Loading...
HomeMy WebLinkAbout03-05-25 Board Packet1 OTAY WATER DISTRICT AND OTAY WATER DISTRICT FINANCING AUTHORITY BOARD OF DIRECTORS MEETING 2554 SWEETWATER SPRINGS BOULEVARD SPRING VALLEY, CALIFORNIA WEDNESDAY MARCH 5, 2025 3:30 P.M. AGENDA 1. ROLL CALL a) BOARD ACTION TO APPROVE REMOTE ATTENDANCE FOR DIRECTOR GARY CROUCHER DUE TO JUST CAUSE. HE WILL REMOTELY ATTEND THE MEETING FROM 1215 FREDERICK LANE, TEMPLE, TEXAS 76502. 2. PLEDGE OF ALLEGIANCE 3. APPROVAL OF AGENDA 4. APPROVAL OF THE MINUTES OF THE REGULAR BOARD MEETING OF JANUARY 8, 2025 5. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD’S JURISDICTION INCLUDING AN ITEM ON TODAY’S AGENDA Members of the public may also submit their comments on agendized and non- agendized items via email to BoardSecretary@otaywater.gov, or may address the Board by submitting a Request to Speak Form thirty (30) minutes prior to the start of the meeting. If you submit a Request to Speak Form, call-in instructions will be sent to the email provided on the form. Your request to speak will be acknowledged during the “Public Participation” portion of the meeting when the Board will hear your comment. When called to speak, please state your Name and the City in which you reside. Please note that you will be provided three (3) minutes to speak and email comments must not take more than three (3) minutes to read. The Board is not permitted to enter into a dialogue with the speaker dur- ing this time. 2 The District’s meeting is live streamed. Information on how to watch and listen to the District’s meeting can be found at this link: https://otaywater.gov/board-of- directors/agenda-and-minutes/board-agenda/ CONSENT CALENDAR 6. ITEMS TO BE ACTED UPON WITHOUT DISCUSSION, UNLESS A REQUEST IS MADE BY A MEMBER OF THE BOARD OR THE PUBLIC TO DISCUSS A PARTICULAR ITEM: a) ADOPT RESOLUTION NO. 4552 APPROVING THE ANNEXATION OF THE PROPERTY OWNED BY JOHN AND EMILY LIEBER (APN 517-030-33-00, 2018-22 WILLOW GLEN DRIVE, EL CAJON, CA) TO THE OTAY WATER DISTRICT SEWER IMPROVEMENT DISTRICT NO. 18 (KEVIN CAMERON) b) AUTHORIZE THE GENERAL MANAGER TO NEGOTIATE AND ENTER INTO AN INITIAL TWO-YEAR AGREEMENT, WITH THE OPTION OF THREE (3) ONE-YEAR EXTENSIONS, WITH PAYMENTUS TO PROVIDE PHONE PAYMENT SERVICES IN AN AMOUNT NOT TO EXCEED $290,000 ($58,000 ANNUALLY) (CATHY BARNHILL) ACTION ITEMS 7. ADMINISTRATIVE SERVICES a) ADOPT RESOLUTION NO. 4553, THE 2024 STATE AND LOCAL CYBER- SECURITY GRANT PROGRAM (MICHAEL KERR) 8. BOARD a) ADOPT RESOLUTION NO. 4554 TO CONFIRM DIRECTORS GARY CROUCHER AND MARK ROBAK AS THE OTAY WATER DISTRICT’S REP- RESENTATIVES TO THE SAN DIEGO COUNTY WATER AUTHORITY, EACH TO VOTE IN THE ABSENCE OF THE OTHER (JOSE MARTINEZ) b) DISCUSS THE 2025 BOARD MEETING CALENDAR (TITA RAMOS-KROG- MAN) INFORMATIONAL ITEMS 9. ENTERPRISE UTILITY BILLING SYSTEM UPGRADE PROJECT (MICHAEL KERR) REPORTS 10. GENERAL MANAGER’S REPORT 3 11. SAN DIEGO COUNTY WATER AUTHORITY UPDATE 12. DIRECTORS' REPORTS/REQUESTS 13. PRESIDENT’S REPORT/REQUESTS OTAY WATER DISTRICT FINANCING AUTHORITY 14. NO MATTERS TO DISCUSS 15. ADJOURNMENT All items appearing on this agenda, whether or not expressly listed for action, may be deliberated and may be subject to action by the Board. The Agenda, and any attachments containing written information, are available at the District’s website at www.otaywater.gov. Written changes to any items to be considered at the open meeting, or to any attachments, will be posted on the District’s website. Copies of the Agenda and all attachments are also available by contacting the District Secretary at (619) 670-2253. If you have any disability which would require accommodation in order to enable you to participate in this meeting, please call the District Secretary at (619) 670-2253 at least 24 hours prior to the meeting. Certification of Posting I certify that on March 3, 2025, I posted a revised copy of the foregoing agenda near the regular meeting place of the Board of Directors of Otay Water District, said time being at least 48 hours in advance of the regular meeting of the Board of Directors (Government Code Section §54954.2). Executed at Spring Valley, California on March 3, 2025. /s/ Tita Ramos-Krogman, District Secretary 1 MINUTES OF THE BOARD OF DIRECTORS MEETINGS OF THE OTAY WATER DISTRICT AND OTAY WATER DISTRICT FINANCING AUTHORITY January 8, 2025 1.The meeting was called to order by President Lopez at 3:35 p.m. 2.ROLL CALL Directors Present:Croucher, Gonzalez, Lopez, Rivera and Robak Directors Absent:None Staff Present:General Manager Jose Martinez, General Counsel Dan Shinoff, Chief of Engineering Michael Long, Chief Financial Officer Joe Beachem, Chief of Administration Adolfo Segura, Chief of Operations Andrew Jackson, Asst. Chief of Finance Kevin Koeppen, District Secretary Tita Ramos-Krogman and others per attached list. A moment of silence was held for district staff member German Garcia, Senior Utility Worker/Operator, who passed away on December 19, 2024. General Manager Jose Martinez provided a brief history of Mr. Garcia. President Lopez noted that Director Croucher may be pulled away from the meeting to help with CalFire’s collaboration with other fire agencies throughout California who are fighting fires in Los Angeles. Director Croucher provided a history of the current conditions in Los Angeles, specifically the Palisades community. 3.PLEDGE OF ALLEGIANCE 4.PRESENTATION OF RECOGNITION PLAQUE TO BOARD PRESIDENT Treasurer Mark Robak presented a recognition plaque award to Board President Jose Lopez and thanked President Lopez for his leadership in 2024. President Lopez shared his gratitude to board members and all district staff. 5.OATH OF OFFICE District Secretary Tita Ramos-Krogman administered the oath of office to re-elected directors Jose Lopez and Mark Robak. 6.ELECTION OF BOARD PRESIDENT AGENDA ITEM 4 2 General Manager Jose Martinez chaired the meeting during the elections of board president, vice president and treasurer of the Otay Water District. A motion was made by Director Robak, seconded by Director Croucher, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to re-elect Director Jose Lopez as President of the board. 7. ELECTION OF BOARD VICE PRESIDENT A motion was made by Director Robak, seconded by Director Croucher, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to elect Director Gary Croucher as Vice President of the board. 8. ELECTION OF BOARD TREASURER A motion was made by Director Robak, seconded by Director Croucher, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to elect Director Francisco X. Rivera as Treasurer of the board. 9. APPROVAL OF THE AGENDA A motion was made by Director Croucher, seconded by Director Rivera, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to approve the agenda and consider Agenda Item 19a (Authorize the General Manager to Enter Into a One-Year Agreement from February 1, 2025, through January 3 31, 2026, with Sun Life Financial for Life, Accidental Death and Dismemberment, and Short/Long-Term Disability Insurance) as a consent item. 10. WATER CONSERVATION GARDEN UPDATE Ms. Lauren Magnuson, Executive Director for the Water Conservation Garden (WCG), provided a history and update of the WCG. She introduced Ms. Yaily Gonzalez, WCG Community Coordinator. Ms. Magnuson read a letter from a teacher who expressed her gratitude to the WCG and hopes that the WCG School Tour Program will return in the future. Ms. Magnuson thanked the Otay Water District (OWD) for their support over the years. Director Croucher shared his gratitude for Ms. Magnuson and the volunteers of the WCG. He requested that Ms. Magnuson provide OWD with the letters that WCG received. In response to several questions from Directors Gonzalez and Robak, Ms. Magnuson stated that the WCG School Tour Program is on hold. She provided a history of the program and details of how much funds are needed to support the program. She also discussed the status of Ms. Smarty Plants and responded to additional questions from the board. 11. APPROVAL OF THE MINUTES OF THE REGULAR MEETINGS OF NOVEMBER 6, 2024, AND SPECIAL BOARD MEETING OF DECEMBER 6, 2024 A motion was made by Director Rivera, seconded by Director Lopez and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to approve the minutes of the regular meeting of November 6, 2024, and special board meeting of December 6, 2024. 12. PUBLIC PARTICIPATION – OPPORTUNITY FOR MEMBERS OF THE PUBLIC TO SPEAK TO THE BOARD ON ANY SUBJECT MATTER WITHIN THE BOARD’S JURISDICTION BUT NOT AN ITEM ON TODAY’S AGENDA No one wished to be heard. 13. RECESS OTAY WATER DISTRICT BOARD MEETING AND CONVENE THE OTAY WATER DISTRICT FINANCING AUTHORITY BOARD MEETING At the request of President Lopez, General Counsel Dan Shinoff provided details of the purpose of the Otay Water District Financing Authority. 4 President Lopez recessed the Otay Water District Board Meeting at 4:25 p.m. and convened the Otay Water District Financing Authority board meeting. 14. ROLL CALL Directors Present: Croucher, Gonzalez, Lopez, Rivera and Robak. 15. RE-AFFIRM OFFICERS OF THE OTAY WATER DISTRICT FINANCING AUTHORITY A motion was made by Director Robak, seconded by Director Rivera and carried with the following vote: Ayes: Directors Croucher, Gonzelez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to elect Director Lopez as President, Director Croucher as Vice President, General Manager Martinez as Executive Director, Director Rivera as Treasurer/Auditor, and District Secretary Ramos-Krogman as Secretary to the Otay Water District Financing Authority. After Closed Session, the board voted 4-0 to re-affirm the district’s Chief Financial Officer, Joe Beachem, as Treasurer/Auditor as required by the By Laws of the Otay Water District Financing Authority. 16. ADJOURN OTAY WATER DISTRICT FINANCING AUTHORITY BOARD MEETING AND RECONVENE THE OTAY WATER DISTRICT BOARD MEETING President Lopez adjourned the Otay Water District Financing Authority board meeting at 4:26 p.m. and reconvened the Otay Water District board meeting. ACTION ITEMS 17. FINANCE a) AUTHORIZE THE GENERAL MANAGER TO APPROVE TO AMEND THE FOLLOWING CIP BUDGETS: INCREASE CIP P2662 BY $3,895,000; DECREASE CIP P2682 BY $480,000; INCREASE CIP R2152 BY $255,000; AND TO NEGOTIATE AND ENTER INTO AN AGREEMENT WITH BADGER METER, INC. FOR THE PURCHASE AND INSTALLATION OF WATER METERS AND ENDPOINTS IN AN AMOUNT NOT-TO-EXCEED $31,117,104, AND THE ADOPTION OF AN ENTERPRISE SOFTWARE AS A SERVICE (SaaS) AGREEMENT FOR A CLOUD-BASED AUTOMATED METERING INFRASTRUCTURE (AMI) INTERFACE IN AN AMOUNT NOT-TO-EXCEED $1,000,000 OVER A SIX-YEAR PERIOD Customer Service Manager Andrea Carey provided a PowerPoint Presentation to the board and responded to their questions and comments. 5 Director Croucher requested that staff provide more background details of Professional Meters, Inc. He also requested that representatives from Badger Meters, Inc. and Professional Meters, Inc. attend a future meeting to provide information about their companies and products, as well as their customer service interactions. Chief Financial Officer Joe Beachem and Ms. Carey responded to additional questions from Director Croucher and noted that the district received grants for this project that will help fund the AMI Upgrade Project. At the request of Director Croucher, Ms. Carey will reach out to Badger Meters, Inc. to inquire about the safety and reliability of the cybersecurity aspect of the project. She responded to additional questions from the board. . A motion was made by Director Robak, seconded by Director Rivera and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to approve staff’s recommendations. 18. ADMINISTRATION a) AUTHORIZE THE GENERAL MANAGER TO ENTER INTO A ONE-YEAR AGREEMENT FROM FEBRUARY 1, 2025, THROUGH JANUARY 31, 2026, WITH SUN LIFE FINANCIAL FOR LIFE, ACCIDENTAL DEATH AND DISMEMBERMENT, AND SHORT/LONG TERM DISABILITY INSURANCE During the consideration of Agenda Item 8, Approval of the Agenda, it was noted that this agenda item was supposed to be a consent item. Therefore, the following action took place: A motion was made by Director Croucher, seconded by Director Rivera, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to approve the agenda and consider Agenda Item 19a (Authorize the General Manager to Enter Into a One-Year Agreement from February 1, 2025, through January 31, 2026, with Sun Life Financial for Life, Accidental Death and Dismemberment, and Short/Long-Term Disability Insurance) as a consent item. 6 19. BOARD a) ADOPT RESOLUTION 4451 OF THE BOARD OF DIRECTORS OF OTAY WATER DISTRICT APPOINTING MARK ROBAK AS THE REPRESENTATIVE TO THE BOARD OF DIRECTORS OF THE SAN DIEGO COUNTY WATER AUTHORITY (SECOND SEAT) AS A RESULT OF THE RESIGNATION OF MR. TIM SMITH FROM THE BOARD A motion was made by Director Croucher, seconded by President Lopez, and carried with the following vote: Ayes: Directors Croucher, Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to appoint Mark Robak as the representative to the Board of Directors of the San Diego County Water Authority (Second Seat). After one year, consider re-appointing Director Robak or appoint another director from the board to the San Diego County Water Authority (Second Seat). b) DISCUSS THE 2025 BOARD MEETING CALENDAR District Secretary Tita Ramos-Krogman noted that the February 2025 Finance and Administration Committee meeting is cancelled and that the Engineering, Operations, and Water Resources Committee meeting will be held on January 21, Tuesday, at 12pm. President Lopez requested that a half-day board workshop be held in February or March 2025. There were no other changes made to the board meeting calendars. INFORMATIONAL ITEM 20. ITEMS ARE PROVIDED TO THE BOARD FOR INFORMATIONAL PURPOSES ONLY. NO ACTION IS REQUIRED ON THE FOLLOWING AGENDA ITEMS a) FIRST QUARTER FISCAL YEAR 2025 CAPITAL IMPROVEMENT PROGRAM REPORT The board waived presentation of this informational item. REPORTS 21. GENERAL MANAGER REPORT Mr. Martinez discussed Zero Emission Vehicles and Charging Infrastructure, the City of San Diego’s requested flows during San Diego County Water Authority’s 10-day raw 7 water shutdown, an update of the district’s response to the United States Environmental Protection Agency’s notice with regards to the district’s chlorine program, and a heartfelt gratitude to a district staff member (Pump Mechanic I) who stopped and intervened to protect a woman and her dogs from being attacked from larger dogs. Mr. Martinez also shared that the district received the ACWA JPIA President’s Special Recognition Award for its efforts to minimize claims. 22. SAN DIEGO COUNTY WATER AUTHORITY UPDATE There were no updates to be provided. 23. DIRECTORS' REPORTS/REQUESTS Written reports from Directors Croucher, Gonzalez, Rivera and Robak were submitted to District Secretary Ramos-Krogman, which will be attached to the minutes for today’s meeting. 24. PRESIDENT’S REPORT A written report from President Lopez was submitted to District Secretary Ramos- Krogman and will be attached to the minutes for today’s meeting. 25. CLOSED SESSION The board recessed to closed session at 6:14 p.m. to discuss the following matter: a. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to California Government Code §54956.8 Property: SALT CREEK GOLF COURSE 525 HUNTE PARWAY CHULAVISTA, CA 91914 Agency negotiator: General Counsel Under negotiation: Disposition of Property Director Croucher left the meeting at 6:14 p.m. RETURN TO OPEN SESSION 26. REPORT ON ANY ACTIONS TAKEN IN CLOSED SESSION. THE BOARD MAY ALSO TAKE ACTION ON ANY ITEMS POSTED IN CLOSED SESSION. The board reconvened from closed session at 7:07 p.m. and General Counsel Dan Shinoff reported that there was no reportable action from closed session. General Counsel Shinoff recommended that the board reconsider Agenda Item 15 (Re-Affirm Officers of the Otay Water District Financing Authority) to re-affirm Otay 8 Water District’s Chief Financial Officer, Joe Beachem, as Treasurer/Auditor to the Otay Water District Finance Authority (OWDFA) and remove Director Rivera as OWDFA Treasurer/Auditor. A motion was made by Director Robak, seconded by Director Gonzalez, and carried with the following vote: Ayes: Directors Gonzalez, Lopez, Rivera and Robak Noes: None Abstain: None Absent: None to approve General Counsel Dan Shinoff’s recommendation. OTAY WATER DISTRICT FINANCING AUTHORITY 27. NO MATTERS TO DISCUSS There were no items scheduled for discussion for the Otay Water District Financing Authority board. 28. ADJOURNMENT With no further business to come before the Board, President Lopez adjourned the meeting at 7:08 p.m. President ATTEST: District Secretary Mark Robak From:12/1/2024 12/31/2024 ITEM DATE MEETING PURPOSE / ISSUES MILEAGE HOME TO OWD OWD TO HOME MILEAGE OTHER LOCATIONS 1 12/2/2024 ACWA Conference Fall Conference 2 12/3/2024 ACWA Conference Fall Conference 3 12/4/2024 ACWA Conference Fall Conference 4 12/5/2024 ACWA Conference Fall Conference 5 12/7/2024 Otay Water District Special Board Meeting 6 12/8/2024 Otay Water District Holiday Party - NO CHARGE 7 12/10/2024 San Diego LAFCO Special Districts Advisory Board - Ad Hoc Committee Rule Review - NO CHARGE 8 12/11/2024 Otay Water District Finance & Administration Committee 9 12/13/2024 East County Chamber of Commerce Board Meeting and retreat 10 12/18/2024 East County EDC Monthly Board Meeting 11 12/20/2024 San Diego LAFCO Special Districts Advisory Board 12 12/31/2024 Otay Water District Salt Creek Ad-Hoc Committee Pay To:Period Covered Employee Number OTAY WATER DISTRICT BOARD OF DIRECTORS PER-DIEM AND MILEAGE CLAIM FORM STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 5, 2025 SUBMITTED BY: Kevin Cameron Engineering Manager PROJECT NO: FILE NO: D1216-090686 ANX-24-002 DIV. NO. 5 APPROVED BY: Michael Long, Chief, Engineering Jose Martinez, General Manager SUBJECT: Adopt Resolution No. 4552 Approving the Sewer Annexation of Property Owned by John and Emily Lieber (APN 517-030-33-00 – 2018-22 Willow Glen Drive, El Cajon, CA) to the Otay Water District Sewer Improvement District No. 18 GENERAL MANAGER’S RECOMMENDATION: Adopt Resolution No. 4552 approving the annexation of the property owned by John and Emily Lieber (APN 517-030-33-00 – 2018-22 Willow Glen Drive, El Cajon, CA) to the Otay Water District Sewer Improvement District (ID) No. 18 (see Exhibit C for Location Map). COMMITTEE ACTION: Please see Attachment A. PURPOSE: The proposed annexation is to provide sewer service to the parcel located on 2018-22 Willow Glen Drive, El Cajon, in an unincorporated area of the County of San Diego, California 92019 (APN 517-030-33-00). AGENDA ITEM 6a 2 ANALYSIS: A written request and Petition signed by the licensed surveyor, Lawrence W. Walsh, has been received for annexation of APN 517- 030-33-00, located on 2018-22 Willow Glen Drive, in the City of El Cajon and County of San Diego, for sewer service. The total acreage to be annexed is 1.81 acres. The property is within the jurisdictional boundary of the Otay Water District (“District”) and following the Board’s approval, it will become part of Sewer ID No. 18. The parcel is located adjacent to an existing 15-inch Otay Water District sewer main on Willow Glen Drive. The parcel is already contained within the District’s water ID boundary. This parcel is part of the District’s Wastewater Master Plan. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The property owner has paid the District’s annexation processing fee of $1,031.17, sewer annexation fee for one (1) sewer EDU (current fee is $1,471.28 per EDU), and will pay sewer capacity fees upon annexation approval for parcels located outside the sewer ID (current fee is $10,759.61 per EDU) in effect at the time the service is provided, and any additional fees, including the availability fee, as established in the attached Resolution (Attachment B). STRATEGIC GOAL: Provide enhanced sewer service to meet customer needs. LEGAL IMPACT: No legal impact. KC/ML:jf Attachments: Attachment A - Committee Action Attachment B - Resolution No. 4552 Exhibit A - Legal Description Exhibit B - Legal Map Exhibit C – Location Map ATTACHMENT A SUBJECT/PROJECT: D1216-090686 ANX-24-002 Adopt Resolution No. 4552 Approving the Sewer Annexation of Property Owned by John and Emily Lieber (APN 517-030-33-00 – 2018-22 Willow Glen Dr., El Cajon, CA) to the Otay Water District Sewer Improvement District No. 18 COMMITTEE ACTION: The Finance and Administration Committee (Committee) reviewed this item at a meeting held on February 19, 2025, and the following comments were made: • Staff provided the staff report to the Committee and noted that the parcel is within the district’s jurisdictional boundary of the Otay Water District. • The Committee inquired if there is a savings opportunity for property owners if they chose to annex to Sewer ID No. 18 at the same time as Mr. and Mrs. Lieber. Staff stated in looking at all the parcels in Exhibit C of the staff report, it does not look like there would be potential savings if they all annexed together given the location of the properties and sewer line. • In response to a question from the Committee, staff stated that the Local Agency Formation Commission (LAFCO) is not involved with this annexation as the property and Sewer ID No. 18 are both within the Otay Water District’s jurisdictional boundaries. • The Committee asked which parcels on Exhibit C have been annexed into Sewer ID 18. After the committee meeting, staff researched the Committee’s inquiry and clarified that parcels that are highlighted in light grey have been annexed into Sewer ID No. 18 and oparcels that are not highlighted in grey are not annexed into Sewer ID No. 18. Following the discussion, the Committee supported staff’s recommendation and presentation to the full board as a consent item. ATTACHMENT B Page 1 of 4 RESOLUTION NO. 4552 A RESOLUTION OF THE BOARD OF DIRECTORS OF OTAY WATER DISTRICT APPROVING THE ANNEXATION TO THE OTAY WATER DISTRICT IMPROVEMENT DISTRICT NO. 18 OF THOSE LANDS DESCRIBED AS “JOHN & EMILY LIEBER SEWER ANNEXATION (APN: 517-030-33-00)” (FILE NO. ANX-24- 002/DIVISION 5) WHEREAS, a letter has been submitted by LAWRENCE W. WALSH, the Licensed Surveyor, representing the owner and party (John & Emily Lieber) that has an interest in the land described in Exhibit "A," attached hereto, for annexation of said land to the Otay Water District Sewer Improvement District (ID) No. 18 pursuant to California Water Code Section 72670 et seq., and WHEREAS, pursuant to Section 72680.1 of said Water Code, the Board of Directors may proceed and act thereon without notice and hearing. NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE OTAY WATER DISTRICT FINDS, RESOLVES, ORDERS, AND DETERMINES as follows: 1. A depiction of the area proposed to be annexed and the boundaries of ID 18 following the annexation is set forth on a map in Exhibit “B” filed with the Secretary of the District, which map shall govern for all details as to the area proposed to be annexed. 2. The purpose of the proposed annexation is to make sewer service available to the area to be annexed, which availability constitutes a benefit to said area. 3. The Board finds and determines that the area proposed to be annexed to ID 18 will be benefited by such annexation and that the property currently within ID 18 will also be benefited ATTACHMENT B Page 2 of 4 and not injured by such annexation because after the annexation a larger tax base will be available to finance the sewer facilities and improvements of ID 18. 4. The Board of Directors hereby declares that the annexation of said property is subject to the owners complying with the following terms and conditions: (a) The petitioner for said annexation shall pay to Otay Water District the following: (1) The annexation processing fee at the time of application; (2) State Board of Equalization filing fees in the amount of $3,500, if applicable; (3) The sewer annexation fees at the time of connection to the Otay Water District water system; (4) Yearly assessment fees will be collected through the County Tax Assessor’s office in the amount of $10 for APN 517-030-33-00; (5) In the event that sewer service is to be provided, Petitioners shall pay all applicable sewer fees per Equipment Dwelling Unit (EDU) at the time the sewer connection is purchased; and (6) Payment by the owner of APN 517-030-33-00 of all other applicable local or state agency fees or charges. ATTACHMENT B Page 3 of 4 (b) The property to be annexed shall be subject to taxation after annexation thereof for the purposes of the improvement district, including the payment of principal and interest on bonds and other obligations of the improvement district, authorized and outstanding at the time of annexation, the same as if the annexed property had always been a part of the improvement district. 5. The Board hereby declares that the property described in Exhibit "A" shall be considered annexed to ID 18 upon passage of this resolution. 6. The Board of Directors further finds and determines that there are no exchanges of property tax revenues to be made pursuant to California Revenue and Taxation Code Section 95 et seq. as a result of such annexation. 7. The annexation of APN 517-030-33-00 to the District’s Sewer Improvement District 18 is hereby designated as the “JOHN & EMILY LIEBER SEWER ANNEXATION (APN: 517-030-33-00).” 8. Pursuant to Section 57202(a) of the Government Code, the effective date of the JOHN & EMILY LIEBER SEWER ANNEXATION (APN: 517-030-33-00) shall be the date this Resolution is adopted by the Board of Directors of the Otay Water District. 9. The General Manager of the District and the Secretary of the District, or their respective designees, are hereby ordered to take all actions required to complete this annexation. ATTACHMENT B Page 4 of 4 PASSED, APPROVED, AND ADOPTED by the Board of Directors of the Otay Water District at a regular meeting held this 5th day of March, 2025. President ATTEST: __________________________________ District Secretary EXHIBIT A G L E N W I L L O W N 89°12'00" E 333.56' N 00°1 0 ' 2 0 " E 86.00' 161.56' N 89°12'00" E R=1,5 3 0 . 0 0 ' Δ=10° 0 0 ' 0 0 " L=26 7 . 0 4 ' N 0 0 ° 1 1 ' 5 0 " E 3 1 2 . 5 5 ' 171.5 5 ' N 60° 2 0 ' 3 0 " E C L N 70°2 0 ' 3 0 " E 110.90 ' D R I V E 81'30' 51' R/W PORTION OF PARCEL 1, PM 8517 PARC E L 2 , PM 85 1 7 PARCEL 1, PM 8378 PARCEL 2, PM 8378 R/W R/W PA R C E L 3 , P M 8 3 7 8 POB CENTER OF SEC. 21 N 89°12'00" E 667.12' TPOB 0 SCALE: 1"= 160'80'40'80' 80'WALSH ENGINEERING & SURVEYING, INC. 607 ALDWYCH ROAD EL CAJON, CA 92020 (619) 588-6747 ASSESSOR'S PARCEL MAP:LAFCO RESOLUTION NO.ACREAGE:DATE: 1"=80' SCALE:0 SCALE: 1"= 160'80'40'80' 80'WALSH ENGINEERING & SURVEYING, INC. 607 ALDWYCH ROAD EL CAJON, CA 92020 (619) 588-6747 ASSESSOR'S PARCEL MAP:LAFCO RESOLUTION NO.ACREAGE:DATE:SCALE: 517-030-33 1.81 AC 11/05/2024XX XX-XX NO SCALE VICINITY MAP OTAY WATER DISTRICT 2554 SWEETWATER SPRINGS BLVD. SPRING VALLEY, CALIFORNIA 91978 LEGEND: DISCLAIMER: CHASE A V E I D A L E SLLH DR WILLO W GLEN D R SITE 8 R/W POB TPOB JA M A C H A R D 54 EXHIBIT B OTAY WATER DISTRICTANNEXATION OF APN 517-030-33-00TO THE OTAY WATER DISTRICT AND TOSEWER IMPROVEMENT DISTRICT 18 EXHIBIT CC:\OneDrive\Otay Water District\ENG PUBLIC SERVICES - Documents\SAMP WSA ANX\D1216-090686 Sewer Annex 2018-22 Willow Glen Dr_APN 517-030-33-00\Archive\Exhibit C-Sewer Annexation-ANX-24-002-Willow Glen Dr-517-030-33.mxd APN 517-111-53-00 ANX-24-002 VISTA VEREDA CT VISTA GRANDE RD !( !( !( !( 5170311400 5170303900 5170310700 ROW 5170311100 51703113005170311200 5170500300 5170304300 5170411700 5170302800 5170303300 5170304500 5170302900 5170304000 5170304100 5170304200 5170303800 5170411600 5170304400 5170310800 5170300800 §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ §¨¦ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ ÃÅ VICINITY MAP PROJECT SITE DIV 5 DIV 1 DIV 2 DIV 4 DIV 3 !\ 5 8 805 805 11 9454 94 125 125 905 125 905 125 NTSF 2018-22 Willow Glen DriveEl Cajon, 92019APN 517-030-33-00 15" PVCSewer Main W I L L O W G L E N D R SINGING CANYON DR CAMPBELL LN STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 5, 2025 SUBMITTED BY: Cathy Barnhill Customer Service Supervisor PROJECT: DIV. NO. All APPROVED BY: Andrea Carey, Customer Service Manager Joseph R. Beachem, Chief Financial Officer Jose Martinez, General Manager SUBJECT: Authorize the General Manager to Negotiate and Enter Into an Agreement with Paymentus for Phone Payment Services GENERAL MANAGER’S RECOMMENDATION: That the Board authorizes the General Manager to negotiate and enter into an initial two-year agreement, with the option of three (3) one- year extensions, with Paymentus to provide phone payment services in an amount not to exceed $290,000 ($58,000 annually). COMMITTEE ACTION: See Attachment A. PURPOSE: Authorize the General Manager to negotiate and enter into an initial two-year agreement, with the option of three (3) one-year extensions, with Paymentus to provide phone payment services in an amount not to exceed $290,000 ($58,000 annually). ANALYSIS: The District accepts approximately 2,750 payments per month through the automated phone system. The contract for the District’s current vendor, Paymentus, will expire in March 2025. In preparation, staff issued a Request for Proposal(RFP) via the District’s online solicitation portal, PlanetBids. Four responses were received, and AGENDA ITEM 6b three were evaluated based on background and experience, ability to perform the required services, implementation, training and support, and estimated monthly cost. The ratings for all criteria, excluding cost, are below: Vendor Overall Service Rating (70 pts Max) Paymentus 68.17 Catalis Payments, LLC 63.33 Infosend, Inc. 50.33 One vendor’s submission was considered non-responsive and was removed from the evaluation process. To ensure an equitable evaluation, staff based the monthly cost analysis on current payment volumes and averages. Below is the projected average monthly cost of each vendor, from lowest to highest, based on RFP submissions: Vendor Monthly Cost Paymentus $4,463.00 Infosend, Inc. $6,284.25 Catalis Payments, LLC $8,869.00 Paymentus received the highest overall service rating and was the most cost-effective. Paymentus has agreed to keep pricing fixed for the duration of the contract, which consists of the initial two-year period and the three (3) optional one-year extensions. District staff who work closely with Paymentus report excellent service, and no negative feedback has been received from District customers utilizing the phone payment service. Furthermore, Paymentus currently manages payment processing for over 200 companies in California, including Sweetwater Authority, which also reports excellent service and expressed satisfaction with the service. FISCAL IMPACT: Joe Beachem, Chief Financial Officer The annual cost for Paymentus services is projected to be approximately $54,000 for fiscal year 2025. Based on historical figures, staff anticipates an increase in phone payment volume and credit card usage, which will increase the overall charges compared to current levels. Based on anticipated increases in future phone payment and credit card usage, staff projects an annual cost of approximately $58,000. STRATEGIC GOAL: Evaluate the most cost-effective and efficient processes and tools to communicate service related issues to customers. LEGAL IMPACT: None. Attachments: A) Committee Action ATTACHMENT A SUBJECT/PROJECT: Authorize the General Manager to Negotiate and Enter Into an Agreement with Paymentus for Phone Payment Services COMMITTEE ACTION: The Finance and Administration Committee (Committee) reviewed this item at a meeting held on February 19, 2025, and the following comments were made: • Staff provided the staff report to the Committee and recommended that the board authorize the General Manager to negotiate and enter into an initial two-year agreement, with the option of three (3) one-year extensions, with Paymentus to provide phone payment services in an amount not to exceed $290,000 ($58,000 annually). • In response to a question from the Committee, staff stated that the agreement with Paymentus could be up to five (5) years as the initial agreement is for two (2) years with the option to enter into three (3) one-year extensions. If the district is not satisfied with Paymentus’ services after the initial two-year agreement has expired, the district has the option to opt out of the agreement and issue a Request for Proposal to seek other vendors who can provide phone payment services. • The Committee shared their feedback on the district’s phone payment services and inquired if the district has received any feedback from customers about the system. Staff stated that a Customer Service Survey was conducted in the past and the overall satisfaction rate of customers was positive. Customers have the option to use the district’s phone system or reach a district staff member who can help assist them with any issues. The phone system also allows customers to leave any feedback through voicemail. • The Committee inquired about the cost of each transaction through the phone payment system. Staff stated each payment transaction is approximately $1.65. • The Committee requested that staff provide steps on how to navigate through the phone payment system, and any other automated system, at the next Finance and Administration Committee meeting. Following the discussion, the Committee supported staff’s recommendation and presentation to the full board as a consent item. No. 4553 AGENDA ITEM 7a 1 RESOLUTION 4554 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE OTAY WATER DISTRICT CONFIRMING GARY CROUCHER AND MARK ROBAK AS THE OTAY WATER DISTRICT’S REPRESENTATIVES TO THE SAN DIEGO COUNTY WATER AUTHORITY, EACH TO VOTE IN THE ABSENCE OF THE OTHER WHEREAS, Section 45-6(g) of the San Diego County Water Au- thority (Chapter 545 of the Statutes of 1943, Chapter 45 Water Code-Appendix) was amended to provide that a member agency’s representative to the San Diego County Water Authority may des- ignate another member of the board of directors of the San Diego County Water Authority to vote in the absence of such repre- sentative, provided the designee is confirmed by the governing body of the member agency; and, provided a written notice is filed with the San Diego County Water Authority prior to the meeting at which the representative is absent; and WHEREAS, the Otay Water District desires to designate Gary Croucher and Mark Robak as the Otay Water District representa- tives to the San Diego County Water Authority, to cast votes on behalf of each other when one or the other is absent from a meeting. NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED by the Board of Directors of the Otay Water District as follows: SECTION 1. That the duly appointed representatives of the Otay Water District are hereby confirmed and authorized to vote AGENDA ITEM 8a 2 as proxy for each other when one or the other is absent from a meeting of the San Diego County Water Authority. SECTION 2. If either of the representatives wishes to cast his vote by proxy, a written notice thereof shall be sent to the clerk of the board of the San Diego County Water Authority prior to the meeting at which the director will be absent SECTION 3. Otay Water District Board Secretary Tita Ramos- Krogman is directed to file a certified copy of this resolution with the clerk of the board of the San Diego County Water Au- thority. PASSED, ADOPTED AND APPROVED by the Otay Water District Board of Directors at a regular meeting held this 5th day of March, 2025. AYES: NOES: ABSENT: ABSTAIN: ___________________________ President ATTEST: ________________________ District Secretary 3 Certification I, Tita Ramos-Krogman, Board Secretary of the Otay Water District, hereby certify the foregoing to be true and exact copy of Resolution 4554 adopted by the board of director of Otay Wa- ter District on March 5, 2025. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of said Water District this _________________________, 2025. ___________________________________ Tita Ramos-Krogman Board Secretary STAFF REPORT TYPE MEETING: Regular Board Meeting MEETING DATE: March 5, 2025 SUBMITTED BY: Tita Ramos-Krogman, District Secretary W.O./G.F. NO: DIV. NO. APPROVED BY: Tita Ramos-Krogman, District Secretary Jose Martinez, General Manager SUBJECT: Board of Directors 2025 Calendar of Meetings GENERAL MANAGER’S RECOMMENDATION: At the request of the Board, the attached Board of Director’s meeting calendar for 2025 is being presented for discussion. PURPOSE: This staff report is being presented to provide the Board the opportunity to review the 2025 Board of Director’s meeting calendar and amend the schedule as needed. COMMITTEE ACTION: N/A ANALYSIS: The Board requested that this item be presented at each meeting so they may have an opportunity to review the Board meeting calendar schedule and amend it as needed. STRATEGIC GOAL: N/A FISCAL IMPACT: None. LEGAL IMPACT: None. Attachment: Calendar of Meetings for 2025 AGENDA ITEM 8b Board of Directors, Workshops and Committee Meetings 2025 Regular Board Meetings: Special Board or Committee Meetings (3rd Wednesday of Each Month or as Noted) January 8, 2025 February 5, 2025 March 5, 2025 April 2, 2025 May 7, 2025 June 4, 2025 July 2, 2025 August 6, 2025 September 3, 2025 October 1, 2025 November 5, 2025 December 3, 2025 January 15, 2025 February 19, 2025 March 19, 2025 April 16, 2025 May 21, 2025 June 18, 2025 July 16, 2025 August 20, 2025 September 17, 2025 October 15, 2025 November 19, 2025 December 17, 2025 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: March 5, 2025 PROJECT: Various DIV. NO. ALL SUBMITTED BY: Michael Kerr, Information Technology Manager APPROVED BY: Adolfo Segura, Chief of Administrative Services Jose Martinez, General Manager SUBJECT: ENTERPRISE UTILITY BILLING SYSTEM UPGRADE PROJECT GENERAL MANAGER'S RECOMMENDATION: No recommendation. This is an informational item only. COMMITTEE ACTION: Please see "Attachment A". PURPOSE: To provide an update on the progress of the District's Utility Billing (UB) system upgrade. ANALYSIS: On September 6, 2023, the District awarded Tyler Technologies (Tyler) the contract to procure, implement, and host new Enterprise Resource Planning (ERP) software. The project emerged as a critical need to replace the District's aging 20-year-old system, which had reached its end-of- life and would no longer be supported due to the vendor’s decision to discontinue product support. These functions include Accounting, General Ledger, Budgeting, Human Capital Management, and Customer Information/Utility Billing processing. During that meeting, staff highlighted specific challenges related to the Munis UB module and discussed the potential need for an external UB solution due to identified limitations. Following a comprehensive assessment, staff confirmed that the Munis UB module exhibits AGENDA ITEM 9 functionality gaps that limit its effectiveness in fulfilling the District's customer billing needs. The Munis UB module does not support the District's intricate rate structures, essential for ensuring accurate and flexible billing. The District's rate calculations are customized to meet various service needs and usage levels, but the lack of adaptability in Munis UB makes it challenging to implement these structures effectively. The current utility rate structure in Munis UB would require significant customization to meet the District's specific rate requirements, meaning the District would have to rely on the vendor for any future or substantial rate changes. This inefficiency is a significant issue that cannot be overlooked, as it would impact the District's ability to maintain efficient billing operations for our customers. Furthermore, there is significant concern regarding the inefficiency of the Munis UB system in executing billing cycles. Research and feedback from other agencies have shown that the system often struggles to complete billing processes, sometimes taking an entire day, which is unmanageable for the District given its size and volume. Additionally, the Munis UB module lacks essential self-service options, which are increasingly important to meet modern customer expectations. Customers currently cannot independently access data such as daily water usage or account history, limiting their ability to manage their accounts effectively. The Munis UB module also has limitations in internal reporting, which is essential for informed decision-making and efficient billing management. Moreover, its lack of full compatibility with the District’s reporting tools limits staff's ability to analyze and manage billing data effectively. Staff have concluded that, in its current state, the Munis UB module does not fully align with the District's operational needs and expectations. Staff have identified two potential pathways to address the District’s billing needs: integrating a third-party solution designed to support our intricate billing structures, in-depth billing cycles, and customer self-service requirements or implementing custom enhancements within the Munis UB module to address the identified functionality gaps. Third-Party Solution Pursuing a third-party UB solution would enable the District to address all areas where the Munis UB module falls short. Over the past year and a half, staff have researched other billing systems throughout the public sector landscape that may better align with the District's requirements. In preparation for a UB system replacement, staff also conducted a Request for Information (RFI) to gather additional and detailed responses from UB vendors. This process provided valuable insights into the capabilities of each vendor's solutions with our specific needs, including core billing functions and advanced features that can accommodate our growing demand for customer self-service, detailed water usage tracking, and flexible rate configurations. The RFI responses have been instrumental in helping staff clarify functional requirements and assess each vendor's ability to meet the District's long-term goals. Custom Enhancements to Munis UB In parallel, staff continued discussing and evaluating the new Munis UB Module as presented to the Board at the September 2023 meeting. Based on these discussions and evaluations, staff are unconvinced that the new Munis UB Module meets the District’s needs. Given the current billing rate structures, it became clear that many of the District's unique billing requirements could only be achieved through extensive custom development. Tyler indicated that most desired functionalities, such as custom rate structures and enhanced customer access features, and improvements to detailed billing processing would require significant customization, leading to substantial project costs. This approach would also increase operational complexity, as maintaining these customizations would require dedicated resources. With essential support staff nearing retirement, the District could face challenges sustaining this customized environment over time. Based on this preliminary information, staff is considering a third-party solution to support the District’s billing needs. The extensive customization required by Munis UB would introduce unnecessary complexity and long-term financial burden, outweighing the advantages of staying within the Munis framework. Staff believes integrating a third-party UB solution offers a more viable and sustainable approach, providing a proven system with built-in capabilities designed to meet the District's unique UB requirements. Proposed Timeline The project timeline outlines a phased approach to the ongoing ERP implementation, detailing each phase's proposed timeline and completion dates, specifically focusing on a new UB system. Begin Phases Completion Module Go-Live Deliverables Jan 2024 Jan 2025 Financial Jan 2025 Chart of Accounts, General Ledger, Accounts Receivable, Purchasing Oct 2024 Oct 2024 HRM/Payroll Oct 2025 Human Resources, Employee Records, Benefits Sept 2025 Mar 2027 Utility Billing (UB) Mar 2027 Utility Billing, Customer Information System Jan 2026 Jan 2027 Permitting Jan 2027 Licensing, Permitting, and Inspections Next Steps Staff will present a final recommendation to the Board in June 2025 for a replacement billing system. This proposal will include detailed research, evaluations, and considerations, giving the Board a comprehensive overview of the proposed system and its benefits for the District. FISCAL IMPACT: Joe Beachem, Chief Financial Officer Funding for this project will come before the Board for consideration during the FY25/26 Board Budget Workshop. STRATEGIC GOAL: This project aligns with the strategic objective of enhancing operational effectiveness by completing the evaluation and upgrade of the District's financial management system through the implementation of new technologies. LEGAL IMPACT: None. ATTACHMENTS: Attachment A – Committee Action Report Attachment B – PowerPoint Presentation ATTACHMENT A SUBJECT/PROJECT: ENTERPRISE UTILITY BILLING SYSTEM UPGRADE PROJECT COMMITTEE ACTION: This item was presented to the Finance and Administration Committee at a meeting held on February 19, 2025, and the following comments were made: • Staff presented the staff report and a PowerPoint Presentation as an informational item to provide the status of the District’s efforts in identifying a new Customer Service and Utility Billing System. • As noted in the staff report, staff will present a final recommendation to the Board in June 2025 for a replacement billing system. • An updated snapshot of the ERP implementation timeline was provided to the Committee. It was noted that the Finance module was completed several weeks ago, marking a significant milestone in the project. The district is now fully engaged in the HRM implementation, collaborating closely with stakeholders to ensure a seamless integration and transition. Moving forward, staff will continue to keep the Board informed on progress and key developments. • In response to a question from the Committee, staff stated that a third-party UB solution would enable the District to address all areas where the Munis UB module falls short. • The Committee inquired about the district’s need to enhance the self-service module. Staff stated that customers currently cannot independently access data such as daily water usage or account history, limiting their ability to manage their accounts effectively. The Customer Service staff provide this information to customers. Enhancing the self-service module would increase efficiency and benefit customers and the district. • In response to a comment from the Committee, staff stated that enhancing the enterprise utility billing system will increase FTE efficiency, which would allow staff to review and update job descriptions that would benefit the district. The Committee suggested that staff look at long-term planning and continuity by investing in staff and giving them the opportunity to succeed. Following the discussion, the Committee supported staff’s recommendation and presentation to the full board as an informational item. Utility Billing System Upgrade February 19, 2025 ATTACHMENT B April 2004 – September 2024 [Sept 6, 2023] Replace a 20-year-old system at end-of-life Address limitations in financial and billing processes Support critical functions: Accounting, Budgeting, Human Capital Management, Permitting & Licensing, Utility Billing Vendor Selected: Tyler Technologies Recap - Enterprise Resource Planning (ERP) System Challenges with MUNIS Utility Billing Module Munis Utility Billing module has significant functionality gaps Lacks flexibility to support the District’s rate structure and other system requirements No self-service options for customers, reporting tools limitations, etc. Exploration of Solutions Considered two paths: third-party integration or customization Extensive research conducted over the last year and a half Request for Information (RFI) issued to assess vendor capabilities Third-Party UB System •Advanced features for detailed water usage tracking •Enhanced customer experience with modern tools •Special rate-structure billing options available Custom Development •Enhancing the Munis UB module through custom development •Potential to tailor solutions to the District's specific needs •Balancing between integration and customization Initial Recommendations •Munis UB requires extensive customization, leading to unnecessary complexity and higher long-term costs •Explicitly designed for Utility Billing requirements •Offers a reliable system with features tailored to meet District needs •A third-party system is strongly recommended to better meet the District’s billing needs •Final recommendation to the Board is planned for May 2025 ERP Timeline 1 STAFF REPORT TYPE MEETING: Regular Board MEETING DATE: February 5, 2025 SUBMITTED BY: Jose Martinez General Manager W.O./G.F. NO: N/A DIV. NO. N/A APPROVED BY: Jose Martinez, General Manager SUBJECT: General Manager’s Report GENERAL MANAGER: •2025 Board Officers Published in Newsletters – Communications staff contacted chambers of commerce, the Association of California Water Agencies (ACWA), and other organizations to publish information about the District’s new board officers being elected to its board of directors. ACWA, Chula Vista Chamber of Commerce, East County Chamber of Commerce, East County Community Times, Otay Chamber of Commerce, South County Economic Development Council, the Spring Valley Chamber of Commerce, and the San Diego County Water Authority Water News Network published a short article in their email blasts. •2025 Water Smart Landscape Contest Launch – In February, the District launched its annual WaterSmart Landscape Contest. Before this year's launch, communications staff joined participating water agencies throughout the county to update the regional contest website, landscapecontest.com. Staff will announce the contest in a bill insert, the customer newsletter, social media posts, email blasts, a news release, and other marketing materials. This year’s deadline for applying is Friday, May 9. Details about the contest in the District’s service area are here: otaywater.gov/landscape-contest. •Chula Vista Chamber of Commerce First Friday Breakfast – On February 7, President Jose Lopez and Vice President Gary Croucher joined the City of Chula Vista Fire Department as part of their presentation to discuss what the District’s role is during a fire and how it collaborates with other agencies. Communications staff distributed handouts that included the District’s partnerships and collaboration with other first AGENDA ITEM 10 2 responder agencies. The fire department talked about fire safety, resources available to the public, and how they managed the Border 2 Fire at Otay Mountain. • Water Education for Latino Leaders (WELL) Presentation – On February 7, General Manager Jose Martinez provided a presentation to 12 locally elected officials of the Untapped Fellowship Cohort regarding Proposition 218. The presentation covered an overview of the proposition, its significance to ratepayers and taxpayers, and recent related legislation. • South County Economic Development Council (SCEDC) Policy and Infrastructure Committee – On Feb. 19, General Manager Jose Martinez and Sweetwater Authority General Manager Carlos Quinteros spoke at SCEDC’s Policy and Infrastructure Committee. General Manager Martinez focused on the District’s emergency connection with Mexico. He also provided an overview of the District and discussed the Hydro Station partnership with Sweetwater Authority and Chula Vista Elementary School District, water affordability, and emergency preparedness. • Chula Vista Elementary School District Speech Contest – As part of its ongoing support of the Chula Vista Elementary School District, the District’s communications staff participated in judging the school district’s annual speech contest semifinals in February. This year’s theme was “A Letter to My Future Self.” The contest allows students to enhance their public speaking skills, build confidence, and grow as communicators and leaders. • Scam Alert Posted to Online Communications – Communications staff collaborated with customer service staff to post a notice on the District’s website and social media platforms about utility-related scams. Customers have made reports to the District and other water agencies that have involved sales pitches and door-to-door visits. Every few years, scam artists make unsolicited home visits to the District’s customers while appearing to be a District representative. They request to take water samples from inside the property, place a filter on the meter, or leave water testing kits with a community water test form at the front door. Their intention may be to sell a water- filtration system or other devices. The District’s notice reminds customers that it will never demand payment in cash or require access to their home unless necessary in an emergency. ADMINISTRATIVE SERVICES: GIS: • Asset Operational Status in Mobile GIS - To enhance the Asset Management Program’s ability to accurately identify valve issues, staff collaborated with Operations staff to develop new operational status categories. These categories specify valve 3 conditions such as “Leak-by,” “Frozen,” “Broken Gearbox,” “Casing Issues,” “Packing Leak,” “Riser Issues,” “Valve Cap Issues,” and “Valve Nut Issues.” These new categories have been incorporated into the GIS mobile platform and InfraMap Cloud, enabling field staff to collect detailed information. The added data will help staff analyze specific problems more effectively and take appropriate corrective actions. • GIS Portal Fire Hazard Updates - To enhance fire protection for the District’s assets, staff, identified Fire Hazard Severity Zones and Fire Protection Responsibility data. They collected and merged data from multiple sources, including SanGIS, state, and federal agencies, consolidating it into the District’s enterprise GIS database for distribution across various GIS applications. This effort provides staff with easy access to both facility and fire hazard information, enabling more effective proactive measures. Human Resources: • Summer Internship Program - Last summer, staff led an effort to develop an internship program for high school students. Staff reached out and met with Sweetwater Unified High School District (SUHSD) and Sweetwater Authority (SWA) personnel to explore participation. The program aims to introduce local high school students to the water industry, providing mentorship and guidance towards a water career. To date, the program curriculum and informational student flyers have been developed and have been sent to SUHSD and SWA for review. Staff are 4 planning subsequent meetings with SUHSD and SWA to finalize program details and actions. • ERP/Tyler Conversion - Staff began participating in the meetings on 10/8/24; ongoing. • COVID Cases - Some COVID regulations for employers expired on 2/3/25; however, the record-keeping requirement for positive cases remains in effect. Notifications to close contacts and those present in the building are no longer required. Masks are no longer required but will remain optional. • Employee Service Milestones – February/March 2025 o None. • New Hires/Recruitments - The District is or will be recruiting for the following positions: o Senior Utility Worker/Equipment Operator: A new Utility Locator started on 1/13/25. Senior Utility Worker/Equipment Operator – Posted 1/24/25. Currently rotating three (3) temporary assignments to backfill position. Application review is in progress. o Utility Maintenance Supervisor: Posted 11/4/24. Currently rotating two (2) temporary assignments to backfill position. Interviews were completed on 2/20/25; pursuing candidate. o Utility Worker (UW) I/II : Pursuing candidate, tentatively scheduled to start on 3/3/25. IT Operations: • EERP Implementation - Staff completed Munis's financial module, with a cutover in early January. The team is now on the Human Resources Management (HRM) module, progressing smoothly and on schedule with a target completion date of November, ensuring all tasks, integrations, and configurations are handled effectively for a seamless transition to the new system. Purchasing & Facilities: • Enhanced Board Room Public Access and Control – Watchlight, the District’s alarm and access contractor, has completed the installation of a controller at the Board Secretary’s desk to manage the locking and unlocking of the public access lobby doors directly from her workspace. A switch with an indicator 5 light provides clear status visibility, ensuring improved control over public access while maintaining the District’s commitment to publicly accessible board and committee meetings. This upgrade enhances scheduling flexibility and enables a rapid response in the event of an emergency lockdown, strengthening security for board members, staff, and the public attending these meetings. Additionally, it ensures that District staff retain control of Board Room access, reinforcing overall facility security. The included photo shows a similar controller installed at the customer service desk, where it is used to unlock the front door in the morning and secure it in the evening or during emergencies. Safety & Security: • Risk Management - ACWA JPIA's property reinsurance partner, Aegis, has requested a baseline property site assessment for Otay Water District. This assessment will include a thorough review of both the operations at 1230 Eastlake Parkway and the Treatment Plant at 11901 Singer Lane, evaluating operations, management strategies, and the risk profile of each site. The purpose of this review is to ensure alignment with the Property Program’s protection and resilience standards. FINANCE: • Sewer Cost of Service Study – Staff is conducting a sewer cost of service study and is currently reviewing the preliminary 6 results. The results are scheduled to be presented at the March Finance Committee meeting and the April Board meeting for incorporation into the FY2026 budget process. The last sewer Proposition 218 hearing was held in October 2020, establishing rates effective for the 2021–2025 period. Staff plans to hold the next Proposition 218 hearing in October 2025, with proposed rates becoming effective on January 1, 2026. These rates will be presented at the June Board meeting. • FY2026 Budget – The FY 2026 Budget process has commenced, with deadlines consistent with prior years. Upcoming notable dates include: o April Board Meeting: Review of the Sewer Cost of Service Study o April 16: Budget Workshop covering CIP, growth, and key assumptions o June Board Meeting: Final budget presentation and approval • Monthly Financial Comparative – The January Monthly Comparative Report has been delayed due to the District’s financial system transition from Eden to Munis, which went live in early January. The delay is a result of the integration and validation process taking longer than projected. Staff anticipates that both the January and February comparative reports will be included in the April Board package. • Banking Services RFQ - Staff issued a Request for Quotation (RFQ) to evaluate the District’s banking services and received two responses. Additionally, pricing from three other agencies was secured for comparison. Otay’s current agreement with U.S. Bank expires in June. Staff is evaluating the bids based on pricing competitiveness and will recommend either extending the agreement with U.S. Bank or proceeding with a full Request for Proposal (RFP). • Broker Onboarding and Annual Recertification – Otay maintains relationships with three broker-dealers to facilitate investments and ensure competitive pricing. Staff is currently evaluating a new broker to replace a retiring broker. Pending a successful review of background checks, references, and financials, staff will onboard the new broker to maintain a total of three. Additionally, staff is conducting the annual broker recertification and reviewing the investment policy for the remaining two brokers. • Cross-Connection Control Plan - The Cross-Connection Control Policy Handbook, effective July 1, 2024, requires all public water systems to submit a Cross-Connection Plan by July 1, 2025. Staff is collaborating with its consultant, West Yost, to 7 develop the District’s plan. Staff has also participated in multiple inter-agency meetings to discuss regulatory requirements that must be incorporated into the plan. Financial Reporting: • The financial reporting as of December 31, 2024, is as follows: o As of the sixth month ending December 31, 2024, there are total revenues of $71,996,731 and total expenses of $68,982,695. The revenues exceeded expenses by $3,014,036. • The financial reporting for investments as of January 31, 2025, is as follows: o The market value shown in the Portfolio Summary and in the Investment Portfolio Details as of January 31, 2025, total $101,682,807 with an average yield to maturity of 4.226%. The total earnings year to date are $2,842,166. ENGINEERING AND WATER SYSTEM OPERATIONS: Engineering: • Vista Diego Hydropneumatic Pump Station Pump, Hydropneumatic Tank, and Backup Power Replacement, 1530 Zone, Vista Diego Road: The project includes the replacement of the existing pumps, the hydropneumatic tank and backup power. The project is within budget and on schedule. (P2639 and P2688) • RWCWRF Disinfection System Improvements: The project involves the replacement of the chlorine gas disinfection system with an ultraviolet (UV) process at the Ralph W. Chapman Water Reclamation Facility. A construction contract has been awarded to GSE Construction Co., Inc. On February 21, 2024, staff presented the Disinfection Improvement Project at the Board Workshop as an informational item. A Notice to Proceed was issued for April 8, 2024, and the contractor, GSE, has mobilized and begun construction. The contractor ordered the Trojan UV system, which arrived on August 22, 2024. Initial work on the sodium hypochlorite containment line has been completed, as has the duct bank to provide power and communication. The first and second planned shutdowns were combined to minimize downtime on the plant and were successfully completed on December 2, 2024. Work completed during the shutdown included new backwash pumps and the installation of a new flow meter. Work has been initiated in the contact basin with demolition, doweling rebar, formwork, and pouring of the new concrete slab, walls, and platform. February 6, 2025 State has recently granted a 8 conditional acceptance of the Engineering Report. The second shutdown to install the Trojan UV system is scheduled for April 2025. The project is on schedule. (R2117 and R2157) • 450-1 Recycled Water Reservoir Stormwater Improvements: Stormwater runoff from the 450-1 Recycled Water Reservoir site has been eroding the downstream area and exposed the District's 30-inch recycled water line. Staff is working with NV5 on potential design and permitting solutions. Helix Environmental is currently working on the regulatory permit considerations for the work within the tributary. The project is within budget and on schedule. (R2164) • Zero Emission Vehicles and Charging Infrastructure: The project is for the capital purchase and installation of various electric vehicle support equipment, such as charging infrastructure needed to power Zero Emission Vehicles (ZEVs) for light, medium, and heavy-duty electric vehicles. The project is in preparation for compliance with the State of California's Executive Order N- 79-20 and the Advanced Clean Fleet Regulation to require ZEV purchases when adding to the District's fleet of vehicles. In December, the District was awarded $128,093.00 in grant funding for the installation of five electric vehicle battery charging stations from the Clean Air for All Grant from the San Diego Air Pollution Control District (APCD). The draft final study of the EV charging stations for the Admin and Operations buildings has been reviewed by staff and will be returned to the consultant for final editing by February 25, 2025. A schedule has been prepared and submitted to the APCD for the upcoming design and construction of five EV charging stations for Operations that comply with deadlines set forth by the grant agreement. (P2684) • Potable Pipeline Replacement Projects: The following set of pipelines is being replaced as a result of past failures, age, lack of redundancy, and/or improved fire flow. The 60% design plans are under review by staff. o PL - 8-inch, 850 Zone, Coronado Avenue, Chestnut/Apple (P2608) o PL - 8-inch, 1004 Zone, Eucalyptus Street, Coronado/Date/La Mesa (P2609) o PL - 12-inch Pipeline Replacement, 803 PZ, Vista Grande (P2615) o PL - 20-inch, 1296 Zone, Proctor Valley Road from Pioneer Way to Melody Road, “South Proctor Road” (P2171) o PL - 20-inch, 1296 Zone, Proctor Valley Road from Melody Road to Schlee “North Proctor Road” (P2058) – Easement offer letters were sent to property owners on November 19, 2024. A 9 meeting was held on December 10, 2024, with three of the six property owners. Separately, three property owners submitted a letter of interest in the offer. Follow-up letters were sent to three of the property owners on January 16, 2025. Coordination continues for the purchase of the easements. The project is within budget and on schedule. • Steele Canyon Road Bridge 20-inch Water Main and 6-inch Force Main Renovations: Several portions of the existing pipelines were noted to have corrosion pitting, primarily located at pipe supports for the 20-inch steel potable water main and at pipe joints for the 6-inch steel sewer force main. The first phase, to assess the extent of the corrosion, has been completed, and staff is now working on preparing recommendations for the repairs of the pipelines. The project is within budget and on schedule. (P2687 & S2079) • Olympic Parkway Recycled Water Line Replacement: Several main breaks within the past few years on the 20-inch recycled water line in Olympic Parkway between Heritage Road and La Media Road resulted in the establishment of this Capital Improvement Program project at the May 2021 Board Meeting. The project was awarded to Burtech in January 2023. The City of Chula Vista permits have been obtained. Consideration was given to potentially using trenchless installation, but several drawbacks and limitations eliminated it from selection. The contractor has started procuring materials, and a Pre-Construction Meeting was held on June 8, 2023. A Notice to Proceed was issued for March 25, 2024, and most of the work will be night work to minimize traffic delays. The valves were delivered and tested at the end of May 2024. The contractor mobilized on July 15, 2024. The contractor is approximately 95% complete with the pipeline installation and is behind schedule. Liquidated damages in the amount of $115,000 ($1,000/day) have been issued for late delivery through December 31, 2024. The project was substantially complete once the final tie-in for the new recycled pipeline was completed on January 14, 2025. Work during February included final paving and installing new traffic loops. Once the City of Chula Vista approves the pavement restoration and the District receives the final compaction and cathodic protection reports, project acceptance will be processed. The project is within budget. (R2159) • Olympic Parkway Transmission Main Assessment and Repair: Several main breaks within the past few years on the 16-inch potable water line in Olympic Parkway between East Palomar 10 Street and State Highway 125 resulted in the establishment of this Capital Improvement Program project through the annual budget process. This project is for the condition assessment and, if needed, repair of interior joints within approximately 3,500 feet of the 16-inch cement mortar-lined and coated steel transmission main along Olympic Parkway east of East Palomar Street. The first phase of this project is an assessment to determine the condition of the interior pipeline joints. The District received permits from the City of Chula Vista and Caltrans. The interior video inspection contractor, Houston Harris, will perform the inspection this fiscal year. The project is within budget and on schedule. (P2706) • Cottonwood Sewer Pump Station Replacement: The project involves the replacement of the existing sewer pump station originally constructed in 1986 as a temporary facility due to operational and accessibility deficiencies. The station serves both the District and County of San Diego customers on the south side of the Sweetwater River. Improvements will incorporate increased station capacity, now and in the future, as the addition of emergency storage to avoid a sewage spill. The design is being prepared by Wood Rodgers, Inc. A meeting with Wood Rodgers to review a portion of their amendment work-in-progress was held on November 20, 2024. A meeting was held with the County of San Diego on December 4, 2024, and a follow-up meeting with Wood Rodgers was held on December 12, 2024. The Mitigated Negative Declaration (MND) was prepared in September 2021 and will be reviewed and updated prior to finalizing the design. Construction of the project is currently estimated for completion in FY 2031. The project is within budget. (S2069) • 870-2 Reservoir and 870-1 Reservoir Floating Cover/Liner Replacement: This project consists of constructing a new 3.4 MG prestressed concrete potable water tank adjacent to the existing 870-1 Reservoir. The project also includes lowering the existing 870-1 Reservoir 30-inch inlet pipe and replacing the existing floating cover and liner within the existing 870-1 Reservoir. The construction contract was awarded to Pacific Hydrotech at the September 2024 Board Meeting. Pacific Hydrotech mobilized to the site on October 28, 2024, completed the brush clearing and potholing, and has completed the highline work and power and control conduits and wiring. Both projects are on schedule. (P2228 & P2563) • Potable Water Pressure Vessel Program - Rolling Hills: The 2004- era Rolling Hills Hydropneumatic Pump Station hydropneumatic pressure vessel was inspected on June 6, 2017, and February 27, 2023. Both inspection reports noted interior corrosion due to 11 internal coating wear. The February 2023 inspection report suggested that the life expectancy of the vessel may be three (3) years. With the hydropneumatic tank near the end of its life and the limited availability of the trailer-mounted variable frequency drive pump station, the tank is scheduled for replacement. Delivery and installation of the new vessel is anticipated in April 2025. The project is within budget and on schedule. (P2663) • Telegraph Rd – Hydrant Repair: In late April 2024, a vehicle accident damaged a dual-purpose blow-off valve and fire hydrant appurtenance located at 1052 Telegraph Canyon Road, Chula Vista, approximately 800 feet east of Heritage Road/Paseo Ranchero. The fire hydrant has been struck three (3) times by vehicles in the past seven (7) years. Notably, in the most recent incident, not only was there damage to the above-ground appurtenance, but when operating the 6-inch valve to isolate the fire hydrant, a break was identified near the 20-inch ACP water main. This water main is a major arterial water line and provides potable water to nearby critical infrastructure including a hospital. Repairs to the pipeline are complicated due to the pipeline’s depth, requiring outside contractors with equipment to repair it at that elevation. The water main is approximately 16 feet deep near the fire hydrant. There are nearby utility crossings, which include a triple 6-foot by 10-foot box culvert, an 8-inch-high pressure gas line, a 36-inch storm drain, and a 30-inch steel casing on the 20-inch water main. Design was completed by staff and advertised for construction on December 10, 2024. The District opened bids on January 7, 2025; five bids were submitted. The lowest bid was M-Rae Engineering, Inc. for $171,600, marginally lower than the Engineer’s Estimate of $180,000. The EO&WR Committee reviewed the staff report on January 21, 2025 and put the item on consent for the February 5 Board meeting. The project was awarded on February 5, 2025. Staff is currently working with the contractor on the execution of the awarded contract. The project will come from the Operations budget, which is sufficient to cover the cost of the repair. • 1004-2 & 1485-2 Reservoir Interior/Exterior Coating & Upgrades: This project is for the interior and exterior coatings of the 1485-2 Reservoir, located at 15010 Lyons Valley Road, Jamul. This welded steel Reservoir has a 1.6-million-gallon capacity. Based upon the current inspection report, the interior and exterior coatings on the 1485-2 Reservoir are nearing the end of their useful lives and need replacement. The Reservoir was constructed in 2006 and has never been recoated. In addition to 12 removing the existing interior and exterior coating and recoating the Reservoir, the project includes rafter replacement, seismic rod replacement, cathodic protection equipment replacement, and structural modifications. Additionally, the project includes door modifications to the 1004-2 Reservoir, located at 1711 Buena Vista Avenue, Spring Valley. This welded steel Reservoir has a 1.26-million-gallon capacity. The project was approved for award to Unified Field Services Corp. at the November Board Meeting with a budget adjustment. A Pre-Construction Meeting was held on January 9, 2025. A Notice to Proceed was issued for January 13, 2025, and the contractor mobilized on January 14, 2025. The contractor has begun the structural upgrades and the preliminary coating removal on the interior roof. The project is on schedule. (P2657 & P2631) • 711 Pump Station Replacement and Expansion and Potable Water Pressure Vessel Program (711 Pump Station Surge Tank): The 2015 Water Facilities Master Plan envisioned total replacement of the 711 Pump Station with a budget of $16M; however, the CIP P2578 concept was re-evaluated with a new concept to restore the original pump capacity while utilizing the pump station structure to reduce cost. The initial project will remove one (1) of the existing five (5) nominal 2,500 GPM pumps and replace it with a nominal 4,000 GPM pump and reconfigured discharge and suction piping as a pilot project. The 1990-era 711 Pump Station surge tank pressure vessel was inspected on August 30, 2021. The inspection report noted interior corrosion due to internal coating wear. The February 2021 inspection report also recommended reinspection the following year; however, District staff opted to replace rather than continue to reinspect the surge tank vessel. Approval to pre-purchase a nominal 4,000 GPM pump to be included in the pilot project was authorized at the February 5, 2025 Board Meeting. Award of the construction contract for the pilot pump configuration and surge tank replacement is anticipated for the April EO&WR Committee and May Board Meeting. (P2578 & P2663) • City of San Diego – Otay 2nd Pipeline Phase 4 Interconnections Relocation: The City of San Diego (City) is working on Phase 4 of the replacement and realignment of the 40-inch potable water line between Telegraph Canyon Road and Bonita Road with a 48- inch pipeline. The District has two interconnections to this line located at East H Street and Telegraph Canyon Road that will need to be replaced to conform to the new construction. The City recently completed the 60% design stage for the new pipeline. The District’s staff has reviewed the City’s 60% 13 design and identified potential utility conflicts that are being coordinated with the City. The two potential interconnection relocations have been identified and are being considered. Additionally, new interconnection agreements with the City of San Diego are being evaluated and will be finalized concurrently with the City finalizing their pipeline design. The City design is expected to be finalized at the beginning of FY 2026. The design is currently in the environmental permitting stage. (P2691) • City of Chula Vista – Heritage Road Replacement: The City of Chula Vista is constructing a new bridge crossing the Otay River at Heritage Road, which provides an opportunity for the District to relocate an existing pipeline out of the river into a more secure location. The City of Chula Vista opened bids in September and awarded the contract at their October 8, 2024 Council meeting. The OWD Board approved the reimbursement agreement on March 1, 2023. The City of Chula Vista Council approved the agreement at their January 7, 2025 Council meeting. Staff is working with the City of Chula Vista to wire funds as described by the reimbursement agreement for water improvements. The project is within budget. (P2553, P2405) • Sycuan Treatment Plant: The Sycuan Tribal Nation is working with the District to evaluate the feasibility of accepting processed solids from their proposed Recycled Water Treatment Plant. The District initiated a Task Order for NV5 to provide engineering services in the technical evaluation of accepting the solids stream, especially as it will combine with the municipal sewer flows into the Ralph W. Chapman Water Recycled Water Facility. Additionally, the consultant will assist the District with regulatory and contractual considerations for accepting the Sycuan discharge. In coordination with the engineering consultants, staff will consider cost impacts and ensure proper cost recovery. As the project progresses, it is anticipated that other agencies’ reviews and/or approvals will be necessary, along with associated agreements established or updated. Consultant and staff time costs are being recovered through a deposit account funded by Sycuan. Progress is dependent on Sycuan providing requested information. District review turnaround times are six to eight weeks due to the complexity of the project. These timelines were relayed and agreeable to Sycuan. Regular meetings for the project are scheduled for every two weeks to ease coordination. • Recycled/Reuse Feasibility: The Sweetwater Authority (SWA) and the District are working collaboratively through a Memorandum 14 of Understanding (MOU) to evaluate the feasibility of extending water reuse into the SWA area. On February 7, 2024, a Professional Services Agreement (PSA) for a feasibility study was awarded by the Board to Carollo Engineers (Carollo). On June 20, 2024, the District was approved for grant funding from the Water Recycling Funding Program for the SWA and OWD Intertie Project for $300,000. The District, SWA, and Carollo are conducting biweekly progress meetings and collecting data for the Planning and Feasibility Report. Carollo is in the process of reviewing and assessing data from both agencies and coordinating additional data as needed. (R1254) • Otay Water District Climate Adaptation and Resilience Planning Project: On November 21, 2023, FEMA approved and issued Hazard Mitigation Grant Program (HMGP) funds for the preparation of a Climate Adaptation and Resilience Plan for the District. FEMA authorized a total of $244,939.70. The CARP will include a risk and resilience assessment focusing on climate change. The CARP will also include the development of resilience and adaptation strategies to allow the District to prioritize risks. Strategies may include updated policies, built infrastructure- based measures, green infrastructure-based measures, operational approaches, staff training and tools, and communication and education for customers. The consultant was on site in January to conduct site visits and staff interviews. The second phase of data collection is currently ongoing. The final Plan will be incorporated into the District’s Local Hazard Mitigation Plan Annex. (P1253) • Water Facilities Master Plan, Urban Water Management Plan, and Integrated Water Resources Plan: On January 21, 2025, the EO&WR Committee was presented with an overview of the Final Draft of the 2022 Water Facilities Master Plan (WFMP). Similarly, the Board was presented the overview on February 5, 2025. The Final Draft of the 2022 WFMP provides an analysis of the infrastructure needs based on data prior to the land use change for the Otay Ranch Village 14 to permanent conservation land in 2024. With the impact of the change affecting several projects in the update, the environmental review for the California Environmental Quality Act (CEQA) was not completed, and the plan will remain in draft. Stopping at the Final Draft stage allowed for over $200,000 in money saved, which can be used for the next update. The next update for the WFMP will be done in parallel with two other District planning documents, the Urban Water Management Plan (UWMP), and the Integrated Water Resources Plan. The UWMP update is required for compliance with the State Water Boards. Combining the three planning documents is anticipated 15 to provide efficiencies and cost savings. The consultant selection is anticipated to go to the EO&WR Committee in March 2025 and the Board in April. • Sewage Flows to Metro vs Planned Capacity: The Metropolitan Water District Amended and Restated Regional Wastewater Disposal Agreement became fully effective at the start of FY 2023. The District’s annual capacity of 0.38 MGD (139 MG) is now in effect, though the District would need to exceed this capacity for three (3) consecutive years before additional capacity must be acquired. The Metropolitan Water District (Metro) capacity was set based upon the District’s sewer system requirements through planning year 2050. The plant experienced a plant upset from September 20, 2024 through September 22, 2024. A planned shutdown in November 2024 was required to accommodate the construction of the new backwash system. The shutdowns result in increased sewer discharge into the Metro system. The current discharge total for FY 2025 is 58.47 MG, below the 81.13 MG planned capacity. 16 OPERATIONS: • Monday, January 20th, the APCD conducted inspections at the following pump stations: 680-1, 980-2, 624-1, 624-2 & 624-3. No violations were noted. • On Saturday, January 25th, Water Systems staff, with assistance from Utility Maintenance staff, performed a planned shutdown on Steele Canyon Road and Jamul Drive in Rancho San Diego. This shutdown was conducted to replace one defective 12-inch distribution valve that was found with excessive leak by during routine valve maintenance. Water isolation valves are critical components of a water distribution system for isolating pipe segments for repair and maintenance purposes. The shutdown lasted approximately nine hours, affected three meters, and one water trailer was available on site for the affected customers. Work was performed on the weekend to avoid any interruptions to Jamacha Elementary school. • On Monday, January 27th, Water Systems staff isolated a section of water main at the 870-1 Reservoir site to allow the contractor to tie-in a temporary hi-line. This hi-line was needed so the contractor could remove existing piping that conflicts with the location of the new 870-2 reservoir project (CIP# P2228). • On Tuesday, January 28th, the 1100 VFD trailer (variable frequency drive) began around the clock testing. This was done to ensure all components were functioning correctly. The test lasted 10 continuous days with satisfactory results. This VFD trailer will be used at the 1100-1 Hydropneumatic Station while the station is down for replacement of the pressure vessel (CIP# P2663). • On Wednesday, January 29th, Water Systems staff, with assistance from Utility Maintenance staff, performed a planned shutdown on Steele Canyon Road and Heatherwood Drive in Rancho San Diego. This shutdown was conducted to replace one defective 12-inch distribution valve that was found with excessive leak by during routine valve maintenance. Water isolation valves are critical components of a water distribution system for isolating pipe Date Meters (Budgete d) Meters Sold (Actua l) EDUs (Budgete d) EDUs Sold (Actua l) Total $ (Budgeted) Total $ Collected (Actual) January 2025 20.2 3 58.8 18 $955,391 $263,188 Totals FY 2025 141.2 114 411.8 319 $6,687,735 $4,825,038 17 segments for repair and maintenance purposes. The shutdown lasted approximately nine hours, affected 50 meters, and four water trailers were available on site for the affected customers. • On Thursday, January 30th, Water Systems staff, with assistance from Utility Maintenance staff, performed a planned shutdown on Singer Lane in Rancho San Diego. This shutdown was conducted to replace one defective eight-inch distribution valve that was found with excessive leak by during routine valve maintenance. Water isolation valves are critical components of a water distribution system for isolating pipe segments for repair and maintenance purposes. The shutdown lasted approximately six and a half hours, affected one meter, and there was one water trailer available on site for the affected customers. • On Friday, January 31st, Water Systems staff, with assistance from Utility Maintenance staff, performed an emergency shutdown on a section of 14-inch steel water main off the 458 Reservoir outlet line. Staff utilized the interagency shared services agreement with Padre Dam Municipal Water District to obtain a 14-inch repair clamp. The shutdown was necessary to repair a section of 14-inch main with excessive corrosion. This shutdown required water distribution changes to supply the 458 Pressure Zone. This shutdown did not have any customer impact. • The following events occurred on Wednesday, February 5th: o Utility Maintenance staff replaced a defective four-inch jockey pump at the Rancho Jamul Hydro station using a District vendor for welding work on the stainless-steel piping. o A site test was conducted at the Russell sewer lift station. A site test is conducted to ensure that all equipment is functioning properly in the event of a power outage. The Automatic Transfer Switch (ATS) and emergency stand by 18 generator are exercised to ensure the proper transfer of utility to auxiliary power. • On Thursday, February 13th, Utility Maintenance staff replaced Victaulic spool and a six-inch valve at Treatment Plant on effluent manifold. Replacement was necessary since the valve was not functioning correctly and a new valve was needed to ensure a proper shutdown. • On Friday, February 14th, Water Systems staff performed an emergency shutdown of the 36-inch transmission main in on Jamacha Blvd and Maya Street in Spring Valley. The shutdown was necessary to make temporary repairs for a section of 12-inch main and a 12-inch isolation valve. This shutdown required water distribution changes to supply the 640 Pressure Zone. This shutdown did not have any customer impact. Plans for permanent repair are currently underway. Purchases and Change Orders: • The following table summarizes purchases and change orders issued during the period from January 29, 2025, through February 13, 2025, that were within staff signatory authority: Date Action Amount Project Contractor/ Consultant/Vendor 1/28/2025 P.O. $1,352.23 CHECK STOCK SAFECHECKS INC. 1/29/2025 P.O. $18,000.00 CY25 VISION BENEFITS ADMINISTRATION FIDELITY SECURITY LIFE INSUR CO 1/29/2025 P.O. $140,200.00 CY25 LIFE & STD/LTD INSURANCE SUN LIFE FINANCIAL 01/31/2025 C.C. $1,570.09 1485-2 TANK INT/EXT COATING PROJECT (P2631) ABC IMAGING 2/4/2025 P.O. $30,872.53 ARMORCAST FRP VAULTS HUBBELL LENOIR CITY 2/4/2025 P.O. $32,937.58 CY25 VISION BENEFITS ADMINISTRATION PACIFIC PIPELINE SUPPLY INC 2/4/2025 P.O. $337,800.00 CY25 LIFE & STD/LTD INSURANCE MIDAMERICA ADMINISTRATIVE 2/10/2025 P.O. $6,500.00 OUTSIDE SERVICES – PROFESSIONAL WRITING PLANT SOUP INC. 19 2/11/2025 P.O. $12,191.28 ALPHA COUPLINGS FERGUSON WATERWORKS #1083 2/12/2025 P.O. $10,000.00 CY25 HEALTH REIMBURSEMENT ARRANGEMENT (HRA) TEEDEEUAS LLC 2/12/2025 C.O. $56,720.00 METER CHANGEOUT CONSULTING SERVICES E SOURCE COMPANIES LLC 2/13/2025 C.O. $28.14 OMNI 3"-4" AND 6" C2 REGISTERS AQUA-METRIC SALES COMPANY Water Conservation and Sales: • Water Conservation – January 2025 usage was 28% higher than January 2013 usage. Since January 2024, customers have saved an average of 9% over 2013 levels. • Potable Water Purchases – The January potable water purchases were 2,329 acre-feet which is 16.5% above the budget of 1,999 acre-feet. Cumulative purchases for the year are 18,445 acre- feet, 2.1% above the year-to-date budget of 18,060 acre-feet. 20 • Recycled Water Purchases – The recycled water purchases from the City of San Diego and production at the District’s treatment facility for the month of January were 258 acre-feet which is 152.9% above the budget of 102 acre-feet. Cumulative purchases and production for the year are 2,697 acre-feet, 7.7% above the year-to-date budget of 2,504 acre-feet. 21 • The table below displays the year-to-date and monthly rainfall data for January. Rainfall Jan. Y-T-D Actual 0.21 0.47 3-year Historical Average 2.99 6.82 Variance (2.78) (93.0%) (6.35) (93.1%) Potable, Recycled, and Sewer (Reporting up to the month of January): • Total number of potable water meters: 52,063. • Total number of sewer connections: 4,756. • Recycled water consumption for the month of January: o Total consumption: 281.79 acre-feet or 91,814,756 gallons. o Average daily consumption: 2,961,766 gallons per day. o Total cumulative recycled water consumption since January 2024: 2,765.51 acre-feet. o Total number of recycled water meters: 805. • Wastewater flows for the month of January: o Total basin flow: 1,663,129 gallons per day. ▪ This is a decrease of 13.3 percent from January 2024. o Spring Valley Sanitation District flows to Metro: 556,616 gallons per day. o Total Otay flow: 1,106,452 gallons per day. o Flow processed at the Ralph W. Chapman Water Recycling Facility: 1,004,774 gallons per day. o Flow to Metro from Otay Water District: 101,677 gallons per day. o By the end of January there were 6,751 wastewater EDUs. Exhibit A FOR THE SIX MONTHS ENDED DECEMBER 31, 2024 Annual YTD REVENUES:Budget Actual Budget Variance Var % Potable Water Sales 74,767,000$ 40,394,293 41,140,000$ (745,707) (1.8%) Recycled Water Sales 11,014,000 7,064,599 6,818,700 245,899 3.6% Potable Energy Charges 3,578,000 1,774,354 1,963,200 (188,846) (9.6%) Potable System Charges 14,131,000 6,761,886 6,769,000 (7,114) (0.1%) Potable MWD & CWA Fixed Charges 16,555,000 7,071,032 7,098,000 (26,968) (0.4%) Potable Penalties and Other Fees 1,067,000 597,081 603,100 (6,019) (1.0%) Total Water Sales 121,112,000 63,663,245 64,392,000$ (728,755) (1.1%) Sewer Charges 3,482,000 1,769,163 1,752,600 16,563 0.9% Meter Fees 158,000 81,048 79,000 2,048 2.6% Capacity Fee Revenues 2,833,000 1,617,287 1,416,600 200,687 14.2% Non-Operating Revenues 2,566,000 1,533,345 1,283,500 249,845 19.5% Tax Revenues 6,840,000 2,723,587 2,683,800 39,787 1.5% Interest 1,102,000 609,056 551,000 58,056 10.5% Total Revenues 138,093,000$ 71,996,731 72,158,500$ (161,769) (0.2%) EXPENSES: Potable Water Purchases 54,323,000$ 28,891,098 28,732,600$ (158,498) (0.6%) Recycled Water Purchases 6,123,000 3,615,800 3,615,800 - 0.0% CWA-Fixed Transportation Charge 1,125,000 - - - 0.0% CWA-Infrastructure Access Charge 3,258,000 1,593,504 1,596,000 2,496 0.2% CWA-Customer Service Charge 2,166,000 1,055,094 1,056,000 906 0.1% CWA-Reliability Charge 3,768,000 1,689,918 1,692,000 2,082 0.1% CWA-Emergency Storage Charge 5,178,000 2,484,726 2,484,000 (726) (0.0%) MWD-Capacity Res Charge 840,000 391,392 390,000 (1,392) (0.4%) MWD-Readiness to Serve Charge 684,000 355,476 342,000 (13,476) (3.9%) Subtotal Water Purchases 77,465,000 40,077,007 39,908,400$ (168,608) (0.4%) Power Charges 5,058,000 2,496,503 2,884,600 388,097 13.5% Payroll & Related Costs 27,724,800 13,462,665 13,813,100 350,435 2.5% Materials & Maintenance 5,224,400 2,249,561 2,613,200 363,639 13.9% Administrative Expenses 9,526,800 4,102,803 4,767,200 664,397 13.9% Legal Fees 402,000 248,056 201,000 (47,056) (23.4%) Expansion Reserve 5,720,000 2,860,000 2,860,000 - 0.0% Betterment Reserve 2,643,300 1,321,700 1,321,700 - 0.0% OPEB Trust 350,000 175,000 175,000 - 0.0% General Fund Reserve 3,978,700 1,989,400 1,989,400 - 0.0% Total Expenses 138,093,000$ 68,982,695 70,533,600$ 1,550,905 2.2% EXCESS REVENUES(EXPENSES) -$ 3,014,036$ 1,624,900$ 1,389,136$ OTAY WATER DISTRICT COMPARATIVE BUDGET SUMMARY F:/MORPT/FS2025-P6 Dec24 - EERP.xlsx 2/24/2025 9:05 AM The year-to-date excess revenue of $3,014,036 is $1,389,136 more than the budgeted excess revenues of $1,624,900. COMPARATIVE BUDGET SUMMARY NET REVENUE AND EXPENSES FOR THE SIX MONTHS ENDED DECEMBER 31, 2024 -$1,600,000 -$1,400,000 -$1,200,000 -$1,000,000 -$800,000 -$600,000 -$400,000 -$200,000 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 $1,800,000 $2,000,000 $2,200,000 $2,400,000 $2,600,000 $2,800,000 $3,000,000 $3,200,000 $3,400,000 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN YTD Actual Net Revenues YTD Budget Net Revenues YTD Variance in Net Revenues OTAY WATER DISTRICT INVESTMENT PORTFOLIO REVIEW January 31, 2025 INVESTMENT OVERVIEW & MARKET STATUS: At the Federal Reserve Board's regular meeting on December 18, 2024, the Committee decided to lower the target range for the federal funds rate from 4.50-4.75% to 4.25%-4.50%, considering the progress on inflation and the balance of risks. There have been no further changes made to the federal funds rate at the most recent meeting which was held on January 29, 2025. Recent indicators suggest that economic activity has continued to expand at a solid pace. The Committee will evaluate the risk balance, outlook, and incoming data prior to making any modifications to the federal funds target range. It is intended to support employment and restore inflation to its 2% objective by decreasing Treasury securities and agency debt. The Committee will continue to observe the effects of incoming information on the economic outlook. In determining the timing and size of future adjustments to the target range for the federal funds rate, they went on to say: "The Committee would be prepared to adjust the stance of monetary policy as appropriate if risks emerge that could impede the attainment of the Committee's goals. The Committee's assessments will take into account a wide range of information, including readings on labor market conditions, inflation pressures and inflation expectations, and financial and international developments." The District's effective rate of return for January 2025 was 4.10%, which was two basis points higher than the previous month. LAIF's return was six basis points lower than last month with an average effective yield of 4.37% for January 2025. The District has maintained a competitive long-term rate of return on the portfolio. The current investment strategy includes an increased level of liquidity above historical levels to meet anticipated higher liquidity requirements. As part of the District’s continued strategy, staff continuously monitors investment options and liquidity needs. Currently no changes in investment strategy are being considered based on a competitive rate of return and increased liquidity requirements Under the District's Investment Policy, all District funds continue to be managed based on the objectives, in priority order, of safety, liquidity, and return on investment. PORTFOLIO COMPLIANCE: January 31, 2025 Investment State Limit Otay Limit Otay Actual 8.01: Treasury Securities 100% 100% 13.26% 8.02: Local Agency Investment Fund (Operations) $75 Million $75 Million $53.93 Million 8.03: Federal Agency Issues 100% 100% 32.69% 8.04: Certificates of Deposit 30% 15% 0 8.05: Short-Term Commercial Notes 25% 10% 0 8.06: Medium-Term Commercial Debt 30% 10% 0 8.07: Money Market Mutual Funds 20% 10% 0.36% 8.08: San Diego County Pool 100% 100% 0.04% 12.0: Maximum Single Financial Institution 100% 50% 0.68% $691,272 0.68% $53,969,070 53.01% $47,140,470 46.31% Otay Water District Investment Portfolio: 01/31/2025 Banks (Passbook/Checking/CD)Pools (LAIF & County)Agencies,Treasury Securities & Money Market Mutual Funds Total Cash and Investments: $101,800,812 (Book Value) Jul FY24 Aug FY24 Sep FY24 1st Qtr FY24 Oct FY24 Nov FY24 Dec FY24 2nd Qtr FY24 Jan FY24 Feb FY24 Mar FY24 3rd Qtr FY24 Apr FY24 May FY24 Jun FY24 4th Qtr FY24 Jul FY25 Aug FY25 Sep FY25 1st Qtr FY25 Oct FY25 Nov FY25 Dec FY25 2nd Qtr FY25 Jan FY25 Otay 3.71 3.74 3.83 3.76 3.76 3.86 3.90 3.84 3.86 4.01 3.90 3.92 4.04 4.02 4.12 4.06 4.13 4.21 4.23 4.19 4.16 4.16 4.08 4.13 4.10 LAIF 3.31 3.43 3.53 3.42 3.67 3.84 3.93 3.81 4.01 4.12 4.23 4.12 4.27 4.33 4.48 4.36 4.52 4.58 4.58 4.56 4.52 4.48 4.43 4.48 4.37 Difference 0.40 0.31 0.30 0.34 0.09 0.02 -0.03 0.03 -0.15 -0.11 -0.33 -0.20 -0.23 -0.31 -0.36 -0.30 -0.39 -0.37 -0.35 -0.37 -0.36 -0.32 -0.35 -0.34 -0.27 -1.00 0.00 1.00 2.00 3.00 4.00 5.00 Re t u r n o n I n v e s t m e n t s Month Performance Measure FY-25 Return on Investment Otay LAIF Difference Target: Meet or Exceed 100% of LAIF OTAY Portfolio Management January 31, 2025 Portfolio Summary % of Portfolio Book ValueInvestmentsMarket Value Par Value Days to MaturityTerm YTM 360 Equiv. YTM 365 Equiv. Federal Agency Issues- Callable 11,500,000.00 79311.37 4.47354811,504,045.0011,500,000.00 4.535 Treasury Securities - Coupon 13,495,265.57 45413.35 4.51623813,503,945.0013,500,000.00 4.579 Federal Agency Issues - Bullet 21,774,234.66 98121.54 3.44825521,663,684.5621,796,000.00 3.496 Money Market 370,969.62 10.37 4.1581370,969.62370,969.62 4.216 Local Agency Investment Fund (LAIF)53,931,640.59 153.34 4.306153,911,253.6253,931,640.59 4.366 San Diego County Pool 37,429.72 10.04 3.778137,637.6337,429.72 3.830 101,109,540.16 100.00%Investments 100,991,535.43101,136,039.93 363 150 4.168 4.226 Cash (not included in yield calculations) Passbook/Checking 691,271.54 1 2.0451691,271.54691,271.54 2.073 101,800,811.70Total Cash and Investments 101,682,806.97101,827,311.47 363 150 4.168 4.226 Current Year January 31 358,680.47 Fiscal Year To Date 2,842,166.47 Average Daily Balance Effective Rate of Return 102,919,555.77 114,625,501.79 4.21%4.10% Total Earnings Month Ending I hereby certify that the investments contained in this report are made in accordance with the District Investment Policy Number 27 adopted by the Board of Directors on May 01, 2024. The investments provide sufficient liquidity to meet the cash flow requirements of the District for the next six months of expenditures. __________________________________________________ ____________________ Joseph Beachem, Chief Financial Officer Portfolio OTAY AP Reporting period 01/01/2025-01/31/2025 Run Date: 02/18/2025 - 17:19 PM (PRF_PM1) 7.3.11 Report Ver. 7.3.11 1 San Diego County Pool YTM for January 2025 is not yet available, this report is using December 2024 YTM of 3.83%. 1 02/24/2025 YTM 360 Page 1 Par Value Book Value Maturity Date Stated RateMarket Value January 31, 2025 Portfolio Details - Investments Average BalanceIssuer Portfolio Management Month End Days to MaturityMoody'sCUSIP Investment # Purchase Date Federal Agency Issues- Callable 4.468Federal Home Loan Bank2422 1,000,000.00 1,000,000.00 05/10/20274.53011/15/2024 997,340.003130B3R54 828 4.290Federal Home Loan Bank2425 7,500,000.00 7,500,000.00 12/30/20264.35012/30/2024 7,502,325.00 Aaa3130B4DY4 697 4.932Federal Home Loan Mortgage2406 3,000,000.00 3,000,000.00 04/25/20255.00010/25/2022 3,004,380.00 Aaa3134GX6A7 83 11,500,000.0011,504,045.0011,500,000.0011,500,000.00Subtotal and Average 4.473 548 Treasury Securities - Coupon 4.998US TREASURY2418 3,000,000.00 2,995,503.53 07/31/20254.75011/01/2023 3,006,690.00 Aaa91282CHN4 180 5.051US TREASURY2419 3,000,000.00 2,994,327.02 03/31/20253.87511/09/2023 2,997,930.00 Aaa91282CGU9 58 4.110US TREASURY2426 7,500,000.00 7,505,435.02 12/31/20254.25001/06/2025 7,499,325.00 Aaa91282CJS1 333 13,495,265.5713,503,945.0013,500,000.0012,283,040.79Subtotal and Average 4.516 238 Federal Agency Issues - Bullet 2.855Federal Farm Credit Bank2397 2,000,000.00 1,999,356.18 04/25/20252.75004/26/2022 1,992,780.00 Aaa3133ENVC1 83 4.261Federal Farm Credit Bank2402 3,000,000.00 2,998,705.42 09/30/20254.25009/30/2022 3,000,300.00 Aaa3133ENP95 241 4.932Federal Farm Credit Bank2420 1,000,000.00 996,098.94 03/05/20264.62504/17/2024 1,004,540.00 Aaa3133EP4K8 397 4.679Federal Farm Credit Bank2421 1,000,000.00 1,000,107.84 05/06/20274.75005/28/2024 1,010,790.00 Aaa3133ERDS7 824 4.060Federal Farm Credit Bank2423 2,000,000.00 2,000,318.75 12/16/20264.12512/16/2024 1,997,200.00 Aaa3133ERK42 683 4.864Federal Farm Credit Bank2424 3,000,000.00 2,999,304.75 07/28/20254.87511/17/2023 3,008,670.00 Aaa3133EPRS6 177 4.928Federal Home Loan Bank2417 4,000,000.00 4,000,000.00 02/28/20255.00007/03/2023 4,000,800.00 Aaa3130AV7L0 27 0.612Federal Home Loan Mortgage2391 1,045,000.00 1,043,366.42 09/23/20250.37509/16/2021 1,019,773.70 Aaa3137EAEX3 234 0.618Federal Home Loan Mortgage2392 2,751,000.00 2,746,610.77 09/23/20250.37509/22/2021 2,684,590.86 Aaa3137EAEX3 234 1.129Federal National Mortage Assoc2394 2,000,000.00 1,990,365.59 11/07/20250.50012/15/2021 1,944,240.00 Aaa3135G06G3 279 21,774,234.6621,663,684.5621,796,000.0022,160,124.25Subtotal and Average 3.448 255 Money Market 4.192Blackrock T - Fund Inst9010 17,438.09 17,438.09 4.25017,438.09RESERVE-10A WRB 1 4.192Blackrock T - Fund Inst9011 39,582.81 39,582.81 4.25039,582.81RESERVE 10 BABS 1 4.152FIRST AMERICAN US TREASURY9016 313,948.72 313,948.72 4.210313,948.72OWD TRUST & CUS 1 370,969.62370,969.62370,969.621,029,414.85Subtotal and Average 4.158 1 Local Agency Investment Fund (LAIF) 4.306STATE OF CALIFORNIA9001 53,931,640.59 53,931,640.59 4.36653,911,253.62LAIF 1 53,931,640.5953,911,253.6253,931,640.5950,944,415.27Subtotal and Average 4.306 1 Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 PM (PRF_PM2) 7.3.11 Report Ver. 7.3.11 YTM 360 Page 2 Par Value Book Value Maturity Date Stated RateMarket Value January 31, 2025 Portfolio Details - Investments Average BalanceIssuer Portfolio Management Month End Days to MaturityMoody'sCUSIP Investment # Purchase Date San Diego County Pool 3.778San Diego County9007 37,429.72 37,429.72 3.83037,637.63SD COUNTY POOL 1 37,429.7237,637.6337,429.721,498,468.22Subtotal and Average 3.778 1 102,919,555.77 101,136,039.93 4.168 150100,991,535.43 101,109,540.16Total and Average Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 PM (PRF_PM2) 7.3.11 YTM 360 Page 3 Par Value Book Value Stated RateMarket Value January 31, 2025 Portfolio Details - Cash Average BalanceIssuer Portfolio Management Month End Days to MaturityMoody'sCUSIP Investment # Purchase Date US Bank 0.000STATE OF CALIFORNIA9003 3,100.00 3,100.003,100.00PETTY CASH 1 2.219STATE OF CALIFORNIA9004 636,920.02 636,920.02 2.250636,920.02OPERATING 1 0.000STATE OF CALIFORNIA9005 3,615.55 3,615.5507/01/2024 3,615.55PAYROLL 1 0.000STATE OF CALIFORNIA9014 47,635.97 47,635.9707/01/2024 47,635.97FLEX ACCT 1 0.00 102,919,555.77 101,827,311.47 4.168 150 1Average Balance 101,682,806.97 101,800,811.70Total Cash and Investments Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 PM (PRF_PM2) 7.3.11 Month End Activity Report Sorted By Issuer January 1, 2025 - January 31, 2025 Current Rate Transaction Date Balance Beginning Balance Ending Par Value Percent of Portfolio Par Value CUSIP Investment #Issuer Purchases or Deposits Redemptions or Withdrawals Issuer: Blackrock T - Fund Inst Money Market Blackrock T - Fund Inst9010 65.374.250 0.00RESERVE-10A WRB Blackrock T - Fund Inst9011 148.394.250 0.00RESERVE 10 BABS 0.0056,807.14 57,020.90Subtotal and Balance 213.76 213.76 0.0056,807.14 57,020.900.056%Issuer Subtotal Issuer: STATE OF CALIFORNIA US Bank STATE OF CALIFORNIA9004 2,431,199.682.250 2,502,784.50OPERATING STATE OF CALIFORNIA9005 0.00 401,125.94PAYROLL STATE OF CALIFORNIA9014 50,030.00 11,616.15FLEX ACCT 2,915,526.591,125,568.45 691,271.54Subtotal and Balance 2,481,229.68 Local Agency Investment Fund (LAIF) STATE OF CALIFORNIA9001 18,671,713.214.366 14,200,000.00LAIF 14,200,000.0049,459,927.38 53,931,640.59Subtotal and Balance 18,671,713.21 21,152,942.89 17,115,526.5950,585,495.83 54,622,912.1353.643%Issuer Subtotal Issuer: FIRST AMERICAN US TREASURY Money Market FIRST AMERICAN US TREASURY9016 9,672,946.714.210 9,514,142.53OWD TRUST & CUS 9,514,142.53155,144.54 313,948.72Subtotal and Balance 9,672,946.71 9,672,946.71 9,514,142.53155,144.54 313,948.720.308%Issuer Subtotal Issuer: Federal Farm Credit Bank Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 DA (PRF_DA) 7.3.11 Report Ver. 7.3.11 Current Rate Transaction Date Balance Beginning Balance Ending Par Value Page 2 Percent of Portfolio Par Value January 1, 2025 - January 31, 2025 Activity Report Month End CUSIP Investment #Issuer Purchases or Deposits Redemptions or Withdrawals Issuer: Federal Farm Credit Bank Federal Agency Issues - Bullet 12,000,000.00 12,000,000.00Subtotal and Balance 0.00 0.0012,000,000.00 12,000,000.0011.785%Issuer Subtotal Issuer: Federal Home Loan Bank Federal Agency Issues- Callable 8,500,000.00 8,500,000.00Subtotal and Balance Federal Agency Issues - Bullet 4,000,000.00 4,000,000.00Subtotal and Balance 0.00 0.0012,500,000.00 12,500,000.0012.276%Issuer Subtotal Issuer: Federal Home Loan Mortgage Federal Agency Issues- Callable 3,000,000.00 3,000,000.00Subtotal and Balance Federal Agency Issues - Bullet 3,796,000.00 3,796,000.00Subtotal and Balance 0.00 0.006,796,000.00 6,796,000.006.674%Issuer Subtotal Issuer: Federal National Mortage Assoc Federal Agency Issues - Bullet Federal National Mortage Assoc2393 0.001.625 01/07/2025 2,000,000.003135G0X24 2,000,000.004,000,000.00 2,000,000.00Subtotal and Balance 0.00 0.00 2,000,000.004,000,000.00 2,000,000.001.964%Issuer Subtotal Issuer: San Diego County San Diego County Pool Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 DA (PRF_DA) 7.3.11 Report Ver. 7.3.11 Current Rate Transaction Date Balance Beginning Balance Ending Par Value Page 3 Percent of Portfolio Par Value January 1, 2025 - January 31, 2025 Activity Report Month End CUSIP Investment #Issuer Purchases or Deposits Redemptions or Withdrawals Issuer: San Diego County San Diego County Pool San Diego County9007 37,429.723.830 9,143,212.38SD COUNTY POOL 9,143,212.389,143,212.38 37,429.72Subtotal and Balance 37,429.72 37,429.72 9,143,212.389,143,212.38 37,429.720.037%Issuer Subtotal Issuer: US TREASURY Treasury Securities - Coupon US TREASURY2426 7,500,000.004.250 01/06/2025 0.0091282CJS1 0.006,000,000.00 13,500,000.00Subtotal and Balance 7,500,000.00 7,500,000.00 0.006,000,000.00 13,500,000.0013.258%Issuer Subtotal 101,236,659.89 101,827,311.47Total37,772,881.5038,363,533.08100.000% Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 DA (PRF_DA) 7.3.11 Report Ver. 7.3.11 Month End Duration Report Sorted by Investment Type - Investment Type Through 01/31/2025 Investment #Security ID Issuer Investment Class Book Value Par Value Market Value Current Rate YTM Current Yield Maturity/ Call Date Duration Modified 360Fund Federal Home Loan Mortgage240699 3,000,000.00 3,004,380.003134GX6A7 4.318 04/25/2025 0.2273,000,000.00 4.932Fair5.0000000 Federal Home Loan Bank242299 1,000,000.00 997,340.003130B3R54 4.657 05/10/2027 2.1181,000,000.00 4.468Fair4.5300000 Federal Home Loan Bank242599 7,500,000.00 7,502,325.003130B4DY4 4.335 12/30/2026 1.8117,500,000.00 4.290Fair4.3500000 US TREASURY241899 3,000,000.00 3,006,690.0091282CHN4 4.327 07/31/2025 0.4932,995,503.53 4.998Fair4.7500000 US TREASURY241999 3,000,000.00 2,997,930.0091282CGU9 4.289 03/31/2025 0.1582,994,327.02 5.051Fair3.8750000 US TREASURY242699 7,500,000.00 7,499,325.0091282CJS1 4.263 12/31/2025 0.8827,505,435.02 4.110Fair4.2500000 Federal Home Loan Mortgage239199 1,045,000.00 1,019,773.703137EAEX3 4.212 09/23/2025 0.6301,043,366.42 0.612Fair.37500000 Federal Home Loan Mortgage239299 2,751,000.00 2,684,590.863137EAEX3 4.212 09/23/2025 0.6302,746,610.77 0.618Fair.37500000 Federal National Mortage Assoc239499 2,000,000.00 1,944,240.003135G06G3 4.235 11/07/2025 0.7491,990,365.59 1.129Fair.50000000 Federal Farm Credit Bank239799 2,000,000.00 1,992,780.003133ENVC1 4.263 04/25/2025 0.2271,999,356.18 2.855Fair2.7500000 Federal Farm Credit Bank240299 3,000,000.00 3,000,300.003133ENP95 4.242 09/30/2025 0.6392,998,705.42 4.261Fair4.2500000 Federal Home Loan Bank241799 4,000,000.00 4,000,800.003130AV7L0 4.644 02/28/2025 0.0734,000,000.00 4.928Fair5.0000000 Federal Farm Credit Bank242099 1,000,000.00 1,004,540.003133EP4K8 4.200 03/05/2026 1.038996,098.94 4.932Fair4.6250000 Federal Farm Credit Bank242199 1,000,000.00 1,010,790.003133ERDS7 4.248 05/06/2027 2.1061,000,107.84 4.679Fair4.7500000 Federal Farm Credit Bank242399 2,000,000.00 1,997,200.003133ERK42 4.206 12/16/2026 1.7782,000,318.75 4.060Fair4.1250000 Federal Farm Credit Bank242499 3,000,000.00 3,008,670.003133EPRS6 4.277 07/28/2025 0.4842,999,304.75 4.864Fair4.8750000 Blackrock T - Fund Inst901099 17,438.09 17,438.09RESERVE-10A 4.250 0.00017,438.09 4.192Amort4.2500000 Blackrock T - Fund Inst901199 39,582.81 39,582.81RESERVE 10 4.250 0.00039,582.81 4.192Amort4.2500000 FIRST AMERICAN US TREASURY901699 313,948.72 313,948.72OWD TRUST &4.210 0.000313,948.72 4.152Amort4.2100000 STATE OF CALIFORNIA900199 53,931,640.59 53,911,253.62LAIF 4.366 0.00053,931,640.59 4.306Fair4.3660000 San Diego County900799 37,429.72 37,637.63SD COUNTY 3.830 0.00037,429.72 3.778Fair3.8300000 4.342 0.391101,109,540.16 101,136,039.93 100,991,535.43Report Total † = Duration can not be calculated on these investments due to incomplete Market price data. Portfolio OTAY NL! APPage 1Data Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 DU (PRF_DU) 7.3.11 Report Ver. 7.3.11 Month End GASB 31 Compliance Detail Sorted by Fund - Fund January 1, 2025 - January 31, 2025 Investment #Maturity Date Beginning Invested Value Purchase of Principal InvestmentClassFundCUSIP Adjustment in Value Ending Invested Value Addition to Principal Redemption of Principal Amortization Adjustment Change in Market Value Fund: Treasury Fund 2391 1,016,272.95Fair Value 09/23/2025 3,500.7599 1,019,773.703137EAEX30.00 0.00 0.00 0.00 2392 2,675,375.01Fair Value 09/23/2025 9,215.8599 2,684,590.863137EAEX30.00 0.00 0.00 0.00 2406 3,005,790.00Fair Value 04/25/2025 -1,410.0099 3,004,380.003134GX6A70.00 0.00 0.00 0.00 2394 1,937,540.00Fair Value 11/07/2025 6,700.0099 1,944,240.003135G06G30.00 0.00 0.00 0.00 2393 1,999,360.00Fair Value 01/07/2025 640.0099 0.003135G0X240.00 0.00 2,000,000.00 0.00 2417 4,003,760.00Fair Value 02/28/2025 -2,960.0099 4,000,800.003130AV7L00.00 0.00 0.00 0.00 2422 1,000,580.00Fair Value 05/10/2027 -3,240.0099 997,340.003130B3R540.00 0.00 0.00 0.00 2425 7,496,250.00Fair Value 12/30/2026 6,075.0099 7,502,325.003130B4DY40.00 0.00 0.00 0.00 9003 3,100.00Amortized 0.0099 3,100.00PETTY CASH 0.00 0.00 0.00 0.00 9004 708,504.84Amortized 0.0099 636,920.02OPERATING0.00 2,431,199.68 2,502,784.50 0.00 9005 404,741.49Amortized 0.0099 3,615.55PAYROLL0.00 0.00 401,125.94 0.00 9014 9,222.12Amortized 0.0099 47,635.97FLEX ACCT 0.00 50,030.00 11,616.15 0.00 9001 49,441,230.79Fair Value -1,690.3799 53,911,253.62LAIF0.00 18,671,713.21 14,200,000.00 0.00 2424 3,009,270.00Fair Value 07/28/2025 -600.0099 3,008,670.003133EPRS60.00 0.00 0.00 0.00 2420 1,003,930.00Fair Value 03/05/2026 610.0099 1,004,540.003133EP4K80.00 0.00 0.00 0.00 2397 1,989,900.00Fair Value 04/25/2025 2,880.0099 1,992,780.003133ENVC10.00 0.00 0.00 0.00 2402 2,999,250.00Fair Value 09/30/2025 1,050.0099 3,000,300.003133ENP950.00 0.00 0.00 0.00 2423 1,996,240.00Fair Value 12/16/2026 960.0099 1,997,200.003133ERK420.00 0.00 0.00 0.00 2421 1,008,790.00Fair Value 05/06/2027 2,000.0099 1,010,790.003133ERDS70.00 0.00 0.00 0.00 2426 0.00Fair Value 12/31/2025 -6,534.3899 7,499,325.0091282CJS17,505,859.38 0.00 0.00 0.00 2418 3,008,250.00Fair Value 07/31/2025 -1,560.0099 3,006,690.0091282CHN40.00 0.00 0.00 0.00 2419 2,996,940.00Fair Value 03/31/2025 990.0099 2,997,930.0091282CGU90.00 0.00 0.00 0.00 9007 9,194,000.00Fair Value -50,579.7199 37,637.63SD COUNTY POOL 0.00 37,429.72 9,143,212.38 0.00 9016 155,144.54Amortized 0.0099 313,948.72OWD TRUST & CUS 0.00 9,672,946.71 9,514,142.53 0.00 9011 39,434.42Amortized 0.0099 39,582.81RESERVE 10 BABS 0.00 148.39 0.00 0.00 9010 17,372.72Amortized 0.0099 17,438.09RESERVE-10A WRB 0.00 65.37 0.00 0.00 101,120,248.88Subtotal -33,952.86 101,682,806.977,505,859.38 30,863,533.08 37,772,881.50 0.00 101,120,248.88Total 101,682,806.97-33,952.867,505,859.38 30,863,533.08 37,772,881.50 0.00 Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 GD (PRF_GD) 7.3.11 Report Ver. 7.3.11 Month End Interest Earnings Sorted by Fund - Fund January 1, 2025 - January 31, 2025 Yield on Beginning Book Value Maturity Date Current Rate Ending Par Value EndingSecurity TypeFund Book Value Beginning Book Value Adjusted Interest Earnings Accretion Amortization/ Earnings Adjusted InterestAnnualized YieldCUSIPInvestment # Interest Earned Fund: Treasury Fund 1,043,366.4223911,045,000.00 0.375FAC09/23/2025 326.56 211.24 537.800.607991,043,155.183137EAEX3 2,746,610.7723922,751,000.00 0.375FAC09/23/2025 859.69 567.57 1,427.260.612992,746,043.203137EAEX3 3,000,000.0024063,000,000.00 5.000MC104/25/2025 12,500.00 0.00 12,500.004.906993,000,000.003134GX6A7 1,990,365.5923942,000,000.00 0.500FAC11/07/2025 833.33 1,047.22 1,880.551.113991,989,318.373135G06G3 0.0023930.00 1.625FAC01/07/2025 541.67 -201.31 340.361.035992,000,201.313135G0X24 4,000,000.0024174,000,000.00 5.000FAC02/28/2025 16,666.67 0.00 16,666.674.906994,000,000.003130AV7L0 1,000,000.0024221,000,000.00 4.530MC105/10/2027 3,775.00 0.00 3,775.004.445991,000,000.003130B3R54 7,500,000.0024257,500,000.00 4.350MC112/30/2026 27,187.50 0.00 27,187.504.268997,500,000.003130B4DY4 3,100.0090033,100.00PA1 0.00 0.00 0.00993,100.00PETTY CASH 636,920.029004636,920.02 2.250PA1 5,841.58 0.00 5,841.589.70899708,504.84OPERATING 3,615.5590053,615.55PA1 0.00 0.00 0.0099404,741.49PAYROLL 47,635.97901447,635.97PA1 0.00 0.00 0.00999,222.12FLEX ACCT 53,931,640.59900153,931,640.59 4.366LA1 188,907.47 0.00 188,907.474.4979949,459,927.38LAIF 2,999,304.7524243,000,000.00 4.875FAC07/28/2025 12,187.50 117.84 12,305.344.831992,999,186.913133EPRS6 996,098.9424201,000,000.00 4.625FAC03/05/2026 3,854.16 297.04 4,151.204.90899995,801.903133EP4K8 1,999,356.1823972,000,000.00 2.750FAC04/25/2025 4,583.34 229.93 4,813.272.835991,999,126.253133ENVC1 2,998,705.4224023,000,000.00 4.250FAC09/30/2025 10,625.00 162.50 10,787.504.236992,998,542.923133ENP95 2,000,318.7524232,000,000.00 4.125FAC12/16/2026 6,875.00 -14.17 6,860.834.038992,000,332.923133ERK42 1,000,107.8424211,000,000.00 4.750FAC05/06/2027 3,958.34 -3.97 3,954.374.655991,000,111.813133ERDS7 7,505,435.0224267,500,000.00 4.250TRC12/31/2025 22,893.65 -424.36 22,469.294.203990.0091282CJS1 2,995,503.5324183,000,000.00 4.750TRC07/31/2025 12,010.50 774.40 12,784.905.027992,994,729.1391282CHN4 2,994,327.0224193,000,000.00 3.875TRC03/31/2025 9,900.41 3,032.11 12,932.525.090992,991,294.9191282CGU9 37,429.72900737,429.72 3.830LA3 4,874.33 0.00 4,874.330.628999,143,212.38SD COUNTY POOL 313,948.729016313,948.72 4.210PA2 3,476.93 0.00 3,476.9326.38799155,144.54OWD TRUST & CUS 39,582.81901139,582.81 4.250PA2 142.86 0.00 142.864.2659939,434.42RESERVE 10 BABS 17,438.09901017,438.09 4.250PA2 62.94 0.00 62.944.2669917,372.72RESERVE-10A WRB 101,827,311.47Subtotal 101,800,811.70 4.148 358,680.475,796.04352,884.43101,198,504.70 101,827,311.47Total 101,800,811.70 4.148 358,680.475,796.04352,884.43101,198,504.70 Portfolio OTAY NL! APData Updated: SET_PM1: 02/18/2025 15:34 Run Date: 02/18/2025 - 15:35 IE (PRF_IE) 7.3.11 Report Ver. 7.3.11 Check Num Check Amt Invoice Description Invoice Total Vendor Num Invoice Num CLIMATE ADAPTATION & RESILIENCE 434.42 22463 20255986 CLIMATE ADAPTATION & RESILIENCE 19,163.36 22463 20255987 2063205 1,050.00 FY25 SHAREPOINT & INTRANET SUPPORT 1,050.00 8488 12747 2063101 1,348.53 INTERNET CIRCUITS (DEC 2024)1,348.53 18122 243531384 2063206 1,348.53 INTERNET CIRCUITS (JAN 2024)1,348.53 18122 250180818 2063196 1,209.48 UB REFUND 0000286474 1,209.48 99999 ubRef021325004 FY25 AS-NEEDED AQUA AMMONIA 402.27 7732 9157198359 FY25 AS-NEEDED AQUA AMMONIA 570.28 7732 9157198348 FY25 AS-NEEDED AQUA AMMONIA 2,506.37 7732 9157198354 2063197 79.16 UB REFUND 0000298664 79.16 99999 ubRef021325006 2063102 80.00 BILLING ADMINISTRATION 80.00 22138 803514 2063103 106.70 BILLING ADMINISTRATION 106.70 22138 804970 BILLING ADMINISTRATION 80.00 22138 823793 BILLING ADMINISTRATION 210.60 22138 810985 2063142 5,138.36 MAGNETIC LEVEL INDICATOR 5,138.36 22601 0946077 2063104 2,685.00 CUSTOMER REFUND 2,685.00 30005 8800012825 2063129 68.80 UB REFUND 0000291645 68.80 99999 ubRef013025007 2063143 125.00 EXPENSE REIMBURSEMENT 125.00 30009 012925 2063174 7,813.65 OMNI 3"-4" AND 6" C2 REGISTERS 7,254.38 3492 INV0106123 2063208 1,972.08 OMNI 3"-4" AND 6" C2 REGISTERS 1,832.26 3492 0106365 2063144 43,163.79 PROF SERV - DEC 2024 43,163.79 17264 309390 2063145 76,365.54 FY25 WORKERS' COMP (QTR 2)76,365.54 20199 123124 QTR 2 WC 2063105 29,795.00 MEMBERSHIP RENEWAL 29,795.00 108 09302024 2063106 3,806.47 TELEPHONE SERVICES (11/12/24 - 12/11/24)3,806.47 7785 000022718970 2063209 3,728.28 TELEPHONE SERVICES (12/12/24 - 01/11/25)3,728.28 7785 000022866833 2063198 1,117.00 UB REFUND 0000257986 1,117.00 99999 ubRef021325001 2063175 8,749.50 FY25 JANITORIAL SERVICES 8,749.50 20125 J1960 2063130 5.01 UB REFUND 0000293482 5.01 99999 ubRef013025009 2063107 321.09 ARMORED TRANSPORTATION SERVICE 321.09 21775 12817742 2063108 247.64 LEGISLATIVE ADVOCACY CONSULTING 247.64 8156 1017285 2063210 1,763.51 LEGISLATIVE ADVOCACY CONSULTING 1,763.51 8156 1022375 2063146 1,299.60 ELECTRICAL ENGINEERING SERVICE 1,299.60 14112 220754114015 2063176 3,344.50 LEGAL CONSULTING SERVICES 3,344.50 3005 334159 2063211 5,072.00 LEGAL CONSULTING SERVICES 5,072.00 3005 335940 2063147 134,067.80 OLYMPIC PARKWAY PIPELINE (DEC 2024)141,124.00 18665 812312024 2063148 16,518.75 UTILITY LOCATING SERVICES (DEC 2024)16,518.75 20374 CAL2051 Check Register Check Dates: 1/23/2025 thru 2/19/2025 Vendor Name Check Dt Invoice ABLEFORCE INC 2/19/2025 12/31/2024 ACC BUSINESS 1/30/2025 12/27/2024 2/19/2025 1/27/2025 AARC CONSULTANTS LLC 2063204 19,597.78 2/19/2025 2/4/2025 2/19/2025 2/4/2025 ACCO ENGINEERED SYSTEMS 2/12/2025 2/10/2025 AIRGAS SPECIALTY PRODUCTS INC 2063173 3,478.92 2/12/2025 1/9/2025 2/12/2025 1/9/2025 2/12/2025 1/9/2025 ALEXIS CHAVEZ 2/12/2025 2/10/2025 AMERIFLEX 1/30/2025 1/9/2025 1/30/2025 1/9/2025 2063207 290.60 2/19/2025 2/8/2025 2/19/2025 2/6/2025 ANAHI VINSON 1/30/2025 1/28/2025 ANTHONY DOMINGUEZ 2/5/2025 1/29/2025 AMETEK MAGNETROL USA LLC 2/5/2025 12/12/2024 AMS PAVING INC 1/30/2025 1/28/2025 ARTIANO SHINOFF ABED 2/5/2025 12/31/2024 ASSOC OF CA WATER AGENCIES 2/5/2025 12/31/2024 AQUA-METRIC SALES COMPANY 2/12/2025 1/22/2025 2/19/2025 1/29/2025 AVS PROPERTIES LLC 2/12/2025 2/10/2025 AZTEC LANDSCAPING INC 2/12/2025 12/31/2024 ASSOCIATION OF CALIFORNIA 1/30/2025 9/30/2024 AT&T 1/30/2025 12/12/2024 2/19/2025 1/12/2025 BROWNSTEIN HYATT FARBER 1/30/2025 1/6/2025 2/19/2025 2/12/2025 BEVON DRUMMOND 1/30/2025 1/28/2025 BRINKS INC 1/30/2025 1/1/2025 BURTECH PIPELINE INC 2/5/2025 1/8/2025 CALBURTON INC 2/5/2025 1/17/2025 BSE ENGINEERING INC 2/5/2025 12/31/2024 BURKE WILLIAMS & SORENSEN LLP 2/12/2025 12/27/2024 2/19/2025 1/30/2025 2/26/2025 7:26:47 PM Page 1 Check Register Check Dates: 1/23/2025 thru 2/19/2025 2063212 320.00 TUITION REIMBURSEMENT (CERTIFICATION)320.00 22093 CR021425 2063149 4,904.50 RFWCWRF DISINFECT SYS (11/1/24-11/30/24))4,904.50 15177 FB59075 RFWCWRF DISINFECT SYS (9/1/24-12/31/24)1,589.50 15177 FB61594 RFWCWRF DISINFECT SYS (9/1/24-12/31/24)22,738.50 15177 FB61211 2063213 22,110.00 FY25-26 ENDPOINT SECURITY SERV 22,110.00 21172 250206-0064472 2063150 2,150.00 VIBRATION TEST ANALYSIS 2,150.00 22272 96814-01(R) ENVIRONMENTAL SERV (10/1/24-11/30/24)450.00 21705 37565 ENVIRONMENTAL SERV (9/1/24 - 9/30/24)6,672.60 21705 37458 2063214 22,838.00 SWITCHGEAR PREVENTATIVE MAINT 22,838.00 6418 19491 BACTERIOLOGICAL TESTING 250.00 4119 38790 BACTERIOLOGICAL TESTING 250.00 4119 38792 BACTERIOLOGICAL TESTING 250.00 4119 38793 BACTERIOLOGICAL TESTING 270.00 4119 38791 BACTERIOLOGICAL TESTING 670.00 4119 38795 BACTERIOLOGICAL TESTING 760.00 4119 38794 BACTERIOLOGICAL TESTING 197.50 4119 39132 BACTERIOLOGICAL TESTING 197.50 4119 39133 BACTERIOLOGICAL TESTING 250.00 4119 39129 BACTERIOLOGICAL TESTING 250.00 4119 39135 BACTERIOLOGICAL TESTING 290.00 4119 39131 BACTERIOLOGICAL TESTING 330.00 4119 39130 FY25 DATA SERVICES - REALQUEST 540.75 15049 82232884 FY25 DATA SERVICES - REALQUEST 540.75 15049 82236261 2063151 1,305.00 405 GALLON TANK 1,305.00 2643 C2024580 DEVELOPER INSPECTION (DEC 2024)116.50 184 2003193E640361224 DEVELOPER INSPECTION (DEC 2024)116.50 184 2003193E641181224 DEVELOPER INSPECTION (DEC 2024)466.00 184 2003193E641891224 SHUT DOWN TEST (JAN 2025)233.00 184 2003193E632930125 SHUT DOWN TEST (JAN 2025)233.00 184 2003193E634500125 SHUT DOWN TEST (JAN 2025)233.00 184 2003193E642060125 2063218 687.00 PERMIT FEES # 01214 (MAR 2025-MAR 2026)687.00 2122 012142012RI2025 2063115 119.92 BI-WEEKLY PAYROLL DEDUCTION 119.92 22745 Ben2754777 2063182 119.92 BI-WEEKLY PAYROLL DEDUCTION 119.92 22745 Ben2754797 2063199 55.30 UB REFUND 0000268369 55.30 99999 ubRef021325003 2063178 2,788.25 ENGINEERING MANAGER OFFICE 2,788.25 18756 18178 2063131 1,783.48 UB REFUND 0000286112 1,783.48 99999 ubRef013025005 CRANE QUARTERLY PM SERVICE INSPECT 320.00 4497 17041 CARLOS ROMERO 2/19/2025 2/14/2025 CAROLLO ENGINEERS INC 2/5/2025 12/11/2024 2063177 24,328.00 2/12/2025 1/15/2025 2/12/2025 1/9/2025 CHAMBERS GROUP INC 2063109 7,122.60 1/30/2025 12/20/2024 1/30/2025 10/16/2024 CENTER FOR INTERNET 2/19/2025 2/6/2025 CHA CONSULTING INC 2/5/2025 12/18/2024 CHULA VISTA ELECTRIC CO 2/19/2025 2/6/2025 CLARKSON LAB & SUPPLY INC 2063110 2,450.00 1/30/2025 12/31/2024 1/30/2025 12/31/2024 1/30/2025 12/31/2024 1/30/2025 12/31/2024 1/30/2025 12/31/2024 1/30/2025 12/31/2024 2063215 1,515.00 2/19/2025 1/31/2025 2/19/2025 1/31/2025 2/19/2025 1/31/2025 2/19/2025 1/31/2025 2/19/2025 1/31/2025 2/19/2025 1/31/2025 CORELOGIC SOLUTIONS LLC 2063216 1,081.50 2/19/2025 12/31/2024 2/19/2025 1/31/2025 2/19/2025 2/1/2025 2/19/2025 2/1/2025 2/19/2025 2/1/2025 CORE-ROSION PRODUCTS 2/5/2025 12/17/2024 COUNTY OF SAN DIEGO 2063111 699.00 1/30/2025 1/1/2025 1/30/2025 1/1/2025 1/30/2025 1/1/2025 2063217 699.00 COURTNEY HOLLEMANS 2/12/2025 2/10/2025 CULTURA 2/12/2025 11/30/2024 2/19/2025 1/29/2025 COURT ORDERED DEBT COLLECTIONS 1/30/2025 1/30/2025 2/12/2025 2/12/2025 CWC COTA VERA 127 LLC 1/30/2025 1/28/2025 D & R CRANE INC 2063219 640.00 2/19/2025 1/20/2025 2/26/2025 7:26:47 PM Page 2 Check Register Check Dates: 1/23/2025 thru 2/19/2025 CRANE QUARTERLY PM SERVICE INSPECT 320.00 4497 17042 2063152 26.13 MILEAGE REIMBURSEMENT 26.13 30035 120624123124 2063112 162.34 CUSTOMER REFUND 162.34 22464 4901012825 2063113 15,841.43 METER CHANGEOUT CONSULTING SERV 15,841.43 21597 24035 2063220 10,870.00 METER CHANGEOUT CONSULTING SERV 10,870.00 21597 24523 2063179 267.88 FY25 RECYCLED WASTE SERVICE 267.88 2447 5458 123124 2063221 2,991.00 UNEMPLOYMENT INSUR (10/1/24-12/31/24)2,991.00 331 L1287689936 2063153 3,338.10 MICROSOFT 365 BUSINESS APP LIC 3,338.10 20794 224181 2063222 3,821.66 MICROSOFT 365 BUSINESS APP LIC 3,821.66 20794 225552 2063154 3,520.24 WATER EFFICIENCY EVAL CONSULTING 3,520.24 21206 OTAY CP-06 2063180 28,818.91 ENVIRONMENTAL SERVICES (NOV 2024)28,818.91 22412 202786 2063223 23,112.52 ENVIRONMENTAL SERVICES (DEC 2024)23,112.52 22412 204441 2063155 1,705.00 RESERVOIR FLOATING COVER OUT 1,705.00 22478 24186 2063114 1,450.13 CY25 VISION BENEFITS ADMINISTRATION 1,450.13 20511 166595615 INVENTORY 282.10 3546 0871213 INVENTORY 708.00 3546 0871205-1 INVENTORY 3,788.40 3546 0871212 INVENTORY 9,065.69 3546 0871205 2063181 5,448.35 INVENTORY 5,056.47 3546 0870167 INVENTORY 4,622.08 3546 0872953 INVENTORY 7,500.00 3546 0874004 2063157 99.00 DOCUMENT SERVICE FY 25 99.00 17888 9003401224 2063225 99.00 DOCUMENT SERVICE FY 25 99.00 17888 9003400125 2063132 1,374.90 UB REFUND 0000291363 1,374.90 99999 ubRef013025006 2063226 19.60 MILEAGE REIMBURSEMENT 19.60 22628 010125013125 2063133 9.96 UB REFUND 0000265629 9.96 99999 ubRef013025004 2063158 286,149.50 RWCWRF DISINFECTION SYSTEM (DEC 2024)301,210.00 22023 712312024 2063227 154,755.00 RWCWRF DISINFECTION SYSTEM (JAN 2025)162,900.00 22023 801312025 FY25 AS-NEEDED SODIUM HYPOCHLORITE 444.12 19978 1010339 FY25 AS-NEEDED SODIUM HYPOCHLORITE 458.92 19978 1009295 FY25 AS-NEEDED SODIUM HYPOCHLORITE 464.85 19978 1010898 FY25 AS-NEEDED SODIUM HYPOCHLORITE 503.34 19978 1010338 FY25 AS-NEEDED SODIUM HYPOCHLORITE 541.83 19978 1010895 FY25 AS-NEEDED SODIUM HYPOCHLORITE 609.93 19978 1010897 FY25 AS-NEEDED SODIUM HYPOCHLORITE 784.61 19978 1011133 FY25 AS-NEEDED SODIUM HYPOCHLORITE 903.05 19978 1009298 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,228.73 19978 1010893 2/19/2025 1/20/2025 E SOURCE COMPANIES LLC 1/30/2025 9/30/2024 2/19/2025 1/31/2025 DELFINA GONZALEZ 2/5/2025 12/31/2024 DICOPEL INC 1/30/2025 1/28/2025 ENTISYS 360 2/5/2025 12/26/2024 2/19/2025 1/28/2025 EDCO DISPOSAL CORPORATION 2/12/2025 12/31/2024 EMPLOYMENT DEVELOPMENT DEPT 2/19/2025 1/30/2025 EROSION CONTROL 2/5/2025 12/17/2024 EYEMED (FIDELITY)1/30/2025 1/1/2025 ENVIRONMENTAL INCENTIVES INC 2/5/2025 1/17/2025 ENVIRONMENTAL SCIENCE ASSOC 2/12/2025 12/12/2024 2/19/2025 1/31/2025 2/4/2025 2/19/2025 2/4/2025 FIRST AMERICAN DATA TREE LLC 2/5/2025 12/31/2024 2/19/2025 1/31/2025 FERGUSON WATERWORKS # 1083 2063156 14,917.11 2/5/2025 12/20/2024 2/5/2025 1/16/2025 2/5/2025 12/17/2024 2/5/2025 12/20/2024 2/12/2025 12/31/2024 2063224 13,061.53 2/19/2025 GENNY BEDOYA 1/30/2025 1/28/2025 GSE CONSTRUCTION CO INC 2/5/2025 1/6/2025 2/19/2025 2/4/2025 FJ WILLER CONTRACTING CO 1/30/2025 1/28/2025 FRANCISCO RIVERA 2/19/2025 1/31/2025 12/30/2024 1/30/2025 12/13/2024 1/30/2025 12/23/2024 1/30/2025 2063116 29,510.34 1/30/2025 12/20/2024 1/30/2025 12/13/2024 1/30/2025 12/27/2024 HASA INC. 1/30/2025 12/20/2024 1/30/2025 12/27/2024 1/30/2025 12/27/2024 2/26/2025 7:26:47 PM Page 3 Check Register Check Dates: 1/23/2025 thru 2/19/2025 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,672.85 19978 1009300 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,740.95 19978 1010337 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,776.48 19978 1010894 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,235.41 19978 1010896 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,279.82 19978 1010336 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,368.64 19978 1009680 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,664.72 19978 1009297 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,871.98 19978 1010340 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,960.81 19978 1008111 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,999.30 19978 1009299 FY25 AS-NEEDED SODIUM HYPOCHLORITE 319.77 19978 1014566 FY25 AS-NEEDED SODIUM HYPOCHLORITE 503.34 19978 1014568 FY25 AS-NEEDED SODIUM HYPOCHLORITE 636.57 19978 1012201 FY25 AS-NEEDED SODIUM HYPOCHLORITE 710.59 19978 1013674 FY25 AS-NEEDED SODIUM HYPOCHLORITE 829.03 19978 1012203 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,125.11 19978 1011950 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,584.03 19978 1014565 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,013.35 19978 1012205 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,146.58 19978 1013676 FY25 AS-NEEDED SODIUM HYPOCHLORITE 2,694.33 19978 1013675 FY25 AS-NEEDED SODIUM HYPOCHLORITE 3,641.79 19978 1011952 FY25 AS-NEEDED SODIUM HYPOCHLORITE 3,686.20 19978 1014567 FY25 AS-NEEDED SODIUM HYPOCHLORITE 4,352.38 19978 1011951 FY25 AS-NEEDED SODIUM HYPOCHLORITE 553.67 19978 1015614 FY25 AS-NEEDED SODIUM HYPOCHLORITE 562.55 19978 1015613 FY25 AS-NEEDED SODIUM HYPOCHLORITE 1,480.40 19978 1015615 2063184 3,340.00 2022 WFMP (DEC 2024) 3,340.00 18436 2009400630 2063159 208.78 AETNA EMPLOYEE ASSISTANCE PROG 208.78 22165 E0337012 ENVIRONMENTAL SERVICES (DEC 2024)6,973.17 2008 126012 ENVIRONMENTAL SERVICES (DEC 2024)15,745.21 2008 126032 SMA HABITAT MANAGEMENT (DEC 2024)14,911.63 2008 93552 SMA HABITAT MANAGEMENT (DEC 2024)17,527.38 2008 93619 2063230 6,465.00 GRANT WRITING (11/1/24-12/31/24)6,465.00 20950 20250030 2063231 5,775.00 ANNUAL HARMONY MOBILE SOFTWARE 5,775.00 21322 0003464 TRAFFIC CONTROL SVCS 1,235.00 6511 00178282 TRAFFIC CONTROL SVCS 1,375.00 6511 00178284 TRAFFIC CONTROL SVCS 4,445.00 6511 00178283 1/30/2025 12/13/2024 1/30/2025 12/20/2024 1/30/2025 12/27/2024 1/30/2025 12/13/2024 1/30/2025 12/20/2024 1/30/2025 12/5/2024 1/30/2025 12/27/2024 1/30/2025 12/20/2024 1/30/2025 12/17/2024 1/30/2025 12/13/2024 2063183 24,243.07 2/12/2025 1/23/2025 2/12/2025 1/23/2025 2/12/2025 1/8/2025 2/12/2025 1/16/2025 2/12/2025 1/8/2025 2/12/2025 1/7/2025 1/16/2025 2/12/2025 1/7/2025 2/12/2025 1/23/2025 2/12/2025 1/23/2025 2/12/2025 1/8/2025 2/12/2025 1/16/2025 HAZEN AND SAWYER DPC 2/12/2025 1/10/2025 HEALTH AND HUMAN RESOURCE 2/5/2025 1/7/2025 2/12/2025 1/7/2025 2063228 2,596.62 2/19/2025 1/30/2025 2/19/2025 1/30/2025 2/19/2025 1/30/2025 2/12/2025 HOCH CONSULTING APC 2/19/2025 2/3/2025 HPS WEST INC.2/19/2025 1/20/2025 HELIX ENVIRONMENTAL 2063117 22,718.38 1/30/2025 12/15/2024 1/30/2025 12/15/2024 2063229 32,439.01 2/19/2025 12/12/2024 2/19/2025 1/17/2025 HUDSON SAFE-T-LITE RENTALS 2063232 7,055.00 2/19/2025 1/23/2025 2/19/2025 1/23/2025 2/19/2025 1/23/2025 2/26/2025 7:26:47 PM Page 4 Check Register Check Dates: 1/23/2025 thru 2/19/2025 BILL PROCESSING SERVICES FY25 2,785.24 8969 279013 BILL PROCESSING SERVICES FY25 4,311.79 8969 278311 BILL PROCESSING SERVICES FY25 15,117.16 8969 278312 BILL PROCESSING SERVICES FY25 3,864.67 8969 280414 BILL PROCESSING SERVICES FY25 14,443.83 8969 280415 2063119 2,355.00 FY25 ANTENNA SUBLEASE 2,355.00 20752 4805570 2063160 2,355.00 FY25 ANTENNA SUBLEASE 2,355.00 20752 412893999 2063120 7,650.00 FY25 AS-NEEDED CHLORINE GAS 7,650.00 10563 958844 2063234 5,100.00 FY25 AS-NEEDED CHLORINE GAS 5,100.00 10563 960869 2063200 166.28 UB REFUND 0000266611 166.28 99999 ubRef021325002 AS-NEEDED FLEET WASHING SVCS FLEET 128.64 22129 Q409939 AS-NEEDED FLEET WASHING SVCS FLEET 165.40 22129 Q413354 AS-NEEDED FLEET WASHING SVCS FLEET 137.83 22129 Q435098 AS-NEEDED FLEET WASHING SVCS FLEET 161.84 22129 Q420965 2063134 13.20 UB REFUND 0000292154 13.20 99999 ubRef013025008 AS-NEEDED ASPHALTIC PAVING SERV 37,132.53 5840 24-119-2 AS-NEEDED ASPHALTIC PAVING SERV 38,826.40 5840 25-172-4 2063237 6,362.53 KORTERRA LOCATE MANAGEMENT 6,362.53 20677 25673 2063121 31.68 REFUND 31.68 30007 012125 2063162 356.18 3G XTR ENCODERS 330.56 5329 278903 2063238 3,236.43 SMA HABITAT MANAGEMENT (NOV 2024)3,236.43 1824 25012802 2063163 24,396.97 PRESSURE VESSEL FOR ROLLING HILLS 24,396.97 20334 51501A 2063135 147.95 UB REFUND 0000094689 147.95 99999 ubRef013025002 2063185 9,999.00 FY25/CY24 LANDSCAPE MAINTENANCE 9,999.00 17261 9410 2063122 2,205.00 GEOTECHNICAL SERVICES FY 24/25 2,205.00 761 296698 2063164 11,060.00 ENGINEERING DESIGN SERV (AUG 2024)11,060.00 18332 406819 RSD/JAMUL PL REPLACEMENT (SEPT 2024)7,752.50 18332 423045 RSD/JAMUL PL REPLACEMENT (SEPT 2024)18,222.50 18332 416443 2063239 6,055.00 RSD/JAMUL PL REPLACEMENT (DEC 2024)6,055.00 18332 429246 2063136 904.72 UB REFUND 0000265583 904.72 99999 ubRef013025003 IN-PLANT INSPECTION (JAN 2025)2,512.00 16834 11419 IN-PLANT INSPECTION (JAN 2025)8,051.00 16834 11418 2063241 5,311.00 INVENTORY 4,929.00 1002 S100471249.001 2063201 537.39 UB REFUND 0000297889 537.39 99999 ubRef021325005 2063187 1,625.01 PETTY CASH REIMBURSEMENT 1,625.01 137 021025 2063165 2,322.01 CISCO MERAKI ACCESS POINTS 2,155.00 13122 43301 2063166 5,887.50 WATER & SEWER COST OF SERVICE 5,887.50 20861 37327 INFOSEND INC 2063118 22,214.19 1/30/2025 1/8/2025 1/30/2025 12/31/2024 1/30/2025 12/31/2024 2063233 18,429.24 2/19/2025 1/31/2025 2/19/2025 1/31/2025 JCI JONES CHEMICALS INC 1/30/2025 12/30/2024 2/19/2025 1/29/2025 IWG TOWERS ASSETS II LLC 1/30/2025 1/1/2025 2/5/2025 2/1/2025 KATHY SOYINTHISANE 2/12/2025 2/10/2025 KEPT COMPANIES INC 2063161 294.04 2/5/2025 12/20/2024 2/5/2025 12/27/2024 2063235 299.67 2/19/2025 1/24/2025 2/19/2025 1/3/2025 KEVIN REED 1/30/2025 1/28/2025 KIRK PAVING INC 2063236 72,160.98 2/19/2025 11/9/2024 2/19/2025 12/18/2024 MASTER METER INC 2/5/2025 12/27/2024 MERKEL & ASSOCIATES INC 2/19/2025 1/28/2025 KORTERRA INC 2/19/2025 1/1/2025 MARY SAXTON 1/30/2025 1/28/2025 NATURESCAPE SERVICES 2/12/2025 12/31/2024 NINYO & MOORE GEOTECHNICAL 1/30/2025 11/30/2024 MODERN CUSTOM FABRICATION INC 2/5/2025 9/18/2024 MYRNA CONTRERAS 1/30/2025 1/28/2025 NV5 INC 2/5/2025 9/18/2024 2063186 25,975.00 2/12/2025 12/20/2024 2/12/2025 11/19/2024 2/19/2025 2/3/2025 PACIFIC PIPELINE SUPPLY INC 2/19/2025 1/3/2025 PATRIOT GENERAL ENGINEERING 2/12/2025 2/10/2025 OMC PROPERTIES LLC 1/30/2025 1/28/2025 ON-SITE TECHNICAL SVCS INC 2063240 10,563.00 2/19/2025 2/5/2025 2/19/2025 2/5/2025 RAFTELIS 2/5/2025 1/13/2025 PETTY CASH CUSTODIAN 2/12/2025 2/10/2025 PINNACLE BUSINESS SOLUTIONS 2/5/2025 12/26/2024 2/26/2025 7:26:47 PM Page 5 Check Register Check Dates: 1/23/2025 thru 2/19/2025 2063188 155,352.32 JOHN DEERE BACKHOE 144,429.29 2950 E0558037 2063242 644.84 FY25 AS-NEEDED SAFETY BOOTS 644.84 19836 20250110069504 2063243 600.00 FY25 SAFETY CONSULTING & SUPP 600.00 11969 4985 2063244 8,000.00 DIGITAL TWIN PROOF OF CONCEPT 8,000.00 8972 0105278 2063123 1,352.23 CHECK STOCK 1,266.97 2683 0546418 FY25 MONTHLY ASSESSOR DATA 125.00 2586 202500017 FY25 MONTHLY ASSESSOR DATA 125.00 2586 202500102 2063124 422.53 BI-WEEKLY PAYROLL DEDUCTIONS 422.53 22684 Ben2754775 2063125 560.00 SOCAL WATERSMART HEW HET WBIC 560.00 3 2829 UTILITY EXPENSES - MONTHLY 980.43 121 012025 UTILITY EXPENSES - MONTHLY 1,211.81 121 012725 UTILITY EXPENSES - MONTHLY 19,674.34 121 012225 UTILITY EXPENSES - MONTHLY 48,485.89 121 012825 UTILITY EXPENSES - MONTHLY 100,065.17 121 013025 UTILITY EXPENSES - MONTHLY 4,014.90 121 020525 UTILITY EXPENSES - MONTHLY 46,922.71 121 020325 UTILITY EXPENSES - MONTHLY 115,320.24 121 020725 2063126 686.41 CUSTOMER REFUND 686.41 30006 0015012825 2063168 293.94 PRIVATE SECURITY HMA SANDAG 293.94 19603 11820891 2063189 670.00 FY25 ON-DEMAND SECURITY RESPONSE 670.00 19603 12046062 2063190 307.50 HR/EMPLOYMENT RELATIONS CONSULT 307.50 22201 012896 2063247 1,017.50 HR/EMPLOYMENT RELATIONS CONSULT 1,017.50 22201 013090 2063248 21,600.00 WIN-911 SOFTWARE LICENSE 21,600.00 30001 64987 2063127 553.85 BI-WEEKLY PAYROLL DEDUCTION 553.85 21115 Ben2754773 2063191 553.85 BI-WEEKLY PAYROLL DEDUCTION 553.85 21115 Ben2754795 2063192 166,699.84 WATER SYS ANNUAL FEES (7/1/25-6/30/26)166,699.84 1460 LW-1049886 2063169 11,764.25 CY2025 LIFE & STD/LTD INSURANCE 11,764.25 15974 38166 010125 UNLEADED AND DIESEL FUEL 10,376.93 10339 443156 UNLEADED AND DIESEL FUEL 15,328.21 10339 443117 2063128 3,200.00 AS-NEEDED COMMUNICATIONS CONSULT 3,200.00 18376 1762 2063193 3,000.00 AS-NEEDED COMMUNICATIONS CONSULT 3,000.00 18376 1770 2063194 1,231.57 UNMANNED AIRCRAFT SYS (UAS)1,231.57 21394 OTAY 15 MUNIS ERP UPGRADE IMPLEMENTATION 1,850.00 3261 045-499463 MUNIS ERP UPGRADE IMPLEMENTATION 4,800.00 3261 045-497103 MUNIS ERP UPGRADE IMPLEMENTATION 8,043.53 3261 045-498817 MUNIS ERP UPGRADE IMPLEMENTATION 8,385.03 3261 045-502344 MUNIS ERP UPGRADE IMPLEMENTATION 11,800.00 3261 045-501296 RDO EQUIPMENT CO 2/12/2025 12/31/2024 RICK ENGINEERING COMPANY 2/19/2025 12/18/2024 SAFECHECKS INC 1/30/2025 1/10/2025 RED WING BUSINESS ADV ACCOUNT 2/19/2025 1/10/2025 RELIANCE SAFETY CONSULTANT INC 2/19/2025 12/16/2024 1/3/2025 2/19/2025 2/3/2025 SAN DIEGO COUNTY SHERIFF 1/30/2025 1/30/2025 SAN DIEGO COUNTY ASSESSOR 2063245 250.00 2/19/2025 2063246 166,257.85 2/19/2025 2/5/2025 2/19/2025 2/3/2025 2/19/2025 2/7/2025 SAN DIEGO COUNTY WATER AUTH 1/30/2025 12/31/2024 SAN DIEGO GAS & ELECTRIC 2063167 170,417.64 2/5/2025 1/20/2025 2/5/2025 1/27/2025 2/5/2025 1/22/2025 2/5/2025 1/28/2025 2/5/2025 1/30/2025 SHAW HR CONSULTING INC.2/12/2025 12/17/2024 2/19/2025 1/22/2025 SANYA MULHERN 1/30/2025 1/28/2025 SECURITAS SECURITY SVC USA INC 2/5/2025 8/1/2024 2/12/2025 1/31/2025 STATE WATER RESOURCES 2/12/2025 12/20/2024 SUN LIFE FINANCIAL 2/5/2025 1/1/2025 SMARTSIGHTS LLC 2/19/2025 1/31/2025 SONIA PONCE 1/30/2025 1/30/2025 2/12/2025 2/12/2025 SVPR COMMUNICATIONS LLC 1/30/2025 12/31/2024 2/12/2025 1/31/2025 SUPREME OIL COMPANY 2063249 25,705.14 2/19/2025 1/28/2025 2/19/2025 1/28/2025 TEEDEEUAS LLC 2/12/2025 11/30/2024 TYLER TECHNOLOGIES INC 2063195 49,278.56 2/12/2025 12/31/2024 2/12/2025 12/11/2024 2/12/2025 12/18/2024 2/12/2025 1/22/2025 2/12/2025 1/15/2025 2/26/2025 7:26:47 PM Page 6 Check Register Check Dates: 1/23/2025 thru 2/19/2025 MUNIS ERP UPGRADE IMPLEMENTATION 14,400.00 3261 045-500122 UNDERGROUND ALERTS FY25 307.36 427 24252158 UNDERGROUND ALERTS FY25 781.45 427 1220240517 UNDERGROUND ALERTS FY25 307.36 427 24252526 UNDERGROUND ALERTS FY25 881.35 427 120250512 FY25 PORT. TOILET RENTAL 155.17 15675 5051822 FY25 PORT. TOILET RENTAL 766.25 15675 5049876 FY25 PORT. TOILET RENTAL 155.17 15675 5109370 FY25 PORT. TOILET RENTAL 766.25 15675 5108408 2063138 6,000.00 PREPAID POSTAGE MACHINE 6,000.00 350 3951012825 CMIS (DEC 2024) 5,100.00 8028 SD545815 CMIS (DEC 2024) 25,080.00 8028 SD237812 2063171 12,785.00 CMIS 870-2 RES & 870-1 RES (DEC 2024)12,785.00 8028 SD24030504 2063252 16,280.00 P2228 - CONSTRUCTION MANAGEMENT 16,280.00 8028 SD24030502 WATER INTERNS FY25 596.40 20909 46844581 WATER INTERNS FY25 1,133.16 20909 46836886 2063202 16,730.00 HYDRAULIC MODELING (ENDING 12/16,730.00 15726 10373 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 81232 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 81255 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82034 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82040 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82055 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82056 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82083 FY25 AS-NEEDED BEE REMOVAL SERV 125.00 1343 82115 2063203 18,679.58 PLAN CHECK (12/7/24-1/3/25) 18,679.58 21997 2061478 ENGINEERING DESIGN SERV (NOV 2024)2,080.00 19866 187777 ENGINEERING DESIGN SERV (NOV 2024)8,288.50 19866 187791 ENGINEERING DESIGN SERV (DEC 2024)3,570.00 19866 1886768677 ENGINEERING DESIGN SERV (DEC 2024)4,375.00 19866 188686 ENGINEERING DESIGN SERV (NOV 2024)8,650.00 19866 187801 2,352,586.82 2/12/2025 12/31/2024 UNDERGROUND SERVICE ALERT 2063170 1,088.81 2/5/2025 1/1/2025 2/5/2025 1/1/2025 2063250 1,188.71 2/19/2025 2/1/2025 2/19/2025 2/1/2025 UNITED SITE SERVICES INC 2063137 921.42 1/30/2025 1/7/2025 1/30/2025 1/7/2025 2063251 921.42 2/19/2025 2/4/2025 2/19/2025 2/4/2025 VOLT WORKFORCE SOLUTIONS 2063140 1,729.56 1/30/2025 12/22/2024 1/30/2025 12/15/2024 UNITED STATES POSTAL SERVICE 1/30/2025 1/28/2025 VALLEY CONSTRUCTION MANAGEMENT 2063139 30,180.00 1/30/2025 1/5/2025 1/30/2025 1/5/2025 2/5/2025 1/5/2025 2/19/2025 11/8/2024 2/5/2025 11/30/2024 WATER SYSTEMS CONSULTING INC 2/12/2025 12/31/2024 WE GOT YA PEST CONTROL INC 2063253 1,000.00 2/19/2025 12/18/2024 2/19/2025 12/20/2024 2/19/2025 1/7/2025 2/19/2025 1/7/2025 2/19/2025 2/19/2025 1/24/2025 WEST YOST & ASSOCIATES INC 2/12/2025 12/31/2024 1/10/2025 2/19/2025 1/10/2025 2/19/2025 1/21/2025 Check Grand Total: WOOD RODGERS INC 2063141 10,368.50 1/30/2025 11/30/2024 1/30/2025 11/30/2024 2063172 16,595.00 2/5/2025 12/31/2024 2/5/2025 12/31/2024 2/26/2025 7:26:47 PM Page 7