cure the agreements, the District has requested that BMB enter into new lease agreements for the both sites. The new agreements will memorialize the change in ownership, provide for a sublease only to Cricket, and strengthen the terms of the existing leases with language that reflects the current District lease terms. The language in the proposed lease agreements includes terms for the following:  Security Deposit equal to the sum of two months’ rent.  Elimination of pro-rating language to simplify the billing process.  20 percent penalties for late payment.  Non-curable Event of Default for failure to pay rent.  Magnetic mount or other non-destructive alternative attachment requirement.  Utilities and back-up power provisions.  New Assignment of Lease requirement to assist in documenting change of ownership.  Assessment of a one-time payment of $1,000.00. As part of the lease agreements, the Rent shall be increased on each calendar anniversary of the Commencement Date at a rate of four percent (4%) per annum. At the beginning of an extension term or 3 additional term the rent will be adjusted to the rate of four percent (4%) per annum or the annual Consumer Price Index change (“CPI”), whichever is greater. The lease agreements also include a non-refundable administrative fee of $4,500 for each amendment that will be due within (30) days of the date of execution of the lease agreements by both parties to reimburse the District for administrative expenses and costs related to the District's supervision and assistance of the lease default cure. FISCAL IMPACT: Joseph Beachem, Chief Financial Officer The District will continue to receive rent which will now be subject to an annual inflation adjustment of four percent effective upon the execution of the lease agreements. STRATEGIC GOAL: The District ensures its continued financial health through long-term financial planning, formalized financial policies, enhanced budget controls, fair pricing, debt planning, and improved financial reporting. LEGAL IMPACT: The agreement has been reviewed and approved by District General Counsel for content and form. DJM/RP:jf P:\WORKING\CELLULAR LEASE FILE\BMB, Tower Holdings LLC\Staff Report\BD 08-07-13\BD 08-07-13, Staff Report, BMB @ 485-1 and 458-1 Res Sites, (DM).docx Attachments: Exhibit A – Location Map Attachment A – Committee Action Attachment B-1 – 458-1 Reservoir Agreement Attachment B-2 – 485-1 Reservoir Agreement ATTACHMENT A SUBJECT/PROJECT: AS588-CS0001 AS588-CS0002 Request to Approve Two (2) Agreements with BMB Tower Holdings, LLC, an Oklahoma Limited Liability Company, for the Installation of a Communications Facility at the 485-1 & 458-1 Reservoir Sites COMMITTEE ACTION: The Finance, Administration, and Communications Committee (Committee) reviewed this item at a meeting held on July 23, 2013 and the following comments were made:  Staff is requesting that the Board approve two (2) agreements with BMB Tower Holdings, LLC for communications facilities at the 485-1 and 458-1 Reservoir Sites.  The original leases for the sites were signed in September 2006 between the District and Cricket Communications (Cricket). In April 2011 the leases were assigned from Cricket to Global Tower Partners, LLC (GTP) and in June 2011, the leases were assigned from GTP to BMB Tower Holdings, LLC.  In June 2012, the District became aware that BMB was subleasing both sites back to Cricket. The agreement that BMB had assumed under the assignment specifically prohibits the subleasing of the sites without the District’s prior written consent. As a requirement to “cure” the existing agreements, the District requested that BMB enter into new lease agreements for both sites which will memorialize the change in ownership, provide for a sublease only to Cricket, and strengthen the terms of the existing leases with language that reflects the District’s current lease terms as discussed in staffs’ report.  The District will continue to receive rent which will now be subject to an annual inflation adjustment of four (4) percent or the annual Consumer Price Index change (“CPI”), whichever is greater, effective upon the execution of the lease amendments.  In response to an inquiry from the committee, staff indicated that Cricket had sold off some of its lease sites. BMB is the current owner and is subleasing the sites back to Cricket. This provided an opportunity to negotiate a new lease with the latest lease terms. It was noted that Otay’s attorney has reviewed the latest agreement language.  Staff indicated in response to another inquiry from the committee, that they became aware of the subleasing agreement between BMB and Cricket through the vendor’s request for access to the sites for maintenance purposes. This triggered an investigation into the lease ownership. Upon completion of the discussion, the Committee supported presentation to the full Board as a consent item. AGREEMENT BETWEEN BMB TOWER HOLDINGS, LLC AND OTAY WATER DISTRICT TO LOCATE A COMMUNICATIONS FACILITY AT OTAY'S 458-1 RESERVOIR SITE (651 Pt.Barrows Drive,Chula Vista CA,91911) This Telecommunication Facility Agreement (the "Agreement")is entered into and effective on the date specified in the signature page (the "Commencement Date"),by and between the Otay Water District,a municipal water district organized and operated pursuant to the Water Code Section 71000,et seq.("Otay"),and BMB Tower Holdings,LLC ("Tenant"). Special terms and conditions are set forth on Exhibit A. RECITALS A.Otay owns a site on which it has constructed water facilities known as the "458-1 RESERVOIR SITE,"as depicted on Attachment A to Exhibit B (the "Reservoir Site"). B.On September 14,2006,Otay entered into that certain lease agreement (the "Original Lease")with Cricket Communications,Inc.,a Delaware corporation for the Reservoir Site. C.On or about April 14,2011 Otay consented to an assignment of the Original Lease from Cricket Communications Inc.to Global Tower Partners,LLC ("GTP"). D.On or about June 6,2011 Otay consented to an assignment of the Original Lease from GTP Communications Inc.to BMB Tower Holdings,LLC ("BMB"). E.On or before April 19,2012 BMB subleased of a portion of the Original Lease space without Otay's consent and failed to pay rent in a timely manner in violation of the terms of the Original Lease and subsequent assignments. F.Tenant has cured the Original Lease defaults including a one-time payment to Otay of $1,000.00. G.Tenant has requested Otay to allow it to continue the use of the Property for location of a communications facility and transmitting and receiving antennas at the Reservoir Site pursuant to the terms and conditions set forth herein. H.Otay is willing to allow Tenant to locate the Facilities (defined below)at the Reservoir Sites pursuant to the terms and conditions set forth herein. AGREEMENT For good and valuable consideration,the receipt and sufficiency of which is hereby acknowledged,Otay and Tenant agree as follows: 1.Premises.Otay owns the real property described in Attachment B to Exhibit B (the "Property").Otay agrees to lease to Tenant,for the installation of antennas and related telecommunications equipment within the Property,as more particularly described on Attachment C to Exhibit B (the "Premises"). 2.Grant of Non-Exclusive Trench and Utility Easements).Upon written request from Tenant,Otay agrees to grant a non-exclusive easement,as legally described and depicted in Exhibit C to this Agreement (the "Easement"),for certain agreed-upon portions of the Property for the purpose of trenching and for the installation and maintenance of the Otay approved utilities needed by Tenant for the Facilities.It is expressly agreed that any such Easement shall Telecommunication Facilities Agreement Page I Form:10-10 AGREEMENT BETWEEN BMB TOWER HOLDINGS, LLC AND OTAY WATER DISTRICT TO LOCATE A COMMUNICATIONS FACILITY AT OTAY'S 485-1 RESERVOIR SITE (996 East H Street,Chula Vista,CA 91910) This Telecommunication Facility Agreement (the "Agreement")is entered into and effective on the date specified in the signature page (the "Commencement Date"),by and between the Otay Water District,a municipal water district organized and operated pursuant to the Water Code Section 71000,et seq.("Otay"),and BMB Tower Holdings,LLC ("Tenant"). Special terms and conditions are set forth on Exhibit A. RECIIALS A.Otay owns a site on which it has constructed water facilities known as the "485-1 RESERVOIR SITE,"as depicted on Attachment A to Exhibit B (the "Reservoir Site"). B.On September 14,2006,Otay entered into that certain lease agreement (the "Original Lease")with Cricket Communications,Inc.,a Delaware corporation for the Reservoir Site. C.On or about April 14,2011 Otay consented to an assignment of the Original Lease from Cricket Communications Inc.to Global Tower Partners,LLC ("GTP"). D.On or about June 6,2011 Otay consented to an assignment of the Original Lease from GTP Communications Inc.to BMB Tower Holdings,LLC ("BMB"). E.On or before April 19,2012 BMB subleased of a portion of the Original Lease space without Otay's consent and failed to pay rent in a timely manner in violation of the terms of the Original Lease and subsequent assignments. F.Tenant has cured the Original Lease defaults including a one-time payment to Otay of $1,000.00. G.Tenant has requested Otay to allow it to continue the use of the Property for location of a communications facility and transmitting and receiving antennas at the Reservoir Site pursuant to the terms and conditions set forth herein. H.Otay is willing to allow Tenant to locate the Facilities (defined below)at the Reservoir Sites pursuant to the terms and conditions set forth herein. AGREEMENT For good and valuable consideration,the receipt and sufficiency of which is hereby acknowledged,Otay and Tenant agree as follows: 1.Premises.Otay owns the real property described in Attachment B to Exhibit B (the "Property").Otay agrees to lease to Tenant,for the installation of antennas and related telecommunications equipment within the Property,as more particularly described on Attachment C to Exhibit B (the "Premises"). 2.Grant of Non-Exclusive Trench and Utility Easementfs).Upon written request from Tenant,Otay agrees to grant a non-exclusive easement,as legally described and depicted in Exhibit C to this Agreement (the "Easement"),for certain agreed-upon portions of the Property for the purpose of trenching and for the installation and maintenance of the Otay approved utilities needed by Tenant for the Facilities.It is expressly agreed that any such Easement shall Telecommunication Facilities Agreement Page 1 Form:10-10 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Stephen Dobrawa Purchasing Manager PROJECT: Various DIV. NO. ALL APPROVED BY: Rom Sarno, Chief of Administrative Services German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: DECLARATION OF SURPLUS VEHICLES AND EQUIPMENT GENERAL MANAGER’S RECOMMENDATION: That the Board declare the identified vehicles and equipment as surplus to the District’s needs. COMMITTEE ACTION: See “Attachment A”. PURPOSE: To present a list of vehicles and equipment and obtain Board declaration that the items identified on the list are surplus to the District’s needs. ANALYSIS: Listed below are various vehicles and equipment that have been determined by the user departments to be of no use, obsolete (spare parts and service not available), beyond useful life, and/or not cost-effective to repair or operate and therefore, surplus to the District’s needs. AGENDA ITEM 6e 2 Vehicles Identified as Surplus Item Qty Description Reason for Declaration 1 1 Unit 135, 2001 Ford Expedition, FA#8135, VIN 1FMPU16L11LB51855, 126,700 miles No longer cost-effective to maintain and operate. Vehicle is no longer required. 2 1 Unit 134, 2002 Ford F-250 Utility Truck, FA#8134, VIN 1FTNF20L02EA58304, 51,000 miles No longer cost-effective to maintain and operate. Vehicle is no longer required. 3 1 Unit 115, 2000 Ford Ranger Pickup Truck, FA#8115, VIN 1FTYR14X8YPA21493, 50,000 miles No longer cost-effective to maintain and operate. Vehicle is no longer required. Equipment Identified as Surplus Item Qty Description Reason for Declaration 4 4 Chlorinators, Pennwalt Wallace & Tiernan, SN’s An-16274, AN-16299, AK-16113, AL-16304 No longer supported by the manufacturer, no longer cost-effective to maintain and operate, and is no longer required. 5 4 Chlorine Analyzers Pennwalt Wallace & Tiernan, SN’s AL-28284, AK-15975, AN-16304, AN-16303 No longer supported by the manufacturer, no longer cost-effective to maintain and operate, and is no longer required. 6 1 Survey Base Station FA# 3987, consisting of Trimble 4800 receivers SN 220179258 and SN 220156335, Trimble Trimmark IIE Base and Repeater SN 220154847, Trimble TSCI Data Collector SN 220149134, and associated wires and antennas No longer required. 7 3 GPS Receiver, Geo Explorer XT, SN’s 4511E00029, 4423E00088, 4423E00179 Inoperable, no longer supported by manufacturer, and no longer serviceable. 8 3 GPS Receiver, Geo Explorer XH, SN’s 4625482501, 4626483207, 4623478371 No longer required. 9 3 Right Angle Gear Drives, SN’s 154977, 154975, 154974 No longer required. 3 10 2 Caterpillar Diesel Engines, Model No. 3406, FA #1512, and SN 17727 No longer supported by manufacturer, no longer cost-effective to maintain and operate. Engines no longer meet APCD requirements. 11 1 Auto Crane Brand Truck Mounted Crane, SN 320304-228BT-0598 No longer required. 12 2 Lamson Process Air Blower, SN’s 911825, 911810 Broken and inoperable and no longer required. 13 1 NEC PBX phone system, hand sets, and associated hardware and cables No longer required, replaced. Before vehicles and equipment (where the individual acquisition cost exceeded $5,000) can be disposed of, the Board must first declare the items as surplus (ref: Purchasing Manual, Section 12). The District’s Purchasing Manual identifies the process for disposing of material, equipment, and supplies that have been declared surplus. Typically, items declared surplus are disposed of by sale through public auction. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The salvage value and associated gain or loss on items is not determined until their disposal. Therefore, the fiscal impact of the recommended action is not known at this time. STRATEGIC GOAL: This action supports the District’s goal to ensure financial health through efficient operations. LEGAL IMPACT: None. Attachments: Attachment A – Committee Action Report ATTACHMENT A SUBJECT/PROJECT: DECLARATION OF SURPLUS VEHICLES AND EQUIPMENT COMMITTEE ACTION: The Finance, Administration, and Communications Committee (Committee) reviewed this item at a meeting held on July 23, 2013 and the following comments were made:  Staff presents annually a list of vehicles and equipment that has been identified as surplus to the District’s needs.  Staff is requesting that the board declare the listed vehicles and equipment on pages two (2) and three (3) of staffs’ report as surplus.  In response to an inquiry from the committee, staff indicated that about the same amount of vehicles is being surplused this year as last year. It is felt that there will be less vehicles surplused next year as the District tends to rotate vehicles. The District has reduced the amount of staff in some areas like the treatment plant, but some vehicles will still need to be replaced. Staff indicated that the number of surplused vehicles will not always be the same. It is dependent on need as staffing is adjusted. Upon completion of the discussion, the Committee supported presentation to the full Board as a consent item. STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Andrea Carey Customer Service Manager PROJECT: DIV. NO. All APPROVED BY: Joseph R. Beachem, Chief Financial Officer German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Authorize the General Manager to Negotiate and Enter into an Agreement with Paymentus for Phone Payment Services GENERAL MANAGER’S RECOMMENDATION: That the Board authorize the General Manager to negotiate and enter into a one-year fixed with four option year renewals (five-year term) agreement with Paymentus to provide phone payment services in an amount not to exceed $250,000 ($50,000 annually). COMMITTEE ACTION: See Attachment A. PURPOSE: To authorize the General Manager to negotiate and enter into an agreement with Paymentus to provide phone payment services. ANALYSIS: The District accepts approximately 2,000 payments per month through the automated phone system. In 2010, the District began offering customers the option to pay by phone at no charge to the customer. Prior to that, the cost to the customer was a $4.80 flat fee per phone payment transaction. The decision to absorb the cost of this service was made to provide a greater range of free payment methods to customers and to take advantage of credit card discount programs through Visa and MasterCard. The District receives approximately $1,000,000 in Visa and MasterCard payments per month through the District’s web payment portal, the phone payment service and the AGENDA ITEM 6f front desk. Visa and MasterCard each offer a utility discount to qualified businesses. This discount reduces the fees charged by Visa and MasterCard to the District from an average of 1.8% to approximately 1%. In order to receive the discounted rate, the District cannot charge a convenience fee to its customers for initiating a payment through any payment portal (i.e. web, phone, front desk). The discounted rates from Visa and MasterCard save the District approximately $8,000 per month in credit card fees; outweighing the costs incurred by the District to offer payment over the phone at no charge. In order to evaluate the cost effectiveness of our current vendor, HP Enterprises, Inc., a request for proposal (RFP) to provide phone payment services for the District was sent to seven vendors. The District received proposals from three vendors. Evaluation criteria consisted of the vendor’s ability to meet District specifications; number of years experience in this type of business with accounts similar to Otay in size; competence and customer service; on time experience in delivery of comparable goods and services; financial stability; and cost. The phone payment services listed below are based on 30,000 credit card payments per year. This number reflects a higher average than the current 2,000 phone transactions processed monthly. This higher number reflects the historical annual increases in phone payments and the added option to pay using a bank account which is not currently available to customers. Vendor Annual Price Paymentus $49,500 Billtrust $55,200 Alacriti $59,400 Otay is currently paying HP Enterprises, Inc. approximately $2.40 per phone payment. With Paymentus, Otay will pay approximately $1.65 per phone payment, resulting in a 30% cost savings to the District. The savings may be greater as the cost to the District is less if customers use their bank account or a debit card instead of credit card to pay. Paymentus handles payment processing for over 60 utilities in California, including Sweetwater Authority. District staff contacted three current Paymentus customers and all had positive feedback on their relationship with Paymentus and the services offered. The proposed agreement will ensure that Paymentus is unable to raise prices for five years and that the District is able to terminate for cause, at any time. Additionally, after the initial one-year period, the District will have the option not to renew should opportunities, circumstances or business practices change. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The annual cost for Paymentus services will be approximately $50,000 per year. Based on the current volume of payments, the expected savings will be approximately $18,000 annually. STRATEGIC GOAL: Evaluate the most cost effective and efficient processes and tools to communicate service related issues to customers. LEGAL IMPACT: None. Attachments: Attachment A - Committee Action ATTACHMENT A SUBJECT/PROJECT: Authorize the General Manager to Negotiate and Enter into an Agreement with Paymentus for Phone Payment Services COMMITTEE ACTION: The Finance, Administration, and Communications Committee (Committee) reviewed this item at a meeting held on July 23, 2013 and the following comments were made:  Staff is requesting that the board approve a one (1) year agreement with four (4) option year renewals (a five-year term) with Paymentus to provide phone payment services in an amount not-to-exceed $250,000 ($50,000 annually).  The District has provided the option for bill payment via the phone since 2008. The District currently accepts 2,000 payments per month through the automated phone system.  In 2010 the District began to offer the option to pay by phone at no charge to the customer. Prior to that, the cost was $4.80 per transaction. Staff indicated the reason the District decided to absorb the cost of the service was to provide customers a greater range of free payment options and to take advantage of credit card discount programs (utility discount) through Visa and Mastercard. The District currently receives, on average, $8,000 per month in savings through the utility discount. The savings offsets credit card fees and costs incurred by the District to offer payment over the phone service at no charge.  It was discussed that the more payment options the District can provide its customers, the easier it is for customers to pay their bills. This reduces the number of late payments/collection activities and assists customers who are behind to bring their account current.  The District wished to evaluate the cost effectiveness of its current vendor, HP Enterprises, Inc., for phone payment services and sent seven vendors a request for proposal. The District received three (3) proposals. The proposals were evaluated and staff is recommending that Paymentus be awarded a one (1) year fixed agreement with four (4) option year renewals (a five-year term).  Paymentus provides services to many utilities in Southern California including Sweetwater Authority, Helix Water District and Olivenhain MWD.  Paymentus costs are significantly lower than the District’s current vendor, HP Enterprises, Inc. The District’s current cost is approximately $2.40/phone transaction which will be reduced to $1.65/phone transaction with Paymentus. It was noted that there may be additional cost savings as the District will also be offering customers the ability to utilize their debit cards and bank accounts as well.  In response to an inquiry from the committee, staff indicated that the District has a sixty (60) day cancellation requirement with its current vendor, HP Enterprises, Inc. This will provide the time needed to make the transition to Paymentus.  The committee observed that by reducing the phone payment services cost, it will provide a positive impact to the Fiscal Year 2014 budget as the District will be reducing its costs for the service. Staff indicated that it is projected that the District will save approximately $18,000 annually. It was noted that, with the addition of the debit card payment option, the savings may be higher than $18,000 because use of the service will likely increase.  Staff indicated in response to another inquiry from the committee that the District will continue to take all four credit cards (VISA, MasterCard, American Express and Discover) via the phone payment services. Payments made on the District’s website may only be made using VISA or MasterCard. Customers are made aware that they may utilize their American Express or Discover cards through the phone payment service.  It was stated that the phone payment services is very easy to utilize and provides customers the ability to pay their water bills anytime during the day or night. It was indicated that District staff has access to view payments made over the phone or website and can get payment information fairly quickly. This is helpful, especially when a customer has been locked for non-payment. Staff can view a customer’s payment and schedule/dispatch a staff member to unlock their meter once they confirm that the customer has made a payment. Upon completion of the discussion, the Committee supported presentation to the full Board as a consent item. STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Gary Stalker Water Systems Manager PROJECT: DIV. NO. All APPROVED BY: Pedro Porras, Chief, Water Operations German Alvarez, Asst. General Manager Mark Watton, General Manager SUBJECT: Approval of Public Health Goal Report Recommendations GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve the recommendations in the Public Health Goal (PHG)Report to take no further action in reducing the levels of the seven constituents listed in the report to levels at or below the PHGs. COMMITTEE ACTION: Please see Attachment “A”. PURPOSE: To present the PHG Report to the Board and to obtain approval for the recommendation that no action be taken to reduce the levels of the seven constituents listed in the report to the PHG or below. The Board meeting will also meet the requirement to have a public hearing to accept and respond to public comment. ANALYSIS: California Health and Safety Code §116470 specifies that larger (>10,000 service connections) water utilities prepare a special report by July 1, 2013 if their water quality measurements have exceeded any Public Health Goals (PHGs). PHGs are non- enforceable goals established by the Cal-EPA’s Office of Environmental Health Hazard Assessment (OEHHA). The law also requires that where OEHHA has not adopted a PHG for a constituent, the water suppliers are to use the Maximum AGENDA ITEM 7a 2 Contaminant Level Goals (MCLGs) adopted by USEPA. Only constituents which have a California primary drinking water standard and for which either a PHG or MCLG has been set are to be addressed. Staff completed this special report before July 1, 2013 (see Attachment B) and staff’s recommendation is that no action be taken for the District to install RO treatment or request suppliers to install RO treatment for the following reasons:  Water served by the District during this three year period met all CDPH and USEPA drinking water standards set to protect public health. CDPH considers water that meets all standards as safe to drink.  To further reduce the levels of the constituents identified in this report that are already significantly below the health-based MCLs established to provide “safe drinking water”, costly treatment processes would be required, translating to an average monthly cost increase of $26.10 - $50.18 per District customer.  The effectiveness of the treatment processes to provide any significant reductions in constituent levels to the PHGs is difficult, if not impossible to determine since the analytical DLR is much higher than the PHG in most cases.  The health protection benefits of these further hypothetical reductions are not at all clear and may not be quantifiable. ADDITIONAL INFORMATION: PHGs are based solely on public health risk considerations. None of the practical risk-management factors that are considered by the USEPA or the California Department of Public Health (CDPH) in setting Maximum Contaminant Levels (MCLs) are considered in setting the PHGs. These factors include analytical detection capability, available treatment technology, benefits and costs. The PHGs are not enforceable and are not required to be met by any public water system. MCLGs are the federal equivalent to PHGs. If a constituent was detected in the District’s distribution system or in the treated water the District purchases from other agencies, between 2010 and 2012, at a level exceeding an applicable PHG or MCLG, the PHG report provides the information required by the regulation. Included is the numerical public health risk associated with the Maximum Contaminant Level (MCL) and the PHG or MCLG, the category or type of risk to health that could be associated with each constituent, the best treatment 3 technology available that could be used to reduce the constituent level, and an estimate of the cost to install that treatment if it is appropriate and feasible. The purpose of the report is to provide customers with information on health-related contaminants detected in the water supply, even when detected below the enforceable MCLs, so customers are aware of whatever risks might be posed by the presence of these contaminants. MCLs are set at very conservative levels that provide very low to negligible risk and are considered the regulatory definition of what is “safe”. PHGs and MCLGs are set at the theoretical level where there is no health risk. MCLGs are set at zero for many contaminants, such as total coliforms, E. coli, and carcinogens, even though it is understood that zero is an unattainable goal and cannot be measured analytically. Most PHGs and MCLGs are set far below the required Detection Levels for Reporting (DLR) which is the minimum level that CDPH has determined can be accurately reported. Below is a table summarizing the seven constituents detected above the PHG or MCLG in calendar years 2010, 2011, and/or 2012. More detail for each is provided in the attached PHG Report. Constituent Units MCL PHG/MCLG DLR Levels Detected Coliforms % Positive 5.0 0 NA 0 – 1.4 Arsenic ppb 10 0.004 2 ND - 3.6 Gross Alpha pCi/L 15 0 3 ND - 9.2 Gross Beta pCi/L 50 0 4 ND – 8.8 Uranium pCi/L 20 0.43 1 ND – 4.1 Bromate ppb 10 0.1 5.0 ND – 6.5 Copper ppm 1.3 0.3 0.05 0.32 – 0.33 MCL = Maximum Contaminant Level PHG = Public Health Goal MCLG = Maximum Contaminant Level Goal DLR = Detection Limits for Reporting Levels Detected = Levels detected either in the Otay distribution system (coliforms and copper only) or in water supplied to the District for 2010 through 2012. NA = Not Applicable ND = Not Detected at or above the DLR 4 This table shows that the PHG or MCLG for five out of seven of the constituents is much lower than the DLR. This means that even if additional treatment is performed to reduce the levels of these constituents, the effectiveness of the treatment to reduce the levels to the PHG or MCLG cannot be accurately determined by analytical methods. The regulation also requires a cost estimate of using the Best Available Technology (BAT) for reducing the level of the constituents to below the PHGs. For coliforms, the BAT is to meet disinfection requirements, which is already done, so no further action is required. For copper, which can leach into the water from plumbing fixtures or copper lines, the BAT is optimized corrosion control, which is also already done, so no further treatment is required. The BAT for the other five constituents is reverse osmosis (RO). According to the Association of California Water Agencies (ACWA) Cost Estimates for Treatment Technology BAT, it would cost approximately $1.56 - $2.99 per 1000 gallons to further remove these constituents using RO treatment. The District’s average annual demand for the three year period was 9,964 million gallons per year. Therefore, RO treatment installed and operated by the District or the District’s water suppliers to meet the District’s water demands would cost from $15 to $30 million per year, which translates to an average monthly cost increase of $26.10 - $50.18 per District customer (using the July 2012 meter count of 49,493 meters). These estimates include all costs including capital, land, construction, engineering, planning, environmental, contingency and O&M costs for the life of the facilities. FISCAL IMPACT: Joe Beachem, Chief Financial Officer None STRATEGIC GOAL: To meet the District’s Mission of providing high value water and wastewater services to the customers of the Otay Water District, in a professional, effective and efficient manner. 5 LEGAL IMPACT: None. Attachment “A”, Committee Action Attachment “B”, Otay Water District Public Health Goals Report on Water Quality ATTACHMENT A SUBJECT/PROJECT: Approval of Public Health Goal Report Recommendations COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee reviewed this item at a meeting held on July 24, 2013, and the following comments were made:  Staff requested that the Board approve the recommendations in the Public Health Goal (PHG) Report to take no further action in reducing the levels of the seven constituents listed on page 3 of the staff report to levels at or below the PHGs.  Staff indicated that the California Health and Safety Code §116470 required a special report to be prepared by larger water utilities if their water quality measurements exceeded any Public Health Goals (PHGs).  Staff noted that PHGs are non-enforceable goals established by the Cal-EPA’s Office of Environmental Health Hazard Assessment (OEHHA) and are not required to be met by any public water system. If OEHHA has not adopted a PHG for a constituent, water suppliers must use the Maximum Contaminant Level Goals (MCLGs) adopted by USEPA.  It was discussed that staff completed the special report before July 1, 2013 (See Attachment B) and recommended that no action be taken for the reasons indicated on page 2 of the staff report.  Staff stated that the purpose of the special report is to provide customers with information on health-related contaminants detected in the water supply, even if the contaminants are detected below the MCLs.  Staff indicated that the PHG or MCLG for five out of seven of the constitutents is much lower than the Detection Limits for Reporting (DLR). The five contituents are Arsenic, Gross Alpha, Gross Beta, Uranium, and Bromate.  Staff highlighted that there is no public health issue for the District and that all water served by the District met all State of California, Department of Public Health and USEPA drinking water standards.  The Committee suggested that staff revise their recommendation to state the following: “That the Otay Water District (District) Board of Directors approve the recommendations in the Public Health Goal (PHG) Report and that no further actions are necessary to reduce the levels of the seven constituents listed in the report to levels at or below the PHGs.”  In response to a question by the Committee, staff stated that the District’s seven constituents are similar to those reported by other local agencies due to a common water supply for the region. Following the discussion, the committee supported staffs’ recommendation and presentation to the full board as an action item. OTAY WATER DISTRICT Public Health Goals Report on Water Quality June 2013 2 OTAY WATER DISTRICT PUBLIC HEALTH GOALS REPORT ON WATER QUALITY SECTION 1: BACKGROUND INFORMATION ................................................... 3 History: .................................................................................................................................... 3 What Are Public Health Goals (PHGs)? ..................................................................................... 3 Reporting Requirements: ......................................................................................................... 3 Water Quality Data Considered: .............................................................................................. 4 Best Available Treatment Technology and Cost Estimates: ....................................................... 4 SECTION 2: CONSTITUENTS DETECTED THAT EXCEED A PHG ................. 4 Arsenic:................................................................................................................... 5 Bromate: ................................................................................................................. 6 Coliform Bacteria: .................................................................................................................... 6 Copper: ................................................................................................................... 7 Radiological: Gross Alpha & Uranium: ..................................................................................... 8 Radiological: Gross Beta: ......................................................................................................... 8 SECTION 3: RECOMMENDATIONS FOR FURTHER ACTION ......................... 9 3 SECTION 1: BACKGROUND INFORMATION Background California Health and Safety Code Health and Safety Code §116470 specifies that larger (>10,000 service connections) water utilities prepare a special report by July 1, 2013 if their water quality measurements have exceeded any Public Health Goals (PHGs). PHGs are non-enforceable goals established by the Cal-EPA’s Office of Environmental Health Hazard Assessment (OEHHA). The law also requires that where OEHHA has not adopted a PHG for a constituent, the water suppliers are to use the Maximum Contaminant Level Goals (MCLGs) adopted by USEPA. Only constituents which have a California primary drinking water standard and for which either a PHG or MCLG has been set are to be addressed. The Association of California Water Agencies (ACWA) formed a workgroup which prepared guidelines for water utilities to use in preparing these required reports. The ACWA guidelines were used in the preparation of our report. No guidance was available from state regulatory agencies. If a constituent was detected in the Otay Water District’s (District’s) distribution system or in the treated water the District purchases from other agencies, between 2010 and 2012 at a level exceeding an applicable PHG or MCLG, this report provides the information required by the law. Included is the numerical public health risk associated with the Maximum Contaminant Level (MCL) and the PHG or MCLG, the category or type of risk to health that could be associated with each constituent, the best treatment technology available that could be used to reduce the constituent level, and an estimate of the cost to install that treatment if it is appropriate and feasible. What Are Public Health Goals PHGs are set by California OEHHA, which is part of Cal-EPA and are based solely on public health risk considerations. None of the practical risk-management factors that are considered by the USEPA or the California Department of Public Health (CDPH) in setting drinking water standards (MCLs) are considered in setting the PHGs. These factors include analytical detection capability, available treatment technology, benefits and costs. The PHGs are not enforceable and are not required to be met by any public water system. MCLGs are the federal equivalent to PHGs. Reporting Requirements The purpose of this report is to inform consumers of District’s drinking water PHGs that were exceeded during 2010, 2011 and 2012, pursuant to California Health and Safety Code Section 116470(b). In addition, this report provides information about the cost of achieving a water quality level that does not exceed the PHGs. For 4 general information about the quality of the water delivered by the District, please refer to the Consumer Confidence Report, also known as the Annual Water Quality Report. An online version of these annual reports can be found at www.otaywater.gov. Included in this report is information regarding the public health risk associated with the MCL and the PHG, such as the possible type of health risk associated with each constituent, the best available treatment technology that may reduce the constituent level, and an estimate of the cost to install such treatment. Water Quality Data Considered All of the water quality data collected by our water system between 2010 and 2012 for purposes of determining compliance with drinking water standards was considered. This data was summarized in our 2010, 2011, and 2012 Consumer Confidence Reports which are mailed to all of our customers annually in June. For each regulated contaminant, DHS establishes Detection Limits for the purposes of Reporting (DLR). DLRs are the minimum levels at which any analytical result must be reported to California Department of Public Health (CDPH). Results indicated below the DLRs cannot be quantified with any certainty. In some cases, PHGs are set below the DLRs. Any contaminant reported below the DLR will be considered zero for the purpose of this report, which is accepted by the California Department of Public Health. Best Available Treatment Technology and Cost Estimates Both the USEPA and CDPH adopt what are known as Best Available Technologies (BATs), which are the best methods of reducing contaminant levels to the MCL. Costs can be estimated for such technologies. However, since many PHGs and MCLGs are set much lower than the MCL, it is not always possible nor feasible to determine what treatment is needed to further reduce a constituent downward to or near the PHG or MCLG, many of which are set at zero. Estimating the costs to reduce a constituent to zero is difficult, if not impossible because it is not possible to verify by analytical means that the level has been lowered to zero. In some cases, installing treatment to try and further reduce very low levels of one constituent may have adverse effects on other aspects of water quality. SECTION 2: CONSTITUENTS DETECTED THAT EXCEED A PHG The following is a discussion of constituents that were detected in the Districts distribution system, or one or more of our drinking water treated water sources at levels above the PHG, or MCLG (if no PHG has been established). 5 Arsenic Arsenic is a naturally occurring element in the earth's crust and is very widely distributed in the environment. All humans are exposed to microgram quantities of arsenic (inorganic and organic) largely from food (25 to 50 μg/day) and to a lesser degree from drinking water and air. In certain geographical areas, natural mineral deposits may contain large quantities of arsenic and this may result in higher levels of arsenic in water. Waste chemical disposal sites may also be a source of arsenic contamination of water supplies. The main commercial use of arsenic in the U.S. is in pesticides, mostly herbicides and in wood preservatives. Misapplication or accidental spills of these materials could result in contamination of nearby water supplies. Arsenic does not have a tendency to accumulate in the body at low environmental exposure levels. Studies in humans have shown considerable individual variability in arsenic toxicity. The levels of arsenic that most people ingest in food and water (up to 50 μg/day) have not usually been considered to be of health concern for non-cancer effects. The MCL for arsenic is 10 parts per billion (ppb), the PHG and MCLG for arsenic is 0.0004 ppb. The DLR, which is the lowest level that CDPH has determined can be measured with certainty, is 2 ppb. Arsenic levels in water that the District purchases from other agencies from 2010 – 2013 ranged from <2 ppb – 3.6 ppb. The health risk associated with arsenic, and the reason that a drinking water standard was adopted for it, is that people who drink water containing Arsenic above the MCL throughout their lifetime could experience an increased risk of getting cancer. The PHG of 0.0004 ppb is based on a level that will result in not more than 1 excess cancer in 1 million people who drink 2 liters daily of this water for 70 years. The actual cancer risk may be lower or zero. Because the DLR for arsenic (2 ppb) is greater than the PHG (0.0004 ppb), it would be difficult to assess the effectiveness of RO treatment on reaching the PHG level. The best available technology (BAT) cited in literature to remove arsenic is reverse osmosis. All costs including capital, land, construction, engineering, planning, environmental, contingency and O&M costs are included but only general assumptions can be made for these items. According to the Association of California Water Agencies (ACWA) Cost Estimates for Treatment Technology BAT, it would cost approximately $1.56‐$2.99 per 1000 gallons to treat bromate using RO treatment. The District’s average annual demand for the three year period was 9,964 million gallons per year. Therefore, RO treatment installed and operated by the District’s water suppliers to meet the District’s water demands would cost from $15 to $30 million per year, which translates to an average monthly cost increase of $26.10 - $50.18 per District customer. 6 Bromate Bromate in water is formed when water containing naturally occurring bromide is disinfected with ozone. Bromate also has a long history of use as a food additive [at levels up to 75 parts per million (ppm) in flour], where it is largely converted to bromide in the baking process. The MCL for bromate is 10 ppb, the PHG is 0.1 ppb and the MCLG is zero based on a running annual average (RAA). The DLR is 5 ppb. The RAA of bromate levels in water that the District purchases from other agencies from 2010 – 2013 ranged from <5 ppb to 6.5 ppb. The CDHS and USEPA have determined that bromate is a health concern at certain levels of exposure. The category of health risk associated with bromate, and the reason that a drinking water standard was adopted for it, is that some people who drink water containing bromate in excess of the MCL over many years may have an increased risk of getting cancer. The numerical health risk for the MCLG of zero mg/L is zero. CDHS and USEPA set the drinking water standard for bromate at 10 mg/L to reduce the risk of cancer or other adverse health effects. One of the most effective Best Available Treatment (BAT) technologies for bromate reduction is reverse osmosis (RO). RO treatment reduces the natural occurring bromide in source water, therefore reducing bromate formation when ozone is applied. Because the DLR for bromate (5 ppb) is greater than the PHG (0.1ppb), it would be difficult to assess the effectiveness of RO treatment on reaching the PHG level. According to the Association of California Water Agencies (ACWA) Cost Estimates for Treatment Technology BAT, it would cost approximately $1.56‐$2.99 per 1000 gallons to treat bromate using RO treatment. The District’s average annual demands for the three year period were 9,964 million gallons per year. Therefore, RO treatment installed and operated by the District’s water suppliers to meet the District’s water demands would cost from $15 to $30 million per year, which translates to an average monthly cost increase of $26.10 - $50.18 per District customer. Coliform Bacteria During 2010, 2011, and 2012, the District collected between 132 and 165 samples each month for total coliform analysis. On rare occasions, a sample was found to be positive for coliform bacteria but follow-up check samples were negative. These were not a violation of state standards. A maximum of 0.6% of these samples were positive in any month. Normally the total coliform was zero and it is likely that the positive samples were due to debris entering the sample at the sample station. E. Coli was not detected in any samples. The MCL for coliform is 5% positive samples of all samples per month and the MCLG is zero. The reason for the coliform drinking water standard is to minimize the 7 possibility of the water containing pathogens which are organisms that cause waterborne disease. Because coliform is only a surrogate indicator of the potential presence of pathogens, it is not possible to state a specific numerical health risk. While USEPA normally sets MCLGs “at a level where no known or anticipated adverse effects on persons would occur”, they indicate that they cannot do so with coliforms. Coliform bacteria are indicator organisms that are ubiquitous in nature and are not generally considered harmful. They are used because of the ease in monitoring and analysis. If a positive sample is found, it indicates a potential problem that needs to be investigated and follow-up sampling done. It is not at all unusual for a system to have an occasional positive sample. It is difficult, if not impossible to assure that a system will never get a positive sample. Important measures that we have implemented include: an effective cross- connection control program; maintenance of a disinfectant residual throughout our system; an effective monitoring and surveillance program; maintaining positive pressure in our distribution system; implementation of a rigorous pipeline disinfection procedure for in-line repair and construction; training in proper sampling techniques to prevent false positives; and replacement of system piping to reduce pipe failures. Our system has already taken all of the steps described by California Department of Public Health as “best available technology” for coliform bacteria in Section 64447, Title 22, CCR. Copper There is no MCL for copper. Instead the 90th percentile value of all samples from household taps in the distribution system cannot exceed an Action Level of 1.3 part per million (ppm). The PHG for copper is 0.30 ppm and the DLR is 0.05 ppm. The category of health risk for copper is gastrointestinal irritation. Numerical health risk data on copper has not yet been provided by OEHHA, the State agency responsible for providing that information. Based on extensive sampling of our distribution system in 2011, our 90th percentile value for copper was 0.32 ppm. Our water system is in full compliance with the Federal and State copper regulation and we are deemed by CDHS to have “optimized corrosion control” for our system. In general, optimizing corrosion control is considered to be the best available technology to deal with corrosion issues and with any copper findings. Since the water distributed by the District meets the “optimized corrosion control” requirements, it is not prudent to initiate additional corrosion control treatment as it involves the addition of other chemicals and there could be additional water quality issues raised. Therefore, no estimate of cost has been included. 8 Radiological: Gross Alpha & Uranium Gross alpha particle activity detections are typically due to uranium. Uranium is a naturally-occurring radioactive element that is ubiquitous in the earth’s crust. Uranium is found in ground and surface waters due to its natural occurrence in geological formations. The national average uranium concentration in surface, ground and domestic water are 1, 3, and 2 picoCuries per liter (pCi/L), respectively. The requirement for radiological monitoring, including uranium, is four consecutive quarters every four years. The California MCL for uranium is 20 pCi/L. Uranium levels in water that the District purchases from other agencies from 2010 – 2013 ranged from <1 pCi/L – 3.6 pCi/L. The Public Health Goal for uranium is 0.43 pCi/L and the DLR is 1 pCI/L. The numerical health risk for uranium based on the California PHG is 1 x 10-6. This means one excess cancer case per million population. The health risk category for uranium is carcinogenicity; chronic toxicity (cancer, human data; kidney toxicity). Carcinogenic risk means capable of producing cancer. Chronic toxicity risk means there may be adverse effects that usually develop gradually from low levels of chemical exposure and that persist for a long time. The best available technology (BAT) cited in literature to remove gross alpha particle activity and uranium is reverse osmosis. All costs including capital, land, construction, engineering, planning, environmental, contingency and O&M costs are included but only general assumptions can be made for these items. According to the Association of California Water Agencies (ACWA) Cost Estimates for Treatment Technology BAT, it would cost approximately $1.56‐$2.99 per 1000 gallons to treat Alpha and Uranium using RO treatment. The District’s average annual demands for the three year period were 9,964 million gallons per year. Therefore, RO treatment installed and operated by the District’s water suppliers to meet the District’s water demands would cost from $15 to $30 million per year, which translates to an average monthly cost increase of $26.10 - $50.18 per District customer. Gross Beta Certain minerals are radioactive and may emit a form of radiation known as photons and beta radiation. The MCL is 50 pCi/L and the DLR is 4 pCi/L. There is no PHG for gross beta particle activity and the MCLG is zero pCi/L. Uranium levels in water that the District purchases from other agencies from 2010 – 2013 ranged from <1 pCi/L – 3.6 pCi/L. The CDPH and USEPA, which set drinking water standards, have determined that gross beta particle activity is a health concern at certain levels of exposure. This radiological constituent is a naturally occurring contaminant in some groundwater and surface water supplies. The category of health risk associated with gross beta particle activity, and the reason that a drinking water standard was adopted for it, is that some people who drink 9 water containing beta and photon emitters in excess of the MCL over many years may have an increased risk of getting cancer. The numerical health risk for the MCLG of zero pCi/L is zero. CDHS and USEPA set the drinking water standard for gross beta particle activity at 50 pCi/L to reduce the risk of cancer or other adverse health effects. The Best Available Technologies (BATs) identified to treat gross beta particle activity are ion exchange and reverse osmosis (RO). The most effective method to consistently remove beta and photon emitters to the MCLG is to install RO treatment. All costs including capital, land, construction, engineering, planning, environmental, contingency and O&M costs are included but only general assumptions can be made for these items. According to the Association of California Water Agencies (ACWA) Cost Estimates for Treatment Technology BAT, it would cost approximately $1.56‐$2.99 per 1000 gallons to treat Gross Beta using RO treatment. The District’s average annual demands for the three year period were 9,964 million gallons per year. Therefore, RO treatment installed and operated by the District’s water suppliers to meet the District’s water demands would cost from $15 to $30 million per year, which translates to an average monthly cost increase of $26.10 - $50.18 per District customer. SECTION 3: RECOMMENDATIONS FOR FURTHER ACTION All water served by the District met all State of California, Department of Public Health and USEPA drinking water standards set to protect public health during this three year period. CDPH considers water that meets all standards as safe to drink. To further reduce the levels of the constituents identified in this report that are already significantly below the health-based Maximum Contaminant Levels established to provide “safe drinking water”, additional costly treatment processes would be required, translating to an average monthly cost increase of $26.10 - $50.18 per District customer. The effectiveness of the treatment processes to provide any significant reductions in constituent levels to the PHGs is difficult, if not impossible to determine since the analytical DLR is much higher than the PHG in most cases. The health protection benefits of these further hypothetical reductions are not at all clear and may not be quantifiable. Therefore, no further actions is recommended. are necessary to reduce the levels of the seven constituents to the PHG or below. STAFF REPORT TYPE MEETING: Regular Board Meeting MEETING DATE: August 7, 2013 SUBMITTED BY: Mark Watton, General Manager W.O./G.F. NO: DIV. NO. APPROVED BY: Susan Cruz, District Secretary Mark Watton, General Manager SUBJECT: Board of Directors 2013 Calendar of Meetings GENERAL MANAGER’S RECOMMENDATION: At the request of the Board, the attached Board of Director’s meeting calendar for 2013 is being presented for discussion. PURPOSE: This staff report is being presented to provide the Board the opportunity to review the 2013 Board of Director’s meeting calendars and amend the schedule as needed. COMMITTEE ACTION: N/A ANALYSIS: The Board requested that this item be presented at each meeting so they may have an opportunity to review the Board meeting calendar schedule and amend it as needed. STRATEGIC GOAL: N/A FISCAL IMPACT: None. LEGAL IMPACT: None. Attachments: Calendar of Meetings for 2013 G:\UserData\DistSec\WINWORD\STAFRPTS\Board Meeting Calendar 8-7-13.doc AGENDA ITEM 8a Board of Directors, Workshops and Committee Meetings 2013 Regular Board Meetings: Special Board or Committee Meetings (3rd Wednesday of Each Month or as Noted) January 8, 2013 February 6, 2013 March 6, 2013 April 3, 2013 May 1, 2013 June 5, 2013 July 3, 2013 August 7, 2013 September 4, 2013 October 2, 2013 November 6, 2013 December 4, 2013 January 16, 2013 February 20, 2013 March 20, 2013 April 17, 2013 May 15, 2013 June 19, 2013 July 17, 2013 August 21, 2013 September 18, 2013 October 16, 2013 November 20, 2013 SPECIAL BOARD MEETINGS: BOARD WORKSHOPS: STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: August 7, 2013 SUBMITTED BY: Mark Watton General Manager W.O./G.F. NO: N/A DIV. NO. N/A APPROVED BY: Mark Watton, General Manager SUBJECT: General Manager’s Report GENERAL MANAGER:  Jamul Water Main Break: The Department of Fish and Game (DFG) notified the District on July 15th that water was surfacing in the vegetated area south of Campo Road and just west of the 944 Pump Station in Jamul. Staff determined there was approximately 15 gpm of potable water surfacing near the District’s 16-inch steel main that supplies water to most of Jamul. Due to the main being down a steep bank from the road in a highly vegetated area, Operations determined the District did not have the proper equipment to make the repair and a contractor would need to be retained. Since there is no redundant feed to Jamul, Operations recommended that the General Manager declare an emergency so repairs could be expedited. Since it is an environmentally sensitive area, the District retained a biologist to monitor the work. The District also coordinated with Cal-Trans since repairs were made within their right-of- way. No customers were affected during the one day shutdown. The contractor discovered a small hole in the top of the main at a joint caused by a root damaging the mortar, allowing the steel to corrode. The rest of the pipe was in good condition and the pipe was repaired and placed back into service on July 23rd. Operations staffs’ estimate for the repairs was approximately $30,000. DFG and Cal-Trans were satisfied with the District’s and the contractor’s efforts to minimize impacts during the repairs. AGENDA ITEM 9 2 ADMINISTRATIVE SERVICES: Purchasing, Facilities, and Water Conservation:  Purchase Orders – There were 167 purchase orders processed in July 2013 for a total of $24,177,811.32. o PO #717051 in the amount of $946,900 was issued for the 803-3 and 832-2 reservoir interior/exterior coatings and upgrades project, for the period of February 25, 2013 to July 25, 2013.  Residential and Commercial Landscape Surveys Provided by Mission Resources Conservation District – District customers requesting water conservation assistance are provided free residential surveys and commercial audits by Mission Resources Conservation District (MRCD). Customers contact MRCD and an appointment is scheduled at their convenience. MRCD is CWA’s countywide consultant providing residential surveys, commercial audits and additional field services to District sites. The District is invoiced $62.50 per residential survey and $42.50 per acre for commercial audits with CWA providing a matching amount. In FY 2013, MRCD staff provided 118 residential surveys and one commercial audit.  Water Conservation Garden – The Garden has contracted with the University of San Diego to prepare a long-range master plan to identify avenues for financial support that will cover future capital improvement projects. A draft version titled, “Re- Imagining Our Relationship with Water: The Water Conservation Garden Capital and Endowment Campaign Case for Support,” is being circulated among Garden stakeholder groups for input. Human Resources:  Upcoming Employee Programs – The Employee Picnic will be held on Saturday, September 7, 2013, from 11:00 am – 4:00 pm at Santee Lakes. The Employee Recognition Luncheon will be held on Wednesday, September 25, 2013, from 12:00 pm – 1:30 pm.  Recruitments – HR is in the process of recruiting for Construction Inspector and Equipment Mechanic II, and preparing to recruit for a Water Systems Operator I/II/III.  New Hires – There were two new hires in the month of July: Utility Worker I and Safety & Security Specialist. 3 INFORMATION TECHNOLOGY AND STRATEGIC PLANNING:  System Replacements - Request for proposals (RFP’s) for the Work Management and the SCADA system replacement have been released for vendor bids. Both systems are at end of life and in need of replacement. As is common with system replacements, the new system will continue to provide the necessary functionality, but also allow a significant upgrade in capabilities as the technology has evolved significantly in the last 10 years. The District anticipates a vendor selection in the next four months.  Communications Systems Upgrades – Day Wireless was selected as the vendor, and implementation of quality control review of the wireless system in the North District has begun. This will assure that both the hardware is reliable and that the design has an appropriate level of redundancy. The wireless system is necessary to support the new SCADA environment and will provide opportunities to support our security systems as a secondary benefit. This effort is being led by Operations with significant technical support from IT. Once complete, IT will take over the primary support responsibilities for the wireless network providing communication services to Operations for SCADA and other uses.  ESRI – International Users Conference in San Diego - Staff (Ming Zhao and Geoff Stevens) provided a presentation at the 2013 ESRI International User Conference on July 11th focusing on the relationship between GIS and Asset Management and highlighting some of the benefits the District will achieve from the combination of these efforts. The conference draws approximately 15,000 GIS professionals to San Diego every year.  Phone Vendor Support - As part of the annual process of reviewing contracts and service levels, staff is changing phone vendors from American Telesource Inc. (ATI) to Advanced Call Processing, Inc. (ACP). ACP has demonstrated a stronger local base of support for our Interactive Intelligence (I3) phone system.  Software Replacement for Viewing GIS Maps in the Field - IT staff is in the process of replacing our Field Mapplet software for newer and more functional software from Iwater. This software provides the GIS interface for field workers to enhance their ability to execute work orders as well as take advantage of GIS information. The new system is fully integrated with GIS and Cityworks, which will be our new work order system. 4  Asset Management Workshop - IT, Operations, Engineering and Finance staff participated in a workshop on July 16th and 17th to further review Otay’s Asset Management Program. The content of the workshop was excellent. It was hosted at the Orange County Sanitation District. The general advice from other practitioners confirmed that the enterprise approach that Otay is taking is the most effective direction based upon industry best practice. Integrating this effort into other operational priorities is always a challenge but can be achieved with careful planning and teamwork. The broad base of support from all departments highlighted Otay’s management commitment to achieve these objectives while still fulfilling day-to-day operational priorities. The product of this workshop and subsequent team review will be a revised and better-integrated project plan for asset management. FINANCE:  Fiscal Year-End Answer Rate - The Customer Service department finished the fiscal year with an average answer rate of 98.9%. This accomplishment was the result of many years’ worth of dedicated staff innovation, time-saving measures and process improvements. This very visible measure demonstrates the District’s commitment to customer-centered service.  2013 Financial Audit – Staff is currently closing the books for the fiscal year ending June 30, 2013 and preparing for the fiscal 2013 annual financial audit, which will be performed by White, Nelson, Diehl, Evans LLP. The auditors have completed their preliminary audit procedures and final fieldwork is scheduled to be completed in September. Under California Government Code section 26909, the District is required to have a financial audit performed annually.  Financial Reporting: o For the twelve months ended June 30, 2013, there are total revenues of $84,761,554 and total expenses of $82,609,401. The revenues exceeded expenses by $2,152,153. o The market value shown in the Portfolio Summary and in the Investment Portfolio Details as of June 30, 2013 total $82,719,671.01 with an average yield to maturity of 0.350%. The total earnings year-to-date are $340,168.23. 5 ENGINEERING AND WATER OPERATIONS: Engineering:  Regulatory Site Access Road: This project will improve the existing access road from the Sheriff substation to the reservoir site. The San Miguel Fire Department (Fire Department) is negotiating with the County to accept this access road as a substitute for the Campo Road deceleration lane requirement in their Major Use Permit. Staff continues working with the County to develop the easement documents. Easements will describe access rights and responsible parties for future maintenance of the entire road alignment from the Jamacha/SR-94 intersection, entrance to the Regulatory Site, and the current access off the SR-94. With the acceptance of the MND by the Board in July, staff will be applying for a grading permit with the County and a Joint Use Agreement with the Water Authority for the road encroachment within their easement. An unresolved item is the Fire Department does not have funding in place for the construction of the road, or for the maintenance of the Skyline Church entrance. (P2504)  North District – South District Interconnection System: This project consists of installing approximately 5.2 miles of 30- inch diameter pipe from H Street in Chula Vista to Paradise Valley Road in Spring Valley. The Draft Environmental Impact Report was issued for public comment on June 12, 2013. The 45- day public comment period ended July 26, 2013. Staff is working with Sweetwater Authority concerning conflicts with their pipelines. (P2511)  30-Inch, 980 Zone, Hunte Parkway – Proctor Valley/Use Area: This project consists of the installation of approximately 2,240 linear-feet of 30-inch steel pipe and appurtenances on Hunte Parkway at Proctor Valley Road, at the entrance to the Salt Creek Golf Course, in the City of Chula Vista. The contract has been accepted and the Notice of Completion was filed with the County of San Diego on July 8, 2013. Sepulveda submitted additional change requests for extended overhead and traffic control delays on the project. Staff has evaluated these requests and has provided an initial determination of “no merit” on these requests based on the information submitted. The Project is within budget and construction is completed. (P2514)  944‐1R Recycled Water Pump Station Upgrades and System Enhancement: This project consists of the installation of a new pump, reconfiguration of the suction header piping, upgrades to the instrumentation, SCADA system, and equipment at the 944-1R pump station. The project also includes the installation of 6 three (3) Pressure Reducing Stations (PRS) on Olympic Parkway, Eastlake Parkway, and Otay Lakes Road. Staff will be bringing a Change Order to the Board for consideration as part of the closing out this project. The Project is within budget and construction is anticipated to be completed in August 2014. (R2091)  Avocado, Louisa, Calavo, Challenge, Hidden Mesa Sanitary Sewer Replacement: This project consists of replacing approximately 4,500 linear-feet of sewer pipeline in Avocado Boulevard and neighboring residential streets. The contract has been accepted and the Notice of Completion was filed with the County of San Diego on July 2, 2013. The Project is within budget. (S2019, S2020, S2022, S2026)  624-1 Reservoir Cover Replacement: This project consists of replacing the floating cover on the 624-1 Reservoir. The existing cover is at the end of its useful life and in need of replacement. The contract has been accepted and the Notice of Completion was filed with the County of San Diego on July 2, 2013. The Project is within budget. (P2477)  12-Inch Potable Water Pipeline, East Orange Avenue, I-805 Crossing: This project consists of the installation of approximately 1,915 linear-feet of 12-inch steel and PVC pipe along with the associated appurtenances from the intersection of Melrose Avenue and Orange Avenue, east across the I-805 overpass, to the intersection of Olympic Parkway and Oleander Avenue in Chula Vista. This new pipeline is needed to meet fire flow requirements while Caltrans reconstructs the Palomar Bridge overpass, which contains a 10-inch pipeline that will be temporarily out of service. The water line was put into service on July 1, 2013. The remaining work of the project consists of final paving and punch list items. The Project is within budget and anticipated to be completed in August 2013. (P2513)  803-3 & 832-2 Reservoirs Interior/Exterior Coatings and Upgrades: This project consists of removing and replacing the interior and exterior coatings of the 803-3 Reservoir 2.0 MG and the 832-2 MG Reservoir 2.0 MG, along with providing structural upgrades to ensure the tanks comply with both State and Federal OSHA standards as well as American Water Works Association and County Health Department standards. The Contractor, Advanced Industrial Services (AIS), is nearing completion on the 803-3 Reservoir. The remaining work at this location consists of disinfection, filling the reservoir, and testing to put the 803- 3 reservoir in service. Work is nearing completion at the 832-2 Reservoir. The remaining work at this location consists of disinfection, filling the reservoir, and testing to put the 832- 7 2 reservoir in service. The Project is within budget and is anticipated to be completed in August 2013. (P2518 & P2519)  For the month of June 2013, the District sold 6 meters (6 EDUs) generating $54,923 in revenue. Projection for this period was 27.6 meters (36.6 EDUs) with budgeted revenue of $331,005. Total revenue for Fiscal Year 2013 through June 2013 is $3,242,833 against the annual budget of $3,972,064.  The following table summarizes Engineering's project purchases issued during the period of June 1, 2013 through July 15, 2013 that were within staff signatory authority: Date Action Amount Contractor/ Consultant Project 7/10/13 P.O. $15,000 Clarkson Lab & Supply, Inc. Various CIP and developer projects for Fiscal Year 2014 Water Operations:  Total number of potable water meters is 49,087.  The June potable water purchases were 3,220.0 acre-feet which is 15.6% above the budget of 2,786.6 acre-feet. The cumulative purchases through June is 32,058.6, acre-feet which is 5.1% above the cumulative budget of 30,514.0 acre-feet. 8  The June recycled water purchases and production was 524.6 acre-feet which is 12.8% above the budget of 465.1 acre-feet. The cumulative production and purchases through June is 4,392.0 acre-feet which is 12.3% above the cumulative budget of 3,911.2 acre-feet.  Recycled water consumption for the month of June is as follows:  Total consumption was 583.6 acre-feet or 190,086,248 gallons and the average daily consumption was 6,336,208 gallons per day.  Total recycled water consumption as of June for FY 2013 is 4617.2 acre-feet.  Total number of recycled water meters is 708.  Wastewater flows for the month of June were as follows:  Total basin flow, gallons per day: 1,728,568.  Spring Valley Sanitation District Flow to Metro, gallons per day: 572,581.  Total Otay flow, gallons per day: 1,155,610.  Flow Processed at the Ralph W. Chapman Water Recycling Facility, gallons per day: 1,148,018.  Flow to Metro from Otay Water District, gallons per day: 7,969.  By the end of June there were 6,083 wastewater EDUs. Check Total 2,562.50 494,190.00 40,716.83 10,899.92 4,726.82 5,405.84 245.29 3,461.90 595.87 CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 2037375 06/26/13 08488 ABLEFORCE INC 3753 04/19/13 PROGRAMMING SERVICES (4/4/13-4/18/13)1,437.50 3809 05/28/13 PROGRAMMING SERVICES (5/11/13-5/17/13)1,125.00 2037674 07/24/13 08488 ABLEFORCE INC 3832 06/18/13 PROGRAMMING SERVICES (5/22/13-6/10/13)1,500.00 1,500.00 2037675 07/24/13 13901 ADVANCED INDUSTRIAL SVCS INC 2A 06/26/13 UPGRADES FOR RES 803-3 / 832-2 (ENDING 5/31/13)255,597.50 3A 06/27/13 UPGRADES FOR RES 803-3 / 832-2 (ENDING 6/30/13)238,592.50 2037676 07/24/13 12006 ADVANCED WEB OFFSET INC 131607 06/03/13 2013 SPRING NEWSLETTER 2,889.00 2,889.00 2037376 06/26/13 12174 AECOM TECHNICAL SERVICES INC 6 05/29/13 DISINFECTION SYSTEM (ENDING 5/3/13)46,810.00 46,810.00 2037547 07/10/13 12174 AECOM TECHNICAL SERVICES INC 7 06/21/13 DISINFECTION SYSTEM (ENDING 5/31/13)45,579.71 45,579.71 2037548 07/10/13 11462 AEGIS ENGINEERING MGMT INC 1202 06/14/13 AS NEEDED DESIGN SVCS (5/4/13-5/31/13)31,942.00 1130 06/16/13 DEVELOPER PLANCHECKS (5/5/13-5/31/13)5,214.49 1042 06/13/13 PLAN CHECKING (5/5/13-5/31/13)3,560.34 2037677 07/24/13 11462 AEGIS ENGINEERING MGMT INC 1131 07/02/13 DEVELOPER PLANCHECKS (6/1/13-6/28/13)8,664.99 1043 07/02/13 PLAN CHECKING (6/1/13-6/28/13)2,234.93 2037377 06/26/13 07732 AIRGAS SPECIALTY PRODUCTS INC 131290770 05/28/13 AQUA AMMONIA 3,126.99 131290769 05/28/13 AQUA AMMONIA 1,599.83 2037633 07/17/13 07732 AIRGAS SPECIALTY PRODUCTS INC 131293711 06/19/13 AQUA AMMONIA 3,054.33 131293710 06/19/13 AQUA AMMONIA 2,351.51 2037378 06/26/13 13753 AIRGAS USA LLC 9016234945 05/28/13 BREATHING AIR 206.04 9910077704 05/31/13 BREATHING AIR 39.25 2037549 07/10/13 13753 AIRGAS USA LLC 9016763059 06/12/13 BREATHING AIR 206.04 206.04 2037678 07/24/13 13753 AIRGAS USA LLC 9910812638 06/30/13 BREATHING AIR 41.75 41.75 2037550 07/10/13 14811 ALARMS UNLIMITED INC 151631 06/24/13 LOBBY MONITOR 3,080.90 151533 06/13/13 RFID DIAGNOSTIC 381.00 2037679 07/24/13 14811 ALARMS UNLIMITED INC 152422 06/27/13 GATE REPAIR (6/25/13)449.00 449.00 2037488 07/03/13 14977 ALEXANDRA VINSON Ref002429007 06/26/13 UB Refund Cst #0000195965 14.30 14.30 2037680 07/24/13 02362 ALLIED WASTE SERVICES # 509 0509005222308 06/25/13 TRASH SERVICES (JULY 2013)530.33 0509005223979 06/25/13 TRASH SERVICES (JULY 2013)65.54 2037551 07/10/13 12911 ALTA LAND SURVEYING INC 27 06/20/13 SURVEY SERVICES (5/15/13-6/14/13)6,945.00 6,945.00 Page 1 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 49,170.00 5,246.51 2,346.69 2,337.06 64.24 2037681 07/24/13 12911 ALTA LAND SURVEYING INC 28 06/30/13 SURVEY SERVICES (ENDING 6/30/13)1,240.00 1,240.00 2037379 06/26/13 14462 ALYSON CONSULTING CM201307 06/05/13 CONST MGMT / INSP - EMERG REPAIRS (5/31/13)880.00 880.00 2037682 07/24/13 14462 ALYSON CONSULTING CM201311 06/30/13 CONST MGMT / INSPECTION (3/1/13-6/30/13)14,670.00 CM201310 06/30/13 CONST MGMT / INSPECTION (3/1/13-6/30/13)14,250.00 CM2013008 06/30/13 CONST MGMT / INSPECTION (3/1/13-6/30/13)11,700.00 CM201309 06/30/13 CONST MGMT / INSPECTION (3/1/13-6/30/13)8,550.00 2037380 06/26/13 11590 AMERICAN DIGITAL CARTOGRAPHY 18986 05/30/13 LICENSE RENEWAL (5/30/13-5/29/14)11,800.00 11,800.00 2037489 07/03/13 14975 AMERICAN EAGLE REAL ESTATE Ref002429005 06/26/13 UB Refund Cst #0000194816 41.11 41.11 2037552 07/10/13 06166 AMERICAN MESSAGING L1109570NG 07/01/13 PAGER SERVICES (JUNE 2013)217.42 217.42 2037381 06/26/13 06165 ANITA FIRE HOSE COMPANY ETC 19905 06/05/13 EXTINGUISHER MAINTENANCE 1,785.51 1,785.51 2037382 06/26/13 00002 ANSWER INC 8494 06/22/13 ANSWERING SERVICES (MONTHLY)1,100.00 1,100.00 2037553 07/10/13 08967 ANTHEM BLUE CROSS EAP 41146 06/25/13 EMPLOYEE ASSISTANCE PROGRAM (JULY 2013)316.66 316.66 2037383 06/26/13 03357 APEX ADVERTISING INC 158051 06/05/13 ANNUAL UNIFORM T-SHIRTS 4,385.45 158071 06/05/13 ANNUAL UNIFORM SWEATSHIRTS AND CAPS 861.06 2037554 07/10/13 03357 APEX ADVERTISING INC 158081 06/06/13 ANNUAL UNIFORM SWEATSHIRTS AND CAPS 2,081.64 160621 06/24/13 ANNUAL UNIFORM T-SHIRTS 265.05 2037384 06/26/13 01509 ARC ERGONOMICS 38145 06/07/13 ROLLER MOUSE 751.52 751.52 2037555 07/10/13 01509 ARC ERGONOMICS 38257 06/19/13 KEYBOARD TRAY 304.51 304.51 2037683 07/24/13 01509 ARC ERGONOMICS 38407 07/03/13 KEYBOARD TRAY 316.44 316.44 2037385 06/26/13 13171 ARCADIS US INC 0522495 06/03/13 WASTEWATER MANAGEMENT (ENDING 5/26/13)4,998.92 4,998.92 2037634 07/17/13 11282 ASHTON, PATRICK 071013 07/10/13 TUITION REIMBURSEMENT (6/1/13)180.00 180.00 2037386 06/26/13 01884 ASSN OF ENVIRONMENTAL PROF'LS 26225360513 05/31/13 MEMBERSHIP RENEWAL 150.00 150.00 2037387 06/26/13 05758 AT&T 33784130450613 06/07/13 PHONE SERVICES (6/7/13-7/6/13)31.71 31.71 2037556 07/10/13 05758 AT&T 0821645728062513 06/25/13 PHONE SERVICES (6/25/13-7/24/13)2,275.35 61942256050613 06/20/13 PHONE SERVICES (6/20/13-7/19/13)61.71 2037557 07/10/13 05758 AT&T 61967053090613 06/15/13 PHONE SERVICES (MONTHLY)32.12 61969851400613 06/24/13 PHONE SERVICES (MONTHLY)32.12 2037388 06/26/13 07785 AT&T 000004405632 06/02/13 PHONE SERVICES (5/2/13-6/1/13)5,667.95 Page 2 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 5,683.57 5,688.02 2037388 06/26/13 07785 AT&T 000004405632 06/02/13 PHONE SERVICES (5/2/13-6/1/13)5,667.95 000004407850 06/02/13 PHONE SERVICES (5/2/13-6/1/13)15.62 2037684 07/24/13 07785 AT&T 000004490323 07/02/13 PHONE SERVICES (6/2/13-7/1/13)5,672.40 000004492540 07/02/13 PHONE SERVICES (6/2/13-7/1/13)15.62 2037389 06/26/13 08330 AT&T INTERNET SERVICES 854782625 06/11/13 INTERNET BANDWIDTH (5/21/13-6/20/13)2,028.00 2,028.00 2037558 07/10/13 08330 AT&T INTERNET SERVICES 8547826250613 06/22/13 INTERNET BANDWIDTH (MONTHLY)1,622.40 1,622.40 2037390 06/26/13 12810 ATKINS 1169650 06/11/13 WATER & SEWER RATE STRUCTURE (4/1/13-6/2/13)784.00 784.00 2037685 07/24/13 12810 ATKINS 1171077 06/26/13 DESIGN SERVICES (ENDING MAY 2013)65.00 65.00 2037559 07/10/13 14985 AZTEC FENCE CO II INC AZ659 06/18/13 FENCE REPAIR 1,880.00 1,880.00 2037686 07/24/13 14985 AZTEC FENCE CO II INC 672E 06/27/13 REPLACE MAGLOCK 860.00 860.00 2037490 07/03/13 14964 BARBARA GALANGUE Ref002428994 06/26/13 UB Refund Cst #0000159628 23.20 23.20 2037560 07/10/13 06285 BARTEL ASSOCIATES LLC 13308 06/11/13 ACTUARIAL SERVICES (MAY 2013)1,165.00 1,165.00 2037687 07/24/13 06285 BARTEL ASSOCIATES LLC 13357 06/26/13 ACTUARIAL SERVICES (JUNE 2013)3,400.00 3,400.00 2037491 07/03/13 14963 BASEMA MELKONLAN Ref002428993 06/26/13 UB Refund Cst #0000146345 28.19 28.19 2037561 07/10/13 14577 BASILE CONSTRUCTION INC 5 06/12/13 ORANGE AVE / 805 12' PIPELINE (ENDING 5/31/13)273,575.08 273,575.08 2037688 07/24/13 14577 BASILE CONSTRUCTION INC 6 06/27/13 ORANGE AVE / 805 12" PIPELINE (ENDING 6/30/13)12,024.47 12,024.47 2037391 06/26/13 01630 BEARCOM 4209922 06/05/13 REPLACEMENT RADIOS 4,200.00 4,200.00 2037492 07/03/13 01630 BEARCOM 4191652 03/22/13 REPLACEMENT RADIOS 24,855.32 24,855.32 2037493 07/03/13 06520 BENSKIN, RONALD 004380 06/27/13 SAFETY BOOTS 147.14 147.14 2037494 07/03/13 14972 BRANDY BALLAS Ref002429002 06/26/13 UB Refund Cst #0000188882 12.93 12.93 2037392 06/26/13 10970 BRENNTAG PACIFIC INC BPI311435 06/04/13 SODIUM HYPOCHLORITE 2,452.82 BPI312756 06/07/13 SODIUM HYPOCHLORITE 2,230.42 BPI309206 05/28/13 SODIUM HYPOCHLORITE 1,562.18 BPI310288 05/31/13 SODIUM HYPOCHLORITE 1,403.34 BPI313339 06/10/13 SODIUM HYPOCHLORITE 961.85 BPI312223 06/06/13 SODIUM HYPOCHLORITE 832.57 BPI309205 05/28/13 SODIUM HYPOCHLORITE 767.95 BPI308722 05/28/13 SODIUM HYPOCHLORITE 760.28 Page 3 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 13,780.28 14,366.33 12,664.92 BPI311433 06/03/13 SODIUM HYPOCHLORITE 754.81 BPI311434 06/03/13 SODIUM HYPOCHLORITE 718.65 BPI313129 06/10/13 SODIUM HYPOCHLORITE 697.83 BPI310287 05/30/13 SODIUM HYPOCHLORITE 637.58 2037562 07/10/13 10970 BRENNTAG PACIFIC INC BPI315544 06/17/13 SODIUM HYPOCHLORITE 2,525.11 BPI316949 06/20/13 SODIUM HYPOCHLORITE 2,313.68 BPI314625 06/13/13 SODIUM HYPOCHLORITE 2,199.75 BPI317928 06/24/13 SODIUM HYPOCHLORITE 1,850.30 BPI313338 06/11/13 SODIUM HYPOCHLORITE 1,256.54 BPI316948 06/20/13 SODIUM HYPOCHLORITE 1,036.34 BPI317927 06/24/13 SODIUM HYPOCHLORITE 1,002.38 BPI315543 06/17/13 SODIUM HYPOCHLORITE 876.40 BPI315542 06/17/13 SODIUM HYPOCHLORITE 702.21 BPI314626 06/13/13 SODIUM HYPOCHLORITE 603.62 2037689 07/24/13 10970 BRENNTAG PACIFIC INC BPI320681 07/01/13 SODIUM HYPOCHLORITE 2,461.43 BPI319884 06/28/13 SODIUM HYPOCHLORITE 2,135.12 BPI321648 07/05/13 SODIUM HYPOCHLORITE 1,600.26 BPI321650 07/03/13 SODIUM HYPOCHLORITE 1,588.26 BPI318319 06/25/13 SODIUM HYPOCHLORITE 1,381.43 BPI321649 07/05/13 SODIUM HYPOCHLORITE 1,037.77 BPI320682 07/01/13 SODIUM HYPOCHLORITE 877.53 BPI320874 07/02/13 SODIUM HYPOCHLORITE 855.72 BPI319065 06/27/13 SODIUM HYPOCHLORITE 727.40 2037393 06/26/13 14855 BROWN FIELD TECHNOLOGY PRK LLC 004365 06/21/13 W/O REFUND D0192-060032 665.09 665.09 2037635 07/17/13 08156 BROWNSTEIN HYATT FARBER 536184 06/17/13 GOVERNMENT RELATIONS COUNSEL (MAY 2013)292.50 292.50 2037636 07/17/13 11461 BUSINESS PRINTING CO INC 106721 07/04/13 2013 CONSUMER CONFIDENCE RPT PRINTING 6,505.35 6,505.35 2037563 07/10/13 05620 C & I EQUIPMENT CO 12341 06/18/13 TANK TRAILER 9,650.00 9,650.00 2037564 07/10/13 02920 CALIFORNIA COMMERCIAL 128879 06/14/13 ASPHALT 2,255.30 2,255.30 2037394 06/26/13 14365 CALIFORNIA ENVIRONMENTAL 5779 05/30/13 APCD RETROFIT 15,213.60 15,213.60 2037637 07/17/13 01432 CALIFORNIA URBAN WATER 2013G1179 02/14/13 MEMBERSHIP DUES 2,334.68 2,334.68 2037395 06/26/13 01004 CALOLYMPIC SAFETY 316194 05/28/13 GT BATTERY/ WINDSOCK 182.58 Page 4 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 305.05 4,032.27 1,258.00 1,878.00 2,545.73 743.60 316193 05/28/13 GT BATTERY/ WINDSOCK 122.47 2037396 06/26/13 02758 CARMEL BUSINESS SYSTEMS INC 7676 06/01/13 DOCUMENT SERVICES (5/1/13-5/24/13)2,799.53 7675 06/01/13 RECORDS MGMT SVCS (5/3/13-5/28/13)851.28 7674 06/01/13 DOCUMENT SERVICES (5/9/13)278.64 7677 06/05/13 DOCUMENT SERVICES 102.82 2037690 07/24/13 02758 CARMEL BUSINESS SYSTEMS INC 7684 07/01/13 RECORDS MGMT SERVICES (6/1/13-6/28/13)3,569.70 3,569.70 2037691 07/24/13 13389 CAYETANO, TITA 072313 07/23/13 COMPUTER LOAN 867.97 867.97 2037692 07/24/13 14673 CGR MANAGEMENT CONSULTANTS LLC103160313 06/30/13 SCADA SYSTEM SOFTWARE 18,046.84 18,046.84 2037397 06/26/13 00446 CITY OF CHULA VISTA DE24160613 06/24/13 PLAN CHECK DEP TO ACCT # DE-2416 4,695.08 4,695.08 2037398 06/26/13 04119 CLARKSON LAB & SUPPLY INC 67597 05/31/13 BACTERIOLOGICAL TESTING 450.00 67594 05/31/13 BACTERIOLOGICAL TESTING 412.00 67596 05/31/13 BACTERIOLOGICAL TESTING 396.00 2037693 07/24/13 04119 CLARKSON LAB & SUPPLY INC 67719 06/30/13 BACTERIOLOGICAL TESTING 801.00 68109 06/30/13 BACTERIOLOGICAL TESTING 408.00 67817 06/30/13 BACTERIOLOGICAL TESTING 373.00 68108 06/30/13 BACTERIOLOGICAL TESTING 296.00 2037694 07/24/13 14928 COASTAL IGNITION & CONTROLS 9212 06/28/13 REPAIR PART 17,075.60 17,075.60 2037399 06/26/13 13900 COMMUNITY BANK 13 06/05/13 RETENTION / GARCIA JUAREZ (ENDING 5/31/13)3,037.50 3,037.50 2037695 07/24/13 13900 COMMUNITY BANK 14 06/20/13 RETENTION / GARCIA JUAREZ (ENDING 6/30/13)623.10 623.10 2037400 06/26/13 08160 COMPLETE OFFICE 15026800 05/29/13 TONER 2,305.97 15025690 05/29/13 TONER 239.76 2037696 07/24/13 03624 COPY LINK INC AR155380 06/27/13 SHARP COPIER MAINTENANCE (FY 2014)371.80 AR155381 06/27/13 SHARP COPIER MAINTENANCE (FY 2014)371.80 2037401 06/26/13 12334 CORODATA MEDIA STORAGE INC DS1257735 05/31/13 TAPE STORAGE (MAY 2013)373.57 373.57 2037697 07/24/13 12334 CORODATA MEDIA STORAGE INC DS1258315 06/30/13 TAPE STORAGE (JUNE 2013)375.23 375.23 2037638 07/17/13 02612 COUNCIL OF WATER UTILITIES 071113 07/11/13 MEETING REGISTRATION (7/16/13)25.00 25.00 2037565 07/10/13 00099 COUNTY OF SAN DIEGO DPWAROTAYMWD051306/18/13 EXCAVATION PERMITS (4/25/13-5/31/13)2,288.66 2,288.66 2037402 06/26/13 00134 COUNTY OF SAN DIEGO 004373 06/25/13 FILING FEE 3,045.25 3,045.25 2037403 06/26/13 00134 COUNTY OF SAN DIEGO 004372 06/25/13 FILING FEE 2,206.25 2,206.25 Page 5 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 851.00 284.00 4,804.00 486.00 3,000.00 2037403 06/26/13 00134 COUNTY OF SAN DIEGO 004372 06/25/13 FILING FEE 2,206.25 2,206.25 2037639 07/17/13 00134 COUNTY OF SAN DIEGO 12475 07/09/13 ELECTRONIC MAPS (ANNUAL)32.00 32.00 2037404 06/26/13 00184 COUNTY OF SAN DIEGO DEH2010HUPFP21281806/06/13 PERMIT RENEWAL (4/30/13-4/30/14)446.00 DEH2002HUPFP13213906/19/13 PERMIT RENEWAL (5/31/13-5/31/14)405.00 2037566 07/10/13 00184 COUNTY OF SAN DIEGO DEH130439D11 06/30/13 SHUT DOWN TEST (5/20/13)142.00 DEH130447D11 06/20/13 SHUT DOWN TEST (5/14/13)142.00 2037698 07/24/13 00184 COUNTY OF SAN DIEGO DEH2002HUPFP12089107/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)2,201.00 DEH2009HUPFP21035107/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)446.00 DEH2009HUPFP21029407/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)405.00 DEH2004HUPFP20316907/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 DEH2009HUPFP21029507/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 DEH2009HUPFP21029607/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 DEH2009HUPFP21029707/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 DEH2009HUPFP21040507/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 DEH2010HUPFP21278607/03/13 UPFP PERMIT RENEWAL (6/30/13-6/30/14)292.00 2037495 07/03/13 02122 COUNTY OF SAN DIEGO 2013042505668 04/25/13 PERMIT FEES # 05668 (JULY 2013-2014)356.00 2013051309283 05/13/13 PERMIT FEES # 04544 (DEC 2013-2014)130.00 2037405 06/26/13 07494 COUNTY OF SAN DIEGO 12D1101539820513 06/04/13 PLAN CHECK/REVIEW TA # 12D110153982 213.18 213.18 2037640 07/17/13 07494 COUNTY OF SAN DIEGO 12D1101539820613 07/04/13 INSPECTION CHARGES (6/19/13)70.20 70.20 2037641 07/17/13 02756 COX COMMUNICATIONS SAN DIEGO 27170613 06/29/13 INTERNET SERVICES (6/29/13-7/28/13)1,500.00 28810613 06/29/13 INTERNET SERVICES (6/29/13-7/28/13)1,500.00 2037567 07/10/13 04443 CSI SERVICES INC 5239 06/18/13 RESERVOIR INSPECTION 5,430.00 5,430.00 2037642 07/17/13 14989 DAVID PHETEPLACE Ref002429291 07/11/13 UB Refund Cst #0000032093 79.13 79.13 2037406 06/26/13 14362 DAY WIRELESS SYSTEMS {20}36750 05/31/13 NETWORK CABLING 4,715.00 4,715.00 2037568 07/10/13 03744 DEPARTMENT OF JUSTICE 980617 06/30/13 FINGERPRINTING SERVICES (JUNE 2013)147.00 147.00 2037569 07/10/13 14988 DIANA ROSAS 004386 07/03/13 CUSTOMER REFUND 167.95 167.95 2037496 07/03/13 03417 DIRECTV 20724867188 06/19/13 SATELLITE TV (6/19/13)6.00 6.00 2037570 07/10/13 11371 DOCUFLOW SOLUTIONS INC 8242 05/20/13 FAX MAINTENANCE (FY 2014)1,235.89 1,235.89 2037497 07/03/13 14966 DONALD CUDDINGTON Ref002428996 06/26/13 UB Refund Cst #0000168260 62.65 62.65 Page 6 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 3,200.00 1,665.00 1,565.00 80,089.24 890.00 8,377.87 2037407 06/26/13 14643 ECHO LABS LLC 20131333 06/07/13 ENERGY MANAGEMENT 4,500.00 4,500.00 2037571 07/10/13 02447 EDCO DISPOSAL CORPORATION 1554580613 06/30/13 RECYCLING SERVICES (JUNE 2013)95.00 95.00 2037498 07/03/13 14959 EDWARD HENRY Ref002428988 06/26/13 UB Refund Cst #0000073973 53.91 53.91 2037499 07/03/13 14974 EMILIA QUINTERO Ref002429004 06/26/13 UB Refund Cst #0000193294 36.47 36.47 2037699 07/24/13 08023 EMPLOYEE BENEFIT SPECIALISTS 0061313IN 06/30/13 EMPLOYEE BENEFITS (JUNE 2013)687.50 687.50 2037700 07/24/13 03765 ENGINEERING PARTNERS INC, THE 1713281 06/28/13 LA PRESA PRS REVIEW OF ELECTRICAL DRAWING 2,000.00 1813283 06/28/13 AS-BUILT DRAWING PREPARATION 1,200.00 2037408 06/26/13 14602 ENVIRO-CARE CO EC2120371 05/31/13 GRIT WASHER / COMPACTOR 6,675.16 6,675.16 2037409 06/26/13 03227 ENVIROMATRIX ANALYTICAL INC 3050915 05/28/13 RECYCLED WATER ANALYSIS (5/10/13-5/17/13)645.00 3060398 06/03/13 RECYCLED WATER ANALYSIS (5/18/13-5/22/13)510.00 3060563 06/10/13 RECYCLED WATER ANALYSIS (5/23/13-5/29/13)510.00 2037572 07/10/13 03227 ENVIROMATRIX ANALYTICAL INC 3060757 06/17/13 RECYCLED WATER ANALYSIS (5/30/13-6/6/13)800.00 3060960 06/24/13 RECYCLED WATER ANALYSIS (6/7/13-6/13/13)765.00 2037701 07/24/13 03227 ENVIROMATRIX ANALYTICAL INC 3061094 06/27/13 RECYCLED WATER ANALYSIS (6/14/13-6/19/13)690.00 690.00 2037702 07/24/13 12134 ENVIRONMENTAL LAB ACCR PROG BR 072313 07/23/13 CERTIFICATION APPLICATION FEE 2,359.00 2,359.00 2037703 07/24/13 03725 ENVIRONMENTAL SYSTEMS RESEARCH92670505 06/26/13 GIS SOFTWARE MAINTENANCE 53,989.24 92670787 06/27/13 ESRI PROFESSIONAL SERVICES 23,500.00 92670504 06/26/13 ESRI PRODUCTION MAPPING 2,600.00 2037500 07/03/13 02939 ESCARCEGA, LUIS 004377 06/26/13 TUITION REIMBURSEMENT 90.00 90.00 2037410 06/26/13 14320 EUROFINS EATON ANALYTICAL INC L0124763 06/04/13 OUTSIDE LAB SERVICES (5/14/13)750.00 750.00 2037573 07/10/13 14320 EUROFINS EATON ANALYTICAL INC L0126984 06/21/13 OUTSIDE LAB SERVICES (6/3/13)375.00 L0126664 06/19/13 OUTSIDE LAB SERVICES (6/3/13)260.00 L0126735 06/19/13 OUTSIDE LAB SERVICES (6/4/13-6/5/13)255.00 2037411 06/26/13 00645 FEDEX 230487352 06/14/13 MAIL SERVICES (6/6/13)6.30 6.30 2037412 06/26/13 03546 FERGUSON WATERWORKS # 1083 0437387 05/29/13 INVENTORY 3,751.92 0438880 06/17/13 INVENTORY 2,908.75 0439726 06/07/13 INVENTORY 1,717.20 2037574 07/10/13 03546 FERGUSON WATERWORKS # 1083 0439461 06/17/13 24" BUTTERFLY VALVE 602.04 602.04 Page 7 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 456.69 205.86 304.41 1,892.19 2037643 07/17/13 03546 FERGUSON WATERWORKS # 1083 0441409 07/02/13 INVENTORY 2,296.38 2,296.38 2037704 07/24/13 03546 FERGUSON WATERWORKS # 1083 0439464 06/28/13 24" BUTTERFLY VALVE 777.60 777.60 2037413 06/26/13 12187 FIRST AMERICAN DATA TREE LLC 9003400513 05/31/13 ONLINE DOCUMENTS (MAY 2013)99.00 99.00 2037705 07/24/13 12187 FIRST AMERICAN DATA TREE LLC 9003400613 06/30/13 ONLINE DOCUMENTS (JUNE 2013)99.00 99.00 2037414 06/26/13 04066 FIRST CHOICE SERVICES - SD 000788 05/29/13 COFFEE SUPPLIES 407.36 407.36 2037575 07/10/13 04066 FIRST CHOICE SERVICES - SD 001787 06/12/13 COFFEE SUPPLIES 1,068.22 1,068.22 2037576 07/10/13 00035 FISHER SCIENTIFIC 8291874 06/13/13 LABORATORY SUPPLIES 415.02 8394239 06/17/13 LABORATORY SUPPLIES 41.67 2037706 07/24/13 00035 FISHER SCIENTIFIC 9117568 07/05/13 LABORATORY SUPPLIES 1,336.11 1,336.11 2037415 06/26/13 02591 FITNESS TECH 8530 06/01/13 EQUIPMENT MAINTENANCE (JUNE 2013)135.00 135.00 2037416 06/26/13 11962 FLEETWASH INC X132264 05/31/13 VEHICLE/FLEET WASHING SERVICE 140.16 X135274 06/07/13 VEHICLE/FLEET WASHING SERVICE 65.70 2037577 07/10/13 11962 FLEETWASH INC x137880 06/14/13 VEHICLE/FLEET WASHING SERVICE 243.09 x140389 06/21/13 VEHICLE/FLEET WASHING SERVICE 61.32 2037707 07/24/13 11962 FLEETWASH INC x142923 06/28/13 VEHICLE/FLEET WASHING SERVICE 41.61 41.61 2037501 07/03/13 01612 FRANCHISE TAX BOARD Ben2429101 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 90.00 90.00 2037644 07/17/13 01612 FRANCHISE TAX BOARD Ben2429409 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 1,032.65 1,032.65 2037502 07/03/13 02344 FRANCHISE TAX BOARD Ben2429107 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 81.00 81.00 2037645 07/17/13 02344 FRANCHISE TAX BOARD Ben2429415 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 81.00 81.00 2037417 06/26/13 07224 FRAZEE INDUSTRIES INC 9530271442640 05/30/13 PAINT 1,840.52 9530271442650 05/30/13 PAINT 51.67 2037503 07/03/13 02254 FRY'S ELECTRONICS INC 004376 06/26/13 COMPUTER LOAN 757.92 757.92 2037418 06/26/13 13716 GARCIA JUAREZ CONSTRUCTION INC 13 05/31/13 CALAVO GARDENS (ENDING 5/31/13)57,712.50 57,712.50 2037708 07/24/13 13716 GARCIA JUAREZ CONSTRUCTION INC 14 06/20/13 CALAVO GARDENS (ENDING 6/30/13)11,838.90 11,838.90 2037646 07/17/13 14997 GARY KENT TEAM Ref002429299 07/11/13 UB Refund Cst #0000199214 19.86 19.86 2037419 06/26/13 10817 GEXPRO 580337304 06/03/13 PLC SOFTWARE 4,300.72 4,300.72 2037504 07/03/13 12673 GONZALEZ, DAVID 17960413 04/30/13 MILEAGE REIMBURSEMENT (APR 2013)117.52 117.52Page 8 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 590.76 1,590.83 3,052.75 2,693.13 7,200.00 362.92 2037504 07/03/13 12673 GONZALEZ, DAVID 17960413 04/30/13 MILEAGE REIMBURSEMENT (APR 2013)117.52 117.52 2037420 06/26/13 00101 GRAINGER INC 9152351434 05/28/13 BLUE PAINT 241.06 9159971507 06/05/13 SURVEY PAINT 209.69 9160022043 06/05/13 BATTERIES 116.94 9161057881 06/06/13 SURVEY PAINT 23.07 2037578 07/10/13 00101 GRAINGER INC 9176160647 CREDIT MEMO -402.08 9173215139 06/20/13 FLUORESCENT LINEAR LAMPS 1,281.03 9175961912 06/24/13 TOOLS (INSPECTION DIVISION)711.88 2037505 07/03/13 14981 GRANITE CONSTRUCTION COMPANY Ref002429011 06/26/13 UB Refund Cst #0000198862 1,173.80 1,173.80 2037421 06/26/13 12907 GREENRIDGE LANDSCAPE INC 10865 05/30/13 LANDSCAPING SERVICES (MAY 2013)8,650.00 8,650.00 2037709 07/24/13 12907 GREENRIDGE LANDSCAPE INC 10980 07/02/13 LANDSCAPING SERVICES (JUNE 2013)8,650.00 8,650.00 2037422 06/26/13 14952 GSA 004367 06/21/13 W/O REFUND D0891-090142 1,602.25 1,602.25 2037423 06/26/13 03773 GTC SYSTEMS INC 35612 06/01/13 NETWORK SERVICES (JUNE 2013)2,289.00 35592 05/31/13 NETWORK SERVICES (MAY 2013)763.75 2037710 07/24/13 03773 GTC SYSTEMS INC 35793 06/28/13 NETWORK SERVICES (JUNE 2013)412.50 412.50 2037647 07/17/13 08968 GURROLA, MICHAEL 071113 07/11/13 SAFETY BOOTS 150.00 150.00 2037579 07/10/13 00174 HACH COMPANY 8358212 06/24/13 LABORATORY SUPPLIES 1,542.38 8345511 06/14/13 TURBIDITY METER 1,150.75 2037711 07/24/13 00174 HACH COMPANY 8371148 07/02/13 WIMS SUPPORT (6/15/13-6/14/14)2,682.00 2,682.00 2037424 06/26/13 02795 HARTFORD INSURANCE CO, THE Ben2428817 06/20/13 MONTHLY CONTRIBUTION TO LTD 5,161.59 5,161.59 2037712 07/24/13 02795 HARTFORD INSURANCE CO, THE Ben2429395 07/18/13 MONTHLY CONTRIBUTION TO LTD 5,161.59 5,161.59 2037713 07/24/13 05986 HAVS INCORPORATED 70061 07/01/13 REPAIR SERVICES (5/28/13 & 6/27/13)372.06 372.06 2037580 07/10/13 04472 HECTOR I MARES-COSSIO 99 06/28/13 BI-NATIONAL CONSULTANT SERVICES (MAY 2013)3,600.00 100 06/28/13 BI-NATIONAL CONSULTANT SERVICES (JUNE 2013)3,600.00 2037425 06/26/13 00062 HELIX WATER DISTRICT 004375 06/20/13 SEWER ACCOUNTS 409.24 409.24 2037506 07/03/13 00062 HELIX WATER DISTRICT 178540010613 06/11/13 WATER PURCHASE (4/4/13-6/6/13)322.82 174639860613 06/11/13 WATER PURCHASE (4/5/13-6/6/13)40.10 2037426 06/26/13 14951 HERITAGE BUILDING & DEVT 004368 06/21/13 W/O REFUND D0894-090149 3,169.81 3,169.81 2037427 06/26/13 04209 HIDDEN VALLEY PUMP 000278800000 06/19/13 PUMP AND MOTOR REBUILD FOR 944-1 P/S 18,226.48 18,226.48Page 9 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 5,933.68 23,164.68 21,723.62 1,675.60 1,885.75 2037427 06/26/13 04209 HIDDEN VALLEY PUMP 000278800000 06/19/13 PUMP AND MOTOR REBUILD FOR 944-1 P/S 18,226.48 18,226.48 2037428 06/26/13 12335 HP ENTERPRISE SERVICES LLC U3079453 06/10/13 IVR PAYMENT SERVICES (MAY 2013)1,856.30 1,856.30 2037714 07/24/13 01649 IDEXX DISTRIBUTION INC 269867942 07/05/13 LABORATORY SUPPLIES 4,633.43 269867943 07/05/13 LABORATORY SUPPLIES 1,300.25 2037429 06/26/13 08969 INFOSEND INC 69268 05/31/13 POSTAGE (MAY 2013)12,922.68 69384 06/03/13 BILL PRINTING SERVICES (MAY 2013)5,220.80 69267 05/31/13 BILL PRINTING SERVICES (MAY 2013)5,021.20 2037715 07/24/13 08969 INFOSEND INC 70018 06/28/13 POSTAGE (JUNE 2013)11,717.77 70222 07/01/13 BILL PRINTING SERVICES (JUNE 2013)5,268.80 70017 06/28/13 BILL PRINTING SERVICES (JUNE 2013)4,737.05 2037430 06/26/13 02372 INTERIOR PLANT SERVICE INC 4704 05/31/13 PLANT SERVICES (MAY 2013)205.00 205.00 2037431 06/26/13 13899 INTERMEDIA.NET INC 2013051399 06/01/13 EXCHANGE OUTSOURCING (5/2/13-6/1/13)3,486.06 3,486.06 2037716 07/24/13 13899 INTERMEDIA.NET INC 2013070106 07/01/13 EXCHANGE OUTSOURCING (6/2/13-7/1/13)3,486.06 3,486.06 2037717 07/24/13 03250 INTERNATIONAL PUBLIC MGMT 071713 07/17/13 MEMBERSHIP RENEWALS (7/1/13-6/30/14)165.00 165.00 2037581 07/10/13 02263 ITRON INC 292608 06/11/13 MAINTENANCE RENEWAL (ANNUAL)4,872.62 4,872.62 2037718 07/24/13 14737 IWATER INC 6318 07/05/13 INFRAMAP SOFTWARE 5,000.00 5,000.00 2037582 07/10/13 00646 JACKSON-HIRSH INC 0864367 06/18/13 LAMINATING SUPPLIES 83.52 83.52 2037432 06/26/13 03077 JANI-KING OF CALIFORNIA INC SDO05130171 05/01/13 JANITORIAL SERVICES (MAY 2013)1,119.82 1,119.82 2037719 07/24/13 03077 JANI-KING OF CALIFORNIA INC SDO06130168 06/01/13 JANITORIAL SERVICES (JUNE 2013)1,119.82 1,119.82 2037583 07/10/13 10563 JCI JONES CHEMICALS INC 582997 CREDIT MEMO -3,000.00 585783 CREDIT MEMO -3,000.00 580442 CREDIT MEMO -2,000.00 582953 05/30/13 CHLORINE 4,837.80 585772 06/24/13 CHLORINE 4,837.80 2037507 07/03/13 14970 JESSICA GALVIN Ref002429000 06/26/13 UB Refund Cst #0000187008 24.77 24.77 2037508 07/03/13 14978 JOEL JOHNSON Ref002429008 06/26/13 UB Refund Cst #0000196171 31.23 31.23 2037584 07/10/13 03172 JONES & STOKES ASSOCIATES INC 0094613 06/10/13 ENVIRONMENTAL CONSULTING (4/27/13-5/24/13)1,313.75 0094614 06/10/13 ENVIRONMENTAL CONSULTING (4/27/13-5/24/13)572.00 2037720 07/24/13 03172 JONES & STOKES ASSOCIATES INC 0094923 07/05/13 ENVIRONMENTAL CONSULTING (4/27/13-6/30/13)5,477.50 Page 10 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 17,949.52 9,153.00 354.75 5,634.18 150.00 2037720 07/24/13 03172 JONES & STOKES ASSOCIATES INC 0094923 07/05/13 ENVIRONMENTAL CONSULTING (4/27/13-6/30/13)5,477.50 0094921 07/05/13 ENVIRONMENTAL CONSULTING (5/25/13-6/30/13)2,982.50 0094930 07/05/13 ENVIRONMENTAL CONSULTING (5/25/13-6/30/13)2,395.00 0094863 07/01/13 ENVIRONMENTAL CONSULTING (4/27/13-5/2/13)2,393.27 0094918 07/05/13 ENVIRONMENTAL CONSULTING (4/27/13-6/30/13)2,177.50 0094920 07/05/13 ENVIRONMENTAL CONSULTING (1/1/13-6/30/13)1,938.00 0094917 07/05/13 ENVIRONMENTAL CONSULTING (5/25/13-6/30/13)585.75 2037509 07/03/13 14960 KATHLEEN PICKARD TRUST Ref002428990 06/26/13 UB Refund Cst #0000089932 29.62 29.62 2037648 07/17/13 14998 KEVIN ECKHAUS Ref002429300 07/11/13 UB Refund Cst #0000199299 56.55 56.55 2037433 06/26/13 05840 KIRK PAVING INC 5365 06/05/13 ASPHALT CONCRETE PAVING 12,628.00 12,628.00 2037585 07/10/13 05840 KIRK PAVING INC 5374 06/21/13 PAVING SERVICES 5,533.00 5373 06/21/13 PAVING SERVICES 3,620.00 2037434 06/26/13 04996 KNOX ATTORNEY SERVICE INC 141075 05/31/13 DELIVERY SERVICES (4/26/13-5/10/13)258.00 258.00 2037721 07/24/13 04996 KNOX ATTORNEY SERVICE INC 4000787 06/30/13 DELIVERY SERVICES (5/31/13-6/21/13)258.00 4004708 07/02/13 DELIVERY SERVICES (6/28/13)32.25 4004707 07/02/13 DELIVERY SERVICES (6/28/13)32.25 4004706 07/02/13 DELIVERY SERVICES (6/28/13)32.25 2037722 07/24/13 14808 KOEPPEN, KEVIN 18190713 07/22/13 TRAVEL EXPENSES (7/16/13)143.33 143.33 2037435 06/26/13 12276 KONECRANES INC SDG00796786 05/29/13 CRANE INSPECTIONS (MAY 2013)400.00 400.00 2037436 06/26/13 14036 KRATOS / HBE 18040113 05/31/13 DOOR INTERCOM 2,032.33 180202132 05/31/13 REMOVE/REATTACH SECURITY TO RESERVOIRS 1,745.60 18010213 05/31/13 CIRCUIT BOARDS 1,620.00 SM42428 05/31/13 MOTION DETECTORS 236.25 2037586 07/10/13 14036 KRATOS / HBE SM42570 06/17/13 ALARM MONITORING (JUNE 2013)55.00 SM42569 06/17/13 ALARM MONITORING (JUNE 2013)55.00 SM42566 06/17/13 ALARM MONITORING (JUNE 2013)40.00 2037437 06/26/13 06497 LAKESIDE LAND COMPANY 271157 06/04/13 LANDFILL 57.56 57.56 2037587 07/10/13 06497 LAKESIDE LAND COMPANY 271489 06/17/13 LANDFILL 53.60 53.60 2037723 07/24/13 06497 LAKESIDE LAND COMPANY 271189 06/05/13 LANDFILL 30.64 30.64 2037510 07/03/13 14967 LAS PALMAS 56 DEVELOPMENT LLC Ref002428997 06/26/13 UB Refund Cst #0000176820 1,678.02 1,678.02 Page 11 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 251,658.45 11,613.69 491.61 6,556.25 2037438 06/26/13 09511 LAYFIELD ENVIRONMENTAL SYSTEMS E04623 05/31/13 FLOATING RESERVOIR COVERS MAINT (MAY 2013)12,154.30 12,154.30 2037588 07/10/13 09511 LAYFIELD ENVIRONMENTAL SYSTEMS 3 06/17/13 FLOATING COVER REPLACEMENT (ENDING 5/31/13)226,224.45 E04631 06/21/13 FLOATING RESERVOIR COVERS MAINT (6/1/13-6/15/13)25,434.00 2037649 07/17/13 09511 LAYFIELD ENVIRONMENTAL SYSTEMS 00014361 06/24/13 RETAINAGE RELEASE 32,022.88 32,022.88 2037724 07/24/13 09511 LAYFIELD ENVIRONMENTAL SYSTEMS 4 06/24/13 FLOATING COVER REPLACEMENT (ENDING 6/28/13)10,973.99 E60074 06/30/13 MAINT OF FLOATING RES COVERS - ADJ (MAY 2013)639.70 2037439 06/26/13 03607 LEE & RO INC LR15659 06/03/13 INTERCONNECTION (7/28/12-5/31/13)16,716.19 16,716.19 2037511 07/03/13 14982 LEVY ORTIZ Ref002429012 06/26/13 UB Refund Cst #0000199030 37.53 37.53 2037512 07/03/13 14976 LEZAMA FAMILY TRUST Ref002429006 06/26/13 UB Refund Cst #0000195701 207.70 207.70 2037513 07/03/13 14979 LILY ARTENSTEIN Ref002429009 06/26/13 UB Refund Cst #0000198116 116.11 116.11 2037589 07/10/13 12910 LOCATORS & SUPPLIES INC 0214109IN 06/14/13 SURVEY SUPPLIES 362.03 0214317IN 06/20/13 SURVEY SUPPLIES 129.58 2037514 07/03/13 03019 LOPEZ, JOSE 70100513 06/20/13 MILEAGE REIMBURSEMENT (MAY 2013)55.94 55.94 2037440 06/26/13 06954 LUSARDI CONSTRUCTION CO 004371 06/19/13 REFUND 1,500.00 1,500.00 2037515 07/03/13 07591 MA, DONGXING 004370 06/27/13 TRAVEL EXPENSES (3/25/13-3/28/13)659.34 659.34 2037725 07/24/13 07591 MA, DONGXING 17470713 07/22/13 TRAVEL EXPENSES (7/8/13-7/11/13)60.00 60.00 2037590 07/10/13 01464 MAG SYSTEMS INC 195225532 06/18/13 FLOW TOTALIZER 302.78 302.78 2037441 06/26/13 14950 MAHER D YOUNAN / DALE R YOUNAN 004367 06/21/13 W/O REFUND D0896-090151 617.37 617.37 2037591 07/10/13 10512 MAIL MANAGEMENT GROUP INC OWD8278 06/28/13 CONSUMER CONF REPORT 2013 PROCESSING 2,314.20 2,314.20 2037726 07/24/13 10512 MAIL MANAGEMENT GROUP INC OWD8343 07/18/13 PROP 218 NOTICE PROCESSING 2,851.00 2,851.00 2037650 07/17/13 14992 MARIA FRANCO Ref002429294 07/11/13 UB Refund Cst #0000155170 54.20 54.20 2037516 07/03/13 14969 MARIETTA SANTOS Ref002428999 06/26/13 UB Refund Cst #0000181767 51.26 51.26 2037517 07/03/13 14962 MARIO GONZALEZ Ref002428992 06/26/13 UB Refund Cst #0000141538 5.30 5.30 2037592 07/10/13 02902 MARSTON & MARSTON INC 201362 06/01/13 DESALINATION OUTREACH (5/1/13-5/30/13))2,182.50 2,182.50 2037727 07/24/13 02902 MARSTON & MARSTON INC 201371 07/01/13 COMMUNITY OUTREACH (JUNE 2013)5,000.00 201372 07/01/13 DESALINATION OUTREACH (6/1/13-6/28/13)1,556.25 2037728 07/24/13 05329 MASTER METER INC 109897 06/27/13 MASTERLINX MOBILE COLLECTOR 17,470.59 17,470.59Page 12 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 624.52 647.56 2037728 07/24/13 05329 MASTER METER INC 109897 06/27/13 MASTERLINX MOBILE COLLECTOR 17,470.59 17,470.59 2037518 07/03/13 14965 MAURICE WRIGHTEN Ref002428995 06/26/13 UB Refund Cst #0000163073 6.26 6.26 2037442 06/26/13 01183 MCMASTER-CARR SUPPLY CO 52674071 05/29/13 BURLAP BAGS 351.75 52589790 05/28/13 SECURITY COVER 140.46 53132918 06/05/13 STRETCH WRAP 119.42 51127847 05/02/13 PIPE CLAMPS 12.89 2037593 07/10/13 01183 MCMASTER-CARR SUPPLY CO 53480477 06/11/13 SKIMMINGS DISCHARGE MATERIALS 521.80 54040792 06/20/13 CONDUIT STRAPS 125.76 2037519 07/03/13 14955 MCMILLIN Ref002428984 06/26/13 UB Refund Cst #0000000718 3,382.94 3,382.94 2037520 07/03/13 14973 MICHAEL EDWARD Ref002429003 06/26/13 UB Refund Cst #0000188911 41.38 41.38 2037729 07/24/13 09581 MICHAEL R WELCH PHD PE 71312 06/30/13 PLANNING SERVICES (4/1/13-6/28/13)1,080.00 1,080.00 2037651 07/17/13 14994 MICHELLE SLAPE Ref002429296 07/11/13 UB Refund Cst #0000186800 34.22 34.22 2037443 06/26/13 00103 MILLER PAVING CORP 116541 06/20/13 ASPHALT CONCRETE PAVING 7,262.00 7,262.00 2037444 06/26/13 01577 MINARIK CORPORATION I1036115DD 05/29/13 PLC MODULES 4,743.36 4,743.36 2037445 06/26/13 00237 MISSION JANITORIAL & ABRASIVE 36389900 05/30/13 JANITORIAL SUPPLIES 768.38 768.38 2037594 07/10/13 00237 MISSION JANITORIAL & ABRASIVE 36548700 06/11/13 JANITORIAL SUPPLIES 1,682.68 1,682.68 2037446 06/26/13 09227 MOORE INDUSTRIES-INTRNTL INC 588508 05/29/13 PID CONTROLLER 2,135.20 2,135.20 2037730 07/24/13 12016 MTGL INC 47140 06/27/13 GEOTECHNICAL SERVICES (6/1/13-6/30/13)7,615.00 7,615.00 2037521 07/03/13 14957 NANETTE DALL Ref002428986 06/26/13 UB Refund Cst #0000058091 96.78 96.78 2037731 07/24/13 12908 NARASIMHAN CONSULTING SERVICES 039011 07/01/13 HYDRAULIC MODELING SERVICES (2/23/13-6/30/13)11,353.50 11,353.50 2037522 07/03/13 03523 NATIONAL DEFERRED COMPENSATIONBen2429099 07/03/13 BI-WEEKLY DEFERRED COMP PLAN 8,707.61 8,707.61 2037652 07/17/13 03523 NATIONAL DEFERRED COMPENSATIONBen2429407 07/18/13 BI-WEEKLY DEFERRED COMP PLAN 8,707.61 8,707.61 2037732 07/24/13 13690 NEAL ELECTRIC CORP 59033 06/27/13 CONDUIT INSTALLATION 1,268.00 1,268.00 2037523 07/03/13 14968 NERYS USA INC Ref002428998 06/26/13 UB Refund Cst #0000177661 137.20 137.20 2037733 07/24/13 08531 NEWEST CONSTRUCTION 201305 06/28/13 SKIMMINGS INSTALL 3,684.00 3,684.00 2037734 07/24/13 14118 NORTHSTAR COURIER INC 2599 07/19/13 COURIER SERVICE 76.34 76.34 2037447 06/26/13 00510 OFFICE DEPOT INC 661159541001 06/06/13 OFFICE SUPPLIES 4.06 4.06 Page 13 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 10,149.84 860.00 3,484.00 2037447 06/26/13 00510 OFFICE DEPOT INC 661159541001 06/06/13 OFFICE SUPPLIES 4.06 4.06 2037524 07/03/13 00510 OFFICE DEPOT INC 661158839001 06/10/13 OFFICE SUPPLIES 40.46 40.46 2037735 07/24/13 00510 OFFICE DEPOT INC 663988764001 07/03/13 OFFICE SUPPLIES 306.10 306.10 2037653 07/17/13 14990 OLGA CHAVEZ Ref002429292 07/11/13 UB Refund Cst #0000071854 180.00 180.00 2037448 06/26/13 03149 ON SITE LASER LLC 47533 06/05/13 PRINTER SERVICES 91.80 91.80 2037736 07/24/13 03149 ON SITE LASER LLC 47747 06/28/13 PRINTER SERVICES 143.80 143.80 2037595 07/10/13 14947 OPTICAL SERVICES COMPANY 8041 06/20/13 MICROSCOPE REPAIR 120.00 120.00 2037449 06/26/13 02334 OTAY LANDFILL - 4531 0000013868 05/31/13 WASTE DISPOSAL 215.99 215.99 2037596 07/10/13 02334 OTAY LANDFILL - 4531 0000013942 06/15/13 WASTE DISPOSAL 313.31 313.31 2037597 07/10/13 01718 OTAY MESA CHAMBER OF COMMERCE 004394 04/16/13 MEMBERSHIP RENEWAL (JUNE 2013-JUNE 2014)600.00 600.00 2037450 06/26/13 01002 PACIFIC PIPELINE SUPPLY 160138 06/06/13 INVENTORY 5,832.00 160584 06/06/13 INVENTORY 4,317.84 2037598 07/10/13 14954 PACIFIC TRANS ENVIRONMENTAL 41555 06/20/13 HAZARDOUS WASTE DISPOSAL 2,054.78 2,054.78 2037451 06/26/13 10419 PARADA PAINTING INC 15841 06/05/13 GRIT CHAMBER COATING 16,832.00 16,832.00 2037452 06/26/13 10419 PARADA PAINTING INC 15842TM 06/05/13 GRIT CHAMBER COATING 510.83 510.83 2037737 07/24/13 14812 PARKWAY SIGNS 13919 06/27/13 SINGER LANE GATE SIGN 194.79 194.79 2037453 06/26/13 05497 PAYPAL INC 24307873 05/31/13 PHONE PAYMENT SERVICES (MAY 2013)54.10 54.10 2037738 07/24/13 05497 PAYPAL INC 24936895 06/30/13 PHONE PAYMENT SERVICES (JUNE 2013)54.10 54.10 2037454 06/26/13 08398 PEERLESS MATERIALS COMPANY 31351 05/29/13 RAGS 388.80 388.80 2037455 06/26/13 03790 PENHALL COMPANY 33563 05/28/13 SAW CUTTING SERVICES 650.00 33562 05/28/13 SAW CUTTING SERVICES 210.00 2037456 06/26/13 00137 PETTY CASH CUSTODIAN 004362 06/25/13 PETTY CASH 483.13 483.13 2037654 07/17/13 00137 PETTY CASH CUSTODIAN 071613 07/16/13 PETTY CASH 295.95 295.95 2037457 06/26/13 00053 PITNEY BOWES INC 779189 06/03/13 POSTAGE METER RENTAL 207.36 207.36 2037739 07/24/13 00053 PITNEY BOWES INC 422848 07/01/13 EQUIPMENT MAINTENANCE (8/1/13-7/31/14)3,178.00 422849 07/01/13 EQUIPMENT MAINTENANCE (8/1/13-7/31/14)306.00 2037740 07/24/13 01715 PORRAS, PEDRO 13210713 07/24/13 TRAVEL EXPENSES (7/14/13-7/16/13)481.05 481.05Page 14 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 2,012.36 1,917.08 2037740 07/24/13 01715 PORRAS, PEDRO 13210713 07/24/13 TRAVEL EXPENSES (7/14/13-7/16/13)481.05 481.05 2037458 06/26/13 03351 POSADA, ROD 004374 06/25/13 TRAVEL EXPENSES (9/29/13-10/2/13)952.41 952.41 2037741 07/24/13 03351 POSADA, ROD 17130713 07/18/13 TRAVEL EXPENSES (7/8/13-7/17/13)195.33 195.33 2037459 06/26/13 13059 PRIORITY BUILDING SERVICES 35047 05/01/13 JANITORIAL SERVICES (MAY 2013)3,504.00 3,504.00 2037742 07/24/13 13059 PRIORITY BUILDING SERVICES 35448 06/01/13 JANITORIAL SERVICES (JUNE 2013)3,504.00 3,504.00 2037460 06/26/13 06641 PRUDENTIAL OVERALL SUPPLY 30343870 05/30/13 UNIFORMS, TOWELS & MATS 387.70 30345363 06/06/13 UNIFORMS, TOWELS & MATS 373.30 30343869 05/30/13 UNIFORMS, TOWELS & MATS 213.12 30345362 06/06/13 UNIFORMS, TOWELS & MATS 213.12 30343871 05/30/13 UNIFORMS, TOWELS & MATS 182.50 30345364 06/06/13 UNIFORMS, TOWELS & MATS 182.50 30343242 05/28/13 UNIFORMS, TOWELS & MATS 114.12 30344748 06/04/13 UNIFORMS, TOWELS & MATS 114.12 30345365 06/06/13 UNIFORMS, TOWELS & MATS 72.86 30343872 05/30/13 UNIFORMS, TOWELS & MATS 66.86 30343241 05/28/13 UNIFORMS, TOWELS & MATS 46.08 30344747 06/04/13 UNIFORMS, TOWELS & MATS 46.08 2037599 07/10/13 06641 PRUDENTIAL OVERALL SUPPLY 30346872 06/13/13 UNIFORMS, TOWELS & MATS 373.26 30348391 06/20/13 UNIFORMS, TOWELS & MATS 371.26 30346871 06/13/13 UNIFORMS, TOWELS & MATS 213.12 30348390 06/20/13 UNIFORMS, TOWELS & MATS 213.12 30346873 06/13/13 UNIFORMS, TOWELS & MATS 182.50 30348392 06/20/13 UNIFORMS, TOWELS & MATS 182.50 30346243 06/11/13 UNIFORMS, TOWELS & MATS 114.12 30347765 06/18/13 UNIFORMS, TOWELS & MATS 114.12 30348393 06/20/13 UNIFORMS, TOWELS & MATS 60.92 30346242 06/11/13 UNIFORMS, TOWELS & MATS 46.08 30347764 06/18/13 UNIFORMS, TOWELS & MATS 46.08 2037655 07/17/13 06641 PRUDENTIAL OVERALL SUPPLY 30346874 06/13/13 UNIFORMS, TOWELS & MATS 66.86 66.86 2037743 07/24/13 06641 PRUDENTIAL OVERALL SUPPLY 30349734 06/27/13 UNIFORMS, TOWELS & MATS 371.26 30349733 06/27/13 UNIFORMS, TOWELS & MATS 213.12 30349735 06/27/13 UNIFORMS, TOWELS & MATS 182.50 Page 15 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 988.00 833.54 92.49 30349273 06/25/13 UNIFORMS, TOWELS & MATS 114.12 30349736 06/27/13 UNIFORMS, TOWELS & MATS 60.92 30349272 06/25/13 UNIFORMS, TOWELS & MATS 46.08 2037461 06/26/13 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2428821 06/20/13 BI-WEEKLY PERS CONTRIBUTION 150,562.38 150,562.38 2037600 07/10/13 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2429091 07/03/13 BI-WEEKLY PERS CONTRIBUTION 149,053.00 149,053.00 2037744 07/24/13 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2429399 07/18/13 BI-WEEKLY PERS CONTRIBUTION 156,463.32 156,463.32 2037601 07/10/13 10294 QWIKPRINTS 131821417 07/01/13 FINGERPRINTING SERVICE (6/19/13)20.00 20.00 2037602 07/10/13 01342 R J SAFETY SUPPLY CO INC 31432900 06/12/13 SAFETY SUPPLIES 631.48 31406700 06/14/13 FACE MASK CERTIFICATION 202.06 2037603 07/10/13 00766 RANROY PRINTING COMPANY 018903 06/20/13 POSTCARDS 1,312.20 1,312.20 2037462 06/26/13 00021 RCP BLOCK & BRICK INC 4357515 05/30/13 CONCRETE 1,928.00 1,928.00 2037656 07/17/13 14995 REAL SOLUTION Ref002429297 07/11/13 UB Refund Cst #0000197123 9.44 9.44 2037657 07/17/13 14996 REMAX ASSOCIATES Ref002429298 07/11/13 UB Refund Cst #0000197369 8.93 8.93 2037604 07/10/13 00521 RICK POST WELDING &9492 06/12/13 WELDING & WET TAPPING 2,592.00 2,592.00 2037745 07/24/13 14255 RK CONTROLS INC 0062601 06/27/13 LOGO KIT 180.11 180.11 2037525 07/03/13 04542 ROBAK, MARK 70140613 06/15/13 MILEAGE REIMBURSEMENT (3/15/13-6/15/13)91.53 70140313A 03/15/13 MILEAGE REIMBURSEMENT ADJ (1/1/13-3/18/13)0.96 2037526 07/03/13 14825 ROBERT CLARK Ref002428989 06/26/13 UB Refund Cst #0000088644 60.00 60.00 2037527 07/03/13 14971 ROCIO GUERRERO Ref002429001 06/26/13 UB Refund Cst #0000188101 27.79 27.79 2037528 07/03/13 14983 ROXANNE JONES Ref002429013 06/26/13 UB Refund Cst #0000199230 30.80 30.80 2037658 07/17/13 14993 RUSLAN GRUB Ref002429295 07/11/13 UB Refund Cst #0000176815 410.80 410.80 2037463 06/26/13 09148 S & J SUPPLY COMPANY INC S100025436001 06/11/13 INVENTORY 637.20 637.20 2037464 06/26/13 05130 SAFARI MICRO INC 230962 05/28/13 SO DIMM 4GB MEMORY 110.44 110.44 2037529 07/03/13 05130 SAFARI MICRO INC 231416 06/04/13 COMPUTERS 4,136.99 4,136.99 2037465 06/26/13 11596 SAN DIEGO CONSTRUCTION WELDING 8927 06/04/13 WELDING SERVICES 1,390.00 1,390.00 2037605 07/10/13 02586 SAN DIEGO COUNTY ASSESSOR 20122240 06/12/13 ASSESSOR DATA 125.00 125.00 2037606 07/10/13 00003 SAN DIEGO COUNTY WATER AUTH 0000000776 06/18/13 SOCAL WATERSMART (APR 2013)1,444.96 1,444.96 Page 16 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 328.80 54,742.79 151,456.92 69,040.33 2037606 07/10/13 00003 SAN DIEGO COUNTY WATER AUTH 0000000776 06/18/13 SOCAL WATERSMART (APR 2013)1,444.96 1,444.96 2037607 07/10/13 00247 SAN DIEGO DAILY TRANSCRIPT 376200 06/12/13 NOTICE OF AVAILABILITY 164.40 374784 06/04/13 BID ADVERTISEMENT 164.40 2037466 06/26/13 00121 SAN DIEGO GAS & ELECTRIC 004364 06/19/13 UTILITY EXPENSES (MONTHLY)38,533.48 004363 06/05/13 UTILITY EXPENSES (MONTHLY)16,209.31 2037608 07/10/13 00121 SAN DIEGO GAS & ELECTRIC 004389 07/03/13 UTILITY EXPENSES (MONTHLY)56,565.25 004382 06/25/13 UTILITY EXPENSES (MONTHLY)52,297.78 004383 06/26/13 UTILITY EXPENSES (MONTHLY)41,758.74 004381 06/24/13 UTILITY EXPENSES (MONTHLY)746.34 004388 06/27/13 UTILITY EXPENSES (MONTHLY)88.81 2037659 07/17/13 00121 SAN DIEGO GAS & ELECTRIC C1230713 07/08/13 UTILITY EXPENSES (MONTHLY)22,391.70 22,391.70 2037467 06/26/13 12080 SAN DIEGO UNION-TRIBUNE, THE 0010752104 06/07/13 NOTICE OF AVAILABILITY 646.80 646.80 2037530 07/03/13 14956 SAUL CONTRERAS Ref002428985 06/26/13 UB Refund Cst #0000014913 180.43 180.43 2037468 06/26/13 12333 SCHINDLER ELEVATOR CORPORATION8103451554 05/01/13 ELEVATOR MAINTENANCE (MAY 2013)416.00 416.00 2037746 07/24/13 12333 SCHINDLER ELEVATOR CORPORATION8103473357 06/01/13 MONTHLY ELEVATOR MAINTENANCE (JUNE 2013)416.00 416.00 2037531 07/03/13 14980 SDNY LLC Ref002429010 06/26/13 UB Refund Cst #0000198132 129.69 129.69 2037747 07/24/13 15000 SEGURA, ADOLFO 17460713 07/18/13 TRAVEL EXPENSES (7/16/13-7/17/13)165.16 165.16 2037748 07/24/13 12904 SEPULVEDA CONSTRUCTION INC 00013791 07/10/13 RETAINAGE RELEASE 64,544.05 15A 07/10/13 30 INCH POTABLE PIPELINE (ENDING 6/30/13)4,496.28 2037609 07/10/13 14785 SEW-EURODRIVE INC 862541 05/29/13 FILTER GEAR REDUCERS 7,774.29 7,774.29 2037610 07/10/13 00419 SHAPE PRODUCTS 162889 06/17/13 DITRIBUTION SUPPLIES 1,205.72 1,205.72 2037469 06/26/13 14949 SHARON BALLARD COX / CLAY COX 004370 06/21/13 W/O REFUND D0895-090150 617.37 617.37 2037470 06/26/13 11516 SIEMENS INDUSTRY INC 901260649 06/01/13 ULTRASONIC TRANSDUCER 646.92 646.92 2037611 07/10/13 11516 SIEMENS INDUSTRY INC 901286773 06/22/13 BIOXIDE FOR P/S 1,442.64 1,442.64 2037660 07/17/13 11516 SIEMENS INDUSTRY INC 900760235 06/01/12 PROCESSING TANK 120.00 120.00 2037749 07/24/13 13327 SILVA-SILVA INTERNATIONAL 1307 06/10/13 PROJECT CONSULTANT (JUNE 2013)4,000.00 4,000.00 2037750 07/24/13 14984 SOLARWINDS INC IN127011 06/27/13 NETWORK MAINTENANCE (6/27/13-6/27/14)10,000.00 10,000.00 2037471 06/26/13 14953 SOUTH BAY DISTRIBUTION LLC 004366 06/21/13 W/O REFUND D0685-060022 8,151.13 8,151.13 Page 17 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 1,273.00 1,273.00 319.92 602,176.16 1,752.50 2037471 06/26/13 14953 SOUTH BAY DISTRIBUTION LLC 004366 06/21/13 W/O REFUND D0685-060022 8,151.13 8,151.13 2037472 06/26/13 11618 SOUTH COAST COPY SYSTEMS AR129185 05/31/13 COPIER MAINTENANCE (JUNE 2013)1,682.59 1,682.59 2037532 07/03/13 11618 SOUTH COAST COPY SYSTEMS AR124576 03/19/13 STAPLES FOR COPIER 132.84 132.84 2037751 07/24/13 11618 SOUTH COAST COPY SYSTEMS AR130877 06/30/13 COPIER MAINTENANCE 1,682.59 1,682.59 2037612 07/10/13 02963 SOUTH COUNTY ECONOMIC 109713 06/12/13 MEMBERSHIP DUES (FY 2014)750.00 750.00 2037473 06/26/13 03103 SOUTHCOAST HEATING &C51146 05/21/13 AC MAINTENANCE (MAY 2013)1,068.00 C51147 05/21/13 AC MAINTENANCE (MAY 2013)205.00 2037752 07/24/13 03103 SOUTHCOAST HEATING &C51390 06/14/13 AC MAINTENANCE (JUNE 2013)1,068.00 C51391 06/14/13 AC MAINTENANCE (JUNE 2013)205.00 2037474 06/26/13 03760 SPANKY'S PORTABLE SERVICES INC 951955 06/03/13 PORTABLE TOILET RENTAL (6/1/13-6/28/13)79.98 951483 05/31/13 PORTABLE TOILET RENTAL (5/31/13-6/27/13)79.98 951482 05/31/13 PORTABLE TOILET RENTAL (5/31/13-6/27/13)79.98 951481 05/31/13 PORTABLE TOILET RENTAL (5/31/13-6/27/13)79.98 2037613 07/10/13 03760 SPANKY'S PORTABLE SERVICES INC 952729 06/12/13 PORTABLE TOILET RENTAL (6/12/13-7/9/13)79.98 79.98 2037475 06/26/13 03516 SPECIAL DISTRICT RISK PD12130053810001 06/10/13 PROPERTY DEDUCTIBLE 500.00 500.00 2037533 07/03/13 03516 SPECIAL DISTRICT RISK 43639 05/21/13 PROPERTY & LIABILITY PROGRAM (ANNUAL)545,537.16 43882 06/06/13 WORKERS' COMPENSATION (JULY-SEPT 2013)56,639.00 2037614 07/10/13 03516 SPECIAL DISTRICT RISK 44252 07/01/13 PROPERTY/LIABILITY COVERAGE (2012-13)13.23 13.23 2037615 07/10/13 03484 SPECIALTY DOORS & AUTOMATION 39322SD 06/13/13 GATE REPAIR 258.89 258.89 2037616 07/10/13 01717 SPRING VALLEY CHAMBER OF 10440713 07/01/13 MEMBERSHIP RENEWAL (2013-2014)550.00 550.00 2037753 07/24/13 02354 STANDARD ELECTRONICS 18573 06/07/13 SECURITY MAINTENANCE (JUNE 2013)1,352.50 18680 06/28/13 RELAY MODULE 400.00 2037534 07/03/13 06281 STATE DISBURSEMENT UNIT Ben2429105 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 919.03 919.03 2037661 07/17/13 06281 STATE DISBURSEMENT UNIT Ben2429413 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 919.03 919.03 2037535 07/03/13 06299 STATE DISBURSEMENT UNIT Ben2429097 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 237.69 237.69 2037662 07/17/13 06299 STATE DISBURSEMENT UNIT Ben2429405 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 237.69 237.69 2037536 07/03/13 06303 STATE DISBURSEMENT UNIT Ben2429103 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 831.23 831.23 2037663 07/17/13 06303 STATE DISBURSEMENT UNIT Ben2429411 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 831.23 831.23 Page 18 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 809.30 322.11 338.04 2037663 07/17/13 06303 STATE DISBURSEMENT UNIT Ben2429411 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 831.23 831.23 2037537 07/03/13 08533 STATE DISBURSEMENT UNIT Ben2429109 07/03/13 BI-WEEKLY PAYROLL DEDUCTION 258.00 258.00 2037664 07/17/13 08533 STATE DISBURSEMENT UNIT Ben2429417 07/18/13 BI-WEEKLY PAYROLL DEDUCTION 258.00 258.00 2037617 07/10/13 03738 STEVEN ENTERPRISES INC 0302630IN 06/12/13 INK CARTRIDGES 1,085.05 1,085.05 2037665 07/17/13 14999 STONE POINT - SWEETWATER HOA 23115 06/28/13 LANDSCAPE PROGRAM 11,685.00 11,685.00 2037618 07/10/13 12809 STUTZ ARTIANO SHINOFF 92244 06/24/13 LEGAL SERVICES (MAY 2013)28,994.80 28,994.80 2037476 06/26/13 12223 SUNBELT RENTALS INC 40257113001 06/07/13 GENSET RENTAL 1,885.67 1,885.67 2037477 06/26/13 02750 SUPERIOR READY MIX LP 571168 06/06/13 CRUSHED ROCK 646.53 570116 06/03/13 CRUSHED ROCK 162.77 2037619 07/10/13 02750 SUPERIOR READY MIX LP 573021 06/17/13 CRUSHED ROCK 83.01 83.01 2037478 06/26/13 02376 TECHKNOWSION INC 2460 05/31/13 SCADA PROGRAMMING 11,587.00 11,587.00 2037620 07/10/13 02376 TECHKNOWSION INC 2464 06/20/13 SCADA PROGRAMMING 4,200.00 4,200.00 2037754 07/24/13 02376 TECHKNOWSION INC 2463 06/21/13 SCADA PROGRAMMING 12,320.00 12,320.00 2037538 07/03/13 08159 TORRES, LEONEL 17571112 07/01/13 TRAVEL EXPENSES (11/8/12)127.87 17571212 07/01/13 TRAVEL EXPENSES (12/5/12)113.44 17570513 07/01/13 TRAVEL EXPENSES (5/14/13)80.80 2037539 07/03/13 14543 TRACOM INC 17064 05/22/13 HIDDEN MOUNTAIN ENCLOSURE 28,099.00 28,099.00 2037666 07/17/13 14991 TRACY MARTINEZ Ref002429293 07/11/13 UB Refund Cst #0000126450 70.88 70.88 2037621 07/10/13 03261 TYLER TECHNOLOGIES INC 04590619 06/11/13 SOFTWARE MAINTENANCE 5,762.81 5,762.81 2037667 07/17/13 03261 TYLER TECHNOLOGIES INC 04590143 06/12/13 SOFTWARE MAINTENANCE 121,850.76 121,850.76 2037479 06/26/13 00427 UNDERGROUND SERVICE ALERT OF 520130475 06/01/13 UNDERGROUND ALERTS (MAY 2013)319.50 319.50 2037755 07/24/13 00427 UNDERGROUND SERVICE ALERT OF 620130471 07/01/13 UNDERGROUND ALERTS (JUNE 2013)360.00 360.00 2037480 06/26/13 14181 UNITED RENTALS (NORTH AMERICA)111714176001 06/10/13 CONCRETE 178.20 178.20 2037622 07/10/13 14181 UNITED RENTALS (NORTH AMERICA)111788716001 06/12/13 CONCRETE 178.20 112027851001 06/21/13 CONCRETE 159.84 2037756 07/24/13 14181 UNITED RENTALS (NORTH AMERICA)112327450001 07/03/13 CONCRETE 159.84 159.84 2037540 07/03/13 00335 UNITED STATES POSTMASTER 4429 07/01/13 POSTAGE FOR PROP 218 NOTICES 15,209.72 15,209.72 Page 19 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 41,878.16 5,157.57 68,638.08 461.45 2037540 07/03/13 00335 UNITED STATES POSTMASTER 4429 07/01/13 POSTAGE FOR PROP 218 NOTICES 15,209.72 15,209.72 2037668 07/17/13 00335 UNITED STATES POSTMASTER 4429 07/01/13 POSTAGE FOR PROP 218 NOTICES 12,260.07 12,260.07 2037669 07/17/13 07662 UNITEDHEALTHCARE SPECIALTY 1229 07/17/13 AD&D & SUPP LIFE INS (AUG 2013)5,617.56 5,617.56 2037481 06/26/13 07674 US BANK O0000000031 05/22/13 CAL CARD EXPENSES (MONTHLY)41,371.73 E000035 05/22/13 CAL CARD EXPENSES (MONTHLY)290.00 E000036 05/22/13 CAL CARD EXPENSES (MONTHLY)216.43 2037541 07/03/13 07674 US BANK 004385 05/22/13 CAL CARD EXPENSES (MONTHLY)52.40 52.40 2037623 07/10/13 07674 US BANK E000037 06/24/13 CAL CARD EXPENSES (MONTHLY)3,284.73 004393 06/24/13 CAL CARD EXPENSES (MONTHLY)1,469.37 E000038 06/24/13 CAL CARD EXPENSES (MONTHLY)403.47 2037670 07/17/13 07674 US BANK O00000032 06/24/13 CAL CARD EXPENSES (MONTHLY)55,936.72 A000045 06/24/13 CAL-CARD EXPENSES (MONTHLY)9,286.67 004390 05/22/13 CAL CARD EXPENSES (MONTHLY)2,375.77 004391 06/24/13 CAL CARD EXPENSES (MONTHLY)1,038.92 2037542 07/03/13 06829 US SECURITY ASSOCIATES INC 150138 05/31/13 SECURITY SERVICES (MAY 2013)263.65 113265 04/30/13 SECURITY SERVICES (APR 2013)197.80 2037482 06/26/13 11606 USA BLUE BOOK 976231 06/04/13 DIGITAL DISPLAYS 993.44 993.44 2037624 07/10/13 11606 USA BLUE BOOK 982879 06/11/13 SKIMMINGS DISCHARGE MATERIALS 61.80 61.80 2037483 06/26/13 13048 V & A CONSULTING ENGINEERS 14099 05/31/13 CORROSION SERVICES (5/1/13-5/31/13)14,751.50 14,751.50 2037757 07/24/13 13048 V & A CONSULTING ENGINEERS 14167R2 06/28/13 CORROSION SERVICES (6/1/13-6/28/13)30,000.02 30,000.02 2037484 06/26/13 03190 VALCO INSTRUMENTS CO INC 90221111 05/29/13 HACH PARTS 4,358.47 4,358.47 2037485 06/26/13 08028 VALLEY CONSTRUCTION MANAGEMENTSD100135 05/31/13 CONSTRUCTION MANAGEMENT (5/1/13-5/31/13)13,575.00 13,575.00 2037758 07/24/13 08028 VALLEY CONSTRUCTION MANAGEMENTSD100136 06/30/13 CONSTRUCTION MANAGEMENT (6/1/13-6/30/13)7,900.00 7,900.00 2037543 07/03/13 01095 VANTAGEPOINT TRANSFER AGENTS Ben2429089 07/03/13 BI-WEEKLY DEFERRED COMP PLAN 12,536.76 12,536.76 2037671 07/17/13 01095 VANTAGEPOINT TRANSFER AGENTS Ben2429397 07/18/13 BI-WEEKLY DEFERRED COMP PLAN 12,532.19 12,532.19 2037544 07/03/13 06414 VANTAGEPOINT TRANSFER AGENTS Ben2429095 07/03/13 BI-WEEKLY 401A PLAN 2,403.28 2,403.28 2037672 07/17/13 06414 VANTAGEPOINT TRANSFER AGENTS Ben2429403 07/18/13 BI-WEEKLY 401A PLAN 2,203.28 2,203.28 2037625 07/10/13 03329 VERIZON WIRELESS 9706954177 06/21/13 WIRELESS SERVICES (5/22/13-6/21/13)5,995.12 5,995.12 Page 20 of 21 Check Total CHECK REGISTER Otay Water District Date Range: 6/20/2013 - 7/24/2013 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 365.00 535.00 1,356.75 56,845.49 2037626 07/10/13 01994 VORTEX 18523 06/19/13 FILTER DISPOSAL 80.00 80.00 2037627 07/10/13 03781 WATTON, MARK 17910613 07/02/13 MILEAGE REIMBURSEMENT (JUNE 2013)163.29 163.29 2037486 06/26/13 01343 WE GOT YA PEST CONTROL 82508 05/28/13 BEE REMOVAL 250.00 82767 06/07/13 PEST CONTROL 115.00 2037628 07/10/13 01343 WE GOT YA PEST CONTROL 82981 06/18/13 PEST CONTROL 995.00 995.00 2037673 07/17/13 01343 WE GOT YA PEST CONTROL 82811 06/05/13 BEE REMOVAL 115.00 82810 06/05/13 BEE REMOVAL 115.00 82808 06/06/13 BEE REMOVAL 115.00 82716 06/04/13 BEE REMOVAL 115.00 83123 06/21/13 BEE REMOVAL 75.00 2037629 07/10/13 07780 WEBER SCIENTIFIC 602471 06/17/13 LABORATORY SUPPLIES 325.40 325.40 2037487 06/26/13 00125 WESTERN PUMP INC W19159 05/31/13 DUSTO INSPECTIONS 400.00 400.00 2037630 07/10/13 00125 WESTERN PUMP INC W19872 06/14/13 ANNUAL MONITORING 956.75 W20144 06/19/13 DUSTO INSPECTIONS 400.00 2037545 07/03/13 14961 WILLIAM MARTIN Ref002428991 06/26/13 UB Refund Cst #0000127381 181.33 181.33 2037546 07/03/13 14958 WILLIAM PENETRANTE Ref002428987 06/26/13 UB Refund Cst #0000067120 157.44 157.44 2037631 07/10/13 03283 WILSON BOHANNAN PADLOCK CO 0100559IN 06/24/13 AIR-VAC LOCKS 1,853.72 1,853.72 2037632 07/10/13 14857 YSI INCORPORATED 529135 06/24/13 TSS METERS 49,959.53 Check Grand Total:4,095,224.80 528191 06/14/13 INF TSS METER 6,885.96 Page 21 of 21