HomeMy WebLinkAbout12-07-16 Board Packet 1 OTAY WATER DISTRICT BOARD OF DIRECTORS MEETING DISTRICT BOARDROOM 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA WEDNESDAY December 7, 2016 3:30 P.M. AGENDA 1. ROLL CALL 2. PLEDGE OF ALLEGIANCE 3. OATH OF OFFICE CEREMONY HECTOR GASTELUM MARK ROBAK MITCH THOMPSON 4. PRESENTATION OF RECOGNITION PLAQUE TO BOARD PRESIDENT 5. RECESS FOR RECEPTION 6. RECONVENE OTAY WATER DISTRICT BOARD MEETING 7. ELECTION OF BOARD PRESIDENT As per Chapter 2, Section 1.03.B, Procedure for Election, of the District’s Code of Ordinances, the General Manager shall chair the proceedings for election of the President. The newly-elected President shall assume office immediately and shall chair the proceedings for the election of the Vice President and Treasurer. 8. ELECTION OF BOARD VICE PRESIDENT 9. ELECTION OF BOARD TREASURER 10. APPROVAL OF AGENDA 11. APPROVE THE MINUTES OF THE REGULAR BOARD MEETING OF OCTO- BER 5, 2016 2 12. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA 13. RECESS OTAY WATER DISTRICT BOARD MEETING 14. CONVENE OTAY SERVICE CORPORATION BOARD MEETING 15. ROLL CALL 16. ELECTION OF OFFICERS a) PRESIDENT b) VICE-PRESIDENT c) TREASURER 17. APPOINTMENT OF OFFICERS a) EXECUTIVE DIRECTOR b) CHIEF FINANCIAL OFFICER c) SECRETARY 18. ADJOURN OTAY SERVICE CORPORATION BOARD MEETING 19. CONVENE OTAY WATER DISTRICT FINANCING AUTHORITY BOARD MEET- ING 20. ROLL CALL 21. RE-AFFIRM OFFICERS OF THE OTAY WATER DISTRICT FINANCING AU- THORITY a) PRESIDENT b) VICE-PRESIDENT c) EXECUTIVE DIRECTOR d) TREASURER/AUDITOR e) SECRETARY 22. ADJOURN OTAY WATER DISTRICT FINANCING AUTHORITY BOARD MEET- ING 23. RECONVENE OTAY WATER DISTRICT BOARD MEETING 3 CONSENT CALENDAR 24. ITEMS TO BE ACTED UPON WITHOUT DISCUSSION, UNLESS A REQUEST IS MADE BY A MEMBER OF THE BOARD OR THE PUBLIC TO DISCUSS A PARTICULAR ITEM: a) APPROVE CHANGE ORDER NO. 4 TO THE EXISTING CONTRACT WITH TRANSTAR PIPELINE, INC. IN THE AMOUNT OF $50,760 FOR THE RANCHO SAN DIEGO BASIN SEWER REHABILITATION - PHASE 1 PROJECT b) ADOPT RESOLUTION NO. 4317, FIXING TERMS AND CONDITIONS FOR THE ANNEXATION OF CERTAIN REAL PROPERTIES OWNED BY LICIA A. BARNETT (APN: 517-112-09-00) INTO THE OTAY WATER DIS- TRICT IMPROVEMENT DISTRICT NO. 18 c) ADOPT THE MITIGATED NEGATIVE DECLARATION FOR THE 870-2 PUMP STATION PROJECT d) APPROVE THE PURCHASE OF A PERMANENT UTILITY EASEMENT AT THE RANCHO SAN DIEGO VILLAGE SHOPPING CENTER FROM REGENCY CENTERS FOR THE CAMPO ROAD SEWER REPLACE- MENT PROJECT IN AN AMOUNT NOT-TO-EXCEED $125,000 e) APPROVE THE ISSUANCE OF A PURCHASE ORDER TO VOLVO CONSTRUCTION EQUIPMENT IN THE AMOUNT NOT-TO-EXCEED $269,764 FOR THE PURCHASE OF TWO (2) REPLACEMENT PORTA- BLE EMERGENCY GENSETS f) APPROVE A TWO-YEAR FIXED AGREEMENT, PLUS THREE (3) ONE- YEAR OPTIONS, WITH T&T JANITORIAL, INC. FOR JANITORIAL SER- VICES IN AN AMOUNT-NOT-TO-EXCEED $286,800 ACTION ITEMS 25. ADMINISTRATION AND FINANCE a) APPROVE THE FIRST AMENDMENT TO THE JOINT POWERS AGENCY WATER CONSERVATION GARDEN OPERATION AGREE- MENT, EXTENDING THE EXPIRATION DATE AN ADDITIONAL SIX MONTHS FROM DECEMBER 31, 2016 TO JUNE 30, 2017 (OTERO) 26. BOARD a) DISCUSSION OF THE 2016 AND 2017 BOARD MEETING CALENDARS 4 INFORMATIONAL ITEM 27. THE FOLLOWING ITEM IS PROVIDED TO THE BOARD FOR INFORMA- TIONAL PURPOSES ONLY. NO ACTION IS REQUIRED ON THE FOLLOWING AGENDA ITEM: a) FIRST QUARTER OF FISCAL YEAR 2017 CAPITAL IMPROVEMENT PROGRAM UPDATE REPORT (MARTIN) REPORTS 28. GENERAL MANAGER’S REPORT a) SAN DIEGO COUNTY WATER AUTHORITY UPDATE 29. DIRECTORS' REPORTS/REQUESTS 30. PRESIDENT’S REPORT/REQUESTS RECESS TO CLOSED SESSION 31. CLOSED SESSION a) CONFERENCE WITH LEGAL COUNSEL – PENDING LITIGATION [GOVERNMENT CODE §54956.9] MARK COZIAHR, ET AL. vs. OTAY WATER DISTRICT, SAN DIEGO COUNTY WATER AUTHORITY, ET AL.; CASE NO. 37-2015-00023413 b) CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section 54956.9: 1 CASE RETURN TO OPEN SESSION 32. REPORT ON ANY ACTIONS TAKEN IN CLOSED SESSION. THE BOARD MAY ALSO TAKE ACTION ON ANY ITEMS POSTED IN CLOSED SESSION 33. ADJOURNMENT 5 All items appearing on this agenda, whether or not expressly listed for action, may be deliberated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the District’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available through the District Secretary by contacting her at (619) 670-2280. If you have any disability which would require accommodation in order to enable you to participate in this meeting, please call the District Secretary at (619) 670-2280 at least 24 hours prior to the meeting. Certification of Posting I certify that on December 2, 2016, I posted a copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time be- ing at least 72 hours in advance of the regular meeting of the Board of Directors (Gov- ernment Code Section §54954.2). Executed at Spring Valley, California on December 2, 2016. /s/ Susan Cruz, District Secretary 1 MINUTES OF THE BOARD OF DIRECTORS MEETING OF THE OTAY WATER DISTRICT October 5, 2016 1. The meeting was called to order by President Thompson at 3:34 p.m. 2. ROLL CALL Directors Present: Lopez, Robak, Smith and Thompson Directors Absent: Croucher (assigned to the Loma Fire in northern CA) Staff Present: General Manager Mark Watton, General Counsel Daniel Shinoff, Attorney Jeanne Blumenfeld, Asst. General Manager German Alvarez, Chief of Engineering Rod Posada, Chief Financial Officer Joe Beachem, Chief of Administration Adolfo Segura, Chief of Operations Pedro Porras, Asst. Chief of Operations Jose Martinez, District Secretary Susan Cruz and others per attached list. 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF AGENDA A motion was made by Director Smith, and seconded by Director Lopez and carried with the following vote: Ayes: Directors Lopez, Robak, Smith and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the agenda. 5. APPROVE THE MINUTES OF THE REGULAR BOARD MEETINGS OF AUGUST 3 AND SEPTEMBER 7, 2016 A motion was made by Director Smith, and seconded by Director Lopez and carried with the following vote: Ayes: Directors Lopez, Robak, Smith and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the minutes of the regular board meetings of August 3 and September 7, 2016. 2 6. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD'S JURISDICTION BUT NOT AN ITEM ON TODAY'S AGENDA Mr. Victor Geroche of El Cajon indicated that he received a notice that his water would be shut off and that he also received a bill in August 2016 for $719. He stated that the bill indicates that he used 13,592.15 gallons of water in approximately one day. He indicated that his property is barely an acre and that if he used that much water in a day, he felt his property would likely be flooded along with his neighbors. Mr. Geroche stated that the District did visit his property to investigate and did change out his meter so it could be tested. The meter tested fine and the new meter was left installed at his property. He questioned the shutoff notice he received and where all the water had gone. He stated that he felt that something was not right. Director Robak inquired if staff had any information that could be shared regarding Mr. Geroche’s water bill. Customer Service Manager Andrea Carey indicated she would look into why Mr. Geroche received a shutoff notice as his account has been “flagged” to prevent his water from being shut off while the District investigates his situation. She stated that the District reviewed the data log for his property for the month in question and found a few days where there were long periods of water use. Mr. Geroche indicated that that could not happen as he manually waters his yard. Ms. Carey stated the meter for Mr. Geroche’s property was tested and it had passed. She indicated that the District’s Water Conservation Specialist Richard Namba also visited Mr. Geroche’s property and Mr. Namba found that Mr. Geroche has in excess of 100 fruit trees on his property and that the ground was covered with decomposed granite. Mr. Namba felt that Mr. Geroche could have left the water running and with the decomposed granite ground cover, the water would have easily slipped into the ground. Mr. Namba observed that Mr. Geroche’s fruit trees were in impeccable order and the quality of the trees were impressive. He felt that Mr. Geroche was a master gardener. Ms. Carey indicated that based on the District’s meter test and Mr. Namba’s observations, the District concluded that the water in question did pass through Mr. Geroche’s meter. She indicated that she and Mr. Geroche have not spoken since the completion of the test and the visit to his property, but she did have a follow-up call to Mr. Geroche noted on her calendar for next week. Mr. Geroche does have a balance on his account and they would be discussing the best way to handle this balance. President Thompson indicated that this was not an item on today’s agenda and stated to Mr. Geroche that the District’s Board has noted his concern and that there will be some follow-up from staff with him. Ms. Carey confirmed that staff would be in contact with Mr. Geroche. 3 CONSENT CALENDAR 7. ITEMS TO BE ACTED UPON WITHOUT DISCUSSION, UNLESS A REQUEST IS MADE BY A MEMBER OF THE BOARD OR THE PUBLIC TO DISCUSS A PARTICULAR ITEM: A motion was made by Director Smith, seconded by President Thompson and carried with the following vote: Ayes: Directors Lopez, Robak, Smith and Thompson Noes: None Abstain: None Absent: Director Croucher to approve the following consent calendar items: a) AWARD A CONSTRUCTION CONTRACT TO UNDERGROUND PIPELINE SOLUTIONS, INC. FOR THE 36-INCH LA PRESA AIR- VACUUM VALVE RELOCATIONS PROJECT IN AN AMOUNT NOT-TO- EXCEED $157,315 b) AWARD A CONSTRUCTION CONTRACT TO BLASTCO, INC. FOR THE 978-1 & 850-2 RESERVOIR INTERIOR/EXTERIOR COATINGS AND UPGRADES PROJECT IN AN AMOUNT NOT-TO-EXCEED $1,106,200 c) APPROVE AN AGREEMENT WITH ECS IMAGING, INC. FOR ENTERPRISE CONTENT MANAGEMENT SOFTWARE LICENSING, IMPLEMENTATION, AND MIGRATION IN AN AMOUNT NOT-TO- EXCEED $185,265, AND REASSIGN AN ADDITIONAL $75,265 TO THIS PROJECT FROM IDENTIFIED CIP SAVINGS ACTION ITEMS 8. ENGINEERING AND WATER OPERATIONS a) APPROVE THE WATER SUPPLY ASSESSMENT AND VERIFICATION REPORT DATED AUGUST 2016 FOR THE CITY OF CHULA VISTA UNIVERSITY INNOVATION DISTRICT PROJECT, AS REQUIRED BY SENATE BILLS 610 AND 221 Environmental Compliance Specialist Lisa Coburn-Boyd indicated that the City of Chula Vista submitted a request to the District for a Water Supply Verification Assessment and Verification Report (WSA&V Report) for their University Innovation District Project pursuant to Senate Bills 610 and 221. She stated the primary intent of these bills is to improve the link between water supply availability and land use decisions. These bills require the water purveyor to prepare a WSA&V Report that will be included in the Project’s CEQA documentation. Board approval is required for the submittal of the WSA&V 4 Report to the City of Chula Vista. Please reference the Committee Action notes attached to staff’s report (Attachment A) for the full details of Ms. Coburn-Boyd’s report. It was discussed that if the City of Chula Vista’s University Innovation District Project does not come to fruition and, instead, a high density development was proposed for the project area, a new WSA&V Report would be required for the new proposed development as it suggests new land use. A motion was made by Director Robak, seconded by President Thompson and carried with the following vote: Ayes: Directors Lopez, Robak, Smith and Thompson Noes: None Abstain: None Absent: Director Croucher to approve staff’s recommendation. 9. BOARD a) DISCUSSION OF THE 2016 BOARD MEETING CALENDAR President Thompson noted that he will not be able to attend the November 2, 2016 board meeting. There were no changes to the board meeting calendar. INFORMATIONAL ITEM 10. THE FOLLOWING ITEM IS PROVIDED TO THE BOARD FOR INFORMATIONAL PURPOSES ONLY. NO ACTION IS REQUIRED ON THE FOLLOWING AGENDA ITEM: a) FISCAL YEAR 2016 BOARD OF DIRECTORS’ EXPENSES Finance Manager Kevin Koeppen presented the Fiscal Year-End 2016 Board of Directors expenses. Please reference the Committee Action notes attached to staff’s report (Attachment A) for the details of Mr. Koeppen’s report. President Thompson indicated that he felt that the board members were doing a good job in setting a tone of being fiscally conservative, especially in comparison to other local agencies. 5 REPORTS 11. GENERAL MANAGER’S REPORT CWA Report General Manager Watton reported that officer elections have occurred at CWA and Director Croucher has been voted Secretary of CWA’s Board of Directors; which places him in the board leadership for the next six (6) years. He stated that CWA has scheduled a Board workshop next week to discuss MWD matters and update the Board on the lawsuit. He lastly shared that the State Board’s conservation mandate is being fast tracked and the agencies, including ACWA, CSDA, etc,, have requested additional time (longer than 10 days) to consider what the State Board is proposing. General Manager’s Report General Manager Watton presented information from his report which included an update on emergency preparedness, the capacity fee study, the Ralph W. Chapman Water Reclamation Facility Master Plan, the Rosarito Beach Desalination Project, and water sales and purchases. Staff clarified with regard to the water conservation chart on page 10 of the General Manager’s report that the percentages noted on the red line in the chart represents the percentage water savings compared to the same month in 2013. The 19% average water savings represents savings since June 2015 (when the mandate was implemented) to present compared to water use in 2013. It was indicated with regard to the City of San Diego’s Pure Water Program on page five (5) that the City is estimating the cost for treatment, flow, solids and the Pure Water Program. Their estimate for the Metro Wastewater portion of the project is $405 million over the next six (6) years. The Metro Tac group is scheduled to review the cost allocation proposal (approximately 33.96% of the $405 million or $135.7 million) for the Metro Wastewater members on Monday. 12. DIRECTORS' REPORTS/REQUESTS Director Smith reported that he attended his regular committee and board meetings and stated that he wished to just comment on the temporary road patch on Telegraph Canyon Road due to a leak. He noted that in comparison to the City of San Diego’s temporary road patches, the repair on Telegraph Canyon Road was very well done. He recognized the City of Chula Vista for their requirements for road patches which have kept their roads even and in good repair. He commended staff on their work on the repair. Director Lopez indicated that along with the regular committee and board meetings that he attends, he attended the South County Economic Summit on 6 September 30. He indicated it was good seeing the businesses and agencies that the District works with and provides services to. Director Robak indicated that he also attended the South County Economic Summit and attended the World Water Day event (world without water) on September 15. He indicated that 20 miles across our border, there are people without water. He stated that we need to look outside our immediate horizon and do what we can to help. He stated that a few years ago an employee approached him and was interest in doing a water well in Tijuana. He asked if there were staff members interested in participating in the Water for People Program and possibly the program could be led by a group from the District. He also indicated at the last meeting the board had discussed CWA’s interest in possibly producing power at the lake behind San Vicente Reservoir. He indicated that there are some doubts about this proposed project and he would hate to see money spent on the project, particularly, with what happened at Lake Hodges. He lastly shared that he attended a meeting at the Water Conservation Garden where they discussed the new operating agreement between the member agencies and the Friends of the Garden organization. The Executive Director Elyssa Robertson presented a proposed agreement that was based on an operating agreement between an electrical power operator and an owner entity (ie. a City, etc.) and they are relying on each member agency to comment and suggest changes. He stated that he and Director Thompson discussed the agreement and they both suggest that the agreement be reviewed by legal thoroughly. 13. PRESIDENT’S REPORT President Thompson presented his report on meetings he attended during the month of September 2016 (his report is attached). He noted that in follow-up to the Wildcoast and Surfrider Foundation’s concerns with the District’s Otay Mesa Conveyance and Disinfection System Project, the District has been meeting with the public and elected officials to clarify the concerns raised and share with them information about the project. He also indicated that he will not be attending the November 2, 2016 board meeting and, thus, this could be the last Otay Water District meeting that he attends as his seat is up for election on November 8. He indicated that he is running to be re-elected to his seat on the board and, of course, the outcome of the election is uncertain. He wished to indicate to staff should this be his last meeting that he appreciated their work and he has been proud to serve on the board. 14. CLOSED SESSION The board recessed to closed session at 5:54 p.m. to discuss the following matters: 7 a) CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section 54956.9: 1 CASE The board reconvened at 5:59 p.m. and General Counsel Shinoff reported that the board met in closed session and took no reportable actions. 15. ADJOURNMENT With no further business to come before the Board, President Thompson adjourned the meeting at 6:00 p.m. ___________________________________ President ATTEST: District Secretary 8 President’s Report October 5, 2016 Board Meeting A) Meetings attended during the Month of September 2016: 1) September 2: Board Agenda Briefing. Met with General Manager Watton and Attorney Jeanne Blumenfeld to review items that will be presented at the September 7 Board Meeting. 2) September 7: OWD Regular Board Meeting 3) September 8: Met with Senator Ben Hueso to update him on the District’s Otay Mesa Conveyance and Disinfection System Project. Attendees: Ms. Ana Molina. 4) September 13: Attended the District’s Finance, Administration and Communications Committee. Reviewed, discussed, and made recommendation on items that will be presented at the October board meeting. 5) September 21: Attended the Water Conservation Garden JPA Board Meeting. Discussed proposed Operating and Maintenance Agreement. 6) September 30: Attended the South County Economic Development Council’s Annual Economic Summit. Attendees: Directors Lopez and Robak, and General Manager Watton. 7) October 1: Board Agenda Briefing. Met with General Manager Watton and General Counsel Dan Shinoff to review items that will be presented at the October 5 Board Meeting. Director Lopez also attended. STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: S2033-003103 DIV. NO.: 5 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Approve Change Order No. 4 to the Contract with Transtar Pipeline, Inc. for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approve Change Order No. 4 to the existing contract with Transtar Pipeline, Inc. (Transtar) in the amount of $50,760.00 for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board authorization for the General Manager to execute Change Order No. 4 to the construction contract with Transtar for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project. ANALYSIS: At the February 3, 2016 Board Meeting, the Board awarded a construction contract in an amount of $970,970 to Transtar to 2 construct sewer improvements that consist of sewer system repairs at fourteen (14) locations within the Rancho San Diego Basin as shown on Exhibit A. The sewer improvements involve the replacement of approximately 3,252 linear feet of 8-inch gravity sewer, four (4) new sewer manholes, reconnection of sewer lines and laterals, maintaining sewer service, restoration of pavement and landscaping, removal of trees, traffic control, erosion control, protection of existing utilities, and all testing and inspection as required by the Contract Documents. Since the award of the construction contract, three (3) change orders have been approved under the General Manager’s authority that total $30,882.71. The approved change orders compensated the Contractor for the following: a realignment of planned sewer at Site 734, located off Hillsdale Road (CO 01); a revised sewer profile at Site 722, located at Julianna Street (CO 02); and restoration of three (3) County of San Diego survey monuments located within the sewer alignments (CO 03). A listing of the change orders and their respective amounts are included in the Change Order Log that is part of Exhibit B. During the construction of the planned sewer at Site 733, located at Paseo Grande, it was discovered that the existing sewer main was located outside the as-built alignment in unconsolidated existing fill. Potholing during construction revealed similar conditions existing throughout the entire Site 733 segment. The Contractor was directed to correct the alignment to the greatest extent possible during which unanticipated loose and caving material was encountered affecting the Contractor’s production. Change Order No. 4 is necessary to resolve all costs associated with the additional work needed to address this unforeseen condition including pothole investigation and additional excavation and backfill. Change Order No. 4 also addresses contract time as a result of the added work described above. Time impacts associated with Change Order No. 4 are provided in Exhibit B, including the addition of twenty two (22) days for impacts due to caving material and one (1) day for weather impacts as provided in contract. In total, the twenty three (23) additional days added to the contract will result in a revised total contract duration of 197 calendar days. The Contractor is completing work on Site 773, Site 728, located on Burris Drive, and Site 771, located on Fuerte Estates Drive. The Contractor has encountered unconsolidated materials at Sites 773 and 728. The District’s Construction Manager is currently assessing the impacts presented by the Contractor and steps are being taken by staff to mitigate impacts to the overall project. It is anticipated 3 that the Project will reach substantial completion by the end of November 2016. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP S2033, as approved in the FY 2017 budget, is $3,000,000. Total expenditures, plus outstanding commitments and forecast including this contract, are $2,999,806.00. See Attachment B for budget detail. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP S2033 is sufficient to support the Project. The Finance Department has determined that, under the current rate model, 100% of the funding is available from the Replacement Fund. STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high quality and reliable water and wastewater services to the customers of the Otay Water District in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is innovative in providing water services at competitive rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM:mlc P:\WORKING\CIP S2033 Sewer System Rehabilitation\Staff Reports\BD 12-07-16 RSD Ph 1 Construction\BD 12- 07-16 Staff Report RSD Basin Sewer Rehab Phase 1 CO 04 (DM-RP).Docx Attachments: Attachment A – Committee Action Attachment B – Budget Detail Exhibit A – Location Map Exhibit B – Change Order No. 4 ATTACHMENT A SUBJECT/PROJECT: S2033-003103 Approve Change Order No. 4 to the Contract with Transtar Pipeline, Inc. for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on November 21, 2016, and the following comments were made:  Staff recommended that the Board approve Change Order No. 4 to the existing contract with Transtar Pipeline, Inc. (Transtar) in the amount of $50,760.00 for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project.  Staff reviewed the staff report with the Committee which noted the following: o Change Order No. 1 – Compensation to the Contractor for realignment of planned sewer at Site 734, located off Hillsdale Road; o Change Order No. 2 – Revised sewer profile at Site 722, located at Julianna Street; and o Change Order No. 3 – Provided for the restoration of three (3) County of San Diego survey monuments located within the sewer alignments.  Details of Change Order No. 4 are provided on page 2 of the staff report. Staff indicated that Change Order No. 4 is necessary to resolve unforeseen conditions at Site 733, located at Paseo Grande, including pothole investigation and additional excavation and backfill. Change Order No. 4 also addresses contract time as a result of the added work.  Staff noted that paving at Site 733 was completed on November 18, 2016.  In response to a question from the Committee, staff stated that the existing sewer main at Site 733 was located outside the as- built alignment within the easement in unconsolidated existing fill. It was economically better to perform the needed repairs and realignment versus as-builts being corrected and acquiring a new easement. In addition, correction to the alignment of the sewer would improve its operation and it would benefit crew members as it would center the sewer main within the easement for easier access during maintenance and repairs.  The Committee inquired if the width of the easement was sufficient. Staff stated yes and indicated that the existing easement is 20 feet wide and that it did not need to be updated.  In response to several questions from the Committee, staff stated that the length of Paseo Grande is more than 250 feet and that the additional 22 days is enough time to complete the work specified in Change Order No. 4.  It was noted that Change Order No. 4 was negotiated down from $135,000 to $50,760.  With regards to unconsolidated materials at Sites 773 and 728 specified at the bottom of page 2 of the staff report, the Committee inquired if another change order will be brought to the board to settle this matter. Staff stated yes and indicated that they are currently in negotiations with the Contractor. Upon completion of the discussion, the Committee accepted staffs’ report and supported presentation to the full board as a consent item. ATTACHMENT B – Budget Detail SUBJECT/PROJECT: S2033-003103 Approve Change Order No. 4 to the Contract with Transtar Pipeline, Inc. for the Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Project Bud 3-Nov-16 Budget 3,000,000 Planning Regulatory Agency Fees 100 100 - 100 PETTY CASH CUSTODIAN Standard Salaries 220,584 220,584 - 220,584 Total Planning 220,684 220,684 - 220,684 Design 001102 Consultant Contracts 152,958 152,958 - 152,958 AEGIS ENGINEERING MGMT INC 20,720 20,720 - 20,720 DARNELL & ASSOCIATES INC 21,446 21,446 - 21,446 SOUTHERN CALIFORNIA SOIL 3,818 3,818 - 3,818 HUNSAKER & ASSOCIATES 21,086 21,086 - 21,086 NINYO & MOORE GEOTECHNICAL AND 6,995 6,995 - 6,995 AIRX UTILITY SURVEYORS INC 71,183 71,183 - 71,183 ARCADIS US INC Professional Legal Fees 920 920 - 920 STUTZ ARTIANO SHINOFF Service Contracts 385 385 - 385 SAN DIEGO DAILY TRANSCRIPT 1,500 1,500 - 1,500 CHICAGO TITLE COMPANY 5,040 5,040 - 5,040 MAYER REPROGRAPHICS INC 333 333 - 333 THE SAN DIEGO UNION-TRIBUNE Standard Salaries 491,072 491,072 - 491,072 Total Design 797,455 797,455 - 797,455 Construction Construction Contracts 970,970 710,031 260,939 970,970 TRANSTAR PIPELINE INC 16,088 16,088 0 16,088 CO #1 TRANSTAR PIPELINE INC 7,350 7,350 0 7,350 CO#2 TRANSTAR PIPELINE INC 7,445 - 7,445 7,445 CO #3 TRANSTAR PIPELINE INC 50,736 - 50,736 50,736 CO #4 TRANSTAR PIPLINE INC 470,211 470,211 0 470,211 ARRIETA CONSTRUCTION INC 24,748 24,748 0 24,748 CALIFORNIA BANK & TRUST Consultant Contracts 2,400 2,400 - 2,400 RBF CONSULTING 100,590 80,390 20,200 100,590 ALYSON CONSULTING 2,738 2,738 - 2,738 AIRX UTILITY SURVEYORS INC 3,000 - 3,000 3,000 HUNSAKER & ASSOCIATES Professional Legal Fees 3,392 3,392 - 3,392 STUTZ ARTIANO SHINOFF Regulatory Agency Fees 30,000 27,343 2,657 30,000 COUNTY OF SAN DIEGO Standard Salaries 232,000 210,820 21,180 232,000 Project Contingency 60,000 - 60,000 60,000 Total Construction 1,981,667 1,555,511 107,037 1,981,667 Grand Total 2,999,806 2,573,650 426,156 2,999,806 Vendor/Comments Otay Water District S2033 - Sewer System Various Locations Rehabilitation Committed Expenditures Outstanding Commitment & Forecast Projected Final Cost OTAY WATER DISTRICTRANCHO SAN DIEGO BASINSEWER REHABILITATION PHASE 1 EXHIBIT A CIP S2033F P:\WORKING\CIP S2033 Sewer System Rehabilitation\Graphics\RSD Phase 1\S2033, RSD Sewer Basin Phase 1, Location Map, Dec 2015.mxd JAMACHA RD C H A S E A V VISTA GRANDE HILLSDALE RD TINA ST WILLOW GLEN DR HILLSDALE RD HIDDEN MESA RD VISTA GRANDE RD SUNDALE RD RD WIND RIVER RD D O N A H U E D R 745 734 723 771 722 733 729 773 728744 880 867 753 779 VICINITY MAP PROJECT SITE NTS DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ?ò Aä%&s ?p ?Ë F 0 1,000500 Feet Legend Sewer Main Repairs (RSD Phase 1) Sewer Gravity Mains Sewer Manholes Site Number123 Contract / P.O. Change Order No. 4 page 2 of 2 Description of Work Description Increase Decrease Time Item No. 1: This Change Order provides for increased excavation, backfill and alignment correction resulting from encountering very loose and caving material and the existing sewer pipe outside the as-built alignment at Site 733 per RFI 006. $50,736.00 22 Item No. 2: Add 1 calendar day due to weather impacts per Contract Specifications 00700-8-5. $0.00 $0.00 1 Sub Total Amount $50,736.00 $0.00 23 Total Net Change Order Amount $50,736.00 Reason: Item No. 1: Resulting from excavation for Site 733 Paseo Grande sewer replacement (Dwg. C-05), buried rock outcropping was encountered with unconsolidated existing fill materials and the existing sewer pipe was discovered to be outside the correct alignment. Potholing revealed similar conditions existing throughout the entire segment. The Contractor was directed to correct the alignment to the extent possible during which unanticipated loose and caving material was encountered affecting production. This change order is necessary to resolve all costs associated with this work including pothole investigation, additional excavation and backfill required to complete the work. Item No. 2: Contract Documents Section 00700-8.5 provides for no cost time extensions due to weather impacts on the project progress. Weather impacted the project one (1) day between August and October 2016. The project was impacted on October 28, 2016 due to weather. COST ESTIMATE SUMMARY COR Site 733 Caving Soils - NEGOTIATED W.O. # PREPARED BY - Douglas Cook Contract: RSD Sewer - Phase 1 SIGNATURE: JOBSITE: C.I.P. NO. DATE: --- --- Impacts of Caving Soils --- --- Operator Foreman 1.0 EA 48.00 48.0 $92.16 $4,424 - --$4,424 Operator 1.0 EA 48.00 48.0 $85.98 $4,127 - --$4,127 Laborer 1.0 EA 48.00 48.0 $64.03 $3,073 ---$3,073 Laborer Apprentice 1.0 EA 48.00 48.0 $36.43 $1,749 ---$1,749 Labor Foreman 1.0 EA 48.00 48.0 $71.86 $3,449 ---$3,449 Crew Truck 1.0 EA 48.00 48.0 -$30.69 $1,473 --$1,473 Pickup Truck 2.0 EA 48.00 96.0 -$28.17 $2,704 --$2,704 Cat 314 Excavator 1.0 EA 48.00 48.0 -$60.18 $2,889 --$2,889 Cat 930 Loader 1.0 EA 48.00 48.0 -$91.98 $4,415 --$4,415 Bobcat S650 Skidsteer 1.0 EA 48.00 48.0 -$24.79 $1,190 --$1,190 Cat 321CL CR Excavator 1.0 EA 48.00 48.0 -$108.59 $5,212 --$5,212 ------ 576.0 $16,822 $17,883 $0 $0 $0 SALES TAX - 8.00%1 LS $0 $0 $16,822 $17,883 $0 $0 $34,705 MARK-UP PER CONTRACT (OH, PROFIT & BOND) $2,692 $2,861 $0 $5,553 TOTAL PRIME CONTRACTOR PRICE 576.0 $19,514 $20,745 $0 $0 $40,258 ----- Super 10 Dump Truck with Driver 2.0 EA 48.00 96.0 ---$99 $9,504 $9,504 ------ ------ 0.0 $0 $0 $0 $9,504 $9,504 SALES TAX 1 ls $0 $0 $0 $0 $0 $9,504 $9,504 MARK-UP PER CONTRACT (OH, PROFIT & BOND)$0 $0 $0 $475 $475 TOTAL SUBCONTRACTOR PRICE 0.0 $0 $0 $0 $9,979 $9,979 PRIME CONTRACTOR MARK-UP PER CONTRACT $0 $0 $0 $499 $499 TOTAL RFP PRICE 576.0 $19,514 $20,745 $0 $10,478 $50,736 UNITSQUANTITY LABOR MH/UNIT TOTAL COST LABOR RATE TOTAL MANHOURS SUBTOTAL COST TOTAL COST SUBTOTAL COST TOTAL COST SUBCONTRACTOR DESCRIPTION DESCRIPTION EQUIPMENT MATERIAL TOTAL COSTUNIT COST TOTAL COSTUNIT COST QUANTITY UNITS LABOR EQUIPMENT UNIT COST TOTAL COSTMH/UNIT TOTAL MANHOURS LABOR RATE TOTAL COST TOTALUNIT COSTUNIT COST TOTAL COST UNIT PRICE TOTAL COST MATERIAL UNIT PRICE TOTALTOTAL COSTUNIT COST Page 1 of 1 10467 Roselle Street San Diego, CA 92121-1503 City, State Zip Phone: 858-453-0744 Fax: 858-453-0745 CA Lic# 724178-A ax: 858-453-0745 September 30, 2016 Doug Cook Construction Manager RE: Rancho San Diego Basin Sewer – Phase 1, RFI #006 Cost and Time Impacts, Sewer Alignment and substandard compaction, Paseo Grande, Site 733, Sheet C-05 Doug: Attached are our T & M sheets for additional costs incurred installing the sewer at Site 733, Paseo Grande. Existing sewer backfill material was loose, substandard, and uncompacted material. We were unable to shore trenches using hydraulic shoring as we used on the downstream portion Site 880. Trench shields had to be used. Our concerns were outlined in RFI #006. In addition we request 22 Calendar Days (8/11-9/1) added to our contract for time spent dealing with the substandard conditions. Equipment is per current Caltrans Rental Rates. Markups are per Section 00700. Backup documentation is also included. Shoring/trench plates which are billed weekly are shown on T&M 013 only. Dump Fees, trucking to dump and additional import material are shown on T&M 014. Total of submitted claim is $135,085.66. Please review for approval and issue appropriate change order. Let me know if you have any questions or wish to discuss. Sincerely John V. Brito VP/Project Manager John V. Brito CIP S2033 - Rancho San Diego Basin Sewer Rehabilitation, Phase 1 Project: S2033 Consultant/Contractor: Transtar Pipeline, Inc.Subproject: 003000 APPROVED C.O. AMOUNT BY DATE DESCRIPTION TYPE C.O. 1 $16,088.00 RP 8/22/2016 Contractor 2 $7,350.00 GA 9/8/2016 Revised sewer profile at Site 722 add 35 lf 8-inch sewer Contractor 3 $7,444.71 MW 10/28/2016 Restore three existing survey monuments Contractor 4 $50,736.00 Board Contractor 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 3435 Total C.O.'s To Date: $81,618.71 8.4% Original Contract Amount:$970,970.00 Current Contract Amount:$1,052,588.71 Change Order Breakdown for the Month: Month Net C.O.$ Limit Authorization C.O. % 11/16 $2,000 Insp 0.0% $5,000 PM/Supervisor 0.0% $10,000 Manager 0.0% $20,000 Chief 0.0% $25,000 AGM 0.0% $75,000 GM 0.0% $81,618.71 >$75,000 Board CHANGE ORDER LOG Realignment resulting in increased excavation and backfill at Site 734 per RFI 001. Paseo Grande differing site condition - unconsolodated existing fill material STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Dan Martin Engineering Manager PROJECT NO: FILE NO: D0980-090289 ENG70-10-147 DIV. NO. 5 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Adopt Resolution No. 4317 Approving the Sewer Annexation of Property Owned by Licia A. Barnett to Otay Water District Improvement District No. 18 (APN 517-112-09-00 - Vista Vereda, El Cajon, CA) GENERAL MANAGER’S RECOMMENDATION: Adopt Resolution No. 4317 approving the annexation of the property owned by Licia A. Barnett to Improvement District (ID) No. 18 (see Exhibit A for Location Map). COMMITTEE ACTION: Please see Attachment A. PURPOSE: The proposed annexation is to provide sewer service to the parcel located at Vista Vereda, El Cajon, in an unincorporated area of the County of San Diego California 92019 (APN 517-112- 09-00). ANALYSIS: A written request and Petition signed by Licia A. Barnett, has been received for annexation of APN 517-112-09-00, located at Vista Vereda, in the City of El Cajon and County of San Diego, for sewer service. The total acreage to be annexed is 0.51 2 acres. The property is within the jurisdictional boundary of the Otay Water District and following the Board’s approval, it will become part of ID No. 18. The parcel is located adjacent to an existing 8-inch Otay Water District sewer main and 12-inch water main. The parcel is already contained within the District’s water ID boundary. This parcel is part of the District’s Wastewater Master Plan. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The property owner will pay the District’s annexation processing fee of $776.20, sewer annexation fees (current fee is $1,059.57 per EDU) and sewer capacity fees for parcels located outside the sewer ID (current fee is $6,661.37) in effect at the time the service service is provided, and any additional fees, including the availability fee, as established in the attached Resolution. STRATEGIC GOAL: Provide enhanced sewer service to meet customer needs. LEGAL IMPACT: No legal impact. DM/RP:mlc \\Owd-fp1\engrplan\Public-s\Annexation Requests\2016\Barnett Sewer Annex Request - Vista Vereda\Staff Report\BD 12-07-16 - Staff Report Sewer Annexation ID 18- Barnett Sewer Annex Request - 1199_.doc Atttachments: Attachment A - Committee Action Attachment B - Resolution No. 4317 Exhibit A - Legal Description Exhibit B - Legal Map Exhibit A -- Location Map ATTACHMENT A SUBJECT/PROJECT: D0980-090289 ENG70-10-147 Adopt Resolution No. 4317 Approving the Sewer Annexation of Property Owned by Licia A. Barnett to Otay Water District Improvement District No. 18 (APN 517-112-09-00 - Vista Vereda, El Cajon, CA) COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on November 21, 2016, and the following comments were made:  Staff recommended that the Board adopt Resolution No. 4317 approving the annexation of the property (APN: 517-112-09- 00) owned by Licia A. Barnett to Improvement District (ID) No. 18.  Staff reviewed the staff report with the Committee and noted that the annexation area totals 0.51 acres and is located within the jurisdictional boundary of the District.  The Committee inquired if the property was on a septic system. Staff stated no and indicated that the property is undeveloped. Upon completion of the discussion, the Committee accepted staffs’ report and supported presentation to the full board as a consent item. ATTACHMENT B Page 1 of 4 RESOLUTION NO. 4317 A RESOLUTION OF THE BOARD OF DIRECTORS OF OTAY WATER DISTRICT APPROVING THE ANNEXATION TO OTAY WATER DISTRICT IMPROVEMENT DISTRICT NO. 18 OF THOSE LANDS DESCRIBED AS “LICIA A. BARNETT SEWER ANNEXATION (APN: 517-112-09- 00)” (FILE NO. ENG70-10-147/DIVISION 5) WHEREAS, a letter has been submitted by LICIA A. BARNETT, the owner and party that has an interest in the land described in Exhibit "A," attached hereto, for annexation of said land to Otay Water District Sewer Improvement District No. 18 pursuant to California Water Code Section 72670 et seq.; and WHEREAS, pursuant to Section 72680.1 of said Water Code, the Board of Directors may proceed and act thereon without notice and hearing. NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE OTAY WATER DISTRICT FINDS, RESOLVES, ORDERS AND DETERMINES as follows: 1. A depiction of the area proposed to be annexed, and the boundaries of ID 18 following the annexation, is set forth on a map in Exhibit “B” filed with the Secretary of the District, which map shall govern for all details as to the area proposed to be annexed. 2. The purpose of the proposed annexation is to make sewer service available to the area to be annexed, which availability constitutes a benefit to said area. 3. The Board finds and determines that the area proposed to be annexed to ID 18 will be benefited by such annexation and that the property currently within ID 18 will also be benefited and not injured by such annexation because after the annexation a ATTACHMENT B Page 2 of 4 larger tax base will be available to finance the sewer facilities and improvements of ID 18. 4. The Board of Directors hereby declares that the annexa- tion of said property is subject to the owners complying with the following terms and conditions: (a) The petitioner for said annexation shall pay to Otay Water District the following: (1) The annexation processing fee at the time of application; (2) The sewer annexation fees at the time of connection to the Otay Water District water system; (3) Yearly assessment fees will be collected through the County Tax Assessor’s office in the amount of $30 for APN 517-112-09-00; (4) In the event that sewer service is to be provided, Petitioners shall pay all applicable sewer fees per Equipment Dwelling Unit (EDU) at the time the sewer connection is purchased; and (5) Payment by the owner of APN 517-112-09-00 of all other applicable local or state agency fees or charges. (b) The property to be annexed shall be subject to taxation after annexation thereof for the purposes of the improvement district, including the payment of principal and interest on bonds and other ATTACHMENT B Page 3 of 4 obligations of the improvement district, author- ized and outstanding at the time of annexation, the same as if the annexed property had always been a part of the improvement district. 5. The Board hereby declares the property described in Exhibit "A" shall be considered annexed to ID 18 upon passage of this resolution. 6. The Board of Directors further finds and determines that there are no exchanges of property tax revenues to be made pursuant to California Revenue and Taxation Code Section 95 et seq., as a result of such annexation. 7. The annexation of APN 517-112-09-00 to the District’s Sewer Improvement District 18 is hereby designated as the “LICIA A. BARNETT SEWER ANNEXATION (APN: 517-112-09-00)”. 8. Pursuant to Section 57202(a) of the Government Code, the effective date of the LICIA A. BARNETT SEWER ANNEXATION (APN: 517-112-09-00) shall be the date this Resolution is adopted by the Board of Directors of the Otay Water District. 9. The General Manager of the District and the Secretary of the District, or their respective designees, are hereby ordered to take all actions required to complete this annexation. PASSED, APPROVED AND ADOPTED by the Board of Directors of the Otay Water District at a regular meeting held this 7th day of December, 2016. President ATTEST: ATTACHMENT B Page 4 of 4 __________________________________ District Secretary EXHIBIT A GEOGRAPHIC DESCRIPTION APN: 517-112-09 ANNEXATION INTO OTAY WATER DISTRICT IMPROVEMENT DISTRICT NO.18 OTAY WATER DISTRICT BEING A PORTION OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 19, TOWNSHIP 16 SOUTH, RANGE 1 EAST, SAN BERNARDINO MERIDIAN, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE UNITED STATES GOVERNMENT SURVEY APPROVED MAY 3, 1859, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION 19, SAID CORNER BEING THE BEGINNING OF A 338.41 FEET RADIUS CURVE, CONCAVE SOUTHEASTERLY, A RADIAL LINE OF SAID CURVE BEARS NORTH 89° 16' 35" WEST, TO SAID POINT, SAID POINT BEING ALSO THE BEGINNING OF THE CENTER LINE OF THAT CERTAIN 40.0 FEET STRIP OF LAND DESCRIBED IN A DEED TO THE COUNTY OF SAN DIEGO, RECORDED JULY 25, 1956, IN BOOK 6191, PAGE 507, OF OFFICIAL RECORDS; THENCE COURSE 1. THROUGH A CENTRAL ANGLE OF 32° 45' 25" A DISTANCE OF 193.47 FEET ALONG THE ARC OF SAID CURVE, AND NORTHERLY ALONG SAID CENTER LINE; THENCE CONTINUING ALONG SAID CENTER LINE AS FOLLOWS: COURSE 2. NORTH 33° 28' 50" EAST A DISTANCE OF 34.51 FEET TANGENT TO SAID CURVE TO THE BEGINNING OF A TANGENT 230.00 FEET RADIUS CURVE CONCAVE SOUTHEASTERLY; THENCE COURSE 3. THROUGH A CENTRAL ANGLE OF 54° 21' 44" A DISTANCE OF 218.22 FEET ALONG THE ARC OF SAID CURVE AND NORTHEASTERLY ALONG SAID CENTER LINE TO THE BEGINNING OF A REVERSE 230.00 FEET RADIUS CURVE CONCAVE NORTHWESTERLY; THENCE COURSE 4. THROUGH A CENTRAL ANGLE OF 20° 40' 51" A DISTANCE OF 83.02 FEET ALONG THE ARC OF SAID CURVE AND NORTHEASTERLY ALONG SAID CENTER LINE TO THE MOST SOUTHERLY CORNER OF THE LAND CONVEYED TO A. VALVERDE BY DEED RECORDED AUGUST 21, 1968, AS INSTRUMENT NO. 1968-143231, OF OFFICIAL RECORDS; THENCE COURSE 5. NORTH 00° 39' 27" EAST A DISTANCE OF 500.10 FEET ALONG THE WESTERLY LINE OF SAID VALVERDES LAND TO A POINT WHICH IS 80 FEET SOUTHERLY FROM THE NORTHWESTERLY CORNER THEREOF BEING THE TRUE POINT OF BEGINNING; THENCE COURSE 6. SOUTH 89° 50' 50" EAST A DISTANCE OF 280.01 FEET PARALLEL WITH THE NORTHERLY LINE OF SAID LAND TO A POINT ON THE EASTERLY LINE OF SAID LAND; THENCE COURSE 7. NORTH 00° 39' 27" EAST A DISTANCE OF 80.00 FEET ALONG SAID EASTERLY LINE TO THE NORTHEASTERLY CORNER THEREOF; THENCE COURSE 8. NORTH 89° 50' 50" WEST A DISTANCE OF 280.01 FEET ALONG THE NORTHERLY LINE OF SAID LAND TO THE NORTHWESTERLY CORNER THEREOF; THENCE COURSE 9. SOUTH 00° 39' 27" WEST A DISTANCE OF 80.00 FEET ALONG THE WESTERLY LINE OF SAID LAND TO THE TRUE POINT BEGINNING. CONTAINING 0.51 ACRES ___________________________________ VICTOR RODRIGUEZ-FERNANDEZ LS 5335 SEE ATTACHED EXHIBIT “B” DISCLAIMER: FOR ASSESSMENT PURPOSES ONLY. THE DESCRIPTION OF LAND IS NOT A LEGAL DESCRIPTION AS DEFINED BY THE SUBDIVISION MAP ACT AND MAY NOT BE USED AS A BASIS FOR AN OFFER FOR SALE OF THE LAND DESCRIBED vrf/10302016 R$ R$ "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "`"` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "` "`"` "` "` "` "` "` "` "` "` "` "` "` "` "` "` 33 33 33 33 33 33 33 33 33 ¹r ¹r $R $R $R $R $R $R $R ¹r ¹r¹r $R l?l? l? l? l? l? l? l?l? l? l? l? l? l? l? l? l? l? l? l? l?l? l? l?l? l? "Cé "CéQW QW QWQW QW QW HERMOSA TOWNSEND PL. VISTA VEREDA R D . VERDE GLEN SAKINAST. JULIANNA ST. G RANDE CT. VISTA VISTA VEREDA HIDDENMESAT R AIL ONYX D R. TR E S EDER CIRCLE M O N A R C H R IDGECIRCLE VISTA GRANDE WAY VIST A 92019 90 153 155 127 Vista Vereda Verde Gln V ist a G r a n d e R d Vista Grande Way Vista Hermosa Way 368 §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ DIV. 5 DIV. 2 DIV. 1 DIV. 3 DIV. 4 5 8 8 805 805 805 11 9454 94 125 125 905 125 905 125 .0 100 200 300 40050FeetLOCA T I O N M A P V I C I N I T Y M A PEXHIBIT AVISTA VEREDA,EL CAJON, CA 92019SEWER ANNEXATION D0980-090289 517-112-09-00 0.51 ACRES 0 VISTA VEREDA, EL CAJON, CA 92019 LICIA A. BARNETT DIV. 5 18 11/2/2016 PROJECT#: APN: AREA: OWNER: ADDRESS: DATE: DIR: SEWER ID: ^_ PROJECT SITE STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2015 SUBMITTED BY: Lisa Coburn-Boyd Environmental Compliance Specialist Bob Kennedy Engineering Manager PROJECT: P2083 - 001101 DIV. NO. 2 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Adoption of a Mitigated Negative Declaration for the 870-2 Pump Station Project GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District (District) Board of Directors (Board) approves the adoption of a Mitigated Negative Declaration for the 870-2 Pump Station Project (see Exhibit A for Project location). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board approval for the adoption of a Mitigated Negative Declaration (MND) for the 870-2 Pump Station Project. ANALYSIS: The Otay Water District is proposing the construction and operation of a new pump station (870-2 Pump Station) and associated sewer force main alignment that would replace the existing Low Head Pump Station (LHPS; 571-1 Pump Station) and High Head Pump Station (HHPS; 870-1 2 Pump Station). Both the LHPS and HHPS have reached the end of their useful lives. The existing pump stations pump water from the Roll Reservoir (570 Zone Reservoir) located on Otay Mesa to different hydraulic zones to maintain water supply within these zones. The new 870-2 Pump Station would pump to the two hydraulic zones currently supplied by the LHPS and HHPS, the 570 zone and the 870 zone. Additionally, these existing pump stations have insufficient capacity for the desalinated water supply that would be introduced to the Roll Reservoir if the District’s proposed Otay Mesa Conveyance and Disinfection System Project (OMCDSP) is implemented. The pump station, site plan, and yard piping have been coordinated with the proposed desalination facilities project to avoid conflicts. The proposed pump station conceptual layout allows for phased construction beginning with installation of pumps that will supply water from the 570 hydraulic zone to the 870 hydraulic zone and two recirculation pumps to maintain water quality in the Roll Reservoir. Phase 2, which would only occur if determined necessary for the OMCDSP, would consist of the installation of pumps that would convey water from the 570 hydraulic zone to the 624 hydraulic zone. In addition to the pump station, construction of the project includes the installation of associated yard piping, a sewer force main, and the improvement of the partially paved access road to the site. The LHPS and HHPS will be demolished at a later date (not part of this project). ICF International prepared the initial study and MND for the Project under their as-needed environmental services contract with the District. Based on the findings of these documents, and with proper mitigation measures taken, as outlined in the final MND (Attachment B), the Project will not have a significant effect on the environment. The impacts that require mitigation are biological resources, cultural resources, and geology/soils. The 30 day notice period for the public to comment on the draft MND began on September 9, 2016 and closed on October 10, 2016. Four comment letters were received from the San Diego County Archaeological Society, the California Department of Fish & Wildlife, the County of San Diego, and the Viejas Band of the Kumeyaay Indians. All of the letters received and the responses to comments are included in the Final MND. The Final MND also includes the mitigation, monitoring, and reporting plan (MMRP), which details the measures that will be taken for mitigation. FISCAL IMPACT: Joe Beachem, Chief Financial Officer None. 3 STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high quality and reliable water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient manner” and the General Manager’s Vision, "A District that is innovative in providing water services at competitive rates, with a reputation for outstanding customer service." LEGAL IMPACT: None. LC-B/BK:mlc P:\WORKING\CIP P2083 870-2 Pump Station Replacement\Staff Reports\BD 12-07-16, Staff Report, 870-2 Pump Station Replacement Project MND.docx Attachments: Exhibit A – Project Location Map Attachment A – Committee Action Attachment B – Final IS/MND and MMRP ATTACHMENT A SUBJECT/PROJECT: P2083-001101 Adoption of a Mitigated Negative Declaration for the 870-2 Pump Station Project COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a meeting held on November 21, 2016, and the following comments were made:  Staff recommended that the Board approve the adoption of a Mitigated Negative Declaration (MND) for the 870-2 Pump Station Project.  Staff stated that the project described in the MND is the construction of the 870-2 Pump Station, an associated sewer force main, yard piping and access road improvements that would replace the existing Low Head Pump Station (LHPS) (571-1 Pump Station) and High Head Pump Station (HHPS) (870-1 Pump Station) that are located near Roll Reservoir at Otay Mesa. Staff noted that both the LHPS and HHPS have reached the end of their useful lives.  It was indicated that a future phase of the new pump station will have the capability of conveying the desalinated water supply that could be introduced to the Roll Reservoir if the District’s proposed Otay Mesa Conveyance and Disinfection System Project is implemented.  Staff stated that ICF International was issued a task order under their as-needed environmental services contract with the District, to prepare the initial study and MND for the Project. Staff highlighted that based on the findings of these documents, and with proper mitigation measures taken (as outlined in the final MND), the Project will not have a significant effect on the environment.  It was noted that the mitigation, monitoring, and reporting plan (MMRP), which details the measures that need to be taken for mitigation, is included in the Final MND. See Attachment B for additional details.  Staff indicated that during the 30-day notice period for the draft MND, the District received comment letters from the County of San Diego, the San Diego County Archaeological Society, the California Department of Fish and Wildlife, and the Viejas Band of the Kumeyaay; the four (4) letters and the responses to their comments are presented in the Final MND (Attachment B). Staff noted that any changes that were made to the MND in response to the comments can be found as either strike-out or underline edits within the document.  In response to several questions from the Committee, staff stated that the existing LHPS and HHPS were built in the 1960s and were originally designed for agricultural purposes; both stations have reached the end of their useful lives. Staff indicated that typically, the life expectancy of a pump station is 25 years. The costs for maintenance and repairs (i.e. replace gas supply line, repair and replace the heat exchangers and the large discharge control valves) are increasing as the existing pump stations have significantly exceeded the typical 25-year life expectancy.  The Committee inquired about the life expectancy for the proposed 870-2 Pump Station. Staff stated that the life expectancy is approximately 30 years and provided the benefits of the proposed 870-2 Pump Station, which are listed on Page 2 of the staff report. The proposed pump station will comply with the ACPD standards and will have the capacity to meet the water supply demand in the 870 zones.  The Committee inquired about the sewer lift station indicated in the MND. Staff stated that the sewer lift station would allow for the construction of a bathroom and chlorine analyzers.  The Committee requested that staff confirm if the District’s reservoir is or is not considered a wetland area; the National Wetland Inventory Map that was included in the MND indicates that the reservoir is a wetland area. This was discussed with the wetlands biologist at ICF and it was verified that the National Wetland Inventory Map is an aerial interpretation done on a very broad scale to identify where areas of wetlands may be found. Since the reservoir is essentially ponded water, it shows up as a wetland area at the scale of the map. This inventory is not intended to be a true delineation of wetlands and everything on the inventory needs to be field verified. In this case, in the field, the structure is not a wetland area. Upon completion of the discussion, the Committee accepted staffs’ report and supported presentation to the full board as a consent item. OTAY WATER DISTRICT870-2 PUMP STATIONLOCATION MAP EXHIBIT A CIP P2083F P: \ W O R K I N G \ C I P P 2 0 8 3 8 7 0 - 2 P u m p S t a t i o n R e p l a c e m e n t \ G r a p h i c s \ E x h i b i t s - F i g u r e s \ E x h i b i t A , L o c a t i o n M a p , O c t o b e r 2 0 1 6 . m x d ROLLRESERVOIR(571-1) LOW HEADPUMP STATION HIGH HEADPUMPSTATION ACCESS FROMALTA RD OWD PROPERTY LINE(APPROX) Firearms Training Facility VICINITY MAP PROJECT SITE NTSDIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ ?ò Aä ?Ë ;&s ?p F 0 250125 Feet FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FOR THE OTAY WATER DISTRICT 870-2 PUMP STATION P REPARED FOR: Otay Water District 2554 Sweetwater Springs Boulevard Spring Valley, California 91978 P REPARED BY: ICF 525 B Street, Suite 1700 San Diego, California 92101 November 2016 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Stephen Beppler Senior Civil Engineer Bob Kennedy Engineering Manager PROJECT: S2024- 001102 DIV. NO. 5 APPROVED BY: Rod Posada, Chief, Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Authorization to Acquire an Easement at Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement GENERAL MANAGER’S RECOMMENDATION: That the Otay Water District Board of Directors (Board) authorize the General Manager to acquire a permanent utility easement at the Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement Project in an amount not to exceed $125,000 (See Exhibit A for location of the easement). COMMITTEE ACTION: Please see Attachment A. PURPOSE: To obtain Board approval authorizing the General Manager to acquire a permanent utility easement at the Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement Project (Project) in an amount not to exceed $125,000. ANALYSIS: The District is in the process of replacing a section of sanitary sewer main known as the Campo Road Sewer, identified in the Wastewater Management Plan as being deficient in capacity. Design 2 and Permit phases of the Project are complete, with the Project awaiting easement procurements prior to beginning the bidding phase. A permanent utility easement is required across Assessor Parcel Number 502-150-18 (Rancho San Diego Village), owned by Regency Centers and its subsidiary CA Rancho San Diego Village, LLC (Regency), to construct the replacement sanitary sewer line as designed, which reflect significant road improvements along SR-94 since the original sewer was constructed in 1974. The easement, irregular shaped to conform to the property boundary and existing District easements on the property, is approximately 24 feet in width and 280 feet in length (see Attachment B for full description). The District, through the project designer Rick Engineering, retained the appraisal services of Colliers International, an independent real estate appraiser, to estimate the “Fair Market Value” of the proposed Permanent Utility Easement acquisition, as that value is defined in Section 1263.320 of the California Code of Civil Procedure. An offer was presented to Regency by letter dated June 1, 2016 (Attachment C) for an amount of $72,400. Based upon the appraised value of the property and Regency’s disagreements with it, the District’s General Counsel and Regency’s attorney have determined through negotiation that the amount of $125,000 constitutes just compensation. A revised offer letter (Attachment D) was then sent to Regency on October 31, 2016 for their written acceptance of the offer. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The total budget for CIP S2024, as approved in the FY 2017 budget, is $8,500,000. Total planning and design phase expenditures to date, plus outstanding commitments and forecast, are $ 1,382.860.69. See Attachment E Budget Detail. Forecasted bidding, additional easement acquisition, and construction phase costs are approximately $6,900,000, for a total project expense currently estimated at about $8,300,000. Based on a review of the financial budget, the Project Manager anticipates that the budget for CIP S2024 will be sufficient to support the Project. Finance has determined that, under the current rate model, 50% of the funding will be available from the Betterment Fund and 50% will be available from the Replacement Fund. 3 STRATEGIC GOAL: This Project supports the District’s Mission statement, “To provide high quality and reliable water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient manner” and the General Manager’s Vision, "A District that is innovative in providing water services at competitive rates, with a reputation for outstanding customer service." LEGAL IMPACT: None. SB/BK/RP:mlc P:\WORKING\CIP S2024 Campo Road Sewer Replacement\Staff Reports\Regency Easement\BD 12-07-16, Staff Report, Campo Rd Sewer Easement Aquisition - Regency (SB-BK).docx Attachments: Attachment A – Committee Action Attachment B – Easement Description Attachment C – Original Offer Letter to Regency Attachment D – Revised Offer Letter to Regency Attachment E – Budget Detail Exhibit A – Location Map ATTACHMENT A SUBJECT/PROJECT: S2024-001102 Authorization to Acquire an Easement at Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement COMMITTEE ACTION: This item was presented to the Finance, Administration and Communications Committee at a meeting held on November 15, 2016. The following comments were made:  Staff is requesting that the Board authorize the General Manager to acquire a permanent utility easement at the Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement Project in an amount not-to-exceed $125,000.  Staff reviewed the information in the staff report.  Staff noted that the parcel owner, Regency Centers (Regency), through their attorney negotiated with the District’s General Counsel a revised just compensation agreement of $125,000 for the permanent utility easement. The District has sent an offer letter on October 31, 2016 to Regency and the property owner has indicated acceptance of the offer verbally. As of today’s Committee meeting, the District has received written confirmation of acceptance of the offer, but have not received the signed documents. The District, though, expects to receive it soon.  It was discussed that there were issues raised with the comparables the District’s appraiser used in the appraisal. The District had it’s as-needed appraiser review the appraisal and they also noted some issues with it. The District, however, decided to move forward with the appraisal rather than pay for another appraisal and requested the assistance of General Counsel to negotiate compensation based upon the issues that were identified.  Staff indicated in response to an inquiry from the Committee that the property owner felt that the appraisal should consider the entire property and the improvements on the property, which yields a higher per square foot value. The District’s appraiser, however, felt the easement is located in an area of the property that cannot be developed and thus, the appraisal did not need to take into account improvements on the full property.  The Committee indicated because the cost of the easement is such a minimal cost in comparison to the overall total project cost of over $7 million and the difference between the original offer of $72,400 and the revised offer of $125,000 is $52,600, disputing would be more costly to the District. Thus, the committee supported moving forward with the current offer of $125,000.  It was noted that the District has not had to utilize the eminent domain process in the past 10 years for District projects. Following the discussion, the committee supported staff’s recommendation and presentation to the full board as a consent item. OWD EASEMENT NO.     RECORDING REQUESTED BY For Recorder's Use AND AFTER RECORDATION MAIL TO:  OTAY WATER DISTRICT 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CA 91978-2004                       APN: 502-150-18 Documentary Transfer Tax: None (Exempt under Rev & Tax Code Section 11922)      GRANT OF EASEMENT OF RIGHT-OF-WAY TO OTAY WATER DISTRICT   For good and valuable consideration, receipt of which is hereby acknowledged, the Undersigned FW CA Rancho San Diego Village, LLC, Delaware Limit Liability Company as Grantor(s) hereby GRANT(S) to OTAY WATER DISTRICT, a municipal water district formed under the Municipal Water District Law of 1911, as amended, situated in the County of San Diego, State of California, as Grantee, a permanent easement of right-of-way of variable feet in width for the purpose of laying underground water and sewer pipelines and laterals, trunk lines, collection lines and laterals, sewer manholes and other underground structures appurtenant to said water or sewer lines, including but not limited to pumps, regulators, and valves within said easement, hereinafter referred to as "said facilities," together with the right to construct, operate, maintain, repair and replace said facilities to the extent it does not unreasonably interfere with Grantor’s use of said land, and the right of ingress and egress for such purposes. Said easement is described and/or depicted as follows: (See Exhibit(s) “A” and “B” attached hereto and made a part hereof)   Grantor reserves the right to use said land at Grantor's own risk for any and all purposes not unreasonably conflicting, interfering or inconsistent with Grantee's use of, and access to, said facilities. Grantor waives any right under Civil Code section 845, and any right to compel Grantee to grade, surface or otherwise improve or maintain said easement area as a roadway.   To the extent it will cause damage to or unreasonably threaten the safety of any of said facilities of Grantee placed within the easement, Grantor shall not increase or decrease or permit to be increased or decreased the ground elevations of said easement existing at the time this document is executed, nor construct or permit to be constructed any permanent building, structures, improvements or other encroachment upon said easement. OWD EASEMENT NO.     Grantee may remove from the easement any building, structure, improvement or other encroachments thereon unreasonably conflicting, interfering or inconsistent with its use for the purposes hereby granted. Grantee shall have the right to install its own gates and locks in any fence, barrier or other enclosure which now crosses or may hereafter cross said easement.   Grantee agrees on its own behalf and on behalf of its successors in interest that it will indemnify and hold harmless Grantor for any damages to the property which result from maintenance and repair operations by the Otay Water District of its pipeline within the easement.   Grantor may use said land as a driveway and to the extent of such use may surface or pave the area, subject to the restrictions as to changes in existing ground elevations and indemnifications set forth above.   Grantor may, at Grantor's expense, and subject to Grantee's prior written consent, relocate the above mentioned facilities in the event such conflict with future development of said property, provided that Grantor does not cause discontinuance of service to any area, and provided, further, that Grantee receives, without expenses to Grantee, an easement comparable to this easement for said relocated facilities. Grantee shall never be required to relocate or alter in any way the facilities installed pursuant to this grant of easement, or to bear any cost in connection therewith as a result of changes in the location of any said facilities.   Grantee shall have the right to transfer and assign all or a portion of this easement to its successor in interest, or to any other political subdivision or public utility for use of the above stated purpose.       Date:   Grantor(s):   Print Name/Corporation/Entity   [Each signature of Grantor must be acknowledged in the form attached hereto]         DISTRICT CERTIFICATE OF ACCEPTANCE   This is to certify that the interest in real property conveyed by the Grant of Easement of Right of Way to Otay Water District dated _, from to OTAY WATER DISTRICT, a municipal water district, is hereby accepted by order of the Board of Directors pursuant to the authority conferred by Resolution No. 1829, adopted on February 23, 1981, and the grantee consents to recordation thereof by its duly authorized officer.   Dated: By: Susan Cruz, District Secretary Otay Water District             CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT      GRANTOR’S SIGNATURE ACKNOWLEDGEMENT       A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.       State of California ) ) ss County of )     On before me, DATE NAME, TITLE OF OFFICER - E.G., "JANE DOE, NOTARY PUBLIC"   personally appeared     NAME(S) OF SIGNER(S)   who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) , or the entity upon behalf of which the person(s) acted, executed the instrument.   I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.   WITNESS my hand and official seal.         Signature of Notary Public (Notary Seal) J-17224 J-17224 EXHIBIT'A'' SEWER EASEMENT Being a portion of Parcel 7 of Parcel Map No. 91 13 in the County of San Diego, State of California, filed in the Office of the County Recorder of San Diego County August 30, 1979 said portion being more particularly described as follows: Beginning at the southwest corner of said Parcel 7; thence along the South line of said Parcel 7 North 85"49'50' East 6.44 feet to the TRUE POINT OF BEGINNING: thence leaving said Southerly line North 04"09'41" West 23.67 feet to the Westerly line of said Parcel 7; thence along said Westerly line North 1 1"03'16" East 1 .51 feet; thence leaving said westerly line North 85'50'19" East 257.57 feet to the southwesterly line of that Sewer Easement Granted to Otay Water District Recorded April 29, 1976 as Document No. 128932: thence along said southwesterly line South 54"13'04" East 48.06 feet; thence leaving said southwesterly line South 86"39'50" West 133.03 feet to a point on the southerly line of said Parcel 7, said point being the beginning of a non-tangent 1530.00 foot radius curve concave Southerly to which a radial line bears North 00o06'44'West; thence along said southerly line Westerly along the arc of said curve through a central angle of 04'03'26" a distance of 108.34 feet; thence continuing along said southerly line South 85'49'50" West 53.55 feet to the TRUE POINT OF BEGINNING. Containing 0.175 acres, more or less /e,¿o/1 A. McMi , L.S. 6242 JblK:lfilesl 17 224llegall 17224 -lgl_sewer ease for pcl 7 No.6187 LAND ** OF C 1of1 SCALE 1" = 50' DIRECTION LENGTH CURVE TABLE NAME DELÏA RAD I US ARC c1 4'O3',26" 1 530.00 1 09.34 PAR@EL 8 SÞ =m5 L I NE TABLE NAME -N-L1 L2 L3 N 04'09'41 " W N 11'03','16" Es 54'13',04" E 23.61 1 .51 48.06 OWD /2ss32 PAR@EL V P.M, g flfl9 SEWER ESMT T0 1lvMD REyD 2/8/1978 AS FILE 78{5275/ c) Eo PARGI t-\ 50'1g',E 257.57',\T.P,O.B,N)a /V85' 53.59 N8î4E5U',E 6'44 CAMPO RD P.O.B. SW COR, PCL 7 s863E5U'W R4530'L.254.13' ESMT PER MAP N0.8327 (STATE ROUTE 94) oAMPO RD (STATE CI85 "% SEWER EASEMENT ACQUIRED, 0,.175 ACRES EXHIBIT'B' 9.2o.Þtl LAND ** OF c CALLE VERDE SITE VIA MERCADO Jo oo o BazELo _fi È" g SEWER EASEMENT PORTIONS OF PARCEL 7 OF PARCEL MAP NO. 91 13 COUNTY OF SAN DIEGO, STATE OF CALIFORNIA dîo o ú;co Þ rp PØ +tcc ËFoo oo oo )a q on o ı@ I to Eã- J-11224 June 1,2016 .dedicated to Community SeMice 2554 SWEETWATER SPRINGS BOULEVARD,SPRING VALLEY,CALIFORNIA91978-2004 TELEPHONE:670-2222,AREACODE 619 WWW.Otaywater.gov Project No.:S2024-001102 FW CA Rancho San Diego Village,LLC,A Delaware Limited Liability Company c/o John Mehigan ' 915Wilshire Blvd.,#2200 Los Angeles,CA 90017 SUBJECT:Permanent Utility Easement - APN #502-150-18; Otay Water District -Campo Road Sewer Replacement Project; Statutory Offer Pursuant to Government Code Section 7267.2(a) Dear Property Owner: The Otay Water District (District)is in the process of relocating District Sewer facilities along Campo Road (SR 94) ("Campo Road Sewer Replacement Project").In connection with the Campo Road Sewer Replacement Project, the District hereby offers to acquire a Permanent Utility Easement across a portion of your real property located at 3681 Avocado Blvd.and identified by Assessor Parcel Number 502-150-18 (the "Real Property").Itis our understanding that you are currently the onlyowner of record ofthe Real Property.If you are not the owner ofthe Real Property, or ifanyone else owns any portion of, or interest in,the Real Property,please contact us immediately. The District wishes to acquire the Permanent Utility Easement amicably,expeditiously, and by negotiation, pending the approval by the Board of Directors ("Board")of the District.To accomplish this, the District is required to (i)establish an amount that the District believes to be "just compensation,"(ii)make an offer to the owner(s) of record to acquire the Permanent Utility Easement for the full amount so established, and (iii) provide the owner(s)with a written statement of,and summaryofthe basis for,the amount established as "justcompensation." The District's offercannot be less than the District's appraisal ofthe value ofthe propertyinterest to be acquired,(see California Government Code Section 7267.2(a)). The District retained the appraisal services of Colliers International, an independent real estate appraiser, to estimate the "Fair Market Value" of the proposed Permanent Utility Easement acquisition, as that value is defined inSection 1263.320 ofthe California Code of Civil Procedure.The appraiser's Fair MarketValue Estimate is shown on the enclosed "Summary ofthe Basis for the Amount Establishedas Just Compensation"and "Summary FW CA Rancho San Diego Village,LLC Permanent Utility Easement - APN #502-150-18 June 1,2016 Page 2 of 3. of Salient Facts and Conclusions."Based upon this independent appraisal,the District has determined that the amount of $72,400.00 constitutes Just Compensation for the proposed purchase of a Permanent Utility Easement which is described and depicted in the enclosed legal description and plat. Ifyou are agreeable with the above offer, an escrow will be opened by or at the direction of the District.Escrow will facilitate the conveyance of the Permanent Utility Easement to the District free and clear of any and all liens,encumbrances,and options or claims for leasehold interests for a total consideration of $72,400.00.The acquisition of the Permanent Utility Easement and access rights is subject to District reviewing the escrow Preliminary Title Report, if any,and accepting the conveyance document.The District will pay all eligible incidental expenses associated with the escrow closing,including any recording fees. Please note that the proceeds related to the purchase of the Permanent Utility Easement may be subject to payment demands for county taxes,assessment liens,federal and state tax liens,creditor judgements,and beneficiaries of trust deeds.Please note further that ifa condemnation action is approved and filed,the District may continue to discuss a negotiated purchase based upon the offer set forth herein. This offer will be deemed revoked,if it has not been accepted before the earlier of (i)the date on which the Board of Directors of the District holds a public hearing on a possible condemnation action,ifany, or (ii)within 45 days of the date of this letter. If the above offer meets with your approval,please sign this letter on Page 3 under the heading "OfferAccepted" and return it to my attention. A duplicate copy of this letter is enclosed for your records.Please review all the enclosed documents prior to making a decision.If you accept our offer,please be ready to execute and deliver the Permanent Utility Easement enclosed with this offer. If you have any questions regarding the project or the terms of the Permanent Utility Easement acquisition proposal,please contact the District's Project Manager,Stephen Beppler, P.E.,Senior Civil Engineer, at (619)670-2209 or by e-mail at steve.beppler@otaywater.gov. Sincerely, otayaNax lark Watfon General Manager MW:jf FW CA Rancho San Diego Village,LLC Permanent Utility Easement - APN #502-150-18 June 1,2016 Page 3 of 3. Enclosures: Summary of the Basis for the Amount Established as Just Compensation Appraisal Summary Statement Proposed Permanent Utility Easement with Exhibit A & B- Legal and Plat The Public Acquisition Process Copy of this Offer Letter OFFER ACCEPTED:FW CA Rancho San Diego Village,LLC Dated: By: Signature Print P:\WORKING\CIP S2024CampoRoadSewerReplacement\Easements\Proposed Easements\Offers\FW CA easementoffer20160518.docx Summary of the Basis for the Amount Established as Just Compensation (Pursuant to Section 1255.010 of the California Code of Civil Procedure) (Accompanying the offer made pursuant to Government Code Section 7267.2) The following is a summary of the basis for the amount established as Just Compensation for the Permanent Utility Easement the District desires to acquire on a portion of the Real Property described in the Offer to which this Summary is attached. The appraisal was made in accordance with accepted appraisal principles, consistent with California valuation law. An identification of the parcel, the project for which the Permanent Utility Easement is required, the required property rights, and the valuation analysis which was the basis for the valuation conclusion is as follows: PROJECT: Otay Water District Campo Road Sewer Replacement Project ASSESSOR PARCEL NUMBER: 502-150-18 SUBJECT PROPERTY LOCATION: 3681 Avocado Blvd, La Mesa, CA 91941 OWNER OF RECORD: FW CA Rancho San Diego Village, LLC, a Delaware limited liability company PO BOX 790830, SAN ANTONIO, TX 78279 Telephone: 213-553-2273 (John Mehigan) INTEREST BEING VALUED: Permanent Utility Easement AREA AFFECTED: Approximately 7,611 square feet, or 0.175 acres DATE OF VALUE: February 12, 2016 SUMMARY OF VALUE CONCLUSIONS AND DESCRIPTION OF THE LARGER PARCEL: Refer to enclosed copy of Appraisal Summary Statement PROPOSED PROJECT: The purpose of the Otay Water District Campo Road Sewer Replacement Project is for the District to replace its facilities that are no longer meeting the District’s needs. The District anticipates using the Permanent Utility Easement as a means to access the trench for the pipe to be realigned. After the realignment of the pipe is accomplished, the District will return the easement to its condition prior to the access. Summary of the Basis for the Amount APN 502-150-18 Established as Just Compensation Page 2 of 3. DESCRIPTION OF THE PERMANENT UTILITY EASEMENT USE: The Permanent Utility Easement has an area of approximately 7,611 square feet. The District will construct a 15” sewer within the Easement. Upon completion, the District will return the Easement to its condition prior to the access, and, thereafter, will access the sewer through manholes. REMAINDER OF PARCEL: The Permanent Utility Easement is not anticipated to have significant impact on the Real Property. VALUATION OF THE LARGER PARCEL Definition of Fair Market Value Fair Market Value is defined under California law as the highest price on the date of valuation that would be agreed by a seller willing to sell but under no particular or urgent necessity to sell and a buyer being ready, willing and able to buy but under no particular necessity for so doing, each dealing with the other with full knowledge of all the uses and purposes for which the property is reasonably adaptable and available. Definition of Highest and Best Use Highest and best use is defined as the reasonably probable use of land that is legally permissible, physically possible, financially feasible, and maximally productive resulting in the highest value. The Highest and Best Use Analysis is used in the appraisal process to identify comparable properties and, where applicable, to determine whether the existing improvements should be retained, renovated, or demolished. The results of the Highest and Best Use Analysis are discussed below. HIGHEST AND BEST USE The Highest and Best Use for the Real Property was determined to be industrial building, as zoned. METHODOLOGY The Sales Comparison Approach was used to estimate the fair market value of the Real Property and the Permanent Utility Easement. Summary of the Basis for the Amount APN 502-150-18 Established as Just Compensation Page 3 of 3. SALES COMPARISON APPROACH The following is a summary of the principal sales considered applicable to the valuation of the larger parcel: SUMMARY OF IMPROVED TRANSACTIONS No. Location Sale Date Size in AC Price Price/SF 1 5900 Severin Dr., La Mesa Pending 2/4/2016 0.46 $400,000 $19.96 2 1338 E. Main St., El Cajon 8/28/2014 1.31 $1,020,000 $17.87 3 714 Grand Ave., Spring Valley 4/3/2015 0.27 $230,000 $19.56 4 230 El Cajon, El Cajon 7/21/2015 0.80 $500,000 $14.35 5 1164 Coushatta, Spring Valley 10/12/2015 1.42 $885,000 $14.31 Broker opinion of value varies from $15 to $20 per square foot depending on size and location of the parcel. The property at Avocado Blvd, consisting of 3.42 acres, has an estimated value of $19 per square foot. VALUATION OF PERMANENT UTILITY EASEMENT The compensation for the Permanent Utility Easement which encumbers 7,611 square feet was based on the fee simple interest of the property, and is a percentage of the fee simple value based on the fact that it is shared property with some rights retained by the current property owner. The fee simple value of the land was established at $19 per square foot. The Permanent Utility Easement takes 50% of the rights to the land. Therefore, the value of the part taken is $72,305 ($19.00 per square foot x 50% shared rights x 7,611 square feet). VALUE OF THE REMAINDER The District will return the Real Property which is subject to the Permanent Utility Easement to its prior condition following the proposed relocation of the District’s facilities. No significant adverse impact is anticipated from the Project. The Permanent Utility Easement will not change the zoning or other land use regulations applicable to the Real Property. Based on the investigation, there are no damages occasioned by the Project to the remainder of the Real Property. BENEFIT The proposed sewer line continues to be underground and will be available through manholes for use on the Real Property. There is no market evidence suggesting that the Permanent Utility Easement will be a benefit to the Real Property. Therefore, there are no demonstrable benefits to the Real Property directly resulting from the Project. OTAY ...Oedicated to Cormmuniig Senrice 2554 SWEETWATER SPRINGS BOULEVARD, SPRING VALLEY CALIFORNIA 91 978-2004 TELEPHONE:670-2222, ABEACODE 619 vvwwotaywater.gov October 31,2016 Project No.: 52024-001102 FW CA Rancho San Diego Village, LLC, A Delaware Limited Liability Company c/o K. Erik Friess Allen Matkins Leck Gamble Mallory & Natsis LLP 1900 Main Street, 5th Floor lrvine, C492614-7321 SUBJECT:Permanent Utility Easement - APN # 502-150-18; Otay Water District - Campo Road Sewer Replacement Project; Statutory Offer Pursuant to Government Code Section 7267.2(a) Dear Property Owner: The Otay Water District (District) hereby presents a revised statutory offer to acquire a Permanent Utility Easement across a portion of your real property located at 3681 Avocado Blvd. and identified by Assessor Parcel Number 502-150-18 (the "Real Property") upon which the District initially offered in a letter dated June 1, 2016. The easement is related to the District's relocation of sanitary sewer facilities along Campo Road (SR 94) ("Campo Road Sewer Replacement Project"). Based upon negotiations between the District's legal counsel and your legal representative, Mr. K. Erik Friess, and considering the appraised value and your disagreements with it, an amount of $125,000.00 has been deemed as Just Compensation for the proposed purchase of the Permanent Utility Easement, which is described and depicted in the enclosed legal description and plat. The description has been revised from the original version provided in the June 1,2016 offer to reflect agreed upon changes. Upon acceptance of this offer, an escrow will be opened by or at the direction of the District. Escrow will facilitate the conveyance of the Permanent Utility Easement to the District free and clear of any and all liens, encumbrances, and options or claims for leasehold interests for a total consideration of $125,000.00. The acquisition of the Permanent Utility Easement and access rights is subject to District reviewing the escrow Preliminary Title Report, if any, and accepting the conveyance document. The District will pay all eligible incidental expenses associated with the escrow closing, including any recording fees. FW CA Rancho San Diego Village, LLC, A Delaware Limited Liability Company c/o K. Erik Friess Permanent Utility Easement - APN # 502-150-18 October 31,2016 Page 2 of 2. Please note that the proceeds related to the purchase of the Permanent Utility Easement may be subject to payment demands for county taxes, assessment liens, federal and state tax liens, creditor judgements, and beneficiaries of trust deeds. This offer will be deemed revoked, if it has not been accepted before the earlier of (i) the date on which the Board of Directors of the District holds a public hearing on a possible condemnation action, if any, or (ii) within 30 days of the date of this letter. Please sign this letter below under the heading "Offer Accepted" and return it to my attention at your earliest convenience. A duplicate copy of this letter is enclosed for your records. Please also be prepared to execute and deliver the Permanent Utility Easement enclosed with this offer. Sincerely, OTAY E ISTRICT ark Watton General Manager MW:mlc Enclosures: Proposed Permanent Utility Easement with Exhib¡t A & B - Legal and Plat Copy of this Offer Letter OFFER ACGEPTED: FW CA Rancho San Diego Village, LLC Dated Signature Print P:\WORKING\ClP 52024 Campo Road Sewer Replacement\Easements\Proposed Easements\Ofiers\Revised Easement Offer - Regency - RSD Village 20161031.Docx By: ATTACHMENT E – Budget Detail Project Budget Detail S2024‐Campo Road Sewer Main Replacement   Level Title1 Committed Expenditures Outstanding  Commitment  Projected  Final Cost  Vendor Planning Consultant  Contracts  $20,020.00 $20,020.00 $0.00 $20,020.00  AEGIS ENGINEERING  MGMT INC  Regulatory Agency  Fees  $132.00 $132.00 $0.00 $132.00  US BANK  $2,260.00 $2,260.00 $0.00 $2,260.00  COUNTY OF SAN  DIEGO  Service Contracts $161.70 $161.70 $0.00 $161.70  SAN DIEGO DAILY  TRANSCRIPT  $42.50 $42.50 $0.00 $42.50  EAST COUNTY  GAZETTE  Standard Salaries $138,106.13 $138,106.13 $0.00 $138,106.13   Total $160,722.33 $160,722.33 $0.00 $160,722.33   Design Consultant  Contracts  $9,315.00 $9,315.00 $0.00 $9,315.00  WATER SYSTEMS  CONSULTING INC  $763,244.35 $687,231.45 $76,012.90 $763,244.35  RICK ENGINEERING  COMPANY  $3,500.00 $3,500.00 $0.00 $3,500.00  MICHAEL D KEAGY  REAL ESTATE  $3,507.75 $3,507.75 $0.00 $3,507.75  NINYO & MOORE  GEOTECHNICAL  Professional Legal  Fees  $182.32 $182.32 $0.00 $182.32  STUTZ ARTIANO  SHINOFF  $1,910.00 $1,910.00 $0.00 $1,910.00  ARTIANO SHINOFF  Regulatory Agency  Fees  $956.00 $956.00 $0.00 $956.00  COUNTY OF SAN  DIEGO  Service Contracts $158.20 $158.20 $0.00 $158.20  SAN DIEGO DAILY  TRANSCRIPT  Easement  Acquisition  $125,000.00 $0.00 $125,000.00 $125,000.00 REGENCY CENTERS  Standard Salaries $241,409.46 $241,409.46 $0.00 $241,409.46   Total $1,149,183.08 $948,170.18 $201,012.90 $1,149,183.08   Construction Consultant  Contracts  $42,460.65 $0.00 $42,460.65 $42,460.65  RICK ENGINEERING  COMPANY  $12,258.00 $12,258.00 $0.00 $12,258.00  NINYO & MOORE  GEOTECHNICAL  $17,400.00 $17,400.00 $0.00 $17,400.00  ALYSON CONSULTING  Standard Salaries $836.63 $836.63 $0.00 $836.63   Total $72,955.28 $30,494.63 $42,460.65 $72,955.28   Budget $8,500,000.00   Total $1,382,860.69 $1,139,387.14 $243,473.55 $1,382,860.69   SUBJECT/PROJECT: S2024-001102 Authorization to Acquire an Easement at Rancho San Diego Village Shopping Center from Regency Centers for the Campo Road Sewer Replacement SKYLINEWESLEYANCHURCH ?Ë AV O C A D O B L V D FURY LANE JAMA C H A B L V D JAMAC H A R D CUYAMACACOLLEGE C A M P O R D C A M P O R D ?Ë OWDREGULATORYSITE Ralph W. ChapmanWater ReclamationFacility SINGER L N RANCHOSAN DIEGOVILLAGE RANCHOSAN DIEGOTOWNECENTER EASEMENTACQUISITION VICINITY MAP PROJECT SITE NTS DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 ?ò Aä;&s ?p ?Ë !\ OTAY WATER DISTRICTCAMPO ROAD SEWER MAIN REPLACEMENTLOCATION MAP EXHIBIT A CIP S2024 0 1,000500 Feet F F P: \ W O R K I N G \ C I P S 2 0 2 4 C a m p o R o a d S e w e r R e p l a c e m e n t \ G r a p h i c s \ E x h i b i t s - F i g u r e s \ E x h i b i t A , L o c a t i o n M a p , R S D V i l l a g e , O c t 2 0 1 6 . m x d Legend Proposed 15-Inch Sewer Main Alignment Existing 10-inch Gravity Sewer to be Replaced Existing Sewer Mains STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Jose Martinez, Asst. Chief of Water Operations PROJECT: DIV. NO. All APPROVED BY: Pedro Porras, Chief Water Operations German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Approval to Purchase two (2) Replacement Portable Emergency Gensets GENERAL MANAGER’S RECOMMENDATION: That the Board authorize the General Manager to issue a purchase order to Volvo Construction Equipment in the amount not to exceed $269,764 for the purchase of two (2) replacement portable emergency gensets. COMMITTEE ACTION: See Attachment A. PURPOSE: To obtain Board authorization to purchase two (2) replacement portable emergency gensets. ANALYSIS: Included in the approved FY 2017 budget, as Item 2 under Capital Purchases, are two (2) replacement portable emergency gensets. The two gensets are a replacement for existing gensets, Unit No. 736 and Unit No. 2143. The existing gensets were manufactured in 1977 (Unit No. 736) and 1986 (Unit No. 2143) and will be 40 and 31 years old, respectively, at the time of replacement. These gensets are currently classified as TIER 0 generator emission levels which indicate they were permitted prior to the State mandated emission limits on portable gensets. In order to comply with State regulatory mandates the gensets must be removed from service and replaced with gensets that are certified to the current emissions levels of the State of California. The new portable gensets will be mounted on trailers with enclosures similar to the existing gensets. The two new gensets will be in compliance with the State TIER 4 emission standards. The specified replacement portable emergency gensets are designed to operate as a backup power source for the District’s various critical facilities, including but not limited to: pump stations, hydro pneumatic stations, lift stations and the emergency operations center (EOC). The replacement gensets support the District’s Strategic Performance Objectives 1.1.2.3 and 4.1.1.9 and Measure 5.3.519 associated with emergency preparedness. As a reminder, Performance Measure 5.3.519 (Emergency Facility Power Testing) is a readiness indicator of the District’s facilities to perform as intended in the event of an emergency. Currently, Operations staff conducts annual testing of the District’s emergency gensets, which include but are not limited to the following:  Simulation of an actual loss of utility power  Observation of proper start up, operation and shutdown of the generator and associated Automatic Transfer Switch (ATS)  Ability to monitor and operate the facility locally and remotely via the District’s SCADA system  Use of a “Load Bank” which places actual power demands on the gensets to evaluate their performance (temperature, pressure, power output, etc.) when operating near rated capacities  Additionally, exercising engines near their capacities is also part of the recommended maintenance for the gensets This testing is part of the ongoing efforts performed by staff to help ensure the District’s ability to supply water in the event of an emergency. Based on system operation evaluations of workflow by the water systems supervision and management, it is recommended that two (2) new portable emergency gensets be purchased and the two older gensets be declared surplus. In accordance with District policy, bids were solicited for the portable gensets. Three (3) bids were received. Prices received include all applicable fees, taxes, delivery, testing and training. Dealer Bid Price Volvo Construction Equipment $269,764 Cummins Pacific $277,796 Hawthorne Power Systems $300,092 FISCAL IMPACT: Joe Beachem, Chief Financial Officer Projected purchase budget for the two (2) portable gensets is $300,000 based on preliminary research. The purchase of the gensets will cost $269,764, which will be charged against the APCD Retrofits and Replacements CIP P2366. The total cost in this account will not exceed budgeted funding. Based on staff’s evaluation, the CIP P2366 budget is sufficient to complete this purchase. Total budget for FY17 is $820,000, of which $520,000 has been previouisly allocated and staff is now requesting to use the remaining $300,000. The Finance Department has determined that 100% of the funds are available in the replacement fund. Expenditure Summary: CIP 2366 FY17 APCD Retrofits and Replacements Budget: $820,000 Equipment Purchased: Two (2) portable pumps $326,160.00 Proposed Replacement: Two (2) portable gensets $269,764.00 Total, Projected Expenditures of Equipment Replacements FY17, CIP P2366 Budget: $224,076 STRATEGIC GOAL: Operate the system to meet demand twenty-four hours a day, seven days a week. LEGAL IMPACT: None. General Manager Attachment A, Committee Action ATTACHMENT A SUBJECT/PROJECT: Approval to Purchase two (2) Replacement Portable Emergency Gensets COMMITTEE ACTION: This item was presented to the Finance, Administration and Communications Committee at a meeting held on November 15, 2016. The following comments were made:  Staff is requesting that the Board authorize the General Manager to issue a purchase order to Volvo Construction Equipment in the amount not to exceed $269,764 for the purchase of two (2) replacement portable emergency gensets.  Staff reviewed the information in the staff report.  Staff noted that within the District’s Strategic Plan there is an objective, Emergency Facility Power Testing Measure, which sets a goal that staff test all 30 of the District’s generators. Staff simulates, once a year, an actual emergency power outage and tests to assure that all 30 generators switch on when there is a power outage. The generators are also load tested to see how they run under a strenuous load over a long period. These load tests provides for preventative maintenance and running the engines at 80 to 100% of their maxiumum level is good for the engines. Lastly, staff tests that the generators automatically recognize that power has been restored, transfers the facility back onto utility power, and then shut down.  It was indicated that the portable generators would provide additional back up power for these critical facilities, which includes pump, hydromatic, and sewer lift stations and the Emergency Operating Center, with the exception of the 980-2 pump station which already has additional back up designed within the distribution system.  It was discussed that generators are very important to the District’s emergency operations as was recognized during the widespread electricity outage from Arizona to Southern California in 2011. It was indicated the District was able to continue operations and water services throughout the outage as the back up generators kept the District’s facilities operating. There were water agencies that were not able to keep operations going as they did not have suffienct back up electrical power to keep their reservoirs full.  In response to an inquiry from the Committee, staff indicated that the District contacted the Air Pollution Control District (APCD) regarding the District’s plan to purchase new gensets as staff wanted to assure they would be in compliance with some proposed changes to existing regulations. The APCD indicated that the new gensets would be fine and that they would allow the District to continue to operate its existing portable generators until the District purchased the new gensets.  Staff indicated, in response to another inquiry from the Committee, that they were confident that the two (2) back up portable gensets would be sufficient for the District’s emergency services needs.  It was discussed the old gensets would be surplused and the District will, as it has in the past, notify Mexico’s water agency of the availability of the District’s surplused gensets. Following the discussion, the committee supported staff’s recommendation and presentation to the full board as a consent item. STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 PROJECT: Various DIV. NO. ALL SUBMITTED BY: Kent Payne Purchasing and Facilities Manager APPROVED BY: Adolfo Segura, Chief, Administrative & IT Services German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: AUTHORIZE A TWO-YEAR FIXED AGREEMENT, PLUS THREE (3) ONE-YEAR OPTIONS, WITH T&T JANITORIAL, INC., FOR JANITORIAL SERVICES AT A NOT-TO-EXCEED TOTAL AMOUNT OF $286,800 GENERAL MANAGER’S RECOMMENDATION: That the Board authorize a two-year fixed agreement, plus three (3) one-year options, with T&T Janitorial, Inc. of San Diego, CA (T&T), for janitorial services at the Administration, Operations, Warehouse and Treatment Plant buildings, plus five remote facility restrooms at a not-to-exceed total amount of $286,800. Monthly and annual fees, which represent an 11% reduction from the current contract, are as follows: Calendar Year Monthly Fee Annual Fee Current Contract $5,370.00 $64,440 T&T Janitorial, Inc. 2017 $4,780.00 $57,360 2018 $4,780.00 $57,360 2019 - Option 1 $4,780.00 $57,360 2020 - Option 2 $4,780.00 $57,360 2021 - Option 3 $4,780.00 $57,360 Contract Total $286,800 COMMITTEE ACTION: See “Attachment A”. 2 PURPOSE: To obtain authorization for the General Manager to enter into a two- year fixed agreement, plus three (3) one-year options, with T&T for janitorial services at a not-to-exceed total amount of $286,800. ANALYSIS: The District utilizes a multi-year contract for janitorial services at its main facilities and five remote sites. A scope of work matrix is provided (“Attachment B”). Staff issued a Request-for-Quotation through its online solicitation portal, BidSync. Forty-three (43) firms and organizations viewed the solicitation; fourteen (14) downloaded the bid packet; and, eleven (11) firms attended a mandatory pre-proposal meeting and site walk held at the main campus and Treatment Plant. The District received nine (9) quotes; one of which was non-responsive and four exceeded the maximum acceptable fee and were not evaluated. The remaining four (4) were evaluated by a review panel and scored on firm qualifications, personnel experience, completeness of the submittal, proposed method to perform the work, proposed hours per year, and proposed monthly fee for each year of the contract (“Attachment C”). Firm Five-Year Fee Total Score Prizm Janitorial Service , Inc. $236,166 311 T&T Janitorial, Inc. $286,600 344 Merchants Building Maintenance $351,568 226 Priority Building Services, LLC* $389,892 231 *Incumbent contract holder for Admin, Operations and Warehouse buildings. T&T’s proposal received the highest score and was determined to be the best value for the required scope of work. Staff checked their references which includes the County of San Diego, the City of Coronado, and Southwest Fisheries Science Center – NOAA. All rated T&T as excellent in both job performance and customer service. An internet search revealed no negative ratings or complaints. T&T is a locally owned certified disadvantaged business enterprise incorporated in 2003, with approximately 50 full and part-time employees. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The annual janitorial services operating budget is $63,000, which is sufficient to cover the yearly cost of the contract. 3 STRATEGIC GOAL: Supports the Districts Strategy: Ensure financial health through formalized policies, prudent investing, and efficient operations. LEGAL IMPACT: None. ATTACHMENTS: Attachment A – Committee Action Report Attachment B – Scope of Work Matrix Attachment C – Scoresheet ATTACHMENT A SUBJECT/PROJECT: AUTHORIZE A TWO-YEAR FIXED AGREEMENT, PLUS THREE (3) ONE- YEAR OPTIONS, WITH T&T JANITORIAL, INC., FOR JANITORIAL SERVICES AT A NOT-TO-EXCEED TOTAL AMOUNT OF $286,800 COMMITTEE ACTION: This item was presented to the Finance, Administration and Communications Committee at a meeting held on November 15, 2016. The following comments were made:  Staff is requesting that the Board authorize a two-year fixed agreement, plus three (3) one-year options, with T&T Janitorial, Inc. (T&T) for janitorial services for District facilities in an amount not-to-exceed $286,800.  Staff reviewed the information in the staff report.  It was indicated that the District contracts out janitorial services and in 2011, the District issued multi-year agreements to two companies, Priority Building Services and Jani-King of California, for specific locations within the District. Priority received the contract for the Admintration, Operations and Warehouse facilities while Jani-King received the contract for the Treatment Plant and all remote facilities that have restrooms. These contracts expire this year.  Staff indicated that while Prizm Janitorial offered the lowest overall cost, the panel was not confident that they would be able to perform the required services due in part to an insufficient number of proposed hours.  In response to an inquiry from the Committee, staff indicated that Prizm Janitorial Services, Inc. (Prizm) offered 173 hours of services while T&T offered a little over 300 hours of services. Staff noted that each firm has its own calculation of the length of time it would take to complete each task in the scope of work and let the contractor decide on the time component for each task. 5  The current contractors have provided janitorial services for five (5) years and the new proposed contract would cost 11% less than the current contractors. It was noted that the current contractors had escalator clauses in their contracts. They are also franchises and have a higher overhead cost.  The proposed contract with T&T has a fixed price for five (5) years and already includes minimum wage increases.  It was indicated that T&T is locked into the first two (2) years of the contract, while the District has the option to terminate (with or without cause) with 60 days notice. Renewal is automatic unless either party provides 60 days prior notice. Following the discussion, the committee supported staff’s recommendation and presentation to the full board as a consent item. 6 ATTACHMENT B SUBJECT/PROJECT: AUTHORIZE A TWO-YEAR FIXED AGREEMENT, PLUS THREE (3) ONE- YEAR OPTIONS, WITH T&T JANITORIAL, INC., FOR JANITORIAL SERVICES AT A NOT-TO-EXCEED TOTAL AMOUNT OF $286,800 SCOPE OF WORK MATRIX* Administration Operations Central Warehouse Treatment Plant # Task Description D W M Q D W M Q D W M Q Common Areas, Meeting Rooms, Offices & Cubicles 1 Empty all waste containers; clean containers as necessary; replace liners as necessary; and place trash in dumpsters. (Liners to be supplied by owner.) X X X 2 Remove smudges from doors, doorframes & elevator doors. X X X 3 Spot-clean partition glass and door glass. X X X 4 Clean, disinfect and polish drinking fountains. X 5 Disinfect door handles. X X X 6 Return furniture to neat and orderly position. X X X 7 Dust & wipe clean meeting room conference tables. X 8 Sweep non-carpeted traffic patterns including hallways, aisles & copy stations. X X X 9 Sweep debris from exterior of main entrance doors. X 10 Vacuum all carpet traffic patterns including primary hallways, aisles & copy stations. X 11 Mop and disinfect all non-carpeted floors, including main stairwell in Administration Building. For Warehouse location, delivery area only. X X X 12 Empty all paper recycling containers and place paper in central recycling bins. X X X 13 Dust, and wipe clean with a treated cloth all desktops (do not disturb tenant papers), meeting room furniture, file cabinets, bookcases, shelves, counters, and fixtures. X X X 14 Spot-clean all wall switches and door facings. X X X 15 Dust baseboards, ledges, and window sills. X X X 16 Remove cobwebs from ceiling corners. X X X 17 Vacuum all carpeted floors including offices, workstations, meeting rooms, training room and board room. X 18 Dust picture frames. X X X D – Daily; W – Weekly; M – Monthly; Q – Quarterly 7 Administration Operations Central Warehouse Treatment Plant # Task Description D W M Q D W M Q D W M Q 19 Brush down or vacuum wall-ceiling vents. X X X 20 Detail vacuum all carpeted areas. X X X 21 Remove spillage spots from carpets. X X X 22 Dust high-reach areas including partition tops, door tops, and air conditioning vents. X X X 23 Clean and polish executive office furniture. X X X 24 Brush or vacuum upholstered furniture. X X X 25 Wipe down plastic and leather furniture. X X X 26 Vacuum chairs. X X X 27 Spot-clean painted partitions and painted walls. X X X Kitchen, Kitchenettes & Break Room/Lunch Room 1 Empty all waste containers, clean containers as necessary, replace liners, and place trash in dumpsters. (Liners to be supplied by owner.) X X X 3 Clean and disinfect kitchen, kitchenettes, and lunchroom & break rooms including sinks, countertops, and tabletops. X X X 4 Clean inside of microwaves. X X X 5 Clean & wipe down exterior surfaces of coffee machines. X X X 6 Sweep floors. X X 7 Mop and disinfect floors. X X 8 Clean & disinfect exterior surfaces of kitchen appliances including microwaves, coffee machines, toaster ovens, stove/oven, refrigerators, and vending machines. X X X 9 Clean lunchroom furniture. X 10 Spot-clean all wall switches and door facings. X X 11 Dust baseboards, ledges, and window sills where applicable. X X 12 Remove cobwebs from ceiling corners where applicable. X X X Restrooms 1 Empty all waste containers, clean containers as necessary, replace liners, and place trash in dumpsters. (Liners to be supplied by owner.) X X X 2 Empty sanitary napkin containers and replace insert. X X X 3 Polish all metal and clean mirrors. X X X 4 Clean and disinfect all dispensers. X X X 5 Clean and disinfect washbasins, toilet bowls and urinals. X X X 6 Disinfect underside and tops of toilet seats. X X X 7 Refill soap, towel, tissue containers, and seat cover dispensers. X X X 8 Mop & disinfect floors. X X X 9 Brush down vents. X X X 10 Wash down ceramic tile walls and toilet compartment partitions. X X X 11 Pour clean water down floor drains to prevent sewer gases. X X X 12 Replace urinal screens. X X X D – Daily; W – Weekly; M – Monthly; Q – Quarterly 8 Regulatory Site Central Area Pump Station 30MG Reservoir 944-1 Reservoir- 1296 Pump Station Buena Vista Pump Station 450/680 Recycled Pump Station # Task Description 2W W 2W W 2W W 2W W 2W W 2W W Restrooms 1 Empty all waste containers, clean containers as necessary, replace liners, and place trash in dumpsters. (Liners to be supplied by owner.) X X X X X X 2 Empty sanitary napkin containers and replace insert. X X X X X X 3 Polish all metal and clean mirrors. X X X X X X 4 Clean and disinfect all dispensers. X X X X X X 5 Clean and disinfect washbasins, toilet bowls and urinals. X X X X X X 6 Disinfect underside and tops of toilet seats. X X X X X X 7 Refill soap, towel, tissue containers, and seat cover dispensers. X X X X X X 8 Mop & disinfect floors. X X X X X X 9 Brush down vents. X X X X X X 10 Wash down ceramic tile walls and toilet compartment partitions. X X X X X X 11 Pour clean water down floor drains to prevent sewer gases. X X X X X X 2W - Twice-Weekly; W - Weekly *Duties may be modified from time-to-time as circumstances require. 9 ATTACHMENT C SUBJECT/PROJECT: AUTHORIZE A TWO-YEAR FIXED AGREEMENT, PLUS THREE (3) ONE- YEAR OPTIONS, WITH T&T JANITORIAL, INC., FOR JANITORIAL SERVICES AT A NOT-TO-EXCEED TOTAL AMOUNT OF $286,800 SCORESHEET Qualification Experience of the Firm Qualification Experience of Assigned Personnel Completeness, Addressed Requested Information Proposed Method to Accomplish Work Hours Proposed Proposed Monthly Fee Total Score References SCORE 20 10 10 15 20 25 100 Prizm Janitorial Services, Inc. A Carey 20 10 10 15 6 25 86 S Chen 14 8 7 8 68 K Payne 18 9 10 14 81 F Conchas 17 8 9 12 77 311 T&T Janitorial, Inc. A Carey 20 10 10 15 17 20 92 S Chen 16 8 7 11 79 K Payne 19 10 10 14 90 Excellent F Conchas 16 8 9 14 84 344 Merchants Building Maintenance A Carey 18 7 6 2 6 10 49 S Chen 16 7 7 8 54 K Payne 18 9 7 10 60 F Conchas 18 9 9 13 65 227 * Priority Building Services, LLC. A Carey 20 6 5 6 15 1 53 S Chen 18 8 9 12 63 K Payne 14 7 7 9 53 F Conchas 18 8 8 12 62 231 *Incumbent STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Tenille Otero Communications Officer PROJECT: Various DIV. NO. ALL APPROVED BY: Mark Watton, General Manager SUBJECT: Amendment to Extend the Joint Powers Agency Water Conservation Garden Operation Agreement GENERAL MANAGER’S RECOMMENDATION: That the Board of Directors approve the first amendment to the Joint Powers Agency (JPA) Water Conservation Garden Operation Agreement (Operation Agreement) [Attachment B], extending the expiration date an additional six months from December 31, 2016 to June 30, 2017. COMMITTEE ACTION: See Attachment A. PURPOSE: To request that the board consider extending the Operation Agreement to allow sufficient time for the Water Conservation Garden Joint Powers Agency (JPA) to thoroughly review and evaluate the Operation Agreement and develop a new agreement that is strategically beneficial for JPA members who provide funding to operate the Garden. ANALYSIS: Members of the JPA funded the construction of the Garden and continue to fund a majority of its operational costs. The original Operation Agreement, dated October 13, 2010, expires on December 31, 2016. The JPA expected to have a revised Operation Agreement completed prior to 2 the expiration date. However, the JPA members determined that since a revised agreement would need to be approved by each of the individual member agencies’ boards, the deadline of December 31 could not be met. The JPA members also agreed that they need adequate time to carefully consider the revisions. In addition, the Funding Agreement is due to expire in June 2017, whereas the Operation Agreement is on a calendar year. Members of the JPA and Friends of the Garden (Friends) Board have concurred that the two agreements’ schedules should be aligned since the funding of the Garden is so closely tied to the Operational Plan. Two District board members, Mark Robak as the District representative and Mitch Thompson as the alternate, support the District on the JPA committee. At the committee’s November 9, 2016 meeting, all members voted to extend the Operation Agreement an additional six months, from December 31, 2016 to June 30, 2017. Extending the agreement will provide the committee sufficient time to thoroughly review and revise the Operation Agreement. This will allow members of the JPA to evaluate their participation in funding and/or operating the Garden so it continues to provide valuable water conservation programs and utilize the facilities constructed at the Garden as intended by its founders. FISCAL IMPACT: Joe Beachem, Chief Financial Officer None. STRATEGIC GOAL: Supports the objective in the District’s Strategic Plan to evaluate and enhance the District's water conservation programs and services. LEGAL IMPACT: None. Attachments: Attachment A – Committee Action Attachment B – First Amendment to Water Conservation Garden Operation Agreement ATTACHMENT A SUBJECT/PROJECT: Amendment to Extend the Joint Powers Agency Water Conservation Garden Operation Agreement COMMITTEE ACTION: This item was presented to the Finance, Administration and Communications Committee at a meeting held on November 15, 2016. The following comments were made:  Staff is requesting that the Board consider extending the Water Conservation Garden Operation Agreement to allow sufficient time for the Water Conservation Garden Joint Powers Agency (JPA) to thoroughly review and evaluate the agreement and develop a new agreement that is strategically beneficial for the JPA members who provide funding to operate the Water Conservation Garden (Garden).  Staff presented the information to the committee in the staff report.  The committee noted that the original operating agreement was developed when the Garden was initially implemented. In previous JPA meetings, the JPA members were concerned that the existing agreement does not adequately represent the relationship between the Friends of the Garden (Friends) and the JPA, nor the roles or functions of each of the groups. The JPA members asked that the Friends develop a new operating agreement. However, the presented agreement was not based on the existing agreement and the JPA members asked that the agreement be reviewed by an attorney who could work with the Friends to assure that it properly represents the relationship between the JPA and the Friends and the roles and functions of each of the groups. Thus, the JPA is requesting that the existing operating agreement be extended another six months until it can be revised and the proposed new agreement can be reviewed by an attorney.  The committee also discussed that the JPA is proposing a ten-year Operation Agreement. It is felt that it would assist the Friends in their fundraising efforts as it would send a message that the relationship between the Friends and the JPA is not temporary. The JPA’s goal is to expand the Garden’s funding and development sources to reduce funding needs from the JPA members.  Staff is recommending that the board approve the first amendment to the Joint Powers Agency Water Conservation Garden Operation Agreement, extending the expiration date an additional six months from December 31, 2016 to June 30, 2017 to allow time for the JPA to thoroughly review and evaluate the new proposed operating agreement. Following the discussion, the committee supported staff’s recommendation and presentation to the full board as an action item. WATER CONSERVATION AUTHORITY FIRST AMENDMENT TO WATER CONSERVATION GARDEN OPERATION AGREEMENT The WATER CONSERVATION GARDEN The Water Conservation Garden Operation Agreement dated October 13, 2010 between the Water Conservation Authority and Friends of the Water Conservation Garden (collectively Parties) is amended as follows. 1.Paragraph 1, DEFINITIONS, section 1.58 SCHEDULED EXPIRATION DATE is amendedto mean June 30, 2017. The Agreement is amended for continued operation and maintenanceservices, and to align the Friends of the Water Conservation Garden's Operations budget withthe budgets of the agencies which make up the Joint Powers Agency. 2.Paragraph 4, TERM, is amended to reflect the extension of the Agreement. 3.Pursuant to Paragraph 14, INSURANCE, Friends of the Water Conservation Garden shall provide updated insurance documents to the Water Conservation Authority as required. 4.All other terms, covenants, and conditions in the original Agreement as amended shall remainin full force and effect, and shall be applicable to this Amendment. The individuals executing this amendment to Agreement represent and warrant that they have the legal capacity and authority to do so on behalf of their respective legal entities. IN WITNESS WHEREOF, the Parties have executed this First Amendment to the Agreement on the date set forth below. AUTHORITY WATER CONSERVATION AUTHORITY, a Joint Powers Authority By: -----------Bo a rd President DATED: ---------- ATTEST: By: ------------Board Secretary OPERATOR FRIENDS OF THE WATER CONSERVATION GARDEN, a California nonprofit benefit corporation By: -----------­ Name: ----------- Title: ------------ By: -----------­ Name: ----------- Title: ------------ Attachment B STAFF REPORT TYPE MEETING: Regular Board Meeting MEETING DATE: December 7, 2016 SUBMITTED BY: Mark Watton, General Manager W.O./G.F. NO: DIV. NO. APPROVED BY: Susan Cruz, District Secretary Mark Watton, General Manager SUBJECT: Board of Directors 2016 and 2017 Calendar of Meetings GENERAL MANAGER’S RECOMMENDATION: At the request of the Board, the attached Board of Director’s meeting calendar for 2016 and 2017 is being presented for discussion. PURPOSE: This staff report is being presented to provide the Board the opportunity to review the 2016 and 2017 Board of Director’s meeting calendar and amend the schedule as needed. COMMITTEE ACTION: N/A ANALYSIS: The Board requested that this item be presented at each meeting so they may have an opportunity to review the Board meeting calendar schedule and amend it as needed. STRATEGIC GOAL: N/A FISCAL IMPACT: None. LEGAL IMPACT: None. Attachment: Calendar of Meetings for 2016 and 2017 G:\UserData\DistSec\WINWORD\STAFRPTS\Board Meeting Calendar 12-7-16.doc Board of Directors, Workshops and Committee Meetings 2016 Regular Board Meetings: Special Board or Committee Meetings (3rd Wednesday of Each Month or as Noted) January 6, 2016 February 3, 2016 March 2, 2016 April 6, 2016 May 4, 2016 June 1, 2016 July 6, 2016 August 3, 2016 September 7, 2016 October 5, 2016 November 2, 2016 December 7, 2016 January 20, 2016 February 17, 2016 March 16, 2016 April 20, 2016 May 18, 2016 June 15, 2016 July 20, 2016 August 17, 2016 September 21, 2016 October 19, 2016 November 16, 2016 December 12, 2016 SPECIAL BOARD MEETINGS: BOARD WORKSHOPS: Board of Directors, Workshops and Committee Meetings 2017 Regular Board Meetings: Special Board or Committee Meetings (3rd Wednesday of Each Month or as Noted) January 4, 2017 February 1, 2017 March 1, 2017 April 5, 2017 May 3, 2017 June 7, 2017 July 5, 2017 August 2, 2017 September 6, 2017 October 4, 2017 November 1, 2017 December 6, 2017 January 18, 2017 February 15, 2017 March 15, 2017 April 19, 2017 May 17, 2017 June 21, 2017 July 19, 2017 August 16, 2017 September 20, 2017 October 18, 2017 November 15, 2017 December 20, 2017 SPECIAL BOARD MEETINGS: BOARD WORKSHOPS: STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Dan Martin Engineering Manager PROJECT: VARIOUS DIV. NO. ALL APPROVED BY: Rod Posada, Chief of Engineering German Alvarez, Assistant General Manager Mark Watton, General Manager SUBJECT: Informational Item – First Quarter Fiscal Year 2017 Capital Improvement Program Report GENERAL MANAGER’S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see Attachment A. PURPOSE: To update the Board about the status of all CIP project expenditures and to highlight significant issues, progress, and milestones on major projects. ANALYSIS: To keep up with growth and to meet our ratepayers' expectations to adequately deliver safe, reliable, cost-effective, and quality water, each year the District staff prepares a Six-Year CIP Plan that identifies the District’s infrastructure needs. The CIP is comprised of four categories consisting of backbone capital facilities, replacement/renewal projects, capital purchases, and developer's reimbursement projects. The First Quarter Fiscal Year 2017 update is intended to provide a detailed analysis of progress in completing these projects within the allotted time and budget of $10.7 million. Expenditures through the First Quarter totaled approximately $2.0 million. Approximately 19% of the Fiscal Year 2017 expenditure budget was spent (see Attachment B). FISCAL IMPACT: Joe Beachem, Chief Financial Officer No fiscal impact as this is an informational item only. STRATEGIC GOAL: The Capital Improvement Program supports the District’s Mission statement, “To provide high quality and reliable water and wastewater services to the customers of the Otay Water District, in a professional, effective, and efficient manner” and the General Manager’s Vision, “A District that is innovative in providing water services at competitive rates, with a reputation for outstanding customer service.” LEGAL IMPACT: None. DM/RP:mlc P:\Forms\D-Construction\CIP Quarterly Reports\CIP Qtr Reports\FY 2017\Q1\Staff Report\BD 12-07-16 Staff Report First Quarter FY 2017 CIP Report (DM-RP).docx Attachments: Attachment A – Committee Action Attachment B - Fiscal Year 2017 First Quarter CIP Expenditure Report Attachment C – Presentation ATTACHMENT A SUBJECT/PROJECT: VARIOUS Informational Item – First Quarter Fiscal Year 2017 Capital Improvement Program Report COMMITTEE ACTION: The Engineering, Operations, and Water Resources Committee (Committee) reviewed this item at a Committee Meeting held on November 21, 2016, and the following comments were made:  Staff reviewed the PowerPoint presentation with the Committee and indicated that the expenditures through the first quarter of FY 2017 totaled $2.0 million, which is about 19% of the District’s fiscal year budget.  Staff indicated that the District’s FY 2017 CIP budget consists of 89 projects that total $10.7 million and is divided into four categories: o Capital Facilities= $3.7 million o Replacement/Renewal= $5.9 million o Capital Purchases= $1.1 million o Developer Reimbursement= $14.0 thousand  The PowerPoint presentation included the following: o Total Life-to-Date Expenditures o CIP Budget Forecast vs. Expenditures o Major CIP Projects o CIP Projects in Construction o Construction Contract Status of projects, contract amount with allowances, net change orders, and percent of project completion o Consultant Contract Status of contract amounts, approve payments to date, change orders, dates when contracts were signed and the end date of contracts  Staff stated that during the first quarter of FY 2017 the rate for Change Orders with Allowance Credit equaled to -0.6%. It was noted that Change Order No. 4 to the Contract with Transtar Pipeline, Inc., was not included in this report. However, if it were to be included in the report, the Change Orders without Allowance Credit would equal to 2.7%, which is still below the 5% allowance.  In response to a question from the Committee, staff stated that the District was able to reach out to several communities and provide information regarding the sewer connection project along Campo Road to Rancho San Diego. One of the main concerns about the project was that the District was unable to align the construction of its sewer connection project with SDG&E’s project on Campo Road. It was noted that SDG&E is able to advance projects under an approved streamlined regulatory environmental process. The District is currently required to follow a standard regulatory permitting process. As a result, SDG&E was able to implement their work on Campo Road ahead of the District’s project. This will result in replacement of the pavement constructed by SDG&E. The Committee requested that staff perform another outreach to the community and provide information about the District’s effort to align projects with other agencies, including SDG&E. Following the discussion, the Committee supported staffs’ recommendation and presentation to the full board as an informational item. FISCAL YEAR 2017 1st QUARTER REPORT (Expenditures through 09/30/2016) ($ In Thousands) Attachment B 2017 09/30/16 CIP No. Description Project Manager FY 2017 Budget Expenses Balance Expense to Budget % Budget Expenses Balance Expense to Budget % Comments CAPITAL FACILITY PROJECTS - P2040 Res - 1655-1 Reservoir 0.5 MG Cameron 20$ 1$ 19$ 5% 3,400$ 485$ 2,915$ 14% Review of the previous environmental documents to begin FY 2017 Q3. P2267 36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations Marchioro 220 17 203 8% 735 476 259 65% Design completed FY 2017 Q1. Construction to begin in FY 2017 Q2. On track. P2382 Safety and Security Improvements Payne 250 60 190 24% 2,811 2,633 178 94% On schedule for completion June 30, 2017 P2405 PL - 624/340 PRS, Paseo Ranchero and Otay Valley Road Cameron 5 - 5 0% 570 - 570 0% Tied to CIP P2553. P2451 Otay Mesa Desalination Conveyance and Disinfection System Kennedy 50 75 (25) 150% 3,875 3,645 230 94% Work to finalize EIR/EIS was expected to be completed FY 2016, but instead will be completed FY 2017. Project within overall budget. P2453 SR-11 Utility Relocations Marchioro 250 1 249 0% 4,000 1,599 2,401 40% Sequence 1 construction accepted FY 2016 Q4. In one year warranty period. P2460 I.D. 7 Trestle and Pipeline Demolition Beppler 50 - 50 0% 600 5 595 1% Planning level investigations started. Do not expect to expend full fiscal year budget based upon preliminary discussions regarding what level of structural consultant input is required prior to bidding the project. P2466 Regional Training Facility Coburn-Boyd6 - 6 0% 300 288 12 96% Project continues to be on hold. P2485 SCADA Communication System and Software Replacement Kerr 85 19 66 22% 2,014 1,686 328 84% Project on schedule for FY 2017 Q1. P2486 Asset Management - Info Master Water Implementation Zhao 25 - 25 0% 957 879 78 92% On track. P2494 Multiple Species Conservation Plan Coburn-Boyd48 - 48 0% 950 854 96 90% Expect to use all of budget later this fiscal year. P2496 Otay Lakes Road Utility Relocations Martin 5 - 5 0% 325 283 42 87% Project accepted FY 2016 Q4. P2504 Regulatory Site Access Road and Pipeline Relocation Cameron 20 - 20 0% 900 330 570 37% Project is driven by County Fire. P2516 PL - 12-Inch, 640 Zone, Jamacha Road - Darby/OsageMarchioro- - - 0% 800 - 800 0% On hold for FY 2017. P2520 Motorola Mobile Radio Upgrade Martinez 30 3 27 10% 120 81 39 68% We expect to expend the remaining balance in FY 2017 Q3. P2521 Large Meter Vault Upgrade Program Carey 100 - 100 0% 400 219 181 55% Work is scheduled to begin FY 2017 Q3. P2537 Operations Yard Property Acquisition Improvements Beppler 10 3 7 30% 775 731 44 94% Construction project accepted FY 2016 Q4. In one year warranty period. P2541 624 Pressure Zone PRSs Marchioro 10 (2) 12 -20% 760 740 20 97% Construction project accepted FY 2016 Q4. In one year warranty period. P2547 District Administration Vehicle Charging Stations Cameron 85 - 85 0% 125 20 105 16% On track. P2550 Fuel Island Upgrade Payne 112 93 19 83% 112 93 19 83% In close out. Final test due in 6 months. P2551 Blossom Lane Helix WD and Otay WD Interconnection Beppler 20 1 19 5% 210 169 41 80% Implementation of SCADA and warranty period of completed construction. Budget on track. P2552 South Barcelona Helix WD and Otay WD Interconnection Beppler 20 1 19 5% 210 166 44 79% Implementation of SCADA and warranty period of completed construction. Budget on track. P2553 Heritage Road Bridge Replacement and Utility Relocation Cameron 100 - 100 0% 1,430 5 1,425 0% City of Chula Vista driven project. The City will update their status to all utilities at a meeting in November 2016. P2564 Administration Carpet Replacement Program Payne 5 - 5 0% 215 - 215 0% Planning to be completed June 30, 2017. P2568 Technology Business Processes Improvement Kerr 100 - 100 0% 135 25 110 19% No expenditures allocated for FY 2017 Q1. The Board item for Enterprise Content Management System was approved at the October Board Meeting. Funds will be transferred from other projects to cover the cost. P2569 Metro Ethernet Implementation/ District Facilities - Pilot Kerr 45 31 14 69% 145 137 8 94% Project on schedule for FY 2017 Q1. P2570 SCADA Equipment & Infrastructure Enhancement Kerr 100 - 100 0% 300 - 300 0% No expenditures allocated for FY 2017 Q1. P2571 Datacenter Network Enhancement & Replacement of Infrastructure Componets Kerr - - - 0% 200 - 200 0% No expenditures allocated for FY 2017. P2572 Enterprise Resource Planning (ERP) Replacement Kerr - - - 0% 500 - 500 0% No expenditures allocated for FY 2017. P2584 Res - 657-1 and 657-2 Reservoir Demolitions Marchioro - - - 0% 720 - 720 0% On hold for FY 2017. R2077 RecPL - 24-Inch, 860 Zone, Alta Road - Alta Gate/Airway Beppler 20 1 19 5% 2,852 2,812 40 99% Under construction. Completion anticipated in FY 2017 Q3. R2079 RecPL - 6-Inch, 450 Zone, Otay Valley Road - Otay Valley/Entertainment Beppler 10 - 10 0% 150 - 150 0% No activity to date. R2109 Sweetwater River Wooden Trestle Improvement for the Recycled Water Forcemain Beppler 10 - 10 0% 375 353 22 94% Construction project accepted FY 2016 Q2. In one year warranty period. FISCAL YEAR-TO-DATE, 09/30/16 LIFE-TO-DATE, 09/30/16 Y:\Board\CurBdPkg\ENGRPLAN\2017\BD 12-07-16\CIP FY 2017 1st Quarter Update\FINAL FY17 1st qtr exp.xlsx Page 1 of 4 11/8/2016 FISCAL YEAR 2017 1st QUARTER REPORT (Expenditures through 09/30/2016) ($ In Thousands) Attachment B 2017 09/30/16 CIP No. Description Project Manager FY 2017 Budget Expenses Balance Expense to Budget % Budget Expenses Balance Expense to Budget % Comments FISCAL YEAR-TO-DATE, 09/30/16 LIFE-TO-DATE, 09/30/16 R2110 RecPS - 944-1 Optimization and Pressure Zone Modifications Marchioro 5 - 5 0% 200 130 70 65% Construction project accepted FY 2016 Q4. In one year warranty period. R2116 RecPL - 14-Inch, 927 Zone, Force Main Improvements Marchioro 1,000 28 972 3% 2,500 684 1,816 27% Construction began FY 2017 Q1. On track. R2117 RWCWRF Disinfection System Improvements Beppler 10 - 10 0% 1,520 111 1,409 7% Awaiting completion of WRF Master Plan and force main assessment before selecting proposed improvements. R2118 Steele Canyon Sewer PS Large Solids Handling Improvements Beppler 68 3 65 4% 75 8 67 11% Design in progress; will need to coordinate construction with a shutdown of WRF. R2119 RWCWRF Automation & Security Upgrades Beppler 95 18 77 19% 300 52 248 17% WRF Master Plan almost complete. Initiation of automation and security improvements to start FY 2017 Q3. R2120 RWCWRF Filtered Water Storage Tank Improvements Beppler 250 5 245 2% 500 5 495 1% Design in progress. Need to coordinate construction with operation of WRF. R2122 Emergency Recycled Water Fire Hydrant Installations Cameron 15 1 14 7% 75 33 42 44% Project was completed in FY 2017 Q1. R2123 Repurpose Otay Mesa Recycled Water Lines Beppler 35 - 35 0% 350 - 350 0% No activity on this project to date. R2124 RecPS - 927-1 Pump 5 Replacement Anderson 55 - 55 0% 55 - 55 0% Advertisement to bid for replacement is anticipated FY 2017 Q2. Money to be expended by the end of FY 2017 Q3. S2012 San Diego County Sanitation District Outfall and RSD Outfall Replacement Beppler 150 - 150 0% 2,420 1,020 1,400 42% County project. Costs are invoiced annually. S2027 Rancho San Diego Pump Station Rehabilitation Beppler 50 - 50 0% 3,500 300 3,200 9% County project. Costs are invoiced annually. S2033 Sewer System Rehabilitation Beppler 200 372 (172) 186% 3,000 2,372 628 79% Project within overall budget. Anticipate completion FY 2017 Q2. S2043 RWCWRF Sludge Handling System Beppler 1 - 1 0% 47 40 7 85% No activity planned until Metro Pure Water costs are established. S2047 Asset Management - Info Master Sewer Implementation Zhao - - - 0% 58 - 58 0% No expenditures for FY 2017. Total Capital Facility Projects Total: 3,745 731 3,014 20%46,571 23,469 23,102 50% REPLACEMENT/RENEWAL PROJECTS P2083 PS - 870-2 Pump Station Replacement Marchioro 390$ 130 260 33% 17,000$ 1,795 15,205 11% Advertisement for construction bid anticipated FY 2017 Q3. On track. P2174 PS - 1090-1 Pump Station Replacement (400 gpm)Marchioro 1 - 1 0% 1,500 4 1,496 0% On hold for FY 2017. P2400 PL - 20-Inch Pipeline Replacement, 711 Zone, Otay Lakes Road - at Santa Paula Marchioro - - - 0% 2,000 - 2,000 0% On hold for FY 2017. P2493 624-2 Reservoir Interior/Exterior Coating Cameron 60 2 58 3% 1,675 1,544 131 92% Expenditures expected in FY 2017 Q2 for warranty work. P2507 East Palomar Street Utility Relocation Cameron 120 1 119 1% 940 719 221 76% Project closeout to begin in FY 2017 Q2. P2508 Pipeline Cathodic Protection Replacement Program Marchioro 300 2 298 1% 725 251 474 35% Construction began FY 2017 Q1. On track. P2518 803-3 Reservoir Interior/Exterior Coating Cameron 40 - 40 0% 700 645 55 92% Two year warranty period will be completed in FY 2017 Q3. P2519 832-2 Reservoir Interior/Exterior Coating Cameron 65 - 65 0% 750 670 80 89% Two year warranty period will be completed in FY 2017 Q3. P2529 711-2 Reservoir Interior & Exterior Coating Cameron 360 420 (60) 117% 840 781 59 93% Construction to be completed FY 2017 Q2. P2530 711-1 Reservoir Interior & Exterior Coating Cameron 90 29 61 32% 1,040 934 106 90% Construction to be completed FY 2017 Q2. P2531 944-1 Reservoir Interior & Exterior Coating Cameron 50 13 37 26% 410 323 87 79% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2532 944-2 Reservoir Interior & Exterior Coating Cameron 50 - 50 0% 1,050 937 113 89% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2533 1200-1 Reservoir Interior & Exterior Coating Cameron 10 - 10 0% 810 - 810 0% Planning anticipated to being FY 2017 Q2. P2534 978-1 Reservoir Interior & Exterior Coating Cameron 615 11 604 2% 715 11 704 2% Design completed FY 2017 Q1. Construction to begin in FY 2017 Q2. On track. P2535 458-2 Reservoir Interior & Exterior Coating & Upgrades Cameron 50 3 47 6% 885 776 109 88% Construction contract completed FY 2016 Q4. Currently in two year warranty period. P2538 Administration and Operations Building Fire Sprinkler Replacement Program Cameron 10 - 10 0% 110 89 21 81% Project was completed in late FY 2016. No expenditures are anticipated, unless for warranty work at one year. P2539 South Bay Bus Rapid Transit (BRT) Utility Relocations Cameron 100 4 96 4% 1,090 882 208 81% SANDAG driven project. Spending will increase in FY 2017 Q4. Y:\Board\CurBdPkg\ENGRPLAN\2017\BD 12-07-16\CIP FY 2017 1st Quarter Update\FINAL FY17 1st qtr exp.xlsx Page 2 of 4 11/8/2016 FISCAL YEAR 2017 1st QUARTER REPORT (Expenditures through 09/30/2016) ($ In Thousands) Attachment B 2017 09/30/16 CIP No. Description Project Manager FY 2017 Budget Expenses Balance Expense to Budget % Budget Expenses Balance Expense to Budget % Comments FISCAL YEAR-TO-DATE, 09/30/16 LIFE-TO-DATE, 09/30/16 P2542 850-3 Reservoir Interior Coating Cameron 50 - 50 0% 630 527 103 84% Construction contract completed FY 2016 Q2. Currently in two year warranty period. P2543 850-1 Reservoir Interior/Exterior Coating Cameron 10 - 10 0% 875 - 875 0% Planning anticipated to being in FY 2017 Q2. P2544 850-2 Reservoir Interior/Exterior Coating Cameron 835 11 824 1% 1,070 11 1,059 1% Design completed FY 2017 Q1. Construction to begin in FY 2017 Q2. On track. P2545 980-1 Reservoir Interior Exterior Coating Cameron 330 133 197 40% 1,495 1,130 365 76% Reservoir placed into service FY 2017 Q1. On track to accept project FY 2017 Q2. P2546 980-2 Reservoir Interior/Exterior Coating Cameron - - - 0% 1,450 - 1,450 0% No expenditures for FY 2017. P2555 Administration and Operations Parking Lot Improvements Cameron 275 7 268 3% 500 55 445 11% Design anticipated to be complete in FY 2017 Q2. P2557 520 Res Recirculation Pipeline Chemical Supply and Analyzer Feed Replacement Project Beppler 50 20 30 40% 100 30 70 30% Design in progress. Construction expected to be completed this fiscal year within budget. P2559 Pressure Vessel Repair and Replacement Program Marchioro 65 12 53 18% 650 59 591 9% RWCWRF surge tank to be replaced by in-house force FY 2017 Q2. On track. P2561 Res - 711-3 Reservoir Cover/Liner Replacement Marchioro 1 2 (1) 200% 1,800 4 1,796 0% Existing cover/liner materials analyzed by laboratory FY 2017 Q1. On track. P2562 Res - 571-1 Reservoir Cover/Liner Replacement Marchioro 90 - 90 0% 2,600 - 2,600 0% Advertisement for construction bid anticipated FY 2017 Q3. On track. P2563 Res - 870-1 Reservoir Cover/Liner Replacement Marchioro 1 2 (1) 200% 1,000 2 998 0% Existing cover/liner materials analyzed by laboratory FY 2017 Q1. On track. P2565 803-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0% 940 - 940 0% No expenditures for FY 2017. P2566 520-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0% 1,500 - 1,500 0% No expenditures for FY 2017. P2567 1004-2 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0% 905 - 905 0% No expenditures for FY 2017. P2573 PL - 12-Inch Pipeline Replacement, 803 Zone, Hillsdale Road Marchioro 160 49 111 31% 1,750 49 1,701 3% PDR completed FY 2017 Q1. On track. P2574 PL - 12-Inch and 14-inch Pipeline Replacement, 803 and 978 Zone, Vista Grande, Pence Drive Marchioro 50 - 50 0% 2,750 - 2,750 0% On hold until FY 2017 Q3 or Q4. P2578 PS - 711-2 (PS 711-1 Replacement and Expansion) - 14,000 gpmMarchioro - - - 0% 6,600 - 6,600 0% On hold for FY 2017. P2579 Temporary Lower Otay Pump Station Improvements Beppler 140 - 140 0% 140 - 140 0% No activitity to date. P2592 East H Street Bike Lane Utility Coordination Beppler 50 - 50 0% 50 - 50 0% No activitity to date. P2593 458-1 Reservoir Interior/Exterior Coating & Upgrades Cameron - - - 0% 840 - 840 0% No expenditures for FY 2017. P2594 Large Meter Replacement Carey 240 68 172 28% 485 68 417 14% On track. R2111 RWCWRF - RAS Pump Replacement Beppler 10 - 10 0% 570 555 15 97% Construction project accepted FY 2016 Q3. Project is in one year warranty period. R2112 450-1 Disinfection Facility Rehabilitation Cameron 25 - 25 0% 265 214 51 81% One year warranty completed FY 2017 Q1. R2121 Res - 944-1 Reservoir Cover/Liner Replacement Marchioro 1 - 1 0% 1,400 19 1,381 1% On hold for FY 2017. S2024 Campo Road Sewer Main Replacement Beppler 50 15 35 30% 8,500 1,130 7,370 13% Project to exceed budget for easement acquistions. Bidding to be in FY 2017 Q3. S2044 Trenchless Sewer Rehabilitation Beppler 600 13 587 2% 650 13 637 2% Design to be completed and project bid in FY 2017 Q2. Construction expected to be completed in FY 2017 Q4. S2045 Fuerte Drive Sewer Relocation Beppler 190 2 188 1% 200 2 198 1% County driven project is behind schedule. Likely only design costs will be spent this fiscal year. S2046 RWCWRF - Aeration Panels Replacement Beppler 250 3 247 1% 450 3 447 1% Design of replacement panels projected to be performed in FY 2017 Q3. Installation may occur next fiscal year, pending panel delivery time. S2048 Hillsdale Road Sewer Repairs Beppler 100 12 88 12% 500 12 488 2% Design in progress. Project on schedule for budgeted amount. S2049 Calavo Basin Sewer Rehabilitation - Phase 2 Beppler 20 - 20 0% 1,000 - 1,000 0% Planning phase, no activity expected until FY 2017 Q3. S2050 Rancho San Diego Basin Sewer Rehabilitation - Phase 2 Beppler - - - 0% 300 - 300 0% No expenditures for FY 2017. S2051 RWCWRF - Headworks Improvements Beppler - - - 0% 750 - 750 0% No expenditures for FY 2017. S2052 RWCWRF - Access Roads Repaving Cameron - - - 0% 750 - 750 0% No expenditures for FY 2017. S2053 RWCWRF - Sedimentation Basins Refurbishment Beppler - - - 0% 600 - 600 0% No expenditures for FY 2017. S2054 Calavo Basin Sewer Rehabilitation - Phase 3 Beppler - - - 0% 300 - 300 0% No expenditures for FY 2017. Total Replacement/Renewal Projects Total: 5,904 964 4,940 16%76,605 14,244 62,361 19% Y:\Board\CurBdPkg\ENGRPLAN\2017\BD 12-07-16\CIP FY 2017 1st Quarter Update\FINAL FY17 1st qtr exp.xlsx Page 3 of 4 11/8/2016 FISCAL YEAR 2017 1st QUARTER REPORT (Expenditures through 09/30/2016) ($ In Thousands) Attachment B 2017 09/30/16 CIP No. Description Project Manager FY 2017 Budget Expenses Balance Expense to Budget % Budget Expenses Balance Expense to Budget % Comments FISCAL YEAR-TO-DATE, 09/30/16 LIFE-TO-DATE, 09/30/16 CAPITAL PURCHASE PROJECTS P2282 Vehicle Capital Purchases Rahders 197$ - 197 0% 5,049$ 3,636 1,413 72% Anticipate 100% expense by the end of FY 2017 Q3. P2285 Office Equipment and Furniture Capital Purchases Payne 15 2 13 13% 589 554 35 94% Purchases to be completed by June 30, 2017. P2286 Field Equipment Capital Purchases Rahders 38 14 24 37% 1,634 1,372 262 84%Anticipate 100% expense for FY 2017. P2366 APCD Engine Replacements and Retrofits Rahders 820 312 508 38% 3,371 2,863 508 85% Anticipate 100% expense by the end of FY 2017 Q3. - Total Capital Purchase Projects Total: 1,070 328 742 31%10,643 8,425 2,218 79% DEVELOPER REIMBURSEMENT PROJECTS P2325 PL-10" to 12" Oversize, 1296 Zone, PB Road-Rolling Hills Hydro PS/PB Bndy Beppler 3$ - 3 0% 22$ 19 3 86% Reimbursement completed FY 2016 Q3. P2403 PL - 12-inch, 624 Zone, Heritage Road - Olympic/Otay Valley Beppler - - - 0% 550 - 550 0% CIP being updated to reflect changes in Village 3 SAMP and Water Facilities Master Plan. P2556 HWY 94 Upsized Utility Relocations at Melody Lane Beppler 1 - 1 0% 100 - 100 0% No work is anticipated on the project for FY 2017. R2084 RecPL - 20-Inch, 680 Zone, Village 2 - Heritage/La Media Beppler 10 - 10 0% 365 1 364 0% Under construction in FY 2017 Q1. Request for reimbursement anticipated FY 2017 Q3. Total Developer Reimbursement Projects Total: 14 - 14 0%1,037 20 1,017 2% 107 10,733$ 2,023$ 8,710$ 19% 134,856$ 46,158$ 88,698$ 34% Y:\Board\CurBdPkg\ENGRPLAN\2017\BD 12-07-16\CIP FY 2017 1st Quarter Update\FINAL FY17 1st qtr exp.xlsx Page 4 of 4 11/8/2016 Otay Water District Capital Improvement Program Fiscal Year 2017 First Quarter (through September 30, 2016) Attachment C 711-1 (3.1 MG) - Completed Reservoir 9/30/2016 Background The approved CIP Budget for Fiscal Year 2017 consists of 89 projects that total $10.7 million. These projects are broken down into four categories. 1.Capital Facilities $ 3.7 million 2.Replacement/Renewal $ 5.9 million 3.Capital Purchases $ 1.1 million 4.Developer Reimbursement $ 14.0 thousand Overall expenditures through the First Quarter of Fiscal Year 2017 totaled $2.0 million, which is approximately 19% of the Fiscal Year budget. 2 Fiscal Year 2017 First Quarter Update ($000) CIP CAT Description FY 2017 Budget FY 2017 Expenditures % FY 2017 Budget Spent Total Life-to- Date Budget Total Life-to-Date Expenditures % Life-to- Date Budget Spent 1 Capital Facilities $3,745 $731 20% $46,571 $23,469 50% 2 Replacement/ Renewal $5,904 $964 16% $76,605 $14,244 19% 3 Capital Purchases $1,070 $328 31% $10,643 $8,425 79% 4 Developer Reimbursement $14 $0 0% $1,037 $20 2% Total: $10,733 $2,023 19% $134,856 $46,158 34% 3 Fiscal Year 2017 First Quarter CIP Budget Forecast vs. Expenditures 4 5 CIP Projects in Construction 980-1 Reservoir Interior/Exterior Coating & Upgrades (P2545) Remove and Replace Deteriorating Reservoir Coatings. Structural Modifications to Increase Service Life. $1.50M Budget Start: February 2016 Completed: August 2016 6 980-1 Reservoir (5.0 MG) – Completed Exterior Location: North End of Salt Creek Golf Course, Hunte Parkway, Chula Vista Division No. 5 08/10/2016 CIP Projects in Construction 711-1 & 711-2 Reservoirs Interior/Exterior Coating & Upgrades (P2530, P2529) Remove and Replace Deteriorating Reservoir Coatings. Structural Modifications to Increase Service Life. $1.88M Budget Start: November 2015 Completed: September 2016 7711-2 (2.3 MG) – Completed Reservoir Location: Park Meadows Road, Chula Vista. Adjacent to East Lake County Club Golf Course Division No. 1 9/30/2016 CIP Projects in Construction Rancho San Diego Basin Sewer Rehabilitation – Phase 1 (S2033-003103) Sewer system repairs at 14 locations 3,250 LF of 8-inch sewer 4 new sewer manholes $3.00M Budget Start: March 2016 Estimated Completion: November 2016 8 Replacement of 8-Inch Sewer –Vista Grande Road (Site 729) Division No. 5 Locations: 14 locations including Hillsdale Road, Donahue Drive, Juliana Street Vista Grande Road, and Sundale Road. 9/13/2016 Construction Contract Status 9 PROJECT TOTAL % P2529 P2530 711-1 &711-2 Reservoir Interior/Exterior Coating & Upgrades Advanced Industrial Services, Inc.$1,103,715 $1,195,695 $15,018 1.4% $1,210,713 $1,206,515 1.3% 99.7% Completed September 2016 P2545 980-1 Reservoir Interior/Exterior Coating & Upgrades Advanced Industrial Services, Inc.$769,000 $876,500 $9,025 1.2% $885,525 $879,025 1.0% 99.3% Completed August 2016 S2033 Rancho San Diego Basin Sewer Rehabilitation - Phase 1 Transtar $951,470 $970,970 $23,438 2.5% $977,075 $733,469 0.6% 75.1% November 2016 P2508 R2116 14-Inch Force Main Rehabilitation Project Charles King Company Inc.$1,045,100 $1,101,250 $0 0.0% $1,045,100 $0 -5.1% 0.0% January 2017 TOTALS: $3,869,285 $4,144,415 $47,481 1.2%$4,118,413 $2,819,009 -0.6% FY 2017 CIP CONSTRUCTION PROJECTS CURRENT CONTRACT AMOUNT TOTAL EARNED TO DATE **THIS CHANGE ORDER RATE INCLUDES THE CREDIT FOR UNUSED ALLOWANCES *NET CHANGE ORDERS DO NOT INCLUDE ALLOWANCE ITEM CREDITS. IT'S A TRUE CHANGE ORDER PERCENTAGE FOR THE PROJECT CIP NO. PROJECT TITLE CONTRACTOR BASE BID AMOUNT CONTRACT AMOUNT W/ ALLOWANCES % CHANGE ORDERS W/ ALLOWANCE CREDIT** % COMPLETE EST. COMP. DATE NET CHANGE ORDERS LTD* Consultant Contract Status Consultant Contract Status 11 QUESTIONS?QUESTIONS? 12 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: December 7, 2016 SUBMITTED BY: Mark Watton General Manager W.O./G.F. NO: N/A DIV. NO. N/A APPROVED BY: Mark Watton, General Manager SUBJECT: General Manager’s Report ADMINISTRATIVE SERVICES: Purchasing & Facilities:  Thermostat and Energy Efficiencies – In line with the District’s goal to achieve more efficient operations, Facilities staff replaced nine thermostats with programmable models at locations rarely used in the Admin building including the Boardroom, lower level training area, and most conference rooms. The cost to install the thermostats and update the HVAC automation software was $1,700. The year-to-year total savings for the last three periods is $5,006 with July and August as a partial month. Staff anticipates that the biggest savings will occur during the warmest months but expects to achieve savings all year round. SDG&E Jul-Aug Aug-Sep Sep-Oct Total 2015 $13,324 $13,878 $13,379 $40,581 2016 $12,203 $11,748 $11,624 $35,575 Savings $1,121 $2,131 $1,754 $5,006 % 8.4% 15.4% 13.1% 12.3% Human Resources:  Holiday Party – Mark your calendars to attend the District’s annual Holiday Party, which will be held Saturday, December 10th, from 6:00 pm to 11:00 pm at The Harbor House in Seaport Village.  Water Utilities Human Resources Consortium (WUHRC) – HR staff attended the WUHRC meeting in November. This is a quarterly meeting 2 where HR colleagues meet to discuss general topics, HR best practices, and network regarding current topics and trends.  HR Policy Updates – Staff finalized updates to the following HR policies and procedures to reflect recent legal updates and per internal need: Family Medical Leave Act, Kin Care, School Activities Leave, and Uniform Policy.  Recruitments/New Hires/Promotions – There were no recruitments, new hires or promotions this month. Safety & Security:  Emergency Preparedness - Hard copies of the following emergency response documentation were added to the District’s Emergency Operations Center (EOC) cabinets: o WebEOC Quick user reference guide; o Draft condensed emergency response plan; o Levels 1 through 3 emergency response flow chart; o FEMA forms ICS 201 through ICS 225; o EPA’s starter guide for water and wastewater utilities “Hazard Mitigation for Natural Disasters”; o District EOC contacts list (updated to include Communications Assistant and GIS staff); o District emergency coordinators and monitors list (updated to reflect changes in staff). INFORMATION TECHNOLOGY AND STRATEGIC PLANNING:  Cityworks Exemplary User Award - The District’s technology team has been selected to receive the Cityworks Exemplary User Award. The award will be presented at the international Cityworks user conference on December 6, 2016. Cityworks is a GIS based, or map- centric enterprise work order and asset management system, which is used to manage District service requests, day-to-day work orders, inspections, and projects in support of our water distribution system. The deployment of Cityworks was a District strategic objective, which was executed by staff nearly two years ago, and was a production system from day one. Otay has been recognized as a leader in both the use of technology and water operations. Past award recipients include The City of Auburn, Alabama, Metropolitan Sewer District of Greater Cincinnati, Ohio, and City of Surrey, British Columbia, Canada.  American Water Works Association (AWWA) Conference – IT staff members Michael Christensen and Isaac Perez, have been selected to present at the National AWWA Water Infrastructure Conference to be held in April 2017 in Anaheim, California. The presentation will focus on the District’s SCADA telecommunications redesign utilizing Metro-Ethernet technology. Members of the AWWA committee contacted 3 the IT department and took an interest in the District’s SCADA telecommunications enhancements. Staff will present an overview of the new design and overall project.  FBI Cyberhood Watch Program – Staff recently met with local FBI representatives to discuss participation in an online engagement/forum for local agencies across the Southern California region. The objective is to share real-time cyber threats and cyber security information with trusted partners within the same industry sector. Information from the FBI’s Cyber Division, FBI’s Threat Intelligence, and the Department of Homeland Security will also be available. Staff will submit the application for acceptance later this month.  Aerial/Oblique Image - Staff participated in the kickoff meeting for the San Diego Regional GIS Council Imagery Collection Project. The project will collect the Aerial/Oblique imagery for agencies within the San Diego region. SanGIS will take the leading role on coordinating the project. The project will save money for each agency by sharing the cost of the overlapping areas. FINANCE:  Meter Change-Out Program - The meter replacement program has been running well, replacing less than 100 meters a month. It was expected that as the AMR meters aged, the meter change-out program would change from a maintenance effort to a District-wide replacement program. Over the past three months, the District has seen an increase in the number of register/transponder battery failures of its oldest AMR meters. Based on this activity, and per life cycle schedule, staff is preparing for District-wide replacement. In January, staff plans to bring a new CIP for Board approval to cover this District-wide replacement effort, during the current fiscal year. The multi-year CIP for this program will be incorporated into the upcoming budget through the normal budgeting process.  Cellular Reading Devices – As a pilot program, Staff will be purchasing 10 cellular reading units to read the construction meters electronically instead of manually. These meters are located throughout the District and cannot be read with the District’s Automated Meter Reading system. Cellular technology would allow the meter reads to be transmitted directly to the office on a daily basis.  FY 2016 CAFR – The CAFR has been completed and was submitted to GFOA for the Certificate of Achievement for Excellence in Financial Reporting. 4  The financial reporting for October 31, 2016 is as follows: o For the four months ending October 31, 2016, there are total revenues of $35,995,189 and total expenses of $32,926,875. The revenues exceeded expenses by $3,068,314.  The financial reporting for investments for October 31, 2016 is as follows: o The market value shown in the Portfolio Summary and in the Investment Portfolio Details as of October 31, 2016 total $84,344,187 with an average yield to maturity of 0.94%. The total earnings year-to-date are $267,420. ENGINEERING AND WATER SYSTEM OPERATIONS: Engineering:  927 Zone, Force Main Assessment and Repair Project: This project consists of inspection, condition assessment, and repair of the existing Ralph W. Chapman Water Reclamation Facility (RWCWRF) 1980 era, 16,000 feet long, 14-inch diameter steel force main. Charles King Company commenced potholing and excavation for replacement blow offs, a new flow metering vault, cathodic protection improvements, and road repairs early October 2016. The fifteen (15) blow off locations included in the contract have been excavated and exposed in preparation for constructing the new blow offs. Pipeline Inspection and Condition Analysis Corporation (PICA) is scheduled to inspect the lower 12,000 feet of force main in early December 2016. The overall project is within budget and on schedule to complete in February 2017. (R2116)  36-Inch Main Pumpouts and Air/Vacuum Ventilation Installations: This project consists of inspection, repairs, and improvements to the District’s La Presa 36-Inch Pipeline between San Diego County Water Authority Flow Control Facility Number 11 and the District’s Regulatory site. The construction agreement between the District and Underground Pipeline Solutions, Inc. from Alpine, CA was executed on October 31, 2016. The construction agreement will relocate six (6) existing air/vacuum valves from underground vaults to above ground locations. Construction is scheduled to begin in December 2016. The project is within budget and on schedule to complete in February 2017. (P2267)  978-1 & 850-2 Reservoir Interior/Exterior Coatings & Upgrades: This project consists of removing and replacing the interior and exterior coatings of the 978-1 0.5 MG Reservoir and the 850-2 3.1 MG Reservoir, along with providing structural upgrades, to ensure the tanks comply with both State and Federal OSHA standards as well 5 as the American Water Works Association and the County Health Department standards. The construction agreement between the District and Blastco, Inc. from Downey, CA was executed on October 18, 2016. The contractor is currently processing submittals for the planned work. The project is within budget and on schedule to complete in June 2017. (P2534 & P2544)  711-1 & 711-2 Reservoir Interior/Exterior Coatings & Upgrades: This project consists of removing and replacing the interior and exterior coatings of the 711-1 3.1 MG Reservoir and the 711-2 2.3 MG Reservoir, along with providing structural upgrades, to ensure the tanks comply with both State and Federal OSHA standards as well as the American Water Works Association and the County Health Department standards. The contractor, Advanced Industrial Services, Inc., has completed all work on the 711-1 and 711-2 Reservoirs and the contract was accepted by the District on November 14, 2016. The project is within budget. (P2529 & P2530)  Rancho San Diego Basin Sewer Rehabilitation – Phase 1: This project consists of sewer system improvements at fourteen (14) locations within the Rancho San Diego Basin. The work includes replacement of approximately 3,250 linear feet of 8-inch gravity sewer main and the installation of four (4) new manholes. The contractor, Transtar Pipeline, Inc., has installed sewer along Hillsdale Road, Juliana Street, Donahue Drive, Paseo Grande, Vista Grande Road, Tina Street, Burris Drive, and Fuerte Knolls with final paving and punch list work pending. The project is within budget; however, the contractor has encountered unforeseen soils conditions at Paseo Grande. A request to compensate the contractor for impacts due to the unforeseen conditions will be presented to the Board as contract Change Order No. 4. Similar soils conditions were encountered at Burris Drive. The District’s Construction Management firm is currently assessing the impacts presented by the contractor. The contract construction is behind schedule as a result of a late start by the contractor and slow contractor progress. It is anticipated that overall construction will be completed in early December 2016. The contractor has been notified that the project is subject to liquidated damages associated with late delivery beyond those attributed to the unforeseen field conditions. (S2033)  Hillsdale Road Potable Water and Sanitary Sewer Replacement: On June 23, 2016, the District issued a Task Order to Psomas to design about 4,000 feet of new potable water pipeline and replacement of two segments of sanitary sewer located in Hillsdale Road between Jamacha Road and Vista Grande Road. The Preliminary Design Report was submitted to the District on September 30, 2016, followed by the 30% Design Submittal on October 3, 2016. The 60% Design Submittal is due in December 2016. Design is scheduled to be completed in the spring of 2017. Caltrans approval of traffic 6 control on Jamacha Road will be required as well as County of San Diego permits. (P2573, S2048)  Ralph W. Chapman Water Reclamation Facility (RWCWRF) Facility Master Plan: On February 29, 2016, the District issued a Task Order to Arcadis to prepare a Master Plan for the RWCWRF to develop a phased approach to implement improvements with prioritizing identified improvements considering the needs, overall costs, long- term payback on investment, and other factors. The District assembled a list of projects to begin the study, but Arcadis will draw upon their expertise to identify additional work that would improve the operation of the facility. Improved instrumentation to enhance the operation and automation is also being studied. A draft of the final master plan was submitted to the District on October 21, 2016, with minor comments noted for Arcadis to finalize by December 2016. The final plan will be used for prioritizing future CIP projects. (R2119)  Water Facilities Master Plan Update: This project will update the District’s existing Water Resources Master Plan that was previously updated in October 2008 and revised in May 2013. The draft Program Environmental Impact Report (PEIR) 45-day public comment period ended September 17, 2016. The final PEIR and Water Facilities Master Plan Update will be ready for the January 2017 Board Meeting. (P1210)  Rosarito Desalination: NSC Agua, a subsidiary of Consolidated Water Company (CWCO), has finalized a 40-year definitive public- private partnership agreement with the State of Baja California on August 25, 2016. District staff and representatives from NSC Agua continue to coordinate on complying with the California Water Resources Control Board Drinking Water Program regulatory requirements related to source water quality testing. After Board certification of the EIR/EIS on September 7, 2016, a notice of the 30-day public comment period was published in the Federal Register on September 14, 2016. Federal agencies have 90-days to comment on whether they feel the project is in the National Interest. After this 90-day period, the State Dept. will issue a Record of Decision/National Interest Determination and there will be an additional 15-day comment period. If it is determined that the project will be in the National Interest, the Presidential Permit will be issued by January 2017. (P2451)  Disposal of Real Estate Properties Declared Surplus by the Board: The District, through a competitive process based on qualifications and pricing, secured the real estate brokerage services of the Norberg Group to support the disposal of six (6) properties declared surplus by the Board. On November 4, 2016, the District closed escrow on the final property located at Dorchester Street in Spring Valley. 7  For the month of October 2016, the District sold 4 meters (6.5 EDUs), generating $58,408 in revenue. Projection for this period was 9.7 meters (28.5 EDUs), with budgeted revenue of $270,175. Total revenue for Fiscal Year 2017 is $706,097 against the annual budget of $3,242,100. Water System Operations (reporting for October):  Throughout the month of October, staff installed new diesel-fuel bulk tanks at the 1004-2 Pump Station and the 1100-1 Hydro Station to provide long-term fuel supply in an extended power outage.  On October 13, a planned shutdown was performed on Mira Costa Circle in Chula Vista to replace a defective 6-inch fire hydrant valve. Eight residential meters were isolated and two water trailers were strategically placed for customers affected.  On October 25, staff submitted the revised bacteriological sampling plan to the DDW for approval. This was required due to the population of potable water customers is expected to increase to more than 220,000 by early 2017. The revised plan includes 7 additional sampling sites.  On November 2, there was a review for the adoption of a new laboratory accreditation standard. Currently ELAP (Environmental Laboratory Accreditation Program (California)) is reviewing the adoption of the NELAC [National Environmental Laboratory Accreditation Conference, (National)], also uses symbol (TNI). There will be ongoing meetings by multiple agencies (City of SD, Helix, Otay, etc.), labs and possibly other outside laboratories to discuss proposed changes and provide comments to the State. The Lab Analyst will be attending these meetings. The proposed changes are not expected to have a big impact on national laboratories, since they are already NELAC compliant. This will, however potentially impact local labs, such as municipalities and Districts. Possible impacts could be an increased cost for certifications, additional documentation requirements, increased staffing needs, and increased costs for outside lab services.  On November 8, Water Systems staff responded to a main break on 12- inch CCP pipe on Hillsdale Rd. in El Cajon. Initially, there were 55 customers affected on Jalisco Rd., Hillsdale Ln. and Hillsdale Rd. Staff high-lined Jalisco Rd. and Hillsdale Ln. reducing the number of customers affected to 14 meters, three water trailers were on-site. Utility Maintenance worked overnight and completed the repairs on November 9, all meters had their services restored by 3:00pm after flushing and bacteriological testing was completed. 8  On the evening of November 13 (Sunday), staff responded to a sanitary sewer overflow near Fair Glen Road in El Cajon. Staff immediately worked to assess and mitigate the issue by clearing the blockage. The blockage was a result of root overgrowth inside a sewer manhole. Staff did not find any evidence that the overflow entered storm drains. Staff performed a CCTV inspection of the adjacent sewer pipe segment, which showed the pipe to be in good condition. Staff has reported this event to the State Water Resources Control Board as a Category 2 Sanitary Sewer Overflow. The sewer manhole will be placed on the “warm spot” inspection cycle which is every 3 months and staff is reviewing several permanent remedies.  On November 16 and 17, the Department of Homeland Security (DHS) conducted a vulnerability assessment of the Treatment Plant and the Regulatory Site. No significant issues were noted but the final report is still pending.  On November 18, the State Water Resources Control Board sent their Sanitary Survey Report from their inspection that was conducted at the District from September 27, 28, and 29. Staff is reviewing the report and preparing the expected response within 30 days. A summary of the results and response will be included in the following board report.  On November 18, the State Water Resources Control Board also approved the revised bacteriological sampling plan that was submitted in October and is effective as of November 21. Purchases and Change Orders:  The following table summarizes purchases and Change Orders issued during the period of October 19, 2016 through November 17, 2016 that were within staff signatory authority: Date Action Amount Contractor/ Consultant Project 10/19/2016 P.O. $3,500.00 JD7 Technologies Internal Inspection of 30-inch Pipe 10-21-16 P.O. $929.89 Mayer Reprographics 978-1 and 850-2 Reservoirs (P2534 & P2544) 10/26/2016 P.O. & C.O. 49,712.00 Matchpoint Inc. Leak Detection Survey Services 11/4/16 P.O. $4,500 Plant Soup, Inc. Professional Writing Services 9 11-4-16 P.O. $1,346.36 Mayer Reprographics 36-Inch La Presa Air Vac Relocation Project (P2267) 11-4-16 P.O. $1,390.68 Southland Pipe Corp. Pressure Vessel Repair and Replacement Program (P2559) 11-4-16 P.O. $5,887.44 Southwest Valve & Equipment Pressure Vessel Repair and Replacement Program (P2559) 11/15/16 P.O. $2,975 Unisource Solutions, Inc. Design Services 11-16-16 P.O. $1,784.25 Kirk Paving, Inc. 1810 ½ Hillsdale Road (S2033) 11-17-16 P.O. $10,500.00 Watchlight Corp. 978-1 Reservoir (P2534) 11-17-16 P.O. $10,500.00 Watchlight Corp. 850-2 Reservoir (P2544) Water Conservation and Sales:  Water Conservation – October 2016 usage was 9% lower than October 2013 usage. Since the State’s conservation mandate began in June 2015, customers have saved an average of 18%. 10  The October potable water purchases were 2,617.6 acre-feet which is 20.9% above the budget of 2,164.5 acre-feet. The cumulative purchases through October were 11,047.5 acre-feet which is 10.1% above the cumulative budget of 10,034.9 acre-feet.  The October recycled water purchases and production were 437.5 acre-feet which is 28.6% above the budget of 340.4 acre-feet. The cumulative production and purchases through October were 1,848.5 acre-feet which is 9.1% above the cumulative budget of 1,694.8 acre-feet. 11 Potable, Recycled, and Sewer (Reporting up to the month of October):  Total number of potable water meters is 49,582.  Recycled water consumption for the month of October is as follows: o Total consumption was 425.9 acre-feet or 138,745,772 gallons and the average daily consumption was 4,475,670 gallons per day. o Total cumulative recycled water consumption since July 1, 2016 is 1977.7 acre-feet. o Total number of recycled water meters is 712.  Wastewater flows for the month of October were as follows: o Total basin flow, gallons per day: 1,532,452. This is an increase of 4.90% from October 2015. o Spring Valley Sanitation District Flow to Metro, gallons per day: 506,504. o Total Otay flow, gallons per day: 1,025,968. o Flow Processed at the Ralph W. Chapman Water Recycling Facility, gallons per day: 0. o Flow to Metro from Otay Water District was 1,025,968 gallons per day.  By the end of October there were 6,105 wastewater EDUs. s3,s00,000 s3,000,000 s2,s00,000 s2,000,000 COMPARATIVE BUDGET SUMMARY NET REVENUES AND EXPENSES FOR THE FOUR MONTHS ENDED OCTOBER 31,2016 YTD Actual Net Revenues YTD Variance Net Revenues YTD Budget in Net Revenues 51,s00,000 s1,000,000 ss00,000 so JUL AUG SEP ocr NOV DEC JAN FEB -ss00,000 -s1,000,000 -s1,s00,000 MAR APR MAY JUN The year-to-date actual net revenues through October show a positive variance of $2,184,161 OTAY V/ATER DISTRICT COMPARATIVE BUDGET SUMMARY FOR FOUR MONTHS ENDED OCTOBER 3I,2016 Actual Budget $ REVENUES: Potable Water Sales Recycled Water Sales Potable Energy Charges Potable System Charges Potable MWD & CWA Fixed Charges Potable Penalties Total Water Sales Sewer Charges Meter Fees Capacity Fee Revenues Non-Operating Revenues Tax Revenues Interest 18,317,154 $ 4,568,804 l ,160,968 4,430,170 4,374,433 258,530 16,103,100 $ 4,065,200 1,025,900 4,413,200 4,364,000 352,500 2,214,054 503,604 135,068 16,910 10,433 (93,970) YTD Variance Exhibit A Yar o/o 13.7Yo 12.4o/o 73.2o/o 0.4Yo 0.zYo (26.7%) 33,709,999 30,323,900 2,796,099 9.2Yo 1,022,302 21,457 586,000 1,045,298 t63,4ts 1,028,100 22,100 416,100 644,800 149,100 52,30046717 (5,798) (643) 169,900 400,498 14,315 (5,583) (0.6%) (2.9o/o) 40.8o/o 62.7o/o 9.6% (10.7%) Annual Budget g 44,450,600 8,900,300 2,164,200 12,204,600 12,535,200 884,000 81,13 8,900 2,glg,goo 66,200 1,248,200 2,179,300 4,033,100 156,900 $ 91,741,500 s 31,271,300 3,615,900 7,976,400 7,714,200 1,g4g,ooo 4,57g,goo 988,800 1,428,000 47,422,400 2,g3g,ooo 20,899,900 3,456,300 4,900,100 250,000 7,482,500 4,og3,600 3,466,400 464,500 1,371,800 961,000 35,000 $ $ 91,741,500 Total Revenues EXPENSES: Potable Water Purchases Recycled Water Purchases CWA-lnfrastructure Access Charge CWA-Customer Service Charge C WA-Rel iability Charge CV/A-Emergency Storage Charge MWD-Capacity Res Charge MWD-Readiness to Serve Charge Subtotal Water Purchases Power Charges Payroll & Related Costs Material & Maintenance Administrative Expenses Legal Fees Transfer to General Fund Reserve Expansion Reserve Betterment Reserve Replacement Reserve Transfer to Sewer General Fund OPEB Trust New Supply Reserve Total Expenses $ 3s,995,189 S 32,636,400 $ 3,358,789 10.3o/o $12,870,532 $ 2,096,017 644,572 582,195 633,368 1,534,695 320,148 422,720 11,697,000 $ 1,857,500 644,400 582,000 633,200 I,534,800 320,000 529,000 (1,173,s32) (238,s17) (172) (1e5) (168) l15 (148) 106,280 (10.0%) (12.8o/o) (0.0%) (0.0%) 0.j%o 0.0Yo (0.0%) 20.1o/o 19,104,237 t7,797,900 (1,306,337) (7.3%) 1,176,074 6,267,793 921,043 1,418,612 80,824 494,200 1,364,500 I,155,500 I 54,800 457,300 320,300 l,136,2oo 6,279,500 982,265 r,515,749 83,333 494,200 1,364,500 1,155,500 154,800 457,300 320,300 (39,874) 10,717 61,222 97,137 2,509 (3.5o/o) 0.2Yo 6.2Yo 6.4o/o 3.0o/o 0.ïYo 0.ÙYo 0.0o/o 0.0Yo 0.jYo 0.}Yo 0.0o/o11700ll700 $ $ 32,926,875 $ 3,068,314 $ 31,752,248 $ 884,152 $ (1,174,627) 2,lg4,16l (3.7o/o) EXCESS REVENUES(EXPENSE) F:/MORPT/FS201 7-1 01 6 updated 1112212016 11:24 AM OTAY \ryATER DISTRICT INVESTMENT PORTFOLIO REVIEW October 31,2016 INVESTMENT OVERVIEW & MARKET STATUS: The federal funds rate has remained constant for over 5 years. On December 16,2015, at the Federal Reserve Board's regular scheduled meeting, the federal funds rate was increased from0.25o/oto 0.500Á" in response to the nation's gradual economic improvement. The Committee judges that there has been considerable improvement in labor market conditions this year, and it is reasonably confident that inflation will rise, over the medium term, to its 2 percent objective. The stance of monetary policy remains accommodative after this increase, thereby supporting further improvement in labor market conditions and a return to 2 percent inflation. There have been no further changes made to the federal funds rate atthe Federal Reserve Board's subsequent regular meetings, the most recent of which was held on November 02,2016. In determining the timing and size of future adjustments to the targetrange for the federal funds rate, they went on to say: "the Committee will assess realized and expected economic conditions relative to its objectives of maximum employment and 2 percent inJlation. This assessment will take into account awide range of inþrmation, including measures of labor market conditions, indicators of inflation pressures and inflation expectations, and readings onfinancial qnd internationql developments. In light of the cuwent shortfall of inflationfrom 2 percent, the Committee will carefully monitor øctual and expected progress toward its inflation goal. The Committee expects that economic conditions will evolve in a manner that will warrant only grødual increases in the federal funds rate; the federal funds rate is likely to remain, for some time, below levels that qre expected to prevail in the longer run. However, the actuøl path of the federal funds rate will depend on the economic outlook as informed by incoming data. " The District's effective rate of return for the month of October 2016 was 0.95yo, which was two basis points lower than the previous month. At the same time the LAIF return on deposits has improved over the previous month, reaching an average effective yield of 0.65% for the month of October 2016. Based on our success at maintaining a competitive rate of retum on our portfolio during this extended period of low interest rates, no changes in investment strategy regarding returns on investment are being considered at this time. The desired portfolio mix is important in mitigating any liquidity risk from unforeseen changes in LAIF or County Pool policy. In accordance with the District's Investment Policy, all District funds continue to be managed based on the objectives, in priority order, of safety, liquidity, and return on investment. PORTFOLIO COMPLIANCE: October 31,2016 Investment 8.01: Treasury Securities 8.02: Local Agency Investment Fund (Operations) 8.02: Local Agency Investment Fund (Bonds) 8.03: Federal Agency Issues 8.04: Certificates of Deposit 8.05: Short-Term Commercial Notes 8.06: Medium-Term Commercial Debt 8.07: Money Market Mutual Funds 8.08: San Diego County Pool I2.0: Maximum Single Financial Institution State Limit 100% $65 Million rc0% t00% 30% 25% 30% 20% 100% r00% Otay Limit t00% $65 Million r00% r00% rs% t0% t0% r0% r00% 50% Otav Actual 0 $9.75 Million 0 68.3t% .t0% 0 0 0 15.90% 4.15% Target: Meet or Exceed 100% of LAIF 1.20 r.00 0.80 0.60 0.40 0.20 0.00 Performance Measure FY-1 7 Return on lnvestment Month r LAIF r Otay n Difference at tro E U'o c troc 5 oÉ, rrrrrltlllll Apr FYI5 May FY 15 June FYI5 4th QtrFYI5 July FYI6 Aug FYI6 Sep FY16 lst Qtr FYI6 Oct FYI6 Nov FYI6 Dec FYI6 2nd Qtr FYI6 Jan FYI6 Feb FYI6 Mar FYI6 3rd Qtr FYI6 Apr FYI6 May FY16 Jun FY16 4th Qtr FYI6 July FYIT Aug FYIT Sep FYIT lst Qtr FYIT Oct FYIT TLAIF 0.28 0.29 0.30 0.29 0.32 0.33 0.34 0.33 0.36 0.37 0.40 0.38 0.45 0.47 0.51 0.47 0.53 0.55 0.58 0.55 0.59 0.61 0.63 0.61 0.65 tOtay 0.71 0.73 0.76 0.73 0.75 0.78 0.78 0.77 0.76 0.79 0.79 0.78 0.80 0.85 0.87 0.84 0.87 0.89 0.96 0.91 0.95 0.92 0.97 0.94 0.95 tr Difference 0.43 0.44 0.46 0.44 0.43 0.45 0.44 0.44 0.40 0.42 0.39 0.40 0.35 0.38 0.36 0.37 0.34 0.34 0.38 0.35 0.36 0.3 r 0.34 0.33 0.30 Otay Water District Investment Portfolio: to / gt/ zot6 3,586,480 4.25% Ss7,73q,o3q 68.3t% Total Cash and lnvestments: 584,514,26L 23,L93,747 27.44% tr Banks (Passbook/Checking/CD) I Pools (LAIF & County) tr Agencies & Corporate Notes Par Month End Portfolio Management Portfolio Summary October 31,2016 Market Value Book Value Y. oÍ Portfol¡o Days to Maturíty YTT/I 360 Equ¡v. YTM 365 Equ¡v.lnvestments Value Term Federal Agency lssues- Callable Federal Agency lssues - Coupon Certificates of Depos¡t - Bank Local Agency lnvestment Fund (LAIF) San Diego County Pool Investments 55,735,000.00 2,000,000.00 81,833.21 9,754,040.26 13,439,706.77 55,637,301. I 5 2,000,380.00 81,833.21 9,757,O25.31 1 3,363,000.00 55,735,000.00 1,999,033.76 81,833.21 9,754,040.26 13,439,706.77 68.80 2.47 0.10 12.04 16.59 792 146 447 1 1 1.050 0.661 0.030 0.645 0.942 1.064 0.670 0.030 0.654 0.955 954 640 731 'l 1 81,010,580.24 80,839,539.67 81,009,614.00 100.00%549673 0.972 0.986 Cash Pãssbooldcheckino(not included in yiefd calculations) Total Cash and lnvestments 3,504,646.92 3,504,646.92 3,504,646.92 o.162 0.164 84,515,227.16 84,3¡f4,186.59 84,514,260.92 549673 o.s72 0.986 Total Earnings October 31 Month Ending Fiscal Year To Date Current Year 67,151.60 267 ,419.52 Average Daily Balance 83,108,712.32 84,487,009.45 Effective Rate of Return 0.95% O,94o/o information Data Corporation. The investments prov¡de sufficient liquidity to meet the cash flow requirements of the District for the next six months of expenditures. //-¡¿ -t¿ Reporting period 10101 12016-10131 12016 Data Updated: SET_ME8: 1111612016 10114 Run Dat€: 11h6no16 - 10:14 Portfolio OTAY NL! AP PM (PRF_PM1) 7.3.0 Report Ver. 7.3.5 Month End Portfolio Management Portfolio Details - lnvestments October 31,2016 Page 1 custP lnvestment #lssuer Average Balãnce Purchase Stated YTM Daysto Matur¡tyDete Parvalue Marketvalue BookValue Rate S&P 360 Matur¡ty Date Federal Agency lssues- Callable 3134G5A47 3134G8NM7 3134G9D38 31 3048547 313047H73 3133EGJUO 313048KR3 3134G8XA2 3133EGBG9 31 30A9C90 3135G0G64 3136G2R665 313046U28 3134G92R1 3134G94W/ 3130A7W(7 3't33EGC26 3133EGGS8 3134G9SL2 3133EGJR7 3136G33N3 3136G33N3 3136G33N3 3136G34U6 3133EGWF8 313049NJ6 3136G4DR1 3136G4D23 0613012014 0312912016 06t2912016 05t2612016 03t29t2016 0710512016 0612312016 0412712016 0512312016 0912812016 '1013012015 1111912015 1?l28t2015 06t28t2016 0412612016 05t24t2016 06/06/2016 0612712016 06t28t2016 0710512016 08t30t2016 0813012016 08/30/2016 08t30t2016 101o312016 1012612016 1012712016 1012512016 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1,030,000.00 2,705,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,001,060.00 2,000,560.00 1,995,320.00 1,998,900.00 2,000,320.00 1,992,740.00 1,995,680.00 1,998,000.00 1,999,640.00 1,995,120.00 1,992,200.00 2,000,340.00 2,001,500.00 1,992,580.00 1,996,600.00 2,001,520.00 2,001,320.00 1,992,580.00 2,000,880.00 1,992,680.00 1,024,942.70 2,691,718.45 1,990,180.00 1,993,220.00 2,000,060.00 1,996,700.00 I,994,280.00 1,996,660.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1,030,000.00 2,705,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1ir'3012016 09t29t2017 1?j2912017 022612018 0312912018 0710512018 07t0612018 0712712018 08t23t2018 0912812018 10t29t2018 1111912018 1212812018 1212812018 04t26t2019 0512412019 06/06/2019 0612712019 0612812019 07105t2019 0812812019 0812812019 0812812019 0812812019 1010312a19 101'1112019 10t17t2019 10t25t2019 2301 2345 2363 2355 2346 2362 2358 2348 2354 2368 2336 2334 2338 2360 2347 2352 2357 2359 2356 2361 2364 2365 2366 2367 2369 2371 2373 2370 Federal Home Loan Mortgage Federal Home Loan Mortgage Federal Home Loan Mortgage Federal Home Loan Bank Federal Home Loan Bank Federal Farm Credit Bank Federal Home Loan Bank Federal Home Loan Mortgage Federal Farm Credit Bank Federal Home Loan Bank Fannie Mae Fann¡e Mae Federal Home Loan Bank Federal Home Loan Mortgage Federal Home Loan Mortgage Federal Home Loan Bank Federal Farm Credit Bank Federal Farm Credit Bank Federal Home Loan Mortgage Federal Farm Credit Bank Federal Náional Mortage Assoc Federal National Mortage Assoc Federal National Morlage Assoc Federal National Mortage Assoc Federal Farm Credit Bank Federal Home Loan Bank Federal Nationâl Mortâge Assoc Federal Nationâl Mortage Assoc Subtotal end Average 0.650 0.850 0.700 0.900 1.000 0.820 0.820 1.000 1.000 1.050 1.100 '1.150 1.375 1.000 1.150 1.250 1.300 1.200 1.300 1.O20 1.125 1.125 1.'t25 1.125 1.'t70 1.200 1.'100 1.200 0.641 0.838 0.690 0.888 0.986 0.809 0.809 0.986 0.986 1.036 1.085 1.134 1.356 0.986 1.134 1.233 1.282 1.184 1.282 1.006 1.1 10 1.110 1.1 10 1.1 10 1.154 't.183 1.085 1.184 59 332 423 482 513 611 612 633 660 696 727 748 787 787 906 934 947 968 969 976 1,030 1,030 1,030 1,030 1,066 1,O74 1,080 1,088 AA AAA AAA AA AA AA AA AA AA AA AA AA 55,864,032.26 55,735,000.00 55,637,301.15 55,735,000.00 1.050 792 Federal Agency lssues - Goupon 3l 33EEC73 2329 Federal Farm Credit Bank Subtotal and Average Data Updated: SET_ME8: 11/1612O16 10:14 0612612015 2,000,000.00 2,000,380.00 1,999,033.76 0.550 AA 0.661 146 0312712017 I,999,033,76 0.661 146 Portfolio OTAY NLI AP PM (PRF_PM2) 7.3.0 1,998,940.90 2,000,000.00 2,000,380.00 Run Oate: l 1/'16/20!6 - 10:14 Report Vsr. 7.3.5 Month End Portfolio Management Portfolio Details - lnvestments October 31,2016 Purchasê Date Page2 CUSIP lnvestnènt #lssuer Average Balance Stated YTM Daysto MeturityParvalue Marketvalue Bookvalue Rate S&P 360 Matur¡ty Date Certificates of Deposit - Bank 20500031 83-7 2341 011222016 81,833.21 81,833.21Cal¡fornia Bank & Trust Subtotel and Average 8l,833.21 81,833.21 81,833.21 81,833.21 81,833.21 0.030 0.030 447 0112212018 0.030 M7 Local Agency lnvestment Fund (LAIF) LAIF LAIF BABS 2OIO STATE OF CALIFORNIA STATE OF CALIFORNIA Subtotal end Average 9001 9012 071o112016 9,754,040.26 0.00 9,757,025.31 0.00 9,754,040.26 0.00 0.654 0.267 0.645 0.263 9,767,664,29 9,754,040.26 9,757,025,31 9,754,040,26 0.645 1 San Diego County Pool SD COUNTY POOL 9OO7 '13,439,706.77 13,363,000.00 13,439,706.77 0.955 0.942San Diego County Subtotal and Average 13,422,729.66 13,439,706.77 13,363,000.00 13,439,706,77 0.942 1 Total and Averege 83,108,712.32 8l,010,580.24 80,839,539.67 81,009,614.00 0.972 549 Data Updated: SET_ME8: 1111612016 10:14 Portfolio OTAY NL! AP PM (PRF_PM2) 7.3.0Run Date: 'l 1/16/2016 - 10:14 Month End Portfolio Management Portfolio Details - Gash October 31, 2016 Page 3 custP lnvestrnent #lssuer Average Balance Purchase Dete Par Value Market Valuê StatedBookValue Rate YTM DaystoS&P 360 Maturþ LJnion Bank UNION MONEY PETTY CASH UNION OPERATING PAYROLL RESERVE.IO COPS RESERVE.IO BABS UBNA-2O,IO BOND UBNA-FLEXACCT STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA Average Balance 0.010 0.400 0.010 0.010 0.010 0.000 0.395 0.000 0.010 0.010 0.000 0.000 9002 9003 9004 9005 901 0 901 I 9013 9014 071o112016 07t01t2016 0710112016 2,034,002.31 2,950.00 1,386,835.27 27,861.29 8,084.06 21,231.33 0.00 23,682.66 2,034,002.31 2,950.00 1,386,835.27 27,861.29 8,084.06 21,231.33 0.00 23,682.66 2,034,002.31 2,950.00 1,386,835.27 27,861.29 8,084.06 21,231.33 0.00 23,682.66 0.00 Total Cash and lnvesûnents Data Updated: SET_ME8: 1111612O16 1O:14 83,108,712.32 84,515,227.16 84,3¡14,186.59 84,514,260,52 0.972 549 Portfolio OTAY NL! AP PM (PRF_PM2) 7.3.0Run Dats: 1 l/16/2016 - 10:14 Month End GASB 31 Gompliance Detail Sorted by Fund - Fund October 1,2016 - October 31,2016 CUSIP lnvestment# Fund lnvestment Class Matur¡ty Beg¡nning lnvested Value Purchasè of Pr¡nc¡pal Add¡t¡on to Principal Redemptíon of Principal Adjustnent ¡n value Amort¡zâtion Adjustment Change in Markêt Value Ending lnvested ValueDate Fund: Treasury Fund 3134G9D38 2363 3134G9ZRI 2360 3134G9S12 2356 3134G8z.M4 2351 3134G8NM7 234s 3134G94W 2347 3134G5447 2301 3134G8XA2 2348 3I34G9AF4 2350 3134G8V\ ru5 2349 3136G4D23 2370 3136G34U6 2367 3136G4DR1 2373 3136G33N3 236ô 3136G33N3 2364 3136G33N3 2365 313048KR3 2358 3130A9NJ6 2371 3130A7H73 2346 313048547 2355 3I30A7WK7 2352 313049C90 2368 3130A6U28 2338 RESERVE.IOBABS 9OI1 LA|F BABS 2010 9012 RESERVE.IOCOPS 9O1O UNIONOPERATING 9OO4 PAYROLL 9OO5 UNION MONEY 9OO2 PETTY CASH 9OO3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,000,000.00 0.00 2,000,000.00 0.00 0.00 0.00 0.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.81 0.00 1.50 772,459.63 0.00 4,062,891.20 0.00 99 oo oo oo ôô oo 99 ôô 99 99 99 oo oo 99 99 ôô 99 99 99 99 99 99 99 oo 99 99 99 oo 99 99 Fair Value Fair Value Amortized Fair Value Amortized Fair Value Fair Value Fair Value Fair Value Fair Value Fa¡r Value Fa¡r Value Fair Value Fair Value Fâir Vâluê Fair Value Fair Value Fair Value Fair Value Fair Value Fair Value Fa¡r Value Amortized Amortized Fa¡r Value Amortized Amort¡zed Amorllzed Amorlized Amortized 1212912017 12128120',t8 0612812019 04t29t2019 09129t2017 0412612019 12t3012016 0712712018 04t2612018 1012712017 10t25t2019 08t28t2019 1011712019 0812812019 0812812019 08t28t2019 07t06l2ue 1011112019 0312912018 0212612018 0512412019 09t28t2018 1212812018 1,997,040.00 1,995,980.00 2,000,000.00 2,000,040.00 2,000,000.00 2,000,520.00 2,001,400.00 2,000,280.00 2,000,720.00 2,000,000.00 0.00 1,999,620.00 0.00 1,995,940.00 1,027,909.10 2,699,508.85 1,998,020.00 0_00 2,001,200.00 2,000,120.00 2,003,200.00 1,998,180.00 2,000,000.00 21,227.52 0.00 8,082.56 851,755.74 27,861.29 2,010,002.30 2,950.00 0.00 0.00 0.00 2,000,000.00 0.00 0.00 0.00 0.00 2,000,000.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 237,380.1 0 0.00 4,038,891.1 9 0.00 -1,720.00 -3,400.00 0.00 -40.00 0.00 -3,920.00 -340.00 -2,280.00 -720.00 0.00 -3,340.00 -6,400.00 -5,720.00 -5,760.00 -2,966.40 -7,790.40 -2,340.00 -3,300.00 -880.00 -1,220.00 -1,680.00 -3,060.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,995,320.00 1,992,580.00 2,000,000.00 0.00 2,000,000.00 1,996,600.00 2,001,060.00 1,998,000.00 0.00 0.00 1,996,660.00 I,993,220.00 I,994,280.00 1,990,1 80.00 1,O24,942.70 2,691,718.45 1,995,680.00 1,996,700.00 2,000,320.00 1,998,900.00 2,001,520.00 1,995,120.00 2,000,000.00 2't,231.33 0_00 8,084.06 1,386,835.27 27,861.29 2,034,002.31 2,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Data Updated: SET_ME8: 1111612016 10:14 Portfolio OTAY NL! AP GD (PRF_GD) 7.1.1 Report Ver. 7.3.5 Run Date: 11l16/2016 - 10:14 Month End GASB 3l Compliance Detail Sorted by Fund - Fund Page2 Adjusûnent in Value Change ín Merket Value End¡ng lnvested ValueCUSIPlnvestment# Fund lnvestnent Glass Maturity Date Beginning lnvested Value Purchase of Principal Add¡t¡on to Principal Redemption of Principal Amort¡zat¡on Adjustment Fund: Treasury Fund UBNA-FLEXACCT UBNA-2o10 BOND LAIF 3133EGWF8 3l33EEC73 3133EGBG9 3133EGGS8 3133EGCZ6 3133EGJR7 3133EGJUO 2050003183-7 3136G2R665 31 35G0G64 SD COUNTY POOL 5,855.80 0.00 5,200,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 198.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9014 9013 9001 2369 2329 2354 2359 2357 2361 2362 2341 2334 2336 9007 99 99 99 99 99 99 99 ôô 99 99 99 99 oo 99 Amorlized Amort¡zed Fair Value Amorl¡zed Amorlized Fair Value Fâir Vâlue Fa¡r Value Amort¡zed Fair Value Amortized Amortized Amorllzed Fair Value 10t03t2019 03t27t2017 0e12312018 0612712019 06/06/2019 07t05t20't9 07t05t2018 0112212018 1111912018 10t29t2018 Subtotal 29,538.46 0.00 9,143,17',t.73 0.00 1,998,835.22 1,999,920.00 1,998,560.00 2,003,480.00 2,000,000.00 1,995,280.00 8l,833.21 2,000,000.00 2,000,000.00 1 3,396,000.00 0.00 0.00 0.00 2,000,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,813,665.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29,238.36 0.00 0.00 I 87.80 0.00 0.00 -280.00 -5,980.00 -2,160.00 0.00 -2,540.00 0.00 0.00 0.00 -62,238.36 23,682.66 0.00 9,757,025.31 2,000,000.00 1,999,033.76 1,999,&0.00 1,992,580.00 2,001,320.00 2,000,000.00 't,992,740.00 81,833.21 2,000,000.00 2,000,000.00 1 3,363,000.00 81,288,175.98 8,000,000.00 10,678,260.28 15,42,127.09 198.54 -r29,887.36 84,354,620.35 Data Updated: SET_ME8: 1111612O16 1O:14 Total 81,288,175.98 8,000,000.00 10,678,260.28 15,482,127.09 198.54 -129,887.36 84,354,620.35 Portfolio OTAY NLI AP GD (PRF_GD) 7.1.1 Report Ver. 7.3.5 Run Date: 11l16/2016- 10:14 Month End Activity Report Sorted By lssuer October 1,2016 - October 31,2016 Par Value Par Value CUSIP lnvestment # Percent lssuer of Portfolio Beginning Balânce Current Rate Transact¡on Date Purchases or Deposits Redemptions or Withdrawals End¡ng Balance lssuer: STATE OF CALIFORNIA Union Bank UNION MONEY UNION OPERATING RESERVE-10 COPS RESERVE-10 BABS UBNA.FLEX ACCT 9002 9004 9010 901 I 9014 STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA 0.010 0.400 0.01 0 0.010 4,062,891.20 772,459.63 1.50 3.81 0.00 4,038,891.19 237,380.10 0.00 0.00 5,855.80 Subtotal and Balance 2,951,417.87 4,835,356.r4 4,282,127.09 3,504,6¡16.92 Local Agency lnvestment Fund (LAIF) LAIF 0.654 5,813,665.78 5,200,000.009OO1 STATE OF CALÍFORNIA Subtotal and Balance lssuerSubtotal 15.688% 9,140,374.48 12,09t,792.35 5,813,665.78 5,200,000.00 9,754,040.26 10,649,021.92 9,482,127.09 13,258,687.18 lssuer: California Bank & Trust Gertificates of Deposit - Bank Subtotal and Balance lssuer Subtotal 81,833.21 0.097%81,833.21 0.00 0,00 81,833.21 81,833.21 Federal Agency lssues- Gallable Subtotal and Balance lssuer Subtotal 4,000,000.00 4,000,000.00 4.733%4,000,000.00 0.00 0.00 4,000,000.00 lssuer: Federal Farm Gredit Bank Federal Agency lssues- Callable 3133EGWF8 2369 Data Updated: SET_ME8: 1111612016 10:'14 Federal Fârm Credil Bank 1.170 10103120'.16 2,000,000.00 0.00 Portfolio OTAY NLI AP DA (PRF_DA) 7.2.0 Report Ver. 7.3.5 Run Date: 1 l/16/2016 - 10:14 lnvestment # Percent lssuer ofPortfolio Month End Activity Report October 1, 2016 - Octobet 31, 2016 Par Value Beg¡nn¡ng Balance Current Rate Transaction Date Page 2 Par Value cuslP Purchases or Depos¡ts Redempt¡ons or\ /¡lhdrawals End¡ng Bafance Subtotal and Bâlance 10,000,000.00 2,000,000.00 0.00 12,000,000.00 Federal Agency lssues - Coupon Subtotal and Balancê lssuerSubtotal 16.565% 2,000,000.00 2,000,000.00 12,000,000.00 2,000,000.00 0.00 14,000,000.00 lssuer: Federal Home Loan Bank Federal Agency lssues' Gallable 3l 30A9NJ6 1.200 1012612016 2,000,000.00 0.002371 Federal Home Loan Bank Subtotål end Balance lssuerSubtotal 16.565% 12,000,000.00 12,000,000.00 2,000,000.00 0,00 14,000,000.00 2,000,000.00 0.00 14,000,000.00 lssuer: Federal Home Loan Mortgage Federal Agency Issues- Callable 3134G8\ A/ú5 3134G9AF4 3134G82M4 2349 2350 2351 0.850 1.050 1.300 0.00 0.00 0.00 Federal Home Loan Mortgage Federal Home Loan Mortgage Federal Home Loan Mortgage lssuerSubtotal 16.565% 1012712016 't0t26t2016 1012912016 2,000,000.00 2,000,000.00 2,000,000.00 20,000,000.00 0.00 6,000,000.00 14,000,000.00 20,000,000.00 0,00 6,000,000,00 f4,000,000.00 lssuer: Federal National Mortage Assoc Federa! Agency lssues- Callable 3136G4D23 3136G4DR1 2370 2373 Federal Nat¡onal Mortage Assoc Federal National Mortage Assoc 1.200 1.100 1012512016 1012712016 2,000,000.00 2,000,000.00 0.00 0.00 Subtotal and Balance lssuerSubtotal 13.885% 7,735,000.00 4,000,000.00 0.00 I I,735,000.00 7,735,000.00 4,000,000,00 0.00 11,735,000.00 lssuer: San Diego County San Diego County Pool SD COUNTY POOL 0.955 29,238.36 0.009007 San Diego County Subtotal and Balance 13,410,468.41 29,238.36 0.00 13,439,706,77 Data Updated: SET_ME8: 1111612016 10:14 Portfolio OTAY NL! AP DA (PRF_DA) 7.2.0 Report Ver. 7.3.5 Run Dâte: I l/16/20'16 - l0:14 Month End Act¡v¡ty Report October l, 2016 - October 31, 2016 Par Value Page 3 Par Valuê CUSIP lnvesûnent # Percent lssuer ofPortfolío Transact¡on Oato Purchases or Deposits Redemptions or Wthdrawals Beginning Balance Current Rate End¡ng Bafance lssuerSubtotal 15.902%13,410,468,41 29,238.36 0.00 13,439,706.77 Totâl 100.000%81,319,093.97 18,678,260,28 15,482,127.05 84,515,227.16 Data Updated: SET_ME8: 1111612O16 10:14 Portfol¡o OTAY NL! AP DA (PRF_DA) 7.2.0 Report V€r. 7.3.5 Run Dãte: l1116/2016 - l0:14 Month End Duration Report Sorted by lnvestment Type - lnvestment Type Through 1013112016 Securifu lD lnvestment # Fund lssuer Market Value Curfent Rate YTM Current360 Yield Matur¡ty/ Mod¡fied Call Date Durât¡on lnvestment Glass Book Value Par Value 3134G5A47 3136G2R665 31 35G0G64 313046U28 3134G8NM7 3130A7H73 3't34G9AW 3134G8X42 313047WK7 3133EGBG9 31 3048547 3134G9S12 3133EGCZ6 31 30A8KR3 3133EGGS8 3134G92R1 3133EGJR7 31 33EGJUO 3l 34G9D38 3136G33N3 3136G33N3 31 36G33N3 3136G34U6 313049C90 3133EGWF8 3136G4D23 313049NJ6 3136G4DR1 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1,030,000.00 2,705,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1,030,000.00 2,705,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,001,060.00 2,000,340.00 1,992,200.00 2,001,500.00 2,000,560.00 2,000,320.00 1,996,600.00 I,998,000.00 2,001,520.00 I,999,640.00 1,998,900.00 2,000,880.00 2,001,320.00 1,995,680.00 1,992,580.00 I,992,580.00 1,992,680.00 1,992,740.00 1,995,320.00 1,024,942.70 2,691,718.45 I,990,1 80.00 I,993,220.00 1,995,120.00 2,000,060.00 I,996,660.00 1,996,700.00 1,994,280.00 .6500000 1 .1 50000 1.100000 1.375000 .8500000 1.000000 1 .1 50000 1.000000 1.250000 1.000000 .9000000 1.300000 1.300000 .8200000 1.200000 1.000000 1.020000 .8200000 .7000000 1.1 25000 1.'125000 1.125000 '1.125000 1.050000 1.170000 1.200000 1.200000 I .1 00000 1213012016 't111912018 10129t2018 1212812018 0912912017 0312912018 0412612019 0712712018 0512412019 08123t2018 0212612018 0612812019 06/06/2019 07t06t2018 0612712019 1212812018 07t0512019 0710512018 1212912017 0812812019 0812812019 0812812019 0812812019 09t28t2018 1010312019 1012512019 1011112019 1011712019 2301 2334 2336 2338 2345 2346 2347 2348 2352 2354 2355 zJcÞ 2357 2358 2359 2360 2361 2362 2363 2364 2365 2366 2367 2368 2369 2370 2371 2373 99 oo 99 99 oo 99 99 99 99 99 99 99 99 99 99 99 ôo 99 99 99 99 99 oo 99 oo 99 99 Federal Home Loan Mortgage Fannie Mae Fannie Mae Federal Home Loan Bank Federal Home Loan Mortgage Federal Home Loan Bank Federal Home Loan Morlgage Federal Home Loan Mortgage Federal Home Loan Bank Federal Farm Cred¡t Bank Federal Home Loan Bank Federal Home Loan Mortgage Federal Farm Credit Bank Federal Home Loan Bank Federal Farm Credit Bank Federal Home Loan Mortgage Federal Farm Credit Bank Federal Farm Cred¡t Bank Federal Home Loan Mortgage Federal National Morlage Assoc Federal Nal¡onal Mortage Assoc Federal Nalional Mortage Assoc Federal National Mortage Assoc Federal Home Loan Bank Federal Farm Credit Bank Federal Nat¡onal Morlage Assoc Federal Home Loan Bank Federal Nat¡onal Mortage Assoc Fa¡r Amort Amort Amort Amort Fa¡r Fâir Fair Fair Fair Fair Amort Fâir Fair Fair Fair Amorl Fa¡r Faí¡ Fair Fair Fair Fair Fair Amort Fair Fair Fair 0.641 1.134 1.085 1.356 0.838 0.986 1.134 0.986 1.233 0.986 0.888 1.282 1.282 0.809 1.184 0.986 1.006 0.809 0.690 1.110 1.110 1.110 1.110 1.036 1.154 1.184 1.183 1.085 0.544 1.142 1.299 1.340 0.819 0.989 1.220 1.058 1.220 '1.010 1.01 1 1.283 1.274 0.950 1.343 1.175 1.159 1.039 0.903 1.303 1.303 '1.303 1.248 '1.'180 1.169 1.257 1.257 1.199 0.161 2.009 1.965 2.110 0.904 1.396 2.442 1.718 2.502 1.787 1.305 2.593 2.533 1.6s9 2.594 2.121 2.624 1.656 1.150 2.765 2.765 2.765 2.766 1.881 2.861 2.920 2.882 2.903 Data Updated: SET_ME8: 1111612016 10:14 Portfolio OTAY NL! AP DU (PRF_DU) 7.1.1 Report Ver. 7.3.5 Run Þate: 1 1/1612016 - 1O:14 Page I Securltu lD Month End Duration Report Sorted by lnvestment Type - Investment Type Through 1013112016 lnvestment Class Eook Vâluê Market Value Curent Râtê Currênt Yield Matur¡ty/ Call Date Modified Durat¡on Par YTMFundlssuerValuê360 3133EEC73 2329 2050003183-7 2341 LAIF 9001 LAIF BABS 2O,IO 9012 sDcouNw 9007 99 99 99 99 ôo Federal Farm Credit Bank California Bank & Trust STATE OF CALIFORNIA STATE OF CALIFORNIA San Diego County Amort Amort Fair Fair Fair 1,999,033.76 81,833.21 9,754,040.26 0.00 13,439,706.77 2,000,000.00 8l,833.21 9,754,O40.26 0.00 13,439,706.77 2,000,380.00 81,833.21 9,757,025.31 0.00 13,363,000.00 .5500000 .0300000 .6540000 .2670000 .9550000 0.661 0.030 0.645 0.263 o.942 0.512 0.030 0.654 0.267 0.955 0312712017 01122t2018 0.400 1.223 0.000 0.000 0.000 Report Total 81,009,614.00 81,010,580.24 80,839,539.67 1.035 1,477 Portfolio OTAY NL! AP DU (PRF_DU) 7.1.1 Report Ver. 7.3.5 Data Updated: SET_ME8: 1111612016 10:14 Run Dale: I 1/16/2016 - 10:14 Page 2 Month End lnterest Earnings Sorted by Fund - Fund October 1, 2016 - October 31, 2016 Yield on Beginning Book Value Adjusted lnterest Earnings CUSIP lnvestment# Fund Secur¡ty Type Ending Par Value Beginning Book Value Ending Matur¡tyBookValue Date CurrentAnnualizedRate Y¡eld lnterest Earned Amortization/ Adjusted lnterestAccretion Earnings Fund: Treasury Fund 3134G9D38 2363 3134c92R1 2360 3134G9SL2 2356 3134G8z.M4 2351 3I34G8NM7 2345 3134G94W 2347 3',t34G5447 2301 3134G8XA2 2348 3134G94F4 2350 3134G8WW5 2349 3136G4D23 2370 3136G34U6 2367 3136G4DR1 2373 3136G33N3 2366 3136G33N3 2364 3136G33N3 2365 3130A8KR3 2358 313049NJ6 2371 3130A7H73 2346 313048547 2355 313047WK7 2352 3130A9C90 2368 313046U28 2338 RESERVE-IOBABS 9O1I RESERVE-IOCOPS 9O1O UNION OPERATING 9OO4 UNION MONEY 9OO2 LAIF 9001 3133EGWF8 2369 2,000,000.00 12t29t2017 2,000,000.00 1212812018 2,000,000.00 06t28t2019 o.o0 0412912019 2,000,000.00 0912912017 2,000,000.00 04t26t2019 2,000,000.00 12t30t2016 2,000,000.00 07 127 1201 I 0.00 04t26t2018 o.00 1012712017 2,000,000.00'10t25t2019 2,000,000.00 08t28t2019 2,000,000.00 10117 12019 2,000,000.00 08t28t2019 1,030,000.00 0812812019 2,705,000.00 08t28t2019 2,000,000.00 07 10612018 2,000,000.00 10t11t2019 2,000,000.00 03129t2018 2,000,000.00 02t26t2018 2,000,000.00 05t24t2019 2,000,000.00 09t28t2018 2,000,000.00 1212812018 21,231.33 8,084.06 1,386,835.27 2,O34,002.31 9,754,040.26 2,000,000.00 10t03t2019 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,166.66 1,666.66 2,166.66 2,022.22 1,416.67 1,916.66 I,083.33 1,666.66 1,458.33 1,227 .78 400.00 1,875.00 244.45 '1,875.00 965.63 2,535.94 1,366.67 333.33 1,666.67 1,500.00 2,083.34 1,750.00 2,291.66 0.18 0.07 549.00 2.30 5,425.47 1,820.00 oo 99 99 99 99 oo oo 99 99 oo oÔ ôô 99 99 99 oo ôô 99 99 99 oo 99 99 99 99 99 99 99 99 MC1 MC1 MCl MC1 MC1 MC1 MCl MC1 MC1 MC1 MCI MCl MC1 MCr MC1 MCI MC1 MCr MC1 MC1 MC1 MCr MC1 PA1 PA1 PA1 PA1 LA1 MC1 2,000,000.00 2,000,000.00 2,000,000.00 0.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 0.00 0.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 1,030,000.00 2,705,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 21,231.33 8,084.06 I,386,835.27 2,034,002.31 9,754,040.26 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 0.00 2,000,000.00 0.00 2,000,000.00 I,030,000.00 2,705,000.00 2.000,000.00 0.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 21,227.52 8,082.56 851,755.74 2,010,002.30 9,140,374.48 0.00 0.700 1.000 1.300 't.300 0.850 1.150 0.650 1.000 1.050 0.850 1.200 1.125 1.100 1.125 1.125 1.125 0.820 '1.200 1.000 0.900 1.250 1.050 1.375 0.010 0.010 0.400 0.010 0.654 1.170 0.687 0.981 1.276 1.318 0.834 1.128 0.638 0.981 1.065 0.862 1.043 1.104 0.892 1.104 1.104 1.104 0.805 1.014 0.981 0.883 1.226 1.030 1.349 0.010 0.010 0.759 0.001 0.699 1.145 1,166.66 1,666.66 2,166.66 2,022.22 1,416.67 1,916.66 1,083.33 1,666.66 '|,458.33 1,227.78 400.00 1,875.00 244.45 1,875.00 965.63 2,535.94 1,366.67 333.33 1,666.67 1,500.00 2,083.34 1,750.00 2,291.66 0.18 0.07 549.00 2.30 5,425.47 I,820.00 Data Updated: SET_ME8: 1111612016 10t14 Portfolio OTAY NL! AP rE (PRF_IE) 7.2.0 ReportVer.7.3.5 Run Dale: l'll16/2016- 10:14 Month End lnterest Earnings October l, 2016 - October 31, 2016 Beginning Book Value Ending MaturityBookValuê Date Page 2 CUSIP lnvestment# Fund Secur¡ty Typo Ending Par Ve¡ue CurrentAnnualizedRate Y¡eld lnterest Eâmêd Amort¡zat¡on/ Adjusted lnterestAccret¡on Earnings Fund: Treasury Fund 31338EC73 3133EGBG9 3133EGGS8 3133EGCZ6 3133EGJR7 3 1 33EGJUO 2050003183-7 3136G2R665 3135G0G64 SD COUNTY POOL 2329 2354 2359 2357 2361 2362 2341 2334 2336 9007 FAC MC1 MC1 MC1 MC1 MCr BCD MC1 MC1 LA3 99 99 99 99 oo oo Ôô 99 oo oo 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 81,833.21 2,000,000.00 2,000,000.00 13,439,706.77 1,998,835.22 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 81,833.21 2,000,000.00 2,000,000.00 13,410,468.41 1,999,033.76 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 81,833.21 2,000,000.00 2,000,000.00 13,439,706.77 03t2712017 o812312018 06t2712015 06/06/2019 0710512019 0710512018 011221201A 11t19t2018 10t2st2018 0.550 1.000 1.200 1.300 1.020 0.820 0.030 1.150 1.100 0.955 198.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.657 0.981 1.177 1.276 1.001 0.805 0.031 1.141 1.079 0.956 916.66 1,666.67 2,000.00 2,166.66 1,700.00 1,366.66 2.12 1,937.50 1,833.33 10,887.12 1,11s.20 1,666.67 2,000.00 2,166.66 1,700.00 1,366.66 2.12 1,937.50 1,833.33 10,887.12 Subtotal 84,460,733,21 81,257,579.44 84,459,766.97 0.9¿t8 66,953.06 198.54 67,1 51.60 Data Updated: SET_ME8: 1111612016 1Oi14 Total 84,460,733,21 81,257,579.4 84,459,766.97 0.948 66,953,06 198.54 67,15r.60 Portfolio OTAY NL! AP lE (PRF_IE) 7.2.0 Report Ver. 7.3.5 Run Dale: 1'111612016 - 'lO:'14 Check Total 10,102.92 5,611.88 11,789.45 4,081.90 4,021.00 14,500.00 CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 2047037 11/09/16 01910 ABCANA INDUSTRIES 996980 10/20/16 SODIUM HYPOCHLORITE 3,844.66 996653 10/13/16 SODIUM HYPOCHLORITE 3,332.74 996657 10/13/16 SODIUM HYPOCHLORITE 1,126.60 996981 10/20/16 SODIUM HYPOCHLORITE 941.24 996655 10/13/16 SODIUM HYPOCHLORITE 857.68 2047093 11/16/16 01910 ABCANA INDUSTRIES 997358 10/28/16 SODIUM HYPOCHLORITE 4,030.03 997359 10/28/16 SODIUM HYPOCHLORITE 830.78 997356 10/28/16 SODIUM HYPOCHLORITE 751.07 2046953 10/26/16 01910 ABCANA INDUSTRIES 995757 09/29/16 SODIUM HYPOCHLORITE 2,769.92 996225 10/06/16 SODIUM HYPOCHLORITE 2,401.11 996125 10/05/16 SODIUM HYPOCHLORITE 1,920.89 993450 08/25/16 SODIUM HYPOCHLORITE 1,632.76 996226 10/06/16 SODIUM HYPOCHLORITE 1,152.53 993938 08/31/16 SODIUM HYPOCHLORITE 865.36 996229 10/06/16 SODIUM HYPOCHLORITE 614.68 995759 09/29/16 SODIUM HYPOCHLORITE 432.20 2047138 11/23/16 01910 ABCANA INDUSTRIES 997673 11/03/16 SODIUM HYPOCHLORITE 2,064.96 997656 11/02/16 SODIUM HYPOCHLORITE 1,056.49 997674 11/03/16 SODIUM HYPOCHLORITE 960.45 2047139 11/23/16 08488 ABLEFORCE INC 7223 11/10/16 SHAREPOINT SERVICES (10/4/16-10/31/16)2,775.00 2,775.00 2046954 10/26/16 12174 AECOM TECHNICAL SERVICES INC 45 10/07/16 DISINFECTION SYSTEM (ENDING 9/30/16)3,781.11 3,781.11 2047038 11/09/16 11462 AEGIS ENGINEERING MGMT INC 1418 10/19/16 DEVELOPER PLAN REVIEW (9/17/16-10/14/16)13,356.98 13,356.98 2046955 10/26/16 07732 AIRGAS SPECIALTY PRODUCTS INC 131459288 10/04/16 AQUA AMMONIA 2,709.00 131459287 10/04/16 AQUA AMMONIA 1,312.00 2046956 10/26/16 13753 AIRGAS USA LLC 9939757784 09/30/16 BREATHING AIR BOTTLES 52.02 52.02 2047094 11/16/16 13753 AIRGAS USA LLC 9940489905 10/31/16 BREATHING AIR BOTTLES 52.02 52.02 2046957 10/26/16 15024 AIRX UTILITY SURVEYORS INC 909302016 10/06/16 UTILITY LOCATING SERVICES (9/1/16-9/30/16)14,275.00 14,275.00 2047140 11/23/16 15024 AIRX UTILITY SURVEYORS INC 1010312016 11/07/16 UTILITY LOCATING SVCS (10/1/16-10/31/16)13,456.00 13,456.00 2047095 11/16/16 14256 ALLIANT INSURANCE SERVICES INC 534352 10/27/16 INSURANCE CONSULTING (JUL-SEPT 2016)7,250.00 534353 10/27/16 INSURANCE CONSULTING (OCT-DEC 2016)7,250.00 2047004 11/02/16 02572 ALVAREZ, GERMAN GA110216 11/02/16 MEAL ADVANCEMENT 208.00 208.00 2047039 11/09/16 14462 ALYSON CONSULTING CM201665 10/14/16 MGMT/INSP (9/1/16-9/30/16)8,590.00 Page 1 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 19,030.00 3,535.00 CM201666 10/14/16 MGMT/INSP (9/1/16-9/30/16)3,750.00 CM201668 10/14/16 MGMT/INSP (9/1/16-9/30/16)2,640.00 CM201664 10/14/16 MGMT/INSP (9/1/16-9/30/16)2,550.00 CM201663 10/14/16 MGMT/INSP (9/1/16-9/30/16)1,500.00 2047040 11/09/16 14462 ALYSON CONSULTING CM201667 10/14/16 CONSTRUCTION MGMT SVCS 1,440.00 1,440.00 2047041 11/09/16 03357 APEX ADVERTISING INC 360061 10/24/16 UNIFORM CAPS 1,845.50 1,845.50 2046958 10/26/16 03492 AQUA-METRIC SALES COMPANY 0062434IN 10/03/16 LARGE SENSUS METERS 6,051.00 6,051.00 2047141 11/23/16 03492 AQUA-METRIC SALES COMPANY 0063024IN 11/03/16 SENSUS OMNI METERS 22,920.46 22,920.46 2047005 11/02/16 17618 ARLENE HERRERA Ref002468749 10/31/16 UB Refund Cst #0000030462 150.00 150.00 2046959 10/26/16 07785 AT&T 000008678581 10/02/16 TELEPHONE SERVICES (9/2/16-10/1/16)6,031.40 6,031.40 2047142 11/23/16 12810 ATKINS NORTH AMERICA INC 1848278 11/07/16 2015 WFMP UPDATE (7/1/16-9/30/16)20,710.75 20,710.75 2047042 11/09/16 13392 AZTECA SYSTEMS INC 11882 06/01/16 CITYWORKS LIC AGREEMENT (11/15/16-6/30/17)56,250.00 56,250.00 2046960 10/26/16 00145 BARRETT ENGINEERED PUMPS 101490 10/04/16 SAMPLE PUMP 2,430.00 2,430.00 2046961 10/26/16 17613 BIENVENUE, DONALD 10192016DB 10/25/16 TUITION REIMBURSEMENT 202.00 202.00 2047082 11/16/16 17653 BRITTANY PACE Ref002470373 11/10/16 UB Refund Cst #0000222913 47.30 47.30 2046962 10/26/16 08156 BROWNSTEIN HYATT FARBER 654655 10/13/16 LEGISLATIVE ADVOCACY (THRU 9/30/16)2,318.50 2,318.50 2047006 11/02/16 08156 BROWNSTEIN HYATT FARBER 654656 10/13/16 LEGISLATIVE ADVOCACY (THRU 9/30/16)474.00 474.00 2047143 11/23/16 08156 BROWNSTEIN HYATT FARBER 659380 11/11/16 LEGISLATIVE ADVOCACY (THRU 10/31/16)2,125.00 2,125.00 2047043 11/09/16 14112 BSE ENGINEERING INC 75400408 10/17/16 ELECTRICAL SERVICES (ENDING 9/30/16)2,205.00 75400504 10/17/16 ELECTRICAL SERVICES (ENDING 9/30/16)1,330.00 2047007 11/02/16 17629 BYROM-DAVEY INC Ref002468760 10/31/16 UB Refund Cst #0000229709 1,141.02 1,141.02 2047144 11/23/16 04071 CAPITOL WEBWORKS LLC 28154 10/31/16 OUTSIDE SERVICES 45.00 45.00 2047096 11/16/16 02758 CARMEL BUSINESS SYSTEMS INC 8088 10/26/16 REPROGRAPHICS SERVICES 784.75 784.75 2046963 10/26/16 02758 CARMEL BUSINESS SYSTEMS INC 8081 10/01/16 REPROGRAPHICS SERVICES 401.50 401.50 2047145 11/23/16 02758 CARMEL BUSINESS SYSTEMS INC 8087 10/24/16 SCANNING SERVICES (10/21/16)35.00 35.00 2046964 10/26/16 15177 CAROLLO ENGINEERS INC 152202 10/05/16 DESIGN/CONST FOR 870-2 PS (7/1/16-8/31/16)71,075.80 71,075.80 2047044 11/09/16 17022 CASTLE ACCESS INC 0223092490 11/01/16 COLOCATION SERVICES 2,098.25 2,098.25 2047146 11/23/16 17466 CHARLES KING COMPANY 110312016 10/31/16 14-INCH FORCE MAIN (ENDING 10/31/16)144,092.84 144,092.84 2047008 11/02/16 17627 CHRIS BUTTS Ref002468758 10/31/16 UB Refund Cst #0000222351 9.24 9.24 Page 2 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 570.90 6,191.00 5,078.00 2047008 11/02/16 17627 CHRIS BUTTS Ref002468758 10/31/16 UB Refund Cst #0000222351 9.24 9.24 2047147 11/23/16 02026 CHULA VISTA ELEM SCHOOL DIST AR046391 11/02/16 GARDEN TOURS (8/26/16)201.15 AR046392 11/02/16 GARDEN TOURS (8/30/16)200.77 AR046390 11/02/16 GARDEN TOURS (8/24/16)168.98 2046965 10/26/16 15256 CIGNA GROUP INSURANCE / LINA 9267101016 10/10/16 AD&D & SUPP LIFE INS (OCT 2016)4,227.63 4,227.63 2047097 11/16/16 15256 CIGNA GROUP INSURANCE / LINA 9267111016 11/10/16 AD&D & SUPP LIFE INS (NOV 2016)4,186.73 4,186.73 2047045 11/09/16 00446 CITY OF CHULA VISTA 59338240001617 11/03/16 SECURED PROPERTY TAXES 106.86 106.86 2047148 11/23/16 13946 CITY OF CHULA VISTA 103116 11/04/16 SPONSORSHIP- STARLIGHT PARADE 500.00 500.00 2047149 11/23/16 00234 CITY TREASURER 1000177441 09/07/16 LABORATORY ANALYSIS (AUG 2016)1,220.00 1,220.00 2047098 11/16/16 04119 CLARKSON LAB & SUPPLY INC 87324 10/31/16 BACTERIOLOGICAL TESTING (10/14/16-10/16/16)867.00 87325 10/31/16 BACTERIOLOGICAL TESTING (10/25/16)795.00 87316 10/31/16 BACTERIOLOGICAL TESTING (9/30/16-10/1/16)761.00 87321 10/31/16 BACTERIOLOGICAL TESTING (10/7/16-10/8/16)761.00 87320 10/31/16 BACTERIOLOGICAL TESTING (10/5/16)757.00 87315 10/31/16 BACTERIOLOGICAL TESTING (9/27/16-9/28/16)642.00 87323 10/31/16 BACTERIOLOGICAL TESTING (10/13/16-10/15/16)458.00 87317 10/31/16 BACTERIOLOGICAL TESTING (10/4/16)340.00 87318 10/31/16 BACTERIOLOGICAL TESTING (10/5/16)302.00 87322 10/31/16 BACTERIOLOGICAL TESTING (10/12/16)302.00 87319 10/31/16 BACTERIOLOGICAL TESTING (10/5/16)206.00 2046966 10/26/16 04119 CLARKSON LAB & SUPPLY INC 86710 09/28/16 BACTERIOLOGICAL TESTING (9/15/16-9/17/16)986.00 86712 09/28/16 BACTERIOLOGICAL TESTING (9/19/16-9/27/16)832.00 86708 09/28/16 BACTERIOLOGICAL TESTING (9/7/16-9/8/16)756.00 86713 09/28/16 BACTERIOLOGICAL TESTING (9/21/16-9/24/16)722.00 86707 09/28/16 BACTERIOLOGICAL TESTING (9/06/16-9/07/16)716.00 86709 09/28/16 BACTERIOLOGICAL TESTING (9/12/16)688.00 86711 09/28/16 BACTERIOLOGICAL TESTING (9/19/16)378.00 2047046 11/09/16 08160 COMPLETE OFFICE 18928390 10/18/16 COPY PAPER 1,338.77 1,338.77 2046967 10/26/16 03706 CONSUMERS PIPE & SUPPLY CO S1335263001 09/28/16 FLOW CONTROL VALVES 10,907.22 10,907.22 2047150 11/23/16 03706 CONSUMERS PIPE & SUPPLY CO S1334665001 10/31/16 6" GATE VALVE/CHECK VALVES 6,724.43 6,724.43 2047099 11/16/16 17660 CORRECTIONS CORP OF AMERICA 0720110416 11/04/16 W/O REFUND D0720-090159 495.01 495.01 2047047 11/09/16 00099 COUNTY OF SAN DIEGO DPWAROTAYMWD091610/13/16 EXCAVATION PERMITS (SEPT 2016)3,971.00 3,971.00 2047100 11/16/16 00134 COUNTY OF SAN DIEGO 111016 11/10/16 VARIANCE REQUEST 107.00 107.00 Page 3 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 852.00 21,672.00 268.46 11,842.79 7,765.20 3,073.61 00134 COUNTY OF SAN DIEGO 111016 VARIANCE REQUEST 2046968 10/26/16 00184 COUNTY OF SAN DIEGO 2003193E602350916 09/26/16 SHUT DOWN TEST (9/26/16)213.00 213.00 2047151 11/23/16 00184 COUNTY OF SAN DIEGO 2003193E602241016 11/04/16 SHUT DOWN TEST (9/30/16)639.00 2003193E602161016 11/04/16 SHUT DOWN TEST (9/30/16)213.00 2047048 11/09/16 00206 COUNTY OF SAN DIEGO 2924 10/18/16 OTHER AGENCY FEES 8,346.00 2923 10/18/16 OTHER AGENCY FEES 7,162.00 2922 10/18/16 OTHER AGENCY FEES 6,164.00 2047152 11/23/16 02756 COX COMMUNICATIONS INC 8801110416 11/04/16 TELECOMM SVCS / METRO-E (11/4/16-12/3/16)134.23 7601110316 11/03/16 TELECOMM SVCS / METRO-E (11/3/16-12/2/16)134.23 2047049 11/09/16 02756 COX COMMUNICATIONS INC 6702102516 10/25/16 TELECOMM SVCS / METRO-E (10/24/16-11/23/16)5,096.16 5,096.16 2047050 11/09/16 00693 CSDA, SAN DIEGO CHAPTER 11172016 11/07/16 BUSINESS MEETING 30.00 30.00 2047153 11/23/16 00693 CSDA, SAN DIEGO CHAPTER 111720165 11/17/16 BUSINESS MEETING 30.00 30.00 2046969 10/26/16 11797 D & H WATER SYSTEMS INC I20160860 10/03/16 WT MOTORS 4,837.16 I20160851 09/29/16 ENCORE STROKE POSTIONER 4,502.40 I20160870 10/04/16 ENCORE 700 2,503.23 2046970 10/26/16 17611 DAVID BURNS 102416 10/24/16 CLAIM SETTLEMENT 354.35 354.35 2047083 11/16/16 17648 DAWN TRENT Ref002470368 11/10/16 UB Refund Cst #0000185811 26.69 26.69 2047009 11/02/16 09585 DC FROST ASSOCIATES INC 10406 09/23/16 LARGE DRUM SCREEN PARTS 2,094.08 2,094.08 2047051 11/09/16 05134 DYCHITAN, MARISSA 11012016MD 11/02/16 TUITION REIMBURSEMENT 167.50 167.50 2046971 10/26/16 03227 ENVIROMATRIX ANALYTICAL INC 6100484 10/04/16 LAB ANALYSIS (9/19/16-9/26/16)565.00 565.00 2047101 11/16/16 03725 ENVIRONMENTAL SYSTEMS RESEARCH 93203805 10/31/16 ESRI ANNUAL SUBS (10/12/16-10/11/17)26,000.00 26,000.00 2046972 10/26/16 14320 EUROFINS EATON ANALYTICAL INC L0288449 10/24/16 OUTSIDE LAB SERVICES (10/3/16-10/4/16)90.00 90.00 2047154 11/23/16 02753 FERGUSON ENTERPRISES INC #1083 05701891 11/10/16 METER BOX LIDS 3,342.17 3,342.17 2047102 11/16/16 03546 FERGUSON WATERWORKS # 1083 0571681 10/26/16 INVENTORY 6,670.08 0572501 10/27/16 FLANGES 1,095.12 2047052 11/09/16 03546 FERGUSON WATERWORKS # 1083 0571674 10/20/16 INVENTORY 7,668.00 7,668.00 2046973 10/26/16 03546 FERGUSON WATERWORKS # 1083 05678672 09/20/16 INVENTORY 1,789.13 05678671 09/19/16 INVENTORY 1,030.92 05678673 09/21/16 INVENTORY 253.56 2046974 10/26/16 12187 FIRST AMERICAN DATA TREE LLC 9003400916 09/30/16 ONLINE DOCUMENTS (MONTHLY)99.00 99.00 2047103 11/16/16 12187 FIRST AMERICAN DATA TREE LLC 9003401016 10/31/16 ONLINE DOCUMENTS (MONTHLY)99.00 99.00 Page 4 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 213.84 233.28 2,740.79 25,759.19 87.10 6,380.52 2047103 11/16/16 12187 FIRST AMERICAN DATA TREE LLC 9003401016 10/31/16 ONLINE DOCUMENTS (MONTHLY)99.00 99.00 2047104 11/16/16 16469 FIRST CHOICE SERVICES 069654 10/28/16 COFFEE SERVICES 151.09 151.09 2047053 11/09/16 16469 FIRST CHOICE SERVICES 069350 10/24/16 COFFEE SERVICES 729.78 729.78 2047155 11/23/16 16469 FIRST CHOICE SERVICES 071036 11/21/16 COFFEE SERVICES 716.08 716.08 2046975 10/26/16 02591 FITNESS TECH 10207 10/01/16 EQUIPMENT MAINTENANCE (OCT 2016)135.00 135.00 2047105 11/16/16 11962 FLEETWASH INC x892313 10/28/16 VEHICLE WASHING (10/28/16)123.12 123.12 2047054 11/09/16 11962 FLEETWASH INC x883035 10/14/16 VEHICLE WASHING (10/14/16)136.08 x886601 10/21/16 VEHICLE WASHING (10/21/16)77.76 2046976 10/26/16 11962 FLEETWASH INC x878131 10/07/16 VEHICLE WASHING (10/7/16)162.00 x872228 09/30/16 VEHICLE WASHING (9/30/16)71.28 2047010 11/02/16 01612 FRANCHISE TAX BOARD Ben2470282 11/03/16 BI-WEEKLY PAYROLL DEDUCTION 55.02 55.02 2047106 11/16/16 13563 FRIENDS OF THE WATER 344 10/31/16 GARDEN TOURS (OCT 2016)760.00 760.00 2047011 11/02/16 17630 GABRIELA LUTTEROTH Ref002468761 10/31/16 UB Refund Cst #0000231436 1,855.24 1,855.24 2047012 11/02/16 14073 GARCIA, LAWRENCE 101916 10/31/16 CERTIFICATION TEST 155.00 155.00 2046977 10/26/16 17566 GOOD AND ROBERTS LLC 8300101816 10/20/16 CUSTOMER REFUND 768.15 768.15 2047156 11/23/16 14948 GPS INSIGHT LLC 985539 11/01/16 GPS MONITORING 6,937.38 6,937.38 2047107 11/16/16 14981 GRANITE CONSTRUCTION COMPANY 0566110416 11/04/16 W/O REFUND D0566-090157 1,695.65 1,695.65 2047055 11/09/16 00174 HACH COMPANY 10155348 10/18/16 APA6000 MODULES 1,392.79 10155347 10/18/16 APA6000 MODULES 1,348.00 2047157 11/23/16 10973 HDR ENGINEERING INC 1200019367 11/08/16 CAPACITY FEE STUDY (9/25/16-10/29/16)6,377.50 6,377.50 2047056 11/09/16 10973 HDR ENGINEERING INC 24 09/20/16 CORROSION SERVICES (5/29/16-8/20/16)15,719.19 1200013694 10/03/16 CAPACITY FEE STUDY (8/24/16-9/24/16)10,040.00 2047084 11/16/16 17647 HECTOR RENDON Ref002470367 11/10/16 UB Refund Cst #0000142317 108.41 108.41 2046978 10/26/16 02008 HELIX ENVIRONMNTL PLANNING INC 23 10/10/16 ENVIRONMENTAL SERVICES (9/1/16-9/30/16)6,965.55 6,965.55 2046979 10/26/16 00062 HELIX WATER DISTRICT 4283101116 10/11/16 WATER USAGE (8/4/16-10/6/16)43.55 3300101116 10/11/16 WATER USAGE (8/5/16-10/6/16)43.55 2047108 11/16/16 15622 ICF JONES & STOKES INC 0118114 10/21/16 ENVIRONMENTAL SERVICES (11/27/15-12/31/15)3,866.08 3,866.08 2047158 11/23/16 15622 ICF JONES & STOKES INC 0118301 11/03/16 ENVIRONMENTAL SERVICES (8/27/16-9/30/16)5,550.00 0118303 11/03/16 ENVIRONMENTAL SERVICES (7/1/16-7/29/16)830.52 2046980 10/26/16 17084 INDUSTRIAL SAFETY SUPPLY CORP 1039419 10/10/16 SAFETY EQUIPMENT 9,212.74 9,212.74Page 5 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 13,763.63 17,454.62 64,301.00 2046980 10/26/16 17084 INDUSTRIAL SAFETY SUPPLY CORP 1039419 10/10/16 SAFETY EQUIPMENT 9,212.74 9,212.74 2047057 11/09/16 17357 INDUSTRIAL VALVE & AUTOMATION 11394 10/18/16 VALVE REPAIR 29,370.24 29,370.24 2047159 11/23/16 08969 INFOSEND INC 112898 11/02/16 BILL PRINTING SERVICES (OCT 2016)2,124.08 2,124.08 2047109 11/16/16 08969 INFOSEND INC 112700 10/31/16 BILL PRINTING SERVICES (OCT 2016)10,775.33 112699 10/31/16 BILL PRINTING SERVICES (OCT 2016)2,988.30 2046981 10/26/16 08969 INFOSEND INC 111425 09/30/16 BILL PRINTING SERVICES (SEPT 2016)12,007.13 111424 09/30/16 BILL PRINTING SERVICES (SEPT 2016)3,326.76 111741 10/03/16 BILL PRINTING SERVICES (SEPT 2016)2,120.73 2047058 11/09/16 17106 INSITE TOWERS DEVELOPMENT LLC 370030 11/01/16 ANTENNA SUBLEASE 1,593.00 1,593.00 2047059 11/09/16 11514 INTERNATIONAL RIGHT OF WAY 364117 09/26/16 MEMBERSHIP RENEWAL 245.00 245.00 2047013 11/02/16 17628 JACKIE SIMPSON Ref002468759 10/31/16 UB Refund Cst #0000222653 58.07 58.07 2047085 11/16/16 17645 JAQUELINE SMITH Ref002470365 11/10/16 UB Refund Cst #0000090959 12.11 12.11 2047014 11/02/16 17631 JENNIFER LYND 3810103116 10/31/16 CUSTOMER REFUND 22.74 22.74 2047015 11/02/16 17620 JOHN FISHER Ref002468751 10/31/16 UB Refund Cst #0000055788 160.37 160.37 2047016 11/02/16 17626 JOHN ZWICK Ref002468757 10/31/16 UB Refund Cst #0000193739 75.35 75.35 2047017 11/02/16 17621 KALA DANIEL Ref002468752 10/31/16 UB Refund Cst #0000055967 100.75 100.75 2047060 11/09/16 10089 KENNEDY, ROBERT 102716 11/04/16 TRAVEL EXPENSE REIMB (10/27/16)159.00 159.00 2047110 11/16/16 15858 KERR, MICHAEL MK111416 11/14/16 MEAL ADVANCEMENT 221.00 221.00 2047018 11/02/16 17624 KEVIN DODGE Ref002468755 10/31/16 UB Refund Cst #0000175980 86.35 86.35 2047111 11/16/16 17649 KIEWIT POWER CONSTRUCTION CO Ref002470369 11/10/16 UB Refund Cst #0000207836 1,839.55 1,839.55 2047112 11/16/16 17650 KIEWIT POWER CONSTRUCTION CO Ref002470370 11/10/16 UB Refund Cst #0000207838 1,899.55 1,899.55 2047113 11/16/16 17651 KIEWIT POWER CONSTRUCTION CO Ref002470371 11/10/16 UB Refund Cst #0000217670 1,899.55 1,899.55 2047061 11/09/16 05840 KIRK PAVING INC 6333 10/24/16 ASPHALTIC CONCRETE PAVING 5,289.40 5,289.40 2046982 10/26/16 05840 KIRK PAVING INC 6295 09/30/16 TELEGRAPH CANYON RD MAIN BREAK 47,606.00 6296 09/30/16 TELEGRAPH CANYON RD MAIN BREAK 14,931.60 6312 10/01/16 ASPHALTIC CONCRETE PAVING 1,763.40 2047160 11/23/16 05840 KIRK PAVING INC 6337 11/07/16 ASPHALTIC CONCRETE PAVING 7,745.90 7,745.90 2046983 10/26/16 14808 KOEPPEN, KEVIN 102416a 10/24/16 REIMBURSEMENT 145.06 145.06 2046984 10/26/16 15810 LANCE PICOTTE SAFETY CONSLTNG OWD100516 10/07/16 ACP TRAINING (10/5/16)1,500.00 1,500.00Page 6 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 2,136.02 673.29 2046984 10/26/16 15810 LANCE PICOTTE SAFETY CONSLTNG OWD100516 10/07/16 ACP TRAINING (10/5/16)1,500.00 1,500.00 2047114 11/16/16 15615 LAYFIELD USA CORPORATION C58741 10/31/16 STRAW WADDLES 1,509.84 C58703 10/27/16 STRAW WADDLES 626.18 2046985 10/26/16 15615 LAYFIELD USA CORPORATION E06760 09/30/16 RESERVOIR COVER MAINT (9/1/16-9/23/16)29,520.00 29,520.00 2047019 11/02/16 13749 LONDON GROUP REALTY ADVISORS 1268 10/28/16 OUTSIDE SERVICES- CONSULTANT 787.50 787.50 2047086 11/16/16 17646 MARIA FRANCO Ref002470366 11/10/16 UB Refund Cst #0000139509 84.83 84.83 2047062 11/09/16 05329 MASTER METER INC 158595 10/14/16 3/4" 3G REGISTER 7,312.69 7,312.69 2047115 11/16/16 02882 MAYER REPROGRAPHICS INC 0013995IN 11/02/16 REPROGRAPHIC SERVICES 929.89 929.89 2047161 11/23/16 02882 MAYER REPROGRAPHICS INC 0014142IN 11/10/16 REPROGRAPHIC SERVICES 1,346.36 1,346.36 2047063 11/09/16 00805 METRO WASTEWATER JPA 225 11/03/16 MEMBERSHIP RENEWAL 472.00 472.00 2047116 11/16/16 11876 MICHAEL D KEAGY REAL ESTATE 103116 10/31/16 APPRAISAL SERVICES (ENDING 10/31/16)525.00 525.00 2047087 11/16/16 17654 MICHAEL HECHT Ref002470374 11/10/16 UB Refund Cst #0000223257 41.53 41.53 2046986 10/26/16 16613 MISSION RESOURCE CONSERVATION 369 11/03/16 HOME WATER USE EVALUATION 93.75 93.75 2047064 11/09/16 16613 MISSION RESOURCE CONSERVATION 370 11/01/16 HOME WATER USE EVAL (OCT 2016)187.50 187.50 2047117 11/16/16 17652 MURFEY CONSTRUCTION INC Ref002470372 11/10/16 UB Refund Cst #0000221991 1,513.32 1,513.32 2047118 11/16/16 14901 MURPHY DEVELOPMENT CO INC 0950110416 11/04/16 W/O REFUND D0950-090243 7,720.02 7,720.02 2047020 11/02/16 16255 NATIONWIDE RETIREMENT Ben2470270 11/03/16 BI-WEEKLY DEFERRED COMP PLAN 10,028.12 10,028.12 2047119 11/16/16 16255 NATIONWIDE RETIREMENT Ben2470421 11/17/16 BI-WEEKLY DEFERRED COMP PLAN 10,028.12 10,028.12 2046987 10/26/16 02848 NEWMAN, PATRICK 102116 10/24/16 CERTIFICATION APPLICATION 140.00 140.00 2046988 10/26/16 00761 NINYO & MOORE GEOTECHNICAL AND 202020 09/30/16 GEOTECHNICAL SERVICES (7/29/16-8/26/16)916.50 916.50 2047021 11/02/16 17622 OAKBROOK RIDGE LP Ref002468753 10/31/16 UB Refund Cst #0000058177 4,623.71 4,623.71 2047120 11/16/16 04229 OTAY PROJECT LP 0261110416a 11/04/16 W/O REFUND D0261-010279 441.41 0261110416 11/04/16 W/O REFUND D0261-010272 231.88 2047065 11/09/16 01002 PACIFIC PIPELINE SUPPLY 310773 10/21/16 INVENTORY 12,091.68 12,091.68 2047088 11/16/16 17655 PATRICIA NEAVEZ Ref002470375 11/10/16 UB Refund Cst #0000225014 32.91 32.91 2047162 11/23/16 17600 PATRICIA RODRIGUEZ Ref002468609 10/17/16 UB Refund Cst #0000224046 175.30 175.30 2047022 11/02/16 00137 PETTY CASH CUSTODIAN 110116 11/01/16 PETTY CASH REIMBURSEMENT 890.88 890.88 2047023 11/02/16 17623 PLAZA DE LAS CALIFORNIA LLC Ref002468754 10/31/16 UB Refund Cst #0000172232 1,663.15 1,663.15 Page 7 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 230,437.57 2,739.04 69,288.06 2047121 11/16/16 03351 POSADA, ROD 110716111116 11/14/16 TRAVEL EXPENSE REIMB (11/07/16-11/11/16)385.91 385.91 2046989 10/26/16 16029 POTABLE DIVERS INC 101016002 10/10/16 RESERVOIR CLEANING 19,600.00 19,600.00 2047066 11/09/16 03613 PSOMAS 123196 10/19/16 DESIGN SERVICES (ENDING 9/29/16)16,611.22 16,611.22 2046990 10/26/16 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2468643 10/20/16 BI-WEEKLY PERS CONTRIBUTION 202,143.06 202,143.06 2047067 11/09/16 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2470272 11/03/16 BI-WEEKLY PERS CONTRIBUTION 200,558.00 200,558.00 2047163 11/23/16 00078 PUBLIC EMPLOYEES RET SYSTEM Ben2470423 11/17/16 BI-WEEKLY PERS CONTRIBUTION 195,889.04 195,889.04 2047024 11/02/16 17616 RAMIREZ, LARRY 101516 10/27/16 SAFETY BOOTS 150.00 150.00 2047068 11/09/16 17642 RAMIREZ, MARCO 103016 11/03/16 SAFETY BOOTS 150.00 150.00 2047089 11/16/16 17657 RAYMOND ECHOLS Ref002470377 11/10/16 UB Refund Cst #0000229868 16.91 16.91 2047025 11/02/16 17619 RENATO DE LA ROSA Ref002468750 10/31/16 UB Refund Cst #0000035836 103.98 103.98 2047122 11/16/16 08972 RICK ENGINEERING COMPANY 174923 10/26/16 TRAFFIC ENGINEERING SVCS (8/27/16-9/30/16)17,166.90 17,166.90 2047069 11/09/16 04542 ROBAK, MARK 060116110216 11/04/16 MILEAGE REIMBURSEMENT (6/1/16-11/2/16)44.28 44.28 2047164 11/23/16 17663 ROBERT P ZINK 2352112116 11/21/16 CUSTOMER REFUND 8,538.71 8,538.71 2047123 11/16/16 06412 ROMERO, TANYA 11152016TR 11/15/16 TUITION REIMBURSEMENT 3,000.00 3,000.00 2047070 11/09/16 01700 RUBALCAVA, GILBERT 11082016GR 11/08/16 TUITION REIMBURSEMENT 150.00 150.00 2046991 10/26/16 06530 SAN DIEGO COUNTRY CLUB INC 11022016 10/21/16 SPONSORSHIP 80.00 80.00 2046992 10/26/16 02586 SAN DIEGO COUNTY ASSESSOR 201600701 10/05/16 ASSESSOR DATA (9/6/16)125.00 125.00 2047165 11/23/16 02586 SAN DIEGO COUNTY ASSESSOR 201600766 11/04/16 ASSESSOR DATA (10/11/16)125.00 125.00 2047071 11/09/16 00003 SAN DIEGO COUNTY WATER AUTH 0000001475 10/20/16 MWD SCWS - HEWS 2,166.99 2,166.99 2047072 11/09/16 00121 SAN DIEGO GAS & ELECTRIC 110216 11/02/16 UTILITY EXPENSES (MONTHLY)84,549.21 102616 10/26/16 UTILITY EXPENSES (MONTHLY)76,865.92 102516 10/25/16 UTILITY EXPENSES (MONTHLY)68,039.59 102316 10/23/16 UTILITY EXPENSES (MONTHLY)775.44 103116 10/31/16 UTILITY EXPENSES (MONTHLY)207.41 2047124 11/16/16 00121 SAN DIEGO GAS & ELECTRIC 110116 11/01/16 UTILITY EXPENSES (MONTHLY)2,708.03 110216a 11/02/16 UTILITY EXPENSES (MONTHLY)31.01 2046993 10/26/16 00121 SAN DIEGO GAS & ELECTRIC 101916 10/19/16 UTILITY EXPENSES (MONTHLY)44,629.47 092216 09/22/16 UTILITY EXPENSES (MONTHLY)22,327.32 100316 10/03/16 UTILITY EXPENSES (MONTHLY)2,331.27 Page 8 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 15,840.00 48.40 2047166 11/23/16 07676 SAN MIGUEL FIRE PROTECTION SMG28946 11/02/16 BUSINESS INSPECTION 394.00 394.00 2047125 11/16/16 03514 SANTOS, MARCIANO 110216 11/10/16 SAFETY BOOTS 145.78 145.78 2047073 11/09/16 00419 SHAPE PRODUCTS 4006955 10/20/16 BUFFER 1,335.79 1,335.79 2047090 11/16/16 17658 SHAUN SHAW Ref002470378 11/10/16 UB Refund Cst #0000231850 20.00 20.00 2047167 11/23/16 15176 SOUTHCOAST HEATING &955171 11/04/16 MAXWELL AC REPLACEMENT 18,057.00 18,057.00 2047168 11/23/16 17567 SOUTHLAND PIPE CORP 85100 11/03/16 FABRICATION 4,972.40 4,972.40 2047126 11/16/16 17662 STATE OF CALIFORNIA 0676110416 11/04/16 W/O REFUND D0676-090201 10,733.24 10,733.24 2047026 11/02/16 01460 STATE WATER RESOURCES LW1007804 10/27/16 ANNUAL PERMIT FEE (7/1/2015 THRU 6/30/2016)8,102.42 8,102.42 2047127 11/16/16 15974 SUN LIFE FINANCIAL Ben2470419 11/17/16 MONTHLY CONTRIBUTION TO LTD 5,093.93 5,093.93 2046994 10/26/16 10339 SUPREME OIL COMPANY 429578 10/03/16 DIESEL FUEL 1,177.18 1,177.18 2047169 11/23/16 10339 SUPREME OIL COMPANY 430766 11/02/16 UNLEADED / DIESEL FUEL 14,489.79 14,489.79 2047027 11/02/16 16610 SVPR COMMUNICATIONS 1118 08/31/16 CONSULTANT SERVICES 2,900.00 2,900.00 2046995 10/26/16 14576 SWIATKOWSKI, KEITH KS102416 10/24/16 TUITION REIMBURSEMENT 120.00 120.00 2047128 11/16/16 17659 SYCUAN BAND OF THE KUMEYAAY 0970110416 11/04/16 W/O REFUND D0970-090265 3,565.46 3,565.46 2047129 11/16/16 03770 TEAMAN RAMIREZ & SMITH INC 77904 11/08/16 AUDIT SERVICES FY 2016 17,023.00 17,023.00 2047074 11/09/16 02376 TECHKNOWSION INC 2678 10/18/16 SCADA UPGRADES 9,000.00 2685 10/24/16 SCADA DEVELOPMENT 3,420.00 2684 10/24/16 SCADA DEVELOPMENT 3,420.00 2047130 11/16/16 17661 TELLO'S PARKING 0719110416 11/04/16 W/O REFUND D0719-060038 109.35 109.35 2047091 11/16/16 17644 TERRY HARMON Ref002470364 11/10/16 UB Refund Cst #0000001205 73.15 73.15 2047131 11/16/16 15926 TEXAS CHILD SUPPORT UNIT Ben2470431 11/17/16 BI-WEEKLY PAYROLL DEDUCTION 184.61 184.61 2047028 11/02/16 15926 TEXAS CHILD SUPPORT UNIT Ben2470284 11/03/16 BI-WEEKLY PAYROLL DEDUCTION 184.61 184.61 2047132 11/16/16 03236 THE CENTRE FOR ORGANIZATION TCFOE1504 09/28/16 SUPERVISORY TRAINING 1,550.00 1,550.00 2047075 11/09/16 03236 THE CENTRE FOR ORGANIZATION TCFOE1541 10/26/16 SUPERVISORY TRAINING 1,995.00 1,995.00 2046996 10/26/16 03071 THE SOCO GROUP INC CL83019 10/15/16 CFN FUEL CARD PURCHASES (10/3/16-10/14/16)3,237.61 3,237.61 2047029 11/02/16 14177 THOMPSON, MITCHELL 100116103116a 10/31/16 MILEAGE REIMBURSEMENT (OCT 2016)45.90 100116103116 10/31/16 EXPENSE REIMBURSEMENT (OCT 2016)2.50 2047030 11/02/16 17625 TIMOTHY BARZAL Ref002468756 10/31/16 UB Refund Cst #0000192863 90.98 90.98 Page 9 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 319.97 258.13 160,266.78 724.60 685.98 2046997 10/26/16 17000 TRANSTAR PIPELINE INC 709302016 10/10/16 RSD SEWER REHAB (ENDING 9/30/16)176,873.22 176,873.22 2046998 10/26/16 00427 UNDERGROUND SERVICE ALERT OF 920160491 10/01/16 UNDERGROUND ALERTS (MONTHLY)649.50 649.50 2047170 11/23/16 00427 UNDERGROUND SERVICE ALERT OF 1020160492 11/01/16 UNDERGROUND ALERTS (MONTHLY)745.50 745.50 2047133 11/16/16 15675 UNITED SITE SERVICES INC 1144628381 10/28/16 PORTABLE TOILET RENTALS (10/26/16-11/22/16)79.98 79.98 2047076 11/09/16 15675 UNITED SITE SERVICES INC 1144574158 10/17/16 PORTABLE TOILET RENTALS (10/14/16-11/10/16)80.03 1144574156 10/17/16 PORTABLE TOILET RENTALS (10/14/16-11/10/16)79.98 1144574155 10/17/16 PORTABLE TOILET RENTALS (10/15/16-11/11/16)79.98 1144574157 10/17/16 PORTABLE TOILET RENTALS (10/14/16-11/10/16)79.98 2046999 10/26/16 15675 UNITED SITE SERVICES INC 1144541600 10/11/16 PORTABLE TOILET RENTALS (10/6/16-11/2/16)98.17 1144541680 10/11/16 PORTABLE TOILET RENTALS (10/7/16-11/3/16)79.98 2047032 11/02/16 07674 US BANK CC20161024283 10/24/16 CAL CARD EXPENSES (MONTHLY)160,266.78 1144510384 09/29/16 PORTABLE TOILET RENTALS (9/28/16-10/25/16)79.98 2047000 10/26/16 06829 US SECURITY ASSOCIATES INC 1440274 09/30/16 PATROLLING SERVICES (SEPT 2016)614.60 1440273 09/30/16 PATROLLING SERVICES (SEPT 2016)110.00 2047077 11/09/16 06829 US SECURITY ASSOCIATES INC 1475453 10/31/16 PATROLLING SERVICES (OCT 2016)110.00 110.00 2047078 11/09/16 01878 VACLAVEK, JACOB 103016110316 11/07/16 TRAVEL EXPENSE REIMB (10/30/16-11/3/16)204.00 204.00 2047134 11/16/16 01095 VANTAGEPOINT TRANSFER AGENTS Ben2470427 11/17/16 BI-WEEKLY DEFERRED COMP PLAN 14,260.54 14,260.54 2047033 11/02/16 01095 VANTAGEPOINT TRANSFER AGENTS Ben2470276 11/03/16 BI-WEEKLY DEFERRED COMP PLAN 14,240.09 14,240.09 2047135 11/16/16 06414 VANTAGEPOINT TRANSFER AGENTS Ben2470429 11/17/16 BI-WEEKLY 401A PLAN 1,340.77 1,340.77 2047034 11/02/16 06414 VANTAGEPOINT TRANSFER AGENTS Ben2470278 11/03/16 BI-WEEKLY 401A PLAN 1,340.77 1,340.77 2047035 11/02/16 12686 VANTAGEPOINT TRANSFER AGENTS Ben2470280 11/03/16 401A TERMINAL PAY 6,450.50 6,450.50 2047001 10/26/16 15807 WATCHLIGHT CORPORATION, THE 489101 09/27/16 SECURITY & ACCESS SERVICE CALL (9/23/16)204.00 489095 09/27/16 SECURITY & ACCESS SERVICE CALL (9/26/16)136.00 489099 09/27/16 SECURITY & ACCESS SERVICE CALL (9/23/16)136.00 489098 09/27/16 SECURITY & ACCESS SERVICE CALL (9/26/16)136.00 489097 09/27/16 SECURITY & ACCESS SERVICE CALL (9/26/16)73.98 2047079 11/09/16 15807 WATCHLIGHT CORPORATION, THE 492208 10/15/16 ALARM MONITORING (NOV 2016)1,568.92 1,568.92 2047002 10/26/16 15726 WATER SYSTEMS CONSULTING INC 2220 09/30/16 HYDRAULIC MODELING (ENDING 9/30/16)7,802.50 7,802.50 2047171 11/23/16 15726 WATER SYSTEMS CONSULTING INC 2274 10/31/16 HYDRAULIC MODELING (ENDING 10/31/16)7,017.50 7,017.50 2047080 11/09/16 03781 WATTON, MARK 100116103116 11/07/16 MILEAGE REIMBURSEMENT (OCT 2016)235.44 235.44 Page 10 of 11 Check Total CHECK REGISTER Otay Water District Date Range: 10/20/2016 - 11/23/2016 Check #Date Vendor Vendor Name Invoice Inv. Date Description Amount 2047003 10/26/16 01343 WE GOT YA PEST CONTROL 108477 09/28/16 BEE REMOVAL 115.00 115.00 2047136 11/16/16 01343 WE GOT YA PEST CONTROL 109222 10/25/16 BEE REMOVAL 115.00 115.00 2047092 11/16/16 17656 WENDY GUTIERREZ Ref002470376 11/10/16 UB Refund Cst #0000225805 24.12 24.12 2047081 11/09/16 13823 WESTERN INNOVATED SERVICES 258942 10/18/16 COURSE AIR DIFFUSERS 4,698.00 4,698.00 2047137 11/16/16 13483 WHITE NELSON DIEHL EVANS LLP 111016 11/10/16 TAX SEMINAR 975.00 975.00 2047036 11/02/16 02230 WILLIAMSON, KELLI 102416102616 11/01/16 TRAVEL EXPENSE REIMB (10/24/16-10/26/16)175.88 175.88 Amount Pd Total:2,402,499.11 Check Grand Total:2,402,499.11 Page 11 of 11