Loading...
HomeMy WebLinkAboutAll Meter Fees and Deposits Effective_1-1-2025Effective Date:1/1/2025 ENR Date:11/11/2024 DEPOSIT FEE NOTE PLAN REVIEW - Section 60.08 A $3,000.00 SUB-AREA MASTER PLAN REVIEW - Section 60.04 $5,000.00 RP / RPDA PLAN REVIEW - Section 38 $1,000.00 *RP / RPDA INSPECTION SERVICES - Section 38.02 PER ESTIMATE *CONSTRUCTION DEPOSIT - Section 60.08 B PER ESTIMATE *SERVICE INSTALLATION REQUEST - Section 28.02 PER ESTIMATE **WATER METER FEES (POTABLE/RECYCLED) - Section 28.01 B SEE ENCLOSED SCHEDULE OF FEES Per Demand Factor **WATER ANNEXATION FEE - Section 9.04 B $2,725.52 Per Demand Factor **SEWER ANNEXATION FEE - Section 9.04 C $1,490.97 Per EDU **SEWER CAPACITY FEE (WITHIN SEWER ID) - Section 53.03 A $7,778.55 Per EDU **SEWER CAPACITY FEE (OUTSIDE SEWER ID) - Section 53.03 A $10,759.61 Per EDU RUSSELL SQUARE PUMP STATION (SEWER CONNECTION FEE) - Section 53.03 B $7,500.00 Per EDU ***DISTRICT PROCESSING FEE - Section 9.04 A $1,031.17 All Annexations ****STATE BOARD OF EQUALIZATION - Section 9.04 A $300.00 - $3,500.00 All Annexations TEMPORARY HYDRANT METER - 2" - Section 31.03 A.1. $2,865.00 A reduced pressure backflow prevention device is installed by the District TEMPORARY HYDRANT METER - 4" - Section 31.03 A.1. $1,986.00 A reduced pressure backflow prevention device is required. Developer is responsible for the installation and certification of a reduced pressure backflow prevention device TEMPORARY HYDRANT METER - 6" - Section 31.03 A.1. $2,465.00 A reduced pressure backflow prevention device is required. Developer is responsible for the installation and certification of a reduced pressure backflow prevention device TANK TRUCK HYDRANT METER - Section 31.03 A.1. $1,000.00 The tank truck temporary hydrant meter is approved for within District boundaries only OUTSIDE USER REQUEST - Section 25.03 D.11.(c).$500.00 WAIVER REQUEST - Section 10.01 $50.00 AVAILABILITY LETTER (WATER/SEWER) - Section 60.03 $75.00 *INCLUDES PERMIT FEE, IF NECESSARY **FEE LINKED TO "ENR INDEX" - ADJUSTED QUARTERLY ***FEE LINKED TO "CONSUMER PRICE INDEX" - ADJUSTED ANNUALLY AND POSTED ON JULY 1 ****FEE BASED ON ACREAGE OF LAND AND IS REQUIRED BY THE STATE BOARD OF EQUALIZATION (http://www.boe.ca.gov) ITEM - CODE OF ORDINANCES SECTION PUBLIC SERVICES FEES AND DEPOSITS OTAY WATER DISTRICT 2554 SWEETWATER SPRINGS BLVD. SPRING VALLEY, CA 91978 Questions about fees and deposits, call Public Services at (619) 670-2241 or e-mail pscounter@otaywater.gov. Office Hours: Monday thru Friday 8:00 am to 5:00 pm EFFECTIVE DATE:1/1/2025 ENR DATE:11/11/2024 3/4" METER 1" METER 1 1/2" METER 2" METER 3" METER 4" METER 6" METER 8" METER 10" METER MAXIMUM RATE IN U.S. GALLONS PER MINUTE GPM RATE AT 80% OF MAXIMUM FLOW 24 gpm 40 gpm 80 gpm 128 gpm 400 gpm 800 gpm 1600 gpm 2720 gpm 4000 gpm Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 DEMAND FACTOR 1 2.5 5 8 16 25 50 80 115 Section 28 INSTALLATION 145.22 145.22 145.22 145.22 874.34 874.34 1,381.08 2,117.76 2,117.76 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 METER FEE 306.01 394.89 641.85 919.70 2,866.15 4,978.04 8,598.42 10,743.09 15,450.57 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 CAPACITY FEE 14,363.61 35,909.03 71,818.05 114,908.88 229,817.76 359,090.25 718,180.50 1,149,088.80 1,651,815.15 Effective 12/7/2020 Ord No. 580 Appendix A - Section 28 S.D.C.W.A. System Capacity Fee 6,364.00 10,182.00 19,092.00 33,093.00 61,094.00 104,370.00 190,920.00 330,928.00 496,392.00 S.D.C.W.A. Water Treatment Capacity Fee 178.00 285.00 534.00 926.00 1,709.00 2,919.00 5,340.00 9,256.00 13,884.00 Effective 1/1/2021 POTABLE METERS PURCHASE TOTAL 21,356.84 46,916.14 92,231.12 149,992.80 296,361.25 472,231.63 924,420.00 1,502,133.65 2,179,659.48 WATER ANNEXATION 2,725.52 6,813.80 13,627.60 21,804.16 43,608.32 68,138.00 136,276.00 218,041.60 313,434.80 Effective 12/7/2020 Ord No. 580 POTABLE METERS W/ANNEX. FEE 24,082.36 53,729.94 105,858.72 171,796.96 339,969.57 540,369.63 1,060,696.00 1,720,175.25 2,493,094.28 Meter Box (if needed) ADD:123.29 123.29 279.48 279.48 4,985.52 4,985.52 4,985.52 7,152.08 7,152.08 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 OTAY WATER DISTRICT PUBLIC SERVICES DOMESTIC METER FEES - ALL ID'S EFFECTIVE DATE:1/1/2025 ENR DATE:11/11/2024 3/4" METER 1" METER 1 1/2" METER 2" METER 3" METER 4" METER 6" METER 8" METER 10" METER MAXIMUM RATE IN U.S. GALLONS PER MINUTE GPM RATE AT 80% OF MAXIMUM FLOW 24 gpm 40 gpm 80 gpm 128 gpm 400 gpm 800 gpm 1600 gpm 2720 gpm 4000 gpm Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 DEMAND FACTOR 1 2.5 5 8 16 25 50 80 115 Section 28 INSTALLATION 145.22 145.22 145.22 145.22 874.34 874.34 1,381.08 2,117.76 2,117.76 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 METER FEE 306.01 394.89 641.85 919.70 2,866.15 4,978.04 8,598.42 10,743.09 15,450.57 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 CAPACITY FEE 10,772.71 26,931.78 53,863.55 86,181.68 172,363.36 269,317.75 538,635.50 861,816.80 1,238,861.65 Effective 12/7/2020 Ord No. 580 Appendix A - Section 28 S.D.C.W.A. System Capacity Fee 6,364.00 10,182.00 19,092.00 33,093.00 61,094.00 104,370.00 190,920.00 330,928.00 496,392.00 S.D.C.W.A. Water Treatment Capacity Fee 178.00 285.00 534.00 926.00 1,709.00 2,919.00 5,340.00 9,256.00 13,884.00 Effective 1/1/2021 POTABLE METERS PURCHASE TOTAL 17,765.94 37,938.89 74,276.62 121,265.60 238,906.85 382,459.13 744,875.00 1,214,861.65 1,766,705.98 WATER ANNEXATION 2,725.52 6,813.80 13,627.60 21,804.16 43,608.32 68,138.00 136,276.00 218,041.60 313,434.80 Effective 12/7/2020 Ord No. 580 POTABLE METERS W/ANNEX. FEE 20,491.46 44,752.69 87,904.22 143,069.76 282,515.17 450,597.13 881,151.00 1,432,903.25 2,080,140.78 Meter Box (if needed) ADD:123.29 123.29 279.48 279.48 4,985.52 4,985.52 4,985.52 7,152.08 7,152.08 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 OTAY WATER DISTRICT PUBLIC SERVICES DOMESTIC METER FEES - TRIAD EFFECTIVE DATE:1/1/2025 ENR DATE:11/11/2024 3/4" METER 1" METER 1 1/2" METER 2" METER 3" METER 4" METER 6" METER 8" METER 10" METER MAXIMUM RATE IN U.S. GALLONS PER MINUTE GPM RATE AT 80% OF MAXIMUM FLOW 24 gpm 40 gpm 80 gpm 128 gpm 400 gpm 800 gpm 1600 gpm 2720 gpm 4000 gpm Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 DEMAND FACTOR 1 2.5 5 8 16 25 50 80 115 Section 28 INSTALLATION 145.22 145.22 145.22 145.22 874.34 874.34 1,381.08 2,117.76 2,117.76 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 METER FEE 306.01 394.89 641.85 919.70 1,983.66 3,861.88 6,952.64 9,262.17 13,143.72 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 CAPACITY FEE 14,363.61 35,909.03 71,818.05 114,908.88 229,817.76 359,090.25 718,180.50 1,149,088.80 1,651,815.15 Effective 12/7/2020 Ord No. 580 Appendix A - Section 28 S.D.C.W.A. System Capacity Fee 6,364.00 10,182.00 19,092.00 33,093.00 61,094.00 104,370.00 190,920.00 330,928.00 496,392.00 S.D.C.W.A. Water Treatment Capacity Fee 178.00 285.00 534.00 926.00 1,709.00 2,919.00 5,340.00 9,256.00 13,884.00 Effective 1/1/2021 POTABLE IRRIGATION METERS PURCHASE TOTAL 21,356.84 46,916.14 92,231.12 149,992.80 295,478.76 471,115.47 922,774.22 1,500,652.73 2,177,352.63 WATER ANNEXATION 2,725.52 6,813.80 13,627.60 21,804.16 43,608.32 68,138.00 136,276.00 218,041.60 313,434.80 Effective 12/7/2020 Ord No. 580 POTABLE IRRIGATION METERS w/ANNEX. FEE 24,082.36 53,729.94 105,858.72 171,796.96 339,087.08 539,253.47 1,059,050.22 1,718,694.33 2,490,787.43 RECYCLED WATER METERS 14,814.84 36,449.14 72,605.12 115,973.80 232,675.76 363,826.47 726,514.22 1,160,468.73 1,667,076.63 RECYCLED WATER METERS W/ANNEX. FEE 17,540.36 43,262.94 86,232.72 137,777.96 276,284.08 431,964.47 862,790.22 1,378,510.33 1,980,511.43 Meter Box (if needed) ADD:314.19 314.19 314.19 314.19 4,985.52 4,985.52 4,985.52 7,152.08 7,152.08 Updated 12/7/2020 Ord No. 580 Appendix A - Section 28 OTAY WATER DISTRICT PUBLIC SERVICES IRRIGATION METER FEES - ALL ID'S